11-Sign in sheet 4-10-26.pdf

PDF 161 KB Posted

Attached to
Bid #1 – FY 27 medDispense® C Series EDU Automated Dispensing Cabinet
Solicitation number
Not on record
Issued by
Montgomery County, Pennsylvania

About this file

This is a sign-in sheet from a mandatory pre-bid conference and site tour for the Montco Cultural Center Theater Roof Replacement Project (Bid #9 FY25/26) held on April 10, 2026, at 10:00 a.m. EDT at Montgomery County Community College in Blue Bell, Pennsylvania. The project involves the replacement of approximately 13,000 square feet of roofing at the Montco Cultural Center Theater, including removal of the existing standing seam metal roof to the deck and installation of a new insulated standing seam metal roof system, new sheet metal work, removal and replacement of existing roof drains, painting of a 1,700 square foot screen wall, and installation of 250 square feet of TPO roofing on a small low-slope area. Sealed bids for this project were due by 12:00 p.m. EDT on April 21, 2026, via PennBid, with questions required to be submitted by 5:00 p.m. EDT on April 14, 2026. Attendance at the mandatory pre-bid conference and walk-through on April 10, 2026, was required, as failure to attend could result in the Owner rejecting a bid. Plans and specifications were available at no charge through PennBid.

Bid responses were required to include Bid Security equal to 10 percent of the bid amount, along with a Non-Collusion Affidavit, Owner's Certification of Responsible Contractor Status form, and contractor resume and references. The project is subject to the Pennsylvania Prevailing Wage Law. The Owner reserved the right to conduct in-person interviews with bidders based on review of resumes and references prior to awarding the contract. The College encourages participation from local, diverse, and disadvantaged businesses. Following bid opening, bids could only be withdrawn in compliance with the modifications and withdrawal provisions outlined in the Instructions to Bidders, with proposals remaining valid for at least 60 days after opening unless delayed by required governmental approvals, bond sales, or grant awards, in which case proposals would be irrevocable for 120 days per Section 3911 of the Pennsylvania Commonwealth Procurement Code.

View the file

Other files

File Type Posted
2-Bid Specifications.docx DOCX document
1-Project Manual FY27 Bid1 medDispense C Series Dispensing Cabinet DRAFT.docx DOCX document
3-Exhibit C - Non-Collusion Affidavit.pdf PDF
1-Exhibit A- Non-Collusion Agreement.pdf PDF
3-Exhibit C - Contractor Resume and References Form.pdf PDF
2-Exhibit B - List of Uniform Items.pdf PDF
4-Project Manual RFP 5 FY25-26 Uniforms.pdf PDF
3-Exhibit C - Owners Certification of Responsible Contractor Status.pdf PDF
1-Exhibit A - Bid Bond Form.pdf PDF
6-Exhibit F - Specifications and Drawings.pdf PDF
9-Montco Cultural Center Theater Roof Project Manual.pdf PDF
8-Exhibit I - Public Works Verification Form.pdf PDF
10-EXHIBIT H - Performance and Payment Bond Forms.pdf PDF
7-Exhibit G - Prevailing Wage.pdf PDF
2-Exhibit B - Non-Collusion Affadavit.pdf PDF
4-Exhibit D - Contractor Resume and References Form.pdf PDF
5-Exhibit E - Subcontractor Disclosure Form.pdf PDF
1-Exhibit 1 - Features Explanation.xlsx XLSX spreadsheet
2-Exhibit 1 - Features Explanation extended.xlsx XLSX spreadsheet
4-RFP 4 FY25-26 HCI Project Manual.pdf PDF
3-Appendix A-Non-Collusion Agreement.pdf PDF
11-Project Manual - Gymnasium Floor Resurfacing.pdf PDF
8-Exhibit H - Floor Design Plan.pdf PDF
7-Exhibit G - Specifications.pdf PDF
2-Exhibit B - Payment Bond.pdf PDF
4-Exhibit D - Owners Certification of Responsible Contractor Status.pdf PDF
9-Exhibit I - Prevailing Wage Determination.pdf PDF
10-Exhibit J - Public Works Verification Form.pdf PDF
3-Exhibit C - Performance Bond.pdf PDF
5-Exhibit E - Non-Collusion Agreement.pdf PDF
1-Exhibit A - Bid Bond Form.pdf PDF
6-Exhibit F - Contractor Resume and References Form.pdf PDF
9-Exhibit G - Project Specifications.pdf PDF
2-Exhibit B - Prevailing Wage Rates.pdf PDF
3-Exhibit C - Owners Certification of Responsible Contractor Status.pdf PDF
6-Exhibit H - Map.pdf PDF
5-Exhibit D - Non-Collusion Agreement.pdf PDF
8-Exhibit E - Performance and Payment Bond Form.pdf PDF
4-Project Manual - Pedestrian Bridge Replacement Project Manual.pdf PDF
1-Exhibit A - Bid Bond Form.pdf PDF
7-EXHIBIT F - Contractor Resume and References Form.pdf PDF
6-MCCC Master Signage Plan - Interior Design Development.pdf PDF
3-Signage Charts.pdf PDF
1-Blue Bell Campus Map.pdf PDF
8-Agreement between the College and Contractor.pdf PDF
5-MCCC Master Signage Plan - Exterior Design Development.pdf PDF
7-Non-Collusion Agreement.pdf PDF
2-Pottstown Campus Map.pdf PDF
9-RFP Master Signage Planning Services - Phases II and III.pdf PDF
4-MCCC Master Signage Plan - Construction Documents.pdf PDF
Show 40 more

Latest 50 of 54 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

File details come from the government source that posted it. Updated .