A018 _ Engineering Data for Provisioning (EDFP).pdf

PDF 192 KB Posted

Attached to
Type I Family of All Terrain Crane Draft Section C (Scope of Work); Draft Attachments, and Draft Contract Data Requirement Lists (CDRLs)
Solicitation number
W56HZV_19_R_0118
Issued by

About this file

This Contract Data Requirements List (CDRL) outlines engineering data requirements for a Type I Family of All Terrain Crane procurement. The contractor must submit Engineering Data for Provisioning (EDFP) to accompany Provisioning Parts Lists (PPL) for Government review and approval. EDFP must include drawings illustrating Unique Identification marking locations and annotated with identification data. EDFP must be submitted in PDF format and in Provisioning List Item Sequence order. The contractor shall incorporate Government comments and resubmit EDFP within specified timelines. EDFP is required to support provisioning and procurement processes.

View the file

Other files

File Type Posted
A082 _ Tool Locator Guide.pdf PDF
A053 _ NMWR Data Summary.pdf PDF
A007 _ Integrated Product Support (IPS).pdf PDF
A071 _ Critical Task List-FOATC.pdf PDF
A056 _ Storage_ Exercise_ Care and Maintenance Plan.pdf PDF
Attachment 0014 _ Hazardous Materials Management Report _ HMMR.XLSX XLSX spreadsheet
A029 _ Safety Assessment Report _ SAR.pdf PDF
A005 _ Integrated Master Schedule (IMS).pdf PDF
Attachment 0027 _ LMI Summary Worksheet _ NMWR Data.pdf PDF
A074 _ New Equipment Training Classes.pdf PDF
Attachment 0009 _ Provisioning Requirements Statement.pdf PDF
A070 _ Training Material Format and Documentation.pdf PDF
Attachment 0025 _ EPCO Source File Requirements.pdf PDF
A017 _ Provisioning Pre-Procurement Screening.pdf PDF
A095 _ Test Support Package _ TSP.pdf PDF
A030 _ System Safety Program Plan _ SSPP.pdf PDF
A058 _ Provisioning Plan.pdf PDF
A036 _ Logistics Support Analysis (LSA).pdf PDF
Attachment 0037 _ Unique Item Identifier Raw Scan Report.xlsx XLSX spreadsheet
A055 _ Accountability Report.pdf PDF
Attachment 0001 - Type I FOATC PD - AT-PRF-0001 Type I FOATC PD 2020-10-08.pdf PDF
A028 _ Hazard Tracking System - HTS.pdf PDF
Attachment 0010 _ LMI Summary Worksheet _ Maintenance Analysis.pdf PDF
A038 _ Logistics Product Data Summary (LPDS).pdf PDF
A075 _ Training Course Completion Report-Student Training Administration.pdf PDF
A063 _ Logistics Product Data.PDF PDF
Attachment 0028 _ Attribute Selection Sheet.pdf PDF
Attachment 0007 _ Exhibit A CDRL DD Form 1423.pdf PDF
Attachment 0016 _ Level of Repair Analysis (LORA).pdf PDF
A089 _ Obsolescence Supportability Analysis Report.pdf PDF
A079 _ Sample IUID Data Plate Report.pdf PDF
A093 _ Analysis Requirement.pdf PDF
A001 _ Basic Issue Items (BII) List.pdf PDF
A062 _ Bill of Materials Report.pdf PDF
A052 _ NMWR Technical Manual.pdf PDF
Attachment 0006 _ Government Furnished Property (GFP) List.xlsx XLSX spreadsheet
Attachment 0012 _ Risk Management Scoring Criteria and Reporting Template.xlsx XLSX spreadsheet
A067 _ Field Level Maintenance New Equipment Training.pdf PDF
A020 _ Failure Mode _ Effects and Criticality Analysis (FMECA).pdf PDF
A065 _ Packaging Test Report.PDF PDF
A083 _ System Tracking and Shipping Report.pdf PDF
Attachment 0030 _ LMI Data Products Worksheet.pdf PDF
Attachment 0005 _ COTS Publications Requirements.pdf PDF
Attachment 0029 _ GEIA-STD-0007 Attribute Selection Worksheet.xlsx XLSX spreadsheet
Attachment 0038 _ TACOM IUID Data Plate Minimum Requirements.pdf PDF
A085 _ DMSMS Management Plan.pdf PDF
Attachment 0022 _ Copyright Release.pdf PDF
Attachment 0017 _ Deployment Equipment Publications Style Guide.pdf PDF
A027 _ Risk Tracking Report.pdf PDF
A037 _ Product Support Analysis (PSA) and Logistics Product Data (LPD) Objectives.pdf PDF
Show 40 more

Latest 50 of 133 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CONTRACT DATA REQUIREMENTS LIST

(1 Data Item)

Form Approved OMB No. 0704-0188

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO.

TBD

B. EXHIBIT

A

C. CATEGORY:

TDP _ _ TM _ _ OTHER __X__

D. SYSTEM/ITEM

Type I FOATC

E. CONTRACT/PR NO.

W56HZV-19-R-0118

F. CONTRACTOR

TBD

1. DATA ITEM NO.

A018

2. TITLE OF DATA ITEM

Logistics Product Data

3. SUBTITLE

Engineering Data For Provisioning (EDFP)

4. AUTHORITY (Data Acquisition Document No.)

DI-SESS-81874

5. CONTRACT REFERENCE

C.1.5.7.1, C.8.3, C.8.3.2

5.7.2

6. REQUIRING OFFICE

SFAE-CSS-FP-C

7. DD 250 REQ

DD

9. DIST

STATEMENT

B

10. FREQUENCY

ASREQ

12. DATE OF 1ST SUBMISSION

SEE BLK 16

14. DISTRIBUTION

a. ADDRESSEE

b. COPIES

8. APP CODE

A

11. AS OF DATE

SEE BLK 16

13. DATE OF SUBSEQUENT

SUBMISSION

SEE BLK 16

Draft

Final

Reg Repro

16. REMARKS

As clarified by Attachment 0009 – Provisioning Requirements Statement.

EDFP will accompany all submissions of Provisioning Parts List (PPL) as supporting documentation to the PPL. See CDRL A016 – Provisioning Parts List (PPL) for delivery schedule.

EDFP submitted must reflect the PPL submitted. Missing EDFP to support PPL in any submittal will render the PPL incomplete and non-acceptable. A complete submission package will be used as the basic technical resource for the Verification Conference.

Any provisioning issues must be presented in the draft submittal at the Government’s Verification.

The contractor shall incorporate all Government changes, corrections, additions and deletions and resubmit the complete and final EDFP on Compact Disk-Read Only Memory (CD-ROM) within 30 calendar days after the final provisioning conference. The final submittal shall be a complete package of all drawings. The Government will provide comments within 30 calendar days.

The contractor shall incorporate all Government comments within 15 calendar days of receipt.

The EDFP provided by the contractor shall illustrate where the Unique Identification (UID) marking is located on the items identified as requiring UID. Section 6 of ASME Y14.100- 2000 and MIL-STD-130N w/change 1 provides the requirement for incorporating markings for DoD item unique identification (IUID) into engineering drawings.

Sequencing of EDFP shall be by Part List Item Sequence Number (PLISN) and Part Number (P/N). Each drawing shall be annotated with PLISN, Original Equipment Manufacturer (OEM) Commercial and Government Entity (CAGE) Code, Part Number (P/N), Provisioning Contract Control Number (PCCN), and Provisioning Control Code (PCC) and nomenclature.

Nomenclature: A description to include sizes, grade, surface finish, and coatings for common hardware shall be available in Logistics Management Information (LMI) data. This data is essential in ensuring that common hardware is not substituted or exchanged due to lack of definitizing information.

After the Government approves each drawing as being suitable for National Stock Number (NSN) assignment, the drawings shall be submitted on a CD-ROM in Adobe Acrobat .pdf file, or some other software product format that the Government agrees to, with each PPL submittal. The drawing package should be in PLISN sequence. This will reduce the amount of space required to store the Technical Data Package and reduce the number of copies to a single electronic copy.

NOTE: All new or revised drawings and associated lists or parts and assemblies shall be prepared and submitted in PDF.

Continued on page two.

APM* 1 1

IPSM* 1 1

Maintenance System Manager*

1 1

15. TOTAL --------- 3 - 3

G. PREPARED BY

Ronald Stoutenburg

H. DATE

25 April 20

I. APPROVED BY

Assistant Product Manager (APM)

J. DATE

DD Form 1423-1, FEB 2001 PREVIOUS EDITION MAY BE USED Page _1_ of _2_ Pages

17. PRICE

GROUP

CONTRACT DATA REQUIREMENTS LIST

(1 Data Item)

Form Approved OMB No. 0704-0188

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO.

B. EXHIBIT

A

C. CATEGORY:

TDP _ _ TM _ _ OTHER __X__

D. SYSTEM/ITEM

Type I FOATC

E. CONTRACT/PR NO.

F. CONTRACTOR

1. DATA ITEM NO.

A018

2. TITLE OF DATA ITEM

Logistics Product Data

3. SUBTITLE

Engineering Data For Provisioning (EDFP)

4. AUTHORITY (Data Acquisition Document No.)

DI-SESS-81874

5. CONTRACT REFERENCE

C.1.5.7.1, C.8.3, C.8.3.2

6. REQUIRING OFFICE

SFAE-CSS-FP-C

7. DD 250 REQ

DD

9. DIST

STATEMENT

B

10. FREQUENCY

ASREQ

12. DATE OF 1ST SUBMISSION

SEE BLK 16

14. DISTRIBUTION

a. ADDRESSEE

b. COPIES

8. APP CODE

A

11. AS OF DATE

SEE BLK 16

13. DATE OF SUBSEQUENT

SUBMISSION

SEE BLK 16

Draft

Final

Reg Repro

16. REMARKS

All approved vendor(s) CAGE codes shall be cited on each EDFP document by the contractor for each part to include all repair parts, Basic Issue Items (BII), Components of End Item (COEI), Special Tools and Test Equipment (STTE), Long Lead-Time Items (LLTI), and Expendable Durable Items List (EDIL). Submission of the EDFP Package shall also contain the approved vendor(s) reference P/Ns, part nomenclature, unit price, a brief description which includes grade & surface finishes and coatings for common hardware.

Provisioning and Pre-Procurement Screening is due concurrent with each submission of Provisioning Parts Lists (PPL) and EDFP.

*See Attachment 0008 – Type I FOATC POC List for distribution names and contact information.

APM* 1 1

IPSM* 1 1

Maintenance System Manager*

1 1

15. TOTAL --------- 3 3

G. PREPARED BY

Ronald Stoutenburg

H. DATE

25 April 20

I. APPROVED BY

Assistant Product Manager (APM)

J. DATE

DD Form 1423-1, FEB 2001 PREVIOUS EDITION MAY BE USED Page _2_ of _2_ Pages

17. PRICE

GROUP

File details come from the government source that posted it. Updated .