9-Exhibit I - Prevailing Wage Determination.pdf

PDF 2 MB Posted

Attached to
Bid #1 – FY 27 medDispense® C Series EDU Automated Dispensing Cabinet
Solicitation number
Not on record
Issued by
Montgomery County, Pennsylvania

About this file

Prevailing Wage Determination File Summary

This is a prevailing wage determination document issued by the Pennsylvania Department of Labor and Industry applicable to construction projects at Montgomery County Community College. The document establishes the prevailing minimum wage rates that must be paid to workers on projects subject to the Pennsylvania Prevailing Wage Law (Act No. 442, approved August 15, 1961, as amended). The prevailing wage rates specified in this determination apply to multiple college projects including the Pedestrian Bridge Replacement project (bids due October 17, 2025, with a mandatory pre-bid meeting on October 3, 2025) and the Gymnasium Floor Resurfacing project (bids due April 8, 2026, with a mandatory pre-bid meeting on March 26, 2026). All contractors, subcontractors, and workers on these projects must comply with the established wage rates for their respective classifications and trades as outlined in the determination.

The prevailing wage rates represent the minimum compensation levels required by state law for all workers employed on covered public works projects. Contractors bidding on Montgomery County Community College projects must incorporate these wage requirements into their cost estimates and ensure full compliance throughout project execution. The determination establishes wage floors for various trade classifications, ensuring that prevailing industry standards are maintained and that workers receive equitable compensation. All bidders must acknowledge and commit to paying these rates as a condition of contract award, with non-compliance resulting in potential penalties and contract remedies under Pennsylvania law.

View the file

Other files

File Type Posted
2-Bid Specifications.docx DOCX document
1-Project Manual FY27 Bid1 medDispense C Series Dispensing Cabinet DRAFT.docx DOCX document
3-Exhibit C - Non-Collusion Affidavit.pdf PDF
1-Exhibit A- Non-Collusion Agreement.pdf PDF
3-Exhibit C - Contractor Resume and References Form.pdf PDF
2-Exhibit B - List of Uniform Items.pdf PDF
4-Project Manual RFP 5 FY25-26 Uniforms.pdf PDF
3-Exhibit C - Owners Certification of Responsible Contractor Status.pdf PDF
1-Exhibit A - Bid Bond Form.pdf PDF
11-Sign in sheet 4-10-26.pdf PDF
6-Exhibit F - Specifications and Drawings.pdf PDF
9-Montco Cultural Center Theater Roof Project Manual.pdf PDF
8-Exhibit I - Public Works Verification Form.pdf PDF
10-EXHIBIT H - Performance and Payment Bond Forms.pdf PDF
7-Exhibit G - Prevailing Wage.pdf PDF
2-Exhibit B - Non-Collusion Affadavit.pdf PDF
4-Exhibit D - Contractor Resume and References Form.pdf PDF
5-Exhibit E - Subcontractor Disclosure Form.pdf PDF
1-Exhibit 1 - Features Explanation.xlsx XLSX spreadsheet
2-Exhibit 1 - Features Explanation extended.xlsx XLSX spreadsheet
4-RFP 4 FY25-26 HCI Project Manual.pdf PDF
3-Appendix A-Non-Collusion Agreement.pdf PDF
11-Project Manual - Gymnasium Floor Resurfacing.pdf PDF
8-Exhibit H - Floor Design Plan.pdf PDF
7-Exhibit G - Specifications.pdf PDF
2-Exhibit B - Payment Bond.pdf PDF
4-Exhibit D - Owners Certification of Responsible Contractor Status.pdf PDF
10-Exhibit J - Public Works Verification Form.pdf PDF
3-Exhibit C - Performance Bond.pdf PDF
5-Exhibit E - Non-Collusion Agreement.pdf PDF
1-Exhibit A - Bid Bond Form.pdf PDF
6-Exhibit F - Contractor Resume and References Form.pdf PDF
9-Exhibit G - Project Specifications.pdf PDF
2-Exhibit B - Prevailing Wage Rates.pdf PDF
3-Exhibit C - Owners Certification of Responsible Contractor Status.pdf PDF
6-Exhibit H - Map.pdf PDF
5-Exhibit D - Non-Collusion Agreement.pdf PDF
8-Exhibit E - Performance and Payment Bond Form.pdf PDF
4-Project Manual - Pedestrian Bridge Replacement Project Manual.pdf PDF
1-Exhibit A - Bid Bond Form.pdf PDF
7-EXHIBIT F - Contractor Resume and References Form.pdf PDF
6-MCCC Master Signage Plan - Interior Design Development.pdf PDF
3-Signage Charts.pdf PDF
1-Blue Bell Campus Map.pdf PDF
8-Agreement between the College and Contractor.pdf PDF
5-MCCC Master Signage Plan - Exterior Design Development.pdf PDF
7-Non-Collusion Agreement.pdf PDF
2-Pottstown Campus Map.pdf PDF
9-RFP Master Signage Planning Services - Phases II and III.pdf PDF
4-MCCC Master Signage Plan - Construction Documents.pdf PDF
Show 40 more

Latest 50 of 54 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

File details come from the government source that posted it. Updated .