A008 _ Product Support Plan (PSP).pdf
PDF 425 KB Posted
- Solicitation number
- W56HZV_19_R_0118
About this file
This document contains a Contract Data Requirements List (CDRL) and details of a federal contract opportunity for the Family of All Terrain Cranes (FOATC). The CDRL requires the contractor to develop and submit an initial Product Support Plan (PSP) within 30 business days of the Logistics Start Of Work Meeting, to include the 12 Integrated Product Support elements. The PSP may be updated several times as logistics efforts progress throughout the acquisition process. The federal contract opportunity notice provides draft Section C, attachments, and CDRLs for the FOATC contract and requests industry review and comments by December 11, 2020, which will be considered for the final RFP to be posted on SAM. The opportunity is for the Department of the Army Materiel Command TACOM Life Cycle Management Command.
View the file
Other files
Show 40 more
Latest 50 of 133 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CONTRACT DATA REQUIREMENTS
LIST
(1 Data Item)
Form Approved
OMB No. 0704-0188
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO.
TBD
B. EXHIBIT
A
C. CATEGORY:
TDP X TM OTHER Logistics
D. SYSTEM/ITEM
Type I FOATC
E. CONTRACT/PR NO.
W56HZV-19-R-0118
F. CONTRACTOR
TBD
1. DATA ITEM NO.
A008
2. TITLE OF DATA ITEM
Integrated Product Support
3. SUBTITLE
Product Support Plan (PSP)
4. AUTHORITY (Data Acquisition Document No.)
DI-MISC-80508B
5. CONTRACT REFERENCE
C.1.3.1.2
6. REQUIRING OFFICE
SFAE-CSS-FP-C
7. DD 250 REQ
No
9. DIST STATEMENT
REQUIRED
C
10. FREQUENCY
ASREQ
12. DATE OF FIRST SUBMISSION
See Blk 16
14. DISTRIBUTION
a. ADDRESSEE
b. COPIES
8. APP CODE
A
11. AS OF DATE
N/A
13. DATE OF SUBSEQUENT
SUBMISSION
See Blk 16
Draft
Final
Reg Repro
16. REMARKS
BLK 9 - The following information shall be included on the deliverable: DISTRIBUTION
STATEMENT C: Distribution authorized to US Government agencies and their contractors;
Administrative or Operational Use. Other requests shall be referred to Project Manager
Force Projection (PM FP) Security Manager at: Program Executive Office Combat Support
& Combat Service Support (PEO CS&CSS), ATTN: SFAE-CSS-FP, 6501 East 11 Mile
Road, Detroit Arsenal, MI 48397-5000.
WARNING: This document contains technical data whose export is restricted by the Arms
Export Control Act (Title 22, U.S.C., sec. 2751, et seq.) or the Export Administration Act of
1979, as amended, Title 50, U.S.C., App. 2401 et seq. Violation of these export laws are subject to severe criminal penalties. Disseminate in accordance with the provisions of
DoD Directive 5230.25.-
BLK 12 – The contractor Integrated Product Support Manager (IPSM) shall develop an initial Product Support Plan (PSP).The PSP shall be delivered to the Government IPSM within 30 business days post the Logistics Start Of Work Meeting (LSOWM). The PSP shall be delivered electronically and in a Microsoft form.
NOTE: The PSP shall include and be sectioned into the 12 Integrated Product Support
(IPS) elements, which were formerly called Integrated Logistics Support (ILS) elements.
However the concept and end product remains identical.
BLK 13 – The PSP may be updated several times as logistics efforts progress throughout the acquisition process. Further updates and deliveries of the PSP may be submitted as necessary by the contractor or upon further request by the
Government.
BLK 14 – See Attachment 0008 – Type I FOATC Point of Contact (POC) List for
Distribution Names and contact information.
Repro = Electronic Delivery
APM 1 1
Logistics Manager 1 1
SYS ENG 1 1
PSM 1 1
15. TOTAL 4 0 4
G. PREPARED BY
Integrated Product Support Manager
H. DATE
5/27/2020
I. APPROVED BY
Assistant Product Manager (APM)
J. DATE
File details come from the government source that posted it. Updated .