This document is a set of structural drawings and specifications related to a federal contract opportunity to replace the main boilers at the Samuel S. Stratton VA Medical Center in Albany, New York.
The project involves replacing three 900 HP dual fuel-fired steam water-tube boilers from 1978 with new boilers, and installing two temporary 1,000 BHP steam boilers during construction. The work will be completed in three phases, with the first phase replacing electrical equipment and installing new switchgear, the second phase installing the temporary boilers, and the third phase removing the existing boilers and installing the new boilers. The project must be substantially complete within 730 calendar days after notice to proceed. The contractor will be required to use the Autodesk Build construction management platform provided by the agency. The structural drawings provide details on concrete, steel, and masonry construction requirements, as well as seismic bracing and anchoring for the new equipment.
View the file
Other files for this federal contract opportunity
Show all 29
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
1. GENERAL
1.1. THE STRUCTURAL DRAWINGS SHALL BE USED IN CONJUNCTION WITH ALL OTHER CONTRACT DRAWINGS AND SPECIFICATIONS. REFER TO CIVIL, ARCHITECTURAL, MECHANICAL, PLUMBING, AND ELECTRICAL DRAWINGS FOR LOCATION, DIMENSIONS, AND DETAILS OF OPENINGS, SLEEVES, EMBEDMENTS, INSERTS, PADS, CURBS, DEPRESSIONS, ANCHOR BOLTS, AND OTHER PROJECT REQUIREMENTS NOT SHOWN ON STRUCTURAL DRAWINGS.
1.2. THE CONTRACTOR IS RESPONSIBLE FOR CHECKING, COORDINATING AND VERIFYING ALL DIMENSIONS IN THE FIELD PRIOR TO COMMENCING WORK. THE CONTRACTOR SHALL IMMEDIATELY REPORT ANY DISCREPANCY TO THE ARCHITECT AND ENGINEER AS A REQUEST FOR INFORMATION (RFI)
BEFORE PROCEEDING WITH WORK.
1.3. THE CONTRACTOR IS RESPONSIBLE FOR VERIFYING IN THE FIELD THE EXISTENCE AND LOCATION OF OVERHEAD, BURIED AND/OR EMBEDDED UTILITIES, AND DETERMINING LOCATIONS OF ALL EMBEDDED MECHANICAL, ELECTRICAL AND PLUMBING SYSTEMS AFFECTED BY THE WORK OF THIS
CONTRACT.
1.4. ALL WORK IS TO CONFORM WITH THE FOLLOWING CODES AND STANDARDS:
1.4.1. CURRENT STATE BUILDING CODE
1.4.2. INTERNATIONAL BUILDING CODE, (IBC 2018)
1.4.3. "BUILDING CODE REQUIREMENTS FOR STRUCTURAL CONCRETE" - AMERICAN CONCRETE INSTITUTE (ACI 318)
1.4.4. "MANUAL OF STEEL CONSTRUCTION" - AMERICAN INSTITUTE OF STEEL CONSTRUCTION (AISC 360)
1.4.5. "STRUCTURAL WELDING CODE - STEEL" - AMERICAN WELDING SOCIETY (AWS D1.1)
1.4.6. "SEISMIC PROVISION FOR STRUCTURAL STEEL BUILDINGS" -AMERICAN INSTITUTE OF STEEL CONSTRUCTION, (AISC)
1.4.7. "MINIMUM DESIGN LOADS FOR BUILDINGS AND OTHER STRUCTURES" - AMERICAN SOCIETY OF CIVIL ENGINEERS, (ASCE 7-16) FOR ADDITIONAL CODES AND STANDARDS REFER TO SPECIFICATIONS.
1.5. THE CONTRACTOR SHALL NOTIFY THE ARCHITECT AND ENGINEER OF UNFORESEEN CONDITIONS THAT MAY BE UNCOVERED DURING DEMOLITION AND CONSTRUCTION AS A REQUEST FOR INFORMATION (RFI) BEFORE PROCEEDING WITH WORK.
1.6. PERMANENT STRUCTURAL ELEMENTS TO BE DESIGNED IN ACCORDANCE WITH PERFORMANCE SPECIFICATIONS INCLUDE, BUT ARE NOT LIMITED TO, THE FOLLOWING:
1.6.1. MISC. ARCH COMPONENT SEISMIC SUPPORTS
1.6.2. MISC. MECHANICAL AND ELECTRICAL COMPONENT AND SYSTEM SEISMIC SUPPORTS
1.6.3. LIGHT GAUGE COLD FORMED STEEL FRAMING
FOR PERFORMANCE DESIGN REQUIREMENTS OF ELEMENTS LISTED ABOVE, REFER TO ADDITIONAL NOTES ON THESE SHEETS AND IN THE TECHNICAL SPECIFICATIONS. ALL DESIGN SUBMITTAL DRAWINGS AND CALCULATIONS SHALL BE CERTIFIED, SIGNED AND SEALED BY A PROFESSIONAL STRUCTURAL
ENGINEER REGISTERED IN THE CURRENT STATE.
1.7. STRUCTURAL REQUIREMENTS TO ACCOMMODATE FIXED EQUIPMENT, INCLUDING BUT NOT LIMITED TO ROOF TOP UNITS ARE INCIDENTAL TO THE REQUIREMENTS OF A SPECIFIC EQUIPMENT MANUFACTURER. ALL WORK SHALL CONFORM TO APPROVED EQUIPMENT MANUFACTURER'S SHOP DRAWINGS AND INSTALLATION INSTRUCTIONS. THE CONTRACTOR SHALL SUBMIT TO THE ENGINEER FOR APPROVAL ANY REQUIRED MODIFICATIONS TO ACCOMMODATE APPROVED EQUIPMENT DRAWINGS. SUCH MODIFICATIONS SHALL BE MADE AT NO COST TO THE OWNER.
1.8. DETAILS AND NOTES SHOWN ON STRUCTURAL DRAWINGS SHALL BE APPLICABLE TO ALL PARTS OF THE STRUCTURAL WORK EXCEPT WHERE SPECIFICALLY REQUIRED OTHERWISE BY CONTRACT DOCUMENTS. CONDITIONS NOT SPECIFICALLY SHOWN SHALL BE SIMILAR TO THOSE SHOWN FOR
LIKE CONDITIONS AS DETERMINED BY THE ENGINEER.
1.9. IN ACCORDANCE WITH SPECIFICATION, TESTING AND INSPECTION OF STRUCTURAL WORK SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR. THE COSTS FOR TESTING AND INSPECTIONS WILL BE PAID BY THE CONTRACTOR. PROVIDE TEST RESULTS TO THE ENGINEER IN A TIMELY MANNER.
1.10. THE CONTRACTOR SHALL DESIGN AND PROVIDE ALL REQUIRED SHORING AND TEMPORARY BRACING TO RESIST FORCES ON THE STRUCTURE THROUGHOUT THE CONSTRUCTION PERIOD.
2. CAST IN PLACE CONCRETE
2.1. CONCRETE WORK SHALL CONFORM TO "BUILDING CODE REQUIREMENTS FOR REINFORCED CONCRETE" (ACI 318) AND "SPECIFICATIONS FOR STRUCTURAL CONCRETE FOR BUILDINGS" (ACI 301).
2.2. CONCRETE SHALL BE CONTROLLED CONCRETE, PROPORTIONED, MIXED AND PLACED IN THE PRESENCE OF A REPRESENTATIVE OF AN APPROVED TESTING AGENCY.
2.3. UNLESS NOTED OTHERWISE, CONCRETE SHALL BE NORMAL WEIGHT AND HAVE A MINIMUM 28 DAY COMPRESSIVE STRENGTH AS FOLLOWS:
2.3.1. FOUNDATIONS: 4000 PSI
2.3.2. INTERIOR SLABS-ON-GRADE, KNEEWALLS, CURBS, AND EQUIPMENT PADS: 4500 PSI
2.3.3. SUSPENDED SLABS: 3000 PSI
2.3.4. EXTERIOR SLABS AND WALKWAYS: 5000 PSI
2.4. ALL PERMANENTLY EXPOSED VERTICAL AND HORIZONTAL CONCRETE SURFACES SHALL BE TREATED OR SEALED IN ACCORDANCE WITH PROJECT SPECIFICATIONS.
2.5. CONCRETE WORK SHALL BE COORDINATED WITH ALL ARCHITECTURAL, MECHANICAL, PLUMBING, ELECTRICAL WORK, AND ALL EQUIPMENT. THE CONTRACTOR SHALL VERIFY INSTALLATION AND LOCATIONS OF ALL EMBEDDED ITEMS INCLUDING BUT NOT LIMITED TO INSERTS, ANCHOR BOLTS, DOWELS, BLOCKOUTS, SLEEVES, EMBEDDED PIPING, AND EMBEDDED CONDUIT PRIOR TO CONCRETE PLACEMENT.
2.6. FOR STRUCTURAL ELEMENTS, THE LOCATIONS AND MAXIMUM SPACING OF VERTICAL JOINTS SHALL BE AS FOLLOWS:
2.6.1. FOUNDATION WALL CONTRACTION JOINT 30 FT.
2.6.2. FOUNDATION WALL CONSTRUCTION JOINT 60 FT.
2.7. FOR SLABS-ON-GRADE, LOCATE CONSTRUCTION OR CONTROL JOINTS ALONG COLUMN LINES OR AS SHOWN. PROVIDE JOINTS AT 20FT. MAX. SPACING. SUBMIT JOINT LOCATIONS AND DETAILS FOR APPROVAL.
2.8. SEALANT FOR CONTROL/CONTRACTION JOINTS AND SAW CUT JOINTS SHALL BE SIKADUR 51 MANUFACTURED BY SIKA OR AN APPROVED EQUAL.
2.9. CONCRETE EXPOSED TO WEATHER (FREEZE-THAW CONDITIONS) IN THE FINISHED PROJECT SHALL BE AIR ENTRAINED PER SPECIFICATIONS REQUIREMENTS.
2.10. A MINIMUM OF 72 HOURS SHALL ELAPSE BETWEEN ADJACENT CONCRETE PLACEMENTS.
2.11. CONCRETE SLABS SHALL BE PLACED SO THAT THE SLAB THICKNESS IS AT NO POINT LESS THAN THAT INDICATED ON THE DRAWINGS.
2.12. PROVIDE A 3/4" CHAMFER ON ALL VERTICAL AND HORIZONTAL CORNERS EXPOSED TO VIEW UNLESS NOTED OTHERWISE.
2.13. ALL CONCRETE SHALL BE WATER CURED UNLESS OTHERWISE AUTHORIZED BY THE ENGINEER.
2.14. NON-SHRINK, NON-METALLIC, GROUT SHALL HAVE A MINIMUM 28-DAY COMPRESSIVE STRENGTH OF 7,500 PSI (ASTM C942) AND A MINIMUM BOND STRENGTH OF 2,000 PSI AT 28-DAYS (ASTM C882). GROUT MAY BE EXTENDED WITH COARSE AGGREGATE PER THE MANUFACTURER'S
RECOMMENDATIONS.
3. CAST IN PLACE CONCRETE REINFORCEMENT
3.1. REINFORCEMENT DETAILING, FABRICATION, AND ERECTION SHALL CONFORM TO "ACI DETAILING MANUAL" - SP-66, "CRSI MANUAL OF STANDARD PRACTICE".
3.2. STEEL REINFORCEMENT, UNLESS NOTED OTHERWISE, SHALL CONFORM TO THE FOLLOWING:
3.2.1. BARS, TIES, AND STIRRUPS ASTM A615 GRADE 60
3.2.2. WELDED WIRE FABRIC ASTM A185, FLAT SHEETS
3.3. REINFORCING STEEL SHALL BE UNCOATED AND DEFORMED.
3.4. MINIMUM CONCRETE PROTECTIVE COVERING FOR REINFORCEMENT, UNLESS REQUIRED FOR FIRE PROTECTION OR NOTED OTHERWISE, SHALL BE AS FOLLOWS:
3.4.1. CONCRETE CAST AGAINST AND PERMANENTLY EXPOSED TO EARTH:____3"
3.4.2. CONCRETE EXPOSED TO EARTH OR WEATHER:
3.4.2.1. NO. 6 THRU NO. 18 BARS____2"
3.4.2.2. NO. 5 BAR, W31 OR D31 WIRE AND SMALLER____2"
3.4.3. SURFACES NOT EXPOSED TO WEATHER OR IN CONTACT WITH GROUND:
3.4.3.1. SLABS, WALLS, JOISTS:
(a) NO. 14 AND NO 18 BARS____2"
(b) NO. 11 BARS AND SMALLER____2"
3.4.3.2. BEAMS, COLUMNS:
(a) PRIMARY REINFORCEMENT____2-1/2"
(b) TIES, STIRRUPS, SPIRALS____2"
3.5. REINFORCING STEEL SHALL BE CONTINUOUS THROUGH ALL CONSTRUCTION JOINTS, CORNERS, AND INTERSECTIONS UNLESS OTHERWISE NOTED. REINFORCING SHALL BE LAPPED AT NECESSARY SPLICES OR HOOKED AT DISCONTINUOUS ENDS, UNLESS OTHERWISE NOTED.
3.6. FOR REINFORCING STEEL SPLICE LAP LENGTHS REFER TO THE TABLE PROVIDED UNLESS OTHERWISE INDICATED.
3.7. MECHANICAL SPLICES SHALL BE PERMITTED SUBJECT TO APPROVAL BY THE ENGINEER. MECHANICAL SPLICES SHALL DEVELOP AT LEAST 125 PERCENT OF THE SPECIFIED YIELD STRENGTH OF THE BAR. NO WELDED CONNECTIONS ARE PERMITTED.
3.8. WELDED WIRE FABRIC SHALL BE LAPPED (1) SQUARE PLUS (2) INCHES WHERE REQUIRED AND SHALL BE WIRED TOGETHER AT ALL LAPS. WWF SHALL BE SUPPORTED BY CHAIRS AND/OR CARRYING BARS PRIOR TO CONCRETE PLACEMENT.
3.9. REINFORCEMENT SHALL NOT BE TACK WELDED.
3.10. NOTIFY THE TESTING LAB AND ENGINEER A MINIMUM OF 48 HOURS PRIOR TO SCHEDULED CONCRETE PLACEMENT IN ORDER TO ACCOMMODATE INSPECTION OF REINFORCEMENT AND CONCRETE TESTING. NO CONCRETE SHALL BE PLACED WITHIN 48 HOURS OF SUCH NOTIFICATION.
3.11. WHERE REINFORCEMENT IS NOT SHOWN ON DRAWINGS, PROVIDE REINFORCEMENT IN ACCORDANCE WITH APPLICABLE DETAILS AS DETERMINED BY THE ARCHITECT AND ENGINEER. IN NO CASE SHALL REINFORCEMENT BE LESS THAN THE MINIMUM REINFORCEMENT PERMITTED BY THE CODES, NOR LESS THAN THE FOLLOWING:
3.11.1. BEAM STIRRUPS: #3 @ 12"
3.11.2. BEAM STIRRUP SUPPORTS: 1-#5 AT EACH STIRRUP BEND
3.11.3. FACE REINFORCEMENT IN BEAMS OR PORTIONS OF BEAMS #4 @ 12" E.F.
3.11.4. STRUCTURAL SLABS: 0.0020 X GROSS CONCRETE AREA IN EACH DIRECTION
3.11.5. CONCRETE WALLS: 0.0025 X GROSS CONCRETE AREA IN EACH DIRECTION
3.12. WHERE REINFORCEMENT IS REQUIRED IN SECTION, REINFORCEMENT IS CONSIDERED TYPICAL WHEREVER THE SECTIONS APPLIES.
3.13. WHERE THERE IS CONFLICT BETWEEN LOCATIONS OF COLUMN VERTICAL BARS AND BEAM HORIZONTAL BARS, THE COLUMN BARS SHALL REMAIN IN THEIR DESIGNATED POSITIONS AND BEAM BAR LOCATIONS SHALL BE ADJUSTED.
3.14. DOWELS SHALL MATCH BAR SIZE, NUMBER AND SPACING, UNLESS NOTED OTHERWISE.
4. MASONRY CONSTRUCTION
4.1. CLAY (BRICK) AND CONCRETE MASONRY (CMU) CONSTRUCTION SHALL CONFORM TO 'BUILDING CODE REQUIREMENTS FOR MASONRY STRUCTURES' (ACI 530-13/ASCE 5-13/TMS402-13), AND TO 'SPECIFICATIONS FOR MASONRY STRUCTURES' (ACI 530, 1-13/ASCE 6-13/TMS 602-13).
4.2. MATERIALS STRENGTH SHALL BE AS FOLLOWS:
4.2.1. CONCRETE MASONRY UNITS (CMU) SHALL CONFORM TO ASTM C-90 OF C-145 GRADE N-1.
4.2.2. MORTAR SHALL CONFORM TO ASTM C-270, TYPE M OR S.
4.2.3. GROUT SHALL CONFORM TO ASTM C-476 FINE OR COARSE.
4.3. MASONRY SHALL HAVE F'M = 1,500 PSI, F'M IS THE COMPRESSIVE STRENGTH OF THE MASONRY AT 28 DAYS AS DETERMINED BY PRISM TESTS.
4.4. PRIOR TO GROUTING CELLS, BARS AND CELLS MUST BE INSPECTED BY THE TESTING AGENCY.
4.5. THE DESIGN OF REINFORCED MASONRY CONSTRUCTIONS IS BASED ON ALLOWABLE STRESSES PREDICATED ON 'WITH INSPECTION' PROVISIONS, REQUIRING THAT QUALIFIED MASONRY INSPECTION TAKE PLACE ON A CONTINUOUS BASIS WHENEVER MASONRY IS BEING PLACED.
4.6. REINFORCED MASONRY WALLS SHALL HAVE BOND BEAMS AT THE TOP OF EACH WALL AND SHALL BE CONTINUOUS WITH ALL INTERSECTING BOND BEAMS.
4.7. BONDING METHODS, TIES, LINTELS AND ACCESSORIES SHALL BE APPROVED BY THE ARCHITECT. ANCHORS SHALL ONLY BE INSTALLED IN FULLY GROUTED CELLS OF CONCRETE MASONRY.
4.8. MASONRY OPENINGS FOR UTILITIES ARE TO BE CLOSED UP WITH NEW MASONRY WORK AROUND THE UTILITY AND PROPERLY FIRESTOPPED WITH MATERIAL SPECIFIED BY ARCHITECT'S DRAWINGS AND SPECIFICATIONS.
4.9. PROVIDE 1-#5 VERTICAL REINFORCING AT 32” OC AT ALL MASONRY WALLS UNLESS NOTED OTHERWISE. THIS REINFORCING SHALL BE CONTINUOUS FULL HEIGHT AND SPLICED 2'-0” ABOVE EACH FLOOR LEVEL.
4.10. PROVIDE W1.7 (9 GAUGE) LADDER TYPE WIRE JOINT REINFORCING AT 16 INCHES VERTICAL SPACING UNLESS NOTED OTHERWISE.
4.11. MASONRY BLOCK CELLS CONTAINING VERTICAL REINFORCING SHALL BE GROUTED SOLID. FILLING CELLS WITH MORTAR IS UNACCEPTABLE. THE COMPRESSIVE STRENGTH OF GROUT AT THE END OF 28 DAYS SHALL BE 3,000 PSI MINIMUM.
4.12. PROVIDE 2-#5 CONTINUOUS HORIZONTAL BARS IN THE TOP COURSE OF WALLS (BOND BEAM) AND AT 4' - 0" O.C. VERT.
5. STRUCTURAL STEEL
5.1. STRUCTURAL STEEL DESIGN, FABRICATION AND ERECTION SHALL CONFORM TO THE AISC "MANUAL OF STEEL CONSTRUCTION", "SPECIFICATION FOR STRUCTURAL STEEL BUILDINGS AND BRIDGES" (ANSI/AISC 360-10), AND "CODE OF STANDARD PRACTICE FOR STEEL BUILDINGS AND BRIDGES"
(ANSI/AISC 360-16).
5.2. STRUCTURAL STEEL SHALL BE NEW STEEL CONFORMING TO THE FOLLOWING:
5.2.1. WIDE FLANGE SHAPES:_____ASTM A992
5.2.2. OTHER STEEL SHAPES, PLATES AND BARS:_____ASTM A572 OR ASTM A36.
5.2.3. STRUCTURAL TUBING:_____ASTM A500 GR B.
5.3. ALL WELDED CONNECTIONS SHALL BE MADE BY APPROVED CERTIFIED WELDERS AND SHALL CONFORM TO A.W.S. SPECIFICATIONS AMENDED TO DATE. ELECTRODES SHALL BE E70XX.
5.4. BOLTS SHALL CONFORM TO ASTM A325 AND BE INSTALLED SNUG-TIGHT UNLESS NOTED OTHERWISE
5.5. STRUCTURAL STEEL FRAMING SHALL BE WITHIN TOLERANCE BEFORE CONNECTIONS ARE FINALLY BOLTED OR WELDED.
5.6. FIELD CUTTING OF STRUCTURAL STEEL OR ANY FIELD MODIFICATIONS OF STRUCTURAL STEEL SHALL NOT BE MADE WITHOUT PRIOR WRITTEN APPROVAL BY THE ENGINEER FOR EACH SPECIFIC USE.
5.7. STRUCTURAL STEEL SHAPES AND PLATES SHALL BE HOT-DIPPED GALVANIZED PER ASTM A123 U.N.O. FASTENERS SHALL BE HOT-DIPPED GALVANIZED PER ASTM A153 U.N.O. HOT-DIPPED GALVANIZING SHALL ALSO CONFORM TO ASTM A385. THE GALVANIZER SHALL SUBMIT A CERTIFICATE OF
CONFORMANCE FOR RECORD.
5.8. PROVIDE FIELD TOUCH-UP AND REPAIR OF GALVANIZING AS REQUIRED PER ASTM A780 USING AN INORGANIC ZINC-RICH PRIMER.
5.9. WHEN DISSIMILAR METALS ARE IN CONTACT (E.G. STAINLESS STEEL IN CONTACT WITH GALVANIZED STEEL), COAT SURFACE WITH COAL TAR EPOXY OR PROVIDE OTHER APPROVED MEANS TO PROVIDE A BARRIER.
5.10. WELDS SHALL BE 1/4" FILLET WELDS MINIMUM UNLESS NOTED OTHERWISE ON THE DRAWINGS.
5.11. PROVIDE TEMPORARY ERECTION BRACING AND SUPPORTS TO HOLD STRUCTURAL STEEL FRAMING SECURELY IN POSITION. SUCH TEMPORARY BRACING AND SUPPORTS SHALL NOT BE REMOVED UNTIL PERMANENT BRACING HAS BEEN INSTALLED.
5.12. ALL THE CONNECTIONS SHALL BE DESIGNED BY A LICENSED ENGINEER WORKING FOR THE FABRICATOR UNLESS NOTED OTHERWISE (AISC 303-16), SHEAR CONNECTION SHALL BE DESIGNED FOR 1/2 MEMBER LOAD CAPACITY AND MOMENT CONNECTION SHALL BE DESIGNED FOR THE FULL
CAPACITY OF THE BEAMS.
5.13. SUBMIT SHOP DRAWINGS AND PRODUCT DATA FOR APPROVAL PRIOR TO FABRICATION.
6. POST INSTALLED CONCRETE ANCHORS AND REINFORCING DOWELS
6.1. ADHESIVE ANCHORS AND REINFORCING DOWELS SHALL BE HILTI HIT-HY-200 ADHESIVE ANCHORING SYSTEM.
6.2. EXPANSION ANCHORS SHALL BE HILTI KWIK BOLT TZ EXPANSION ANCHORS.
6.3. INSTALL ANCHORS IN STRICT CONFORMANCE WITH THE MANUFACTURER'S REQUIREMENTS.
6.4. HOLES SHALL BE THOROUGHLY CLEANED AND DRY PRIOR TO INSTALLING ANCHORS.
6.5. DO NOT DAMAGE EXISTING REINFORCING. LOCATE REINFORCING WITH PROFOMETER OR OTHER MEANS PRIOR TO DRILLING CONCRETE.
6.6. ANCHORS INSTALLED OVERHEAD SHALL BE PROOF TESTED BY THE MANUFACTURER'S FIELD ENGINEER OR OTHER APPROVED AGENCY. PROOF TEST A MINIMUM OF 25% OF THE ANCHORS OR (2) TOTAL, WHICHEVER IS GREATER.
6.7. FOR THE EQUIPMENT ANCHOR BOLT INSTALLATION, REFER TO THE MANUFACTURER INSTALLATION INSTRUCTION AND REQUIREMENT. THE ANCHORS INSTALLED SHALL BE TESTED PER MANUFACTURER SPECIFICATION.
7. EXISTING SLAB PENETRATION
7.1. DO NOT DAMAGE EXISTING CONCRETE REINFORCEMENT . LOCATE REINFORCING WITH PROFOMENTER OR OTHER MEANS PRIOR TO SAW CUT OR CORE DRILL.
7.2. THE CONTRACTOR SHALL REPORT ENGINEER FOR APPROVAL BEFORE ANY EXISTING REBAR CUT AND PROVIDE DETAILED REINFORCING SCAN
THE FOLLOWING CRITERIA WILL BE USED TO DESIGN THE STRUCTURAL
SUPPORT AND CATWALKS.
1. BUILDING RISK CATEGORY IV - ESSENTIAL FACILITY
2. DEAD LOADS
2.1. ACTUAL WEIGHT OF THE BOILERS AND ITS ACCESSORIES.
3. LIVE LOADS
3.1. ROOF: 20 PSF
3.2. CATWALK: 250 PSF
4. SNOW LOADS
4.1. GROUND SNOW LOAD, Pg - 40 PSF
4.2. MINIMUM FLAT ROOF SNOW LOAD, Pf MIN - 35 PSF
4.3. SNOW IMPORTANT FACTOR, Is - 1.2
5. WIND LOADS
5.1. BASIC WIND SPEED, VULT - 120 MPH
5.2. WIND EXPOSURE CATEGORY - B
6. SEISMIC LOADS
6.1. SPECTRAL RESPONSE ACCELERATION PARAMETER, Ss - 0.23
6.2. SPECTRAL RESPONSE ACCELERATION PARAMETER, S1 - 0.069
6.3. SEISMIC IMPORTANCE FACTOR, I/E - 1.5
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
248 Copeland Street Quincy, MA 02169 P: 617-481-6390 F: 617-687-5990
200 Brickstone Square Andover, MA 01810 P: 978-296-6227 F: 978-475-5768
100% CONSTRUCTION
DOCUMENTS
REPLACE MAIN BOILERS 528A8-17-805
Samuel S. Stratton VA Medical Center, 113 Holland Ave., Albany, New York 12208
06/05/2024
105 Central Street Stoneham, MA 02180 P: 781-275-6050
C U se rs
\h a u n g \D o c u m e n ts
\A lb a n y B o ile r_ S tr u ct B id S e t_
V h a u n g
G H
V P
.r v t
/7
/2
:2
:4
P M
SG-001
STRUTURAL GENERAL NOTES
QS HLRevisions: Date:
PHASE 1 DEMOLITION KEY NOTES:
1. DEMOLISH CONCRETE PAD UNDER FUEL OIL #6 PUMP/HEATER
SKID. REPATCH THE FLOOR AS PER VA SPECIFICATIONS.
2. DEMOLISH CONCRETE PAD UNDER WINTER BOILER FUEL OIL
PUMP SKID. REPATCH THE FLOOR AS PER VA SPECIFICATIONS.
3. DEMOLISH CONCRETE PAD UNDER BOILER FEED WATER PUMPS
AND CONDENSATE TRANSFER PUMPS. REPATCH THE FLOOR AS
PER VA SPECIFICATIONS.
4. DEMOLISH STRUCTURAL SUPPORT FOR EXISTING CONDENSATE
TANK. REPATCH THE FLOOR AS PER VA SPECIFICATIONS. REFER
TO CONCRETE SLAB REPAIR DETAIL FOR MORE INFORMATION.
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
248 Copeland Street Quincy, MA 02169 P: 617-481-6390 F: 617-687-5990
200 Brickstone Square Andover, MA 01810 P: 978-296-6227 F: 978-475-5768
100% CONSTRUCTION
DOCUMENTS
REPLACE MAIN BOILERS 528A8-17-805
Samuel S. Stratton VA Medical Center, 113 Holland Ave., Albany, New York 12208
06/05/2024
N
105 Central Street Stoneham, MA 02180 P: 781-275-6050
C U se rs
\h a u n g \D o c u m e n ts
\A lb a n y B o ile r_ S tr u ct B id S e t_
V h a u n g
G H
V P
.r v t
/7
/2
:2
:2
P M
SD-201
STRUCTURAL PHASE 2 - SUB-BASEMENT
DEMOLITION PLAN
1 1 1
2 2 2
PHASE 2 DEMOLITION KEY NOTES:
1. DEMOLISH BOILER CONCRETE PAD. REPATCH THE FLOOR AS PER
VA SPECIFICATIONS.
2. DEMOLISH ELECTRICAL PANEL CONCRETE PAD. REPATCH THE
FLOOR AS PER VA SPECIFICATIONS.
3. DEMOLISH FUEL OIL PUMP SKID CONCRETE PAD. REPATCH THE
FLOOR AS PER VA SPECIFICATIONS.
4. DEMOLISH STRUCTURAL COLUMNS SUPPORTING PIPING RACK
AND BOILER PLATFORM. REPATCH THE FLOOR AS PER VA
SPECIFICATIONS.
5. DEMOLISH CONCRETE PAD UNDER CONTROL PANEL. REPATCH
THE FLOOR AS PER VA SPECIFICATIONS.
6. DEMOLISH CONCRETE PADS UNDER BLOWDOWN TANK. REPATCH
THE FLOOR AS PER VA SPECIFICATIONS.
7. PROVIDE TEMPORARY SUPPORT FOR EXISTING PIPING. SUBMIT
SUPPORT DETAILS TO ENGINEER PRIOR TO DEMOLITION.
7 7 7
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
248 Copeland Street Quincy, MA 02169 P: 617-481-6390 F: 617-687-5990
200 Brickstone Square Andover, MA 01810 P: 978-296-6227 F: 978-475-5768
100% CONSTRUCTION
DOCUMENTS
REPLACE MAIN BOILERS 528A8-17-805
Samuel S. Stratton VA Medical Center, 113 Holland Ave., Albany, New York 12208
06/05/2024
N
105 Central Street Stoneham, MA 02180 P: 781-275-6050
C U se rs
\h a u n g \D o c u m e n ts
\A lb a n y B o ile r_ S tr u ct B id S e t_
V h a u n g
G H
V P
.r v t
/7
/2
:2
:2
P M
SD-301
STRUCTURAL PHASE 3 - SUB-BASEMENT
PHASE 2 DEMOLITION KEY NOTES:
1. DEMOLISH SUPPORTING PIPING RACK. TURN SOME SECTIONS OF
REMOVED STEEL BEAM OVER TO VA WHEN REQUESTED. PROVIDE
TEMPORARY SUPPORT BEFORE DEMOLITION
2. DEMOLISH BOILER PLATFORM ENTIRELY
3. DEMOLISH DE-AERATOR TANK SUPPORT FRAME (BEAMS AND
COLUMNS)
1 1
2 2 2 3
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
248 Copeland Street Quincy, MA 02169 P: 617-481-6390 F: 617-687-5990
200 Brickstone Square Andover, MA 01810 P: 978-296-6227 F: 978-475-5768
100% CONSTRUCTION
DOCUMENTS
REPLACE MAIN BOILERS 528A8-17-805
Samuel S. Stratton VA Medical Center, 113 Holland Ave., Albany, New York 12208
06/05/2024
N
105 Central Street Stoneham, MA 02180 P: 781-275-6050
C U se rs
\h a u n g \D o c u m e n ts
\A lb a n y B o ile r_ S tr u ct B id S e t_
V h a u n g
G H
V P
.r v t
/7
/2
:2
:2
P M
SD-302
STRUCTURAL PHASE 3 - BASEMENT
PHASE 1 NEW WORK KEY NOTES:
1. PROVIDE TWO (2) CONCRETE PADS FOR CONDENSATE TANK. PAD
SIZE : 2'0" X 6'0" X 0'4" (L x W x H). REFER TO GENERAL NOTES FOR
REQUREMENTS ON EQUIPMENT ANCHORAGE. COORDINATE WITH
TANK SPECIFICATIIONS FOR EXACT PAD LOCATION.
2. PROVIDE CONCRETE PAD FOR BOILER PUMP SKID. PAD SIZE : 6'0"
X 3'0" X 0'4" (L x W x H). REFER TO GENERAL NOTES FOR
REQUREMENTS ON EQUIPMENT ANCHORAGE. COORDINATE WITH
APPROVED SUBMITTALS FOR EXACT SIZE AND LOCATION OF THE
PADS.
3. PROVIDE CONCRETE PAD FOR DOMESTIC WATER HEATER. PAD
SIZE : 10'4" X 7'9" X 0'4" (L x W x H). REFER TO GENERAL NOTES
FOR REQUREMENTS ON EQUIPMENT ANCHORAGE. COORDINATE
WITH APPROVED SUBMITTALS FOR EXACT SIZE AND LOCATION OF
THE PADS.
4. PROVIDE CONCRETE PAD FOR FLASH TANK . PAD SIZE : 1'0" X 1'0"
X 0'4" (L x W x H). REFER TO GENERAL NOTES FOR REQUREMENTS
ON EQUIPMENT ANCHORAGE. COORDINATE WITH APPROVED
SUBMITTALS FOR EXACT SIZE AND LOCATION OF THE PADS.
5. PROVIDE CONCRETE PAD FOR CONDENSATE PUMP. PAD SIZE :
3'2" X 2'6" X 0'4" (L x W x H). REFER TO GENERAL NOTES FOR
REQUREMENTS ON EQUIPMENT ANCHORAGE. COORDINATE WITH
APPROVED SUBMITTALS FOR EXACT SIZE AND LOCATION OF THE
PADS.
1' - 11" 6' - 0" 6' - 11" 2' - 0" 5' - 9" 2' - 0" 16' - 1"
10' - 4"
10' - 4" 13' - 0"
3' - 2"
19' - 11"
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
248 Copeland Street Quincy, MA 02169 P: 617-481-6390 F: 617-687-5990
200 Brickstone Square Andover, MA 01810 P: 978-296-6227 F: 978-475-5768
100% CONSTRUCTION
DOCUMENTS
REPLACE MAIN BOILERS 528A8-17-805
Samuel S. Stratton VA Medical Center, 113 Holland Ave., Albany, New York 12208
06/05/2024
N
105 Central Street Stoneham, MA 02180 P: 781-275-6050
C U se rs
\h a u n g \D o c u m e n ts
\A lb a n y B o ile r_ S tr u ct B id S e t_
V h a u n g
G H
V P
.r v t
/7
/2
:2
:2
P M
SF-201
STRUCTURAL PHASE 2 - SUB-BASEMENT NEW
WORK PLAN
SF-401
SF-401
PHASE 2 NEW WORK KEY NOTES:
1. PROVIDE CONCRETE PAD FOR 600 BHP BOILER. PAD SIZE : 22'9" X
8'6" X 0'8" (L x W x H). REFER TO GENERAL NOTES FOR
REQUREMENTS ON EQUIPMENT ANCHORAGE. COORDINATE WITH
BOILER SPECIFICATION FOR EXACT SIZE AND LOCATION.
2. PROVIDE CONCRETE PAD FOR 300 BHP BOILER. PAD SIZE : 18'4" X
7'8" X 0'8" (L x W x H). REFER TO GENERAL NOTES FOR
REQUREMENTS ON EQUIPMENT ANCHORAGE .COORDINATE WITH
BOILER SPECIFICATION FOR EXACT SIZE AND LOCATION.
3. PROVIDE CONCRETE PAD FOR GENERATOR DAY TANK. PAD SIZE :
3'0" X 2'6" X 0'4" (L x W x H). REFER TO GENERAL NOTES FOR
REQUREMENTS ON EQUIPMENT ANCHORAGE.
4. PROVIDE CONCRETE PAD FOR GENERATOR. PAD SIZE : 9'6" X 4'0"
X 0'4" (L x W x H). REFER TO GENERAL NOTES FOR REQUREMENTS
ON EQUIPMENT ANCHORAGE.
5. PROVIDE CONCRETE PAD FOR BLOWDOWN TANK. PAD SIZE : 3'0"
X 3'0" X 0'4" (L x W x H). REFER TO GENERAL NOTES FOR
REQUREMENTS ON EQUIPMENT ANCHORAGE.
1 1 2 2
SF-401
SF-401
SF-401
9' - 6" 5' - 5" 9' - 6" 5' - 4" 8' - 2" 5' - 3" 8' - 2"
3' - 0" 10' - 8"
9' - 6" 7' - 11"
3' - 7" 19' - 11" 28' - 3"
SF-504
SF-504
3' - 0"
14' - 3" 9' - 0" 5' - 11" 9' - 0" 5' - 10" 7' - 8" 5' - 9" 7' - 8"
W8X24
W8X24
W8X24
W8X24
W8X24
W8X24
HSS6X6X1/2 HSS6X6X1/2 HSS6X6X1/2 HSS6X6X1/2 HSS6X6X1/2 HSS6X6X1/2
HSS6X6X1/2 HSS6X6X1/2
HSS6X6X1/2
HSS6X6X1/2
HSS6X6X1/2
HSS6X6X1/2
HSS6X6X1/2HSS6X6X1/2
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
248 Copeland Street Quincy, MA 02169 P: 617-481-6390 F: 617-687-5990
200 Brickstone Square Andover, MA 01810 P: 978-296-6227 F: 978-475-5768
100% CONSTRUCTION
DOCUMENTS
REPLACE MAIN BOILERS 528A8-17-805
Samuel S. Stratton VA Medical Center, 113 Holland Ave., Albany, New York 12208
06/05/2024
N
105 Central Street Stoneham, MA 02180 P: 781-275-6050
C U se rs
\h a u n g \D o c u m e n ts
\A lb a n y B o ile r_ S tr u ct B id S e t_
V h a u n g
G H
V P
.r v t
/7
/2
:2
:2
P M
SF-301
STRUCTURAL PHASE 3 - SUB-BASEMENT NEW
P
SF-401
SF-401
W X
W X
1 1 1
2 2
2 2
W X
W8X15
W X
HSS6X6X1/2
HSS6X6X1/2
HSS6X6X1/2 HSS6X6X1/2
HSS6X6X1/2
W8X15
HSS6X6X1/2
W X
W8X15
W X
W X
HSS6X6X1/2
HSS6X6X1/2
W8X15
HSS6X6X1/2
HSS6X6X1/2
HSS6X6X1/2HSS6X6X1/2
W X
W8X15
W X
W X
W X
W8X15
W X
W X
HSS6X6X1/2
HSS6X6X1/2
HSS6X6X1/2HSS6X6X1/2
W10X30 W10X30
W10X30 W10X30
W10X30W X
W X
W X
SF-401
SF-401
SF-401
SF-504
SF-504
SEE CONCRETE WALL
ANCHOR DETAIL (TYP)
SC (TYP. FOR ALL W8X15 TO
W8X15 CONNECTION)
MC (TYP. FOR ALL W8 TO
HSS CONNECTION)
SC
CUT EXISTING HAND RAIL
FOR OPENING TO NEW
CATWALK SHEAR CONNECTION (SC)
FOR W10 SPLICES (TYP.)
SHEAR CONNECTION (SC)
FOR W10 SPLICES (TYP.)
17' - 11" 2' - 0" 26' - 3" 2' - 0" 18' - 9"
4' - 0" 4' - 1" 4' - 1" 4' - 1"
W8X15
W X
W8X15
3' - 1" 5' - 1"
HSS6X6X1/2 HSS6X6X1/2 HSS6X6X1/2 HSS6X6X1/2
W8X15W8X15
W8X15
W X
W X
W X
W X
W X
W X
W X
W X
HSS6X6X1/2
W8X15
W 8X15
5' - 10" 3' - 7" 3' - 10" 5' - 8"
W8X15
3' - 9" 5' - 9" 3' - 9" 5' - 9"
3' - 1" 5' - 1"
SLOPE DOWN
8 8
NEW WORK KEY NOTES:
1. PROVIDE NEW PIPING SUPPORT FRAME
2. PROVIDE NEW BOILER PLATFORM AND SUPPORT FRAME. REFER
TO SF-501 FOR CHECKER PLATE DETAILS
3. RE-ENFORCE THE MEZZANINE FRAMING TO SUPPORT NEW DE-
AERATOR TANK
4. PROVIDE CATWALK TO CONNECT MENZANINE AND CHILLER
PLANT. REFER TO SF-501 FOR CHECKER PLATE DETAILS
5. PROVIDE FRAMING FOR NEW LOUVERS. DEFER TO SECTIONS AND
DETAILS FOR MORE INFO.
6. MC INDICATES FULL MOMENT CONNECTION. SC INDICATES
SIMPLE SHEAR CONNECTION (SEE GENEAL NOTES 5.12)
7. PROVIDE FRAMING FOR NEW DOUBLE DOORS. REFER TO
SECTIONS AND DETAILS FOR MORE INFO.
8. SEE S501 FOR ALT. DIAMOND CHECKER PLATE DETAIL
9. PROVIDE PLATFORM, LADDER AND HANDRAIL TO ACCESS ALL THE
VALVES
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
248 Copeland Street Quincy, MA 02169 P: 617-481-6390 F: 617-687-5990
200 Brickstone Square Andover, MA 01810 P: 978-296-6227 F: 978-475-5768
100% CONSTRUCTION
DOCUMENTS
REPLACE MAIN BOILERS 528A8-17-805
Samuel S. Stratton VA Medical Center, 113 Holland Ave., Albany, New York 12208
06/05/2024
N
105 Central Street Stoneham, MA 02180 P: 781-275-6050
C U se rs
\h a u n g \D o c u m e n ts
\A lb a n y B o ile r_ S tr u ct B id S e t_
V h a u n g
G H
V P
.r v t
/7
/2
:2
:2
P M
SF-302
STRUCTURAL PHASE 3 - BASEMENT NEW
Sub basement 178' - 9"
Basement 190' - 7"
Level 1 202' - 6"
Roof 216' - 5 3/4"
W8X15
L3X3X1/4
H S
S
X X
/2
H S
S
X X
/2W8X15
W
X
W8X24
W X
4W
X
HAND RAIL
REFER TO CHECKER
PLATE DETAIL FOR
MORE INFO
2' - 8"
REFER TO W8 COLUMN TO
CONCRETE FLOOR
ANCHOR DETAIL FOR MORE
INFO
REFER TO HSS
COLUMN TO
CONCRETE FLOOR
ANCHOR DETAIL
FOR MORE INFO
L3X3X1/4
HAND RAIL
REFER TO CHECKER
PLATE DETAIL FOR
MORE INFO
W8X24
W
X
Sub basement 178' - 9"
Basement 190' - 7"
Level 1 202' - 6"
Roof 216' - 5 3/4"
W8X15
L3X3X1/4
H S
S
X X
/2
H S
S
X X
/2
W X
W X
4W8X24
W10X30 W10X30
3' - 0"
HAND RAIL
3' - 0"
REFER TO CHECKER
PLATE DETAIL FOR
MORE INFO
REFER TO W8 COLUMN TO
CONCRETE FLOOR
ANCHOR DETAIL FOR MORE
INFO
REFER TO HSS COLUMN TO
CONCRETE FLOOR ANCHOR
DETAIL FOR MORE INFO
L3X3X1/4
SEE CONCRETE
WALL ANCHOR
DETAIL (TYP)
ACCESS PLATFORM
AND HANDRAIL
W8X15
W8X24
Sub basement 178' - 9"
Basement 190' - 7"
Level 1 202' - 6"
Roof 216' - 5 3/4"
W8X15
RE-ENFORCE BEAMS
Sub basement 178' - 9"
Basement 190' - 7"
Level 1 202' - 6"
Roof 216' - 5 3/4"
Sub basement 178' - 9"
Basement 190' - 7"
Level 1 202' - 6"
Roof 216' - 5 3/4"
19' - 11" 28' - 3" 18' - 9"
SHEAR CONNECTION (SC)
FOR W10 SPLICES (TYP.)
W10X30 W10X30
W X
W X
W X
SHEAR
CONNECTION (SC)
CUT EXISTING HAND RAIL
FOR OPENING TO NEW
CATWALK
2' - 0" 2' - 0"
SHEAR CONNECTION (SC)
FOR W10 SPLICES (TYP.)
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
248 Copeland Street Quincy, MA 02169 P: 617-481-6390 F: 617-687-5990
200 Brickstone Square Andover, MA 01810 P: 978-296-6227 F: 978-475-5768
100% CONSTRUCTION
DOCUMENTS
REPLACE MAIN BOILERS 528A8-17-805
Samuel S. Stratton VA Medical Center, 113 Holland Ave., Albany, New York 12208
06/05/2024
N
105 Central Street Stoneham, MA 02180 P: 781-275-6050
C U se rs
\h a u n g \D o c u m e n ts
\A lb a n y B o ile r_ S tr u ct B id S e t_
V h a u n g
G H
V P
.r v t
/7
/2
:2
:3
P M
SF-401
STRUCTURAL SECTIONS
QS HL
3/16" = 1'-0"
STRUCTURAL SECTION 1
3/16" = 1'-0"
STRUCTURAL SECTION 2
3/16" = 1'-0"
STRUCTURAL SECTION 3
3/16" = 1'-0"
STRUCTURAL SECTION 5
3/16" = 1'-0"
STRUCTURAL SECTION 4
Revisions: Date:
P$
SF-501
NEW WORK KEY NOTES:
1. PROVIDE SEISMIC BRACING USING WALL MOUNTED ANGLE
BRACKET. SEE DETAIL SHEET FOR MORE INFO.
2. PROVIDE SEISMIC BRACING USING CLEVIS HANGER AND RIGID
MEMBER. SEE DETAIL SHEET FOR MORE INFO.
3. PROVIDE ANCHOR BOLT TO SECURE CONDENSATE TANK TO
CONCRETE PAD, USING HILTI KWIK BLT TZ 5/8". THE AMOUNT OF
ANCHOR BOLTS RECOMMENDED BY MANUFACTURER IS MINIMUM 4
BOLTS AT FOUR CORNERS.
4. PROVIDE ANCHOR BOLT TO SECURE DOMESTIC WATER HEATER TO
CONCRETE PAD, USING HILTI KWIK BLT TZ 5/8". THE AMOUNT OF
ANCHOR BOLTS RECOMMENDED BY MANUFACTURER IS MINIMUM 4
BOLTS AT FOUR CORNERS.
5. PROVIDE ANCHOR BOLT TO SECURE FUEL OIL PUMP TO CONCRETE
PAD, USING HILTI KWIK BLT TZ 1/2". THE AMOUNT OF ANCHOR BOLTS
RECOMMENDED BY MANUFACTURER IS MINIMUM 4 BOLTS AT FOUR
CORNERS.
6. PROVIDE SEISMIC BRACING USING TRAPEZE HANGER AND CABLES.
SEE DETAIL SHEET FOR MORE INFO.
DWH-1
DWH-2
Sub basement 178' - 9"
Basement 190' - 7"
Sub-basement 178' - 9"
Basement Mezzanie 190' - 7"
Level 1 202' - 6"
Roof 216' - 6"
Level 1 202' - 6"
Roof 216' - 5 3/4"
Sub-basement 178' - 9"
Basement 190' - 6 31/32"
Level 1 202' - 6"
Roof 216' - 5 3/4"
2 2
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
248 Copeland Street Quincy, MA 02169 P: 617-481-6390 F: 617-687-5990
200 Brickstone Square Andover, MA 01810 P: 978-296-6227 F: 978-475-5768
100% CONSTRUCTION
DOCUMENTS
REPLACE MAIN BOILERS 528A8-17-805
Samuel S. Stratton VA Medical Center, 113 Holland Ave., Albany, New York 12208
06/05/2024
N
105 Central Street Stoneham, MA 02180 P: 781-275-6050
C U se rs
\h a u n g \D o c u m e n ts
\A lb a n y B o ile r_ S tr u ct B id S e t_
V h a u n g
G H
V P
.r v t
/7
/2
:2
:3
P M
SF-501
STRUCTURAL PHASE 2 - SUB-BASEMENT
SEISMIC BRACING PLAN
QS HL
3/16" = 1'-0"
2.3 STRUCTURAL - PHASE 2 -
SUB-BASEMENT SEISMIC BRACING
3/16" = 1'-0"
PHASE 2 - SUB-BASEMENT SEISMIC
SECTIONS
NEW WORK KEY NOTES:
1. PROVIDE SEISMIC BRACING USING RIGID COLUMN AND ANCHOR
TO ROOF DECK OR ROOF SUPPORTING BEAMS. SEE DETAIL
SHEET FOR MORE INFO.
1 1 1 1
SF-502
(TO BE VERIFY IN THE FIELD)
17' - 0"
(TO BE VERIFY IN THE FIELD)
19' - 1"
(TO BE VERIFY IN THE FIELD)
18' - 11"
Sub basement 178' - 9"
Basement 190' - 7"
Sub-basement 178' - 9"
Basement Mezzanie 190' - 7"
Level 1 202' - 6"
Roof 216' - 6"
Level 1 202' - 6"
Roof 216' - 5 3/4"
Sub-basement 178' - 9"
Basement 190' - 6 31/32"
Level 1 202' - 6"
Roof 216' - 5 3/4"
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
248 Copeland Street Quincy, MA 02169 P: 617-481-6390 F: 617-687-5990
200 Brickstone Square Andover, MA 01810 P: 978-296-6227 F: 978-475-5768
100% CONSTRUCTION
DOCUMENTS
REPLACE MAIN BOILERS 528A8-17-805
Samuel S. Stratton VA Medical Center, 113 Holland Ave., Albany, New York 12208
06/05/2024
N
105 Central Street Stoneham, MA 02180 P: 781-275-6050
C U se rs
\h a u n g \D o c u m e n ts
\A lb a n y B o ile r_ S tr u ct B id S e t_
V h a u n g
G H
V P
.r v t
/7
/2
:2
:3
P M
SF-502
STRUCTURAL PHASE 2 - BASEMENT SEISMIC
BRACING PLAN
QS HL
3/16" = 1'-0"
2.4 STRUCTURAL - PHASE 2 -
BASEMENT SEISMIC BRACING
3/16" = 1'-0"
PHASE 2 - BASEMENT SEISMIC
SECTIONS
P
SF-401
SF-401
NEW WORK KEY NOTES:
1. PROVIDE SEISMIC BRACING USING CLEVIS HANGER AND RIGID
MEMBER. SEE DETAIL SHEET FOR MORE INFO.
2. ALL THE OVER HEAD STEAM PIPES, PUMPED CONDENSATE PIPES
AND CONDENSATE PIPES WITHIN THIS AREA SHALL BE
SUPPORTED FROM NEW PIPING SUPPORT FRAME. REFER TO
SF-302 FOR MORE DETAILS OF PIPING SUPPORT FRAME.
3. PROVIDE ANCHOR BOLTS TO SECURE BOILER TO CONCRETE PAD,
USING HILTI KWIK BLT TZ 3/4". THE AMOUNT OF ANCHOR BOLTS
RECOMMENDED BY MANUFACTURER IS MINIMUM 4 BOLTS AT
FOUR CORNERS.
SF-504
3 3 3 3
SF-504
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
248 Copeland Street Quincy, MA 02169 P: 617-481-6390 F: 617-687-5990
200 Brickstone Square Andover, MA 01810 P: 978-296-6227 F: 978-475-5768
100% CONSTRUCTION
DOCUMENTS
REPLACE MAIN BOILERS 528A8-17-805
Samuel S. Stratton VA Medical Center, 113 Holland Ave., Albany, New York 12208
06/05/2024
N
105 Central Street Stoneham, MA 02180 P: 781-275-6050
C U se rs
\h a u n g \D o c u m e n ts
\A lb a n y B o ile r_ S tr u ct B id S e t_
V h a u n g
G H
V P
.r v t
/7
/2
:2
:3
P M
SF-503
STRUCTURAL PHASE 3 - SUB-BASEMENT
SEISMIC BRACING PLAN
SF-401
SF-401
NEW WORK KEY NOTES:
1. PROVIDE SEISMIC BRACING USING RIGID COLUMN & PIPE CLAMP
AND ANCHOR FROM THE WALL OR COLUMN. SEE DETAIL SHEET
FOR MORE INFO.
2. PROVIDE W8X15 BEAM AND CLAMP ALL STEAM PIPES TO THE
BEAM.
3. PROVIDE SEISMIC BRACING USING CLEAVIS HANGER WITH
REINFORCED WITH WIRE ARCHORS. SEE DETAIL SHEET FOR
MORE INFO.
4. PROVIDE SEISMIC BRACING USING RIGID COLUMN AND ANCHOR
TO THE FLOOR. SEE DETAIL SHEET FOR MORE INFO.
5. PROVIDE SEISMIC BRACING USING RIGID COLUMN AND ANCHOR
TO THE ROOF STRUCTURE. SEE DETAIL SHEET FOR MORE INFO
1 1
1 1 1 1
2 2 2 2
SF-504
3 3
SF-504
5 5 5
5 5 5 5
5 5 5 5
SF-401
SF-401
1 2
W10X30W10X30
HAND
RAIL HAND
RAIL
W8X15
W8X15
HSS6X6X1/2
HSS6X6X1/2
L3X3X1/4
Sub basement 178' - 9"
Basement 190' - 7"
Sub-basement 178' - 9"
Basement Mezzanie 190' - 7"
Level 1 202' - 6"
Roof 216' - 6"
Level 1 202' - 6"
Roof 216' - 5 3/4"
Sub-basement 178' - 9"
Basement 190' - 6 31/32"
Level 1 202' - 6"
Roof 216' - 5 3/4"
SF-401
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
248 Copeland Street Quincy, MA 02169 P: 617-481-6390 F: 617-687-5990
200 Brickstone Square Andover, MA 01810 P: 978-296-6227 F: 978-475-5768
100% CONSTRUCTION
DOCUMENTS
REPLACE MAIN BOILERS 528A8-17-805
Samuel S. Stratton VA Medical Center, 113 Holland Ave., Albany, New York 12208
06/05/2024
N
105 Central Street Stoneham, MA 02180 P: 781-275-6050
C U se rs
\h a u n g \D o c u m e n ts
\A lb a n y B o ile r_ S tr u ct B id S e t_
V h a u n g
G H
V P
.r v t
/7
/2
:2
:3
P M
SF-504
STRUCTURAL PHASE 3 - BASEMENT SEISMIC
BRACING PLAN
QS HL
3/16" = 1'-0"
3.7 STRUCTURAL - PHASE 3 -
BASEMENT SEISMIC BRACING
3/16" = 1'-0"
PHASE 3 - BASEMENT SEISMIC
SECTIONS 2
3/16" = 1'-0"
PHASE 3 - BASEMENT SEISMIC
SECTIONS1
4 4
NTS
GENERATOR EXHAUST AIR LOUVER FRAMING DETAILS
NTS
GENERATOR OUTDOOR AIR INTAKE LOUVER FRAMING DETAILS
NTS
TYPICAL CONCRETE PAD DETAILS
NTS
TYPICAL W8X15 TO CONCRETE WALL ANCHOR DETAIL
NTS
TYPICAL HSS COLUMN TO CONCRETE FLOOR ANCHOR DETAIL
NTS
TYPICAL W8 COLUMN TO CONCRETE FLOOR ANCHOR DETAIL
NTS
CHECKER PLATE DETAIL
END PLATE DETAIL
END PLATE DETAIL
NTS
ELECTRICAL ROOM NEW DOOR OPENING FRAMING DETAILS
END PLATE DETAIL
NTS
TOPSIDE CONCRETE SLAB REPAIR DETAIL
EX. CONCRETE SLAB TO REMAIN
1/2" SAW CUT AT PERIMETER
REPAIR MORTAR
CHIP MIN 2" UNLESS EX.
REINFORCING IS EXPOSED
AREA OF DEFICIENT CONCRETE
4"4"
NEW WALL OPENING
EXISTING CONCRETE WALL
NEW W8X24 STEEL
LINTEL AND 1/4"STEEL
PLATE
EXISTING CONCRETE
AND BRICK WALL.
NEW W8X24 STEEL
LINTEL AND 1/4" STEEL
PLATE
NEW LOUVER
EXISTING SLAB
EXISTING
FOUNDATION WALL
NEW WALL
OPENING
EXISTING
CONCRETE WALL
NEW W8X24 STEEL LINTEL AND 1/4 "
STEEL PLATE
NEW C8X11.5 STEEL JAMB
AND BRICK INFILL
NEW LOUVER
EXISTING SLAB
EXISTING
FOUNDATION WALL
NEW BRICK WALL.
NEW W8X24 STEEL LINTEL AND 1/4 "
STEEL PLATE
EXISTING CONCRETE
AND BRICK WALL.
NEW BRICK WALL.
(4) 5/8" HILTI HIT - 200
CONCRETE ANCHORS
(4) 5/8" HILTI HIT - 200
CONCRETE ANCHORS
#4 REBAR
@ 12" O.C.
#4 DOWEL @12" O.C.
BOTH WAY WITH HILTI
Hit-HY 200 ADHESIVE
ANCHORING
EXISTING FLOOR
SEE PLANS FOR PAD HEIGHT
6" EMB
W
NOTES:
1. REFER TO FLOOR PLANS FOR LOCATION AND DIMENSION OF HOUSE KEEPING PADS.
2. COORDINATE WITH MEP CONTRACTORS FOR EXACT LOCATION AND SIZE OF
EQUIPMENT.
3. PADS SHALL BE 6" BEYOND EQUIPMENT UNLESS OTHERWISE NOTED.
4. INSTALL STAINLESS STEEL CHAIRS TO HOLD UP REBAR DURING POUR.
W8X15
9"
9" 12"
12"
3/4" END PLATE WITH
(4) - 3/4" HILTI KWIK TZ
BOLTS
8"
8" 10"
10"
1" END PLATE WITH
(4) - 3/4" HILTI KWIK TZ
BOLTS
4"
10"
10"
1" END PLATE WITH
(4) - 3/4" HILTI KWIK TZ
BOLTS
W10X26
W8X24
W8X24
HANDRAIL
1/8" DIAMOND CHECKER PLATE (GALVANIZED)
1/8" STITCH WELD TO L 2-1/2 X L 2-1/2
L5 X 3-1/2 X 5/16, SHOP WELD
TO SUPPORTING STEEL
MEMBER
SUPPORTING STEEL MEMBER
L 2-1/2 X 2-1/2 X 1/4 @ 12" OC MAX SPACING
FIELD WELD OR
BOLT TO W-BEAM
W8X24
L3X3X1/4
3" 3"
SHEAR
CONNECTION
BY OTHER
SHEAR CONNECTION BY OTHER
(SEE GENERAL NOTE 5.12)
3/4" CHAMFER AROUND
EDGE
9"
9" 12"
12"
1/2" END PLATE
WITH (4) - 5/8" HILTI
HIT - 200 CONCRETE
ANCHORS
NOTES:
- PAINT THE STEEL PLATE AND BEAM WITH TNEMEC
PRODUCT OR EQUAL TO AVOID RUSTING
9"
9" 12"
12"
1/2" END PLATE
WITH (4) - 5/8" HILTI
HIT - 200 CONCRETE
ANCHORS
NOTES:
- PAINT THE STEEL PLATE AND BEAM WITH TNEMEC
PRODUCT OR EQUAL TO AVOID RUSTING
NOTES:
- PAINT THE STEEL PLATE AND BEAM WITH TNEMEC
PRODUCT OR EQUAL TO AVOID RUSTING
NOTES:
- PAINT THE STEEL PLATE AND BEAM WITH TNEMEC
PRODUCT OR EQUAL TO AVOID RUSTING
NOTES:
- PAINT THE STEEL PLATE
AND BEAM WITH TNEMEC
PRODUCT OR EQUAL TO
AVOID RUSTING
NOTES:
- PAINT THE STEEL PLATE AND BEAM WITH TNEMEC
PRODUCT OR EQUAL TO AVOID RUSTING
END PLATE
SEE END PLATE DETAILS
END PLATE
SEE END PLATE DETAILS
NEW W12X26 STEEL LINTEL
AND 1/4"STEEL PLATE
NEW WALL OPENING
EXISTING CONCRETE WALL
(4) 5/8" HILTI HIT - 200
CONCRETE ANCHORS
END PLATE
SEE END PLATE DETAILS
EXISTING CONCRETE
AND BRICK WALL.
EXISTING SLAB
EXISTING
FOUNDATION WALL
NEW BRICK WALL.
NEW W12X26 STEEL LINTEL
AND 1/4"STEEL PLATE
NEW DOOR
9"
13" 16"
12"
1/2" END PLATE
WITH (4) - 5/8" HILTI
HIT - 200 CONCRETE
ANCHORS
CONCRETE SLAB REPAIR INSTRUCTION
• HAZARDOUS MATERIAL ABATEMENT, IF NECESSARY, SHALL BE PERFORMED PRIOR
TO PROCEEDING WITH CONCRETE REPAIR.
• THOROUGHLY CLEAN REPAIR AREAS BY POWER WASHING.
• REPAIR MORTAR SHALL BE SIKATOP 122 PLUS MANUFACTURED BY SIKA CORP. OR
APPROVED EQUAL.
• BONDING AGENT SHALL BE ARMITEC 110 EPOCEM MANUFACTURED BY SIKA CORP.
OR APPROVED EQUAL.
• CONCRETE REPAIR PROCEDURE:
(A) PREPARE THE REPAIR PER PREPARATION NOTES ABOVE.
(B) APPLY (2) COATS OF CORROSION INHIBITOR PER THE MANUFACTURER'S
RECOMMENDATIONS. ALLOW TO DRY FOR 24 HOURS, THEN REMOVE SURFACE
FILM BY POWER WASHING.
(C) APPLY BONDING AGENT PER THE MANUFACTURER'S RECOMMENDATIONS.
(D) INSTALL MORTAR IN REPAIR AREA PER THE MANUFACTURER'S
RECOMMENDATIONS.
(E) CURE REPAIR MORTAR PER MANUFACTURER'S RECOMMENDATIONS.
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
248 Copeland Street Quincy, MA 02169 P: 617-481-6390 F: 617-687-5990
200 Brickstone Square Andover, MA 01810 P: 978-296-6227 F: 978-475-5768
100% CONSTRUCTION
DOCUMENTS
REPLACE MAIN BOILERS 528A8-17-805
Samuel S. Stratton VA Medical Center, 113 Holland Ave., Albany, New York 12208
06/05/2024
105 Central Street Stoneham, MA 02180 P: 781-275-6050
C U se rs
\h a u n g \D o c u m e n ts
\A lb a n y B o ile r_ S tr u ct B id S e t_
V h a u n g
G H
V P
.r v t
/7
/2
:2
:3
P M
SF-601
STRUCTURAL DETAILS
Topside Concrete Slab Repair Detail
3' max
W6X15
5/8" Hilti HDA Undercut Concrete
3/4" Hilti HDA Undercut 8"
8"
12"
12"
12x12x 3/4" Base PL
W6X15
TYP
1/4
7.5"
MIN
5/8" HILTI HDA UNDERCUT
CONCRETE
1/4" STIFFENER
16x9x 3/4" BASE PL
1/4" STIFFENER
36"
(8) 5/8" HILTI HDA
UNDERCUT
SPACED AT 3-6-3
INCHES
6" DIA SCH 40 TUBE
12' max
10x10x1/2" CAP PL1/2 " Hilti
5 NTS
SEISMIC COLUMN BRACING DETAIL
5"
12"
1 NTS
SINGLE PIPE SUPPORTED BY PIPE CLAMP AND WIRE
2 NTS
TRAPEZE SUPPORTED WITH RIGID MEMBER
ALTERNATE LOCATION
3 NTS
CLEAVIS HANGER REINFORCED WITH WIRE ARCHORS
6 NTS
WALL MOUNTED PIPE SUPPORT SYSTEM
1 5/8 "
UNISTRUT P1000
ALTERNATE CABLE LOCATION
4 NTS
DETAIL
10 NTS
DOUBLE CLEVIS HANGER WITH TRAPEZE SEISMIC BRACE
5/8" Hilti HDA Undercut Concrete
Pipe Bracket
11 NTS
PIPE BRACING TO WALL
12 NTS
SINGLE PIPE IN TRAPEZE SEISMIC BRACING7 NTS
RIGID MEMBER ATTACHED TO CLEVIS HANGER SEISMIC BRACE
8 NTS
DOUBLE PIPE IN TRAPEZE SEISMIC BRACING DETAIL
9 NTS
CLEVIS HANGER WITH TRAPEZE SEISMIC BRACE
5/8 " HILTI HDA
UNDERCUT CONCRETE
5/8 " HILTI KWIK BOLT TZ
PIPE BRACKET
HILTI HDA UNDERCUT CONCRETE
5/8 "
HILTI HDA UNDERCUT CONCRETE
5/8 "
7X19 GALVANIZED
AIRCRAFT CABLE
1 5/8 "
UNISTRUT P1000
7X19 GALVANIZED
AIRCRAFT CABLE
7X19 GALVANIZED
AIRCRAFT CABLE
7X19 GALVANIZED
AIRCRAFT CABLE
1 5/8 "
UNISTRUT P1000
7X19 GALVANIZED
AIRCRAFT CABLE
7X19 GALVANIZED
AIRCRAFT CABLE
NOTE: ANCHOR TO WALL USING 5/8" HILTI HDA
UNDERCUT CONCRETE
PIPE CLAMP
TRAPEZE HANGER
TRAPEZE HANGER
TRAPEZE HANGER
TRAPEZE HANGER
TRAPEZE HANGER
3/4" CONNECTION PLATE
W/ (4) 3/4" DIA A325 BOLTS
6" DIA SCH 80 TUBE
1/2" TREADED ROD
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
248 Copeland Street Quincy, MA 02169 P: 617-481-6390 F: 617-687-5990
200 Brickstone Square Andover, MA 01810 P: 978-296-6227 F: 978-475-5768
100% CONSTRUCTION
DOCUMENTS
REPLACE MAIN BOILERS 528A8-17-805
Samuel S. Stratton VA Medical Center, 113 Holland Ave., Albany, New York 12208
06/05/2024
105 Central Street Stoneham, MA 02180 P: 781-275-6050
C U se rs
\h a u n g \D o c u m e n ts
\A lb a n y B o ile r_ S tr u ct B id S e t_
V h a u n g
G H
V P
.r v t
/7
/2
:2
:4
P M
SF-602
STRUCTURAL SEISMIC DETAILS
| Sheets |
| SD-201 - STRUCTURAL PHASE 2 - SUB-BASEMENT DEMOLITION PLAN |
| SD-301 - STRUCTURAL PHASE 3 - SUB-BASEMENT DEMOLITION PLAN |
| SD-302 - STRUCTURAL PHASE 3 - BASEMENT DEMOLITION PLAN |
| SF-201 - STRUCTURAL PHASE 2 - SUB-BASEMENT NEW WORK PLAN |
| SF-301 - STRUCTURAL PHASE 3 - SUB-BASEMENT NEW WORK PLAN |
| SF-302 - STRUCTURAL PHASE 3 - BASEMENT NEW WORK PLAN |
| SF-401 - STRUCTURAL SECTIONS |
| SF-501 - STRUCTURAL PHASE 2 - SUB-BASEMENT SEISMIC BRACING PLAN |
| SF-502 - STRUCTURAL PHASE 2 - BASEMENT SEISMIC BRACING PLAN |
| SF-503 - STRUCTURAL PHASE 3 - SUB-BASEMENT SEISMIC BRACING PLAN |
| SF-504 - STRUCTURAL PHASE 3 - BASEMENT SEISMIC BRACING PLAN |
| SF-601 - STRUCTURAL DETAILS |
| SF-602 - STRUCTURAL SEISMIC DETAILS |
| SG-001 - STRUTURAL GENERAL NOTES |
File details come from the government source that posted it. Updated .