This document is a Scope of Work for a federal contract opportunity to replace the main boilers at the Samuel S. Stratton VA Medical Center in Albany, New York. The project will be completed in three phases:
Phase 1 will replace the existing electrical equipment and install new switchgear to serve the chiller and boiler plants. Phase 2 will install two temporary 1,000 BHP dual fuel steam boilers and related equipment, including a temporary control trailer. The temporary boilers will provide steam and domestic hot water service while the existing boilers are removed. Phase 3 will remove the existing 900 HP boilers, install new boilers, and restore the permanent boiler control system. The contract requires the use of the Autodesk Build construction management platform and has a deadline of 730 calendar days after the notice to proceed. The agency is the Department of Veterans Affairs, Veterans Health Administration, Veterans Integrated Service Network 2.
View the file
Other files for this federal contract opportunity
Show all 29
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
M M MM M
M
H X
-2
H X
-1
E X
IS
T
IN
G
P R
V -1
8" HPS
L P
S
L P
S
LPS BRANCH TO
UNIT HEATER TO
BE REMOVED
8" LPS
8"Ø LPS BYPASS
LINE
8" HPS CAP
6" VENT THRU ROOF
H P
S
BOILER #3BOILER #2BOILER #1
EXH. HD AB. ROOF
2" VENT THRU ROOF (TYPICAL
FOR ALL BOILERS)
V V
BOILER STEAM FLOW
TRANSMITTER
(TYPICAL FOR ALL BOILERS)
DN TO OSD (TYP) DN TO OSD (TYP)
DRIP LEG
H P
S
3" HPS TO BOILER SOOT BLOWER
PRV - 19A/B
6" LPS TO DA TANK
PRESSURE RELIEF
VALVES SET AT 145 &
150 PSIG
6" LPS
V
BOILER #4
(SUMMER BOILER)T-1 T-2
T-15 T-17
6" HPS
H P
S
MUA-1 PRV
UH-4UH-3
1-1/2" HPR
1" HPS
UH-5
ST-2
ST-1
H P
S F
R O
M B
-1
H P
S F
R O
M B
-4
H P
S F
R O
M B
-2
H P
S F
R O
M B
-3
H P
R
1" HPR TO DA TANK
/4
H
P R
3/4" HPR TO DA TANK
TYPICAL FOR ALL
BOILER
CONNECTIONS
ST-06 ST-05
ST-01 ST-02
ST-03
ST-04
3/4" TO PRESSURE
GAUGES IN CONTROL
ROOM
H P
S T
O L A
U N
D R
Y
H P
S T
O B
O
IL
E R
A T
O M
IZ
E
R S
/4
H
P S
T O
P R
E S
S U
R E
G A
U G
E S
6" HPS TO
LAUNDRY
10" HPS TO
HOSPITAL
PRV - 24A/B
PRV - 22A/B
" H
P S
HOSPITAL HTG
SYSTEM STEAM
FLOW
V
H P
S T
O H
O S
P
IT
A L
8" HPS TO CHILLER
PLANT
8" HPS
6" HPS
OSD
SILENCER ABOVE ROOF
H P
S T
O C
H
IL
L E
R P
L A
N T
6" HPS
H P
S
2" LPS TO MUA-1
1-1/2" LPR TO
CONDENSATE TANK
4" HPS
1-1/2" HPR TO FLASH
TANK
E X
IS
T
IN
G
P R
V -3
H X
-3
H X
-4
TO CHILLER
PLANT UNIT
HEATERS
8" HPS
14" LPS
T-6T-7
T-8
-1
/2
H P
R
1" LPR
EXISTING PRV TO
REMAIN
E X
IS
T
IN
G
P R
V -2
LPS BRANCH TO
UNIT HEATER TO
REMAIN
L P
S
EV-2.1 EV-3.1
EV-1
EV-4
EV-2.2 EV-3.2
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
248 Copeland Street Quincy, MA 02169 P: 617-481-6390 F: 617-687-5990
200 Brickstone Square Andover, MA 01810 P: 978-296-6227 F: 978-475-5768
100% CONSTRUCTION
DOCUMENTS
REPLACE MAIN BOILERS 528A8-17-805
Samuel S. Stratton VA Medical Center, 113 Holland Ave., Albany, New York 12208
06/05/2024
105 Central Street Stoneham, MA 02180 P: 781-275-6050
C U se rs
\h a u n g \D o c u m e n ts
\A lb a n y_ B o ile r_ M e c h
E le ct ri c a l U p g ra d e
V h a u n g
G H
V P
.r v t
/3
/2
:1
:0
A
M
MID-101
STEAM RISER DIAGRAM - PHASE 1 -
DEMOLITION
12" = 1'-0"
RISER DIAGRAM 1 - PHASE 1 - DEMOLITION
Revisions: Date:
EXCELS IOR
084767-1
LSL
LSH
LI
LI
LSL
LSH
LI
TI
TI
LT
LCV
LCV
FROM HX-1/2 CONDENSATE
PUMP
2" PR
H X
-2
H X
-1
P R
VF
L A
S H
T A
N K
H P
R
LPR BRANCH FROM
UNIT HEATER TO BE
REMOVED
EXISTING
CONDENSATE PUMP
TO BE REMOVED
EXISTING PRV AND
ACCESSORIES TO BE
REMOVED
EXISTING FLASH TANK
AND ACCESSORIES
TO BE REMOVED
EXISTING HX-1&2
TO BE REMOVED
EXISTING STEAM
TRAPS TO BE
REPLACED
EXISTING
END-OF-MAIN STEAM
TRAP TO REMAIN.
6" LPSFROM PRV - 19A/B
HPR FROM PRV - 19A/B
HPR MAIN STEAM HEADER 1" HPR
3/4" HPR
3/4" CAP 11/4" CAP 2" CAP
V
EXH. HD AB. ROOF
TO BOILERS
4" HPR
V
1"
11/2"
11/2"
LWC
LEVEL TRANSMITTER
4" OFL
3 / 4
B F
R E
C
IR
C
T Y
P
2"
3/4" FD
DEAERATOR TANK
ABANDONED
6" LPS
(STEAM TURBINE WAS REMOVED)
TO BOILERS
FROM B-2 BLOWDOWN
FROM B-1 BLOWDOWN
FROM B-3 BLOWDOWN
EXISTING BLOWDOWN TANK
EXH. HD AB. ROOF
S W
4" PR AND LPR
FROM ARF (ABANDONED) 1-1/2" LPR 1-1/2" LPR
2" LPR
6" LPR
2" BYPASS
3" LPR
3" LPR
4" OFL
6"
BYPASS
OSD
4" OFL
2" PC (RECIRC)
4" LPR
3" LPR
4"
SUCTION
3" PC
4"
SUCTION
3" PC
1" V
11/2"
1"
LEVEL TRANSMITTER
3/4" ED
3/4"
1"
3/4"
11/2"
SAN
11/2" ED
1" ED
3/4" ED
1"
LEVEL
SWITCH LOW
LEVEL
SWITCH HIGH
11/2"
11/2"
CONDENSATE TANK
P-5
P-4
FLASH TANK
16" DIA X 36" L. 3"
"V
EXISTING CONNECTION FROM
CONDENSATE TANK
TO DA TANK SHALL REMAIN UNTIL
AFTER TEMPORARY
BOILERS WITH DEDICATED DA
TANKS ARE OPERATING
4" TO HEAT
RECOVERY UNIT
ON MEZZANINE
4" TO HEAT
RECOVERY UNIT
ON MEZZANINE
OSD
P-1 P-2 P-3
P C
FROM HOSPITAL
FROM HOSPITAL
FROM TANK VAULT
FROM HX-3/4 3" PR
FROM HOSPITAL 2" LPR
FROM PLANT UHs
FROM HOSPITAL 4" LPR
FROM MUA-1 1-/2" LPR
F R
O M
W A
T E
R S
O F
T E
N E
R S
V
BASEMENT / MEZZANINE LEVEL
1-1/2" HPR
1-1/2" HPR
11/2" BOILER B #4
MECH ROOM
11/2" FROM
HOSPITAL
MECHANICAL ROOM WALL
SUB-BASEMENT LEVEL
2" PR
OSD
EXISTING TRENCH
E X
IS
T
IN
G
P R
V -3
H X
-3
H X
-4
E X
IS
T
IN
G
P R
V -2
LPR BRANCH
FROM UNIT
HEATER TO
REMAIN
L P
R
1" LPR
LPR BRANCH
FROM UNIT
HEATERS TO
REMAIN
EXISTING
HX-3&4
CONDENSATE
PUMP TO
REMAIN
P R
P R
EXISTING
HX-3&4
TO
REMAIN
6" VTR
SW
CTPD
CONTROLLER
WATER LEVEL
TRANSMITTER
WATER LEVEL CONTROL
SCHEMATIC
M F
G R
[4 m m
[4 m m
TOP OF TANK
OFL LINE
HIGH LEVEL ALARM
LOW LEVEL ALARM
EMERGENCY MAKE-UP
[4 m m
NORMAL WATER LEVEL
C OF TANK
CV-3
CV-4
OFL
OFL
CONTROLLER
OFL CONTROL
SWITCH
OVERFLOW CONTROL
SCHEMATIC
CV-5
SAFETY DEVICE MANUAL
CAN BE 1/3 OF TANK
B Y
D A
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
248 Copeland Street Quincy, MA 02169 P: 617-481-6390 F: 617-687-5990
200 Brickstone Square Andover, MA 01810 P: 978-296-6227 F: 978-475-5768
100% CONSTRUCTION
DOCUMENTS
REPLACE MAIN BOILERS 528A8-17-805
Samuel S. Stratton VA Medical Center, 113 Holland Ave., Albany, New York 12208
06/05/2024
105 Central Street Stoneham, MA 02180 P: 781-275-6050
C U se rs
\h a u n g \D o c u m e n ts
\A lb a n y_ B o ile r_ M e c h
E le ct ri c a l U p g ra d e
V h a u n g
G H
V P
.r v t
/3
/2
:1
:0
A
M
MID-102
CONDENSATE RISER DIAGRAM - PHASE 1 -
DEMOLITION
12" = 1'-0"
RISER DIAGRAM 2 - PHASE 1 - DEMOLITION
Revisions: Date:
L P
S
8" HPS CAP
6" VENT THRU ROOF
H P
S
BOILER #3BOILER #2BOILER #1
EXH. HD AB. ROOF
2" VENT THRU ROOF (TYPICAL
FOR ALL BOILERS)
V V
BOILER STEAM FLOW
TRANSMITTER
(TYPICAL FOR ALL BOILERS)
DN TO OSD (TYP) DN TO OSD (TYP)
DRIP LEG
H P
S
3" HPS TO BOILER SOOT BLOWER
PRV - 19A/B
6" LPS TO DA TANK
PRESSURE RELIEF
VALVES SET AT 145 &
150 PSIG
6" LPS
V
BOILER #4
(SUMMER BOILER)T-1 T-2
T-15 T-17
6" HPS
H P
S
MUA-1 PRV
UH-4UH-3
1-1/2" HPR
1" HPS
UH-5
ST-2
ST-1
H P
S F
R O
M B
-1
H P
S F
R O
M B
-4
H P
S F
R O
M B
-2
H P
S F
R O
M B
-3
H P
R
1" HPR TO DA TANK
/4
H
P R
3/4" HPR TO DA TANK
TYPICAL FOR ALL
BOILER
CONNECTIONS
ST-06 ST-05
ST-01 ST-02
ST-03
ST-04
3/4" TO PRESSURE
GAUGES IN CONTROL
ROOM
H P
S T
O L A
U N
D R
Y
H P
S T
O B
O
IL
E R
A T
O M
IZ
E
R S
/4
H
P S
T O
P R
E S
S U
R E
G A
U G
E S
6" HPS TO
LAUNDRY
10" HPS TO
HOSPITAL
PRV - 24A/B
PRV - 22A/B
" H
P S
HOSPITAL HTG
SYSTEM STEAM
FLOW
V
H P
S T
O H
O S
P
IT
A L
8" HPS TO CHILLER
PLANT
8" HPS
6" HPS
OSD
SILENCER ABOVE ROOF
H P
S T
O C
H
IL
L E
R P
L A
N T
6" HPS
H P
S
2" LPS TO MUA-1
1-1/2" LPR TO
CONDENSATE TANK
4" HPS
1-1/2" HPR TO FLASH
TANK
E X
IS
T
IN
G
P R
V -3
H X
-3
H X
-4
TO CHILLER
PLANT UNIT
HEATERS
8" HPS
14" LPS
T-6T-7
T-8
-1
/2
H P
R
1" LPR
EXISTING PRV TO
REMAIN
E X
IS
T
IN
G
P R
V -2
LPS BRANCH TO
UNIT HEATER TO
REMAIN
L P
S
EV-2.1 EV-3.1
EV-1
EV-4
EV-2.2 EV-3.2
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
248 Copeland Street Quincy, MA 02169 P: 617-481-6390 F: 617-687-5990
200 Brickstone Square Andover, MA 01810 P: 978-296-6227 F: 978-475-5768
100% CONSTRUCTION
DOCUMENTS
REPLACE MAIN BOILERS 528A8-17-805
Samuel S. Stratton VA Medical Center, 113 Holland Ave., Albany, New York 12208
06/05/2024
105 Central Street Stoneham, MA 02180 P: 781-275-6050
C U se rs
\h a u n g \D o c u m e n ts
\A lb a n y_ B o ile r_ M e c h
E le ct ri c a l U p g ra d e
V h a u n g
G H
V P
.r v t
/3
/2
:1
:0
A
M
MID-201
STEAM RISER DIAGRAM - PHASE 2 -
DEMOLITION
ND HLRevisions: Date:
LSH
LI
LI
LSL
LSH
LI
TI
TI
LT
LCV
LCV
1-1/2"Ø LPR
L P
R
L
P R
FROM STEAM TRAPS IN
CHILLER PLANT
6" LPSFROM PRV - 19A/B
HPR FROM PRV - 19A/B
HPR MAIN STEAM HEADER 1" HPR
3/4" HPR
3/4" CAP 11/4" CAP 2" CAP
V
EXH. HD AB. ROOF
TO BOILERS
4" HPR
V
1"
11/2"
11/2"
LWC
LEVEL TRANSMITTER
4" OFL
3 / 4
B F
R E
C
IR
C
T Y
P
2"
3/4" FD
DEAERATOR TANK
ABANDONED
6" LPS
(STEAM TURBINE WAS REMOVED)
TO BOILERS
FROM B-2 BLOWDOWN
FROM B-1 BLOWDOWN
FROM B-3 BLOWDOWN
EXISTING BLOWDOWN TANK
EXH. HD AB. ROOF
S W
4" PR AND LPR
FROM ARF (ABANDONED) 1-1/2" LPR 1-1/2" LPR
2" LPR
6" LPR
2" BYPASS
3" LPR
3" LPR
4" OFL
6"
BYPASS
OSD
4" OFL
2" PC (RECIRC)
4" LPR
3" LPR
4"
SUCTION
3" PC
4"
SUCTION
3" PC
1" V
11/2"
1"
LEVEL TRANSMITTER
3/4" ED
3/4"
1"
3/4"
11/2"
SAN
11/2" ED
1" ED
3/4" ED
1"
LEVEL
SWITCH LOW
LEVEL
SWITCH HIGH
11/2"
11/2"
CONDENSATE TANK
P-5
P-4
FLASH TANK
16" DIA X 36" L. 3"
"V
EXISTING CONNECTION FROM
CONDENSATE TANK
TO DA TANK SHALL REMAIN UNTIL
AFTER TEMPORARY
BOILERS WITH DEDICATED DA
TANKS ARE OPERATING
4" TO HEAT
RECOVERY UNIT
ON MEZZANINE
4" TO HEAT
RECOVERY UNIT
ON MEZZANINE
OSD
P-1 P-2 P-3
P C
FROM HOSPITAL
FROM HOSPITAL
FROM TANK VAULT
FROM HX-3/4 3" PR
FROM HOSPITAL 2" LPR
FROM PLANT UHs
FROM HOSPITAL 4" LPR
FROM MUA-1 1-/2" LPR
F R
O M
W A
T E
R S
O F
T E
N E
R S
V
BASEMENT / MEZZANINE LEVEL
1-1/2" HPR
1-1/2" HPR
11/2" BOILER B #4
MECH ROOM
11/2" FROM
HOSPITAL
MECHANICAL ROOM WALL
SUB-BASEMENT LEVEL
2" PR
OSD
EXISTING TRENCH
E X
IS
T
IN
G
P R
V -3
H X
-3
H X
-4
E X
IS
T
IN
G
P R
V -2
LPR BRANCH
FROM UNIT
HEATER TO
REMAIN
L P
R
1" LPR
LPR BRANCH
FROM UNIT
HEATERS TO
REMAIN
EXISTING
HX-3&4
CONDENSATE
PUMP TO
REMAIN
P R
P R
EXISTING
HX-3&4
TO
REMAIN
6" VTR
SW
CTPD
CONTROLLER
WATER LEVEL
TRANSMITTER
WATER LEVEL CONTROL
SCHEMATIC
M F
G R
[4 m m
[4 m m
TOP OF TANK
OFL LINE
HIGH LEVEL ALARM
LOW LEVEL ALARM
EMERGENCY MAKE-UP
[4 m m
NORMAL WATER LEVEL
C OF TANK
CV-3
CV-4
OFL
OFL
CONTROLLER
OFL CONTROL
SWITCH
OVERFLOW CONTROL
SCHEMATIC
CV-5
SAFETY DEVICE MANUAL
CAN BE 1/3 OF TANK
B Y
D A
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
248 Copeland Street Quincy, MA 02169 P: 617-481-6390 F: 617-687-5990
200 Brickstone Square Andover, MA 01810 P: 978-296-6227 F: 978-475-5768
100% CONSTRUCTION
DOCUMENTS
REPLACE MAIN BOILERS 528A8-17-805
Samuel S. Stratton VA Medical Center, 113 Holland Ave., Albany, New York 12208
06/05/2024
105 Central Street Stoneham, MA 02180 P: 781-275-6050
C U se rs
\h a u n g \D o c u m e n ts
\A lb a n y_ B o ile r_ M e c h
E le ct ri c a l U p g ra d e
V h a u n g
G H
V P
.r v t
/3
/2
:1
:0
A
M
MID-202
CONDENSATE RISER DIAGRAM - PHASE 2 -
DEMOLITION
ND HLRevisions: Date:
L P
S
FROM
TEMPORARY
BOILERS
8" HPS
H P
S
PRV-25
UH-4UH-3
-1
/2
H P
S
/4
L
P R
UH-5
1" LPS
1" HPR
8" HPS
6" HPS
PRV-26
1" LPR NEW
CONDENSATE PUMP
(WITHIN SWH SKID)
3/4" HPR
L P
S
SWH-2
4" PR TO PR MAIN2-1/2" PR TO PR MAIN
6" LPS
8" LPS
GV-14
GV-13
ST-52
ST-51
ST-35 ST-36
ST-37
ST-53 ST-54
ST-50
ST-56
-1
/2
L P
S
1" VTR
PSV-1
PSV-2
VTR
GV-16B
GV-17
GV-19
GV-18
GV-23
GV-22
GV-24
TO FLASH TANK
FT-1
TO NEAREST
FLOOR DRAIN
2-1/2" V
FLASH
STEAM FROM
FLASH
VESSEL
3/4" LPR
1-1/2" LPS
3/4" LPR
PROVIDE DRAIN PIPE
FOR DRIP PAN ELBOW
AND RUN TO NEAREST
FLOOR DRAIN.
ST-58
TO FLASH TANK
FT-1
2-1/2" PILOT OPERATED
BACK PRESSURE
REGULATOR. SPIRAX
SARCO 2.5"BP OR
EQUAL
ST-57
TO FLASH TANK
FT-1 THROUGH
2"Ø PC
GV-16A
ST-59
TO 1"HPR
(HEADER
DRIP LEG)
ST-61
3/4" LPR NEW CONDENSATE
PUMP (WITHIN SWH SKID)
SWH-1
ST-60
3/4" LPR NEW CONDENSATE
PUMP (WITHIN SWH SKID)
TO FLASH TANK
FT-1 8" HPS CAP
6" VENT THRU ROOF
H P
S
BOILER #3BOILER #2BOILER #1
EXH. HD AB. ROOF
2" VENT THRU ROOF (TYPICAL
FOR ALL BOILERS)
V V
BOILER STEAM FLOW
TRANSMITTER
(TYPICAL FOR ALL BOILERS)
DN TO OSD (TYP) DN TO OSD (TYP)
DRIP LEG
H P
S
3" HPS TO BOILER SOOT BLOWER
PRV - 19A/B
6" LPS TO DA TANK
PRESSURE RELIEF
VALVES SET AT 145 &
150 PSIG
6" LPS
V
BOILER #4
(SUMMER BOILER)T-1 T-2
T-15 T-17
6" HPS
H P
S T
O H
W G
E N
E R
A T
O R
S
T-18
BOILER STEAM FLOW
METERING (TYP. FOR ALL
BOILERS) TO BE
REMOVED AND REPLACED
6" LPS DN AND ABANDONED
(STEAM TURBINE WAS REMOVED)
L P
S
DRAIN
MAIN STEAM HEADER TO BE DEMOLISHED
6" HPS
PROVIDE NEW GATE VALVE
GV-6 ON 10" HPS SEVING
HOSPITAL BELOW CROSS
CONNECTION TO 6" HPS
SECONDARY HEADER AND NEW
8" CROSS CONNECTION TO 8"
HPS FROM CHILLER PLANT
H P
S F
R O
M B
-1
H P
S F
R O
M B
-4
H P
S F
R O
M B
-2
H P
S F
R O
M B
-3
H P
R
1" HPR TO DA TANK
/4
H
P R
3/4" HPR TO DA TANK
TYPICAL FOR ALL
BOILER
CONNECTIONS
ST-06 ST-05
ST-01 ST-02
ST-03
ST-04
3/4" TO PRESSURE
GAUGES IN CONTROL
ROOM
H P
S T
O L A
U N
D R
Y
H P
S T
O B
O
IL
E R
A T
O M
IZ
E
R S
/4
H
P S
T O
P R
E S
S U
R E
G A
U G
E S
6" HPS TO
LAUNDRY
10" HPS TO
HOSPITAL
PRV - 24A/B
PRV - 22A/B
" H
P S
HOSPITAL HTG
SYSTEM STEAM
FLOW
V
H P
S T
O H
O S
P
IT
A L
8" HPS TO CHILLER
PLANT
8" HPS
6" HPS
OSD
SILENCER ABOVE ROOF
H P
S T
O C
H
IL
L E
R P
L A
N T
6" HPS
H P
S
2" LPS TO MUA-1
1-1/2" LPR TO
CONDENSATE TANK
4" HPS
1-1/2" HPR TO FLASH
TANK
E X
IS
T
IN
G
P R
V -3
H X
-3
H X
-4
TO CHILLER
PLANT UNIT
HEATERS
8" HPS
14" LPS
T-6T-7
T-8
-1
/2
H P
R
1" LPR
EXISTING PRV TO
REMAIN
E X
IS
T
IN
G
P R
V -2
LPS BRANCH TO
UNIT HEATER TO
REMAIN
L P
S
EV-2.1 EV-3.1
EV-1
EV-4
EV-2.2 EV-3.2
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
248 Copeland Street Quincy, MA 02169 P: 617-481-6390 F: 617-687-5990
200 Brickstone Square Andover, MA 01810 P: 978-296-6227 F: 978-475-5768
100% CONSTRUCTION
DOCUMENTS
REPLACE MAIN BOILERS 528A8-17-805
Samuel S. Stratton VA Medical Center, 113 Holland Ave., Albany, New York 12208
06/05/2024
105 Central Street Stoneham, MA 02180 P: 781-275-6050
C U se rs
\h a u n g \D o c u m e n ts
\A lb a n y_ B o ile r_ M e c h
E le ct ri c a l U p g ra d e
V h a u n g
G H
V P
.r v t
/3
/2
:1
:0
A
M
MID-301
STEAM RISER DIAGRAM - PHASE 3 -
DEMOLITION
ND HLRevisions: Date:
LSH
LI
TI
LT
LCV
LCV
M
M
M
FROM STEAM TRAPS IN
CHILLER PLANT
CTPD-1 TO TEMP. BOILER
CTPD-2 TO TEMP. BOILER
TO TEMPORARY
BOILERS
1-1/2" LPR
2" LPR
3" LPR
4" PR
6" VTR
FEED WATER
S W
4" PR
3" PR
2" LPR
4" LPR
1-1/2" LPR
3" CTPD-1
3" CTPD-2
B F
CW
C T
P S
4"
CTPD
EMERGENCY
MAKE-UP
(TANK BYPASS)
TO DEAERATORNC
NC
30" VAC-30PSI 0-60PSI
FLEX CONN.
STRAINER
NC NC
NC
NC
NC
LEVEL TRANSMITTER
HIGH LEVEL ALARM SW
LOW LEVEL ALARM SW 30-300°F
4" OFL
2" PC (RECIRC)
RECIRCULATION ORIFICE (SEE
DETAIL ON SD232111-07)
1"
1 1/2"
CONDENSATE STORAGE TANK
FROM SWH-1
FROM SWH-2
2-1/2" PR
4" PR
4" LPR
P R
L P
R
CONDENSATE
TRANSFER
PUMPS
NORMAL
MAKE-UP
WATER METER
FROM PRV-26 3/4" HPR CONNECT TO 10"
LPS SERVING
SWH-1&2
2"
WM-1
EMERGENCY
MAKE-UP
COLD WATER
METER
WM-3
CONDENSATE
METER
WM-4
FT-1
2" VTR
NC
NC
2"
SPARE TAP
CP-1
2" VTR
2" PR
GAGE
GLASS
3/4"
3/4"
1-1/2"
/4
/4
2"
PSV-4
3"
VALVE AND CAP
FOR CONNECTION IN
PHASE 3
T
T
T
T
VALVE AND CAP
FOR CONNECTION IN
PHASE 3
VALVE AND CAP
FOR CONNECTION IN
PHASE 3
T
T
T
T
T
T
T
T
NC NC
6" LPSFROM PRV - 19A/B
HPR FROM PRV - 19A/B
HPR MAIN STEAM HEADER 1" HPR
3/4" HPR
3/4" CAP 11/4" CAP 2" CAP
V
EXH. HD AB. ROOF
TO BOILERS
4" HPR
V
1"
11/2"
11/2"
LWC
LEVEL TRANSMITTER
4" OFL
3 / 4
B F
R E
C
IR
C
T Y
P
2"
3/4" FD
DEAERATOR TANK
ABANDONED
6" LPS
(STEAM TURBINE WAS REMOVED)
TO BOILERS
FROM B-2 BLOWDOWN
FROM B-1 BLOWDOWN
FROM B-3 BLOWDOWN
EXISTING BLOWDOWN TANK
EXH. HD AB. ROOF
E D
2" BD
P-1 P-2 P-3
P C
FROM HOSPITAL
FROM HOSPITAL
FROM TANK VAULT
FROM HX-3/4 3" PR
FROM HOSPITAL 2" LPR
FROM PLANT UHs
FROM HOSPITAL 4" LPR
FROM MUA-1 1-/2" LPR
F R
O M
W A
T E
R S
O F
T E
N E
R S
V
BASEMENT / MEZZANINE LEVEL
1-1/2" HPR
1-1/2" HPR
11/2" BOILER B #4
MECH ROOM
11/2" FROM
HOSPITAL
MECHANICAL ROOM WALL
SUB-BASEMENT LEVEL
2" PR
OSD
EXISTING TRENCH
6" VTR
SW
CTPD
CONTROLLER
WATER LEVEL
TRANSMITTER
WATER LEVEL CONTROL
SCHEMATIC
M F
G R
[4 m m
[4 m m
TOP OF TANK
OFL LINE
HIGH LEVEL ALARM
LOW LEVEL ALARM
EMERGENCY MAKE-UP
[4 m m
NORMAL WATER LEVEL
C OF TANK
CV-3
CV-4
OFL
OFL
CONTROLLER
OFL CONTROL
SWITCH
OVERFLOW CONTROL
SCHEMATIC
CV-5
SAFETY DEVICE MANUAL
CAN BE 1/3 OF TANK
B Y
D A
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
248 Copeland Street Quincy, MA 02169 P: 617-481-6390 F: 617-687-5990
200 Brickstone Square Andover, MA 01810 P: 978-296-6227 F: 978-475-5768
100% CONSTRUCTION
DOCUMENTS
REPLACE MAIN BOILERS 528A8-17-805
Samuel S. Stratton VA Medical Center, 113 Holland Ave., Albany, New York 12208
06/05/2024
105 Central Street Stoneham, MA 02180 P: 781-275-6050
C U se rs
\h a u n g \D o c u m e n ts
\A lb a n y_ B o ile r_ M e c h
E le ct ri c a l U p g ra d e
V h a u n g
G H
V P
.r v t
/3
/2
:1
:0
A
M
MID-302
CONDENSATE RISER DIAGRAM - PHASE 3 -
DEMOLITION
ND HLRevisions: Date:
L P
S
8" HPS CAP
6" VENT THRU ROOF
H P
S
BOILER #3BOILER #2BOILER #1
EXH. HD AB. ROOF
2" VENT THRU ROOF (TYPICAL
FOR ALL BOILERS)
V V
BOILER STEAM FLOW
TRANSMITTER
(TYPICAL FOR ALL BOILERS)
DN TO OSD (TYP) DN TO OSD (TYP)
DRIP LEG
H P
S
3" HPS TO BOILER SOOT BLOWER
PRV - 19A/B
6" LPS TO DA TANK
PRESSURE RELIEF
VALVES SET AT 145 &
150 PSIG
6" LPS
V
BOILER #4
(SUMMER BOILER)T-1 T-2
T-15 T-17
6" HPS
H P
S F
R O
M B
-1
H P
S F
R O
M B
-4
H P
S F
R O
M B
-2
H P
S F
R O
M B
-3
H P
R
1" HPR TO DA TANK
/4
H
P R
3/4" HPR TO DA TANK
TYPICAL FOR ALL
BOILER
CONNECTIONS
ST-06 ST-05
ST-01 ST-02
ST-03
ST-04
3/4" TO PRESSURE
GAUGES IN CONTROL
ROOM
H P
S T
O L A
U N
D R
Y
H P
S T
O B
O
IL
E R
A T
O M
IZ
E
R S
/4
H
P S
T O
P R
E S
S U
R E
G A
U G
E S
6" HPS TO
LAUNDRY
10" HPS TO
HOSPITAL
PRV - 24A/B
PRV - 22A/B
" H
P S
HOSPITAL HTG
SYSTEM STEAM
FLOW
V
H P
S T
O H
O S
P
IT
A L
8" HPS TO CHILLER
PLANT
8" HPS
6" HPS
OSD
SILENCER ABOVE ROOF
H P
S T
O C
H
IL
L E
R P
L A
N T
6" HPS
H P
S
2" LPS TO MUA-1
1-1/2" LPR TO
CONDENSATE TANK
4" HPS
1-1/2" HPR TO FLASH
TANK
E X
IS
T
IN
G
P R
V -3
H X
-3
H X
-4
TO CHILLER
PLANT UNIT
HEATERS
8" HPS
14" LPS
T-6T-7
T-8
-1
/2
H P
R
1" LPR
EXISTING PRV TO
REMAIN
E X
IS
T
IN
G
P R
V -2
LPS BRANCH TO
UNIT HEATER TO
REMAIN
L P
S
EV-2.1 EV-3.1
EV-1
EV-4
EV-2.2 EV-3.2
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
248 Copeland Street Quincy, MA 02169 P: 617-481-6390 F: 617-687-5990
200 Brickstone Square Andover, MA 01810 P: 978-296-6227 F: 978-475-5768
100% CONSTRUCTION
DOCUMENTS
REPLACE MAIN BOILERS 528A8-17-805
Samuel S. Stratton VA Medical Center, 113 Holland Ave., Albany, New York 12208
06/05/2024
N
105 Central Street Stoneham, MA 02180 P: 781-275-6050
C U se rs
\h a u n g \D o c u m e n ts
\A lb a n y_ B o ile r_ M e c h
E le ct ri c a l U p g ra d e
V h a u n g
G H
V P
.r v t
/3
/2
:1
:5
A
M
MI-101
STEAM RISER DIAGRAM - PHASE 1 - NEW WORK
Revisions: Date:
LSH
LI
LI
LSL
LSH
LI
TI
TI
LT
LCV
LCV
1-1/2"Ø LPR
L P
R
L
P R
FROM STEAM TRAPS IN
CHILLER PLANT
EXISTING STEAM
TRAPS TO BE
REPLACED
EXISTING STEAM
TRAPS TO
REMAIN. CONNECT
TO 2"Ø PC.
PROVIDE (3) 1"
CAPPED AND VALVED
CONNECTIONS
6" LPSFROM PRV - 19A/B
HPR FROM PRV - 19A/B
HPR MAIN STEAM HEADER 1" HPR
3/4" HPR
3/4" CAP 11/4" CAP 2" CAP
V
EXH. HD AB. ROOF
TO BOILERS
4" HPR
V
1"
11/2"
11/2"
LWC
LEVEL TRANSMITTER
4" OFL
3 / 4
B F
R E
C
IR
C
T Y
P
2"
3/4" FD
DEAERATOR TANK
ABANDONED
6" LPS
(STEAM TURBINE WAS REMOVED)
TO BOILERS
FROM B-2 BLOWDOWN
FROM B-1 BLOWDOWN
FROM B-3 BLOWDOWN
EXISTING BLOWDOWN TANK
EXH. HD AB. ROOF
S W
P-1 P-2 P-3
P C
FROM HOSPITAL
FROM HOSPITAL
FROM TANK VAULT
FROM HX-3/4 3" PR
FROM HOSPITAL 2" LPR
FROM PLANT UHs
FROM HOSPITAL 4" LPR
FROM MUA-1 1-/2" LPR
F R
O M
W A
T E
R S
O F
T E
N E
R S
V
BASEMENT / MEZZANINE LEVEL
1-1/2" HPR
1-1/2" HPR
11/2" BOILER B #4
MECH ROOM
11/2" FROM
HOSPITAL
MECHANICAL ROOM WALL
SUB-BASEMENT LEVEL
2" PR
OSD
EXISTING TRENCH
E X
IS
T
IN
G
P R
V -3
H X
-3
H X
-4
E X
IS
T
IN
G
P R
V -2
LPR BRANCH
FROM UNIT
HEATER TO
REMAIN
L P
R
1" LPR
LPR BRANCH
FROM UNIT
HEATERS TO
REMAIN
EXISTING
HX-3&4
CONDENSATE
PUMP TO
REMAIN
P R
P R
EXISTING
HX-3&4
TO
REMAIN
6" VTR
SW
CTPD
CONTROLLER
WATER LEVEL
TRANSMITTER
WATER LEVEL CONTROL
SCHEMATIC
M F
G R
[4 m m
[4 m m
TOP OF TANK
OFL LINE
HIGH LEVEL ALARM
LOW LEVEL ALARM
EMERGENCY MAKE-UP
[4 m m
NORMAL WATER LEVEL
C OF TANK
CV-3
CV-4
OFL
OFL
CONTROLLER
OFL CONTROL
SWITCH
OVERFLOW CONTROL
SCHEMATIC
CV-5
SAFETY DEVICE MANUAL
CAN BE 1/3 OF TANK
B Y
D A
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
248 Copeland Street Quincy, MA 02169 P: 617-481-6390 F: 617-687-5990
200 Brickstone Square Andover, MA 01810 P: 978-296-6227 F: 978-475-5768
100% CONSTRUCTION
DOCUMENTS
REPLACE MAIN BOILERS 528A8-17-805
Samuel S. Stratton VA Medical Center, 113 Holland Ave., Albany, New York 12208
06/05/2024
N
105 Central Street Stoneham, MA 02180 P: 781-275-6050
C U se rs
\h a u n g \D o c u m e n ts
\A lb a n y_ B o ile r_ M e c h
E le ct ri c a l U p g ra d e
V h a u n g
G H
V P
.r v t
/3
/2
:1
:5
A
M
MI-102
CONDENSATE RISER DIAGRAM - PHASE 1 - NEW
WORK
Revisions: Date:
L P
S
FROM
TEMPORARY
BOILERS
8" HPS
H P
S
PRV-25
UH-4UH-3
-1
/2
H P
S
/4
L
P R
UH-5
1" LPS
1" HPR
8" HPS
6" HPS
PRV-26
1" LPR NEW
CONDENSATE PUMP
(WITHIN SWH SKID)
3/4" HPR
L P
S
SWH-2
4" PR TO PR MAIN2-1/2" PR TO PR MAIN
6" LPS
8" LPS
GV-14
GV-13
ST-52
ST-51
ST-35 ST-36
ST-37
ST-53 ST-54
ST-50
ST-56
-1
/2
L P
S
1" VTR
PSV-1
PSV-2
VTR
GV-16B
GV-17
GV-19
GV-18
GV-23
GV-22
GV-24
TO FLASH TANK
FT-1
TO NEAREST
FLOOR DRAIN
2-1/2" V
FLASH
STEAM FROM
FLASH
VESSEL
3/4" LPR
1-1/2" LPS
3/4" LPR
PROVIDE DRAIN PIPE
FOR DRIP PAN ELBOW
AND RUN TO NEAREST
FLOOR DRAIN.
ST-58
TO FLASH TANK
FT-1
2-1/2" PILOT OPERATED
BACK PRESSURE
REGULATOR. SPIRAX
SARCO 2.5"BP OR
EQUAL
ST-57
TO FLASH TANK
FT-1 THROUGH
2"Ø PC
GV-16A
ST-59
TO 1"HPR
(HEADER
DRIP LEG)
ST-61
3/4" LPR NEW CONDENSATE
PUMP (WITHIN SWH SKID)
SWH-1
ST-60
3/4" LPR NEW CONDENSATE
PUMP (WITHIN SWH SKID)
TO FLASH TANK
FT-1 8" HPS CAP
6" VENT THRU ROOF
H P
S
BOILER #3BOILER #2BOILER #1
EXH. HD AB. ROOF
2" VENT THRU ROOF (TYPICAL
FOR ALL BOILERS)
V V
BOILER STEAM FLOW
TRANSMITTER
(TYPICAL FOR ALL BOILERS)
DN TO OSD (TYP) DN TO OSD (TYP)
DRIP LEG
H P
S
3" HPS TO BOILER SOOT BLOWER
PRV - 19A/B
6" LPS TO DA TANK
PRESSURE RELIEF
VALVES SET AT 145 &
150 PSIG
6" LPS
V
BOILER #4
(SUMMER BOILER)T-1 T-2
T-15 T-17
6" HPS
CROSS CONNECT 8" HPS
FROM CHILLER PLANT TO 10"
HPS SERVING HOSPITAL.
CROSS CONNECT 4" HPS
SERVING MUA-1 AND OTHER
BOILER ROOM EQUIPMENT
TO 6" HPS SECONDARY
HEADER
H P
S F
R O
M B
-1
H P
S F
R O
M B
-4
H P
S F
R O
M B
-2
H P
S F
R O
M B
-3
H P
R
1" HPR TO DA TANK
/4
H
P R
3/4" HPR TO DA TANK
TYPICAL FOR ALL
BOILER
CONNECTIONS
ST-06 ST-05
ST-01 ST-02
ST-03
ST-04
3/4" TO PRESSURE
GAUGES IN CONTROL
ROOM
H P
S T
O L A
U N
D R
Y
H P
S T
O B
O
IL
E R
A T
O M
IZ
E
R S
/4
H
P S
T O
P R
E S
S U
R E
G A
U G
E S
6" HPS TO
LAUNDRY
10" HPS TO
HOSPITAL
PRV - 24A/B
PRV - 22A/B
" H
P S
HOSPITAL HTG
SYSTEM STEAM
FLOW
V
H P
S T
O H
O S
P
IT
A L
8" HPS TO CHILLER
PLANT
8" HPS
6" HPS
OSD
SILENCER ABOVE ROOF
H P
S T
O C
H
IL
L E
R P
L A
N T
6" HPS
H P
S
2" LPS TO MUA-1
1-1/2" LPR TO
CONDENSATE TANK
4" HPS
1-1/2" HPR TO FLASH
TANK
E X
IS
T
IN
G
P R
V -3
H X
-3
H X
-4
TO CHILLER
PLANT UNIT
HEATERS
8" HPS
14" LPS
T-6T-7
T-8
-1
/2
H P
R
1" LPR
EXISTING PRV TO
REMAIN
E X
IS
T
IN
G
P R
V -2
LPS BRANCH TO
UNIT HEATER TO
REMAIN
L P
S
EV-2.1 EV-3.1
EV-1
EV-4
EV-2.2 EV-3.2
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
248 Copeland Street Quincy, MA 02169 P: 617-481-6390 F: 617-687-5990
200 Brickstone Square Andover, MA 01810 P: 978-296-6227 F: 978-475-5768
100% CONSTRUCTION
DOCUMENTS
REPLACE MAIN BOILERS 528A8-17-805
Samuel S. Stratton VA Medical Center, 113 Holland Ave., Albany, New York 12208
06/05/2024
N
105 Central Street Stoneham, MA 02180 P: 781-275-6050
C U se rs
\h a u n g \D o c u m e n ts
\A lb a n y_ B o ile r_ M e c h
E le ct ri c a l U p g ra d e
V h a u n g
G H
V P
.r v t
/3
/2
:1
:5
A
M
MI-201
STEAM RISER DIAGRAM - PHASE 2 - NEW WORK
ND HLRevisions: Date:
LSH
LI
TI
LT
LCV
LCV
M
M
M
1-1/2"Ø LPR
L P
R
L
P R
FROM STEAM TRAPS IN
CHILLER PLANT
CTPD-1 TO TEMP. BOILER
CTPD-2 TO TEMP. BOILER
TO TEMPORARY
BOILERS
1-1/2" LPR
2" LPR
3" LPR
4" PR
6" VTR
FEED WATER
S W
4" PR
3" PR
2" LPR
4" LPR
1-1/2" LPR
3" CTPD-1
3" CTPD-2
B F
CW
C T
P S
4"
CTPD
EMERGENCY
MAKE-UP
(TANK BYPASS)
TO DEAERATORNC
NC
30" VAC-30PSI 0-60PSI
FLEX CONN.
STRAINER
NC NC
NC
NC
NC
LEVEL TRANSMITTER
HIGH LEVEL ALARM SW
LOW LEVEL ALARM SW 30-300°F
4" OFL
2" PC (RECIRC)
RECIRCULATION ORIFICE (SEE
DETAIL ON SD232111-07)
1"
1 1/2"
CONDENSATE STORAGE TANK
FROM SWH-1
FROM SWH-2
2-1/2" PR
4" PR
4" LPR
P R
L P
R
CONDENSATE
TRANSFER
PUMPS
NORMAL
MAKE-UP
WATER METER
FROM PRV-26 3/4" HPR CONNECT TO 10"
LPS SERVING
SWH-1&2
2"
WM-1
EMERGENCY
MAKE-UP
COLD WATER
METER
WM-3
CONDENSATE
METER
WM-4
FT-1
2" VTR
NC
NC
2"
SPARE TAP
CP-1
2" VTR
2" PR
GAGE
GLASS
3/4"
3/4"
1-1/2"
/4
/4
2"
PSV-4
3"
ST-56
ST-57
ST-58
VALVE AND CAP
FOR CONNECTION IN
PHASE 3
T
T
T
T
VALVE AND CAP
FOR CONNECTION IN
PHASE 3
VALVE AND CAP
FOR CONNECTION IN
PHASE 3
T
T
T
T
T
T
T
T
NC NC
6" LPSFROM PRV - 19A/B
HPR FROM PRV - 19A/B
HPR MAIN STEAM HEADER 1" HPR
3/4" HPR
3/4" CAP 11/4" CAP 2" CAP
V
EXH. HD AB. ROOF
TO BOILERS
4" HPR
V
1"
11/2"
11/2"
LWC
LEVEL TRANSMITTER
4" OFL
3 / 4
B F
R E
C
IR
C
T Y
P
2"
3/4" FD
DEAERATOR TANK
ABANDONED
6" LPS
(STEAM TURBINE WAS REMOVED)
TO BOILERS
FROM B-2 BLOWDOWN
FROM B-1 BLOWDOWN
FROM B-3 BLOWDOWN
EXISTING BLOWDOWN TANK
EXH. HD AB. ROOF
PROVIDE VALVES AHEAD
OF FEEDWATER PUMP
INSTALLATION
PROVIDE VALVES AHEAD
OF PERMANENT BOILER
INSTALLATION (TYP. 4).
REFER TO BOILER FEED WATER
CONNECTION DETAIL FOR MORE
INFO
OSD
P-1 P-2 P-3
P C
FROM HOSPITAL
FROM HOSPITAL
FROM TANK VAULT
FROM HX-3/4 3" PR
FROM HOSPITAL 2" LPR
FROM PLANT UHs
FROM HOSPITAL 4" LPR
FROM MUA-1 1-/2" LPR
F R
O M
W A
T E
R S
O F
T E
N E
R S
V
BASEMENT / MEZZANINE LEVEL
1-1/2" HPR
1-1/2" HPR
11/2" BOILER B #4
MECH ROOM
11/2" FROM
HOSPITAL
MECHANICAL ROOM WALL
SUB-BASEMENT LEVEL
2" PR
OSD
EXISTING TRENCH
E X
IS
T
IN
G
P R
V -3
H X
-3
H X
-4
E X
IS
T
IN
G
P R
V -2
LPR BRANCH
FROM UNIT
HEATER TO
REMAIN
L P
R
1" LPR
LPR BRANCH
FROM UNIT
HEATERS TO
REMAIN
EXISTING
HX-3&4
CONDENSATE
PUMP TO
REMAIN
P R
P R
EXISTING
HX-3&4
TO
REMAIN
6" VTR
SW
CTPD
CONTROLLER
WATER LEVEL
TRANSMITTER
WATER LEVEL CONTROL
SCHEMATIC
M F
G R
[4 m m
[4 m m
TOP OF TANK
OFL LINE
HIGH LEVEL ALARM
LOW LEVEL ALARM
EMERGENCY MAKE-UP
[4 m m
NORMAL WATER LEVEL
C OF TANK
CV-3
CV-4
OFL
OFL
CONTROLLER
OFL CONTROL
SWITCH
OVERFLOW CONTROL
SCHEMATIC
CV-5
SAFETY DEVICE MANUAL
CAN BE 1/3 OF TANK
B Y
D A
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
248 Copeland Street Quincy, MA 02169 P: 617-481-6390 F: 617-687-5990
200 Brickstone Square Andover, MA 01810 P: 978-296-6227 F: 978-475-5768
100% CONSTRUCTION
DOCUMENTS
REPLACE MAIN BOILERS 528A8-17-805
Samuel S. Stratton VA Medical Center, 113 Holland Ave., Albany, New York 12208
06/05/2024
N
105 Central Street Stoneham, MA 02180 P: 781-275-6050
C U se rs
\h a u n g \D o c u m e n ts
\A lb a n y_ B o ile r_ M e c h
E le ct ri c a l U p g ra d e
V h a u n g
G H
V P
.r v t
/3
/2
:1
:5
A
M
MI-202
CONDENSATE RISER DIAGRAM - PHASE 2 - NEW
WORK
NP HLRevisions: Date:
M M M M M M M M
-2
P
S
IG
-2
P
S
IG
-2
P
S
IG
-2
P
S
IG
-2
P
S
IG
-2
P
S
IG
-2
P
S
IG
-2
P
S
IG
-2
P
S
IG
L P
S
FROM
TEMPORARY
BOILERS
8" HPS
H P
S
PRV-25
UH-4UH-3
-1
/2
H P
S
/4
L
P R
UH-5
1" LPS
1" HPR
8" HPS
6" HPS
PRV-26
1" LPR NEW
CONDENSATE PUMP
(WITHIN SWH SKID)
3/4" HPR
L P
S
SWH-2
4" PR TO PR MAIN2-1/2" PR TO PR MAIN
6" LPS
8" LPS
GV-14
GV-13
ST-52
ST-51
ST-35 ST-36
ST-37
ST-53 ST-54
ST-50
ST-56
-1
/2
L P
S
1" VTR
PSV-1
PSV-2
VTR
GV-16B
GV-17
GV-19
GV-18
GV-23
GV-22
GV-24
TO FLASH TANK
FT-1
TO NEAREST
FLOOR DRAIN
2-1/2" V
FLASH
STEAM FROM
FLASH
VESSEL
3/4" LPR
1-1/2" LPS
3/4" LPR
PROVIDE DRAIN PIPE
FOR DRIP PAN ELBOW
AND RUN TO NEAREST
FLOOR DRAIN.
ST-58
TO FLASH TANK
FT-1
2-1/2" PILOT OPERATED
BACK PRESSURE
REGULATOR. SPIRAX
SARCO 2.5"BP OR
EQUAL
ST-57
TO FLASH TANK
FT-1 THROUGH
2"Ø PC
GV-16A
ST-59
TO 1"HPR
(HEADER
DRIP LEG)
ST-61
3/4" LPR NEW CONDENSATE
PUMP (WITHIN SWH SKID)
SWH-1
ST-60
3/4" LPR NEW CONDENSATE
PUMP (WITHIN SWH SKID)
TO FLASH TANK
FT-1
OSD OSD OSD OSD
PROVIDE NEW MAIN STEAM HEADER
8" HPS
8" HPS
6" HPS
6" HPS
H P
S F
R O
M B
-3
NEW STEAM METERS TO BE PROVIDED ON
- EACH BOILER CONNECTION (Q'TY 4)
- 10" HPS TO MAIN HOSPITAL (Q'TY 1)
- 8" HPS TO CHILLER PLANT (Q'TY 1)
- 4" HPS TO BOILER PLANT (Q'TY 1)
- 4" HPS TO DOMESTIC WATER HEATER (Q'TY 1)
H P
S F
R O
M B
-1
H P
S F
R O
M B
-2
H P
S F
R O
M B
-4
V
VENT THRU
ROOF - TWO
VENTS PER
BOILER (TYPICAL)
NON-RETURN
STOP-CHECK
SIZE 8" TYP. 2
V
V V
PRV - 19
BOILER 1 BOILER 2 BOILER 3 BOILER 4
6" LPS TO DA TANK
REPLACE PRESSURE
RELIEF VALVES - SET
AT 145 & 150 PSIG
PROVIDE DOUBLE BLOCK AND BLEED
VALVE ASSEMBLY FOR ALL ISOLATION
VALVES CONNECT TO MAIN HEADER.
PROVIDE FACTORY INSTALLED
BYPASS ON VALVES 4" AND LARGER;
CONNECT TO EXISTING DRAIN (TYP.)
H P
S S
P A
R E
H P
S S
P A
R E
H P
S T
O S
W H
P R
V
6" LPS
H P
S
2" HPR TO NEW HEAT
RECOVERY UNIT
/4
H
P R
H P
R
EXTENT 1-1/2" HPR FROM
EXISTING FLASH TANK
AFTER THE FLASH TANK
IS REMOVED.
1-1/2" HPR
/4
L
P R
1" HPR
2" HPR1-1/2" HPR
SM-1 SM-6 SM-2 SM-3
SM-7 SM-8
SM-5
GV-5 GV-1 GV-10 GV-6 GV-2 GV-3 GV-11 GV-7 GV-4 GV-9GV-12
ST-1 ST-2
ST-15 ST-17
/4
L
P R
TO CONDENSATE TANK
LPR HEADER UNDER
MEZZANINE
GV-15
ST-55
PROVIDE NEW
FLOOR DRAIN (TYP.)
NON-RETURN
STOP-CHECK
SIZE 6" TYP. 2
PROVIDE DRAIN PIPE
FOR DRIP PAN ELBOW
AND RUN TO NEAREST
FLOOR DRAIN.
PROVIDE DRAIN PIPE
FOR DRIP PAN ELBOW
AND RUN TO NEAREST
FLOOR DRAIN.
PSV-3
SM-4
GV-20
10" HPS TO
HOSPITAL
PRV - 24A/B
PRV - 22A/B
" H
P S
HOSPITAL HTG
SYSTEM STEAM
FLOW
V
H P
S T
O H
O S
P
IT
A L
8" HPS TO CHILLER
PLANT
8" HPS
6" HPS
OSD
SILENCER ABOVE ROOF
H P
S T
O C
H
IL
L E
R P
L A
N T
6" HPS
H P
S
2" LPS TO MUA-1
1-1/2" LPR TO
CONDENSATE TANK
4" HPS
1-1/2" HPR TO FLASH
TANK
E X
IS
T
IN
G
P R
V -3
H X
-3
H X
-4
TO CHILLER
PLANT UNIT
HEATERS
8" HPS
14" LPS
T-6T-7
T-8
-1
/2
H P
R
1" LPR
EXISTING PRV TO
REMAIN
E X
IS
T
IN
G
P R
V -2
LPS BRANCH TO
UNIT HEATER TO
REMAIN
L P
S
EV-2.1 EV-3.1
EV-1
EV-4
EV-2.2 EV-3.2
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
248 Copeland Street Quincy, MA 02169 P: 617-481-6390 F: 617-687-5990
200 Brickstone Square Andover, MA 01810 P: 978-296-6227 F: 978-475-5768
100% CONSTRUCTION
DOCUMENTS
REPLACE MAIN BOILERS 528A8-17-805
Samuel S. Stratton VA Medical Center, 113 Holland Ave., Albany, New York 12208
06/05/2024
N
105 Central Street Stoneham, MA 02180 P: 781-275-6050
C U se rs
\h a u n g \D o c u m e n ts
\A lb a n y_ B o ile r_ M e c h
E le ct ri c a l U p g ra d e
V h a u n g
G H
V P
.r v t
/3
/2
:1
:5
A
M
MI-301
STEAM RISER DIAGRAM - PHASE 3 - NEW WORK
ND HLRevisions: Date:
1 1/2"
NCNCNCNC
LEVEL
TRANSMITTER
LOW LEVEL
ALARM SW
GAGE GLASS
HIGH LEVEL
ALARM SW
OFL CONTROL
SWITCH
D
NC
2"
NC
OSD
M M M M
M
M
M
M
1-1/2"Ø LPR
L P
R
L
P R
FROM STEAM TRAPS IN
CHILLER PLANT
CTPD-1 TO TEMP. BOILER
CTPD-2 TO TEMP. BOILER
TO TEMPORARY
BOILERS
1-1/2" LPR
2" LPR
3" LPR
4" PR
6" VTR
FEED WATER
S W
4" PR
3" PR
2" LPR
4" LPR
1-1/2" LPR
3" CTPD-1
3" CTPD-2
B F
CW
C T
P S
4"
CTPD
EMERGENCY
MAKE-UP
(TANK BYPASS)
TO DEAERATORNC
NC
30" VAC-30PSI 0-60PSI
FLEX CONN.
STRAINER
NC NC
NC
NC
NC
LEVEL TRANSMITTER
HIGH LEVEL ALARM SW
LOW LEVEL ALARM SW 30-300°F
4" OFL
2" PC (RECIRC)
RECIRCULATION ORIFICE (SEE
DETAIL ON SD232111-07)
1"
1 1/2"
CONDENSATE STORAGE TANK
FROM SWH-1
FROM SWH-2
2-1/2" PR
4" PR
4" LPR
P R
L P
R
CONDENSATE
TRANSFER
PUMPS
NORMAL
MAKE-UP
WATER METER
FROM PRV-26 3/4" HPR CONNECT TO 10"
LPS SERVING
SWH-1&2
2"
WM-1
EMERGENCY
MAKE-UP
COLD WATER
METER
WM-3
CONDENSATE
METER
WM-4
FT-1
2" VTR
NC
NC
2"
SPARE TAP
CP-1
2" VTR
2" PR
GAGE
GLASS
3/4"
3/4"
1-1/2"
/4
/4
2"
PSV-4
3"
ST-56
ST-57
ST-58
VALVE AND CAP
FOR CONNECTION IN
PHASE 3
T
T
T
T
VALVE AND CAP
FOR CONNECTION IN
PHASE 3
VALVE AND CAP
FOR CONNECTION IN
PHASE 3
T
T
T
T
T
T
T
T
NC NC
C T
P D
FWP-2 FWP-3
6"
LPS
FEEDWATER
DEAERATOR
AND STORAGE
TANK
EMERGENCY
MAKE-UP
NORMAL
MAKE-UP
CTPD
CV
CV
SW
0-150°C [30-300°F]
30-300°F
[30" VAC-30PSI]
762mm VAC-207kPa
S W
FWP-1
LWC
6" LPS
3" BF-1
3" BF-2
BF-1 AND BF-2 TO FHX AT BOILER
B-1 AND B-2
FOR MORE INFO, REFER TO
MECHANICAL DETAILS ON MI-302
AND MECHANICAL SCHEDULES
ON MI-402
VENT THRU
ROOF
V
FROM PRV - 19
BF-1 AND BF-2 TO BOILER
B-3 AND B-4
REFER TO BOILER FEED
WATER CONNECTION
DETAIL FOR MORE INFO
(TYP.)
HPR FROM PRV - 19 3/4" HPR
/4
F
W S
TO
SAMPLE
COOLER
C F
P
FROM
CHEMICAL
PUMP
PROVIDE CONTROL
VALVE AND TIE TO
LEVEL CONTROL
B-4 B-3 B-2 B-1
FHX-2 FHX-1
(TYP.)
3" BF-2
3" BF-2
3" BF-2
3" BF-2
3" BF-1
3" BF-1
3" BF-1
3" BF-1
SW
FW METER (TYP.)
EMERGENCY
MAKE-UP
WATER METER
WM-2
WM-5WM-6WM-7WM-8
PROVIDE STEAM CONTROL
VALVE MODULATED TO
CONTROL TEMPERATURE
AT THE SCRUBBING
SECTION OF THE
DEARERATOR.
PRESSURE RELIEF VALVE.
CV
-1
/2
S W
/4
S
W
/4
S
W
/4
S
W
/4
S
W
FOR BOILER
FILL-UP
(TYP.)
3/4" SW TO
CHEMICAL
TREATMENT
NEPTUNE
TANK
NC
3/4" DEDICATE AIR VENT
TO ATMOSPHERE.
REFER TO DA DETAILS
FOR MORE INFO
VALVE LOCKED
OPEN
OFL PIPE INLET 6"
BELOW HIGH LEVEL
ALARM SET POINT
2" RECIR.
3/4" RECIR. (TYP.)
FROM B-2 BOTTOM
BLOWDOWN
FROM B-1 BOTTOM
BLOWDOWN
FROM B-3 BOTTOM
BLOWDOWN
2" BD
FROM B-4 BOTTOM
BLOWDOWN
BDS-1
1-1/2" SW
FROM B-2 SURFACE
BLOWDOWN
FROM B-1 SURFACE
BLOWDOWN
FROM B-3 SURFACE
BLOWDOWN
FROM B-4 SURFACE
BLOWDOWN
TO CONDUCTIVITY
CONTROLLER AND
SAMPLE COOLER
STATION
1" BD
1" BD
1" BD
1" BD
FROM HOSPITAL
FROM HOSPITAL
FROM TANK VAULT
FROM HX-3/4 3" PR
FROM HOSPITAL 2" LPR
FROM PLANT UHs
FROM HOSPITAL 4" LPR
FROM MUA-1 1-/2" LPR
F R
O M
W A
T E
R S
O F
T E
N E
R S
V
BASEMENT / MEZZANINE LEVEL
1-1/2" HPR
1-1/2" HPR
11/2" BOILER B #4
MECH ROOM
11/2" FROM
HOSPITAL
MECHANICAL ROOM WALL
SUB-BASEMENT LEVEL
2" PR
OSD
EXISTING TRENCH
E X
IS
T
IN
G
P R
V -3
H X
-3
H X
-4
E X
IS
T
IN
G
P R
V -2
LPR BRANCH
FROM UNIT
HEATER TO
REMAIN
L P
R
1" LPR
LPR BRANCH
FROM UNIT
HEATERS TO
REMAIN
EXISTING
HX-3&4
CONDENSATE
PUMP TO
REMAIN
P R
P R
EXISTING
HX-3&4
TO
REMAIN
6" VTR
SW
CTPD
CONTROLLER
WATER LEVEL
TRANSMITTER
WATER LEVEL CONTROL
SCHEMATIC
M F
G R
[4 m m
[4 m m
TOP OF TANK
OFL LINE
HIGH LEVEL ALARM
LOW LEVEL ALARM
EMERGENCY MAKE-UP
[4 m m
NORMAL WATER LEVEL
C OF TANK
CV-3
CV-4
OFL
OFL
CONTROLLER
OFL CONTROL
SWITCH
OVERFLOW CONTROL
SCHEMATIC
CV-5
SAFETY DEVICE MANUAL
CAN BE 1/3 OF TANK
B Y
D A
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
248 Copeland Street Quincy, MA 02169 P: 617-481-6390 F: 617-687-5990
200 Brickstone Square Andover, MA 01810 P: 978-296-6227 F: 978-475-5768
100% CONSTRUCTION
DOCUMENTS
REPLACE MAIN BOILERS 528A8-17-805
Samuel S. Stratton VA Medical Center, 113 Holland Ave., Albany, New York 12208
06/05/2024
N
105 Central Street Stoneham, MA 02180 P: 781-275-6050
C U se rs
\h a u n g \D o c u m e n ts
\A lb a n y_ B o ile r_ M e c h
E le ct ri c a l U p g ra d e
V h a u n g
G H
V P
.r v t
/3
/2
:1
:5
A
M
MI-302
CONDENSATE RISER DIAGRAM - PHASE 3 - NEW
WORK
ND HLRevisions: Date:
Sub-basement
Level 1
Roof
Sub-basement
Basement
Level 1
Roof
M
[4'] MAX.
1219mm. MAX m m
[2
NATURAL GAS AND LIQUEFIED PETROLEUM GAS - BURNER AND IGNITER FUEL STANDARD PIPING DIAGRAM
NTS
PRV
G G (I
FILTER
L P
F (I
G/LPG(I)
V
V
VV
NOTES:
1. PIPING SIZED BY BURNER MFGR. TO SUIT FLOW
REQUIREMENTS & AVAILABLE PRESSURE.
2. SIZE AUTOMATIC VENT VALVES & VENT PIPING AS FOLLOWS:
3. VENT HEADER SAME SIZE AS MAIN BURNER VENT.
FUEL PLOW
CONTROL VALVE
0-1.5xMAX.
BURNER PRESS
(IN. WC)
DIRT POCKETS
HIGH PRESS.
CUTOUT SW.
10mm [3/8"]V
LOCKABLEAUTOMATIC
VENT VALVE
SEE NOTE 2
SAFETY SHUT-OFF VALVESSEE NOTE 1
PRVFILTER
20mm [3/4"]V
15mm [1/2"]V
0-200kPa
[0-30 PSIG]
MAIN
BURNER
LOW PRESS.
CUTOUT SW.
0-1.5xPRV SET
PRESS.
DIRT
V
V
G
TYPICAL BURNER MAIN GAS &
IGNITER (PILOT) GAS PIPING
FILTER PRV
20mm [3/4"]
25mm [1"] FROM PRV
INTERNAL RELIEF VENTS
25mm [1"] FROM
PRV CASING PILOT VENTS
FLEX. CONN.
IGNITER (PILOT)
AUTOMATIC VENT VALVE
25mm [1"]
20mm [3/4"]
0-200kPa
[0-30 PSIG]
LOW PRESS.
CUTOUT SW.
SEE NOTE 1
3-WAY
SAFETY SHUT-OFF VALVES
SEE
NOTE 2
SEE NOTE 2
0-1.5xPRV
SET PRESS.
ROOF
SCREENED OUTLET
OR VENT CAP (TYP.)
DIRT
LOCKABLE
10mm [3/8"]V
10mm [3/8"]V
10mm [3/8"]V
20mm [3/4"]
15-40 [1/2 TO 1-1/2]
50 [2]
65-75 [2-1/2 TO 3]
100-125 [4-5]
150 [6]
20 [3/4]
25 [1]
32 [1-1/4]
50 [2]
65 [2-1/2]
FUEL SSO VALVE SIZE mm [in] VENT SIZE mm [in]
NO.2 BURNER FUEL OIL SYSTEMS - PIPING DIAGRAM
NTS
FROM NATURAL GAS
MAIN PROVIDED BY PLBG
FROM LIQUEFIED
PETROLEUM GAS MAIN
PROVIDED BY PLBG
FOP
3&4
1-1/2"FOS
1-1/2"FOR
EXISTING FOS
TO EXIT B-3 TO
BE
DEMOLISHED IN
PHASE 3
EXISTING FOS
TO EXIT B-2 TO
BE
DEMOLISHED IN
PHASE 3
EXISTING FOS
TO EXIT B-1 TO
BE
DEMOLISHED IN
PHASE 3
EXISTING WINTER
BOILER FUEL OIL
PUMP TO BE
DEMOLISHED IN
PHASE 2
EXISTING SUMMER BOILER
FUEL OIL PUMP TO BE
DEMOLISHED AFTER
FOB-3&4 ARE INSTALLED
FOS/FOR TO SUMMER BOILER
ROOM TO BE DEMOLISHED IN
PHASE 3
PROVIDE CROSS CONNECT TO ALLOW
SUMMER BOILER PUMP TO SERVE WINTER
BOILERS BEFORE NEW FOP-3&4 ARE
INSTALLED.
THIS CROSS CONNECT PIPING TO BE
DEMOLISHED IN PHASE 3
DOUBLE WALL
CONTAINMENT PIPE.
CONTAINS
1-1/2" FOS
1-1/2" FOR
BOILER ROOM
CHILLER ROOM
HILL
PROVIDE LEAK DETECTION
SWITCH AT THE LOW
POINT IN ACCESSIBLE
LOCATIONTEMPORARY
BOILER
OUTDOOR ENCLOSURE
EXISTING
FOS/FOR TO BE
DEMOLISHED IN
PHASE 3
1-1/4" DS
2" DR
DOUBLE WALL
CONTAINMENT
PIPE
BOILER ROOMCORRIDOR
NEW EMERGENCY
GENERATOR ROOMNEW
ELECTRICAL
ROOM
DT-1
EXISTING
1-1/4" DS MAIN
1-1/2" DR MAIN
NEW 1" DR TO DS
TANK IN TANK
VAULT
PROVIDE LEAK DETECTION
SWITCH AND ALARM AT THE
BOTTOM OF RISER
DIESEL OIL SYSTEMS - PIPING DIAGRAM
NTS
BACK PRESSURE
CONTROL VALVE
1-1/2"FOS
1-1/2"FOR
FOS/FOR TO B-1 FOS/FOR TO B-2 FOS/FOR TO B-3 FOS/FOR TO B-4
FUEL OIL TRENCH
PROVIDE LEAK DETECTION
SWITCH AND ALARM AT THE
BOTTOM OF RISER
DOUBLE WALL
CONTAINMENT
PIPE
BACK PRESSURE
CONTROL VALVE
PROVIDE (4) VALVES
AND (4) PIPE UNIONS
FUEL DRAINAGE
PURPOSE
PROVIDE A 1" VENT PIPE AND
EXISTINGEND DOWN TO 3' AFF.
PROVIDE LOCKABLE VALVE AND
SIGN. THIS VALVE WILL ALLOW
TO BLEED AIR OUT OF THE
SYSTEM DURING FILLING FUEL.
FUEL OIL PIT
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
248 Copeland Street Quincy, MA 02169 P: 617-481-6390 F: 617-687-5990
200 Brickstone Square Andover, MA 01810 P: 978-296-6227 F: 978-475-5768
100% CONSTRUCTION
DOCUMENTS
REPLACE MAIN BOILERS 528A8-17-805
Samuel S. Stratton VA Medical Center, 113 Holland Ave., Albany, New York 12208
06/05/2024
N
105 Central Street Stoneham, MA 02180 P: 781-275-6050
C U se rs
\h a u n g \D o c u m e n ts
\A lb a n y_ B o ile r_ M e c h
E le ct ri c a l U p g ra d e
V h a u n g
G H
V P
.r v t
/3
/2
:1
:5
A
M
MI-303
OTHER RISER DIAGRAM - PHASE 3 - NEW WORK
ND HLRevisions: Date:
m m
M
A X
NTS
WATER METER INSTALLATION
NTS
NOTES:
1. INSTALLATION OF SENSORS AND TRANSMITTERS SHALL CONFORM TO
RECOMMENDATIONS OF MANUFACTURERS OF TRANSMITTERS.
3'-6" [1.1m]
[1
M
IN
[6
M
IN
[1
M
IN
[6
M
IN
m m m m m m m m
PROVIDE INSULATION
SHIELD
& INSERT FOR ALL
PIPING
(200mm [8"] MIN.)
BAND
43mm [1-5/8"] 12 GAUGE CHANNEL OR 50x50x6.4mm
[2"X2"X1/4"] ANGLE
15mm [1/2"] DIA.
HANGER RODS WITH
900mm [36"] MAX.
SPACING ON EACH
CHANNEL
WELD
SADDLE
INSULATION SHIELD
AT HANGER
PROVIDE HIGH COMPRESSIVE
STRENGTH INSULATION (9
PSF MIN. DENSITY) UNDER
INSULATION SHIELD
INSULATION (VAPOR
BARRIER TYPE IS
REQUIRED FOR LOW
TEMPERATURE PIPE)
HANGER ROD
TO 10" LPS SERVING
SWH-1 & SWH-2
2" DRAIN PIPE, RUN
TO CONDENSATE
PUMP CP-1
DOV W/ HOSE BIB
PIPE TO INDIRECT
DRAIN
NTS
NTS
T
E
P
T
L
L+76mm[3"]
L+101mm[4"]
L+203mm[8"]
D+101mm[4"]
D+203mm[8"]
PIPE ANCHOR SCHEDULE
D L P T E N S BOLT PATTERN
LARGE PIPE ANCHOR 152-457mm [6" -18"]
NTS
PRESSURE TRANSMITTER INSTALLATION
NTS
9 NTS
STEEL EXPANSION SHIELD FOR EXISTING
CONSTRUCTION AND INSERTS FOR NEW
CONSTRUCTION THIS TYPE SHALL BE USED
ONLY IN SLABS OR BEAMS OF 4" [100mm] MIN
DEPTH
CONCRETE
SLAB
NUTS & WASHERS
3/8" [10mm] MIN DIA
HANGER RODS
FOR PIPES UNDER 2" [50mm] IN SIZE USE 1 1/2"x1 1/2"x1/4" [40x40x6.4mm] ANGLE. ALL PIPES 2" [50mm] & LARGER USE 3"x3"x1/4" [75x75x6.4mm]
ANGLE
TURNBUCKLE
3/8" [10mm] MIN DIA
HANGER RODS
3/8" [10mm] MIN DIA
INSERTS NEW
CONSTRUCTION ONLY.
SECURING HANGER RODS IN CONCRETE
MAXIMUM PIPE/TUBING SUPPORT SPACING
NOTE: FOR TRAPEZE HANGER TAKE SPACING OF SMALLEST SIZE ON TRAPEZE.
NOM. SIZE
PIPE
TUBING
PIPE HANGERS DETAIL
mm
[IN]
mm
[FT]
mm
[FT]
THRU 20
[THRU3
4]
[7]
[5]
[1]
[7]
[6]
[114]
[7]
[7]
[112]
[9]
[8]
[2]
[10]
[8]
[212]
[11]
[9]
[3]
[12]
[10]
[4]
[14]
[12]
[5]
[16]
[13]
[6]
[17]
[14]
[8]
[19]
[16]
[10]
[22]
[12]
[23]
[14]
[25]
[16]
[27]
[18]
[28]
[20]
[30]
[24]
[32] mm
NOTES:
A. INSTALL WALL PLATE FIRST THEN
WELD ON REMAINING ASSEMBLY.
ONE WALL PLATE FOR BOTH
CHILLED WATER S.&R. IS
OPTIONAL.
ANCHOR BOLTS
N=NUMBER S=SIZE
DRILL Ø = S+3.175mm
DRILL Ø = S+[18"]
in mm in mm in mm in mm in mm in mm in
6 1
6 1
6 1
6 1
13 1
13 1
13 1
13 1
13 1
13 1
13 1
13 1
13 5
10 3
25 1
19 3
19 3
19 3
19 3
19 3
19 3
508 20
216 81
INSULATE AS INDICATED FOR ALL CHILLED WATER.
INSULATE PIPE ONLY FOR STEAM, CONDENSATE &
HEATING WATER.
NOTE A
D=PIPE O.D.
1/2" [15mm] STEEL PIPE OR
STEEL TUBING TO SENSORS
DIFFERENTIAL PRESSURE
TRANSMITTER (FLOW, LEVEL)
BLOWDOWN
PT
ELEVATION
CW OR SW
BYPASS
WATER METER, LINK TO BMS
FLOOR
ELEVATION
SUPPORT BRACKET ANCHORED
TO WALL OR COLUMN
80 MESH STRAINER
N.C.
CONCRETE
FOUNDATION
BOILER BASE
FRAME
PLATE WELDED TO BASE (PLATE
DESIGNED BY BOILER FRAME
MANUFACTURER)
ANCHOR BOLTS SIZE AND
QUANTITY DETERMINED BY
CONTRACTOR BASED ON
BOILER FURNISHED
NOTES:
1. REFER TO SYMBOL AND SCHEDULE SHEETS FOR SEISMIC FORCE DESIGN INFORMATION.
2. PROVIDE SLOTTED HOLES IN PLATES TO ALLOW THERMAL EXPANSION IF RECOMMENDED BY BOILER MANUFACTURER
ANCHOR BOLT
PLATE
CONC.
FOUNDATION
REBAR
BOILER BASE
FRAME
CONC.
PIERS
TANK
SADDLES
ANCHOR
BOLTS
(TYPICAL)
PLAN
SLOTTED HOLE LENGTH
= BOLT SIZE 15mm
[+0.5"] EACH SIDE
10mm [3/8"] THK.
STEEL PLATE
BOLTED TO PIER
TANK
SADDLE
CONCRETE
PIER
SADDLE
BEAMALTERNATE FOR TANKS
SUPPORTED BY STEEL BEAMS
REINFORCEMENT PLATES
BOLTS
ELEVATION
REBAR
ANCHOR BOLT
FLOOR
PLAN
ELEVATION
BOILER
EQUIPMENT ANCHORING - PACKAGED BOILER AND
CONDENSATE STORAGE TANKS
PIPING CONNECTIONS TO VERTICAL TYPE STEAM UNIT HEATER
STEAM
CONDENSATE
RETURN
INVERTED
BUCKET
TRAP
STEAM SUPPLY
UNIT
HEATER
PIPING CONNECTIONS TO HORIZONTAL TYPE STEAM UNIT HEATER
UNIT HEATER
STEAM CONDENSATE
RETURN
INVERTED
BUCKET TRAP
STEAM SUPPLY
SCALE POCKET
SCALE POCKET
STEAM CONTROL
VALVE
STEAM CONTROL VALVE
NOTE:
UNIT MOUNTED THERMOSTAT SHALL MAINTAIN SPACE TEMPERATURE
AS INDICATED IN CONTROL SEQUENCE OR HVAC CONTROL DRAWINGS.
UNIT HEATERS (STEAM) PIPING CONNECTIONS
P
D
C
D+[1"]
NTS
D+25mm
PIPE ANCHOR SCHEDULE
D P C N S BOLT PATTERN
SMALL PIPE ANCHOR 38-102mm [11
2"-4"]
INSULATE AS INDICATED FOR ALL
CHILLED WATER. INSULATE PIPE
ONLY FOR STEAM, CONDENSATE
& HEATING WATER.
NOTE:
WHERE USED FOR COPPER TUBE
OR PIPE, BRAZE TO FABRICATED
STEEL ANCHOR
D+[21 2"]
D+[43 4"]
D+121mm
D+64mm D+[11
2"] D+38mm
D+[33 4"]
D+95mm
8mm
[516"]
ANCHOR BOLTS
N=NUMBER
S=SIZE
DRILL Ø = S+2mm
DRILL Ø = S+[116"]
STEEL PIPE OR
COPPER
TUBED=PIPE
O.D.
NOTE
A mm in mm in mm in mm in mm in
13 1 2"
102 4
19 3
NTS
VERTICAL FLASH VESSEL DETAILS
2" HPR
-1
/2
H P
R
-1
/2
H P
R
L P
S
V T
R
FLASH STEAM OUTLET
INLET
CONDENSATE/RESIDUAL BLOWDOWN OUTLET
INSPECTION COVER
INSPECTION COVER
CONCRETE
BEAM
TAV
SIDE VIEW TRAPEZE HANGER FOR UP TO
453KG [1000 LB.] UNIFORM LOAD
ADJUSTABLE CLEVIS HANGER TYPE 1 - SEE SPECIFICATIONS ADJUSTABLE CLEVIS HANGER TYPE 43 - SEE SPECIFICATIONS
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
248 Copeland Street Quincy, MA 02169 P: 617-481-6390 F: 617-687-5990
200 Brickstone Square Andover, MA 01810 P: 978-296-6227 F: 978-475-5768
100% CONSTRUCTION
DOCUMENTS
REPLACE MAIN BOILERS 528A8-17-805
Samuel S. Stratton VA Medical Center, 113 Holland Ave., Albany, New York 12208
06/05/2024
105 Central Street Stoneham, MA 02180 P: 781-275-6050
C U se rs
\h a u n g \D o c u m e n ts
\A lb a n y_ B o ile r_ M e c h
E le ct ri c a l U p g ra d e
V h a u n g
G H
V P
.r v t
/3
/2
:1
:5
A
M
MI-401
MECHANICAL DETAILS
ND HLRevisions: Date:
STEAM TRAP ASSEMBLY
STEAM LINE DRIP POCKET
WATER SAMPLE COOLERS
CONDUCTIVITY CONTROLLER
NTS
[6
M
IN
[1
[6
M
IN
[1
M
IN
[1
M
IN
[24" MAX]
[3"] m m m m m m m m m m
610mm
76mm
V A
R
IE
S
2 - SUPPORTS UP TO 24" SPAN
MAX 24"
/4
MIN 4"
M
IN
FROM EXISTING HX-3 & 4
FROM EXISTING HX-1 & 2
FROM NEW DA TANK
FROM B-1
FROM B-2
FROM B-3
FROM B-4
CONDUCTIVITY
SENSOR (TYP.)
TO BLOW DOWN
TANK
NTS
SEISMIC BRACING DETAIL
STEAM METER DETAIL
NTS
NTS
NTS
WATER FLOW MEASURING STATION
NTS
STEAM SAFETY VALVE
NTS
D
CONFIGURATION WORKS
FOR EITHER SIDE
PIPE
ANGLE
MIN: 30
MAX: 60
CONNECTION
TO STRUCTURE
1-5\8" X 1-5\8" X 12 GA
STRUT UNISTRUT P1000
SERIES OR SIMILAR
A 307 STEEL
BOLT
5\8" HILTI KB TZ
(4" MIN EMBEDMENT LENGTH)
DECK
LONGITUDINAL
1-5\8" X 1-5\8" X 12 GA
STRUT UNISTRUT P1000
SERIES OR SIMILAR 1-5\8" X 1-5\8" X 12 GA
STRUT UNISTRUT P1000
SERIES OR SIMILAR
U-BOLTS
TRANSVERSE 1-5\8" X 1-5\8" X 12
GA STRUT
UNISTRUT P1000
SERIES OR SIMILAR
NOTE:
MAINTAIN UPSTREAM AND DOWN STREAM DISTANCES RECOMMENDED BY
METER MANUFACTURERS
TT
PT
PRESSURE
TRANSMITTER
TEMPERATURE
TRANSMITTER
FLOW METER
INTERFACE
WITH BACNET
SYSTEM
DIFFERENTIAL PRESSURE (DP) CELL
STEAM FLOW MEASUREMENT
SHUTOFF VALVE
TO METERING
SYSTEM
BUILDING INCOMING
MAIN STEAM
DRIP LEG (TYP.)
20mm [3/4"] DRAIN
(ALTERNATE LOCATIONS)
(TYPICAL)
STEAM LINE
(TYPICAL)
CAP (TYPICAL)
PIPE T0 STEAM
TRAP (TYPICAL)
NOTE:
DRIP POCKET PIPE SIZE SAME AS
STEAM MAIN UNLESS OTHERWISE
NOTED.
20mm [3/4"] MIN.
FROM DRIP
CONNECTION DRIP
RETURN
10mm [3/8"] TEST
CONNECTION
STEAM LINE DRIP POCKET AND STEAM TRAP ASSEMBLY
TE
TEMPERATURE
ELEMENT
INTERFACE WITH
METERING STATION
TEFE
SUPPLY
OUTLET
FLOW
ELEMENT
BACNET
INTERFACE
NOTE:
MAINTAIN UPSTREAM AND DOWNSTREAM DISTANCES RECOMMENDED BY METER
MANUFACTURERS.
GREATER THAN 50mm [2"] DIA.
PIPE
50mm [2"] DIA. & SMALLER
VERTICAL
GREATER THAN 50mm [2"] DIA.
PIPE
50mm [2"] DIA. & SMALLER
HORIZONTAL
65mm [2 1/2"] DIA.
INSTALLATION OF THERMOMETER WELLS
NOTE:
PROVIDE THE APPROPRIATE WELL DEPTH TO HAVE THE
NECESSARY INSULATION STAND-OFF DISTANCE.
65mm [2 1/2"] DIA.
PROVIDE UNION UNLESS
SAFETY
VALVE HAS FLANGED
OUTLET
SAFETY VALVE
OPEN DRAIN (NOTE 3)
CONNECTION TO
PRESSURE VESSEL OR
PIPE
VENT PIPE THROUGH ROOF
SUPPORT AS INDICATED ON DWGS.
(NOTES 1, 2)
PIPE THREADED INTO ELBOW
(SAME SIZE AS ELBOW)
DRIP PAN ELBOW
(SECTIONAL VIEW)
20mm [3/4"] DRAIN TO
FLOOR DRAIN OR OPEN
SIGHT DRAIN (NOTE 4)
ELEVATION
NOTES:
1. UNLESS OTHERWISE SHOWN ON THE DRAWINGS, SIZE THE VENT PIPE SO THAT STEAM IS
NOT BLOWN OUT AT THE VENT PIPE ENTRANCE. UTILIZE THE CALCULATION METHOD
CONTAINED IN ANSI B31.1. POWER PIPING CODE, APPENDIX II. THE VENT PIPE SHOULD GO
VERTICAL THRU THE ROOF WITH NO TURNS OR ANGLES. WHERE REQUIRED THERE SHALL BE
NO MORE THEN A TOTAL OR 180 DEGREES IN DIRECTIONAL CHANGES MADE WITH 45 DEG.
ELBOWS.
2. VENT PIPE SHALL TERMINATE 1829mm [6'] MIN. ABOVE FINISHED ROOF.
3. DISCHARGE OF DRAIN SHALL BE DIRECTED AWAY FROM PLATFORMS OR OTHER AREAS
WHERE PERSONNEL MAY OCCUPY.
4. DO NOT CONNECT ANY OTHER DRAIN TO THE DRIP PAN ELBOW DRAIN PIPE.
5. SEE SPECIFICATIONS FOR ADDITIONAL REQUIREMENTS.
FLEXIBLE
CONNECTOR
NOTES:
1. MAXIMUM STRUT LENGTH 8"
2. STRUT TO CLIP BOLT DIAMETER 1\2"
3. BY OTHER'S: HILTI'S NUTS, BOLTS, WASHERS.
5. SEISMIC RESTRAINTS SHALL BE PROVIDED PER THE
LATEST ADOPTED EDITION OF THE APPLICABLE STATE
BUILDING CODE AND THE SMACNA SEISMIC RESTRAINT
MANUAL, GUIDELINES FOR MECHANICAL SYSTEMS. THE
CONTRACTOR SHALL SUBMIT SHOP DRAWINGS OF THE
PROPOSED RESTRAINTS, STRUCTURAL ATTACHMENT
METHODS AND RESTRAINT LOCATIONS TO THE ARCHITECT
FOR REVIEW AND APPROVAL. THE SUBMITTED DOCUMENTS
SHALL BE PREPARED AND STAMPED BY A STRUCTURAL
ENGINEER LICENSED IN THE PROJECT LOCATION.
D
S W
20mm [3/4"]
COOLING
WATER
8mm [1/4"]
SAMPLE
OUTLET
20mm [3/4"]
ANTI-SYPHON
VACUUM BREAKER
0-83°C [30-180°F]
SAMPLE COOLER NOTES:
15mm [1/2"]
SAMPLE COOLER
FD
S W
BOILER FLOW DIAGRAM
NTS
BO
CF
C B
D
BOILER
(TYPICAL)
ECONOMIZER
(TYPICAL)
V
D
OSD
CONTROL VALVE
10-260°C [50-500°F]
F W
P D
FWPD
F W
P D
FWPD
SRV-1
B F
-2
B F
-1 F
R O
M F
E E
D W
A T
E R
P U
M P
S
3/4" TO NEAREST
FLOOR DRAIN IN
BOILER ROOM
20mm [3/4"]
STACK
B W
S
BO
51mm [2]
T O
S A
M P
L E
C O
O L E
R
20mm 3/4"
FROM
CHEMICAL
FEEDER
TO BLOWDOWN TANK BO
2ND BO LINE
REQUIRED IF BOILER
HAS TWO BO
CONNECTIONS
FWPD
CONTROLLER
BOILER WATER LEVEL CONTROL SCHEMATIC
(SEE SPECS FOR TYPE OF SYSTEM)
BOILER WATER LEVEL
TRANSMITTER
BOILER STEAM FLOW
TRANSMITTER
BOILER FEEDWATER
PRESSURE TRANSMITTER
S
IN
G L E
E L E
M E
N T
S Y
S T
E M
D U
A L
E L E
M E
N T
S Y
S T
E M
T H
R E
E E
L E
M E
N T
S Y
S T
E M
0-150°C [30-300°F]
0-2000kPa
[0-300PSIG]
C V
-9 ,1
,1
PROVIDE
TEMPERATURE
TRANSMITTERS
HERE
0-2000kPa
[0-300PSIG]
20mm [3/4"]
RUN TO FLASH
VESSEL
M
CONTROL VALVE
1. PROVIDE SEPARATE COOLERS FOR BWS AND FWS.
2. ABOVE DIAGRAM SHOWs SAMPLE COOLER FOR NEW DA TANK DT-1 AND EXISTING HX-1,2,3, 4. PROVIDE
SAMPLE COOLER FOR EACH BOILER WITH TYPICAL DETAIL
3. MOUNT SAMPLE COOLERS ON EXISTING BOARD AND 4' ABOVE FINISHED FLOOR.
CONDUCTIVITY CONTROLLER
CONDUCTIVITY CONTROLLER NOTES:
1. PROVIDE NEW CONDUCTIVITY SENSORS, CONTROLLERS AND MODULATING VALVES.
2. MOUNT ASSEMBLY ON EXISTING BOARD AND 4' ABOVE FINISHED FLOOR.
PIPE TRENCH IN BUILDING
NTS
NOTES:
1.
2.
COORDINATE TRENCH DETAIL WITH ARCHITECTURAL & STRUCTURAL.
REFER TO SPECIFICATION, SEALING & CAULKING.
CENTER BOLT FOR SPAN
GREATER THAN 24"
4" 5.4#7/8"∅
TYPE 40 SHIELD
BANDED TO PIPE
HIGH DENSITY INSERT
TYPICAL COLD PIPE TYPICAL
HOT PIPE
TYPE 39
SADDLE
REMOVABLE COVER
3/16" STAINLESS STEEL
SLIP-RESISTANCE FLOOR PLATE
(3-1/2" BEARING AT EACH END)
CAULK
AND SEAL
[1 m m
SLOPE
MIN 6"
COMPACTED
CRUSH STONE
#4 @12" EW
WATER STOPPER
4 SEE STRUCTURAL DRAWINGS FOR MORE SEISMIC
BRACING DETAILS
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
248 Copeland Street Quincy, MA 02169 P: 617-481-6390 F: 617-687-5990
200 Brickstone Square Andover, MA 01810 P: 978-296-6227 F: 978-475-5768
100% CONSTRUCTION
DOCUMENTS
REPLACE MAIN BOILERS 528A8-17-805
Samuel S. Stratton VA Medical Center, 113 Holland Ave., Albany, New York 12208
06/05/2024
105 Central Street Stoneham, MA 02180 P: 781-275-6050
C U se rs
\h a u n g \D o c u m e n ts
\A lb a n y_ B o ile r_ M e c h
E le ct ri c a l U p g ra d e
V h a u n g
G H
V P
.r v t
/3
/2
:1
:5
A
M
MI-402
MECHANICAL DETAILS
ND HLRevisions: Date:
m m m m
[1
M
IN
[6
M
IN
m m m m
[1
M
IN
[6
M
IN
m m m m
[1
M
IN
[6
M
IN
C
LC
300mm[12"]
150mm[6"]
12"
ALIGN WITH CENTER OF WEAR
PLATE
L TANK (NORMAL WATER LEVEL)
6"
6"
6"
600mm [2'] MAX.
762mm [2'-6"]
PLATFORM
300mm [12"]
25mm [1"]
4XD2 MIN.
20XD2 MIN.10XD1 MIN.
STEAM TRAP TESTING VALVE WITH 1/4" FNPT
TEST PORT WHICH IS NORMALLY BLOCKED WHEN
THE VALVE IS OPEN AND OPEN WHEN THE VALVE
IS IN TEST POSITION
TO RETURN MAIN
DIELECTRIC FITTING WHERE
RETURN IS COPPER PIPE
STEAM TRAP TESTING VALVE WITH 1/4" FNPT
TEST PORT WHICH IS NORMALLY BLOCKED WHEN
THE VALVE IS OPEN AND OPEN WHEN THE VALVE
IS IN TEST POSITION
TO RETURN MAIN
DIELECTRIC FITTING WHERE
RETURN IS COPPER PIPE
STEAM TRAP TESTING VALVE WITH 1/4" FNPT
TEST PORT WHICH IS NORMALLY BLOCKED WHEN
THE VALVE IS OPEN AND OPEN WHEN THE VALVE
IS IN TEST POSITION
DIELECTRIC FITTING WHERE
RETURN IS COPPER PIPE
CAP
DOUBLE VALVE (1/3 AND 2/3)
NTS
STEAM PRESSURE REDUCING STATION
NTS
FLOW
NTS
FLOW
NTS
THERMOSTATIC STEAM TRAP ASSEMBLY
FLOW
NTS
END OF STEAM LINE DRIP TRAP
CONDENSATE
STEAM PIPE
NTS
POWER ROOF VENTILATOR
CHEMICAL FEED SYSTEM - PUMPED TYPE
NTS
V
D
F W
P D
CF
CF
V T
R
BO
CW
CW
BOILER BLOWDOWN TANK
NTS
NTS
NTS
VENT TO ATMOSPHERE
NOTES:
1. SEE FLOOR PLANS FOR PIPE SIZES.
2. SEE EQUIPMENT SCHEDULES FOR VALVE DATA AND PIPE SIZES D1 AND D2. INSTALL VALVES AS RECOMMENDED
BY MANUFACTURER.
3. MAKE BYPASS VALVE DISCHARGE PIPE THE SAME SIZE AS D2 FOR THE LARGEST PRV.
4. PROVIDE NECESSARY UNIONS FOR THE REMOVAL OF VALVE WITH SCREWED CONNECTIONS.
5. SLOPE PILOT CONTROL LINE FROM PRESSURE REDUCING VALVE TO DOWN STREAM STEAM PIPING. MINIMUM SLOPE SHALL BE 25'/100', 25mm/300mm [1"/12"]
SIPHON
(TYP.)
PILOT CONTROL LINE
REDUCER
(TYP.)
IF REQUIRED
NOTE 1
D1
N.C.
D2
D2
NOTE 1
NOTE 3
INVERTER BUCKET
TRAP ASSEMBLY
TYP.
PSV
SEE DRAWINGS FOR PIPE SIZES
TO RETURN MAIN
SCHEDULE 80 STEEL PIPE
PIPE SIZE SHALL BE SAME SIZE AS
TRAP
S…