2-Exhibit B - Prevailing Wage Rates.pdf

PDF 36 KB Posted

Attached to
Bid #1 – FY 27 medDispense® C Series EDU Automated Dispensing Cabinet
Solicitation number
Not on record
Issued by
Montgomery County, Pennsylvania

About this file

This document is a Prevailing Wages Project Rates report issued by the Bureau of Labor Law Compliance of the Commonwealth of Pennsylvania Department of Labor & Industry for the Pedestrian Bridge Replacement project (Serial Number 25-08764). The project involves the removal and replacement of an existing 75-foot long by 8-foot-wide pedestrian bridge located in Blue Bell, Montgomery County, with Montgomery County Community College as the awarding agency. The contract award date is set for 10/24/2025, with a project determination date of 9/22/2025, and the project is classified under the Highway category.

The document provides detailed prevailing wage rates for numerous construction trade classifications, including both Building and Heavy/Highway work categories. The wage rates are structured with an hourly rate and fringe benefits, with effective dates ranging from 5/1/2024 to 5/1/2026, and cover a wide range of trades such as bricklayers, carpenters, electricians, laborers, millwrights, operators, painters, and many others. The rates show incremental increases over the specified period, with total compensation (hourly rate plus fringe benefits) varying significantly across different job classifications, ranging from around $52 to over $117 per hour. The comprehensive wage schedule ensures that workers on this public works project are compensated according to predetermined local standards for their specific trade and skill level.

View the file

Other files

File Type Posted
2-Bid Specifications.docx DOCX document
1-Project Manual FY27 Bid1 medDispense C Series Dispensing Cabinet DRAFT.docx DOCX document
3-Exhibit C - Non-Collusion Affidavit.pdf PDF
1-Exhibit A- Non-Collusion Agreement.pdf PDF
3-Exhibit C - Contractor Resume and References Form.pdf PDF
2-Exhibit B - List of Uniform Items.pdf PDF
4-Project Manual RFP 5 FY25-26 Uniforms.pdf PDF
3-Exhibit C - Owners Certification of Responsible Contractor Status.pdf PDF
1-Exhibit A - Bid Bond Form.pdf PDF
11-Sign in sheet 4-10-26.pdf PDF
6-Exhibit F - Specifications and Drawings.pdf PDF
9-Montco Cultural Center Theater Roof Project Manual.pdf PDF
8-Exhibit I - Public Works Verification Form.pdf PDF
10-EXHIBIT H - Performance and Payment Bond Forms.pdf PDF
7-Exhibit G - Prevailing Wage.pdf PDF
2-Exhibit B - Non-Collusion Affadavit.pdf PDF
4-Exhibit D - Contractor Resume and References Form.pdf PDF
5-Exhibit E - Subcontractor Disclosure Form.pdf PDF
1-Exhibit 1 - Features Explanation.xlsx XLSX spreadsheet
2-Exhibit 1 - Features Explanation extended.xlsx XLSX spreadsheet
4-RFP 4 FY25-26 HCI Project Manual.pdf PDF
3-Appendix A-Non-Collusion Agreement.pdf PDF
11-Project Manual - Gymnasium Floor Resurfacing.pdf PDF
8-Exhibit H - Floor Design Plan.pdf PDF
7-Exhibit G - Specifications.pdf PDF
2-Exhibit B - Payment Bond.pdf PDF
4-Exhibit D - Owners Certification of Responsible Contractor Status.pdf PDF
9-Exhibit I - Prevailing Wage Determination.pdf PDF
10-Exhibit J - Public Works Verification Form.pdf PDF
3-Exhibit C - Performance Bond.pdf PDF
5-Exhibit E - Non-Collusion Agreement.pdf PDF
1-Exhibit A - Bid Bond Form.pdf PDF
6-Exhibit F - Contractor Resume and References Form.pdf PDF
9-Exhibit G - Project Specifications.pdf PDF
3-Exhibit C - Owners Certification of Responsible Contractor Status.pdf PDF
6-Exhibit H - Map.pdf PDF
5-Exhibit D - Non-Collusion Agreement.pdf PDF
8-Exhibit E - Performance and Payment Bond Form.pdf PDF
4-Project Manual - Pedestrian Bridge Replacement Project Manual.pdf PDF
1-Exhibit A - Bid Bond Form.pdf PDF
7-EXHIBIT F - Contractor Resume and References Form.pdf PDF
6-MCCC Master Signage Plan - Interior Design Development.pdf PDF
3-Signage Charts.pdf PDF
1-Blue Bell Campus Map.pdf PDF
8-Agreement between the College and Contractor.pdf PDF
5-MCCC Master Signage Plan - Exterior Design Development.pdf PDF
7-Non-Collusion Agreement.pdf PDF
2-Pottstown Campus Map.pdf PDF
9-RFP Master Signage Planning Services - Phases II and III.pdf PDF
4-MCCC Master Signage Plan - Construction Documents.pdf PDF
Show 40 more

Latest 50 of 54 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Project Name: Pedestrian Bridge Replacement

General Description: Removal and replacement of an existing 75-foot long by 8-foot-wide pedestrian bridge.

Project Locality Blue Bell

Awarding Agency: Montgomery County Community College

Contract Award Date: 10/24/2025

Serial Number: 25-08764

Project Classification: Highway

Determination Date: 9/22/2025

Assigned Field Office: Philadelphia

Field Office Phone Number: (215)560-1858

Toll Free Phone Number:

Project County: Montgomery County

BUREAU OF LABOR LAW COMPLIANCE

PREVAILING WAGES PROJECT RATES

Commonwealth of Pennsylvania Department of Labor & Industry Report Date: 9/24/2025 Page 1 of 8

Project: 25-08764 - Building Effective Date

Expiration Date

Hourly Rate Fringe Benefits

Total

Asbestos & Insulation Workers 5/1/2024 $59.37 $46.03 $105.40

Asbestos & Insulation Workers 5/1/2025 $60.84 $48.71 $109.55

Boilermaker (Commercial, Institutional, and Minor Repair Work)

3/1/2024 $36.71 $19.13 $55.84

Boilermakers 1/1/2024 $52.10 $35.72 $87.82

Bricklayer 5/1/2023 $47.50 $31.42 $78.92

Bricklayer 5/1/2025 $50.00 $32.57 $82.57

Carpenter - Chief of Party (Surveying & Layout) 5/1/2024 $52.58 $29.02 $81.60

Carpenter - Chief of Party (Surveying & Layout) 5/1/2025 $54.59 $29.02 $83.61

Carpenter - Instrument Person (Surveying & Layout) 5/1/2024 $45.72 $29.02 $74.74

Carpenter - Instrument Person (Surveying & Layout) 5/1/2025 $47.47 $29.02 $76.49

Carpenter - Rodman (Surveying & Layout) 5/1/2024 $22.86 $20.62 $43.48

Carpenter - Rodman (Surveying & Layout) 5/1/2025 $23.74 $20.62 $44.36

Carpenters 5/1/2024 $45.72 $29.02 $74.74

Carpenters 5/1/2025 $47.47 $29.02 $76.49

Cement Finishers & Plasterers 5/1/2022 $38.57 $32.39 $70.96

Cement Masons 5/1/2024 $46.70 $32.46 $79.16

Cement Masons 5/1/2025 $48.70 $32.46 $81.16

Dockbuilder, Pile Drivers 5/1/2024 $52.98 $37.99 $90.97

Dockbuilder, Pile Drivers 5/1/2025 $55.23 $37.99 $93.22

Dockbuilder, Pile Drivers 5/1/2026 $56.98 $37.99 $94.97

Dockbuilder/Pile Driver Diver 5/1/2023 $58.41 $41.74 $100.15

Dockbuilder/Pile Driver Diver 5/1/2024 $61.54 $41.74 $103.28

Dockbuilder/Pile Driver Diver 5/1/2025 $64.35 $41.74 $106.09

Dockbuilder/Pile Driver Diver 5/1/2026 $66.54 $41.74 $108.28

Dockbuilder/pile driver tender 5/1/2023 $50.48 $37.99 $88.47

Dockbuilder/pile driver tender 5/1/2024 $52.98 $37.99 $90.97

Dockbuilder/pile driver tender 5/1/2025 $55.23 $37.99 $93.22

Dockbuilder/pile driver tender 5/1/2026 $56.98 $37.99 $94.97

Drywall Finisher 5/1/2024 $42.25 $32.56 $74.81

Drywall Finisher 5/1/2025 $43.78 $33.00 $76.78

Electricians 4/29/2024 $56.67 $46.24 $102.91

Electricians 5/1/2025 $58.63 $47.28 $105.91

Elevator Constructor 1/1/2025 $71.85 $45.77 $117.62

Floor Coverer 5/1/2024 $52.19 $29.21 $81.40

Floor Coverer 5/1/2025 $51.67 $31.69 $83.36

Floor Coverer 5/1/2026 $52.84 $32.86 $85.70

Glazier 5/1/2024 $48.00 $37.50 $85.50

Glazier 5/1/2025 $49.96 $38.34 $88.30

Interior Finish 5/1/2023 $34.60 $25.80 $60.40

Iron Workers (Bridge, Structural, Ornamental, Precast) 7/1/2024 $53.20 $45.01 $98.21

Iron Workers (Riggers) 7/1/2024 $44.64 $34.39 $79.03

Iron Workers (Riggers) 7/1/2025 $44.77 $36.27 $81.04

Iron Workers (Rodman/Reinforcing) 7/1/2024 $47.70 $34.77 $82.47

Iron Workers (Rodman/Reinforcing) 7/1/2025 $47.80 $36.65 $84.45

BUREAU OF LABOR LAW COMPLIANCE

PREVAILING WAGES PROJECT RATES

Report Date: 9/24/2025 Page 2 of 8

Expiration Date

Hourly Rate Fringe Benefits

Total

Laborers (Class 01 - See notes) 5/1/2024 $35.85 $26.00 $61.85

Laborers (Class 01 - See notes) 5/1/2025 $37.25 $26.10 $63.35

Laborers (Class 02 - See notes) 5/1/2024 $39.40 $27.55 $66.95

Laborers (Class 02 - See notes) 5/1/2025 $41.00 $27.70 $68.70

Laborers (Class 03 - See notes) 5/1/2024 $36.27 $26.18 $62.45

Laborers (Class 03 - See notes) 5/1/2025 $37.67 $26.28 $63.95

Laborers (Class 04 - See notes) 5/1/2024 $36.27 $26.18 $62.45

Laborers (Class 04 - See notes) 5/1/2025 $37.67 $26.28 $63.95

Laborers (Class 05 - See notes) 5/1/2024 $35.85 $26.00 $61.85

Laborers (Class 05 - See notes) 5/1/2025 $37.25 $26.10 $63.35

Landscape Laborer 5/1/2024 $30.70 $24.23 $54.93

Landscape Laborer 5/1/2025 $32.15 $24.30 $56.45

Marble Finisher 5/1/2023 $39.52 $29.30 $68.82

Marble Finisher 5/1/2025 $41.17 $30.75 $71.92

Marble Mason 5/1/2023 $47.20 $31.95 $79.15

Mason Tender, Cement 5/1/2023 $35.02 $25.98 $61.00

Millwright 5/1/2024 $54.67 $35.81 $90.48

Millwright 5/1/2025 $57.39 $35.81 $93.20

Millwright 5/1/2026 $60.20 $35.81 $96.01

Operators (Building, Class 01 - See Notes) 5/1/2024 $53.36 $33.65 $87.01

Operators (Building, Class 01 - See Notes) 5/1/2025 $54.52 $34.49 $89.01

Operators (Building, Class 01 - See Notes) 5/1/2026 $55.67 $35.34 $91.01

Operators (Building, Class 01A - See Notes) 5/1/2024 $56.37 $34.53 $90.90

Operators (Building, Class 01A - See Notes) 5/1/2025 $57.52 $35.38 $92.90

Operators (Building, Class 01A - See Notes) 5/1/2026 $58.68 $36.22 $94.90

Operators (Building, Class 02 - See Notes) 5/1/2024 $53.11 $33.58 $86.69

Operators (Building, Class 02 - See Notes) 5/1/2025 $54.27 $34.42 $88.69

Operators (Building, Class 02 - See Notes) 5/1/2026 $55.43 $35.26 $90.69

Operators (Building, Class 02A - See Notes) 5/1/2024 $56.13 $34.45 $90.58

Operators (Building, Class 02A - See Notes) 5/1/2025 $57.29 $35.29 $92.58

Operators (Building, Class 02A - See Notes) 5/1/2026 $58.44 $36.14 $94.58

Operators (Building, Class 03 - See Notes) 5/1/2024 $49.03 $32.37 $81.40

Operators (Building, Class 03 - See Notes) 5/1/2025 $50.18 $33.22 $83.40

Operators (Building, Class 03 - See Notes) 5/1/2026 $51.34 $34.06 $85.40

Operators (Building, Class 04 - See Notes) 5/1/2024 $48.73 $32.28 $81.01

Operators (Building, Class 04 - See Notes) 5/1/2025 $49.88 $33.13 $83.01

Operators (Building, Class 04 - See Notes) 5/1/2026 $51.04 $33.97 $85.01

Operators (Building, Class 05 - See Notes) 5/1/2024 $47.00 $31.78 $78.78

Operators (Building, Class 05 - See Notes) 5/1/2025 $48.16 $32.62 $80.78

Operators (Building, Class 05 - See Notes) 5/1/2026 $49.32 $33.46 $82.78

Operators (Building, Class 06 - See Notes) 5/1/2024 $46.02 $31.48 $77.50

Operators (Building, Class 06 - See Notes) 5/1/2025 $47.17 $32.33 $79.50

Operators (Building, Class 06 - See Notes) 5/1/2026 $48.34 $33.16 $81.50

Operators (Building, Class 07A- See Notes) 5/1/2024 $64.80 $38.61 $103.41

BUREAU OF LABOR LAW COMPLIANCE

PREVAILING WAGES PROJECT RATES

Report Date: 9/24/2025 Page 3 of 8

Expiration Date

Hourly Rate Fringe Benefits

Total

Operators (Building, Class 07A- See Notes) 5/1/2025 $66.26 $39.55 $105.81

Operators (Building, Class 07A- See Notes) 5/1/2026 $67.73 $40.48 $108.21

Operators (Building, Class 07B- See Notes) 5/1/2024 $64.50 $38.53 $103.03

Operators (Building, Class 07B- See Notes) 5/1/2025 $65.97 $39.46 $105.43

Operators (Building, Class 07B- See Notes) 5/1/2026 $67.44 $40.39 $107.83

Painters Class 1 (see notes) 5/1/2024 $42.97 $34.11 $77.08

Painters Class 1 (see notes) 5/1/2025 $44.38 $34.55 $78.93

Painters - Line Stripping 12/1/2024 $44.12 $27.91 $72.03

Painters Class 4 (see notes) 5/1/2024 $45.06 $34.11 $79.17

Painters Class 4 (see notes) 5/1/2025 $46.47 $34.55 $81.02

Plasterers 5/1/2024 $39.88 $33.08 $72.96 plumber 5/1/2024 $67.53 $38.31 $105.84 plumber 5/1/2025 $70.53 $39.46 $109.99

Pointers, Caulkers, Cleaners 5/1/2023 $48.80 $30.70 $79.50

Pointers, Caulkers, Cleaners 5/1/2025 $51.35 $31.80 $83.15

Roofers (Composition) 5/1/2024 $44.13 $34.77 $78.90

Roofers (Composition) 5/1/2025 $46.03 $34.77 $80.80

Roofers (Shingle) 5/1/2023 $32.85 $22.10 $54.95

Roofers (Shingle) 5/1/2024 $34.35 $22.20 $56.55

Roofers (Slate & Tile) 5/1/2023 $35.85 $22.10 $57.95

Roofers (Slate & Tile) 5/1/2024 $37.35 $22.20 $59.55

Sheet Metal Workers 5/1/2024 $59.22 $50.56 $109.78

Sheet Metal Workers 5/1/2025 $62.62 $52.17 $114.79

Sign Makers and Hangars 7/15/2024 $32.32 $25.82 $58.14

Sign Makers and Hangars 7/15/2025 $33.48 $26.41 $59.89

Sprinklerfitters 1/1/2023 $62.23 $31.99 $94.22

Sprinklerfitters 5/1/2025 $70.37 $34.85 $105.22

Steamfitters 5/1/2024 $70.32 $43.09 $113.41

Steamfitters 5/1/2025 $72.52 $44.89 $117.41

Stone Masons 5/1/2023 $47.20 $31.95 $79.15

Stone Masons 5/1/2025 $50.00 $32.80 $82.80

Terrazzo Finisher 5/1/2023 $43.75 $27.86 $71.61

Terrazzo Finisher 5/1/2025 $45.61 $29.41 $75.02

Terrazzo Grinder 5/1/2023 $44.02 $27.86 $71.88

Terrazzo Grinder 5/1/2025 $45.88 $29.41 $75.29

Terrazzo Mechanics 5/1/2023 $50.26 $29.56 $79.82

Terrazzo Mechanics 5/1/2025 $52.21 $31.26 $83.47

Tile Finisher 5/1/2023 $39.52 $29.30 $68.82

Tile Finisher 5/1/2025 $41.17 $30.75 $71.92

Tile Setter 5/1/2023 $50.26 $29.56 $79.82

Tile Setter 5/1/2025 $52.21 $31.26 $83.47

Truckdriver class 1(see notes) 5/1/2024 $36.79 $22.54 $59.33

Truckdriver class 2 (see notes) 5/1/2024 $36.89 $22.54 $59.43

Window Film / Tint Installer 6/1/2019 $24.52 $12.08 $36.60

BUREAU OF LABOR LAW COMPLIANCE

PREVAILING WAGES PROJECT RATES

Report Date: 9/24/2025 Page 4 of 8

Expiration Date

Hourly Rate Fringe Benefits

Total

Window Film / Tint Installer 6/1/2024 $26.37 $14.83 $41.20

BUREAU OF LABOR LAW COMPLIANCE

PREVAILING WAGES PROJECT RATES

Report Date: 9/24/2025 Page 5 of 8

Project: 25-08764 - Heavy/Highway Effective

Expiration Date

Hourly Rate Fringe Benefits

Total

Bricklayer 5/1/2025 $50.00 $32.57 $82.57

Carpenter - Chief of Party (Surveying & Layout) 5/1/2024 $65.19 $29.06 $94.25

Carpenter - Chief of Party (Surveying & Layout) 5/1/2025 $65.96 $30.09 $96.05

Carpenter - Chief of Party (Surveying & Layout) 5/1/2026 $67.52 $30.44 $97.96

Carpenter - Instrument Person (Surveying & Layout) 5/1/2024 $56.69 $29.06 $85.75

Carpenter - Instrument Person (Surveying & Layout) 5/1/2025 $58.39 $29.06 $87.45

Carpenter - Instrument Person (Surveying & Layout) 5/1/2026 $60.09 $29.06 $89.15

Carpenter - Rodman (Surveying & Layout) 5/1/2024 $45.35 $22.41 $67.76

Carpenter - Rodman (Surveying & Layout) 5/1/2025 $45.88 $23.19 $69.07

Carpenter - Rodman (Surveying & Layout) 5/1/2026 $46.97 $23.54 $70.51

Carpenter 5/1/2024 $56.69 $29.06 $85.75

Carpenter 5/1/2025 $57.36 $30.09 $87.45

Carpenter 5/1/2026 $58.71 $30.44 $89.15

Cement Masons 5/1/2023 $43.20 $32.91 $76.11

Cement Masons 5/1/2025 $46.55 $32.66 $79.21

Dockbuilder, Pile Drivers 5/1/2024 $52.98 $37.99 $90.97

Dockbuilder, Pile Drivers 5/1/2025 $55.23 $37.99 $93.22

Dockbuilder, Pile Drivers 5/1/2026 $56.98 $37.99 $94.97

Dockbuilder/ Pile driver diver 5/1/2024 $66.25 $37.99 $104.24

Dockbuilder/ Pile driver diver 5/1/2025 $60.31 $44.97 $105.28

Dockbuilder/ Pile driver diver 5/1/2026 $61.88 $45.47 $107.35

Dockbuilder/Pile Driver Diver 5/1/2024 $61.54 $41.74 $103.28

Dockbuilder/Pile Driver Diver 5/1/2025 $64.35 $41.74 $106.09

Dockbuilder/Pile Driver Diver 5/1/2026 $66.54 $41.74 $108.28

Dockbuilder/pile driver tender 5/1/2024 $52.98 $37.99 $90.97

Dockbuilder/pile driver tender 5/1/2025 $55.23 $37.99 $93.22

Dockbuilder/pile driver tender 5/1/2026 $56.98 $37.99 $94.97

Electric Lineman 6/3/2024 $62.07 $33.96 $96.03

Iron Workers (Bridge, Structural, Ornamental, Precast) 7/1/2024 $53.20 $45.01 $98.21

Iron Workers (Riggers) 7/1/2023 $42.53 $34.14 $76.67

Iron Workers (Rodman/Reinforcing) 7/1/2023 $45.70 $34.77 $80.47

Laborers (Class 01 - See notes) 5/1/2024 $38.80 $27.65 $66.45

Laborers (Class 01 - See notes) 5/1/2025 $40.20 $27.80 $68.00

Laborers (Class 02 - See notes) 5/1/2024 $39.00 $27.65 $66.65

Laborers (Class 02 - See notes) 5/1/2025 $40.40 $27.80 $68.20

Laborers (Class 03 - See notes) 5/1/2024 $39.00 $27.65 $66.65

Laborers (Class 03 - See notes) 5/1/2025 $40.40 $27.80 $68.20

Laborers (Class 04 - See notes) 5/1/2024 $33.60 $27.65 $61.25

Laborers (Class 04 - See notes) 5/1/2025 $35.00 $27.80 $62.80

Laborers (Class 05 - See notes) 5/1/2024 $39.65 $27.65 $67.30

Laborers (Class 05 - See notes) 5/1/2025 $41.05 $27.80 $68.85

Laborers (Class 06 - See notes) 5/1/2024 $39.70 $27.65 $67.35

Laborers (Class 06 - See notes) 5/1/2025 $41.10 $27.80 $68.90

Laborers (Class 07 - See notes) 5/1/2024 $39.55 $27.65 $67.20

BUREAU OF LABOR LAW COMPLIANCE

PREVAILING WAGES PROJECT RATES

Report Date: 9/24/2025 Page 6 of 8

Expiration Date

Hourly Rate Fringe Benefits

Total

Laborers (Class 07 - See notes) 5/1/2025 $40.95 $27.80 $68.75

Laborers (Class 08 - See notes) 5/1/2024 $39.30 $27.65 $66.95

Laborers (Class 08 - See notes) 5/1/2025 $40.70 $27.80 $68.50

Laborers (Class 09 - See notes) 5/1/2024 $39.15 $27.65 $66.80

Laborers (Class 09 - See notes) 5/1/2025 $40.55 $27.80 $68.35

Laborers (Class 10- See notes) 5/1/2024 $39.30 $27.65 $66.95

Laborers (Class 10- See notes) 5/1/2025 $40.70 $27.80 $68.50

Laborers (Class 11 -See Notes) 5/1/2024 $39.20 $27.65 $66.85

Laborers (Class 11 -See Notes) 5/1/2025 $40.60 $27.80 $68.40

Laborers (Class 12 -See Notes) 5/1/2024 $40.90 $27.65 $68.55

Laborers (Class 12 -See Notes) 5/1/2025 $42.30 $27.80 $70.10

Laborers (Class 13 -See Notes) 5/1/2024 $42.93 $27.65 $70.58

Laborers (Class 13 -See Notes) 5/1/2025 $44.33 $27.80 $72.13

Laborers (Class 14 -See Notes) 5/1/2024 $39.50 $27.65 $67.15

Laborers (Class 14 -See Notes) 5/1/2025 $40.90 $27.80 $68.70

Laborers Utility (PGW ONLY) (Flagperson) 5/1/2024 $32.67 $19.63 $52.30

Laborers Utility (PGW ONLY) (Flagperson) 5/1/2025 $34.07 $19.73 $53.80

Laborers Utility (PGW ONLY) 5/1/2024 $39.70 $19.63 $59.33

Laborers Utility (PGW ONLY) 5/1/2025 $41.10 $19.73 $60.83

Landscape Laborer 5/1/2024 $30.28 $24.05 $54.33

Landscape Laborer 5/1/2025 $31.73 $24.15 $55.88

Millwright 5/1/2024 $54.67 $35.81 $90.48

Millwright 5/1/2025 $57.39 $35.81 $93.20

Millwright 5/1/2026 $60.20 $35.81 $96.01

Operators Class 01 - See Notes (Building, Heavy, Highway)

5/1/2024 $53.36 $33.65 $87.01

Operators Class 01 - See Notes (Building, Heavy, Highway)

5/1/2025 $54.52 $34.49 $89.01

Operators Class 01 - See Notes (Building, Heavy, Highway)

5/1/2026 $55.67 $35.34 $91.01

Operators Class 01a - See Notes (Building, Heavy, Highway)

5/1/2024 $56.37 $34.53 $90.90

Operators Class 01a - See Notes (Building, Heavy, Highway)

5/1/2025 $57.52 $35.38 $92.90

Operators Class 01a - See Notes (Building, Heavy, Highway)

5/1/2026 $58.68 $36.22 $94.90

Operators Class 02 - See Notes (Building, Heavy, Highway)

5/1/2024 $53.11 $33.58 $86.69

Operators Class 02 - See Notes (Building, Heavy, Highway)

5/1/2025 $54.27 $34.42 $88.69

Operators Class 02 - See Notes (Building, Heavy, Highway)

5/1/2026 $55.43 $35.26 $90.69

Operators Class 02a - See Notes (Building, Heavy, Highway)

5/1/2024 $56.13 $34.45 $90.58

Operators Class 02a - See Notes (Building, Heavy, Highway)

5/1/2025 $57.29 $35.29 $92.58

Operators Class 02a - See Notes (Building, Heavy, Highway)

5/1/2026 $58.44 $36.14 $94.58

BUREAU OF LABOR LAW COMPLIANCE

PREVAILING WAGES PROJECT RATES

Report Date: 9/24/2025 Page 7 of 8

Expiration Date

Hourly Rate Fringe Benefits

Total

Operators Class 03 - See Notes (Building, Heavy, Highway)

5/1/2024 $49.03 $32.37 $81.40

Operators Class 03 - See Notes (Building, Heavy, Highway)

5/1/2025 $50.18 $33.22 $83.40

Operators Class 03 - See Notes (Building, Heavy, Highway)

5/1/2026 $51.34 $34.06 $85.40

Operators Class 04 - See Notes (Building, Heavy, Highway)

5/1/2023 $47.57 $31.44 $79.01

Operators Class 04 - See Notes (Building, Heavy, Highway)

5/1/2024 $48.73 $32.28 $81.01

Operators Class 04 - See Notes (Building, Heavy, Highway)

5/1/2025 $49.88 $33.13 $83.01

Operators Class 04 - See Notes (Building, Heavy, Highway)

5/1/2026 $51.04 $33.97 $85.01

Operators Class 05 - See Notes (Building, Heavy, Highway)

5/1/2023 $45.85 $30.93 $76.78

Operators Class 05 - See Notes (Building, Heavy, Highway)

5/1/2024 $47.00 $31.78 $78.78

Operators Class 05 - See Notes (Building, Heavy, Highway)

5/1/2025 $48.16 $32.62 $80.78

Operators Class 05 - See Notes (Building, Heavy, Highway)

5/1/2026 $49.32 $33.46 $82.78

Operators Class 06 - See Notes (Building, Heavy, Highway)

5/1/2023 $44.85 $30.65 $75.50

Operators Class 06 - See Notes (Building, Heavy, Highway)

5/1/2024 $46.02 $31.48 $77.50

Operators Class 06 - See Notes (Building, Heavy, Highway)

5/1/2025 $47.17 $32.33 $79.50

Operators Class 06 - See Notes (Building, Heavy, Highway)

5/1/2026 $48.34 $33.16 $81.50

Operators Class 07 (A) - See Notes (Building, Heavy, Highway)

5/1/2023 $63.33 $37.68 $101.01

Operators Class 07 (A) - See Notes (Building, Heavy, Highway)

5/1/2024 $64.80 $38.61 $103.41

Operators Class 07 (A) - See Notes (Building, Heavy, Highway)

5/1/2025 $66.26 $39.55 $105.81

Operators Class 07 (A) - See Notes (Building, Heavy, Highway)

5/1/2026 $67.73 $40.48 $108.21

Operators Class 07 (B) - See Notes (Building, Heavy, Highway)

5/1/2024 $64.50 $38.53 $103.03

Operators Class 07 (B) - See Notes (Building, Heavy, Highway)

5/1/2025 $65.97 $39.46 $105.43

Operators Class 07 (B) - See Notes (Building, Heavy, Highway)

5/1/2026 $67.44 $40.39 $107.83

Painters - Line Stripping 12/1/2024 $44.12 $27.91 $72.03

Painters Class 2 (see notes) 2/1/2025 $50.85 $33.91 $84.76

Painters Class 3 (see notes) 2/1/2025 $61.81 $33.95 $95.76

Pointers, Caulkers, Cleaners 5/1/2025 $51.35 $31.80 $83.15

Steamfitters (Heavy and Highway - Gas Distribution) 5/1/2024 $66.80 $42.93 $109.73

Steamfitters (Heavy and Highway - Gas Distribution) 5/1/2025 $68.89 $44.73 $113.62

Truckdriver class 1(see notes) 5/1/2024 $36.64 $22.54 $59.18

Truckdriver class 2 (see notes) 5/1/2024 $36.74 $22.54 $59.28

BUREAU OF LABOR LAW COMPLIANCE

PREVAILING WAGES PROJECT RATES

Report Date: 9/24/2025 Page 8 of 8

File details come from the government source that posted it. Updated .