3B- Albany Architectural - stamped.pdf

PDF 8 MB Posted

Attached to
Z1DA--528A8-17-805 REPLACE MAIN BOILERS Federal contract opportunity
Solicitation number
36C24224B0047
Issued by
Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 2

About this file

This document is a Scope of Work for a federal contract opportunity to replace the main boilers at the Samuel S. Stratton VA Medical Center in Albany, New York.

The key details are:

  • The project includes construction services to replace three 900 HP dual fuel-fired steam water-tube boilers with temporary 1,000 BHP steam boilers and a newer 400 HP fire-tube steam boiler.
  • The work is to be completed in three phases: 1) Replace electrical equipment and install new switchgear, 2) Install the temporary boilers and replace domestic hot water boilers, and 3) Remove the existing 900 HP boilers and install the new boilers.
  • The contractor must use the Autodesk Build construction management platform and complete all required submittals prior to mobilization.
  • The work must be substantially complete within 730 calendar days after the notice to proceed.
  • The Department of Veterans Affairs, Veterans Integrated Service Network 2 is the federal agency issuing this contract opportunity.

View the file

Other files for this federal contract opportunity

Other files attached to Z1DA--528A8-17-805 REPLACE MAIN BOILERS, newest first.
File Type Posted
36C24224B0047 0006.docx DOCX document
36C24224B0047 0005.docx DOCX document
36C24224B0047 0004.docx DOCX document
2024-09-09 Walk Through Sign in Sheet .pdf PDF
263623 Automatic Transfer Switch.pdf PDF
261316 Medium Voltage Fusible Interrupter Switches.pdf PDF
262300 Switchgear.pdf PDF
260511ReqForElecInstall.pdf PDF
36C24224B0047 0003.docx DOCX document
E-501 Boiler Plant Pre-Purchase One-Line Diagram.pdf PDF
Boiler Plant - Electrcial Purchase.png PNG image
261219 Pad mounted Liquid Filled Medium Voltage Transformers.pdf PDF
260573 Overcurrent Protective Device Coordination Study.pdf PDF
36C24224B0047 0002.docx DOCX document
2024-08-23 Walk Through Sign in Sheet .pdf PDF
36C24224B0047 0001.docx DOCX document
7- Albany Electrical - stamped.pdf PDF
6A- Albany Mechanical - stamped.pdf PDF
5- Albany Civil - stamped.pdf PDF
8- Albany Fire Protection - Stamped.pdf PDF
3A- Albany Architectural - stamped.pdf PDF
WD Albany NY20240002 07-12-2024.docx DOCX document
9- Albany Plumbing - stamped.pdf PDF
4- Albany Structural - stamped.pdf PDF
2- Albany General - stamped.pdf PDF
36C24224B0047_1.docx DOCX document
10- Albany Specs.pdf PDF
3C- Albany Architectural - stamped.pdf PDF
6B- Albany Mechanical - stamped.pdf PDF
Show all 29

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

NOTES:

1. POST BARRICADES WILL BE PAINTED WITH ONE PRIME COAT OF RED OXIDE (PAINT NO.1), ONE FINISH

COAT OF DULL BLACK ENAMEL PER VA SPECIFICATIONS, AND STRIPES CONSISTING OF 4" BANDS OF

YELLOW REFLECTORIZED TAPE WILL BE USED UNLESS OTHERWISE SPECIFIED ON THE PLANS.

2. FINISH COLOR COMBINATIONS, OTHER THAN THAT SPECIFIED ABOVE, WILL BE SUBMITTED TO THE

AGENCY FOR APPROVAL.

5"�x7'-0"

STANDARD PIPE POST

BARRICADE CONCRETE

FILLED

UTILITY

CONCRETE PER

VA

SPECIFICATIONS

TYPE "A" TYPE "B"

3"3"

4"

4"

4"

4"

3"�x5'-0"

STANDARD PIPE POST

BARRICADE CONCRETE

FILLED.

12"9"

Sub-basement 178' - 9"

Basement Mezzanie 190' - 7"

Level 1 202' - 6"

AI-102

AI-102

AI-102

Sub-basement 178' - 9"

Basement Mezzanie 190' - 7"

1' - 4"

17' - 4"

C SECTION @ 16" O.C

AI-102

NEW SUSPENDED CEILING

C SECTION 800S200-54

24 GAUGE B-DECK

THE ROOF DECK SHALL BE 1:12 SLOPE

EXISTING CMU WALL

NOTE:

THE DECKING PLACEMENT IS ALLOWED TO MAKE

SOME SMALL ADJUSTMENTS TO ACCOMANDATE

THE PRESERVED PIPING. CONTRACTOR IS REQUIRED

TO SUBMIT HIS/HER REQUEST IN DRAWING WITH WRITING

TO GET APPROVED FROM ARCHITECT WITHOUT

ADDITIONAL CHARGES.

NEW SUSPENDED CEILING

NEW CEILING FIXTURE

EDGE OF THE WALL

PROVIDE BRACKET TO ANCHOR TO

EXISTING WALL

C SECTION 800S200-54

24 GAUGE B-DECK

THE ROOF DECK SHALL BE

1:12 SLOPE

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

248 Copeland Street Quincy, MA 02169 P: 617-481-6390 F: 617-687-5990

200 Brickstone Square Andover, MA 01810 P: 978-296-6227 F: 978-475-5768

100% CONSTRUCTION

DOCUMENTS

REPLACE MAIN BOILERS 528A8-17-805

Samuel S. Stratton VA Medical Center, 113 Holland Ave., Albany, New York 12208

06/05/2024

105 Central Street Stoneham, MA 02180 P: 781-275-6050

C U s e rs \h a u n g \D o c u m e n ts \A lb a n y

B o ile r_

A rc h

B id

S e t_ V h a u n g

G H

V P

.r v t

/4

/2

:2

:1

A

M

AI-102

ARCHITECTURAL PHASE 3 - NEW WORK

SECTIONS AND DETAILS

DM SH

1/4" = 1'-0"

SECTION THRU CONTROL ROOM (1)

1/4" = 1'-0"

SECTION THRU CONTROL ROOM (2)

1 1/2" = 1'-0"

CONTROL ROOM - DETAIL 2

ISOMETRIC VIEW - CONTROL ROOM

ISOMETRIC VIEW - PARTIAL ENLARGEMENT

1 1/2" = 1'-0"

CONTROL ROOM - DETAIL 3

NTS

CONCRETE POST BARRICADE DETAIL

Revisions: Date:

Basement Mezzanie

Sub-basement 178' - 9"

Basement Mezzanie 190' - 7"

AI-103

Sub-basement 178' - 9"

Basement Mezzanie 190' - 7"

" 2'X2' OPENING

WITH FRAME FOR

VENT AIR FILTER

NOTE:

THE TOP OF STUD

WILL AGAINST THE

(E) CATWALK EDGE

ACTUAL HEIGHT OF

STUD WILL NEED

FIELD VERIFIED

Sub-basement 178' - 9"

NEW 3/4 PLYWOOD

TO COVER THE ENTIRE (E)

CATWALK TO BLOCK THE

DUST ENTERING THE

EQUIPMENT AREA

UNDERNEATH

2X4 WOOD STUD TO

AGAINST THE (E)

CATWALK AND USE

METAL WIRE TIE-UP

2X4 TOP PLATE

WITH DOOR SHIM

72"X80" DOUBLE

SLIDING DOOR

2X4 BOTTOM PLATE

(E) TANK

(E) AIR COMPRESSER (E) CONC. PAD

(E) STRUCTURAL

METAL ANGLE BRACKET

1/2" PLYWOOD

TO COVER THE

ENTIRE GAP

BETWEEN THE

WALL AND THE (E)

CATWALK

2'- 6'' x2'- 6'' OPENING

FOR AIR FILTER

VIEW OF P#1

VIEW OF P#2

VIEW OF P#3

30X80DOOR

THE TOP OF THIS AREA

CONTAINS SOME PIPING

EXHAUST FAN, AND SO FORTH,

PLYWOOD AND THE

SUPPORTING 2X4 STUD

WILL NEED TO BE ADJUSTED

AND DONE IN THE FIELD TO

ACCOMMODATE THE(E)

CONDITION. SEE PIX #2 & #3.

NOTE: THE EXISTING EXHAUST

FAN NEED TO BE WRAPPED AND

CONTINUE ITS FUNCTION FOR THE

TEMPORARY ENCLOSURE AREA

DUST FREE IS REQUIRED.

2X4 WOOD STUD TO

AGAINST THE(E)

CATWALK AND USE

METAL WIRE TIE-UP

COVERED BY 1/2 PLYWOOD

ALL AROUND, TYP. ALL GAPS

NEED TO BE SEALED COMPLETELY

WITHOUT AIR LEAKING.

2X4 TOP PLATE

APPLIED TO THE

ENTIRE WALL

5' - 10"

12' - 11"

1' - 9"

72"X80" DOULE

SLIDING DOOR

30"X80"

SINGLE DOOR

2X4 STUD WALL

@16" O.C. TYP.

(2) 30''x30'' OPENING

FOR AIR FILTER

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

248 Copeland Street Quincy, MA 02169 P: 617-481-6390 F: 617-687-5990

200 Brickstone Square Andover, MA 01810 P: 978-296-6227 F: 978-475-5768

100% CONSTRUCTION

DOCUMENTS

REPLACE MAIN BOILERS 528A8-17-805

Samuel S. Stratton VA Medical Center, 113 Holland Ave., Albany, New York 12208

06/05/2024

N

105 Central Street Stoneham, MA 02180 P: 781-275-6050

C U s e rs \h a u n g \D o c u m e n ts \A lb a n y

B o ile r_

A rc h

B id

S e t_ V h a u n g

G H

V P

.r v t

/4

/2

:2

:1

A

M

AI-103

ARCHITECTURAL PHASE 2 - NEW TEMPORARY

DUST BARRIER ENCLOSURE

DM SH

3/8" = 1'-0"

Elevation 1 - FRONT VIEW 3/8" = 1'-0"

Elevation 1 - LEFT SIDE VIEW

3/8" = 1'-0"

SECTION THRU NEW TEMPORARY DUST BARRIER ENCLOSURE

P #1 P #2 P #3

(E)) EXHUST FAN

ISOMETRIC VIEW - TEMPORARY DUST BARRIER ENCLOSURE

3/8" = 1'-0"

1. SUB-BASEMENT - NEW TEMPORARY DUST BARRIER ENCLOSURE

NOTE

1. NON-COMBUSTIBLE OR LIMITED COMBUSTIBLE MATERIAL SHALL BE USED FOR THE DUST PARTITION. THIS WOULD

INCLUDE FIRE RETARDANT TREATED WOOD AND APPROVED FIRE-RESISTANT PLASTIC.

Basement Mezzanie 190' - 7"

Level 1 202' - 6"

Roof 216' - 6"

Sub-basement 178' - 9"

Basement Mezzanie 190' - 7"

Sub-basement 178' - 9"

Basement Mezzanie 190' - 7"

Sub-basement 178' - 9"

Basement Mezzanie 190' - 7"

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

248 Copeland Street Quincy, MA 02169 P: 617-481-6390 F: 617-687-5990

200 Brickstone Square Andover, MA 01810 P: 978-296-6227 F: 978-475-5768

100% CONSTRUCTION

DOCUMENTS

REPLACE MAIN BOILERS 528A8-17-805

Samuel S. Stratton VA Medical Center, 113 Holland Ave., Albany, New York 12208

06/05/2024

N

105 Central Street Stoneham, MA 02180 P: 781-275-6050

C U s e rs \h a u n g \D o c u m e n ts \A lb a n y

B o ile r_

A rc h

B id

S e t_ V h a u n g

G H

V P

.r v t

/4

/2

:2

:1

A

M

AI-104

ARCHITECTURAL PHASE 3 - WALL SECTIONS

DM SH

3/4" = 1'-0"

WALL SECTION - THRU NEW LOUVER AT BOILER ROOM CATWALK

3/4" = 1'-0"

WALL SECTION - ELECTRICAL ROOM EAST WALL

3/4" = 1'-0"

WALL SECTION - GENERATOR ROOM WEST WALL

AI-202

AI-202

AI-202

AI-202

AI-202

AI-202

3/4" = 1'-0"

WALL SECTION - GENERATOR ROOM EAST WALL

AI-202

AI-202

VENT HOLE 1 1/2" WIDER THAN PIPE

M

IN

COLD PLUMBING VENT STACK. REFER TO

MECHANICAL DRAWINGS FOR HEIGHT

AND VENT MATERIAL

REFER TO MECHANICAL DRAWINGS FOR

PIPE SUPPORT DETAIL BELOW ROOF

SEALANT AT TOP OF 1" STAINLESS

STEEL METAL DRAW BAND TO PIPE

SEALANT TAPE BETWEEN PRE-MANUFACTURED

BOOT FLASHING AND PIPE

PRE-MANUFACTURED BOOT FLASHING SET INTO

MASTIC ON EXISTING MULTI-PLY ROOFING

LIQUID APPLIED BASE COAT OVER 2 PLY

STRIPPING AND MULTI-PLY EXISTING ROOF

AND LIQUID APPLIED TOP COAT OVER

PRESSURE TREATED 2X6 NAILERS & 1_

" PT

PLYWOOD SECURED TO EXISTING CONCRETE

DECK. BLOCKING THICKNESS TO MATCH

EXISTING ROOF THICKENESS

ROXUL INSULATION IN CAVITY

CAULKING TO SEAL PERIMETER

EXISTING TREMCO PREMIUM SMOOTH

MULTI-PLY ROOF MEMBRANE

EXISTING CONC. DECK - VIF

EXISTING ROOF INSULATION AND

DECK BOARD - VIF

TWO-PLY STRIPPING ADHERED TO ROOF

MEMBRANE MIN. 4" OVERLAP TO FLASHING AND

EXISTING ROOF MEMBRANE

NOTE:

1. PRIMING OF THE SUBSTRATE MAY BE REQUIRED, FOLLOW SPECIFICATIONS AND MANUFACTURER RECOMMENDATIONS.

2. INSTALL A SECTION OF CARLISLE 750XLT TO FORM A BARRIER UNDER THE INSULATION AND SEAL FROM THE EXISTING ROOF TOPPING TO

EXISTING INSULATION EDGE.

EXISTING ROOF INSULATION AND

DECK BOARD - VIF

REMOVE EXISTING CURB BLOCKING

DOWN TO CONCRETE DECK SURFACE

AS REQUIRED

EXISTING CONC. DECK - VIF

ADD SECTION ON NEW VAPOR

BARRIER OVER LAPPED WITH

EXISTING

EXISTING TREMCO PREMIUM SMOOTH

MULTI-PLY ROOF MEMBRANE

TWO-PLY STRIPPING ADHERED TO ROOF

MEMBRANE MIN. 4" OVERLAP TO NEW ROOF

MEMBRANE AND EXISTING ROOF MEMBRANE

NEW SECTION OF TREMCO PREMIUM SMOOTH

MULTI-PLY ROOF MEMBRANE OVER APPROVED

ROOF DECK BOARD

NEW SECTION OF

POLYISOCYANURATE RIGID

INSULATION TO MATCH EXISTING

1/4" SQUARE PLATE WITH TNEMEC RUST

PROOFING OVER EXISTING SQUARE OPENING.

OVERHANG 6" ON ALL SIDES WITH 2 ANCHORS

ON EACH SIDE. TOTAL 8 ANCHORS

VENT HOLE 1 1/2" WIDER THAN INSULATED LINER

M

IN

.1

M

IN

HOT PLUMBING VENT STACK. REFER TO

MECHANICAL DRAWINGS FOR HEIGHT AND

VENT MATERIAL

HOT PLUMBING VENT STACK. REFER TO

MECHANICAL DRAWINGS FOR HEIGHT

AND VENT MATERIAL

SHEET METAL SLEEVE

TWO-PLY STRIPPING ADHERED TO ROOF

MEMBRANE MIN. 4" OVERLAP TO FLASHING AND

EXISTING ROOF MEMBRANE

EXISTING TREMCO PREMIUM SMOOTH

MULTI-PLY ROOF MEMBRANE

SHEET METAL RAIN COLLAR OVERLAPPING

FLASHING COLLAR BY MIN. 3"

STAINESS STEEL CLAMPING RING

APPROPRIATE HIGH TEMPERATURE SEALANT. IF

TEMPERATURE IS ASSUMED TO EXCEED 400

DEGREES WELD OR SOLDER COLLAR TO PIPE

HOT PLUMBING VENT STACK. INSULATED

METAL PIPE LINER

MASTIC SEAL PERIMETER OF SHEET

METAL SLEEVE

PRESSURE TREATED 2X6 NAILERS & 1_

" PT

PLYWOOD SECURED TO EXISTING CONCRETE

DECK. BLOCKING THICKNESS TO MATCH

EXISTING ROOF THICKENESS

ROXUL INSULATION IN CAVITY

CAULKING TO SEAL PERIMETER

EXISTING CONC. DECK - VIF

EXISTING ROOF INSULATION AND

DECK BOARD - VIF

REFER TO MECHANICAL DRAWINGS FOR

PIPE SUPPORT DETAIL BELOW ROOF

NOTE:

1. INSTALL A SECTION OF CARLISLE 750XLT TO FORM A BARRIER UNDER THE INSULATION AND SEAL FROM THE EXISTING ROOF TOPPING TO

EXISTING INSULATION EDGE.

EXISTING ROOF INSULATION AND

DECK BOARD - VIF

REMOVE EXISTING CURB BLOCKING

DOWN TO CONCRETE DECK SURFACE

AS REQUIRED

EXISTING CONC. DECK - VIF

ADD SECTION ON NEW VAPOR

BARRIER OVER LAPPED WITH

EXISTING

EXISTING TREMCO PREMIUM SMOOTH

MULTI-PLY ROOF MEMBRANE

TWO-PLY STRIPPING ADHERED TO ROOF

MEMBRANE MIN. 4" OVERLAP TO NEW ROOF

MEMBRANE AND EXISTING ROOF MEMBRANE

NEW SECTION OF TREMCO PREMIUM SMOOTH

MULTI-PLY ROOF MEMBRANE OVER APPROVED

ROOF DECK BOARD

NEW SECTION OF

POLYISOCYANURATE RIGID

INSULATION OR EXTRUDED

POLYSTYRENE, V.I.F.

1/4" SQUARE PLATE WITH TNEMEC RUST

PROOFING OVER EXISTING ROUND OPENING.

OVERHANG 4" ON ALL SIDES WITH 1 ANCHORS

ON EACH SIDE. TOTAL 4 ANCHORS

3'-1" DIAM.

VIF EXIST. OPENING

2'-5"

/2

3'-4 1/2"

OD

3'-1" DIAM.

VIF EXIST. OPENING

/2

LIQUID APPLIED BASE COAT OVER 2 PLY

STRIPPING AND MULTI-PLY EXISTING ROOF

AND LIQUID APPLIED TOP COAT OVER

PRESSURE TREATED 2X8 NAILERS

& 1_

" PT PLYWOOD SECURED TO

EXISTING CONCRETE DECK.

BLOCKING THICKNESS TO MATCH

EXISTING ROOF THICKENESS

EXISTING TREMCO PREMIUM

SMOOTH MULTI-PLY ROOF

MEMBRANE

EXISTING CONC. DECK - VIF

EXISTING ROOF INSULATION AND

DECK BOARD - VIF

TWO-PLY STRIPPING ADHERED TO ROOF

MEMBRANE MIN. 4" OVERLAP TO CURB BASE

AND EXISTING ROOF MEMBRANE

GASKETED FASTENERS MIN. 2 PER

SIDE OR AS REQUIRED BY EQUIPMENT

MANUFACTURER

PRESSURE TREATED WOOD NAILER

FASTEN TO PREFABRICATED METAL

EQUIPMENT CURB

NEW ROOF MOUNT EXHAUST FAN. REFER TO

MECHANICAL DRAWINGS FOR INFORMATION

2X12 PRESSURE TREATED WOOD

VERTICAL BLOCKING ALL AROUND

NOTE:

1. PRIMING OF THE SUBSTRATE

MAY BE REQUIRED, FOLLOW

SPECIFICATIONS AND

MANUFACTURER

RECOMMENDATIONS.

2. a. THERE ARE 4 EXISTING

OPENINGS WILL BE REUSED

FOR EF-1,EF-2,EF-3, AND

EF-4.

b. A NEW OPENING WILL

BE NEEDED FOR EF-5.

MAKE THIS NEW OPENING

SAME AS THE EXISTING'S

COAT EXPOSED WOOD BLOCKING

AND ANGLE WITH INTUMESCENT

PAINT AS REQUIRED

P.T. WOOD CANT

PREFABRICATED ROOF CURB

ADAPTER

PRESSURE TREATED 2X8 NAILERS

& 1_

" PT PLYWOOD SECURED TO

EXISTING CONCRETE DECK.

BLOCKING THICKNESS TO MATCH

EXISTING ROOF THICKENESS

PREFABRICATED ROOF CURB

ADAPTER

PREFABRICATED METAL CURB

PROVIDE NEW ADJUSTOR TO FIT THE SMALLER

EQUIPMENT 2X2 PRESSURE TREATED WOOD

TOP BLOCKING ALL AROUND

/4

/4

/2

1'-8 3/8"

5 3/4" 8 3/4" 5 7/8"

2 7/8"

COLD PLUMBING VENT STACK. REFER TO

MECHANICAL DRAWINGS FOR HEIGHT

AND VENT MATERIAL, 1 1_

" DIA.

SEALANT AT TOP OF 1" STAINLESS

STEEL METAL DRAW BAND TO PIPE

LIQUID APPLIED BASE COAT OVER

2 PLY STRIPPING AND MULTI-PLY EXISTING

ROOF AND LIQUID APPLIED TOP COAT OVER

SEALANT TAPE BETWEEN PRE-MANUFACTURED

BOOT FLASHING AND PIPE

PRE-MANUFACTURED BOOT FLASHING SET INTO

MASTIC ON EXISTING MULTI-PLY ROOFING

EXISTING TREMCO PREMIUM SMOOTH

MULTI-PLY ROOF MEMBRANE

TWO-PLY STRIPPING ADHERED TO ROOF

MEMBRANE MIN. 4" OVERLAP TO FLASHING AND

EXISTING ROOF MEMBRANE

ROXUL INSULATION IN CAVITY

CAULKING TO SEAL PERIMETER

EXISTING CONC. DECK - VIF

EXISTING ROOF INSULATION AND

DECK BOARD - VIF

PRESSURE TREATED 2X6 NAILERS & 1_

" PT

PLYWOOD SECURED TO EXISTING CONCRETE

DECK. BLOCKING THICKNESS TO MATCH

EXISTING ROOF THICKENESS

COLD PLUMBING VENT STACK. REFER TO

MECHANICAL DRAWINGS FOR HEIGHT

AND VENT MATERIAL, TYP.

PRE-MANUFACTURED BOOT FLASHING

SET INTO MASTIC ON EXISTING MULTI-PLY ROOFING,

TYP.

EDGE OF HOLE, 1-1/2" DIAMETER

TYP.

SECTION VIEW

PLAN VIEW

NOTE:

1. PRIMING OF THE SUBSTRATE MAY BE REQUIRED, FOLLOW SPECIFICATIONS AND MANUFACTURER RECOMMENDATIONS.

2. INSTALL A SECTION OF CARLISLE 750XLT TO FORM A BARRIER UNDER THE INSULATION AND SEAL FROM THE EXISTING ROOF TOPPING TO

EXISTING INSULATION EDGE.

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

248 Copeland Street Quincy, MA 02169 P: 617-481-6390 F: 617-687-5990

200 Brickstone Square Andover, MA 01810 P: 978-296-6227 F: 978-475-5768

100% CONSTRUCTION

DOCUMENTS

REPLACE MAIN BOILERS 528A8-17-805

Samuel S. Stratton VA Medical Center, 113 Holland Ave., Albany, New York 12208

06/05/2024

N

105 Central Street Stoneham, MA 02180 P: 781-275-6050

C U s e rs \h a u n g \D o c u m e n ts \A lb a n y

B o ile r_

A rc h

B id

S e t_ V h a u n g

G H

V P

.r v t

/4

/2

:2

:1

A

M

AI-201

ARCHITECTURAL PHASE 3 - ROOF

PENETRATION DETAILS

DM SH

1 1/2" = 1'-0"

COLD VENT STACK DETAIL

1 1/2" = 1'-0"

EXHAUST FAN ROOF CURB IN-FILL DETAIL

1 1/2" = 1'-0"

HOT VENT STACK DETAIL

1 1/2" = 1'-0"

ROOF VENT IN-FILL DETAIL

1 1/2" = 1'-0"

EXHAUST FAN ROOF CURB AND ROOF PLAN DETAIL

1 1/2" = 1'-0"

MULTI COLD PIPE DETAIL

EXISTING 4" VENEER

BRICK FULLY GROUTED

AIR INTAKE LOUVER

SEALANT & BACK ROD

MOUNTING METHOD

PER MANUFACTURER'S

REQUIREMENT

STRUCTURAL LINTEL

(E) BRICK WALL JAMB

REPAIR, RE-POINTING

AND PATCHING ARE

REQUIRED DURING THE

INSTALLATION WHEN NEEDED

REMOVE EXISTING

PRE-CAST SILL AND

PREPARE TOP OF

EXISTING FOUNDATION

WALL FOR NEW WORK

AIR INTAKE LOUVER

MOUNTING METHOD

PER MANUFACTURER'S

REQUIREMENT

STRUCTURAL LENTEL

(E) BRICK WALL JAMB

REPAIR, RE-POINTING

AND PATCHING ARE

REQUIRED DURING THE

INSTALLATION WHEN NEEDED

METAL SILL FLASHING

4 1/2"

14 GA. ALUMINUM CLIP ANGLE AT

HEAD AND JAMBS FASTEN TO

CONCRETE AS REQUIRED

PROVIDE BACKER ROD AND

CAULKING AT HEAD AND JAMB

SEAMS

EXISTING CONCRETE WALL

EXISTING FULLY GROUTED

BRICK VENEER

NEW W8X24 STEEL BEAM W/ 1/4"

PLATE. COAT BEAM AND PLATE IN

INTUMESCENT PAINT FOR MIN. 2 HR.

RATING

FILL CAVITY SOLID WITH

CLOSED CELL SPRAY FOAM

INSULATION

PRIME AND PAINT EXPOSED

EDGE OF STEEL PLATE

4 1/2"

PRESSURE TREATED 2X10 SILL

BLOCKING SET IN MASTIC WITH

FIELD CUT EDGE ON EXTERIOR

ANCHORED TO CONCRETE AT 24"

O.C.

.04 GUAGE SLOPED PRE-FINISHED

ALUMINUM BASE FLASHING

ADHERED TO BLOCKING. COLOR

TO MATCH LOUVER.

WIRE BIRD SCREEN

4" SEEP DRAINABLE EXTRUDED

ALUMINUM WALL LOUVER

EXISTING CONCRETE WALL

4 1/2"

14 GA. ALUMINUM CLIP ANGLE AT

HEAD AND JAMBS FASTEN TO

CONCRETE AS REQUIRED

PROVIDE BACKER ROD AND

CAULKING AT HEAD AND JAMB

SEAMS

FULLY GROUTED BRICK

VENEER TO MATCH EXISTING

BRICK WALL

8" CMU IN-FILL WALL

NEW W8X24 STEEL BEAM W/ 1/4"

PLATE. COAT BEAM AND PLATE IN

INTUMESCENT PAINT FOR MIN. 2 HR.

RATING

FILL CAVITY SOLID WITH

CLOSED CELL SPRAY FOAM

INSULATION

PRIME AND PAINT EXPOSED

EDGE OF STEEL PLATE

4 1/2"

PRESSURE TREATED

2X10 SILL BLOCKING

SET IN MASTIC WITH

FIELD CUT EDGE ON

EXTERIOR ANCHORED TO

CONCRETE AT 24" O.C.

.04 GUAGE SLOPED

PRE-FINISHED

ALUMINUM BASE

FLASHING ADHERED

TO BLOCKING. COLOR

TO MATCH LOUVER.

WIRE BIRD SCREEN 4" DEEP DRAINABLE EXTRUDED

ALUMINUM WALL LOUVER

8" CMU IN-FILL WALL

FULLY GROUTED BRICK

VENEER TO MATCH EXISTING

BRICK WALL

EXISTING CONCRETE FLOOR

EXISTING CONCRETE WALL

EXISTING FULLY GROUTED

BRICK VENEER

FILL CAVITY SOLID WITH

CLOSED CELL SPRAY FOAM

INSULATION

NEW W12X26 STEEL BEAM W/ 1/4"

PLATE. COAT BEAM AND PLATE IN

INTUMESCENT PAINT FOR MIN. 2 HR.

RATING

PRIME AND PAINT EXPOSED

EDGE OF STEEL PLATEFLASH ANCHOR BOLT

WELDED STEEL FRAME

FIRE CAULK JOINT

5"

3 / 8

ADA COMPLIANT ALUM.

THRESHOLD SET ON

NON-SHRINK GROUT

EXISTING CONCRETE FLOOR

1 / 2

PER DOOR

FRAME WIDTH

FLUSH ANCHOR

SCREW AT THIRD POINTS

WELDED STEEL FRAME

EXIST. CONCRETE WALL

FIRE CAULK JOINTS

3_

" FRT WOOD SHIM

EXISTING BRICK

VENEER

V.I.F.

5"

3 / 8

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

248 Copeland Street Quincy, MA 02169 P: 617-481-6390 F: 617-687-5990

200 Brickstone Square Andover, MA 01810 P: 978-296-6227 F: 978-475-5768

100% CONSTRUCTION

DOCUMENTS

REPLACE MAIN BOILERS 528A8-17-805

Samuel S. Stratton VA Medical Center, 113 Holland Ave., Albany, New York 12208

06/05/2024

N

105 Central Street Stoneham, MA 02180 P: 781-275-6050

C U s e rs \h a u n g \D o c u m e n ts \A lb a n y

B o ile r_

A rc h

B id

S e t_ V h a u n g

G H

V P

.r v t

/4

/2

:2

:2

A

M

AI-202

ARCHITECTURAL PHASE 3 - LOUVER/WALL

DETAILS

DM SH

1 1/2" = 1'-0"

HEAD DETAIL AT BOILER ROOM LOUVER

1 1/2" = 1'-0"

SILL DETAIL AT BOILER ROOM LOUVER

1 1/2" = 1'-0"

HEAD DETAIL AT GENRATOR ROOM WEST WALL LOUVER

1 1/2" = 1'-0"

SILL DETAIL AT GENRATOR ROOM WEST WALL LOUVER

1 1/2" = 1'-0"

HEAD DETAIL AT GENRATOR ROOM EAST WALL LOUVER

1 1/2" = 1'-0"

SILL DETAIL AT GENRATOR ROOM EAST WALL LOUVER

1 1/2" = 1'-0"

DOOR HEAD DETAIL AT ELEC ROOM EAST WALL

1 1/2" = 1'-0"

DOOR THRESHOLD DETAIL AT ELEC ROOM EAST WALL

1 1/2" = 1'-0"

DOOR JAMB DETAIL

File details come from the government source that posted it. Updated .