3B- Albany Architectural - stamped.pdf
PDF 8 MB Posted
- Attached to
- Z1DA--528A8-17-805 REPLACE MAIN BOILERS Federal contract opportunity
- Solicitation number
- 36C24224B0047
About this file
This document is a Scope of Work for a federal contract opportunity to replace the main boilers at the Samuel S. Stratton VA Medical Center in Albany, New York.
The key details are:
- The project includes construction services to replace three 900 HP dual fuel-fired steam water-tube boilers with temporary 1,000 BHP steam boilers and a newer 400 HP fire-tube steam boiler.
- The work is to be completed in three phases: 1) Replace electrical equipment and install new switchgear, 2) Install the temporary boilers and replace domestic hot water boilers, and 3) Remove the existing 900 HP boilers and install the new boilers.
- The contractor must use the Autodesk Build construction management platform and complete all required submittals prior to mobilization.
- The work must be substantially complete within 730 calendar days after the notice to proceed.
- The Department of Veterans Affairs, Veterans Integrated Service Network 2 is the federal agency issuing this contract opportunity.
View the file
Other files for this federal contract opportunity
Show all 29
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
NOTES:
1. POST BARRICADES WILL BE PAINTED WITH ONE PRIME COAT OF RED OXIDE (PAINT NO.1), ONE FINISH
COAT OF DULL BLACK ENAMEL PER VA SPECIFICATIONS, AND STRIPES CONSISTING OF 4" BANDS OF
YELLOW REFLECTORIZED TAPE WILL BE USED UNLESS OTHERWISE SPECIFIED ON THE PLANS.
2. FINISH COLOR COMBINATIONS, OTHER THAN THAT SPECIFIED ABOVE, WILL BE SUBMITTED TO THE
AGENCY FOR APPROVAL.
5"�x7'-0"
STANDARD PIPE POST
BARRICADE CONCRETE
FILLED
UTILITY
CONCRETE PER
VA
SPECIFICATIONS
TYPE "A" TYPE "B"
3"3"
4"
4"
4"
4"
3"�x5'-0"
STANDARD PIPE POST
BARRICADE CONCRETE
FILLED.
12"9"
Sub-basement 178' - 9"
Basement Mezzanie 190' - 7"
Level 1 202' - 6"
AI-102
AI-102
AI-102
Sub-basement 178' - 9"
Basement Mezzanie 190' - 7"
1' - 4"
17' - 4"
C SECTION @ 16" O.C
AI-102
NEW SUSPENDED CEILING
C SECTION 800S200-54
24 GAUGE B-DECK
THE ROOF DECK SHALL BE 1:12 SLOPE
EXISTING CMU WALL
NOTE:
THE DECKING PLACEMENT IS ALLOWED TO MAKE
SOME SMALL ADJUSTMENTS TO ACCOMANDATE
THE PRESERVED PIPING. CONTRACTOR IS REQUIRED
TO SUBMIT HIS/HER REQUEST IN DRAWING WITH WRITING
TO GET APPROVED FROM ARCHITECT WITHOUT
ADDITIONAL CHARGES.
NEW SUSPENDED CEILING
NEW CEILING FIXTURE
EDGE OF THE WALL
PROVIDE BRACKET TO ANCHOR TO
EXISTING WALL
C SECTION 800S200-54
24 GAUGE B-DECK
THE ROOF DECK SHALL BE
1:12 SLOPE
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
248 Copeland Street Quincy, MA 02169 P: 617-481-6390 F: 617-687-5990
200 Brickstone Square Andover, MA 01810 P: 978-296-6227 F: 978-475-5768
100% CONSTRUCTION
DOCUMENTS
REPLACE MAIN BOILERS 528A8-17-805
Samuel S. Stratton VA Medical Center, 113 Holland Ave., Albany, New York 12208
06/05/2024
105 Central Street Stoneham, MA 02180 P: 781-275-6050
C U s e rs \h a u n g \D o c u m e n ts \A lb a n y
B o ile r_
A rc h
B id
S e t_ V h a u n g
G H
V P
.r v t
/4
/2
:2
:1
A
M
AI-102
ARCHITECTURAL PHASE 3 - NEW WORK
SECTIONS AND DETAILS
DM SH
1/4" = 1'-0"
SECTION THRU CONTROL ROOM (1)
1/4" = 1'-0"
SECTION THRU CONTROL ROOM (2)
1 1/2" = 1'-0"
CONTROL ROOM - DETAIL 2
ISOMETRIC VIEW - CONTROL ROOM
ISOMETRIC VIEW - PARTIAL ENLARGEMENT
1 1/2" = 1'-0"
CONTROL ROOM - DETAIL 3
NTS
CONCRETE POST BARRICADE DETAIL
Revisions: Date:
Basement Mezzanie
Sub-basement 178' - 9"
Basement Mezzanie 190' - 7"
AI-103
Sub-basement 178' - 9"
Basement Mezzanie 190' - 7"
" 2'X2' OPENING
WITH FRAME FOR
VENT AIR FILTER
NOTE:
THE TOP OF STUD
WILL AGAINST THE
(E) CATWALK EDGE
ACTUAL HEIGHT OF
STUD WILL NEED
FIELD VERIFIED
Sub-basement 178' - 9"
NEW 3/4 PLYWOOD
TO COVER THE ENTIRE (E)
CATWALK TO BLOCK THE
DUST ENTERING THE
EQUIPMENT AREA
UNDERNEATH
2X4 WOOD STUD TO
AGAINST THE (E)
CATWALK AND USE
METAL WIRE TIE-UP
2X4 TOP PLATE
WITH DOOR SHIM
72"X80" DOUBLE
SLIDING DOOR
2X4 BOTTOM PLATE
(E) TANK
(E) AIR COMPRESSER (E) CONC. PAD
(E) STRUCTURAL
METAL ANGLE BRACKET
1/2" PLYWOOD
TO COVER THE
ENTIRE GAP
BETWEEN THE
WALL AND THE (E)
CATWALK
2'- 6'' x2'- 6'' OPENING
FOR AIR FILTER
VIEW OF P#1
VIEW OF P#2
VIEW OF P#3
30X80DOOR
THE TOP OF THIS AREA
CONTAINS SOME PIPING
EXHAUST FAN, AND SO FORTH,
PLYWOOD AND THE
SUPPORTING 2X4 STUD
WILL NEED TO BE ADJUSTED
AND DONE IN THE FIELD TO
ACCOMMODATE THE(E)
CONDITION. SEE PIX #2 & #3.
NOTE: THE EXISTING EXHAUST
FAN NEED TO BE WRAPPED AND
CONTINUE ITS FUNCTION FOR THE
TEMPORARY ENCLOSURE AREA
DUST FREE IS REQUIRED.
2X4 WOOD STUD TO
AGAINST THE(E)
CATWALK AND USE
METAL WIRE TIE-UP
COVERED BY 1/2 PLYWOOD
ALL AROUND, TYP. ALL GAPS
NEED TO BE SEALED COMPLETELY
WITHOUT AIR LEAKING.
2X4 TOP PLATE
APPLIED TO THE
ENTIRE WALL
5' - 10"
12' - 11"
1' - 9"
72"X80" DOULE
SLIDING DOOR
30"X80"
SINGLE DOOR
2X4 STUD WALL
@16" O.C. TYP.
(2) 30''x30'' OPENING
FOR AIR FILTER
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
248 Copeland Street Quincy, MA 02169 P: 617-481-6390 F: 617-687-5990
200 Brickstone Square Andover, MA 01810 P: 978-296-6227 F: 978-475-5768
100% CONSTRUCTION
DOCUMENTS
REPLACE MAIN BOILERS 528A8-17-805
Samuel S. Stratton VA Medical Center, 113 Holland Ave., Albany, New York 12208
06/05/2024
N
105 Central Street Stoneham, MA 02180 P: 781-275-6050
C U s e rs \h a u n g \D o c u m e n ts \A lb a n y
B o ile r_
A rc h
B id
S e t_ V h a u n g
G H
V P
.r v t
/4
/2
:2
:1
A
M
AI-103
ARCHITECTURAL PHASE 2 - NEW TEMPORARY
DUST BARRIER ENCLOSURE
DM SH
3/8" = 1'-0"
Elevation 1 - FRONT VIEW 3/8" = 1'-0"
Elevation 1 - LEFT SIDE VIEW
3/8" = 1'-0"
SECTION THRU NEW TEMPORARY DUST BARRIER ENCLOSURE
P #1 P #2 P #3
(E)) EXHUST FAN
ISOMETRIC VIEW - TEMPORARY DUST BARRIER ENCLOSURE
3/8" = 1'-0"
1. SUB-BASEMENT - NEW TEMPORARY DUST BARRIER ENCLOSURE
NOTE
1. NON-COMBUSTIBLE OR LIMITED COMBUSTIBLE MATERIAL SHALL BE USED FOR THE DUST PARTITION. THIS WOULD
INCLUDE FIRE RETARDANT TREATED WOOD AND APPROVED FIRE-RESISTANT PLASTIC.
Basement Mezzanie 190' - 7"
Level 1 202' - 6"
Roof 216' - 6"
Sub-basement 178' - 9"
Basement Mezzanie 190' - 7"
Sub-basement 178' - 9"
Basement Mezzanie 190' - 7"
Sub-basement 178' - 9"
Basement Mezzanie 190' - 7"
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
248 Copeland Street Quincy, MA 02169 P: 617-481-6390 F: 617-687-5990
200 Brickstone Square Andover, MA 01810 P: 978-296-6227 F: 978-475-5768
100% CONSTRUCTION
DOCUMENTS
REPLACE MAIN BOILERS 528A8-17-805
Samuel S. Stratton VA Medical Center, 113 Holland Ave., Albany, New York 12208
06/05/2024
N
105 Central Street Stoneham, MA 02180 P: 781-275-6050
C U s e rs \h a u n g \D o c u m e n ts \A lb a n y
B o ile r_
A rc h
B id
S e t_ V h a u n g
G H
V P
.r v t
/4
/2
:2
:1
A
M
AI-104
ARCHITECTURAL PHASE 3 - WALL SECTIONS
DM SH
3/4" = 1'-0"
WALL SECTION - THRU NEW LOUVER AT BOILER ROOM CATWALK
3/4" = 1'-0"
WALL SECTION - ELECTRICAL ROOM EAST WALL
3/4" = 1'-0"
WALL SECTION - GENERATOR ROOM WEST WALL
AI-202
AI-202
AI-202
AI-202
AI-202
AI-202
3/4" = 1'-0"
WALL SECTION - GENERATOR ROOM EAST WALL
AI-202
AI-202
VENT HOLE 1 1/2" WIDER THAN PIPE
M
IN
COLD PLUMBING VENT STACK. REFER TO
MECHANICAL DRAWINGS FOR HEIGHT
AND VENT MATERIAL
REFER TO MECHANICAL DRAWINGS FOR
PIPE SUPPORT DETAIL BELOW ROOF
SEALANT AT TOP OF 1" STAINLESS
STEEL METAL DRAW BAND TO PIPE
SEALANT TAPE BETWEEN PRE-MANUFACTURED
BOOT FLASHING AND PIPE
PRE-MANUFACTURED BOOT FLASHING SET INTO
MASTIC ON EXISTING MULTI-PLY ROOFING
LIQUID APPLIED BASE COAT OVER 2 PLY
STRIPPING AND MULTI-PLY EXISTING ROOF
AND LIQUID APPLIED TOP COAT OVER
PRESSURE TREATED 2X6 NAILERS & 1_
" PT
PLYWOOD SECURED TO EXISTING CONCRETE
DECK. BLOCKING THICKNESS TO MATCH
EXISTING ROOF THICKENESS
ROXUL INSULATION IN CAVITY
CAULKING TO SEAL PERIMETER
EXISTING TREMCO PREMIUM SMOOTH
MULTI-PLY ROOF MEMBRANE
EXISTING CONC. DECK - VIF
EXISTING ROOF INSULATION AND
DECK BOARD - VIF
TWO-PLY STRIPPING ADHERED TO ROOF
MEMBRANE MIN. 4" OVERLAP TO FLASHING AND
EXISTING ROOF MEMBRANE
NOTE:
1. PRIMING OF THE SUBSTRATE MAY BE REQUIRED, FOLLOW SPECIFICATIONS AND MANUFACTURER RECOMMENDATIONS.
2. INSTALL A SECTION OF CARLISLE 750XLT TO FORM A BARRIER UNDER THE INSULATION AND SEAL FROM THE EXISTING ROOF TOPPING TO
EXISTING INSULATION EDGE.
EXISTING ROOF INSULATION AND
DECK BOARD - VIF
REMOVE EXISTING CURB BLOCKING
DOWN TO CONCRETE DECK SURFACE
AS REQUIRED
EXISTING CONC. DECK - VIF
ADD SECTION ON NEW VAPOR
BARRIER OVER LAPPED WITH
EXISTING
EXISTING TREMCO PREMIUM SMOOTH
MULTI-PLY ROOF MEMBRANE
TWO-PLY STRIPPING ADHERED TO ROOF
MEMBRANE MIN. 4" OVERLAP TO NEW ROOF
MEMBRANE AND EXISTING ROOF MEMBRANE
NEW SECTION OF TREMCO PREMIUM SMOOTH
MULTI-PLY ROOF MEMBRANE OVER APPROVED
ROOF DECK BOARD
NEW SECTION OF
POLYISOCYANURATE RIGID
INSULATION TO MATCH EXISTING
1/4" SQUARE PLATE WITH TNEMEC RUST
PROOFING OVER EXISTING SQUARE OPENING.
OVERHANG 6" ON ALL SIDES WITH 2 ANCHORS
ON EACH SIDE. TOTAL 8 ANCHORS
VENT HOLE 1 1/2" WIDER THAN INSULATED LINER
M
IN
.1
M
IN
HOT PLUMBING VENT STACK. REFER TO
MECHANICAL DRAWINGS FOR HEIGHT AND
VENT MATERIAL
HOT PLUMBING VENT STACK. REFER TO
MECHANICAL DRAWINGS FOR HEIGHT
AND VENT MATERIAL
SHEET METAL SLEEVE
TWO-PLY STRIPPING ADHERED TO ROOF
MEMBRANE MIN. 4" OVERLAP TO FLASHING AND
EXISTING ROOF MEMBRANE
EXISTING TREMCO PREMIUM SMOOTH
MULTI-PLY ROOF MEMBRANE
SHEET METAL RAIN COLLAR OVERLAPPING
FLASHING COLLAR BY MIN. 3"
STAINESS STEEL CLAMPING RING
APPROPRIATE HIGH TEMPERATURE SEALANT. IF
TEMPERATURE IS ASSUMED TO EXCEED 400
DEGREES WELD OR SOLDER COLLAR TO PIPE
HOT PLUMBING VENT STACK. INSULATED
METAL PIPE LINER
MASTIC SEAL PERIMETER OF SHEET
METAL SLEEVE
PRESSURE TREATED 2X6 NAILERS & 1_
" PT
PLYWOOD SECURED TO EXISTING CONCRETE
DECK. BLOCKING THICKNESS TO MATCH
EXISTING ROOF THICKENESS
ROXUL INSULATION IN CAVITY
CAULKING TO SEAL PERIMETER
EXISTING CONC. DECK - VIF
EXISTING ROOF INSULATION AND
DECK BOARD - VIF
REFER TO MECHANICAL DRAWINGS FOR
PIPE SUPPORT DETAIL BELOW ROOF
NOTE:
1. INSTALL A SECTION OF CARLISLE 750XLT TO FORM A BARRIER UNDER THE INSULATION AND SEAL FROM THE EXISTING ROOF TOPPING TO
EXISTING INSULATION EDGE.
EXISTING ROOF INSULATION AND
DECK BOARD - VIF
REMOVE EXISTING CURB BLOCKING
DOWN TO CONCRETE DECK SURFACE
AS REQUIRED
EXISTING CONC. DECK - VIF
ADD SECTION ON NEW VAPOR
BARRIER OVER LAPPED WITH
EXISTING
EXISTING TREMCO PREMIUM SMOOTH
MULTI-PLY ROOF MEMBRANE
TWO-PLY STRIPPING ADHERED TO ROOF
MEMBRANE MIN. 4" OVERLAP TO NEW ROOF
MEMBRANE AND EXISTING ROOF MEMBRANE
NEW SECTION OF TREMCO PREMIUM SMOOTH
MULTI-PLY ROOF MEMBRANE OVER APPROVED
ROOF DECK BOARD
NEW SECTION OF
POLYISOCYANURATE RIGID
INSULATION OR EXTRUDED
POLYSTYRENE, V.I.F.
1/4" SQUARE PLATE WITH TNEMEC RUST
PROOFING OVER EXISTING ROUND OPENING.
OVERHANG 4" ON ALL SIDES WITH 1 ANCHORS
ON EACH SIDE. TOTAL 4 ANCHORS
3'-1" DIAM.
VIF EXIST. OPENING
2'-5"
/2
3'-4 1/2"
OD
3'-1" DIAM.
VIF EXIST. OPENING
/2
LIQUID APPLIED BASE COAT OVER 2 PLY
STRIPPING AND MULTI-PLY EXISTING ROOF
AND LIQUID APPLIED TOP COAT OVER
PRESSURE TREATED 2X8 NAILERS
& 1_
" PT PLYWOOD SECURED TO
EXISTING CONCRETE DECK.
BLOCKING THICKNESS TO MATCH
EXISTING ROOF THICKENESS
EXISTING TREMCO PREMIUM
SMOOTH MULTI-PLY ROOF
MEMBRANE
EXISTING CONC. DECK - VIF
EXISTING ROOF INSULATION AND
DECK BOARD - VIF
TWO-PLY STRIPPING ADHERED TO ROOF
MEMBRANE MIN. 4" OVERLAP TO CURB BASE
AND EXISTING ROOF MEMBRANE
GASKETED FASTENERS MIN. 2 PER
SIDE OR AS REQUIRED BY EQUIPMENT
MANUFACTURER
PRESSURE TREATED WOOD NAILER
FASTEN TO PREFABRICATED METAL
EQUIPMENT CURB
NEW ROOF MOUNT EXHAUST FAN. REFER TO
MECHANICAL DRAWINGS FOR INFORMATION
2X12 PRESSURE TREATED WOOD
VERTICAL BLOCKING ALL AROUND
NOTE:
1. PRIMING OF THE SUBSTRATE
MAY BE REQUIRED, FOLLOW
SPECIFICATIONS AND
MANUFACTURER
RECOMMENDATIONS.
2. a. THERE ARE 4 EXISTING
OPENINGS WILL BE REUSED
FOR EF-1,EF-2,EF-3, AND
EF-4.
b. A NEW OPENING WILL
BE NEEDED FOR EF-5.
MAKE THIS NEW OPENING
SAME AS THE EXISTING'S
COAT EXPOSED WOOD BLOCKING
AND ANGLE WITH INTUMESCENT
PAINT AS REQUIRED
P.T. WOOD CANT
PREFABRICATED ROOF CURB
ADAPTER
PRESSURE TREATED 2X8 NAILERS
& 1_
" PT PLYWOOD SECURED TO
EXISTING CONCRETE DECK.
BLOCKING THICKNESS TO MATCH
EXISTING ROOF THICKENESS
PREFABRICATED ROOF CURB
ADAPTER
PREFABRICATED METAL CURB
PROVIDE NEW ADJUSTOR TO FIT THE SMALLER
EQUIPMENT 2X2 PRESSURE TREATED WOOD
TOP BLOCKING ALL AROUND
/4
/4
/2
1'-8 3/8"
5 3/4" 8 3/4" 5 7/8"
2 7/8"
COLD PLUMBING VENT STACK. REFER TO
MECHANICAL DRAWINGS FOR HEIGHT
AND VENT MATERIAL, 1 1_
" DIA.
SEALANT AT TOP OF 1" STAINLESS
STEEL METAL DRAW BAND TO PIPE
LIQUID APPLIED BASE COAT OVER
2 PLY STRIPPING AND MULTI-PLY EXISTING
ROOF AND LIQUID APPLIED TOP COAT OVER
SEALANT TAPE BETWEEN PRE-MANUFACTURED
BOOT FLASHING AND PIPE
PRE-MANUFACTURED BOOT FLASHING SET INTO
MASTIC ON EXISTING MULTI-PLY ROOFING
EXISTING TREMCO PREMIUM SMOOTH
MULTI-PLY ROOF MEMBRANE
TWO-PLY STRIPPING ADHERED TO ROOF
MEMBRANE MIN. 4" OVERLAP TO FLASHING AND
EXISTING ROOF MEMBRANE
ROXUL INSULATION IN CAVITY
CAULKING TO SEAL PERIMETER
EXISTING CONC. DECK - VIF
EXISTING ROOF INSULATION AND
DECK BOARD - VIF
PRESSURE TREATED 2X6 NAILERS & 1_
" PT
PLYWOOD SECURED TO EXISTING CONCRETE
DECK. BLOCKING THICKNESS TO MATCH
EXISTING ROOF THICKENESS
COLD PLUMBING VENT STACK. REFER TO
MECHANICAL DRAWINGS FOR HEIGHT
AND VENT MATERIAL, TYP.
PRE-MANUFACTURED BOOT FLASHING
SET INTO MASTIC ON EXISTING MULTI-PLY ROOFING,
TYP.
EDGE OF HOLE, 1-1/2" DIAMETER
TYP.
SECTION VIEW
PLAN VIEW
NOTE:
1. PRIMING OF THE SUBSTRATE MAY BE REQUIRED, FOLLOW SPECIFICATIONS AND MANUFACTURER RECOMMENDATIONS.
2. INSTALL A SECTION OF CARLISLE 750XLT TO FORM A BARRIER UNDER THE INSULATION AND SEAL FROM THE EXISTING ROOF TOPPING TO
EXISTING INSULATION EDGE.
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
248 Copeland Street Quincy, MA 02169 P: 617-481-6390 F: 617-687-5990
200 Brickstone Square Andover, MA 01810 P: 978-296-6227 F: 978-475-5768
100% CONSTRUCTION
DOCUMENTS
REPLACE MAIN BOILERS 528A8-17-805
Samuel S. Stratton VA Medical Center, 113 Holland Ave., Albany, New York 12208
06/05/2024
N
105 Central Street Stoneham, MA 02180 P: 781-275-6050
C U s e rs \h a u n g \D o c u m e n ts \A lb a n y
B o ile r_
A rc h
B id
S e t_ V h a u n g
G H
V P
.r v t
/4
/2
:2
:1
A
M
AI-201
ARCHITECTURAL PHASE 3 - ROOF
PENETRATION DETAILS
DM SH
1 1/2" = 1'-0"
COLD VENT STACK DETAIL
1 1/2" = 1'-0"
EXHAUST FAN ROOF CURB IN-FILL DETAIL
1 1/2" = 1'-0"
HOT VENT STACK DETAIL
1 1/2" = 1'-0"
ROOF VENT IN-FILL DETAIL
1 1/2" = 1'-0"
EXHAUST FAN ROOF CURB AND ROOF PLAN DETAIL
1 1/2" = 1'-0"
MULTI COLD PIPE DETAIL
EXISTING 4" VENEER
BRICK FULLY GROUTED
AIR INTAKE LOUVER
SEALANT & BACK ROD
MOUNTING METHOD
PER MANUFACTURER'S
REQUIREMENT
STRUCTURAL LINTEL
(E) BRICK WALL JAMB
REPAIR, RE-POINTING
AND PATCHING ARE
REQUIRED DURING THE
INSTALLATION WHEN NEEDED
REMOVE EXISTING
PRE-CAST SILL AND
PREPARE TOP OF
EXISTING FOUNDATION
WALL FOR NEW WORK
AIR INTAKE LOUVER
MOUNTING METHOD
PER MANUFACTURER'S
REQUIREMENT
STRUCTURAL LENTEL
(E) BRICK WALL JAMB
REPAIR, RE-POINTING
AND PATCHING ARE
REQUIRED DURING THE
INSTALLATION WHEN NEEDED
METAL SILL FLASHING
4 1/2"
14 GA. ALUMINUM CLIP ANGLE AT
HEAD AND JAMBS FASTEN TO
CONCRETE AS REQUIRED
PROVIDE BACKER ROD AND
CAULKING AT HEAD AND JAMB
SEAMS
EXISTING CONCRETE WALL
EXISTING FULLY GROUTED
BRICK VENEER
NEW W8X24 STEEL BEAM W/ 1/4"
PLATE. COAT BEAM AND PLATE IN
INTUMESCENT PAINT FOR MIN. 2 HR.
RATING
FILL CAVITY SOLID WITH
CLOSED CELL SPRAY FOAM
INSULATION
PRIME AND PAINT EXPOSED
EDGE OF STEEL PLATE
4 1/2"
PRESSURE TREATED 2X10 SILL
BLOCKING SET IN MASTIC WITH
FIELD CUT EDGE ON EXTERIOR
ANCHORED TO CONCRETE AT 24"
O.C.
.04 GUAGE SLOPED PRE-FINISHED
ALUMINUM BASE FLASHING
ADHERED TO BLOCKING. COLOR
TO MATCH LOUVER.
WIRE BIRD SCREEN
4" SEEP DRAINABLE EXTRUDED
ALUMINUM WALL LOUVER
EXISTING CONCRETE WALL
4 1/2"
14 GA. ALUMINUM CLIP ANGLE AT
HEAD AND JAMBS FASTEN TO
CONCRETE AS REQUIRED
PROVIDE BACKER ROD AND
CAULKING AT HEAD AND JAMB
SEAMS
FULLY GROUTED BRICK
VENEER TO MATCH EXISTING
BRICK WALL
8" CMU IN-FILL WALL
NEW W8X24 STEEL BEAM W/ 1/4"
PLATE. COAT BEAM AND PLATE IN
INTUMESCENT PAINT FOR MIN. 2 HR.
RATING
FILL CAVITY SOLID WITH
CLOSED CELL SPRAY FOAM
INSULATION
PRIME AND PAINT EXPOSED
EDGE OF STEEL PLATE
4 1/2"
PRESSURE TREATED
2X10 SILL BLOCKING
SET IN MASTIC WITH
FIELD CUT EDGE ON
EXTERIOR ANCHORED TO
CONCRETE AT 24" O.C.
.04 GUAGE SLOPED
PRE-FINISHED
ALUMINUM BASE
FLASHING ADHERED
TO BLOCKING. COLOR
TO MATCH LOUVER.
WIRE BIRD SCREEN 4" DEEP DRAINABLE EXTRUDED
ALUMINUM WALL LOUVER
8" CMU IN-FILL WALL
FULLY GROUTED BRICK
VENEER TO MATCH EXISTING
BRICK WALL
EXISTING CONCRETE FLOOR
EXISTING CONCRETE WALL
EXISTING FULLY GROUTED
BRICK VENEER
FILL CAVITY SOLID WITH
CLOSED CELL SPRAY FOAM
INSULATION
NEW W12X26 STEEL BEAM W/ 1/4"
PLATE. COAT BEAM AND PLATE IN
INTUMESCENT PAINT FOR MIN. 2 HR.
RATING
PRIME AND PAINT EXPOSED
EDGE OF STEEL PLATEFLASH ANCHOR BOLT
WELDED STEEL FRAME
FIRE CAULK JOINT
5"
3 / 8
ADA COMPLIANT ALUM.
THRESHOLD SET ON
NON-SHRINK GROUT
EXISTING CONCRETE FLOOR
1 / 2
PER DOOR
FRAME WIDTH
FLUSH ANCHOR
SCREW AT THIRD POINTS
WELDED STEEL FRAME
EXIST. CONCRETE WALL
FIRE CAULK JOINTS
3_
" FRT WOOD SHIM
EXISTING BRICK
VENEER
V.I.F.
5"
3 / 8
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
248 Copeland Street Quincy, MA 02169 P: 617-481-6390 F: 617-687-5990
200 Brickstone Square Andover, MA 01810 P: 978-296-6227 F: 978-475-5768
100% CONSTRUCTION
DOCUMENTS
REPLACE MAIN BOILERS 528A8-17-805
Samuel S. Stratton VA Medical Center, 113 Holland Ave., Albany, New York 12208
06/05/2024
N
105 Central Street Stoneham, MA 02180 P: 781-275-6050
C U s e rs \h a u n g \D o c u m e n ts \A lb a n y
B o ile r_
A rc h
B id
S e t_ V h a u n g
G H
V P
.r v t
/4
/2
:2
:2
A
M
AI-202
ARCHITECTURAL PHASE 3 - LOUVER/WALL
DETAILS
DM SH
1 1/2" = 1'-0"
HEAD DETAIL AT BOILER ROOM LOUVER
1 1/2" = 1'-0"
SILL DETAIL AT BOILER ROOM LOUVER
1 1/2" = 1'-0"
HEAD DETAIL AT GENRATOR ROOM WEST WALL LOUVER
1 1/2" = 1'-0"
SILL DETAIL AT GENRATOR ROOM WEST WALL LOUVER
1 1/2" = 1'-0"
HEAD DETAIL AT GENRATOR ROOM EAST WALL LOUVER
1 1/2" = 1'-0"
SILL DETAIL AT GENRATOR ROOM EAST WALL LOUVER
1 1/2" = 1'-0"
DOOR HEAD DETAIL AT ELEC ROOM EAST WALL
1 1/2" = 1'-0"
DOOR THRESHOLD DETAIL AT ELEC ROOM EAST WALL
1 1/2" = 1'-0"
DOOR JAMB DETAIL