8- Albany Fire Protection - Stamped.pdf
PDF 2 MB Posted
- Attached to
- Z1DA--528A8-17-805 REPLACE MAIN BOILERS Federal contract opportunity
- Solicitation number
- 36C24224B0047
About this file
This document is a Solicitation issued by the Department of Veterans Affairs, Veterans Integrated Service Network 2, for the project titled "Z1DA--528A8-17-805 REPLACE MAIN BOILERS".
The key details are:
- The project includes construction services to replace the primary boilers serving the Albany VA Medical Center, with the goal of improving boiler plant reliability and efficiency.
- The work will be completed in three phases: 1) Replace electrical equipment and install new switchgear, 2) Install two temporary boilers and replace domestic hot water boilers, and 3) Remove the existing 900 HP boilers and install the new boilers.
- The work is required to be substantially complete within 730 calendar days after the notice to proceed.
- The contractor will be required to use the Autodesk Build construction management platform and complete required training prior to beginning work.
- No security accreditation package is required for this project.
View the file
Other files for this federal contract opportunity
Show all 29
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ACOUSTICAL TILEACT
ABOVE FINISH FLOORAFF
ACCESS PANELAP
BUILDINGBLDG
CEILINGCLG
CEMENT LINED DUCTILE IRONCLDI
CONNECT TO EXISTINGCTE
CONTINUATIONCONT
DIAMETERDIA
DOWNDN
DRAWINGDWG
ELEVATIONEL/ELEV
EXISTINGEX
FINISH FLOOR ELEVATIONFFE
FIRE HOSE VALVEFHV
FLOORFLR
FIRE PROTECTIONFP
FLOW SWITCHFS
GALVANIZEDGALV
GENERAL CONTRACTORGC
GALLONS PER MINUTEGPM
INVERTINV
MECHANICALMECH
NORMALLY CLOSEDNC
NORMALLY OPENNO
NOT TO SCALENTS
NOT IN CONTRACTNIC
POST INDICATOR VALVEPIV
POUNDS PER SQUARE INCHPSI
SPECIFICATIONSPEC
TAMPER SWITCHTS
TYPICALTYP
ABBREVIATIONS
PRESSURE GAUGEPG
PRESSURE REDUCING/REGULATING VALVEPRV
PRESSURE SWITCHPS
PREACTION SYSTEM MAIN RISERPSR
SPRINKLER DRAINSPD
WET PIPE SPRINKLER SYSTEMSPR
STANDPIPE SYSTEMSTP
VALVE IN VERTICALVIV
ZONE CONTROL ASSEMBLYZCA
AUTHORITY HAVING JURISDICTIONAHJ
BACKFLOW PREVENTERBFP
ELECTRIC ALARM BELLEAB
EXISTING TO BE REMOVEDETBR
EXISTING TO REMAINETR
FIRE SERVICE/MAIN/BUILDING WET PIPINGF
FIRE DEPARTMENT CONNECTIONFDC
FIRE DEPARTMENT VALVEFDV
FIRE DEPARTMENT VALVE CABINETFDVC
FIRE HOSE CABINETFHC
LOW PRESSURE SWITCHLPS
OPEN END DRAINOED
OUTSIDE SCREW & YOKEOS&Y
EQUIPMENT & VALVES
FIRE DEPARTMENT HOSE VALVE
SUPERVISED BUTTERFLY VALVE
SPRINKLER ZONE CONTROL ASSEMBLYZCA
PIPING LINETYPES
FIRE SERVICE/MAIN/BUILDING WET PIPING
WET PIPE SPRINKLER SYSTEM
FIRE DEPARTMENT CONNECTION PIPING
SPRINKLER DRAIN
STANDPIPE SYSTEM
EXISTING TO REMAIN
EXISTING TO BE REMOVED
ELBOW UP OR RISE
ELBOW DOWN OR DROP
TEE LOOKING DOWN
TEE LOOKING UP
UNION
FLOW IN DIRECTION OF ARROW
CAP OR END OF PIPE
REDUCER/INCREASER
PIPE SLEEVE
CONNECT TO EXISTING
PIPING SYMBOLS
ORIENTATION
SPRINKLER SCHEDULE
GENERAL NOTES
1. FIRE PROTECTION WORK SHALL BE DONE IN ACCORDANCE WITH THE LATEST EDITION OF THE VA FIRE PROTECTION DESIGN MANUAL AND THE LATEST NATIONAL FIRE PROTECTION ASSOCIATION CODES AND STANDARDS INCLUDING 13, 14, 20, AND 24.
2. ALL FIRE PROTECTION SYSTEMS, EQUIPMENT, PIPING AND VALVES SHALL BE INSTALLED AND TESTED BY A SPRINKLER CONTRACTOR LICENSED BY THE
STATE AND EXPERIENCED IN THE INSTALLATION OF SPRINKLER SYSTEMS.
3. ALL WORK SHALL BE PERFORMED IN ACCORANCE WITH THE 2022 EDITION OF NFPA 13, THE 2023 EDITION OF NFPA 25, THE 2024 EDITON OF NFPA 101, AND THE 2024 EDITION OF NFPA 170.
4. PIPING AND EQUIPMENT IS SHOWN DIAGRAMMATICALLY THE ACTUAL ROUTING OF PIPING AND EXACT LOCATION OF EQUIPMENT SHALL BE DETERMINED
IN THE FIELD.
5. THE DRAWINGS SUGGEST ROUTING OF PIPING, PIPE SIZES AND APPROXIMATE LOCATION OF HEADS. THE CONTRACTOR SHALL PRODUCE A COMPLETE SET OF WORKING PLANS IN ACCORDANCE WITH NFPA 13. THE SYSTEM SHALL BE HYDRAULICALLY CALCULATED PER THE DESIGN CRITERIA SPECIFIED.
ALL PLANS AND CALCULATIONS SHALL BE STAMPED BY THE CONTRACTOR'S REGISTERED FIRE PROTECTION ENGINEER AND SHALL BE SUBMITTED TO
THE LOCAL AUTHORITY AND OWNER'S UNDERWRITER FOR APPROVAL.
6. IN ADDITION TO REVIEWING AND COORDINATING WITH THE OTHER TRADES (CIVIL, STRUCTURAL, ARCHITECTURAL, HVAC AND ELECTRICAL) THE CONTRACTOR SHALL VISIT THE SITE AND FAMILIARIZE HIMSELF WITH THE DETAILS OF CONSTRUCTION.
7. FURNISH AND INSTALL ALL NECESSARY PIPING EQUIPMENT SUPPORTS AND ANY EQUIPMENT NOT SHOWN ON DRAWINGS OR CALLED FOR IN THE
SPECIFICATIONS BUT NECESSARY TO PROVIDE A COMPLETE AND WORKABLE SYSTEM.
8. PROVIDE ACCESS TO ALL EQUIPMENT REQUIRING PERIODIC SERVICE AND MAINTENANCE.
9. FURNISH ACCESS PANELS TO THE GENERAL CONTRACTOR FOR INSTALLATION UNDER THE RELATED TRADES.
10. PITCH ALL PIPING TO DRAIN, PROVIDE AN AUXILIARY DRAIN AT ALL LOW POINTS.
11. PROVIDE WATER TIGHT SLEEVES ON ALL PIPES PASSING THROUGH EXTERIOR WALLS AND BASEMENT FLOORS.
12. ALL VALVES CONTROLLING FIRE PROTECTION MAINS SHALL BE PROVIDED WITH TAMPER/SUPERVISORY SWITCHES WIRED TO THE FIRE ALARM
CONTROL PANEL.
13. CONTRACTOR SHALL PROVIDE FIRE STOPPING FOR ALL PENETRATIONS THRU FIRE WALLS AND FIRE RATED SEPARATIONS, CONTRACTOR SHALL COORDINATE WITH THE ARCHITECTURAL DRAWINGS FOR LOCATIONS AND RATINGS OF ALL FIRE RATED SEPARATIONS AND BARRIERS, INSTALLATION
OF FIRE STOPPING SHALL BE IN ACCORDANCE WITH MANUFACTURERS RECOMMENDATIONS.
14. ALL FIRE PROTECTION SYSTEMS SHALL BE SEISMICALLY BRACED ACCORDING TO THE APPLICABLE SECTIONS OF VA DESIGN MANUAL AND THE
REFERENCED EDITION OF NFPA-13.
15. INSTALL SPRINKLERS IN ACCORDANCE WITH ALL NFPA 13 OBSTRUCTION CRITERIA. PROVIDE ADDITIONAL SPRINKLERS OR ALTERNATE LOCATIONS (WITH
ENGINEER'S APPROVAL) TO COMPLY WITH ALL SPACING AND OBSTRUCTION CRITERIA.
16. PROVIDE MINIMUM 1" PIPE TO ALL INDIVIDUAL SPRINKLERS. DO NOT RE-USE EXISTING 1/2" AND 3/4" OUTLETS FOR NEW ARM-OVER OR RETURN BEND INSTALLATION. PROVIDE NEW 1" (MINIMUM) CONNECTION TO EXISTING BRANCHLINE AS NECESSARY.
17. ALL PIPING SHALL BE SCH 40 BLACK STEEL WITH THREADED FITTINGS 2" AND BELOW, HIGH PRESSURE GROOVED FITTINGS MAY BE USED FOR PIPES LARGER THAN 2". ALL BRANCH PIPING SHALL BE CONNECTED TO THE MAINS EITHER BY MANUFACTURED TEES OR THREADED WELD-O-LETS
18. FLEXIBLE SPRINKLER PIPING IS NOT ALLOWED.
19. HIGH TEMPERATURE SPRINKLERS SHALL BE USED IN THE BOILER PLANT. ORDINARY TEMPERTAURE SPRINKLERS SHALL BE USED IN THE CONTROL
ROOM.
20. CONTRACTOR SHALL ASSUME ALL SHUT OFF VALVES DO NOT WORK AND INCLUDE FREEZING PIPING AS PART OF THEIR BID. ALL SHUT-DOWNS AND IMPAIRMENTS SHALL BE CLOSELY COORDINATED WITH THE VA. SPRINKLER SHUT DOWNS ARE HANDLED BY VA FMS STAFF ONLY. COORDINATE WITH COR AND VISN FIRE PROTECTION ENGINEER. ALL VALVES SHALL BE ACCESSIBLE FROM FLOOR OR HAVE CHAIN DRIVE.
21. ALL NEW SPRINKLER PIPING SHALL BE PAINTED RED. REFER TO SPECIFCATION SECTION 09 91 00 FOR ADDITIONAL INFORMATION.
22. FIRE PROTECTION PIPING MAY BE ENLARGED FROM THE DESIGN DRAWINGS BUT SHALL NOT BE REDUCED.
F
SPR
FDC
SPD
STP
UPRIGHT
RESPONSECONDITIONSYMBOL
QUICKNEW
COVERAGE
STANDARD
K-FACTOR
5.6
FINISH
BRASS
TEMP RATING
225 HIGH
DEMOLITION NOTES
1. REFER TO THE ARCHITECTURAL DRAWINGS FOR THE EXTENT OF THE DEMOLITION SCOPE OF WORK AND AREA. THE DEMOLITION PLANS INDICATE THE
GENERAL INTENT AND ARE NOT INTENDED TO SHOW ALL ITEMS TO BE REMOVED OR RETAINED.
2. THE LOCATIONS OF EXISTING EQUIPMENT INCLUDING PIPING, DUCTWORK, EQUIPMENT, CONDUITS, ETC ARE SHOWN IN AN APPROXIMATE WAY ONLY.
VISIT THE SITE PRIOR TO SUBMISSION OF THE BIDS AND COMMENCEMENT OF WORK TO BECOME FAMILIAR WITH THE ACTUAL CONDITIONS AND
EXTENT OF THE WORK.
3. TRACE AND LABEL ALL EXISTING SYSTEMS WITHIN THE DEMOLITION AREA AND BEYOND PRIOR TO DISCONNECTION AND REMOVAL TO ENSURE THAT NO AREA OUTSIDE THE DEMOLITION AREA IS AFFECTED. REVIEW IN DETAIL WITH THE GENERAL CONTRACTOR AND OWNER WHAT IS TO BE REMOVED AND REMAIN PRIOR TO WORK COMMENCING THE DEMOLITION. THERE SHALL BE NO INTERRUPTION OF SERVICES OUTSIDE THE DEMOLITION AREA
WITHOUT APPROVAL FROM THE OWNER'S REPRESENTATIVE.
4. COORDINATE EQUIPMENT REMOVAL WITH ALL PARTIES TO PROVIDE DISCONNECTION. REMOVE EQUIPMENT BY UNFASTENING AT THE SUPPORTS OR ATTACHMENTS. ALSO REMOVE THE ATTACHMENTS FROM THE BUILDING, LEAVING NO COMPONENT OF THE ORIGINAL INSTALLATION.
5. EXERCISE CARE WITH EQUIPMENT THAT IS TO BE RELOCATED OR TURNED OVER TO THE OWNER. EXAMINE THE EQUIPMENT BEFORE REMOVAL IN THE PRESENCE OF THE OWNER'S REPRESENTATIVE TO DETERMINE ITS CONDITION. DELIVER OWNER-RETAINED EQUIPMENT TO AN ON-SITE LOCATION DESIGNATED BY THE OWNER AND OBTAIN ACKNOWLEDGMENT OF RECEIPT IN ORIGINAL CONDITION.
6. INSTALL RELOCATED EQUIPMENT IN ORIGINAL CONDITION ENSURING NO DAMAGE.
7. PROMPTLY REPAIR ANY DAMAGE CAUSED DURING/BY THE EXECUTION OF WORK. DAMAGE INCLUDES BUT IS NOT LIMITED TO DESTRUCTION OF ITEMS
INTENDED TO REMAIN OR TO BE SALVAGED.
8. NOTIFY THE OWNER'S REPRESENTATIVE IMMEDIATELY OF ANY UNANTICIPATED HIDDEN CONDITIONS ENCOUNTERED DURING THE DEMOLITION.
9. ALL ITEMS REMOVED SHALL BE OFFERED TO THE OWNER FOR SALVAGE. IF THE OWNER DOES NOT TAKE POSSESSION OF THE ITEMS, DISPOSE OF THE ITEMS IN A SAFE AND LEGAL MANNER. ALL ITEMS CLASSIFIED AS HAZARDOUS SHALL BE DISPOSED AS HAZARDOUS WASTES AND A UNIFORM
HAZARDOUS WASTE MANIFEST SHALL BE PROVIDED TO THE OWNER.
10. ENSURE THE SAFE PASSAGE OF PERSONS IN AND AROUND THE BUILDING DURING DEMOLITION. PREVENT INJURY TO PERSONS AND DAMAGE TO PROPERTY. PROVIDE ADEQUATE SHORING AND BRACING TO PREVENT COLLAPSE. IMMEDIATELY REPAIR DAMAGED PROPERTY TO THE CONDITION
BEFORE BEING DAMAGED. TAKE EFFECTIVE MEASURES TO PREVENT WINDBLOWN DUST.
11. DO NOT USE CUTTING TORCHES UNTIL WORK AREA IS CLEARED OF FLAMMABLE MATERIALS. AT CONCEALED SPACES, SUCH AS PIPE INTERIORS, VERIFY CONDITION AND CONTENTS OF HIDDEN SPACE BEFORE STARTING FLAME-CUTTING OPERATIONS. MAINTAIN FIRE WATCH AND PORTABLE FIRE- SUPPRESSION DEVICES DURING FLAME-CUTTING OPERATIONS. MAINTAIN ADEQUATE VENTILATION WHEN USING CUTTING TORCHES.
12. NOTIFY UTILITY COMPANIES IN ACCORDANCE WITH THEIR REQUIREMENTS PRIOR TO DEMOLITION. VERIFY THAT THE UTILITIES HAVE BEEN
DISCONNECTED, VALVED, CAPPED AND MADE SAFE PRIOR TO DEMOLITION.
13. THE EXISTING FIRE PROTECTION SYSTEM (HOSE VALVES AND AREAS OUTSIDE OF THE BOILER ROOM) SHALL REMAIN FULLY FUNCTIONAL DURING THE ENTIRE DEMOLITION AND CONSTRUCTION PERIOD. ALL REQUIRED SYSTEM SHUTDOWNS SHALL BE COORDINATED WITH AND APPROVED BY THE OWNER'S REPRESENTATIVE AND THE AUTHORITY HAVING JURISDICTION. WHEN THE STANDPIPE SYSTEM IS DRAINED TO INSTALL THE VALVES FIRE PROTECTION TO THE CHILLER PLANT WILL ALSO BE REMOVED. A FIRE WATCH WILL BE REQUIRED FOR BOTH AREAS UNTIL FIRE PROTECTION FOR
BOTH AREAS IS RE-ESTABLISHED
14. CREATE AND SUBMIT IMPAIRMENT PLANS TO THE OWNER AND AHJ IF ANY PORTION OF THE EXISTING FIRE PROTECTION SYSTEM IS TAKEN OUT OF SERVICE DURING THE EXECUTION OF THE PROJECT. COORDINATE IMPAIRMENT PLANS WITH THE OWNER.
15. REMOVE ABANDONED AND/OR SCHEDULED TO BE DEMOLISHED FIRE PROTECTION SPRINKLERS, PIPE, FITTINGS, HANGERS, AND SUPPORTS BACK TO
THE LAST ACTIVE MAIN OR BRANCHLINE. CAP OR PLUG ALL OPEN OR UNUSED OUTLETS.
PENDENTQUICKNEW STANDARD 5.6 CHROME 100 ORDINARYQUICK
DRY PIPE SPRINKLER SYSTEMD
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
248 Copeland Street Quincy, MA 02169 P: 617-481-6390 F: 617-687-5990
200 Brickstone Square Andover, MA 01810 P: 978-296-6227 F: 978-475-5768
100% CONSTRUCTION
DOCUMENTS
REPLACE MAIN BOILERS 528A8-17-805
Samuel S. Stratton VA Medical Center, 113 Holland Ave., Albany, New York 12208
06/05/2024
105 Central Street Stoneham, MA 02180 P: 781-275-6050
C
U s e rs \m ik e
.s h n e e r\ D o c u m e n ts \Y
A lb a n y
B o ile r_
M E
P
M ik e
.S h n e e r.
rv t
/3 /2
:3
:5
P
M
FX-000
FIRE PROTECTION LEGEND
MS JP
DRAWING LIST - FIRE PROTECTION
SHEET
NUMBER SHEET NAME
FX-000 FIRE PROTECTION LEGEND
FD-201 FIRE PROTECTION BASEMENT FLOOR DEMOLITION PLAN
FX-201 FIRE PROTECTION NEW WORK PART PLANS
FX-600 FIRE PROTECTION DETAILS
FX-601 FIRE PROTECTION DETAILS
Revisions: Date:
EXCELS IOR
084767-1
ETBR: 1 1/2"FDV
ETBR: 1 1/2"FDV
STP STP
STP
S T
P
CUT AND CAP EXISTING
4"SPR FOR RECONNECTION
TO NEW FDV
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
248 Copeland Street Quincy, MA 02169 P: 617-481-6390 F: 617-687-5990
200 Brickstone Square Andover, MA 01810 P: 978-296-6227 F: 978-475-5768
100% CONSTRUCTION
DOCUMENTS
REPLACE MAIN BOILERS 528A8-17-805
Samuel S. Stratton VA Medical Center, 113 Holland Ave., Albany, New York 12208
06/05/2024
N
105 Central Street Stoneham, MA 02180 P: 781-275-6050
C U s e rs \m ik e
.s h n e e r\ D o c u m e n ts \Y
A lb a n y
B o ile r_
M E
P
M ik e .S h n e e r.
rv t
/6 /2
:1
:1
P M
FD-201
FIRE PROTECTION BASEMENT FLOOR
DEMOLITION PLAN
MS JP
8' 16'4'0
1/8" = 1'-0"FD-201
1 FIRE PROTECTION BASEMENT FLOOR DEMOLITION PLAN
Revisions: Date:
ETR: 4"STP DROP
ETR: 4"STP DROP
ETR: 2 1/2"STP DROP
4" SPR
ETR 4" STP
ETR 4" STP
S T
P
4" SPR DROP
NOTES:
1. SPRINKLER AND PIPING LOCATIONS, AND
FLOW RATES, SHALL BE DESIGNED AND
INSTALLED PER CREDENTIALED
PROFESSIONAL IN ACCORDANCE WITH
SPECIFICATION SECTION 211313. DRAWING
LAYOUT IS PROVIDED FOR CONSISTENCY
OF APPROXIMATE SCOPE.
2. SPRINKLER PROTECTION SHALL BE
DESIGNED IN ACCORDNCE WITH NFPA 13
REQUIREMNTS FOR ORDINARY HAZARD
GROUP II OCCUPANCY WITH A DESIGN
DENSITY OF 0.20 GPM PER SQ.FT. OVER THE
MOST REMOTE 1,500 SQ.FT.
3. ALL PIPING NEAR EXHAUST OPENINGS
SHALL NOT BE CLOSER THAT 12" TO THE
ROOF OPENING.
4. PIPING SHALL NOT BE LESS IN SIZE THAN
INDICATED ON THE DRAWINGS.
5. PROVIDE LOW POINT DRAINS AS
REQUIRED.
6. MAXIMUM VELOCITY IN MAINS SHALL NOT
EXCEED 25 FPS.
7. MAXIMUM VELOCITY IN BRANCHES SHALL
NOT EXEED 20 FPS.
S P
R
S P
R
/2
S P
R
/2
S P
R
S P
R
S P
R
4" SPR
S P
R
S P
R
S P
R
S P
R 2
S P
R
S P
R
S P
R
4" SPR
S P
R
S P
R
S P
R2
S P
R
S P
R
S P
R
S P
R
S P
R
S P
R
S P
R
4" SPR
S P
R
S P
R
S P
R
S P
R
S P
R
S P
R
S P
R
S P
R
S P
R
S P
R
S P
R
S P
R
S P
R
S P
R
ETR 4" STP
D
D
4"DACV-1
FIREFLEX
TOTAL PAC
N2
2"SPD DN
4"SPR DN
4"D DROP TO
DACV-1
4"D DN TO SUB-
BASEMENT
4" D4" D
F702
FX-600
ETR: 4"STP UP/DN
ETR: 4"STP UP
4" SPR UP
2 1/2"FDV
4" SPR DROP TO 2 1/2"FDV
ETR:4"STP UP
SPRINKLER INSTALLED in
LOW CEILING (TYP. FOR 2)
1"SPR UP
1"SPR UP
2"SPD DROP TO 24" ABOVE
FINISHED GRADE AND SPILL TO
GRADE OUTSIDE. PROVIDE
WITH DOWNTURNED ELBOW,
INSECT SCREEN, AND
CONCRETE SPLASH BLOCK.
PROVIDE UPRIGHT
SPRINKLER PROTECTION
BENEATH MEZZANINE
2" D 2" D
2" D2" D
2" D 2" D
2" D2" D
2" D 2" D
2" D 2" D
4" D
D
D
D
S P
D
D
S P
D
S P
R
S P
D
S P
R
S P
R
S
P R
S P
R
S P
R
S
P R
S P
R
S
P R
S P
R
S P
R
S
P R
S P
R
4" SPR4" SPR
S P
R
2"SPR DROP
BELOW STAIR
PROVIDE LOW
POINT DRAIN
ETR 4" SPR
S P
R
4"SPR AND 2"
SPD UP TO
MEZZANINE4"D UP TO
MEZZANINE
2"D DROP TO DRUM DRIP. PROVIDE
WITH 2"SPD DROP. 24" ABOVE
FINISHED GRADE AND SPILL TO GRADE
OUTSIDE. PROVIDE WITH
DOWNTURNED ELBOW, INSECT
SCREEN, AND CONCRETE SPLASH
BLOCK.
F702
FX-600
TEMPORARY AIR
COMPRESSOR
ENCLOSURE SHALL
BE DEMOLISHED
PRIOR TO
COMPLETION OF FIRE
PROTECTION
SPRINKLER SYSTEM
INSTALLATION 2"SPD
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
248 Copeland Street Quincy, MA 02169 P: 617-481-6390 F: 617-687-5990
200 Brickstone Square Andover, MA 01810 P: 978-296-6227 F: 978-475-5768
100% CONSTRUCTION
DOCUMENTS
REPLACE MAIN BOILERS 528A8-17-805
Samuel S. Stratton VA Medical Center, 113 Holland Ave., Albany, New York 12208
06/05/2024
N
105 Central Street Stoneham, MA 02180 P: 781-275-6050
C
U s e rs \m ik e
.s h n e e r\ D o c u m e n ts \Y
A lb a n y
B o ile r_
M E
P
M ik e
.S h n e e r.
rv t
/3 /2
:2
:1
P M
FX-201
FIRE PROTECTION NEW WORK PART PLANS
MS JP
8' 16'4'0
1/8" = 1'-0"FX-201
1 Fire Protection Basement New Work Part Plan (Ph2)
1"SPR DROP TO
SPRINKLER
INSTALLED IN
LOW CEILING
1"SPR DROP TO
SPRINKLER
INSTALLED IN
LOW CEILING
8' 16'4'0
1/8" = 1'-0"FX-201
2 Fire Protection Sub-Basement New Work Part Plan (Ph2)
AREA:
DENSITY:
HAZARD:
HEADS FLOWING:
SPRINKLER DEMAND:
HOSE ALLOWANCE:
TOTAL:
SAFETY FACTOR:
ADDITIONAL INFO:
HYDRAULIC DESIGN DATA:
ORDINARY HAZARD GROUP
.20 GPM/SF
1,532 SF
308.96 GPM
250 GPM
558.96 GPM
51.38 PSI
40.57 PSI
REMOTE AREA 1
S1
S2
S3
S4
S5
S6
M1
S7
S8
S9
S10
S11
S12
M2
S13
S14
S15
S16
M3 M4 M5 M6 M7 M8 M9 M10
M11
TOR1 10
TEST
Revisions: Date:
SUPERVISED INDICATING CONTROL VALVE
SWING CHECK VALVE
TO SPRINKLER
ZONE PIPING
ZONE CONTROL ASSEMBLY WITH
INTEGRATED WATER-FLOW SWITCH,
PRESSURE-GAUGE, TEST & DRAIN
VALVE ASSEMBLY AND PRESSURE
RELIEF VALVE
TO DRAIN RISER
OR EXTERIOR
DISCHARGE
FROM
SUPPLY
RISER
ZONE CONTROL ASSEMBLY F600
1. ASSEMBLY WITH CHECK VALVE FOR INSTALLATION FROM STANDPIPE RISER OR DUAL-
FED SPRINKLER ZONE
NO SCALE
UNDERSIDE OF STRUCTURE
CONCENTRIC ONE-PIECE
REDUCER
SPRINKLER
BRANCH PIPING
1" SPRIG
NEW UPRIGHT SPRINKLER FROM NEW BRANCHLINE F815
NO SCALE
UPRIGHT SPRINKLER; POSITION
DEFLECTOR WITH RESPECT TO
STRUCTURAL ELEMENTS PER
NFPA 13 REQUIREMENTS
FOR CONSTRUCTION TYPE.
ELECTRICAL WORK AND DEDICATED SPACE F1101
MIN. 6'-0" OR
TO
STRUCTURA
L CEILING
DEDICATED
ELECTRICAL
SPACE
6'
MAI
N
ON
OFF
MAI
N
ON
OFF
MAI
N
ON
OFF
MAI
N
ON
OFF
MAI
N
ON
OFF
MAI
N
ON
OFF
MIN.
DEPTH
4'-0"
MIN.
HEIGHT
6'-6"
30"
480V
DEDICATED
ELECTRICAL
SPACE BELOW
DEDICATED
ELECTRICAL
SPACE ABOVE
NOTES:
1. NO EQUIPMENT FOREIGN TO THE ELECTRICAL INSTALLATION (PIPING, DUCTS, ETC.) SHALL ENTER THE
DEDICATED SPACE ABOVE OR BELOW ELECTRICAL POWER EQUIPMENT INCLUDING SWITCHGEAR,
SWITCHBOARDS, PANELBOARDS, & MOTOR CONTROL CENTERS.
2. NO EQUIPMENT SHALL PROTRUDE INTO WORKING SPACE.
3. PIPING SYSTEMS INSTALLED ABOVE THE DEDICATED ELECTRICAL SPACE SHALL BE ALLOWED WHERE
DRIP PANS ARE INSTALLED TO CAPTURE LEAKS. RUPTURES OR CONDENSATION DRIPS. THE PIPING
AND DRIP PANS SHALL BOTH BE OUTSIDE THE DEDICATED SPACE ENVELOPE.
WORKING
SPACE
ELECTRICAL CLEARANCE GWB CEILING F1102
VOLTAGE TO GROUND (SINGLE PHASE VOLTAGE) CONDITION 1 CONDITION 2 CONDITION 3
0-150 36" 36" 36"
151-600 36" 42" 48"
CONDITION 1 - EXPOSED LIVE PARTS ON ONE SIDE OF THE WORKING SPACE AND NO LIVE OR
GROUNDED PARTS ON THE OTHER SIDE OF THE WORKING SPACE, OR EXPOSED LIVE PARTS ON BOTH
SIDES OF THE WORKING SPACE THAT ARE EFFECTIVELY GUARDED BY INSULATING MATERIALS.
CONDITION 2 - EXPOSED LIVE PARTS ON ONE SIDE OF THE WORKING SPACE AND GROUNDED PARTS ON THE OTHER SIDE OF THE WORKING SPACE. CONCRETE, BRICK, OR TILE WALLS SHALL BE CONSIDERED AS
GROUNDED CONDITION 3 - EXPOSED LIVE PARTS ON BOTH SIDES OF THE WORKING SPACE
NOTE: CLEARANCE WIDTH SHALL BE 30" OR THE WIDTH OF THE CONTROL PANEL/POWER
CONNECTION, WHICHEVER IS GREATER
30"
MIN.
36"-48"
SEE
TABLE
BELOW
FLOOR TO
TOP OF
EQUIPMENT
36"-48"
SEE TABLE BELOW
MINIMUM ELECTRICAL CLEARANCES (NEC 2017 COMPLIANCE)
SECTION "A-A"
REQUIRED
ELECTRICAL
CLEARANCE
AREA
REQUIRED
ELECTRICAL
CLEARANCE
AREA
PLAN VIEW
EQUIPMENT
EQUIPMENT
PROVIDE MINIMUM
30x22 ACCESS
PANEL WITHIN
CLEARANCE AREA
A
A
CONTROL PANEL/
POWER
CONNECTION/
DISCONNECT
CEILING
CONTROL
PANEL/POWER
CONNECTION/
DISCONNECT
NOTES:
1. DETAIL APPLIES TO ALL MECHANICAL
EQUIPMENT LOCATED ABOVE A
CEILING THAT REQUIRES POWER,
INCLUDING CONTROL POWER.
EQUIPMENT INCLUDES, BUT IS NOT
LIMITED TO, FAN POWERED BOXES,
VAV BOXES, FANS, FAN COIL UNITS,
HEAT PUMPS, CRAC UNITS, DX SPLIT
SYSTEMS, DUCT HEATERS, ETC.
2. ELECTRICAL CLEARANCE AREA
(INCLUDING WITHIN CEILING) MUST
BE FREE FROM LIGHTS, SPRINKLER
HEADS, FIRE ALARM DEVICES,
SPEAKERS, PIPING, DUCTWORK,
BEAMS AND OTHER OBSTRUCTIONS.
3. THE HEIGHT OF THE ELECTRICAL
CLEARANCE SHALL BE AS REQUIRED
TO INSTALL AND PERFORM
MAINTENANCE ON THE EQUIPMENT.
MINIMUM HEIGHT SHALL BE FROM
FLOOR TO TOP OF EQUIPMENT.
4. REFER TO SPECIFIC
MANUFACTURER PRODUCT DATA
FOR ADDITIONAL ACCESS AND
CLEARANCE REQUIREMENTS FOR
FANS, COMPRESSORS, VALVES,
DAMPERS, FILTERS, ETC. PROVIDE
ACCESS PANELS AS REQUIRED.
5. COORDINATE WITH ALL TRADES TO
PROVIDE THESE MINIMUM REQUIRED
CLEARANCES.
ELECTRICAL CLEARANCE ATC CEILING F1103
VOLTAGE TO GROUND (SINGLE PHASE VOLTAGE) CONDITION 1 CONDITION 2 CONDITION 3
0-150 36" 36" 36"
151-600 36" 42" 48"
CONDITION 1 - EXPOSED LIVE PARTS ON ONE SIDE OF THE WORKING SPACE AND NO LIVE OR
GROUNDED PARTS ON THE OTHER SIDE OF THE WORKING SPACE, OR EXPOSED LIVE PARTS ON BOTH
SIDES OF THE WORKING SPACE THAT ARE EFFECTIVELY GUARDED BY INSULATING MATERIALS.
CONDITION 2 - EXPOSED LIVE PARTS ON ONE SIDE OF THE WORKING SPACE AND GROUNDED PARTS ON THE OTHER SIDE OF THE WORKING SPACE. CONCRETE, BRICK, OR TILE WALLS SHALL BE CONSIDERED AS
GROUNDED CONDITION 3 - EXPOSED LIVE PARTS ON BOTH SIDES OF THE WORKING SPACE
NOTE: CLEARANCE WIDTH SHALL BE 30" OR THE WIDTH OF THE CONTROL PANEL/POWER
CONNECTION, WHICHEVER IS GREATER
30"
MIN.
36"-48"
SEE
TABLE
BELOW
FLOOR TO
TOP OF
EQUIPMENT
36"-48"
SEE TABLE BELOW
MINIMUM ELECTRICAL CLEARANCES (NEC 2017 COMPLIANCE)
SECTION "A-A"
REQUIRED
ELECTRICAL
CLEARANCE
AREA
REQUIRED
ELECTRICAL
CLEARANCE
AREA
PLAN VIEW
EQUIPMENT
EQUIPMENT
PROVIDE MINIMUM
30x22 ACCESS
PANEL WITHIN
CLEARANCE AREA
A
A
CONTROL PANEL/
POWER
CONNECTION/
DISCONNECT
CEILING
CONTROL
PANEL/POWER
CONNECTION/
DISCONNECT
NOTES:
1. DETAIL APPLIES TO ALL MECHANICAL
EQUIPMENT LOCATED ABOVE A
CEILING THAT REQUIRES POWER,
INCLUDING CONTROL POWER.
EQUIPMENT INCLUDES, BUT IS NOT
LIMITED TO, FAN POWERED BOXES,
VAV BOXES, FANS, FAN COIL UNITS,
HEAT PUMPS, CRAC UNITS, DX SPLIT
SYSTEMS, DUCT HEATERS, ETC.
2. ELECTRICAL CLEARANCE AREA
(INCLUDING WITHIN CEILING) MUST
BE FREE FROM LIGHTS, SPRINKLER
HEADS, FIRE ALARM DEVICES,
SPEAKERS, PIPING, DUCTWORK,
BEAMS AND OTHER OBSTRUCTIONS.
3. THE HEIGHT OF THE ELECTRICAL
CLEARANCE SHALL BE AS REQUIRED
TO INSTALL AND PERFORM
MAINTENANCE ON THE EQUIPMENT.
MINIMUM HEIGHT SHALL BE FROM
FLOOR TO TOP OF EQUIPMENT.
4. REFER TO SPECIFIC
MANUFACTURER PRODUCT DATA
FOR ADDITIONAL ACCESS AND
CLEARANCE REQUIREMENTS FOR
FANS, COMPRESSORS, VALVES,
DAMPERS, FILTERS, ETC. PROVIDE
ACCESS PANELS AS REQUIRED.
5. COORDINATE WITH ALL TRADES TO
PROVIDE THESE MINIMUM REQUIRED
CLEARANCES.
UNDERSIDE OF STRUCTURE
1" RETURN BEND:
PROVIDE SUPPORT
SPRINKLER BRANCH
PIPING
CONCENTRIC ONE-PIECE
REDUCER
SUSPENDED CEILING
RECESSED PENDENT SPRINKLER
NOTE:
CONCEALED SHOWN FOR ILLUSTRATION ONLY, SEE
SPECIFICATIONS FOR PROJECT SPECIFIC REQUIREMENTS
NEW PENDENT SPRINKLER FROM NEW BRANCHLINE F803
NO SCALE
SPRINKLER UNDER DUCTWORK DIAGRAM F857
NO SCALE
48" DUCT
TYP. PIPE HANGER
RISER NIPPLE
CROSS MAIN
CEILING/ ROOF DECK
UPRIGHT SPRINKLER
HEAD (TYP)
1" DROP TO SPR. HEAD
1" DIRT LEG
NOTE:
1. THE DETAIL SHOWN APPLIES ANYWHERE THERE IS DUCT (OR SIMILAR OBSTRUCTION) OVER 48" WIDE OR IF TWO DUCTS, RUNNING PARALLEL, ARE LESS THAN 12" APART AND THE TOTAL WIDTH IS OVER 48". SPRINKLER
SPACING SHALL BE 7'-0" ALONG LENGTH OF DUCT.
DRY SYSTEM RISER F210
NO SCALE
TO DRY SYSTEM
2" MAIN DRAIN
2" DRAIN TO
EXTERIOR
FROM WET SYSTEM
STANCHION BOLTED TO
EQUIPMENT FITTINGS AND
ANCHORED TO FLOOR
SUPERVISED
INDICATING CONTROL
VALVE
DRY-PIPE VALVE W/ QUICK
OPENING DEVICES &
STANDARD TRIM INCLUDING
WATER & N2 PRESSURE
GAGES, DRAIN & TEST
VALVES, ALARM PRESSURE
SWITCH & N2 PRESSURE
SUPERVISORY SWITCH
N2 CONNECTION
TO DRY-PIPE VALVE TRIM
VIA PRESSURE
MAINTENANCE REGULATOR
(NOT SHOWN)
FIREFLEX TOTALPAC
N2 ENCLOSURE
PGEN-5 FF AIR COMPRESSOR
PGEN-5 FF N2 GENERATOR
DRY / PRE-ACTION SYSTEM AUXILIARY DRAIN
DIAGRAM
F702
DRY SYSTEM AUXILIARY DRAIN
1" VALVE
1" x 2" INCREASER
2" x 12" NIPPLE
1" X 2" INCREASER
1" VALVE
1" NIPPLE AND CAP
NO SCALE
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
248 Copeland Street Quincy, MA 02169 P: 617-481-6390 F: 617-687-5990
200 Brickstone Square Andover, MA 01810 P: 978-296-6227 F: 978-475-5768
100% CONSTRUCTION
DOCUMENTS
REPLACE MAIN BOILERS 528A8-17-805
Samuel S. Stratton VA Medical Center, 113 Holland Ave., Albany, New York 12208
06/05/2024
105 Central Street Stoneham, MA 02180 P: 781-275-6050
C
U s e rs \m ik e
.s h n e e r\ D o c u m e n ts \Y
A lb a n y
B o ile r_
M E
P
M ik e
.S h n e e r.
rv t
/3 /2
:3
:1
P
M
FX-600
FIRE PROTECTION DETAILS
MS JPRevisions: Date:
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
248 Copeland Street Quincy, MA 02169 P: 617-481-6390 F: 617-687-5990
200 Brickstone Square Andover, MA 01810 P: 978-296-6227 F: 978-475-5768
100% CONSTRUCTION
DOCUMENTS
REPLACE MAIN BOILERS 528A8-17-805
Samuel S. Stratton VA Medical Center, 113 Holland Ave., Albany, New York 12208
06/05/2024
105 Central Street Stoneham, MA 02180 P: 781-275-6050
C
U s e rs \m ik e
.s h n e e r\ D o c u m e n ts \Y
A lb a n y
B o ile r_
M E
P
M ik e
.S h n e e r.
rv t
/3 /2
:3
:1
P
M
FX-601
FIRE PROTECTION DETAILS
MS JPRevisions: Date:
| Sheets |
| FX-000 - FIRE PROTECTION LEGEND |
| FX-201 - FIRE PROTECTION NEW WORK PART PLANS |
| FX-600 - FIRE PROTECTION DETAILS |
| FX-601 - FIRE PROTECTION DETAILS |
| Daniel.Wall@nv5.com | |
| 2024-06-06T15:47:41-0400 | |
| Daniel J. Wall | |
| I am signing 6 sheets from FX-000 to FX-601. |
File details come from the government source that posted it. Updated .