This document is a 100% Construction Documents package for the federal contract opportunity to "Replace Main Boilers" at the Samuel S. Stratton VA Medical Center in Albany, New York.
The key details are:
- The project includes construction services to replace the primary boilers serving the Albany VAMC main hospital, with the goal of improving boiler plant reliability and efficiency.
- The project will be completed in three phases: 1) Replace existing electrical equipment and install new switchgear, 2) Install two temporary boilers and replace domestic hot water boilers with steam converters, and 3) Remove the existing 900 HP boilers and install new boilers.
- All work must be substantially complete within 730 calendar days after notice to proceed. The contractor is required to utilize the Autodesk Build construction management platform.
- The contract value is not specified. No small business set-aside is indicated.
View the file
Other files for this federal contract opportunity
Show all 29
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ACOUSTICAL TILEACT
ABOVE FINISH FLOORAFF
ACCESS PANELAP
ARCHITECTARCH
BATH TUBBT
BUILDINGBLDG
CUBIC FEET PER HOURCFH
CUBIC FEET PER MINUTECFM
CAST IRONCI
CEILINGCLG
CEMENT LINED DUCTILE IRONCLDI
CLEANOUTCO
CONCRETECONC
CONTINUATIONCONT
CONTRACTORCONTR
CHROME PLATEDCP
CONNECT TO EXISTINGCTE
COLD WATERCW
DOUBLE CHECK VALVE ASSEMBLYDCVA
DIAMETERDIA
DOWNDN
DRAWINGDWG
ELECTRICAL CONTRACTOREC
ELEVATIONEL/ELEV
EMERGENCY SHOWER EMS
EXISTING TO REMAINETR
FLOOR CLEANOUTFCO
FINISH FLOOR ELEVATIONFFE
FIXTURE NUMBERP-#
FLOORFLR
FIRE PROTECTIONFP
FLOW SWITCHFS
FOOTFT
ABBREVIATIONS
FLUSH VALVEFV
GALVANIZEDGALV
GENERAL CONTRACTORGC
GREASE INTERCEPTORGI
GALLON PER FLUSHGPF
GALLONS PER MINUTEGPM
HANDICAPPEDHC
HOT WATERHW
HOT WATER CIRCULATIONHWC
INSIDE DIAMETERID
INVERTINV
INDIRECT WASTEIW
LIMIT OF PLUMBING CONTRACTORLPC
MECHANICALMECH
MOP SERVICE BASIN-FIXTURE IDENTIFICATIONMSB
NORMALLY CLOSEDNC
NORMALLY OPENNO
NOT TO SCALENTS
NOT IN CONTRACTNIC
OUTSIDE DIAMETEROD
OPEN END DRAINOED
PLUMBING CONTRACTORPC
PLUMBINGPLBG
POUNDS PER SQUARE INCHPSI
REDUCED PRESSURE BACKFLOW PREVENTERRPBP
SHOCK ABSORBERSA
SHOWER-FIXTURE IDENTIFICATIONSH
SINK-FIXTURE IDENTIFICATIONSK
SPECIFICATIONSPEC
SOIL STACKSS
STAINLESS STEELST.ST.
TEMPERED WATERTW
TYPICALTYP
URINAL-FIXTURE IDENTIFICATIONU
VENTV
VACUUM BREAKERVB
VENT STACKVS
VENT THRU ROOFVTR
WASTEW
WATER CLOSET-FIXTURE IDENTIFICATIONWC
DOMESTIC COLD WATER
DOMESTIC COLD WATER BELOW SLAB
DOMESTIC HOT WATER
DOMESTIC HOT WATER CIRCULATING
WASTE ABOVE GROUND
WASTE BELOW SLAB
VENT ABOVE GROUND
VENT BELOW SLAB
PUMP DISCHARGE
INDIRECT WASTE
INDIRECT WASTE BELOW SLAB
NATURAL GAS PIPING
GAS VENT PIPING
140°F DOMESTIC HOT WATER
140°F DOMESTIC HOT WATER CIRCULATING
180°F DOMESTIC HOT WATER
180°F DOMESTIC HOT WATER CIRCULATING
COMPRESSED AIR
CW
HW
HWC
W
W
V
V
PD
IW
IW
G
GV
CA
BYHWR BYPASS HOT WATER RETURN
PIPING LEGEND GENERAL
FLOOR DRAIN
TRENCH DRAIN
AREA DRAIN
CLEANOUT
FLOOR CLEANOUT
GRADE CLEANOUT
P-TRAP
ELBOW UP OR RISE
ELBOW DOWN OR DROP
CAP OR END OF PIPE
HOSE BIBB
TEE LOOKING UP
TEE LOOKING DOWN
UNION
REDUCED PRESSURE ZONE BACKFLOW PREVENTER
CONNECT TO EXISTING
EXISTING TO REMAIN
EXISTING TO BE REMOVED
FLOW IN DIRECTION OF ARROWS
DIRECTION OF SLOPE
REDUCER
PIPE SLEEVE
PIPE GUIDE
FLOW METER
KEY NOTE DESIGNATION
LIMIT OF WORK
HANDICAP ACCESSIBLE
TRAP PRIMER
FM
TP
VALVES
BALL VALVE
CHECK VALVE
GAS COCK
MIXING VALVE
BALANCING VALVE
PRESSURE REDUCING/REGULATING VALVE
PRESSURE GAUGE
BACK WATER VALVE
FLOW SWITCH
SOLENOID VALVES
DESIGNATION INDICATOR
DETAIL DESIGNATION NUMBER
DETAIL DESIGNATION DRAWING
PD
IW
IW
G
GV
CA
BYHWR
140°
140°
180°
180°
140°
140°
180°
180°
GAS METER
WATER METER
G
M
A
P2.0
VALVE VERTICAL
GENERAL NOTES
1. PLUMBING WORK SHALL BE DONE IN ACCORDANCE WITH THE LATEST EDITION OF THE STATE PLUMBING AND GAS CODE INCLUDING
ALL LOCAL AMENDMENTS.
3. PIPING AND EQUIPMENT IS SHOWN DIAGRAMMATICALLY. THE ACTUAL ROUTING OF PIPING AND EXACT LOCATION OF EQUIPMENT
SHALL BE DETERMINED IN THE FIELD.
4. IN ADDITION TO REVIEWING AND COORDINATING WITH THE OTHER TRADES (CIVIL, STRUCTURAL, ARCHITECTURAL, FIRE PROTECTION, HVAC, AND ELECTRICAL) THE CONTRACTOR SHALL VISIT THE SITE AND FAMILIARIZE HIMSELF WITH DETAILS OF
CONSTRUCTION.
5. FURNISH AND INSTALL ALL NECESSARY PIPING, EQUIPMENT SUPPORTS AND ANY EQUIPMENT NOT SHOWN ON DRAWINGS OR CALLED FOR IN THE SPECIFICATIONS BUT NECESSARY TO PROVIDE A COMPLETE AND WORKABLE SYSTEM.
6. PROVIDE ACCESSIBLE SHUTOFF VALVES ON ALL BRANCH PIPING AND ON ALL SUPPLY PIPING TO INDIVIDUAL FIXTURES AND
EQUIPMENT.
7. PROVIDE ACCESS TO ALL EQUIPMENT REQUIRING PERIODIC SERVICE AND MAINTENANCE.
8. FURNISH ACCESS PANELS TO THE GENERAL CONTRACTOR FOR INSTALLATION UNDER THE RELATED TRADES.
9. PITCH ALL WATER LINES TO DRAIN.
10. INSTALL HORIZONTAL RUNS OF WATER PIPING AS HIGH AS POSSIBLE AND PROVIDE DRAIN-OFFS AT ALL LOW POINTS.
11. HOT WATER TAKEOFFS SHALL HAVE NOT LESS THAN THREE ELBOW SWINGS.
12. PROVIDE DRAIN VALVE ON HOUSE SIDE OF WATER METER.
13. PIPING SHALL RUN CONCEALED IN ALL AREAS WITH THE EXCEPTION OF MECHANICAL ROOMS, AREAS WHERE NO CEILING EXISTS OR
WHERE NOTED ON THE PLANS.
14. INSTALL DIELECTRIC COUPLINGS BETWEEN DISSIMILAR MATERIALS.
15. PROVIDE DANDY CLEANOUTS AT THE BASE OF ALL SANITARY AND RAINWATER STACKS.
16. PROVIDE DRIP LEGS FOR ALL GAS RISERS.
17. AN AIR GAP OF AT LEAST TWICE THE EFFECTIVE DIAMETER OF THE DRAIN SERVED SHALL BE PROVIDED ON ALL EQUIPMENT DRAINS
PIPED TO FLOOR DRAINS.
18. REQUIRED FIRE RESISTANCE RATING OF FLOORS, WALLS AND CEILINGS SHALL BE MAINTAINED WHEN PIPE PENETRATIONS ARE
MADE.
19. REFER TO DETAILS FOR PIPE AND EQUIPMENT SIZES NOT SHOWN ON THE PLANS.
20. ALL WORK SHOWN ON DETAILS BUT NOT ON PLANS OR VICE VERSA SHALL BE INCLUDED AS IF SHOWN ON BOTH.
21. SEE SPECIFICATIONS FOR OTHER REQUIREMENTS.
22. CONTRACTOR SHALL ASSUME ALL SHUT OFF VALVES DO NOT WORK AND SHALL INCLUDE FREEZING PIPING AS PART OF THEIR BID.
ALL WORK SHALL BE PERFORMED WITH NO SHUT-DOWNS TO THE HOSPITAL'S WATER SYSTEMS.
DEMOLITION NOTES
1. REFER TO THE ARCHITECTURAL DRAWINGS FOR THE EXTENT OF THE DEMOLITION SCOPE OF WORK AND AREA. THE DEMOLITION PLANS INDICATE THE GENERAL INTENT AND ARE NOT INTENDED TO SHOW ALL ITEMS TO BE REMOVED OR RETAINED.
2. THE LOCATIONS OF EXISTING EQUIPMENT INCLUDING PIPING, DUCTWORK, EQUIPMENT, CONDUITS, ETC ARE SHOWN IN AN APPROXIMATE WAY ONLY. VISIT THE SITE PRIOR TO SUBMISSION OF THE BIDS AND COMMENCEMENT OF WORK TO BECOME FAMILIAR
WITH THE ACTUAL CONDITIONS AND EXTENT OF THE WORK.
3. TRACE AND LABEL ALL EXISTING SYSTEMS WITHIN THE DEMOLITION AREA AND BEYOND PRIOR TO DISCONNECTION AND REMOVAL TO ENSURE THAT NO AREA OUTSIDE THE DEMOLITION AREA IS AFFECTED. REVIEW IN DETAIL WITH THE GENERAL CONTRACTOR AND OWNER WHAT IS TO BE REMOVED AND REMAIN PRIOR TO WORK COMMENCING THE DEMOLITION. THERE SHALL BE NO INTERRUPTION OF SERVICES OUTSIDE THE DEMOLITION AREA WITHOUT APPROVAL FROM THE OWNER'S REPRESENTATIVE.
4. COORDINATE EQUIPMENT REMOVAL WITH ALL PARTIES TO PROVIDE DISCONNECTION. REMOVE EQUIPMENT BY UNFASTENING AT THE SUPPORTS OR ATTACHMENTS. ALSO REMOVE THE ATTACHMENTS FROM THE BUILDING, LEAVING NO COMPONENT OF THE ORIGINAL
INSTALLATION.
5. EXERCISE CARE WITH EQUIPMENT THAT IS TO BE RELOCATED OR TURNED OVER TO THE OWNER. EXAMINE THE EQUIPMENT BEFORE REMOVAL IN THE PRESENCE OF THE OWNER'S REPRESENTATIVE TO DETERMINE ITS CONDITION. DELIVER OWNER-RETAINED EQUIPMENT TO AN ON-SITE LOCATION DESIGNATED BY THE OWNER AND OBTAIN ACKNOWLEDGMENT OF RECEIPT IN ORIGINAL
CONDITION.
6. INSTALL RELOCATED EQUIPMENT IN ORIGINAL CONDITION ENSURING NO DAMAGE.
7. PROMPTLY REPAIR ANY DAMAGE CAUSED DURING/BY THE EXECUTION OF WORK. DAMAGE INCLUDES BUT IS NOT LIMITED TO
DESTRUCTION OF ITEMS INTENDED TO REMAIN OR TO BE SALVAGED.
8. NOTIFY THE OWNER'S REPRESENTATIVE IMMEDIATELY OF ANY UNANTICIPATED HIDDEN CONDITIONS ENCOUNTERED DURING THE
DEMOLITION.
9. ALL ITEMS REMOVED SHALL BE OFFERED TO THE OWNER FOR SALVAGE. IF THE OWNER DOES NOT TAKE POSSESSION, DISPOSE OF THE ITEMS IN A SAFE AND LEGAL MANNER. ALL ITEMS CLASSIFIED AS HAZARDOUS SHALL BE DISPOSED AS HAZARDOUS WASTES AND A
UNIFORM HAZARDOUS WASTE MANIFEST SHALL BE PROVIDED TO THE OWNER.
10. ENSURE THE SAFE PASSAGE OF PERSONS IN AND AROUND THE BUILDING DURING DEMOLITION. PREVENT INJURY TO PERSONS AND DAMAGE TO PROPERTY. PROVIDE ADEQUATE SHORING AND BRACING TO PREVENT COLLAPSE. IMMEDIATELY REPAIR DAMAGED PROPERTY TO THE CONDITION BEFORE BEING DAMAGED. TAKE EFFECTIVE MEASURES TO PREVENT WINDBLOWN DUST.
11. DO NOT USE CUTTING TORCHES UNTIL WORK AREA IS CLEARED OF FLAMMABLE MATERIALS. AT CONCEALED SPACES, SUCH AS DUCT AND PIPE INTERIORS, VERIFY CONDITION AND CONTENTS OF HIDDEN SPACE BEFORE STARTING FLAME-CUTTING OPERATIONS.
MAINTAIN FIRE WATCH AND PORTABLE FIRE-SUPPRESSION DEVICES DURING FLAME-CUTTING OPERATIONS. MAINTAIN ADEQUATE
VENTILATION WHEN USING CUTTING TORCHES.
12. NOTIFY UTILITY COMPANIES IN ACCORDANCE WITH THEIR REQUIREMENTS PRIOR TO DEMOLITION. VERIFY THAT THE UTILITIES HAVE
BEEN DISCONNECTED, VALVED, CAPPED AND MADE SAFE PRIOR TO DEMOLITION.
13. DRAIN, PURGE, OR OTHERWISE REMOVE, COLLECT, AND PROPERLY DISPOSE OF CHEMICALS, LIQUIDS, GASES, EXPLOSIVES, ACIDS, FLAMMABLES, OR OTHER DANGEROUS MATERIALS BEFORE PROCEEDING WITH DEMOLITION OPERATIONS.
14. PROPERLY LABEL ALL UNLABELED SERVICE PIPELINES AND VALVES TO REMAIN WITH COLOR PIPE MARKERS AND VALVE TAGS. MOUNT A VALVE AND SERVICE CHART IN THE AREA OF DEMOLITION THAT IDENTIFIES ALL LABELED SERVICES. URN ONE COPY OF SAME OVER
TO THE CM OWNER.
15. PRIOR TO DEMOLITION, MAKE SAFE ALL SERVICE PIPE TERMINATIONS TO THE AREA. PROVIDE VALVE AND CAPS ON PRESSURE
SERVICES TO THE AREA THAT ARE TO REMAIN IN SERVICE.
16. CONTRACTOR TO INCLUDE A LUMP SUM TO REMOVE UP TO 300 LINEAR FEET OF 4" AND BELOW PIPING, INSULATION, SUPPORTS, AND APPURTENANCES FROM THE BOILER AND CHILLER PLANTS. THE PIPING WILL BE IDENTIFIED IN AN RFI OR BY THE VA COR. INCLUDE
SHUT OFF VALVES AND CAPS WHERE NEEDED. SEAL PENETRATIONS TO MATCH EXISTING.
PROPANE GAS PIPINGPP
PROPANE (UNDERGROUND) GAS PIPINGP(UG)P(UG)
FLOW METERFM
NPCW (UG) NON POTABLE COLD WATER (UNDER GROUND)NPCW (UG)
NATURAL GAS PIPING (UNDERGROUND)G(UG)G (UG)
EXISTINGEX
RECIRCULATING PUMPRCP
STEAM WATER HEATERSWH
LOW ZONE COLD WATERLZCW
HIGH ZONE HOT WATERHZHW
LOW ZONE HOT WATERLZHW
HIGH ZONE COLD WATERHZCW
HIGH ZONE HOT WATER RETURNHZHWR
LOW ZONE HOT WATER RETURNLZHWR
BYPASS HOT WATER RETURNBYHWR
BYPASS HIGH ZONE HOT WATER RETURNBYHZHWR
GASG
GAS PROPANEG(P)
GAS VENT THROUGH ROOFGVTR
ELECTRIC WATER HEATEREWH
TEMPERATURE MIXING VALVETMV
WATER METERWW
FLOOR DRAINFD
WASTE AND TRAPW&T
NON-POTABLE COLD WATERNPCW
EXISTING TO BE REMOVEDETBR
LZCW LOW ZONE COLD WATERLZCW
LZHW LOW ZONE HOT WATERLZHW
HZCW HIGH ZONE COLD WATERHZCW
HZHW HIGH ZONE HOT WATERHZHW
LZHWR LOW ZONE HOT WATER RETURNLZHWR
HZHWR HIGH ZONE HOT WATER RETURNHZHWR
PROPANE GAS VENT PIPINGGV (P)GV(P)
P-TRAPT
STORM DRAINSW
GAS PROPANE VENT THROUGH ROOFG(P)VTR
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
248 Copeland Street Quincy, MA 02169 P: 617-481-6390 F: 617-687-5990
200 Brickstone Square Andover, MA 01810 P: 978-296-6227 F: 978-475-5768
100% CONSTRUCTION
DOCUMENTS
REPLACE MAIN BOILERS 528A8-17-805
Samuel S. Stratton VA Medical Center, 113 Holland Ave., Albany, New York 12208
06/05/2024
105 Central Street Stoneham, MA 02180 P: 781-275-6050
C U s e rs \j o s ia s .p a u l\ D o c u m e n ts
\Y
A lb a n y
B o ile r_
M E
P
J o s ia s .P a u l.
rv t
/3 /2
:0
:2
P
M
P-000
PLUMBING LEGEND
MS JP
DRAWING LIST - PLUMBING
SHEET NUMBER SHEET NAME
P-000 PLUMBING LEGEND
P-201 PLUMBING PHASE 2 - SITE PLAN
PD-201 PLUMBING PHASE 2 - BASEMENT DEMOLITION PLAN
PP-201U PLUMBING PHASE 2 - SUB BASEMENT UNDERSLAB PLAN
PP-201 PLUMBING PHASE 2- SUB BASEMENT PLAN
PP-202 PLUMBING PHASE 2- SUB BASEMENT PLAN TEMPORARY BOILER LOCATION
PP-203 PLUMBING PHASE 2 - BASEMENT FLOOR PLAN
PD-301U PLUMBING PHASE 3 - SUB BASEMENT UNDERSLAB DEMOLITION PLAN
PD-301 PLUMBING PHASE 3 - SUB BASEMENT DEMOLITION PLAN
PD-302 PLUMBING PHASE 3 - SUB BASEMENT DEMOLITION PLAN TEMPORARY
BOILER LOCATION
PP-301U PLUMBING PHASE 3 - SUB BASEMENT UNDERSLAB PLAN
PP-301 PLUMBING PHASE 3 - SUB BASEMENT PLAN
PP-302 PLUMBING PHASE 3 - BASEMENT FLOOR PLAN
PP-303 PLUMBING PHASE 3 - ROOF PLAN
P-501 PLUMBING EXISTING WATER HEATERS RISER DIAGRAM
P-502 PLUMBING NEW STEAM WATER HEATERS RISER DIAGRAM AND WATER
HEATER DETAIL
P-601 PLUMBING DETAILS
P-602 PLUMBING DETAILS
P-701 PLUMBING SCHEDULES
PHASING REQUIREMENTS
REFER TO DWG GI-004 FOR PHASING AND SHUTDOWN
REQUIREMENTS
VA DESIGN GUIDE GENERAL NOTE
THE CONTRACTOR SHOULD ASSUME ALL SHUT OFF VALVES
DO NOT WORK AND THAT THEY SHOULD INCLUDE FREEZING
PIPING AS PART OF THEIR BID.
GENERAL NOTE
1. ADD VA PLUMBING DESIGN GUIDE.
2. ADD VA DESIGN MANUAL.
Revisions: Date:
EXCELS IOR
084767-1
BUILDING 5
BUILDING 4
BOILER PLANT
CHILLER AND ELEC.
EQUIPMENT
BUILDING 3
UTILITIES
BUILDING 54
CHILLER PLANT
GAZEBO
A /C
A /C
CONCRETE SIDEWALK
CONCRETE SIDEWALK
CONCRETE SIDEWALK
N52° 10' 05"W 457.55
THE CHARLES HEALY
MEMORIAL ELECTRIC
GENERATION FACILITY
MYRTLE AVE
APPROX. 6" GAS LINE
2"
UG
GAS
V C P
SAN MH E1
RIM: ??INV (A): ??
INV (B): 166.2
INV (C): ??
EXISTING CITY OF ALBANY 96"
DIA. CONCRETE SEWER
(A)
(B)
4" P
VC
D
RA
IN
L
IN
E
(C)
HVAC
TUNNEL
ACCESS
SHED
ABANDONED HVAC PIPING
J
J
H H E
H H E
"YIELDTO PED"
J
S
S
ST
ST
ST
ST
ST
SAN
SAN
SAN
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
VALVE 30(CAPPED)
VALVE 28
HYDRANT 10
VALVE 29
HYDRANT 09
APPROX. LOCATION OF 30" CITY WATER MAIN
EL
EL
EL
8B
XX
EL
EL
EL
EL
EL
1?
D Y
H
D Y H
J
J
J
A /C
A /C
APPROXIMATE LOCATION
OF BOILER PLANT
TEMPORARY BOILER TRAILER #2
TEMPORARY BOILER TRAILER #1
TEMPORARY BOILER
CONTROL ROOM
PP-102
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
248 Copeland Street Quincy, MA 02169 P: 617-481-6390 F: 617-687-5990
200 Brickstone Square Andover, MA 01810 P: 978-296-6227 F: 978-475-5768
100% CONSTRUCTION
DOCUMENTS
REPLACE MAIN BOILERS 528A8-17-805
Samuel S. Stratton VA Medical Center, 113 Holland Ave., Albany, New York 12208
06/05/2024
N
105 Central Street Stoneham, MA 02180 P: 781-275-6050
C U s e rs \j o s ia s .p a u l\ D o c u m e n ts
\Y
A lb a n y
B o ile r_
M E
P
J o s ia s .P a u l.
rv t
/3 /2
:0
:2
P
M
P-201
PLUMBING PHASE 2 - SITE PLAN
MS JP
1" = 20'-0"
PLUMBING PHASE 2 - SITE PLAN
PLUMBING GENERAL NOTE:
1. THE WASTE DISCHARGE GOING TO
THE AREA DRAIN SHALL BE 140°F OR
BELOW.
Revisions: Date:
ETBR: HWH-3
ETBR: HWH-2
ETBR: HWH-1
ETBR: T-2
ETBR: T-1
ETBR: TMV-1
ETBR: TMV-2
ETBR:
4"ULTRASONIC
FLOW METER
ETBR: P-2
ETBR: P-1
ETBR: ET-1
ETR: 1 1/2"HPHWR DN
ETR: 2"BYHWR DN (BYPASS)
ETR:1 1/2"LPHWR DN
LZCW
HZCW
HZHW
LZHW
LPCW
L P
C W
H P
H W
H P
H W
R
L P
H W
L P
H W
R B
Y H
W R
ETR 4"
ETR 4"
ETR 4"
ETR 4"
ETR 1 1/2"LZHWR
ETR 2"BYPASS HWR (BYBASS)
ETR 1 1/2"HPHWR
WATER HEATER DEMOLITION NOTE:
NEW WATER HEATER INSTALLATION
SHALL BE COMPLETE AND NEW
WATER HEATERS SHALL BE FULLY
COMMISSIONED AND OPERATIONAL
PRIOR TO DEMOLITION OF EXISTING
WATER HEATERS.
ETR: 4"HPHW VALVED AND
CAPPED FOR RECONECTION
ETR: 4"HPHW VALVED AND
CAPPED FOR RECONECTION
(3)ETBR: 3"G UP
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
248 Copeland Street Quincy, MA 02169 P: 617-481-6390 F: 617-687-5990
200 Brickstone Square Andover, MA 01810 P: 978-296-6227 F: 978-475-5768
100% CONSTRUCTION
DOCUMENTS
REPLACE MAIN BOILERS 528A8-17-805
Samuel S. Stratton VA Medical Center, 113 Holland Ave., Albany, New York 12208
06/05/2024
N
105 Central Street Stoneham, MA 02180 P: 781-275-6050
C U s e rs \j o s ia s .p a u l\ D o c u m e n ts
\Y
A lb a n y
B o ile r_
M E
P
J o s ia s .P a u l.
rv t
/3 /2
:0
:3
P
M
PD-201
PLUMBING PHASE 2 - BASEMENT DEMOLITION
PLAN
MS JP
8' 16'4'0
1/8" = 1'-0"PD-201
1 PLUMBING PHASE 2 - BASEMENT DEMOLITION PLAN
KEY NOTES
1. EXISTING EMERGENCY SHOWER TO REMAIN. CUT AND CAP CW PIPING BACK TO THE NEAREST ACTIVE MAIN AND PREPARE FOR RECONNECTION. CAREFULLY DISCONNECT AND REMOVE EXISTING MIXING
VALVE AND RETURN TO THE VA.
PLUMBING GENERAL NOTES
1. WHEN REQUESTED BY THE VA, THE CONTRACTOR SHALL TURN OVER ALL REMOVED PUMPS, MIXING VALVES, STAINLESS STEEL TANKS, ULTRASONIC FLOW METERS, AND GAS FIRED WATER HEATERS.
INCLUDE REMOVAL OF UNISTRUT AND OTHER SUPPORTS WHEN NOT UTILIZED FOR NEW INSTALLATION.
Revisions: Date:
ETR 6"
6"W w/NEW 6"W
6"V UP
S=.01
4"W&T UP
ETR: 4"W&T UP
ETR: FCO
UNDERSLAB PIPING NOTE
EXISTING SLAB IS UP TO 24" THICK. THIS
CONTRACTOR SHALL INCLUDE IN THEIR BID A
GROUND PENETRATING RADAR AND/OR VIDEO
INSPECTION OF EXISTING UNDER SLAB PIPING AS
REQUIRED TO VERIFY THE LOCATIONS OF ALL UNDER
SLAB PIPING IN THE AREA OF WORK PRIOR TO THE
START OF ANY DEMOLITION OR SLAB CUTTING WORK.
ROD AND CLEAN ALL EXISTING UNDER-SLAB PIPING
PRIOR TO NEW INSTALLATION.
SEE DRAWING PP-301U
FOR CONTINUATION
IN PHASE 3
SEE DRAWING PP-301U
FOR CONTINUATION
IN PHASE 3
FCOSEE DRAWING PP-301U
FOR CONTINUATION
IN PHASE 3
4"W&T UP
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
248 Copeland Street Quincy, MA 02169 P: 617-481-6390 F: 617-687-5990
200 Brickstone Square Andover, MA 01810 P: 978-296-6227 F: 978-475-5768
100% CONSTRUCTION
DOCUMENTS
REPLACE MAIN BOILERS 528A8-17-805
Samuel S. Stratton VA Medical Center, 113 Holland Ave., Albany, New York 12208
06/05/2024
N
105 Central Street Stoneham, MA 02180 P: 781-275-6050
C U s e rs \j o s ia s .p a u l\ D o c u m e n ts
\Y
A lb a n y
B o ile r_
M E
P
J o s ia s .P a u l.
rv t
/3 /2
:0
:4
P
M
PP-201U
PLUMBING PHASE 2 - SUB BASEMENT
UNDERSLAB PLAN
MS JP
8' 16'4'0
1/8" = 1'-0"PP-201U
1 PLUMBING PHASE 2 - SUB BASEMENT UNDERSLAB PLAN
Revisions: Date:
G G
ETR: COGEN
ETR: (2) GAS MTER
ETR 2"G
ETR 6"G
ETR 6"G
ETR 4"G
ETR 2"G
ETR 6"LZCW
ETR 6"HZHW
ETR 2 1/2"CA
ETR 3"CW
ETR 1"HW
ETR 1/2"HWC
ETR 1 1/2"LZHWRC
ETR 2"
ETR 2"LZCW
ETR: BRINE TANK
AND SOFTENERETR: BLOW-
OFF TANK
ETR 1"
ETR 3/4"CW DROP
ETR 1"
ETR 1 1/2"
ETR 3/4"
ETR 3"G (HP)
G
G
G G
ETR 1"
ETR 3"G (HP)
ETR 3"G (HP)
G
ETR: 3/4"G DN
ETR: 3"G DN
ETR: 4"FD
ETR: 4"FD
ETR: 4"FD
ETR: FCO
ETR: FCO
ETR: FCO
ETR: FCO
ETR: FCO
ETR: FCO
ETR: 4"FD
CACA
ETR 2"
CA
ETR 2"
ETR:1 1/2"CW UP
G
ETR 3/4"G
ETR 1 1/2" LPCW
EXISTING
BOILER RCP-1A
RCP-2A
SWH-2
G
2"BYHWR
1 1/2"HZHWR SWH-1
1 1/2"LZHWR
4"LZHW
4"LZCW
ETR: 4"FD
ETR: 4"FD
G
EXISTING
BOILER
EXISTING
BOILER
ETR: 2"G DROP
ETR 3/4"CA DROP
EXISTING
BOILER
ETR: 4"FDETR: 4"FD
ETR: 4"FD
ETR: 4"FD
ETR: 4"FD
ETR: 4"FD
NEW CONDENSATE
TANK (BY HVAC)
4"FD-E
4"W&T DN
PROVIDE (2) 2"RPZ
6"G w/NEW 6"G
PROVIDE NEW 6" AUTOMATIC GAS
SHUT-OFF VALVE. INSTALL VALVE
AT LOCATION ACCESSIBLE FROM
CATWALK
6"G w/NEW 6"G
ETR:2"CA DROP TO
COMPRESSED AIR
SKID
EXISTING AIR
COMPRESSOR
EXISTING AIR
DRYER
3/4"NPCW DROP
C W
3" CW
1"
1"
CWCW
ETR 3/4"CA
TMV-2
4"LZCW UP
4"HZCW UP
4"HZHW UP
4"LZHW UP
1 1/2"HZHWR UP
2"BYHWR UP
1 1/2"LZHWR UP
TMV-1
WM-10
WM-9
SEE DWG.
PP-202 FOR
CONTINUATION
ETR: EMS
P100
P-601
P1104
P-601
TYP.
ETR: 4"FD
3" NPCW
1 1/2"CW w/NEW
1"CW
3"CW w/NEW
3"CW
3" CW
ETR 3" CW
ETR 3"
E T
R N
P C
W
NPCW
N P
C W
2"
NPCW
2"
3"NPCW CAPPED
CONNECTION FOR NEW
BOILER MAKE-UP.
COORDINATE EXACT
LOCATION WITH HVAC
CONTRACTOR
3"CW DROP
6"G RISE
1"CW RISE
2"NPCW RISE
EXISTING 3"G PIPING
SERVES EXISTING
EQUIPMENT AND SHALL
REMAIN.
PROVIDE WITH
DRAIN VALVE
PROVIDE WITH
DRAIN VALVE
ETR 3/4"
RCP-1B
RCP-2B
C W
4"FD-E
4"FD-E
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
248 Copeland Street Quincy, MA 02169 P: 617-481-6390 F: 617-687-5990
200 Brickstone Square Andover, MA 01810 P: 978-296-6227 F: 978-475-5768
100% CONSTRUCTION
DOCUMENTS
REPLACE MAIN BOILERS 528A8-17-805
Samuel S. Stratton VA Medical Center, 113 Holland Ave., Albany, New York 12208
06/05/2024
N
105 Central Street Stoneham, MA 02180 P: 781-275-6050
C U s e rs \j o s ia s .p a u l\ D o c u m e n ts
\Y
A lb a n y
B o ile r_
M E
P
J o s ia s .P a u l.
rv t
/3 /2
:0
:4
P M
PP-201
PLUMBING PHASE 2- SUB BASEMENT PLAN
MS JP
8' 16'4'0
1/8" = 1'-0"PP-201
1 PLUMBING PHASE 2- SUB BASEMENT PLAN
Revisions: Date:
A /C
A /C
G
G
2"NPCW DROP
1"CW DROP
4"G DROP
TO TEMPORARY
BOILERS
PROVIDE NEW MEDICAL GAS
MASTER ALARM PANEL IN
TEMPORARY CONTROL ROOM.
PROVIDE ALL NECESSARY
WIRING TO ALL SOURCE
MEDICAL GAS EQUIPMENT IN
ACCORDANCE WITH NFPA 99
C W
1"
1"
CW
TEMPORARY BOILER
CONTROL ROOM
HEAT TRACED AND INSULATED
CW UNDERGROUND PIPING
6"G
(84,00 CFH)
6"G
(84,00 CFH)
6"G
(84,00 CFH)
TEMPORARY BOILER TRAILER #1
TEMPORARY BOILER TRAILER #2
SEE DWG.
PP-201 FOR
CONTINUATION
1"CW
EWH-1
EWH-2
6"G DROP
1"CW DROP
2"NPCW DROP
NPCW
2"
2"
N P
C W
2"NPCW
NPCW
CW
G
6"G
(84,00 CFH)
1"CW
2"NPCW
PROVIDE SHUT-OFF VALVES.
CAPPED DRAIN VALVES TO
SERVE CW AND NPCW AS
SHOWN
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
248 Copeland Street Quincy, MA 02169 P: 617-481-6390 F: 617-687-5990
200 Brickstone Square Andover, MA 01810 P: 978-296-6227 F: 978-475-5768
100% CONSTRUCTION
DOCUMENTS
REPLACE MAIN BOILERS 528A8-17-805
Samuel S. Stratton VA Medical Center, 113 Holland Ave., Albany, New York 12208
06/05/2024
N
105 Central Street Stoneham, MA 02180 P: 781-275-6050
C U s e rs \j o s ia s .p a u l\ D o c u m e n ts
\Y
A lb a n y
B o ile r_
M E
P
J o s ia s .P a u l.
rv t
/3 /2
:0
:4
P
M
PP-202
PLUMBING PHASE 2- SUB BASEMENT PLAN
TEMPORARY BOILER LOCATION
MS JP
8' 16'4'0
1/8" = 1'-0"PP-202
1 PLUMBING PHASE 2- SUB BASEMENT PLAN TEMPORARY BOILER LOCATION
Revisions: Date:
ETR: 1 1/2"HZHWR DN
ETR: 2"BYPASS HWR DN
ETR:1 1/2"LZHWR DN
LZCW
HZCW
HZHW
LZHW
ETR 4"
ETR 4"
ETR 4"
ETR 4"
ETR 1 1/2"LZHWR
ETR 2"BYPASS HWR (BYBASS)
ETR 1 1/2"HPHWR
4"LZCW DN
4"HZCW DN
4"HZHW DN
4"LZHW DN
1 1/2"HZHWR DN
2"BYPASS HWR DN
1 1/2"LZHWR DN
4"LZHW w/NEW
4"LZHW
1 1/2"HZHWR w/NEW
1 1/2"HZHWR
2"BYHZHWR
(BYPASS)
w/NEW 2"HZHWR
(BY PASS)
1 1/2"LZHWR w/NEW
1 1/2"LZHWR
4"HZHW w/NEW
4"HZHW
4"LZCW w/NEW
4"LZCW
4"HZCW w/NEW
4"HZCW
HWHZHW
LZHW
4"
4"
ETR: EMS
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
248 Copeland Street Quincy, MA 02169 P: 617-481-6390 F: 617-687-5990
200 Brickstone Square Andover, MA 01810 P: 978-296-6227 F: 978-475-5768
100% CONSTRUCTION
DOCUMENTS
REPLACE MAIN BOILERS 528A8-17-805
Samuel S. Stratton VA Medical Center, 113 Holland Ave., Albany, New York 12208
06/05/2024
N
105 Central Street Stoneham, MA 02180 P: 781-275-6050
C U s e rs \j o s ia s .p a u l\ D o c u m e n ts
\Y
A lb a n y
B o ile r_
M E
P
J o s ia s .P a u l.
rv t
/3 /2
:0
:4
P
M
PP-203
PLUMBING PHASE 2 - BASEMENT FLOOR PLAN
MS JP
8' 16'4'0
3/16" = 1'-0"PP-203
1 PLUMBING PHASE 2 - BASEMENT FLOOR PLAN
Revisions: Date:
ETR 6"ETR 6"
W
ETBR: 4"W&T UP ETBR: 4"W&T UP ETBR: 4"W&T UP
ETBR: 4"W&T UP
ETBR: 4"W&T UP
ETBR: 4"W&T UP
ETBR: 4"W&T UP
ETBR: 4"W&T UP
ETBR: 4"W&T UP
ETBR: 4"W&T UPETBR: 4"W&T UP
ETBR: FCO
ETR: FCO
ETR: 4"W&T UP
ETBR 4"ETBR 4"
ETR 4"W
ETR 4"
ETR 6"
ETR 6"
ETR: 4"W&T UP
ETR 4"
ETR 6" ETR 4"
ETR: 4"W&T UP
ETR: 4"W&T UP
ETR: FCO
ETR: FCO
ETR 6"ETR 6"
ETR 4"
ETR 6"
ETR: FCO
ETR 4"
ETR 4"
W
ETR: 6"S UP
ETR: 4"W&T UP
ETR: FCO
UNDERSLAB PIPING NOTE:
EXISTING SLAB IS UP TO 24" THICK. THIS
CONTRACTOR SHALL INCLUDE IN THEIR BID A
GROUND PENETRATING RADAR AND/OR VIDEO
INSPECTION OF EXISTING UNDER SLAB PIPING AS
REQUIRED TO VERIFY THE LOCATIONS OF ALL
UNDER SLAB PIPING IN THE AREA OF WORK PRIOR
TO THE START OF ANY DEMOLITION OR SLAB
CUTTING WORK.
SEE DRAWING PP-101U
FOR CONTINUATION
IN PHASE 1
SEE DRAWING PP-101U
FOR CONTINUATION
IN PHASE 1
ETR: 4"W UP
WW
W W
W
W
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
248 Copeland Street Quincy, MA 02169 P: 617-481-6390 F: 617-687-5990
200 Brickstone Square Andover, MA 01810 P: 978-296-6227 F: 978-475-5768
100% CONSTRUCTION
DOCUMENTS
REPLACE MAIN BOILERS 528A8-17-805
Samuel S. Stratton VA Medical Center, 113 Holland Ave., Albany, New York 12208
06/05/2024
N
105 Central Street Stoneham, MA 02180 P: 781-275-6050
C U s e rs \j o s ia s .p a u l\ D o c u m e n ts
\Y
A lb a n y
B o ile r_
M E
P
J o s ia s .P a u l.
rv t
/3 /2
:1
:1
P M
PD-301U
PLUMBING PHASE 3 - SUB BASEMENT
UNDERSLAB DEMOLITION PLAN
MS JP
8' 16'4'0
1/8" = 1'-0"PD-301U
1 PLUMBING PHASE 3 - SUB BASEMENT UNDERSLAB DEMOLITION PLAN
Revisions: Date:
FM
ETR: COGEN
SUMMER BOILER
DEMOLISHED BY
CONTRACTOR
ETR: (2) GAS MTER
ETBR: 4"G DROP
ETBR: 4"G DROP
ETBR: 4"G DROP
ETR: BRINE TANK
AND SOFTENER
ETR: BLOW-
OFF TANK
ETBR: 2"CW SOFTENER
DROP
ETRB: 2"CW DROP
TO PUMP P-2
ETR 3/4"CW DROP
ETBR 3/4"CW TO
EACH BOILER
(TYPICAL 3)
ETBR 1/2"HW TO
EACH BOILER
(TYPICAL 3)
ETBR: 4"FD
ETBR: 4"FD
ETBR: 4"FD
ETBR: 4"FD
ETR: 4"FD
ETR 3"G
ETR 3"CW
ETR 1"HW
ETR 1/2"HWC
ETR 2"
ETR 6"HZHW
ETR 6"LZCW
ETR 2 1/2"CA
ETR 1 1/2"LZHWRC
ETR 2"LZCW
ETR 6"G
ETR 2"G
ETR 6"G
ETR 4"G
ETR 3"G(HP)
G
G
G
ETR 3"G (HP)
ETBR: 4"FD
ETR 3"G
ETR 3"G
ETR 3"GG
ETR 3/4"G
ETR: 3/4"G DN
G ETR: 3"G DN
ETR: FCO
ETR: FCO
ETR: FCO
ETR: FCO
ETBR: 2"GVTR
ETBR: 2"GVTR
ETBR: 2"GVTR
ETR: 4"FD
ETR: 4"FD
ETR 1 1/2"CW
ETBR: AUTOMATIC
SHUT-OFF VALVE
DEMOLISH ALL ASSOCIATED
CONDUITS AND CONTROLS
FCO
G
ETR: 4"FD
ETR: 4"FD
ETBR: 4"FD
ETBR: 4"FD
ETBR: 4"FD
ETR: 4"FD
ETBR: 4"FD
ETR:FCO
UNDERSLAB PIPING NOTE:
EXISTING SLAB IS UP TO 24" THICK. THIS
CONTRACTOR SHALL INCLUDE IN THEIR BID A
GROUND PENETRATING RADAR AND/OR VIDEO
INSPECTION OF EXISTING UNDER SLAB PIPING AS
REQUIRED TO VERIFY THE LOCATIONS OF ALL
UNDER SLAB PIPING IN THE AREA OF WORK PRIOR
TO THE START OF ANY DEMOLITION OR SLAB
CUTTING WORK.
CA
G G
ETBR: 2"G DROP
ETBR: 3/4"CA DROP
ETR:2"CA TO
COMPRESSED
AIR SKID
EXISTING AIR
COMPRESSOR
EXISTING AIR
COMPRESSOR
EXISTING AIR
DRYER
EXISTING AIR
DRYER
ETR: MED GAS
ALARM PANEL
ETR: MEDICAL OXYGEN
ALARM PANEL
ETBR
(3)ETBR: GV UP
(3)ETBR: BALL VALVE
(3)ETBR: BALL VALVE
(3)ETBR: BALL VALVE
GAS PIPING SERVING EXISTING
WATER HEATERS AT THE MEZZANINE
LEVEL SHALL BE DEMOLISHED IN PHASE 1
(3)ETBR: 3"G UP
ETR:CO
ETR: 4"SW DN
SW
ETR: 4"SW UP TO
EXISTING ROOF
DRAIN
ETR: 3/4"CW DROP
TO EXISTING
FAUCET
ETR: 3/4"CW DROP
TO EXISTING
FAUCET
ETR 3/4"
ETR 3/4"
NATURAL GAS LINE SERVING
THE COGEN UNIT SHALL
REMAIN ACTIVE WHEN THE
BOILER PLAN GAS LINE IN
OPERATION
ETR: FCO
EXISTING 3"G PIPING SERVES
EXISTING EQUIPMENT AND
SHALL REMAIN.
CAEFULLY
DISCONNECT AND
REMOVE (2) EXISTING
BACKFLOW
PREVENTERS AND
PRESENT TO THE VA
ETBR: 2"LZCW DROP
ETBR: (2)2"LZCW DROP
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
248 Copeland Street Quincy, MA 02169 P: 617-481-6390 F: 617-687-5990
200 Brickstone Square Andover, MA 01810 P: 978-296-6227 F: 978-475-5768
100% CONSTRUCTION
DOCUMENTS
REPLACE MAIN BOILERS 528A8-17-805
Samuel S. Stratton VA Medical Center, 113 Holland Ave., Albany, New York 12208
06/05/2024
N
105 Central Street Stoneham, MA 02180 P: 781-275-6050
C U s e rs \j o s ia s .p a u l\ D o c u m e n ts
\Y
A lb a n y
B o ile r_
M E
P
J o s ia s .P a u l.
rv t
/3 /2
:5
:0
P M
PD-301
PLUMBING PHASE 3 - SUB BASEMENT
DEMOLITION PLAN
MS JP
8' 16'4'0
1/8" = 1'-0"PD-301
1 Plumbing Demo Plan-0B (Ph2) SUB
KEY NOTES
1. EXISTING EMERGENCY SHOWER TO REMAIN. CUT AND CAP CW PIPING BACK TO THE NEAREST ACTIVE MAIN AND PREPARE FOR RECONNECTION. CAREFULLY DISCONNECT AND REMOVE EXISTING MIXING
VALVE AND RETURN TO THE VA.
PLUMBING GENERAL NOTES
1. WHEN REQUESTED BY THE VA, THE CONTRACTOR SHALL TURN OVER ALL REMOVED PUMPS, MIXING VALVES, STAINLESS STEEL TANKS, ULTRASONIC FLOW METERS, AND GAS FIRED WATER HEATERS.
INCLUDE REMOVAL OF UNISTRUT AND OTHER SUPPORTS WHEN NOT UTILIZED FOR NEW INSTALLATION.
Revisions: Date:
A /C
A /C
DEMOLISH EXISTING MEDICAL
GAS ALARM PANEL IN THE TEMPORARY
CONTROL ROOM.
DEMOLISH EXISTING
WATER HEATER (TYP. 2)
IN THE TEMPORARY
CONTROL ROOM.
ETBR: TEMPORARY BOILER TRAILER #1
(BY OTHERS)
ETBR: TEMPORARY BOILER TRAILER #2
(BY OTHERS)
ETBR: TEMPORARY
BOILER CONTROL
ROOM (BY OTHERS)
DEMOLISH TEMPORARY GAS PIPING, WATER
PIPING, AND HEAT TRACE AFTER TEMPORARY
BOILERS ARE DEMOLISHED. CUT PIPING BACK
INSIDE BUILDING AND AND CAP GAS TIGHT AND
WATER TIGHT.
ETR: 4"G
ETR: 1"CW
ETR: 2"NPCW
ETR: 4"G
ETR: 1"CW
ETR: 2"NPCW
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
248 Copeland Street Quincy, MA 02169 P: 617-481-6390 F: 617-687-5990
200 Brickstone Square Andover, MA 01810 P: 978-296-6227 F: 978-475-5768
100% CONSTRUCTION
DOCUMENTS
REPLACE MAIN BOILERS 528A8-17-805
Samuel S. Stratton VA Medical Center, 113 Holland Ave., Albany, New York 12208
06/05/2024
N
105 Central Street Stoneham, MA 02180 P: 781-275-6050
C U s e rs \j o s ia s .p a u l\ D o c u m e n ts
\Y
A lb a n y
B o ile r_
M E
P
J o s ia s .P a u l.
rv t
/3 /2
:0
:3
P
M
PD-302
PLUMBING PHASE 3 - SUB BASEMENT
DEMOLITION PLAN TEMPORARY BOILER
LOCATION
MS JP
8' 16'4'0
1/8" = 1'-0"PD-302
1 PLUMBING PHASE 3 - SUB BASEMENT DEMOLITION PLAN TEMPORARY BOILER LOCATION
GENERAL PLUMBING NOTE
THE TEMPORARY PIPING INCLUDING HEAT TRACING WILL BE REMOVED
FROM THE PIPING ENCLOSURE ONCE THE NEW BOILERS ARE OPERATIONAL.
TERMINATE AT CHILLER PLANT WALL WITH CAP ON EXTERIOR PIPE AND
SHUT OFF AND DRAIN ON INTERIOR.
Revisions: Date:
ETR 6"ETR 6"
WW
ETR: FCO
ETR: 4"W&T UP
ETR 4"W
ETR 4"
ETR 6"
W
ETR 6"
ETR: 4"W&T UP
ETR 4"
ETR 6" ETR 4"
ETR: 4"W&T UP
ETR: 4"W&T UP
ETR: FCO
ETR: FCO
ETR 6"ETR 6"
ETR 4"
ETR 6"
ETR: FCO
ETR 6"
ETR 4"
ETR 4"
W
W W
ETR: 6"
ETR: 4"W&T UP
ETR: FCO
4"W&T UP
4"
4"W w/NEW 4"W
6"
WFCO
6"W&T UP
6"
S=.01
S=.01S=.01S=.01 S=.01
6"W&T UP 6"W&T UP
6" 6"
S=.01S=.01 6" 6"
6"W&T UP
6"
4"
ETR:4"W&T UP
ETR:4"W&T UP
FCO
ETR: 4"W&T UP
ETR: FCO
UNDERSLAB PIPING NOTE:
EXISTING SLAB IS UP TO 24" THICK. THIS
CONTRACTOR SHALL INCLUDE IN THEIR BID A
GROUND PENETRATING RADAR AND/OR VIDEO
INSPECTION OF EXISTING UNDER SLAB PIPING AS
REQUIRED TO VERIFY THE LOCATIONS OF ALL
UNDER SLAB PIPING IN THE AREA OF WORK PRIOR
TO THE START OF ANY DEMOLITION OR SLAB
CUTTING WORK.
ROD AND CLEAN ALL EXISTING UNDER-SLAB PIPING
PRIOR TO NEW INSTALLATION.
6"W w/NEW 6"W
ETR: 4"SW UP
S W
W
ETR: CO
W
ETR:4"V UP
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
248 Copeland Street Quincy, MA 02169 P: 617-481-6390 F: 617-687-5990
200 Brickstone Square Andover, MA 01810 P: 978-296-6227 F: 978-475-5768
100% CONSTRUCTION
DOCUMENTS
REPLACE MAIN BOILERS 528A8-17-805
Samuel S. Stratton VA Medical Center, 113 Holland Ave., Albany, New York 12208
06/05/2024
N
105 Central Street Stoneham, MA 02180 P: 781-275-6050
C U s e rs \j o s ia s .p a u l\ D o c u m e n ts
\Y
A lb a n y
B o ile r_
M E
P
J o s ia s .P a u l.
rv t
/3 /2
:0
:0
P M
PP-301U
PLUMBING PHASE 3 - SUB BASEMENT
UNDERSLAB PLAN
MS JP
8' 16'4'0
1/8" = 1'-0"PP-301U
1 PLUMBING PHASE 3 - SUB BASEMENT UNDERSLAB PLAN
Revisions: Date:
ETR: COGEN
ETR: (2) GAS MTER
ETR 2"G
ETR 6"G
ETR 4"G
ETR 6"LZCW
ETR 6"HZHW
ETR 2 1/2"CA
ETR 3"CW
ETR 1"HW
ETR 1/2"HWC
ETR 1 1/2"LZHWRC
ETR 2"
ETR 2"LZCW
ETR: BRINE TANK
AND SOFTENER
ETR: BLOW-
OFF TANK
ETR 1"
ETR 3/4"CW DROP
ETR 1"
ETR 1 1/2"
ETR 3"G (HP)
G
G
G
G
ETR 1"
ETR 1"
ETR 3"G (HP)
ETR 3"G (HP)
ETR 3"G
ETR 3"G
G
ETR: 3/4"G DN
ETR: 3"G DN
ETR: 4"FD
ETR: 4"FD
ETR: 4"FD
ETR: FCO
ETR: FCO
ETR: FCO
ETR: FCO
ETR: FCO
ETR: FCO
ETR: 4"FD
CACA
ETR 2"
CA
ETR: 2"CA DROP
COMPRESSED AIR SKID
ETR 2"
ETR:1 1/2"CW UP
G
ETR 3/4"G
ETR 1 1/2" LPCW
B-1 B-2 B-3
B-4
BOILER
(PROVIDED
BY HVAC)
(TYP. 4)
G
P
G
P GP
G
GP GP
(2)2 1/2"G DROP
2 1/2"G(P) DROP
(2)2"G DROP
2"G(P) DROP
(2)2"G DROP
2"G(P) DROP
(3)1 1/2"GVTR
(3)1 1/2"G(P)VTR
(3)1 1/2"GVTR
(3)1 1/2"G(P)VTR
(3)1 1/2"GVTR
(3)1 1/2"G(P)VTR
(3)1 1/2"GVTR
(3)1 1/2"G(P)VTR
6"FD-E
6"W DN&T
6"FD-E
6"W&T DN
6"FD-E
6"W&T DN
6"FD-E
6"W&T DN
SWH-2
G
ETR:4"FD-E
ETR:4"W&T DN
ETR: 4"FD-E
ETR:4"W&T DN
FCO
FCO
ETR: 4"FD
ETR: 4"FD
ETR: FCO
G
6"G VALVED AND
CAPPED CONNECTION
FOR FUTURE
P (U
G
2"P DN
TWO (2) 500 GALLON PROPANE TANKS.
PROVIDE WITH FILL CONNECTION
COMPATIBLE WITH PROPANE PROVIDER
EQUIPMENT. PROVIDE ALL RELIEF VENTS
AND AUTOMATIC SHUT-OFF VALVE
REQUIRED BY NFPA 58. PROVIDE WITH
NITROGEN CYLINDER TO OPERATE
AUTOMATIC SHUT-OFF VALVE.
FIRST STAGE
REGULATOR SET AT
10 PSI
SECOND STAGE
REGULATOR
SET AT 60" W.C.
2"
P
EXISTING AIR COMPRESSOR
EXISTING AIR
DRYER
EXISTING AIR
DRYER
ETR 1"CW
GM-2
GM-3 GM-4
GM-5
GM-1
CA-FM1
ETR: MED GAS
ALARM PANEL
ETR: MEDICAL OXYGEN
ALARM PANEL
(2)2 1/2"G DROP
2 1/2"G(P) DROP
6"G
(73,482 CFH)
3"G
(24,494 CFH)
3"G
(24,494 CFH)
2 1/2"G
(12,247 CFH)
2 1/2"G
(12,247 CFH)
4"G
(24,494 CFH)
4"G
(48,988 CFH)
ETR:EMS
TMV-3
(2)1 1/2"LZHW DN
1 1/2"LZCW DN
1 1/2"
1 1/2"
1 1/2"
1 1/2"LZHW DROP
1 1/2"LZCW DROP
1 1/2"TW DROP
ETR: 4"FD
6"G w/NEW 6"G
ETR 6"G
(73,482 CFH)
CONNECT TO GAS STRAIN
PROVIDED WITH BOILER
(BOILER BY HVAC CONTRACTOR)
CONNECT TO GAS STRAIN
PROVIDED WITH BOILER
(BOILER BY HVAC CONTRACTOR)
CONNECT TO GAS STRAIN
PROVIDED WITH BOILER
(BOILER BY HVAC CONTRACTOR)
CONNECT TO GAS STRAIN
PROVIDED WITH BOILER
(BOILER BY HVAC CONTRACTOR)
6"V UP&DN
ETR 3"G
P (U
G
P-FM1
PROVIDE BOLLARDS TO
PROTECT PROPANE
TANKS
ETR:CO
ETR: 4"SW DN
ETR: 4"SW UP TO
EXISTING ROOF
DRAIN
ETR: 3/4"CW DROP
TO EXISTING
FAUCET
ETR: 3/4"CW DROP
TO EXISTING
FAUCET
ETR 3/4"
ETR 3/4"
SW
6"
ETR: 4"G
ETR: 1"CW
ETR: 2"NPCW
ETR: 4"G
ETR: 1"CW
ETR: 2"NPCW
ETR: 3"CW
ETR: RPBP
ETR:CONDENSATE
PUMP (BY HVAC)
ETR: 3"NPCW
CAPPED
ETR: 3"NPCW
ETR: 1"CW
2"P RISE
2"P DN
SWH-1
E T
R
N
P C
W
ETR 3" CW
ETR: DRAIN
VALVE
ETR: DRAIN
VALVE
NC
NC
FCO
2"L
CAPPED
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
248 Copeland Street Quincy, MA 02169 P: 617-481-6390 F: 617-687-5990
200 Brickstone Square Andover, MA 01810 P: 978-296-6227 F: 978-475-5768
100% CONSTRUCTION
DOCUMENTS
REPLACE MAIN BOILERS 528A8-17-805
Samuel S. Stratton VA Medical Center, 113 Holland Ave., Albany, New York 12208
06/05/2024
N
105 Central Street Stoneham, MA 02180 P: 781-275-6050
C U s e rs \j o s ia s .p a u l\ D o c u m e n ts
\Y
A lb a n y
B o ile r_
M E
P
J o s ia s .P a u l.
rv t
/3 /2
:0
:1
P M
PP-301
PLUMBING PHASE 3 - SUB BASEMENT PLAN
MS JP
8' 16'4'0
1/8" = 1'-0"PP-301
1 PLUMBING PHASE 3 - SUB BASEMENT PLAN
PLUMBING GENERAL NOTE:
1. CONTRACTOR SHALL PROVIDE YELLOW
PAINT, PROPANE LABELS ABOVE GRADE
FOR EXTERIOR AND BLUE PAINT FOR THE
INTERIOR PIPING.
Revisions: Date:
ZCW
LZHW
HZHW
HZCW
LZCW
ETR: 1 1/2" HZHWR DN
ETR: 2"BYHWR DN (BYPASS)
ETR:1 1/2"LZHWR DN
ETR 4"
ETR 4"
ETR 4"
ETR 4"
6"V UP&DN
ETR:EMS
TMV-3
1 1/2"TW DROP
4"LZCW w/NEW
1 1/2"LZCW
4"LZHW w/NEW
1/4"LZHW
1 1/2"
1 1/2"
1 1/2"
(2)1 1/2"LZHW DN
1 1/2"LZCW DN
1 1/2"LZCW DROP
1 1/2"LZHW DROP
REFER TO
DRAWING PP-203
PHASE I FOR
CONTINUATION
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
248 Copeland Street Quincy, MA 02169 P: 617-481-6390 F: 617-687-5990
200 Brickstone Square Andover, MA 01810 P: 978-296-6227 F: 978-475-5768
100% CONSTRUCTION
DOCUMENTS
REPLACE MAIN BOILERS 528A8-17-805
Samuel S. Stratton VA Medical Center, 113 Holland Ave., Albany, New York 12208
06/05/2024
N
105 Central Street Stoneham, MA 02180 P: 781-275-6050
C U s e rs \j o s ia s .p a u l\ D o c u m e n ts
\Y
A lb a n y
B o ile r_
M E
P
J o s ia s .P a u l.
rv t
/3 /2
:0
:5
P
M
PP-302
PLUMBING PHASE 3 - BASEMENT FLOOR PLAN
MS JP
8' 16'4'0
1/8" = 1'-0"PP-302
1 PLUMBING PHASE 3 - BASEMENT FLOOR PLAN
Revisions: Date:
6"VTR
INSTALLED A MINIMUM OF 18'-0"
AWAY FROM ANY AIR INTAKES OR
ANY OTHER BUILDING OPENINGS.
(6)1 1/2" GVTR
GAS VENTS THROUGH ROOF SHALL BE
COMBINED TO RUN THROUGH A SINGLE ROOF
PENETRATION LARGE ENOUGH TO
ACCOMMODATE ALL VENTS
PROVIDE WITH DOWN TURN ELBOW AND
INSECT SCREEN ON ALL GAS VENTS
(6)1 1/2" GVTR
GAS VENTS THROUGH ROOF SHALL BE
COMBINED TO RUN THROUGH A SINGLE
ROOF PENETRATION LARGE ENOUGH TO
ACCOMMODATE ALL VENTS
PROVIDE WITH DOWN TURN ELBOW AND
INSECT SCREEN ON ALL GAS VENTS
(6)1 1/2" GVTR
GAS VENTS THROUGH ROOF SHALL BE
COMBINED TO RUN THROUGH A SINGLE
ROOF PENETRATION LARGE ENOUGH TO
ACCOMMODATE ALL VENTS
PROVIDE WITH DOWN TURN ELBOW AND
INSECT SCREEN ON ALL GAS VENTS
(6)1 1/2" GVTR
GAS VENTS THROUGH ROOF SHALL BE
COMBINED TO RUN THROUGH A SINGLE
ROOF PENETRATION LARGE ENOUGH TO
ACCOMMODATE ALL VENTS
PROVIDE WITH DOWN TURN ELBOW AND
INSECT SCREEN ON ALL GAS VENTS
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
248 Copeland Street Quincy, MA 02169 P: 617-481-6390 F: 617-687-5990
200 Brickstone Square Andover, MA 01810 P: 978-296-6227 F: 978-475-5768
100% CONSTRUCTION
DOCUMENTS
REPLACE MAIN BOILERS 528A8-17-805
Samuel S. Stratton VA Medical Center, 113 Holland Ave., Albany, New York 12208
06/05/2024
N
105 Central Street Stoneham, MA 02180 P: 781-275-6050
C U s e rs \j o s ia s .p a u l\ D o c u m e n ts
\Y
A lb a n y
B o ile r_
M E
P
J o s ia s .P a u l.
rv t
/3 /2
:0
:5
P
M
PP-303
PLUMBING PHASE 3 - ROOF PLAN
MS JP
8' 16'4'0
1/4" = 1'-0"PP-303
1 PLUMBING PHASE 3 - ROOF PLAN
Revisions: Date:
SCALE: N/A
PLUMBING EXISTING WATER HEATERS
RISER DIAGRAM (TO BE DEMOLISHED)
1"
T
1"
4"
NC
HIGH PRESSURE
COLD WATER
NC
LPCW HPCW
LPHW HPHW
LPHWR HPHWR
EXISTING 6" HIGH
PRESSURE COLD
WATER
4"LOW PRESSURE
COLD WATER 2"
3" THREE-WAY
THERMOSTATIC
MIXING VALVE
(90 GPM MAX)
LOW PRESSURE
HOT WATER
SUPPLY TO
TANK ROOM
4"
2"
4"
4"
4" LAUNDRY HW
SUPPLY CONNECTION
4" LAUNDRY HW
SUPPLY CONNECTION
4" LAUNDRY HW
SUPPLY CONNECTION
TO DRAIN
HIGH PRESSURE
HOT WATER
SUPPLY TO
TANK ROOM
3" THREE-WAY
THERMOSTATIC
MIXING VALVE
(90 GPM MAX)
DEMOLISHED
WATER
HEATER
DEMOLISHED
WATER
HEATER
DEMOLISHED
EXPANSION
TANKDEMOLISHED
WATER
HEATER
DEMOLISHED
EXPANSION
TANK
DEMOLISHED
EXPANSION
TANK
CUT&CAP EXISTING HOT WATER
RETURN PIPING FOR RECONNECTION
TO NEW WATER HEATERS. REFER TO
FLOOR PLANS FOR ADDITIONAL
INFORMATION.
CUT&CAP EXISTING COLD WATER PIPING
FOR RECONNECTION TO NEW WATER
HEATERS. REFER TO FLOOR PLANS FOR
ADDITIONAL INFORMATION
CUT&CAP EXISTING COLD WATER
PIPING FOR RECONNECTION TO
NEW WATER HEATERS. REFER TO
FLOOR PLANS FOR ADDITIONAL
INFORMATION
CUT&CAP EXISTING HOT
WATER PIPING FOR
RECONNECTION TO NEW
WATER HEATERS. REFER
TO FLOOR PLANS FOR
ADDITIONAL INFORMATION
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
248 Copeland Street Quincy, MA 02169 P: 617-481-6390 F: 617-687-5990
200 Brickstone Square Andover, MA 01810 P: 978-296-6227 F: 978-475-5768
100% CONSTRUCTION
DOCUMENTS
REPLACE MAIN BOILERS 528A8-17-805
Samuel S. Stratton VA Medical Center, 113 Holland Ave., Albany, New York 12208
06/05/2024
105 Central Street Stoneham, MA 02180 P: 781-275-6050
C U s e rs \j o s ia s .p a u l\ D o c u m e n ts
\Y
A lb a n y
B o ile r_
M E
P
J o s ia s .P a u l.
rv t
/3 /2
:0
:2
P
M
P-501
PLUMBING EXISTING WATER HEATERS RISER
DIAGRAM
MS JPRevisions: Date:
3__
9__
1_
1__
1_
13__
13__
13__
11__
1__
~386 3_
11__
7__
3_
3__
1_
1_
3_
OAH
1_
7__
1_
SCALE: N/A
F
F
F
A
A
D
A
A
D
A
D
D
A
B
B
C
C
B C
B
C
E
G
H
H
I
G I
J
H
I
G
622 22
1 1
2 3
B
E
PLUMBING NEW STEAM POWERED WATER HEATERS
RISER DIAGRAM
TMV-2 TMV-1
SWH-2
11/2"HZHWR
4"HZHW
4"HZCW
11/2"HZHWR
4"HZHW
4"HZCW
4"LZCW
4"LZHW
11/2"LZHWR
11/2"BYHWR
11/2"BYHWR
11/2"BYHWR
11/2"BYHWR
4"LZCW
4"LZHW
11/2"LZHWR
BASEMENT FLOOR
SUB BASEMENT FLOOR
RCP-2A
RCP-2B
RCP-1A
RCP-1B
TO BUILDING SUPPLY
SWH-1
4"FD-B 4"FD-B
4" 4"
NC
NC
P-1STEAM WATER WATER HEATER PIPING DIAGRAM
FRONT VIEW
(for clarity, some items not shown)
Top View (for clarity, some items not shown)
Right View (for clarity, some items not shown)
Condensate Detail
(from front view) Blending System Detail
(from front view)
CONNECTION SCHEDULE
NO. SIZE FUNCTION DESCRIPTION
A 2" COLD WATER INLET #1 ANSI 150
B 2" MIXED WATER OUTLET ANSI 150
C 6" STEAM INLET ANSI 150
D 11/2" CONDENSATE OUTLET ANSI 150
E 1/2" MOTIVE INLET NPT
F 1/2" CONDENSATE OUTLET NPT
G 2" COLD WATER INLET #2 ANSI 150
H 2" HEATER RETURN ANSI 150
I 2" MIXED RETURN ANSI 150
J 1/2" AIR VENT OUTLET PIPE END
2 1
SPIRAX SARCO LEA33 CONTROL VALVE WITH
ROTORK CVL 500 ACTUATOR 2 1/2" ANSI 125
3 1
BILL OF MATERIALS
QTY.TAG DESCRIPTION SIZE/MODEL
ALPHA LAVAL M10, TITANIUM HEAT EXCHANGER
5 1
DESCRIPTIONTAG QTY. SIZE/MODEL
2" ANSI 150 6 17(78 GPM)
SPIRAX SARCO LEA33 CONTROL VALVE WITH
ROTORK CVL 500 ACTUATOR 1 1/2" ANSI 125
SPIRAX SARCO PRESSURE GAUGE ASSEMBLY
(30/60 HG/PSIG) 1/4" NPT
CONTROL BOX
SPIRAX SARCO EL2270 TEMPERATURE PROBE 1/2" NPT
TBD
1 SPIRAX SARCO APT14HC AUTOMATIC PUMP TRAP
2" x 1 1/2"
ANSI 150
SPIRAX SARCO FIG. 12 STRAINER 1/2" NPT
SPIRAX SARCO M10S BALL VALVE 1/2" NPT
1/2" NPT
MAGNATROL SOLENOID VALVE
(114S42 120 VAC)2
SPIRAX SARCO TSS300 THERMOSTATIC AIR VENT 1/2" NPT2
T&P RELIEF VALVE 3/4" NPT2 (set @ 150psig, 210°F)
INTEGRAL SS RE-CIRCULATION PUMP
GRUNDFOS NO. UP15-29SU
3/4" UNION
W/ISOLATION VALVE
2 1/2" NPTMAGNATROL SOLENOID VALVE
(114W42 120 VAC)
2 1/2" NPT
SPIRAX SARCO
UTD52L THERMOSTATIC TRAP
1 DCV41 CHECK VALVE 1/2" NPT
2 3-WAY CONTROL VALVE (QLM63M) 2" ANSI 150
18 4 DCV4 CHECK VALVE 2" ANSI 150
DESCRIPTIONTAG QTY. SIZE/MODEL
1-1/2" NPTEXPANSION TANK
(DELTA DFA-500, 132 GALLON)1
1 STORAGE TANK 40"dia, 72" tall
21 2 6" ANSI 150
NOTES:
22 4 GATE VALVES 2" ANSI 125
From Storage Tank
UNIT TO BE HYDROTESTED @ = 188 PSIG AFTER ASSEMBLY.1.
ALL ELECTRICAL WIRING TO BE IN ACCORDANCE WITH THE2.
NATIONAL ELECTRICAL CODE.
ALL PNEUMATIC & ELECTRICAL SYSTEMS MUST BE CHECKED3.
FOR PROPER OPERATION.
ALL CONDUIT IS "SEALTITE" OR EQUAL.4.
UNIT SIZED TO HEAT 78 GPM WATER5.
FABRICATION IS TO BE IN ACCORDANCE WITH SPIRAX SARCO6.
SPECIFICATIONS AS FOLLOWS:
- #100-HVA-10 GENERAL REQUIREMENTS.
- #101-HVA-10 MATERIAL REQUIREMENTS.
- #102-HVA-10 WELDING REQUIREMENTS.
- #103-HVA-10 PAINTING.
- #105-HVA-10 STAINLESS
REQUIREMENTS.
ALL OPEN THREADED CONNECTIONS TO BE PLUGGED7.
FLANGE BOLT HOLES TO STRADDLE THE CENTERLINE8.
STAINLESS STEEL WATERSIDE PIPING.9.
10. QTY =2
23 4 BUTTERFLY VALVES W/ SS DISCS. 2" ANSI 150
(POWELL 1787)
M40 BALL VALVE w/ VALPES
VSFS ACTUATOR
NC
NC
WM-9
VB
WM-10
VB
P905
P-601
P1104
P-601
P1104
P-601
P905
P-601
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
248 Copeland Street Quincy, MA 02169 P: 617-481-6390 F: 617-687-5990
200 Brickstone Square Andover, MA 01810 P: 978-296-6227 F: 978-475-5768
100% CONSTRUCTION
DOCUMENTS
REPLACE MAIN BOILERS 528A8-17-805
Samuel S. Stratton VA Medical Center, 113 Holland Ave., Albany, New York 12208
06/05/2024
105 Central Street Stoneham, MA 02180 P: 781-275-6050
C U s e rs \j o s ia s .p a u l\ D o c u m e n ts
\Y
A lb a n y
B o ile r_
M E
P
J o s ia s .P a u l.
rv t
/3 /2
:0
:2
P
M
P-502
PLUMBING NEW STEAM WATER HEATERS
RISER DIAGRAM AND WATER HEATER DETAIL
MS JPRevisions: Date:
NC
last last
T last last
TT
T
P1104
HOT WATER SUPPLY
COLD WATER SUPPLY
HOT WATER RETURN
WATER
HEATER
MIXING VALVE PIPING DIAGRAM
HIGH-LOW
MIXING
VALVE SET
AT 120°F
THERMOMETER
(TYP.)
BALANCING VALVE
CHECK VALVE (TYP.)
REDUNDANT
CIRCULATION PUMPS
AQUASTAT
FULL SIZE MALE
THREAD END
BALL VALVE
FOR MIXING
VALVE SETUP
27" HIGH
HEAT TRAP
(TYP.)
T
PRESSURE GAUGE
(TYP.)
BAND HANGER
FOR PIPE SIZES 1/2" THRU 4"
NOTES:
1. SEE SPECIFICATION FOR HANGER SIZES AND MATERIAL.
2. DISTANCE BETWEEN HANGERS SHALL BE IN ACCORDANCE WITH THE APPLICABLE PLUMBING CODE.
3. HANGER ROD SHALL BE PER MANUFACTURER'S RECOMMENDATIONS.
SUPPORT NUT
BAND HANGER P800
NO SCALE
BAND HANGER
FOR PIPE SIZES 1/2" THRU 4"
NOTES:
1. SEE SPECIFICATION FOR HANGER SIZES AND MATERIAL.
2. DISTANCE BETWEEN HANGERS SHALL BE IN ACCORDANCE WITH THE
APPLICABLE PLUMBING CODE.
3. HANGER ROD SHALL BE PER MANUFACTURER'S RECOMMENDATIONS.
INSULATION PER
SPECIFICATIONS
SUPPORT NUT
GALVANIZED
STEEL
INSULATION
SHIELD (12"
LONG)
BAND HANGER WITH INSULATED PIPE P801
NO SCALE
CLEVIS PIPE HANGER
FOR PIPE SIZES
LARGER THAN 4 INCHES
SUPPORT NUT
NOTES:
1. SEE SPECIFICATION FOR HANGER SIZES AND MATERIAL.
2. DISTANCE BETWEEN HANGERS SHALL BE IN ACCORDANCE WITH THE APPLICABLE
PLUMBING CODE.
3. HANGER ROD SHALL BE PER MANUFACTURER'S RECOMMENDATIONS.
CLEVIS PIPE HANGER SUPPORT P802
NO SCALE
CLEVIS PIPE HANGER
FOR PIPE SIZES LARGER
THAN 4 INCHES
NOTES:
1. SEE SPECIFICATION FOR HANGER SIZES AND MATERIAL.
2. DISTANCE BETWEEN HANGERS SHALL BE IN ACCORDANCE WITH THE APPLICABLE PLUMBING CODE.
3. HANGER ROD SHALL BE PER MANUFACTURER'S RECOMMENDATIONS.
INSULATION PER
SPECIFICATIONS
SUPPORT NUT
GALVANIZED STEEL
INSULATION SHIEL
(12" LONG)
CLEVIS PIPE HANGER SUPPORT WITH INSULATED
PIPE
P803
NO SCALE
PIPE SHIELD DIAGRAM P809
A
1/2" OF A
LOCKNUT
WASHER
INSULATION
PIPING
CL
CL
PIPE SIZE DIM. A
GA. OF
STEEL
UP TO 4" 12" 18
5" & 6" 18"
24"
14ABOVE 6"
1/2" OF A
NO SCALE
INSULATION
SHIELD SCHEDULE
Electrical Work and Dedicated Space P1701
MIN. 6'-0" OR
TO
STRUCTURA
L CEILING
DEDICATED
ELECTRICAL
SPACE
6'
MAI
N
ON
OFF
MAI
N
ON
OFF
MAI
N
ON
OFF
MAI
N
ON
OFF
MAI
N
ON
OFF
MAI
N
ON
OFF
MIN.
DEPTH
4'-0"
MIN.
HEIGHT
6'-6"
30"
480V
DEDICATED
ELECTRICAL
SPACE BELOW
DEDICATED
ELECTRICAL
SPACE ABOVE
NOTES:
1. NO EQUIPMENT FOREIGN TO THE ELECTRICAL INSTALLATION (PIPING,
DUCTS, ETC.) SHALL ENTER THE DEDICATED SPACE ABOVE OR BELOW
ELECTRICAL POWER EQUIPMENT INCLUDING SWITCHGEAR,
SWITCHBOARDS, PANELBOARDS, & MOTOR CONTROL CENTERS.
2. NO EQUIPMENT SHALL PROTRUDE INTO WORKING SPACE.
3. PIPING SYSTEMS INSTALLED ABOVE THE DEDICATED ELECTRICAL SPACE
SHALL BE ALLOWED WHERE DRIP PANS ARE INSTALLED TO CAPTURE
LEAKS. RUPTURES OR CONDENSATION DRIPS. THE PIPING AND DRIP
PANS SHALL BOTH BE OUTSIDE THE DEDICATED SPACE ENVELOPE.
WORKING
SPACE
ELECTRICAL CLEARANCE CEILING P1702
VOLTAGE TO GROUND (SINGLE PHASE VOLTAGE) CONDITION 1 CONDITION 2 CONDITION 3
0-150 36" 36" 36"
151-600 36" 42" 48"
CONDITION 1 - EXPOSED LIVE PARTS ON ONE SIDE OF THE WORKING SPACE AND NO LIVE OR
GROUNDED PARTS ON THE OTHER SIDE OF THE WORKING SPACE, OR EXPOSED LIVE PARTS ON BOTH
SIDES OF THE WORKING SPACE THAT ARE EFFECTIVELY GUARDED BY INSULATING MATERIALS.
CONDITION 2 - EXPOSED LIVE PARTS ON ONE SIDE OF THE WORKING SPACE AND GROUNDED PARTS ON THE OTHER SIDE OF THE WORKING SPACE. CONCRETE, BRICK, OR TILE WALLS SHALL BE CONSIDERED AS
GROUNDED CONDITION 3 - EXPOSED LIVE PARTS ON BOTH SIDES OF THE WORKING SPACE
NOTE: CLEARANCE WIDTH SHALL BE 30" OR THE WIDTH OF THE CONTROL PANEL/POWER
CONNECTION, WHICHEVER IS GREATER
30"
MIN.
36"-48"
SEE
TABLE
BELOW
FLOOR TO
TOP OF
EQUIPMENT
36"-48"
SEE TABLE BELOW
MINIMUM ELECTRICAL CLEARANCES (NEC 2017 COMPLIANCE)
SECTION "A-A"
REQUIRED
ELECTRICAL
CLEARANCE
AREA
REQUIRED
ELECTRICAL
CLEARANCE
AREA
PLAN VIEW
EQUIPMENT
EQUIPMENT
PROVIDE MINIMUM
30x22 ACCESS
PANEL WITHIN
CLEARANCE AREA
A
A
CONTROL PANEL/
POWER
CONNECTION/
DISCONNECT
CEILING
CONTROL
PANEL/POWER
CONNECTION/
DISCONNECT
NOTES:
1. DETAIL APPLIES TO ALL MECHANICAL
EQUIPMENT LOCATED ABOVE A
CEILING THAT REQUIRES POWER,
INCLUDING CONTROL POWER.
EQUIPMENT INCLUDES, BUT IS NOT
LIMITED TO, FAN POWERED BOXES,
VAV BOXES, FANS, FAN COIL UNITS,
HEAT PUMPS, CRAC UNITS, DX SPLIT
SYSTEMS, DUCT HEATERS, ETC.
2. ELECTRICAL CLEARANCE AREA
(INCLUDING WITHIN CEILING) MUST
BE FREE FROM LIGHTS, SPRINKLER
HEADS, FIRE ALARM DEVICES,
SPEAKERS, PIPING, DUCTWORK,
BEAMS AND OTHER OBSTRUCTIONS.
3. THE HEIGHT OF THE ELECTRICAL
CLEARANCE SHALL BE AS REQUIRED
TO INSTALL AND PERFORM
MAINTENANCE ON THE EQUIPMENT.
MINIMUM HEIGHT SHALL BE FROM
FLOOR TO TOP OF EQUIPMENT.
4. REFER TO SPECIFIC
MANUFACTURER PRODUCT DATA
FOR ADDITIONAL ACCESS AND
CLEARANCE REQUIREMENTS FOR
FANS, COMPRESSORS, VALVES,
DAMPERS, FILTERS, ETC. PROVIDE
ACCESS PANELS AS REQUIRED.
5. COORDINATE WITH ALL TRADES TO
PROVIDE THESE MINIMUM REQUIRED
CLEARANCES.
RECIRCULATION PUMP DETAIL P905
NO SCALE
TYPICAL UNION
CHECK
VALVE
POWER PUMP BY ELECTRICAL
E
GAUGE COCK
DIAL TYPE
PRESSURE
GAUGE (0-100 PSI)
AQUASTAT
SET TO TURN PUMP ON
AT 110 DEGREES AND
TURN PUMP OFF AT 125
DEGREES
TYPICAL
BALL VALVE
REFER TO SCHEDULE FOR
RECIRC PUMP
INFORMATION
FLOW
NOTE:
THE HOT WATER RECIRCULATION PUMP
IS CONTROLLED VIA WATER TEMPERATURE
IN SERIES WITH A TIME CLOCK SUPPLIED AND
INSTALLED BY THE PLUMBING CONTRACTOR.
PROVIDE 120V BRANCH CIRCUITS AS ILLUSTRATED
AND INTERCONNECT THE DEVICES WITH 2#10 AND
1#10G-3/4C.
BALANCING VALVE
CHECK VALVE
DIRECTION OF FLOW
SERVICE BALL VALVE
RECIRCULATION PIPING
BALANCING STATION DETAIL P600
NO SCALE
140°F
°F
TEST COCK TYPICAL
CONT. BY HVAC
3' TO 4'
ABOVE FLOOR
PIPE TO
FLOOR DRAIN
ADJUSTABLE
FLOOR SUPPORT
FULL SIZE AIR GAP
STRAINER
PIPE SADDLE
FINISHED
FLOOR
ALL BRONZE REDUCED PRESSURE
BACKFLOW PREVENTER
SHUT OFF VALVE TYPICAL
NOTES:
1. FURNISH TO OWNER ONE TEST KIT AND SPARE PARTS KIT.
2. THIS CONTRACTOR SHALL ACT AS THE OWNERS AGENT IN SEEKING APPROVAL FROM ALL LOCAL
AND STATE AUTHORITIES. THIS CONTRACTOR SHALL SUBMIT ALL PLANS, SPECS. AND
APPLICATIONS REQUIRED FOR APPROVAL AND PAY ALL FEES.
3. SEE FLOOR PLANS FOR SIZES.
4. MAINTAIN 1'-0" CLEARANCE FROM WALL.
5. TEST AND CERTIFY EACH INSTALLATION.
REDUCED PRESSURE BACKFLOW PREVENTER P100
NO SCALE
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
248 Copeland Street Quincy, MA 02169 P: 617-481-6390 F: 617-687-5990
200 Brickstone Square Andover, MA 01810 P: 978-296-6227 F: 978-475-5768
100% CONSTRUCTION
DOCUMENTS
REPLACE MAIN BOILERS 528A8-17-805
Samuel S. Stratton VA Medical Center, 113 Holland Ave., Albany, New York 12208
06/05/2024
105 Central Street Stoneham, MA 02180 P: 781-275-6050
C U s e rs \j o s ia s .p a u l\ D o c u m e n ts
\Y
A lb a n y
B o ile r_
M E
P
J o s ia s .P a u l.
rv t
/3 /2
:0
:3
P
M
P-601
PLUMBING DETAILS
MS JPRevisions: Date:
7.5"
MIN
5/8" HILTI HDA UNDERCUT
CONCRETE
1/4" STIFFENER
16x9x 3/4" BASE PL
1/4" STIFFENER
36"
(8) 5/8" HILTI HDA
UNDERCUT
SPACED AT 3-6-3
INCHES
6" DIA SCH 40 TUBE
12' max
10x10x1/2" CAP PL1/2 " Hilti
5 NTS
SEISMIC COLUMN BRACING DETAIL
5"
12"
1 NTS
SINGLE PIPE SUPPORTED BY PIPE CLAMP AND WIRE
2 NTS
TRAPEZE SUPPORTED WITH RIGID MEMBER
ALTERNATE LOCATION
3 NTS
CLEAVIS HANGER REINFORCED WITH WIRE ARCHORS
W6X15
3' max
W6X15
5/8" Hilti HDA Undercut Concrete
6 NTS
WALL MOUNTED PIPE SUPPORT SYSTEM
1/4" Stiffener
10x12x 3/4" Base PL
3/4" Hilti HDA Undercut
6"
8"
1 5/8 "
UNISTRUT P1000
ALTERNATE CABLE LOCATION
4 NTS
DETAIL
10 NTS
DOUBLE CLEVIS HANGER WITH TRAPEZE SEISMIC BRACE
5/8" Hilti HDA Undercut Concrete
Pipe Bracket
11 NTS
PIPE BRACING TO WALL
12 NTS
SINGLE PIPE IN TRAPEZE SEISMIC BRACING7 NTS
RIGID MEMBER ATTACHED TO CLEVIS HANGER SEISMIC BRACE
8 NTS
DOUBLE PIPE IN TRAPEZE SEISMIC BRACING…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .