3C- Albany Architectural - stamped.pdf
PDF 16 MB Posted
- Attached to
- Z1DA--528A8-17-805 REPLACE MAIN BOILERS Federal contract opportunity
- Solicitation number
- 36C24224B0047
About this file
This document is a Scope of Work for a federal contract opportunity to replace the main boilers at the Albany VAMC. The project includes construction services to replace three 900 HP dual fuel steam boilers from 1978 with temporary 1,000 BHP steam boilers during the replacement. The work will be performed in three phases - first replacing the electrical equipment and installing new switchgear, second installing the temporary boilers, and third removing the old boilers and installing the new ones. The contract requires the use of the Autodesk Build construction management platform, with all submittals and project communications to be handled through that system. The work must be substantially complete within 730 calendar days of the notice to proceed. The Department of Veterans Affairs, Veterans Integrated Service Network 2, is the federal agency issuing this contract opportunity.
View the file
Other files for this federal contract opportunity
Show all 29
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
M
IN
1 7/8"
8" 8"
SUSPENDED CEILING NOTES
SUSP. ACCUSTICAL CLG. 23" = 1'-0"SUSP. T-BAR & BRACING 51-1/2"=1'-0"
73"=1'-0" 41-1/2"=1'-0"
31-1/2"=1'-0"61-1/2"=1'-0"
SUSPENDED CEILING NOTESCEIL. GRID SUSPENSION SYS.HANGER & BRACING WIRES
CEIL. GRID SUSPENSION SYS. CEIL. GRID SUSPENSION SYS.
@ CONC. SLAB
2"
MA
X
O.C.MAX.
F
IN
IS
H
C E
IL
IN
G H
T
8"
MIN. CLR.
3/8"
O .C
M
A X
90 90
8"
3/8"
MAIN RUNNER.
RUNNER OR
CLEAR CROSS
3/8" MIN.
8"
12'-0"4'-0"
MAIN AND CROSS RUNNERS.
TIE TWO ADJACENT WALL TO CEILING
NOTE:
ELEVATION
PLAN
TILE CEILING
ACCOUSTICAL
MIN. NO. 12 GAUGE
BEND WEB & FLANGES
SPLAYED WIRES
@ CONVERGENCE OF
COMPRESSION STRUT
MAIN RUNNER @ 48" O.C.
IN 1-1/2" AT BOTH ENDS OF WIRES
4'-0" MAX. FROM WALLS, W/ 4 TIGHT TURNS
EACH OTHER) SPACED @ 12'-0" O.C. EA. WAY &
4 - 12 GAUGE SPLAYED WIRES (90° FROM
@ 24" O.C.
CROSS RUNNERS
MAX.
45°
LATERAL BRACING
- TYP.
MAX.
45°
& ATTACH TO STRUCTURE
ABOVE W/ #10 x 2"
WOOD SCREWS
WOOD STRUCTURE
BOTTOM OF
AT BOTH ENDS OF WIRES
W/ 3 TIGHT TURNS IN 1-1/2"
WIRES @ 4'-0" O.C. EA. WAY
12 GA. VERTICAL HANGER
- TYP.
TO STRUCTURE
ANGELES. RR NO. 23256 CHICAGO METALLIC (TYPICAL).
INSTALLATION PER 4917 AND 18 AND CITY OF LOS
WITHIN SIX FEET FROM EACH WALL. UBC STANDARD
FEET ON-CENTER IN BOTH DIRECTIONS WITH THE FIRST POINT
THESE HORIZONTAL RESTRAINT POINTS SHALL BE PLACED 122.
COMPONENT INDUCED BY THE BRACING WIRES.
STRUT SHALL BE ADEQUATE TO RESIST THE VERTICAL
MEMBERS SUPPORTING THE ROOF OR FLOOR ABOVE. THE
SHALL BE EXTENDED TO AND FASTENED TO THE STRUCTURAL
VERTICAL STRUT: A STRUT FASTENED TO THE MAIN RUNNER1.
NOTES:
TO UNDERSIDE OF STRUCTURE ABOVE
#12 GA. VERTICAL WIRE AT 2'-0" O.C. ATTACH
AT 4'-0" O.C.
MAIN RUNNER
45 DEG.
45 DEG.
45 DEG.
AT 2'-0" O.C.
CROSS RUNNER
45 DEG.
EACH RUNNER ATTATCH
BRACING IN PLANE OF
#12 GA. SPLAY WIRE
(GOOD FOR UP TO 4' HIGH).
OTHER APPROVED EQUAL
CONST. TYPES ONLY) OR
WD. STUD (NONE COMBUSTIBLE
BLACK IRON, EMT OR
MAYBE STEEL STUD,
RIGID VERTICAL STRUT
EA. WAY
HANGERS @ 4'-0" O.C.
12 GA. VERT. WIRE
EA. WAY.
90° APART @ 12'-0" O.C.
ON FOUR DIRECTIONS
12 GA. WIRE SPLAYED
GYPSUM WALL
BOARD
CONTINUOUS
WALL ANGLE16 GAUGE ANGLE
POP RIVET
#8 S.M.S.
EACH STUD
THRU SPLICE
CONNECTION
TYPICAL HANGER WIRE AT
4'-0" O.C. WITH ONE
PAIR OF BRACING WIRES
PARALLEL TO WALL AT
12'-0" O.C.
CLR
POP RIVET
#12 GA. HANGER WIRES
(TYP.)
2" MOLDING
A13
SEE
A13
MAX.45°
WOOD JOIST
HANGER WIRE
WOOD JOIST
ANCHOR
x 12 GA. MIN.
1" WIDE X 2" LONG
STEEL STRAP
BRACING WIRE
- HILTI OR EQUAL
12 GA. CLG. CLIP
3/4" WIDE x
TEST LOAD = 200 LBS.
ALLOWABLE LOAD = 100 LBS.
TIMES THE ALLOWABLE LOAD
(10) ANCHORS FOR TWO (2)
TEST ONE (1) OUT OF TEN
ANCHOR
NOTE:
THE WIRE.
ACCEPTABLE TO DSA/SSS.
OFFSETS. THE SLOPE OF THESE WIRES SHOULD NOT EXCEED 45 DEGREES FROM THE PLANE OF THE
OF THE WIRE ALIGNS AS CLOSELY AS POSSIBLEWITH THE DIRECTION OF THE FORCES ACTING ON
11. SEPARATE ALL CEILING HANGING AND BRACING WIRES AT LEAST 6" FROM ALL UNBRACED DUCTS, PIPES, CONDUIT, ETC. IT IS ACCEPTABLE TO ATTACH LIGHTWEIGHT ITEMS, SUCH AS SINGLE ELECTRICAL CONDUIT NOT EXCEEDING 3/4" NOMINAL DIAMETER, TO HANGER WIRES USING CONNECTORS
CEILING GRID SYSTEM RUNNERS, ONE END OF MAIN AND CROSS RUNNERS SHOULD BE FREE AND A
MINIMUM OF 1/2 INCH CLEAR OF WALL.
8. AT THE PERIMETER OF THE CEILING AREA WHERE MAIN OR CROSS RUNNERS ARE NOT CONNECTED TO THE ADJACENT WALL, PROVIDE INTERCONNECTION BETWEEN THE RUNNERS AT THE FREE END TO PREVENT LATERAL SPREADING. A METAL STRUT OR A 16 GA. WIRE WITH A POSITIVE MECHANICAL CONNECTION TO THE RUNNER MAY BE USED. WHERE THE PERPENDICULAR DISTANCE FROM THE WALL TO
THE FIRST PARALLEL RUNNER IS 12" OR LESS, THIS INTERLOCK IS NOT REQUIRED.
9. PROVIDE SETS OF 4 - 12 GA. SPLAYED BRACING WIRES ORIENTED 90 DEGREES FROM EACH OTHER AT A SPACING NOT MORE THAN 12' x 12' ON CENTER. PROVIDE BRACING WIRES AT LOCATIONS NOT MORE THAN 1/2 THE ABOVE SPACING FROM EACH PERIMETER WALL AND AT THE EDGE OF VERTICAL CEILING
CEILING AND SHOULD BE TAUT WITHOUT CAUSING THE CEILING TOLIFT. SPLICES IN BRACING WIRES ARE
NOT TO BEPERMITTED WITHOUT SPECIAL DSA/SSS APPROVAL.
10. FASTEN HANGER WIRES WITH NOT LESS THAN 3 TIGHT TURNS. FASTEN BRACING WIRES WITH 4 TIGHT TURNS. MAKE ALL TIGHT TURNS WITHIN A DISTANCE OF 1 1/2 INCHES. HANGER OR BRACING WIRE ANCHORS TO THE STRUCTURE SHOULD BE INSTALLED IN SUCH A MANNER THAT THE DIRECTION
2. THE CONTRACTOR SHALL VERIFY ADEQUACY OF HANGER WIRES TO PROVIDE A CEILING ASSEMBLY
WITH A MAXIMUM DEFLECTION OF 1/360 OF THE SPAN.
3. INSTALLATION SHALL BE PER MANUFACTURER'S RECOMMENDATIONS.
4. HANGER WIRES SHALL BE #12 GA. FOR 4'-0" x 4'-0" SPACING.
5. PROVIDE 12 GA. HANGER WIRES AT THE ENDS OF ALL MAIN AND CROSS RUNNERS WITHIN 8" FROM THE SUPPORT OR WITHIN 1/4 OF THE LENGTH OF THE END TEE, WHICHEVER IS LEAST, FOR THE PERIMETER OF THE CEILING AREA. END CONNECTIONS FOR RUNNERS WHICH ARE DESIGNED AND DETAILED TO RESIST THE APPLIED HORIZONTAL FORCES MAY BE USED IN LIEU OF THE 12 GA.
HANGER WIRES SUBJECT TO DSA/SSS REVIEW AND APPROVAL.
6. PROVIDE TRAPEZE OR OTHER SUPPLEMENTARY SUPPORT MEMBERS AT OBSTRUCTIONS TO MAIN HANGER SPACING. PROVIDE ADDITIONAL HANGERS, STRUTS OR BRACES AS REQUIRED AT ALL CEILING BREAKS, SOFFITS OR DISCONTINUOUS AREAS. HANGER WIRES THAT ARE MORE THAN 1 IN 6 OUT
OF PLUMB ARE TO HAVE COUNTER-SLOPING WIRES.
7. CEILING GRID MEMBERS MAY BE ATTACHED TO NOT MORE THAN 2 ADJACENT WALLS. CEILING GRID MEMBERS SHOULD BE AT LEAST 1/2 INCH FREE OF OTHER WALLS. IF WALLS RUN DIAGONALLY TO
1. SUSPENSION SYSTEM SHALL BE DONN HEAVY DUTY EXPOSED GRID 24" x 48" SYSTEM WITH DX26 MAINRUNNERS AND DX424 CROSS RUNNERS. COMPONENTS SHALL BE FORMED FROM COMMERCIAL QUALITY COLD- ROLLED STEEL, ELECTRO GALVANIZED COATED AND PREPAINTED. EXPOSED FINISH SHALL
BE LOW SHEEN SATIN WHITE. ACOUSTIC UNITS SHALL HAVE A FLAME SPREAD OF 0-25.
WEIGHT OF THE FIXTURE.
FIXTURES MUST HAVE SLACK SAFETY WIRES AT EACH CORNER. ALL FLUSH OR RECESSED LIGHT FIXTURES AND AIR TERMINALS OR SERVICES WEIGHING 56 POUNDS OR MORE MUST BE INDEPENDENTLY SUPPORTED BY NOT LESS THAN 4 TAUT 12 GA. WIRES EACH ATTACHED TO THE FIXTURE AND TO
THE STRUCTURE ABOVE REGARDLESS OF THE TYPE OF CEILING GRID SYSTEM USED.
THE 4 TAUT 12 GA. WIRES INCLUDING THEIR ATTACHMENT TO THE STRUCTURE ABOVE MUST BE
CAPABLE OF SUPPORTING 4 TIMES THE WEIGHT OF THE UNIT.
14. SUPPORT SURFACE MOUNTED LIGHT FIXTURES BY AT LEAST 2 POSITIVE DEVICES WHICH SURROUND THE CEILING RUNNER AND WHICH ARE EACH SUPPORTED FROM THE STRUCTURE ABOVE BY A 12 GA. WIRE.
SPRING CLIPS OR CLAMPS THAT CONNECT ONLY TO THE RUNNER ARE NOT ACCEPTABLE.
PROVIDE ADDITIONAL SUPPORTS WHEN LIGHT FIXTURES ARE 8 FEET OR LONGER.
15. SUPPORT PENDENT MOUNTED LIGHT FIXTURES DIRECTLY FROM THE STRUCTURE ABOVE WITH HANGER WIRES OR CABLES PASSING THROUGH EACH PENDANT HANGER AND CAPABLE OF SUPPORTING 4 TIMES THE
12. ATTACH ALL LIGHT FIXTURES TO THE CEILING GRID RUNNERS TO RESIST A HORIZONTAL FORCE
EQUAL TO THE WEIGHT OF THE FIXTURES.
13. FLUSH OR RECESSED LIGHT FIXTURES AND AIR TERMINALS OR SERVICES WEIGHING LESS THAN 56 POUNDS MAY BE SUPPORTED DIRECTLY ON THE RUNNERS OF A HEAVY DUTY GRID SYSTEM BUT, IN ADDITION, THEY MUST HAVE A MINIMUM OF 2 - 12 GA. SLACK SAFETY WIRES ATTACHED TO THE FIXTURE AT DIAGONAL CORNERS AND ANCHORED TO THE STRUCTURE ABOVE. ALL 4'-0" x 4'-0" LIGHT
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
248 Copeland Street Quincy, MA 02169 P: 617-481-6390 F: 617-687-5990
200 Brickstone Square Andover, MA 01810 P: 978-296-6227 F: 978-475-5768
100% CONSTRUCTION
DOCUMENTS
REPLACE MAIN BOILERS 528A8-17-805
Samuel S. Stratton VA Medical Center, 113 Holland Ave., Albany, New York 12208
06/05/2024
N
105 Central Street Stoneham, MA 02180 P: 781-275-6050
C U s e rs \h a u n g \D o c u m e n ts \A lb a n y
B o ile r_
A rc h
B id
S e t_ V h a u n g
G H
V P
.r v t
/4
/2
:2
:2
A
M
AI-203
ARCHITECTURAL PHASE 3 - SUSPENDED
CEILING DETAILS
DM SHRevisions: Date:
1_
" STRUCTURAL CEMENT
BD.
6" METAL STUD. ALL
6" METAL U TRACK
GALVANIZED METAL
PANEL
METAL STUD.
CONTINUE ACROSS. 16" O.C.
BOLT FASTENER
ALL AROUND
6" METAL STUD
@16" O.C.
1_
" STRUCTURAL CEMENT
BD.
NEW FILL-IN
STRUCTURAL CMU
WALL 8" AND 4"
TOGETHER TO FIT THE
EXISTING WALL
EXISTING WALL
EXISTING WALL
NEW FILL-IN BRICKS
TO MATCH EXISTING'S
STRUCTURAL CMU WALL
8", 4" TOGETHER TO FIT
THE EXISTING WALL
6" METAL U
TRACK
MECHANICAL DUCTS
INSULATION ALL
AROUND
6" METAL U TRACK
6" METAL U TRACK
12" METAL FLASHING WITH
FASTENER ALL AROUND
EXISTING WALL
AT CHIMNEY SIDE
EXISTING OPENING BOTTOM
3- DUCTS, 15" RADIUS
WITH 1.25" INSULATION
ALL AROUND
0 '- 0"
-0 '- 6"
NEW OPENING TOP 0 '- 0"
NEW OPENING BOTTOM
0 '- 0"
EXISTING OPENING TOP
NEW FILL-IN BRICKS
TO MATCH EXISTING'S
1_
" STRUCTURAL CEMENT BD.
GALVANIZED METAL COLLAR 3"
WIDE AND 3/8 " LARGER THAN
THE INSULATION, FIELD WELDING
ALL AROUND. TYP.
SEALANT CAULKING
ALL AROUND, TYP.
FIELD WELD, TYP.
6" METAL U TRACK
6" METAL U TRACK
6" METAL STUD
EXISTING OPENING
E X
IS
T
IN
G
O P
E N
IN
G
E X
IS
T
IN
G
O P
E N
IN
G
EXISTING WALL
EXISTING WALLEXISTING WALL
EXISTING WALLEXISTING WALL
6" METAL U TRACK
6" METAL STUD
@16" O.C. TYP.
6" METAL STUD
@16" O.C. TYP.
E X
IS
T
IN
G
O P
E N
IN
G
SECTION VIEW ELEVATION/ SECTION VIEW
PLAN VIEW
EXISTING WALL
NEW FILL-IN BRICKS IN
FRONT OF METAL STUD
TO MATCH EXISTING'S
3/4" = 1'-0" 3/4" = 1'-0"
3/4" = 1'-0"
8" METAL STUD BEHIND
METAL FLANGE,
BRICKS INFILL IN THE
FRONT TO MATCH
EXISTING'S
6" METAL U TRACK
BRICKS INFILL IN THE
FRONT TO MATCH
EXISTING'S
METAL FLANGE ALL
AROUND FASTENED TO
THE METAL STUD
METAL FLANGE ALL
AROUND FASTENED TO
THE METAL STUD
EXISTING WALLEXISTING WALL
EXISTING WALL
EXISTING WALL
6" METAL U TRACK
6" METAL STUD
@16" O.C. TYP.
6" METAL STUD
@16" O.C. TYP.
1_
" STRUCTURAL
CEMENT BOARD
3' X 4' LOUVER
METAL FLANGE ALL
AROUND FASTENED TO
THE METAL STUD
METAL FLANGE ALL
AROUND FASTENED TO
THE METAL STUD
3' X 4' LOUVER
2' X 2' METAL ACCESS
PANEL WITH 2 HOUR
FIRE RATING
6" METAL U TRACK
6" METAL U TRACK
BEHIND METAL FLANGE
2' X 2' METAL ACCESS
PANEL WITH 2 HOUR
FIRE RATING
METAL U TRACK
3' X 4' LOUVER
BRICKS INFILL IN THE
FRONT TO MATCH
EXISTING'S
BOILER ROOM
SIDE
CHIMNEY SIDE
BOILER ROOM
SIDE
CHIMNEY SIDE
BOILER ROOM
SIDE
CHIMNEY SIDE
PLAN VIEW
3/4" = 1'-0"
E X
IS
T
IN
G
O P
E N
IN
G
1_
" STRUCTURAL
CEMENT BOARD
GALVANIZED METAL PANEL
BOLT FASTENER ALL
AROUND
2'-4" 4'-4" 1'-4"
8'-0"
7'-0"
2 1 2 1
3+43+4
AI-404
AI-404
AI-404
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
248 Copeland Street Quincy, MA 02169 P: 617-481-6390 F: 617-687-5990
200 Brickstone Square Andover, MA 01810 P: 978-296-6227 F: 978-475-5768
100% CONSTRUCTION
DOCUMENTS
REPLACE MAIN BOILERS 528A8-17-805
Samuel S. Stratton VA Medical Center, 113 Holland Ave., Albany, New York 12208
06/05/2024
N
105 Central Street Stoneham, MA 02180 P: 781-275-6050
C U s e rs \h a u n g \D o c u m e n ts \A lb a n y
B o ile r_
A rc h
B id
S e t_ V h a u n g
G H
V P
.r v t
/4
/2
:2
:2
A
M
AI-204
ARCHITECTURAL PHASE 3 - BREECH DETAILS
DM SHRevisions: Date:
GROUND LINE
Sub-basement 178' - 9"
Basement Mezzanie 190' - 7"
Level 1 202' - 6"
Roof 216' - 6"
Sub-basement 178' - 9"
Basement Mezzanie 190' - 7"
Level 1 202' - 6"
Roof 216' - 6"
Sub-basement 178' - 9"
Basement Mezzanie 190' - 7"
Level 1 202' - 6"
Roof 216' - 6"
Sub-basement 178' - 9"
Basement Mezzanie 190' - 7"
Level 1 202' - 6"
Roof 216' - 6"
AF-101
45 AF-103 4AF-103
AF-103
AF-1035
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
248 Copeland Street Quincy, MA 02169 P: 617-481-6390 F: 617-687-5990
200 Brickstone Square Andover, MA 01810 P: 978-296-6227 F: 978-475-5768
100% CONSTRUCTION
DOCUMENTS
REPLACE MAIN BOILERS 528A8-17-805
Samuel S. Stratton VA Medical Center, 113 Holland Ave., Albany, New York 12208
06/05/2024
N
105 Central Street Stoneham, MA 02180 P: 781-275-6050
C U s e rs \h a u n g \D o c u m e n ts \A lb a n y
B o ile r_
A rc h
B id
S e t_ V h a u n g
G H
V P
.r v t
/4
/2
:2
:0
A
M
AF-101
ARCHITECTURAL PHASE 3 - ROOM FINISHES
DM SH
3/16" = 1'-0"
BOILER ROOM NORTH ELEVATION - FINISHES
3/16" = 1'-0"
BOILER ROOM SOUTH ELEVATION - FINISHES
3/16" = 1'-0"
BOILER ROOM EAST ELEVATION - FINISHES
3/16" = 1'-0"
BOILER ROOM WEST ELEVATION - FINISHES
CONTROL ROOM
EPOXY
PAINT
PAINTED
CONCRETE
170 110 115 115 510
PAINTED
CONCRETE
BOILER ROOM
MEZZANINE
SUB-BASEMENT
EPOXY
PAINT
2800 - - - - - -
PAINTED
CONCRETE
PLASTER BOARD - - - 65 65
EXPOSED BLOCK - - 75 75 150
PAINTED
CONCRETE
700 1600 650 870 3820
BOILER ROOM
EPOXY
PAINT
EXPOSED BRICK 2900 1500 1400 750 6550
PAINTED
CONCRETE
MATL. AREA (SF) AREA (SF) AREA (SF) AREA (SF) AREA (SF) AREA (SF) MATL. AREA (SF)
MATL.
N S E W TOTALROOM NAME
FLOOR
WALLS
CEILING
1/8" = 1'-0"
BOILER ROOM FINISHES
BOILER ROOM
CONTROL ROOM
NOTES
1. NO PAINTING WORK ON BRICK WALLS.
2. WALL PAINT: APPLY BENJAMIN MOORE 199 LRV:69 ON ALL INTERIOR WALLS,
EGGSHELL FINISH.
3. FLOOR PAINT: GRAY EPOXY TO MATCH THE EXISTING EXPOXY OR ENAMEL WITH LOW
SKID COEFFICIENT.
4. CEILING PAINT: ALL CEILING WILL BE FLAT WHITE.
5. SOME NEW PIPING HAVE THE SPECIAL DESIGNATED COLORS CONTRACTOR WILL
NEED TO COORDINATE WITH MEP DESIGN ENGINEERS TO ACQUIRE THE DETAILED
INFORMATIONS.
6. CONTROL ROOM WILL HAVE A SUSPENDED CEILING.
7. PAINT ALL OF THE STAIR NOSING AND RAILINGS BRIGHT YELLOW AFTER CLEANING.
8. PAINT ALL OF THE HOUSEKEEPING PADS IN THE BOILER AND CHILLER PLANTS
BRIGHT RED.
Revisions: Date:
AF-102
AF-102
AF-103 4AF-103
AF-103
AF-1035
Sub-basement 178' - 9"
Basement Mezzanie 190' - 7"
Sub-basement 178' - 9"
Basement Mezzanie 190' - 7"
Sub-basement 178' - 9"
Basement Mezzanie 190' - 7"
Sub-basement 178' - 9"
Basement Mezzanie 190' - 7"
Sub-basement 178' - 9"
Basement Mezzanie 190' - 7"
Sub-basement 178' - 9"
Basement Mezzanie 190' - 7"
Sub-basement 178' - 9"
Basement Mezzanie 190' - 7"
Sub-basement 178' - 9"
Basement Mezzanie 190' - 7"
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
248 Copeland Street Quincy, MA 02169 P: 617-481-6390 F: 617-687-5990
200 Brickstone Square Andover, MA 01810 P: 978-296-6227 F: 978-475-5768
100% CONSTRUCTION
DOCUMENTS
REPLACE MAIN BOILERS 528A8-17-805
Samuel S. Stratton VA Medical Center, 113 Holland Ave., Albany, New York 12208
06/05/2024
N
105 Central Street Stoneham, MA 02180 P: 781-275-6050
C U s e rs \h a u n g \D o c u m e n ts \A lb a n y
B o ile r_
A rc h
B id
S e t_ V h a u n g
G H
V P
.r v t
/4
/2
:2
:0
A
M
AF-102
ARCHITECTURAL PHASE 3 - ROOM FINISHES
DM SH
1/8" = 1'-0"
ELECTRICAL ROOM AND GENERATOR ROOM FINISHES
3/16" = 1'-0"
GENERATOR ROOM NORTH ELEVATION - FINISHES
3/16" = 1'-0"
GENERATOR ROOM SOUTH ELEVATION - FINISHES
3/16" = 1'-0"
GENERATOR ROOM EAST ELEVATION - FINISHES
3/16" = 1'-0"
GENERATOR ROOM WEST ELEVATION - FINISHES
3/16" = 1'-0"
ELECTRICAL ROOM NORTH ELEVATION - FINISHES
3/16" = 1'-0"
ELECTRICAL ROOM EAST ELEVATION - FINISHES
3/16" = 1'-0"
ELECTRICAL ROOM WEST ELEVATION - FINISHESTOILET
EPOXY
PAINT
PAINTED
CONCRETE
117 103 117 103 554
PAINTED
CONCRETE
OFFICE
EPOXY
PAINT
PAINTED
CONCRETE
84 84 98 98 364
PAINTED
CONCRETE
ELECTRICAL ROOM
EPOXY
PAINT
PAINTED
CONCRETE
490 510 176 220 1396
PAINTED
CONCRETE
GENERATOR ROOM
EPOXY
PAINT
PAINTED
CONCRETE
510 485 215 192 1402
PAINTED
CONCRETE
560 SEE SCHEDULE NOTES ON AF-101
MATL. AREA (SF) AREA (SF) AREA (SF) AREA (SF) AREA (SF) AREA (SF) MATL. AREA (SF)
MATL.
N S E W TOTAL
FLOOR
WALL
CEILING
GENERATOR ROOM
ELECTRICAL ROOM
BOILER ROOM
CONTROL ROOM
OFFICE TOILET
3/16" = 1'-0"
ELECTRICAL ROOM SOUTH ELEVATION - FINISHES
EXISTING 4" VENEER BRICK FULLY GROUTED
EXIST ING 36" STEEL BEAM ENCASED IN
CONCRETE
GROUND LINEAF-101
45 AF-103 4AF-103
AF-103
AF-1035
(2) EDGES OF ROOF
OPENIN 2'X2' AT
CEILING NEED TO BE
REPAIRED, P #12
Sub-basement 178' - 9"
Basement Mezzanie 190' - 7"
Level 1 202' - 6"
Roof 216' - 6"
BRICK WALL CRACK
128" HEIGHT, P #1
(E) OPENING 2' DIA.
(E) BREECHING
(4) EXISTING HOLES
2'X2' NEED TO
REPAIR, BRICK INFILL
P #2
CONC. WALL CRACK
4' HEIGHT, P #3
Sub-basement 178' - 9"
Basement Mezzanie 190' - 7"
Level 1 202' - 6"
Roof 216' - 6"
CRACK AT THE EDGE OF CONC. /BRICK
WALL 16' HEIGHT, PIC #4
CRACK 10' L , P #5CRACK 10' L , P #5
PIPE OUT HOLE P #6AREA OF HOLE, 2'X4', P #6
Sub-basement 178' - 9"
Basement Mezzanie 190' - 7"
Level 1 202' - 6"
Roof 216' - 6"
BEAM CRACK 10' LONG/EA AND ROOF
HOLE (2'X6'/EA), P #13
EDGE CRACK (10' L) , P #14
Sub-basement 178' - 9"
Basement Mezzanie 190' - 7"
Level 1 202' - 6"
Roof 216' - 6"
BRICK CRACK AT
EDGE 1' L , P #8
CRACK 10' L , P #8
BRICK CRACK AT
EDGE 30' L , P #9
BRICK CRACK AT
EDGE 30' L , P #10
CONC/ BRICK
CRACK AT
EDGE 3' H & 7' L ,
P #11
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
248 Copeland Street Quincy, MA 02169 P: 617-481-6390 F: 617-687-5990
200 Brickstone Square Andover, MA 01810 P: 978-296-6227 F: 978-475-5768
100% CONSTRUCTION
DOCUMENTS
REPLACE MAIN BOILERS 528A8-17-805
Samuel S. Stratton VA Medical Center, 113 Holland Ave., Albany, New York 12208
06/05/2024
N
105 Central Street Stoneham, MA 02180 P: 781-275-6050
C U s e rs \h a u n g \D o c u m e n ts \A lb a n y
B o ile r_
A rc h
B id
S e t_ V h a u n g
G H
V P
.r v t
/4
/2
:2
:1
A
M
AF-103
ARCHITECTURAL PHASE 3 - WALL AND CEILING
REPAIRS
DM SH
1/8" = 1'-0"
BOILER ROOM WALL AND CEILING REPAIRS
1/8" = 1'-0"
BOILER ROOM NORTH WALL - REPAIRS
1/8" = 1'-0"
BOILER ROOM SOUTH WALL - REPAIRS
1/8" = 1'-0"
BOILER ROOM EAST WALL - REPAIRS
1/8" = 1'-0"
BOILER ROOM WEST WALL - REPAIRS
CRACK AREA
P #1
AREA OF HOLES
P #2
P #11
CRACK AREA
AREA OF CRACK
P #3 P #4
AREA OF HOLES
PIC #5
CRACK AREA
PIPE OUT HOLE
P #6
AREA OF HOLE
P #7
P #8
AREA OF CRACK
P #9
AREA OF CRACK AREA OF CRACK
P #10
(2) EDGES OF
ROOF OPENING
AT CEILING
NEED TO BE
REPAIRED
P #12
P #13
CRACK AREA
P #14 CRACK AREA
CEILING N/A 60 20
WALL 20 80 140 20
LINEAR FEET SQUARE FEET LINEAR FEET SQUARE FEET
BRICK WALL CONCRETE WALL
NOTES
ROOM REPAIR SCHEDULE
File details come from the government source that posted it. Updated .