This document is a Solicitation for a federal contract opportunity to replace the main boilers at the Albany VA Medical Center. The project involves constructing new electrical and boiler plant infrastructure, installing temporary boilers, and replacing the existing 900 HP boilers with new boilers. Key details include:
The project will be performed in phases, with the first phase replacing electrical equipment and installing new switchgear, the second phase installing temporary boilers, and the third phase removing the existing 900 HP boilers and installing new boilers. The contractor will be required to use the Autodesk Build construction management platform and complete all required submittals prior to mobilization. The contract has a substantial completion deadline of 730 calendar days after the notice to proceed. The agency issuing the solicitation is the Department of Veterans Affairs Veterans Health Administration, Veterans Integrated Service Network 2.
View the file
Other files for this federal contract opportunity
Show all 29
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ONE LINE SYMBOLS LEGEND
XXAS
XXAF
XXAT
XXAF
K
M
ELECTRICAL BOILER PLANT ONE-LINE DIAGRAM
SCALE: NTS
ELEVATION
SCALE: 1/4"=1'-0"
PLAN VIEW
SCALE: 1/4"=1'-0"
DOUBLE ENDED MAIN SWITCHGEAR 'BP-SWGR'
PLAN VIEW AND ELEVATION
SCALE: 1/4"=1'-0"
ELEVATION
SCALE: 1/4"=1'-0"
PLAN VIEW
SCALE: 1/4"=1'-0"
STANDBY EMEGENCY SWITCHGEAR 'BP-ESD'
PLAN VIEW AND ELEVATION
SCALE: 1/4"=1'-0"
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
248 Copeland Street Quincy, MA 02169 P: 617-481-6390 F: 617-687-5990
200 Brickstone Square Andover, MA 01810 P: 978-296-6227 F: 978-475-5768
EQUIPMENT
PRE-PURCHASE
REPLACE MAIN BOILERS 528A8-17-805
06/17/2024
ELECTRICAL
BOILER PLANT ONE-LINE DIAGRAM
DJC MVM
E-501
Work