7- Albany Electrical - stamped.pdf

PDF 13 MB Posted

Attached to
Z1DA--528A8-17-805 REPLACE MAIN BOILERS Federal contract opportunity
Solicitation number
36C24224B0047
Issued by
Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 2

About this file

This document is a Scope of Work for a federal contract opportunity to replace the main boilers at the Albany VA Medical Center. The project includes construction services to replace three 900 HP dual fuel-fired steam boilers that date to 1978. Two temporary 1,000 BHP steam boilers will be staged during construction, and a newer 400 HP boiler is anticipated to remain in service. The work will be completed in three phases, including replacing electrical equipment, installing the temporary boilers, and then removing and replacing the 900 HP boilers. The contractor will be required to use the Autodesk Build construction management platform and meet specific submittal and commissioning requirements. The contract has a period of performance of 730 calendar days from notice to proceed.

View the file

Other files for this federal contract opportunity

Other files attached to Z1DA--528A8-17-805 REPLACE MAIN BOILERS, newest first.
File Type Posted
36C24224B0047 0006.docx DOCX document
36C24224B0047 0005.docx DOCX document
2024-09-09 Walk Through Sign in Sheet .pdf PDF
36C24224B0047 0004.docx DOCX document
262300 Switchgear.pdf PDF
260511ReqForElecInstall.pdf PDF
36C24224B0047 0003.docx DOCX document
260573 Overcurrent Protective Device Coordination Study.pdf PDF
263623 Automatic Transfer Switch.pdf PDF
261316 Medium Voltage Fusible Interrupter Switches.pdf PDF
E-501 Boiler Plant Pre-Purchase One-Line Diagram.pdf PDF
Boiler Plant - Electrcial Purchase.png PNG image
261219 Pad mounted Liquid Filled Medium Voltage Transformers.pdf PDF
36C24224B0047 0002.docx DOCX document
2024-08-23 Walk Through Sign in Sheet .pdf PDF
36C24224B0047 0001.docx DOCX document
8- Albany Fire Protection - Stamped.pdf PDF
3A- Albany Architectural - stamped.pdf PDF
WD Albany NY20240002 07-12-2024.docx DOCX document
10- Albany Specs.pdf PDF
3C- Albany Architectural - stamped.pdf PDF
3B- Albany Architectural - stamped.pdf PDF
6B- Albany Mechanical - stamped.pdf PDF
6A- Albany Mechanical - stamped.pdf PDF
5- Albany Civil - stamped.pdf PDF
9- Albany Plumbing - stamped.pdf PDF
4- Albany Structural - stamped.pdf PDF
2- Albany General - stamped.pdf PDF
36C24224B0047_1.docx DOCX document
Show all 29

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

MOTOR & CONTROLS

ONE LINE SYMBOLS LEGEND

DISCONNECT SWITCH, UNFUSED

FUSE

POTENTIAL TRANSFORMER "2" INDICATES QUANTITY

CURRENT TRANSFORMER

"3" - INDICATES QUANTITY

"500:5A" - INDICATES PRIMARY TO SECONDARY TURNS RATIO

3 PHASE, 4 WIRE WYE SOLIDLY GROUNDED

PANELBOARD

R21A

HG4

SITE LEGEND

CABLE TO GROUND CONNECTION

3/4" x 10'-0" COPPER CLAD GROUND ROD

CABLE TO CABLE CONNECTION

CABLE TO STRUCTURAL STEEL CONNECTION

ELECTRIC MANHOLE

TELEPHONE MANHOLE

ELECTRIC HAND HOLE

TELEPHONE HAND HOLE

EM

TM

EH

TH

G GROUND CABLE

UE UNDERGROUND ELECTRIC

'UE-EX' DENOTES EXISTING UNDERGROUND ELECTRIC

UT UNDERGROUND TELEPHONE

UNDERGROUND SECTION, REFER TO SECTION DETAIL

"A" INDICATES DETAIL LETTER

"#" INDICATES DRAWING NUMBER

AUTOMATIC TRANSFER SWITCH

MOTOR WITH DISCONNECT

EQUIPMENT CONTROL PANEL

MOTOR, NUMERAL INDICATES HORSEPOWER

"2" - INDICATES HORSEPOWER RATING

DISCONNECT SWITCH RATED 30AMP, 3-POLE, IN NEMA TYPE

1 ENCLOSURE, UNLESS OTHERWISE NOTED

"3R" - INDICATES NEMA TYPE 3R ENCLOSURE

"2P" - INDICATES 2 POLE SINGLE PHASE DISCONNECT

"60AS" - INDICATES 60A SWITCH

VARIABLE SPEED DRIVE

MANUAL MOTOR STARTING SWITCH WITH THERMAL

OVERLOAD PROTECTION

FUSED DISCONNECT SWITCH, 3-POLE, IN NEMA TYPE 1

ENCLOSURE, UNLESS OTHERWISE NOTED.

"3R" - INDICATES NEMA TYPE 3R ENCLOSURE

"60AS" - INDICATES 60AMP SWITCH

"50AF" - INDICATES 50AMP FUSES

M

CP

VFD

ATS

WIRING DEVICES

JUNCTION BOX

PULL BOX

DUPLEX RECEPTACLE, GROUNDING TYPE, RATED 20A, 125V

"5"- INDICATES CIRCUIT NUMBER

"GFI"- INDICATES INTEGRAL GROUND FAULT CIRCUIT INTERRUPTER

"WP" - INDICATES WEATHERPROOF

"C" - INDICATES COUNTER HEIGHT

"XP" - INDICATES EXPLOSION PROOF - CLASS I, DIVISION 2

PB

J

GFI

POWER DISTRIBUTION

CUSTOMER METER

DRY TYPE TRANSFORMER

"T5" - INDICATES KVA RATING OF TRANSFORMER

REFER TO DRY TYPE K-RATED TRANSFORMER SCHEDULE

GROUND BAR

480Y/277 VOLT PANELBOARD, SURFACE MOUNTED

REFER TO SCHEDULE OF PANELBOARDS

208Y/120 VOLT PANELBOARD, SURFACE MOUNTED

REFER TO SCHEDULE OF PANELBOARDS

G

T5

M

EXISTING EQUIPMENT LEGEND

XM EXISTING EQUIPMENT TO REMAIN

X EXISTING EQUIPMENT TO BE REMOVED

XR EXISTING EQUIPMENT TO BE RELOCATED

XN NEW LOCATION OF EXISTING RELOCATED EQUIPMENT

NR EXISTING EQUIPMENT TO BE REMOVED AND NEW EQUIPMENT TO BE

INSTALLED ON EXISTING BRANCH/FEEDER

EXISTING EQUIPMENT FOR INFORMATION ONLY-

INDICATED BY SYMBOL WITH LIGHT AND OUT OF FUNCTION LINE

TYPE

EXISTING EQUIPMENT TO BE REWORKED-

INDICATED BY SYMBOL WITH DASHED AND IN FUNCTION LINE TYPE

EPO

LV

WP

a

THREE WAY SWITCH, RATED 20A, 120/277V

SWITCHES

SINGLE POLE SWITCH, RATED 20A, 120/277V

"a" LOWER CASE LETTER INDICATES FIXTURE SWITCH CONTROL

LOW VOLTAGE

PUSH BUTTON STATION. "EPO" INDICATES EMERGENCY POWER OFF

SINGLE POLE SWITCH, WEATHERPROOF

OCCUPANCY SENSOR, RECESS WALL MOUNTED

"01"-INDICATES SINGLE CIRCUIT OUTPUT.

"02"-INDICATES DUAL CIRCUIT OUTPUT.

a a a a

AMPEREA/AMP

ALTERNATION CURRENTAC

AMERICAN WITH DISABILITIES ACTADA

AMPERE FRAMEAF

ABOVE FINISHED FLOORAFF

ABOVE FINISHED GRADEAFG

AMPERE INTERRUPTING CAPACITYAIC

ALUMINUMAL

AMPERE INTERRUPTING CAPACITYAT

AUTOMATIC TRANSFER SWITCHATS

AMERICAN WIRE GAUGEAWG

BURIEDB

CONDUITC

CABLECA

CABLE TELEVISIONCATV

CLOSED CIRCUIT TELEVISION SYSTEMCCTV

CIRCUIT BREAKERCB

CIRCUITSCKT

CENTRAL PROCESSING UNITCPU

CENTERLINEC

DECIBELdB

DIRECT CURRENTDC

DRAWINGDWG

ELECTRICAL CONTRACTOREC

ELECTRIC METALLIC TUBINGEMT

FEEDERFDR

FLEXIBLE LIQUID TIGHT METALLIC TUBINGFLMT

FREQUENCYFREQ

GROUNDING ELECTRODE CONDUCTORGEC

GROUND FAULT INTERRUPTINGGFI

GROUNDGND

HANDHOLEHH

HORSEPOWERHP

HEATING, VENTILATING, AND AIR

CONDITIONING

HVAC

ABBREVIATIONS

KILOWATT HOURSKWH

LIGHTINGLTG

MAIN CIRCUIT BREAKERMCB

MASSACHUSETTS ELECTRICAL CODEMEC

MOTOR/GENERATOR SETM/G

MANHOLEMH

MAIN LUGS ONLYMLO

MOUNTEDMTD

MOUNTINGMTG

NORMALLY CLOSED CONTACTNC

NATIONAL ELECTRICAL CODENEC

NORMALLY OPEN CONTACTNO

NOT TO SCALENTS

NUMBER#

OVER CURRENT PROTECTION DEVICEOPD

PROVIDED UNDER OTHER SECTIONSPOS

POLYVINYL CHLORIDEPVC

POWERPWR

RIGID GALVANIZED STEELRGS

ROOT MEAN SQUARE VALUERMS

REVOLUTIONS PER MINUTERPM

SOLID NEUTRALSN

SWITCHBOARDSWBD

TERMINAL BLOCKTB

TELEPHONETEL

TERMINALTERMN

TWISTED SHIELDED-PAIRTSP

TRANSIENT VOLTAGE SURGE SUPPRESSERTVSS

TYPICALTYP

UNDERGROUNDUG

UNLESS OTHERWISE NOTEDUNO

UNINTERRUPTIBLE POWER SUPPLYUPS

UNSHIELDED TWISTED-PAIRUTP

VOLTSV

HERTZHZ

ISOLATED GROUNDIG

JUNCTION BOXJB

KILOVOLT-AMPEREKVA

KILOWATTKW

VOLT-AMPEREVA

VARIABLE SPEED DRIVEVSD

WATTSW

WEATHERPROOFWP

BRANCH CIRCUIT OR FEEDER CONCEALED IN FINISHED AREAS

BRANCH CIRCUIT OR FEEDER, CONCEALED IN OR UNDER FLOOR SLAB

BRANCH CIRCUIT OR FEEDER TURNING UP TOWARDS OBSERVER

BRANCH CIRCUIT OR FEEDER TURNING DOWN AWAY FROM OBSERVER

CONDUIT STUBBED ABOVE CEILING

R22A-1,3,5

BRANCH CIRCUIT HOME RUN TICKS INDICATE QUANTITY OF CONDUCTORS,

GROUND CONDUCTORS ARE NOT INDICATED. NO TICKS INDICATES 2#12 &

1#12G IN 3/4"C MINIMUM. R22A-1,3,5 INDICATES PANEL AND CIRCUIT

DESIGNATION FROM WHICH HOMERUN SHALL ORIGINATE. EACH CIRCUIT

SHALL BE 20A-1P (20AMP SINGLE POLE) UNLESS NOTED OTHERWISE.

H42B-1 100A-3P

FEEDER HOMERUN. REFER TO LEGEND OF FEEDER SIZES FOR

CONDUCTOR AND RACEWAY REQUIREMENTS DESIGNATED INSIDE TAG.

H42B-1 INDICATES PANEL AND CIRCUIT NUMBER DESIGNATION FROM

WHICH HOME RUN SHALL ORIGINATE, 100A-3P INDICATES 100 AMPERE, 3

POLE CIRCUIT BREAKER.

FLEXIBLE CONNECTION TO EQUIPMENT. RACEWAY AND CONDUCTOR

RATING TO MATCH ASSOCIATED BRANCH CIRCUIT OR FEEDER

BRANCH CIRCUIT AND FEEDER

FR1

2,a

AR1

2,a

LIGHTING FIXTURES

LIGHTING FIXTURE (SEE LIGHTING FIXTURE SCHEDULE)

"FR2" - INDICATES LIGHTING FIXTURE TYPE

"2" - INDICATES CIRCUIT NUMBER

"a" - INDICATES SWITCH CONTROL

"NL" - INDICATES NIGHT LIGHT (UNSWITCHED) CIRCUIT

RECESSED DIRECTIONALLY ORIENTED WALLWASH

TYPE LIGHTING FIXTURE.

LIGHTING FIXTURE WALL MOUNTED

EXIT SIGN LIGHTING FIXTURE, CEILING, PENDANT MOUNTED,

ARROWS, AND EXIT FACE (SHADED) AS INDICATED

EXIT SIGN LIGHTING FIXTURE, WALL MOUNTED, ARROWS

AND EXIT FACE AS (SHADED) AS INDICATED

EMERGENCY LIGHTING REMOTE LAMP HEADS, SINGLE OR DOUBLE

EMERGENCY LIGHTING BATTERY UNIT WITH DOUBLE LAMP HEADS

HW

EB

FR2

2,NL

A

30AS

60AS

60AF

MECHANICAL EQUIPMENT TAG , ALPHANUMERIC CORRESPONDS

TO EQUIPMENT ID. SEE MECHANICAL EQUIPMENT SCHEDULE FOR

ADDITIONAL INFORMATION.

TYPE

L

SURGE PROTECTIVE DEVICESPD

CONTACTOR IN NEMA 1 ENCLOSURE UNLESS OTHERWISE NOTED C

MOTOR CONTROL CENTER

MCC

ENCLOSED CIRCUIT BREAKER IN NEMA TYPE 1

ENCLOSURE, UNLESS OTHERWISE NOTED

CB

EXISTING EQUIPMENT TO BE REWORKED

GENERATORG

TRANSFORMER

AUTOMATIC TRANSFER SWITCHN

L

E

A. ALL RECESSED LIGHTING FIXTURES IN LAY-IN CEILINGS SHALL BE INSTALLED WITH A 6’LONG

FLEXIBLE METALLIC CONDUIT.

B. LIGHTING FIXTURE LOCATIONS AND ELEVATION SHALL ACCOMMODATE THREE LEVELS OF

LIGHTING THROUGHOUT THE BOILER PLANT. COORDINATE ANY CONFLICTS WITH OTHER

TRADES WITH MECHANICAL AND ELECTRICAL ENGINEERS.

C. COORDINATE THE PLACEMENT OF ALL PENDENT, SURFACE OR SEMI-FLUSH FIXTURES AND

DEVICES WITH THE FIRE PROTECTION CONTRACTOR TO MAINTAIN NFPA 13 REQUIRED

SEPARATION BETWEEN SPRINKLER DEADS AND OBSTRUCTIONS.

D. CIRCUIT NUMBERS ARE DIAGRAMMATIC, EXACT NUMBERS SHALL BE DETERMINED IN THE

FIELD AND REFLECTED ON AS-BUILT DOCUMENTATION BY THE ELECTRICAL CONTRACTOR.

THE ASSOCIATED CIRCUIT NYMBER AND SWITCH LEG NOMENCLATURE THAT ARE APPLIED

TO EACH LIGHTING FIXTURE AND CONTROLLING DEVICE INFER INTERCONNECTING BRANCH

CIRCUITRY.

E. VOLTAGE DROP HAS BEEN CONSIDERED IN THE DESIGN OF ALL BRANCH CIRCUIT AND

FEEDER SIZES BASED UPON THE ILLUSTRATED EQUIPMENT LAYOUTS AND SHORTEST

CONDUCTOR/RACEWAY ROUTING. THE CONTRACTOR SHALL BE RESPONSIBLE FOR

DEVIATIONS TAKEN THAT WILL INCREASE CONDUCTOR/RACEWAY ROUTING LENGTHS.

BRANCH CIRCUIT LONGER THAN 75’ FOR 120-VOLT, AND 175’ FOR 277-VOLT FROM PANEL TO

LAST DEVICE SHALL BE INCREASED A MINIMUM OF ONE-SIZE ABOVE THAT SPECIFIED TO

LIMIT VOLTAGE DROP TO LESS THAN 3%.

F. PROVIDE CONSTANTLY ENERGIZED (UNSWITCHED) BRANCH CIRCUITRY TO ALL EXIT SIGNS

AND EGRESS LIGHTS FROM THE DESIGNATED SOURCE.

G. LIGHTING BRANCH CIRCUITRY SHALL BE INSTALLED IN CONDUIT FROM THE PANELBOARD

TO ALL FIXTURES AND DEVICES. LIGHTING BRANCH CIRCUITRY MAY BE IN TYPE MC CABLE

ONLY WHERE CONCEALED ABOVE SUSPENDED CEILINGS AND ONLY FOR THE LAST 6-FOOT

WHIP.

ELECTRICAL LIGHTING NOTES

A. REFER TO THIS SHEET FOR LEGEND, ABBREVIATIONS, AND GENERAL NOTES.

B. CIRCUIT NUMBERS ARE DIAGRAMMATIC, EXACT NUMBERS SHALL BE DETERMINED IN

THE FIELD AND REFLECTED ON AS-BUILT DOCUMENTATION BY THE ELECTRICAL

CONTRACTOR. THE ASSOCIATED CIRCUIT NYMBER AND SWITCH LEG NOMENCLATURE

THAT ARE APPLIED TO EACH DEVICE AND PIECE OF EQUIPMENT INFER

INTERCONNECTING BRANCH CIRCUITRY. INTERCONNECTING BRANCH CIRCUIT WIRING

SHALL BE SIZES EQUAL TO THE HOMERUN UNLESS NOTED OTHERWISE.

C. VOLTAGE DROP HAS BEEN CONSIDERED IN THE DESIGN OF ALL BRANCH CIRCUITRY AND

FEEDER SIZES BASED UPON THE ILLUSTRATED EQUIPMENT LAYOUTS AND SHORTEST

CONDUCTOR/RACEWAY ROUTING. THE ELECTRICAL CONTRACTOR SHALL BE

RESPONSIBLE FOR DEVIATIONS TAKEN THAT WILL INCREASE CONDUCTOR/RACEWAY

ROUTING LENGTHS. BRANCH CIRCUITS LONGER THAN 75’ FOR 120-VOLT, AND 175’ FOR

277-VOLT FROM PANEL TO LAST OUTLET SHALL BE INCREASED A MINIMUM OF ONE-SIZE

ABOVE THAT SPECIFIED TO LIMIT VOLTAGE DROP TO LESS THAN 3%.

D. POWER BRANCH CIRCUITRY SHALL BE INSTALLED IN CONDUIT FROM THE PANEL TO THE

LAST DEVICE, MC CABLE IS PROHIBITED.

E. SWITCHGEAR, SWITCHBOARDS, PANELBOARDS, AND DISCONNECT SWITCHES SHALL BE

FIELD MARKED TO WARN QUALIFIED PERSONS OF POTENITAL ELECTRIC ARC FLASH

HAZARDS. THE MARKING SHALL BE LOCATED SO AS TO BE CLEARLY VISIBLE TO

QUALIFIED PERSONS BEFORE EXAMINATION, ADJUSTMENT, SERVICING, OR

MAINTENANCE OF THE EQUIPMENT.

F. ALL EXPOSED BRANCH CIRCUITRY ON THE ROOF SHALL BE INSTALLED IN RIGID METAL

CONDUIT WITH FLEXIBLE CONNECTIONS TO ALL MECHANICAL EQUIPMENT UTILIZING

LIQUID TIGHT FLEXIBLE METAL CONDUIT NOT TO EXCEED 18”. ALL PENETRATIONS OF

WEATHER TIGHT BOXES SHALL UTILIZE WEATHERPROOF HUBS. ALL CONDUIT

SUPPORTS SHALL BE HOT DIPPED GALVANIZED. ALL FASTENERS, MISCELLANEOUS

SUPPORTS (UNITSTRUT OR EQUAL) AND HARDWARE UTILIZED FOR THE ELECTRICAL

INSTALLATION SHALL BE STAINLESS STEEL.

G. EVERY PENETRATION (INCLUDING BUT NOT LIMITED TO DUCTS, PIPES, CONDUITS,

SLEECES, AND BOXES) THROUGH EXTERIOR WALLS AND SOFFITS MUST BE SEALED TO

THE AIR BARRIER/WATER RESISTIVE BARRIER REQUIRED.

ELECTRICAL POWER NOTES

1. REFER TO THE MECHANICAL DRAWINGS FOR THE EXTENT OF THE DEMOLITION SCOPE OF

WORK AND AREA. THE DEMOLITION PLANS INDICATE THE GENERAL INTENT AND ARE NOT

INTENDED TO SHOW ALL ITEMS TO BE REMOVED OR RETAINED. THE ELECTRICAL SCOPE

MAY EXTEND BEYOND THE AREA DEFINED BY THE MECHANICAL DEMOLITION LIMITS TO

FULLY COMPLY WITH VARIOUS REQUIREMENTS OF THE CONTRACT DOCUMENTS.

2. THE ELECTRICAL DEMOLITION PLANS ARE NOT INTENDED TO SHOW ALL ITEMS TO BE

REMOVED OR RETAINED. DISCONNECT AND MAKE SAFE DEVICES AND EQUIPMENT LOCATED

ON WALLS AND/OR CEILINGS TO BE REMOVED. NOTIFY THE OWNER'S REPRESENTATIVE

IMMEDIATELY OF ANY UNANTICIPATED HIDDEN CONDITIONS ENCOUNTERED DURING THE

DEMOLITION.

3. PERFORM ELECTRICAL DEMOLITION WORK AS SHOWN ON THE DRAWINGS AND AS

SPECIFIED IN COOPERATION WITH THE OTHER TRADES AND AS SCHEDULED AND

APPROVED BY THE OWNER'S REPRESENTATIVE. DISCONNECT AND MAKE SAFE ALL

ELECTRICAL EQUIPMENT IDENTIFIED FOR REMOVAL ON THE ELECTRICAL, HVAC, PLUMBING,

CIVIL, AND FIRE PROTECTION PLANS. CONTRACTOR SHALL PERFORM A THOROUGH PRE-

CONSTRUCTION SURVEY PRIOR TO COMMENCMENT OF DEMOLITION WORK AND NOTIFY

THE OWNER/ENGINEER OF ANY HIDDEN CONDITIONS NOT ILLUSTRATED ON THE DRAWINGS.

4. THE LOCATIONS OF EXISTING EQUIPMENT INCLUDING PIPING, DUCTWORK, EQUIPMENT,

CONDUITS, ETC ARE SHOWN IN AN APPROXIMATE WAY ONLY. VISIT THE SITE PRIOR TO

SUBMISSION OF THE BIDS AND COMMENCEMENT OF WORK TO BECOME FAMILIAR WITH THE

ACTUAL CONDITIONS AND EXTENT OF THE WORK.

5. POWER OUTAGES CAUSED BY DEMOLITION THAT AFFECT OTHER AREAS SHALL BE HELD TO

A MINIMUM. SHUTDOWNS SHALL BE COORDINATED WITH USERS AND THE OWNER. NIGHT,

WEEKEND, AND/OR HOLIDAY TIME REQUIRED TO PERFORM ELECTRICAL DEMOLITION WORK

OR NEW ELECTRICAL WORK SHALL BE CARRIED AS PART OF THE CONTRACT COST.

6. CIRCUIT TRACE AND LABEL ALL EXISTING BRANCH CIRCUITS AND FEEDERS WITHIN THE

AREA OF DEMOLITION SCOPE PRIOR TO DE-ENERGIZING AND DISCONNECTION. ALL

CIRCUITS WITHIN PANELBOARDS IDENTIFIED FOR REMOVAL SHALL BE TRACED AND

LABELED TO ENSURE THAT NO AREA OUTSIDE THE DEMOLITION SCOPE LIMIT IS AFFECTED.

THERE SHALL BE NO INTERRUPTION OF SERVICES OUTSIDE THE DEMOLITION AREA

WITHOUT APPROVAL FROM THE OWNER'S REPRESENTATIVE.

7. DE-ENERGIZE AND REMOVE ALL CONDUCTORS AND RACEWAYS TO THEIR POINTS OF

ORIGIN WITHIN THE AREA OF DEMOLITION SCOPE. ITEMS IDENTIFIED FOR DEMOLITION

SHALL NOT BE ABANDONED IN PLACE. RACEWAYS THAT ENTER MASONRY WALLS AND

FLOORS SHALL BE CUT FLUSH AT THE SURFACE FOR PATCHING BY OTHERS. ALL CIRCUIT

BREAKERS ASSOCIATED WITH THE DEMOLITION SCOPE SHALL BE DE-ENERGIZED AND

LABELED SPARE.

8. PROMPTLY REPAIR ANY DAMAGE CAUSED DURING/BY THE EXECUTION OF WORK. DAMAGE

INCLUDES BUT IS NOT LIMITED TO DESTRUCTION OF ITEMS INTENDED TO REMAIN OR TO BE

SALVAGED.

9. EXERCISE CARE WITH EQUIPMENT THAT IS TO BE RELOCATED OR TURNED OVER TO THE

OWNER. EXAMINE THE EQUIPMENT BEFORE REMOVAL IN THE PRESENCE OF THE OWNER'S

REPRESENTATIVE TO DETERMINE ITS CONDITION. DELIVER OWNER-RETAINED EQUIPMENT

TO AN ON-SITE LOCATION DESIGNATED BY THE OWNER AND OBTAIN ACKNOWLEDGMENT OF

RECEIPT IN ORIGINAL CONDITION.

10. ALL ITEMS REMOVED SHALL BE OFFERED TO THE OWNER FOR SALVAGE. IF THE OWNER

DOES NOT TAKE POSSESSION, DISPOSE OF THE ITEMS IN A SAFE AND LEGAL MANNER. ALL

ITEMS CLASSIFIED AS HAZARDOUS SHALL BE DISPOSED AS HAZARDOUS WASTES AND A

UNIFORM HAZARDOUS WASTE MANIFEST SHALL BE PROVIDED TO THE OWNER.

11. ENSURE THE SAFE PASSAGE OF PERSONS IN AND AROUND THE BUILDING DURING

DEMOLITION. PREVENT INJURY TO PERSONS AND DAMAGE TO PROPERTY. PROVIDE

ADEQUATE SHORING AND BRACING TO PREVENT COLLAPSE. IMMEDIATELY REPAIR

DAMAGED PROPERTY TO THE CONDITION BEFORE BEING DAMAGED. TAKE EFFECTIVE

MEASURES TO PREVENT WINDBLOWN DUST.

12. ALL DEMOLITION SCOPE ASSOCIATED WITH LOW VOLTAGE SYSTEMS INCLUDING BUT NOT

LIMITED TO TELEPHONE, DATA, SECURITY, PAGING, CCTV, ETC. SHALL BE INCLUDED IN THIS

CONTRACT.

13. THE EXISTING FIRE ALARM SYSTEM SHALL REMAIN FULLY FUNCTIONAL DURING THE ENTIRE

DEMOLITION AND CONSTRUCTION PERIOD. REUSE OF EXISTING FIRE ALARM SYSTEM

RACEWAYS SHALL NOT BE ALLOWED. ALL REQUIRED SYSTEM SHUTDOWNS SHALL BE

COORDINATED WITH AND APPROVED BY THE OWNER'S REPRESENTATIVE AND THE

AUTHORITY HAVING JURISDICTION. DEMOLITION OF THE EXISTING SYSTEM SHALL NOT

COMMENCE UNTIL THE NEW SYSTEM HAS BEEN COMPLETELY INSTALLED, TESTED AND

APPROVED BY THE AUTHORITY HAVING JURISDICTION.

14. CREATE AND SUBMIT IMPAIRMENT PLANS TO THE OWNER AND AHJ IF ANY PORTION OF THE

EXISTING FIRE ALARM SYSTEM IS TAKEN OUT OF SERVICE DURING THE EXECUTION OF THE

PROJECT.

15. REMOVED FLUORESCENT AND HID LAMPS AND BATTERIES SHALL BE RECYCLED BY A

FACILITY APPROVED BY THE OWNER'S REPRESENTATIVE.

16. ALL BALLASTS IN LIGHTING FIXTURES TO BE DISPOSED SHALL BE VERIFIED TO BE PCB FREE.

ALL BALLASTS MANUFACTURED PRIOR TO 1979 AND NOT LABELED AS PCB FREE SHALL BE

CONSIDERED TO CONTAIN PCBS. PROVIDE WRITTEN VERIFICATION TO THE OWNER'S

REPRESENTATIVE THAT CONFIRMS PCB FREE WASTE. WHERE PCB FREE WASTE CANNOT

BE VERIFIED, BALLASTS SHALL BE RECYCLED BY A FACILITY APPROVED BY THE OWNER'S

REPRESENTATIVE, WITH PCB COMPONENTS ELIMINATED BY A HIGH TEMPERATURE

INCINERATION.

17. TYPICAL FOR BOILER PLANT AND CHILLER PLANT: PROVIDE LUMP SUM AND ALLOW FOR THE

REMOVAL OF 400LF OF INACTIVE BRANCH CIRCUIT WIRING/CONDUIT AND RELATED

SUPPORTS BACK TO SOURCE. RELATED CIRCUIT BREAKERS SHALL BE TURNED TO OFF

POSITION AND LABELED AS 'SPARE'. ALL PENETRATIONS SHALL BE SEALED TO MATCH

EXISTING ADJACENT CONDITIONS. SCOPE OF WORK SHALL BE IDENTIFIED BY CIRCUIT

TRACING AND DOCUMENTED IN AN RFI OR BY THE VAMC COR.

ELECTRICAL DEMOLITION NOTES

A. ALL WORK WITHIN DESIGNATED AREA SHALL BE IN ACCORDANCE WITH ARTICLE 500 AND

501 OF NEC. CARRY IN BID ALL COSTS ASSOCIATED FOR A COMPLETE INSTALLATION TO

MEET/EXCEED ALL OF THOSE REQUIREMENTS.

B. ALL CONDUITS WITHIN THESE DESIGNATED AREAS SHALL BE RIGID GALVANIZED STEEL.

C. ALL POWER CONDUCTORS SHALL BE TWHN INSULATION, RATED FOR EXPLOSION-PROOF

AREAS.

D. PROVIDE CONDUIT SEALS AT ALL CLASSIFIED BOUNDARIES, ENCLOSURES AND

EQUIPMENT IN ACCORDANCE WITH NEC ARTICLE 501.

EXPLOSION PROOF INSTALLATION NOTES

LD LOW VOLTAGE DIMMER SWITCHa

FIRE ALARM

FIRE ALARM SMOKE DETECTOR, PHOTO ELECTRIC UNLESS NOTED

OTHERWISE

FIRE ALARM ANNUNCIATOR

FIRE ALARM BELL

ANN

B

S

FIRE ALARM COMBINED STROBE AND HORN DEVICE,

NUMERAL INDICATES CANDELA VALUE

"WG" INDICATES WIRE GUARD

FIRE ALARM MANUAL PULL STATION

"SC" INDICATES STOPPER COVER

F SC

15cd

WGF

B

HOT WATER HEATERHWH

EXPLOSION PROOFXP

ANNUNCIATORANN

XRW

DISCONNECT SWITCH, FUSED

"XXAF" INDICATES FUSE RATING "XXAS" INDICATES SWITCH SIZE

XXAS

XXAT

XXAF

XXAT CIRCUIT BREAKER, FIXED

"XXAF" INDICATES FRAME SIZE "XXAT" INDICATES TRIP

XXAF

XXAT CIRCUIT BREAKER, DRAW OUT

"XXAF" INDICATES FRAME SIZE "XXAT" INDICATES TRIP

XXAF

XXAT PRIMARY DRAWOUT CIRCUIT BREAKER

"XXAF" INDICATES FRAME SIZE "XXAT" INDICATES TRIP

LIGHTNING ARRESTOR

GROUND CONNECTION

KIRK KEY INTERLOCKK

SURGE PROTECTIVE DEVICE

TELEPHONE OUTLET

SEE TELECOMMUNICATIONS NOTE A

TELECOMMUNICATIONS LEGEND

DATA OUTLET

SEE TELECOMMUNICATIONS NOTE A

COMBINATION TELEPHONE/DATA OUTLET

SEE TELECOMMUNICATIONS NOTE A

TV OUTLET, WALL MOUNTED TV

TELECOMMUNICATIONS NOTES

A. PROVIDE 4" SQUARE WORK BOX AND 1" EMPTY CONDUIT WITH PULLWIRE TO IT RACK.

SPD

CCTV

CCTV CAMERA

SEE TELECOMMUNICATIONS NOTE A

COMBINATION FUSED DISCONNECT MAGNETIC MOTOR

STARTER.

REFER TO MAGNETIC MOTOR STARTER AND VFD SCHEDULE

FOR TYPE, SIZE AND ENCLOSURE

60AS

50AF

MOTOR STARTER

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

248 Copeland Street Quincy, MA 02169 P: 617-481-6390 F: 617-687-5990

200 Brickstone Square Andover, MA 01810 P: 978-296-6227 F: 978-475-5768

100% CONSTRUCTION

DOCUMENTS

REPLACE MAIN BOILERS 528A8-17-805

Samuel S. Stratton VA Medical Center, 113 Holland Ave., Albany, New York 12208

06/05/2024

105 Central Street Stoneham, MA 02180 P: 781-275-6050

C U s e rs \k e v in

.i n g

\D o c u m e n ts

\Y

A lb a n y B o ile r_ E

K e v in

.I n g

V

U B

V

P E

U Z

.r v t

/4

/2

:4

:2

P M

E-000

ELECTRICAL - LEGEND & ABBREVIATIONS

DJC MVM

ELECTRICAL DRAWING LIST

SHEET

NUMBER SHEET NAME

E-000 ELECTRICAL - LEGEND & ABBREVIATIONS

ESP-101 ELECTRICAL - PHASE 1 - SITE PLAN - CHILLER PLANT AND BOILER PLANT SERVICE UPGRADE -

NEW WORK

ESP-102 ELECTRICAL - PHASE 1 - SITE PLAN - TEMPORARY BOILERS

ESP-103 ELECTRICAL - PHASE 1 - SITE DETAILS

ESP-104 ELECTRICAL - PHASE 1 - TEMPORARY BOILER CONTROL ROOM

ELD-201 ELECTRICAL - PHASE 2 - SUB-BASEMENT LIGHTING DEMOLITION PLAN

ELD-202 ELECTRICAL - PHASE 2 - BASEMENT LIGHTING DEMOLITION PLAN

ELD-301 ELECTRICAL - PHASE 3 - SUB-BASEMENT LIGHTING DEMOLITION PLAN

ELD-302 ELECTRICAL - PHASE 3 - BASEMENT LIGHTING DEMOLITION PLAN

EPD-100 ELECTRICAL - BOILER PLANT CONTROL ROOM DEMOLITION

EPD-101 ELECTRICAL - BOILER PLANT - PHASE 1 - SUB-BASEMENT DEMOLITION

EPD-102 ELECTRICAL - PHASE 1 - BASEMENT POWER DEMOLITION PLAN

EPD-201 ELECTRICAL - PHASE 2 - SUB-BASEMENT POWER DEMOLITION PLAN

EPD-202 ELECTRICAL - PHASE 2 - BASEMENT POWER DEMOLITION PLAN

EPD-301 ELECTRICAL - PHASE 3 - SUB-BASEMENT POWER DEMOLITION PLAN

EPD-302 ELECTRICAL - PHASE 3 - BASEMENT POWER DEMOLITION PLAN

EPD-303 ELECTRICAL - PHASE 3 - ROOF POWER DEMOLITION PLAN

EPD-511 ELECTRICAL - PHASE 1 - BOILER PLANT ONE-LINE DIAGRAM - DEMOLITION

EPD-512 ELECTRICAL - PHASE 1 - CHILLER PLANT ONE-LINE DIAGRAM - DEMOLITION

EPD-520 ELECTRICAL - PHASE 2 - BOILER PLANT ONE-LINE DIAGRAM - DEMOLITION

EPD-530 ELECTRICAL - PHASE 3 - BOILER PLANT ONE-LINE DIAGRAM - DEMOLITION

EPD-531 ELECTRICAL - PHASE 3 - BOILER PLANT ONE-LINE DIAGRAM -TEMPORARY BOILERS

DEMOLITION

EPSD-101 ELECTRICAL PHASE 1 - SITE PLAN - CHILLER PLANT AND BOILER PLANT SERVICE UPGRADE -

NEW WORK

EL-201 ELECTRICAL - PHASE 2 - SUB-BASEMENT LIGHTING NEW WORK PLAN

EL-202 ELECTRICAL - PHASE 2 - BASEMENT LIGHTING NEW WORK PLAN

EL-301 ELECTRICAL - PHASE 3 - SUB-BASEMENT LIGHTING NEW WORK PLAN

EL-302 ELECTRICAL - PHASE 3 - BASEMENT LIGHTING NEW WORK PLAN

EP-100 ELECTRICAL - BOILER PLANT CONTROL ROOM NEW WORK

EP-101 ELECTRICAL - PHASE 1 - SUB-BASEMENT NEW WORK PLAN

EP-102 ELECTRICAL - PHASE 1 - BASEMENT NEW WORK PLANS

EP-103 ELECTRICAL - PHASE 1 - OVERALL SUB-BASEMENT POWER NEW WORK PLAN

EP-201 ELECTRICAL - PHASE 2 - SUB-BASEMENT POWER NEW WORK PLAN

EP-202 ELECTRICAL - PHASE 2 - BASEMENT POWER NEW WORK PLAN

EP-301 ELECTRICAL - PHASE 3 - SUB-BASEMENT POWER NEW WORK PLAN

EP-302 ELECTRICAL - PHASE 3 - BASEMENT POWER NEW WORK PLAN

EP-303 ELECTRICAL - PHASE 3 - ROOF POWER NEW WORK PLAN

EP-510 ELECTRICAL - PHASE 1 - BOILER PLANT ONE-LINE DIAGRAM - TEMPORARY BOILERS

EP-511 ELECTRICAL - PHASE 1 - BOILER PLANT ONE-LINE DIAGRAM - NEW WORK

EP-512 ELECTRICAL - PHASE 1 - CHILLER PLANT ONE-LINE DIAGRAM - TEMPORARY POWER

EP-513 ELECTRICAL - PHASE 1 - CHILLER PLANT ONE-LINE DIAGRAM - NEW WORK

EP-521 ELECTRICAL - PHASE 2 - BOILER PLANT ONE-LINE DIAGRAM - NEW WORK

EP-531 ELECTRICAL - PHASE 3 - CHILLER PLANT ONE-LINE DIAGRAM - NEW WORK

EP-532 BOILER PLANT - PHASE 3 - ONE-LINE DIAGRAM - NEW WORK

E-301 ELECTRICAL - DETAILS

E-302 ELECTRICAL - DETAILS

E-401 ELECTRICAL - SCHEDULES

E-402 ELECTRICAL - PANEL SCHEDULES

E-403 ELECTRICAL - PANEL SCHEDULES

Sheet Count: 48

Revisions: Date: 06/04/2024

PB PB

EM

J

BP-P2A-20

EM

PB PB J

BP-P2A-15

PB

EH

J

EM

EM

T4 ATS

BUILDING 5

BUILDING 4

BOILER PLANT

CHILLER AND ELEC.

EQUIPMENT

BUILDING 3

UTILITIES

BUILDING 54

CHILLER PLANT

GAZEBO

MYRTLE AVE

N52° 10' 05"W 457.55

THE CHARLES HEALY

MEMORIAL ELECTRIC

GENERATION FACILITY

CONCRETE SIDEWALK

CONCRETE SIDEWALK

CONCRETE SIDEWALK

J

"YIELDTO PED"

40'20'0 1" = 20' - 0"

EXISTING EMERGENCY DISTRIBUTION

ENCLOSURE (BLDG #14A).

NOTES:

1. FOR SYMBOLS AND NOTES, SEE DRAWING E-000.

2. REFER TO CIVIL DRAWINGS FOR EXACT LOCATION OF

MANHOLES AND DUCTBANK ROUTING.

3. REFER TO DRAWING ESP-103 FOR RELATED DETAILS.

4. PROVIDE TESTING OF EXISTING FEEDERS R538 AND R639

PRIOR TO COMMENCEMENT OF WORK. REFER TO

SPECIFICATION 260513-3.7 FOR TESTING CRITERIA.

APPROXIMATE LOCATION OF EXISTING

SUBSTATION TRANSFORMER VAULT

ROOM U-11

XM

XM

XM

XM

EXISTING ELECTRIC

MANHOLE EMH-3

EXISTING ELECTRIC

MANHOLE EMH-1

XM

XM

EXISTING CAMPUS

13.2kV MV SWITCHGEAR

R

R

UE

UE

TO NEW

DOUBLE-ENDED

SWITCHGEAR

'52-SWGR'

WP WP

EXISTING

1000kW GENERATOR G1

EXISTING

1000kW GENERATOR G2

EXISTING

1000kW GENERATOR G3

NEW ELECTRIC MANHOLE

'EMH-1A'

WP

UE

2#10+#10G-1"C

UE

T -R

T -R

T-R235T-R134

(TYPICAL)

NEW ELECTRIC

MANHOLE EMH-2A

WP

WP

2#10+#10G-1"C

WP

U E

U E

U E

(TYP OF 2)

(TYP OF 2)

TO NEW

'BP-SWGR'

P S

P S

T T

L B

WP

EXISTING GENERATOR

PARALLEL SWITCHGEAR

EXISTING PANEL ' 14A-IL--LS'

EXISTING 'ATS-14A-LS'

XMXM

XMXM

XM

XM

XM

XM

XM

U E

TO NEW DISTRIBUTION BOARD

'DP-14A-HCC'.

SEE DRAWING EP-103 FOR

CONTINUATION

ESP-103

A

ES

P-

C

ESP-103

ESP-103

A

B

UE

NEW LOADBANK

WP

TO NEW STANDBY

GENERATOR

U E

ES

P-

E

PS-639

PS-538

PS-134

PS-235

UE

UE

UE UE UE UE

ESP-103

A

EXISTING UTILITY CO

PAD-MOUNTED TRANSFORMER

EXISTING UTILITY CO

PRIMARY SWITCH.

EXISTING UTILITY CO

PRIMARY SWITCH.

EXISTING UTILITY CO.

PAD-MOUNTED TRANSFORMER.XMXM

XM XMT T

PS PS

EXISTING POWER CONDITIONER

XM

ES

P-

D

PB PB

EM

J

BP-P2A-20

EM

PB PB J

BP-P2A-15

PB

EH

J

EM

EM

T4 ATS

BUILDING 5

BUILDING 4

BOILER PLANT

CHILLER AND ELEC.

EQUIPMENT

BUILDING 3

UTILITIES

BUILDING 54

CHILLER PLANT

GAZEBO

MYRTLE AVE

N52° 10' 05"W 457.55

THE CHARLES HEALY

MEMORIAL ELECTRIC

GENERATION FACILITY

CONCRETE SIDEWALK

CONCRETE SIDEWALK

CONCRETE SIDEWALK

J

"YIELDTO PED"

40'20'0 1" = 20' - 0"

EXISTING EMERGENCY DISTRIBUTION

ENCLOSURE (BLDG #14A).

NOTES:

1. FOR SYMBOLS AND NOTES, SEE DRAWING E-000.

2. REFER TO CIVIL DRAWINGS FOR EXACT LOCATION OF

MANHOLES AND DUCTBANK ROUTING.

3. REFER TO DRAWING ESP-103 FOR RELATED DETAILS.

4. PROVIDE TESTING OF EXISTING FEEDERS R538 AND R639

PRIOR TO COMMENCEMENT OF WORK. REFER TO

SPECIFICATION 260513-3.7 FOR TESTING CRITERIA.

APPROXIMATE LOCATION OF EXISTING

SUBSTATION TRANSFORMER VAULT

ROOM U-11

XM

XM

XM

XM

EXISTING ELECTRIC

MANHOLE EMH-3

EXISTING ELECTRIC

MANHOLE EMH-1

XM

XM

EXISTING CAMPUS

13.2kV MV SWITCHGEAR

R

R

UE

UE

TO NEW

DOUBLE-ENDED

SWITCHGEAR

'52-SWGR'

WP WP

EXISTING

1000kW GENERATOR G1

EXISTING

1000kW GENERATOR G2

EXISTING

1000kW GENERATOR G3

NEW ELECTRIC MANHOLE

'EMH-1A'

WP

UE

2#10+#10G-1"C

UE

T -R

T -R

T-R235T-R134

(TYPICAL)

NEW ELECTRIC

MANHOLE EMH-2A

WP

WP

2#10+#10G-1"C

WP

U E

U E

U E

(TYP OF 2)

(TYP OF 2)

TO NEW

'BP-SWGR'

P S

P S

T T

L B

WP

EXISTING GENERATOR

PARALLEL SWITCHGEAR

EXISTING PANEL ' 14A-IL--LS'

EXISTING 'ATS-14A-LS'

XMXM

XMXM

XM

XM

XM

XM

XM

U E

TO NEW DISTRIBUTION BOARD

'DP-14A-HCC'.

SEE DRAWING EP-103 FOR

CONTINUATION

ESP-103

A

ES

P-

C

ESP-103

ESP-103

A

B

UE

NEW LOADBANK

WP

TO NEW STANDBY

GENERATOR

U E

ES

P-

E

PS-639

PS-538

PS-134

PS-235

UE

UE

UE UE UE UE

ESP-103

A

EXISTING UTILITY CO

PAD-MOUNTED TRANSFORMER

EXISTING UTILITY CO

PRIMARY SWITCH.

EXISTING UTILITY CO

PRIMARY SWITCH.

EXISTING UTILITY CO.

PAD-MOUNTED TRANSFORMER.XMXM

XM XMT T

PS PS

EXISTING POWER CONDITIONER

XM

ES

P-

D

NOT USED

CONTRACTOR SHALL FIELD DETERMINE SCOPE OF WORK REQUIRED TO ENABLE BOTTOM ENTRY OF NEW FEEDER INTO EXISTING MV SWITCHGEAR WITHOUT IMPACTING STRUCTURAL INTEGRITY OF EXISTING EQUIPMENT OR RELATED HOUSKEEPING PAD. SUBMIT DETAILED NARRATIVE OUTLINING INTENDED SCOPE OF WORK AND ANY ASSOCIATED SHUTDOWNS (DURATION AND AFFECTED LOADS) AS PART OF BID SUBMISSION. ALL COSTS REQUIRED TO ENABLE INSTALLATION OF FEEDERS SHALL BE CARRIED AS

PART OF BID INCLUDING EVALUATION BY STRUCTURAL ENGINEER, TEMPORARY POWER, ETC.

FOR TRANSFORMER HEATER. PROVIDE 2#10+#10G-1"C.

MINIMUM WEATHERPROOF PULLBOX DIMENSIONS SHALL BE 48"X36"X36" . PROVIDE PULLBOX

CALCULATIONS BASED ON ACTUAL CONDUIT CONFIGURATION.

MINIMUM WEATHERPROOF PULLBOX DIMENSIONS SHALL BE 36"X36"X24". PROVIDE PULLBOX

CALCULATIONS BASED ON ACTUAL CONDUIT CONFIGURATION

PROVIDE WEATHERPROOF PULLBOX MOUNTED ON RETAINING WALL AND TRANSITION TO RIGID

GALVANIZED STEEL CONDUIT (RGS) RUN ALONG WALL WITHIN AREAWAY TO PENETRATE EXTERIOR WALL AT SUB-BASEMENT CEILING. PROVIDE CONDUIT SEAL (LINK SEAL) AT WALL PENETRATION TO PROHIBIT WATER INFILTRATION. STUB OUT SPARE CONDUITS AT SUB-BASEMENT LEVEL AND CAP FOR FUTURE

USE.

SPARE CONDUIT SHALL BE STUBBED UP AND CAPPED AT 6' AFF WITHIN BUILDING #14A.

NOTES:

1 REFER TO SPECIFICATIONS AND DETAILS FOR ADDITIONAL INFORMATION.

KEYNOTES

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

248 Copeland Street Quincy, MA 02169 P: 617-481-6390 F: 617-687-5990

200 Brickstone Square Andover, MA 01810 P: 978-296-6227 F: 978-475-5768

100% CONSTRUCTION

DOCUMENTS

REPLACE MAIN BOILERS 528A8-17-805

Samuel S. Stratton VA Medical Center, 113 Holland Ave., Albany, New York 12208

06/05/2024

N

105 Central Street Stoneham, MA 02180 P: 781-275-6050

C U s e rs \k e v in

.i n g

\D o c u m e n ts

\Y

A lb a n y B o ile r_ E

K e v in

.I n g

V

U B

V

P E

U Z

.r v t

/4

/2

:4

:0

P M

ESP-101

ELECTRICAL - PHASE 1 - SITE PLAN - CHILLER

PLANT AND BOILER PLANT SERVICE UPGRADE -

NEW WORK

DJC MVM

1" = 20'-0"

MV ELECTRICAL UPGRADE SITE PLAN - PHASE 1 - BASE BID

BUILDING 5

BUILDING 4

BOILER PLANT

CHILLER AND ELEC.

EQUIPMENT

BUILDING 3

UTILITIES

BUILDING 54

CHILLER PLANT

GAZEBO

A /C

A /C

CONCRETE SIDEWALK

CONCRETE SIDEWALK

N52° 10' 05"W 457.55

THE CHARLES HEALY

MEMORIAL ELECTRIC

GENERATION FACILITY

MYRTLE AVE

APPROX. 6" GAS LINE

2"

UG

GAS

V C P

SAN MH E1

RIM: ??INV (A): ??

INV (B): 166.2

INV (C): ??

EXISTING CITY OF ALBANY 96"

(A)

(B)

4" P

VC

D

RA

IN

L

IN

E

(C)

HVAC

TUNNEL

ACCESS

SHED

ABANDONED HVAC PIPING

J

J

H H E

H H E

"YIELDTO PED"

J

S

S

ST

ST

ST

ST

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

VALVE 30(CAPPED)

VALVE 28

HYDRANT 10

VALVE 29

HYDRANT 09

APPROX. LOCATION OF 30" CITY WATER MAIN

EL

EL

EL

8B

XX

EL

EL

EL

1?

D Y

H

D Y H

BUILDING 5

BUILDING 4

BOILER PLANT

CHILLER AND ELEC.

EQUIPMENT

BUILDING 3

UTILITIES

BUILDING 54

CHILLER PLANT

A /C

A /C

CONCRETE SIDEWALK

CONCRETE SIDEWALK

N52° 10' 05"W 457.55

THE CHARLES HEALY

MEMORIAL ELECTRIC

GENERATION FACILITY

MYRTLE AVE

V C P

SAN MH E1

RIM: ??INV (A): ??

INV (B): 166.2

INV (C): ??

(A)

(B)

4" P

VC

D

RA

IN

L

IN

E

(C)

HVAC

TUNNEL

ACCESS

SHED

ABANDONED HVAC PIPING

J

J

H H E

H H E

J

S

S

ST

ST

ST

ST

ST

SAN

SAN

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

VALVE 30(CAPPED)

VALVE 28

HYDRANT 10

VALVE 29

HYDRANT 09

EL

EL

EL

8B

XX

EL

EL

EL

1?

D Y

H

D Y H

TEMPORARY BOILER TRAILER #2

TEMPORARY BOILER TRAILER #1

TEMPORARY BOILER

CONTROL ROOM

APPROXIMATE LOCATION

OF BOILER PLANT

ESP-104

HEAT TRACED PIPING,

SEE DETAIL E311 ON DRAWING E-301 AND

DRAWING PP-202 FOR ADDITIONAL INFORMATION HT

HT

H T

(1) - 2"C (TRAILER PANEL CD-ELP2)

4#250kCMIL+#4G-3"C (TEMP BOILER #1) 4#250kCMIL+#4G-3"C (TEMP BOILER #2)

(2) - 3"C SPARE (TEMP BOILERS)

(2) - 2"C (CONTROL WIRING)

(1) - 2"C (TELECOM)

(1) - 2"C (TV COAX)

(1) - 2"C (FIRE ALARM)

(1) - 2"C (TEMP GENERATOR ANNUNCIATOR CONTROL WIRING)

ALL CONDUIT SHALL BE RUN ON PIPE RACK WITHIN

TEMPORARY PIPING OUTDOOR ENCLOSURE. REFER

TO DRAWINGS C-200 AND C-201 FOR ADDITIONAL INFORMATION.

J

J

FOR HEAT

TRACE

CP-ELP2-22,24

20A/1P-GF

WP

WP

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

248 Copeland Street Quincy, MA 02169 P: 617-481-6390 F: 617-687-5990

200 Brickstone Square Andover, MA 01810 P: 978-296-6227 F: 978-475-5768

100% CONSTRUCTION

DOCUMENTS

REPLACE MAIN BOILERS 528A8-17-805

Samuel S. Stratton VA Medical Center, 113 Holland Ave., Albany, New York 12208

06/05/2024

N

105 Central Street Stoneham, MA 02180 P: 781-275-6050

C U s e rs \k e v in

.i n g

\D o c u m e n ts

\Y

A lb a n y B o ile r_ E

K e v in

.I n g

V

U B

V

P E

U Z

.r v t

/4

/2

:4

:0

P M

ESP-102

ELECTRICAL - PHASE 1 - SITE PLAN -

TEMPORARY BOILERS

DJC MVM

1" = 20'-0"

ELECTRICAL SITE PLAN

PHASE 3 DEMOLITION NOTES:

1. UPON PROJECT COMPLETION (END OF PHASE 3) ELECTRICAL CONTRACTOR SHALL DISCONNECT ALL THREE TRAILERS AND MAKE THEM ELECTRICALLY SAFE FOR TRANSPORT INCLUDING BUT NOT LIMITED TO THE

FOLLOWING SCOPE;

a. DISCONNECTION OF THE SINGLE-POINT POWER FEED TO EACH TRAILER AND REMOVAL OF

CONDUCTORS BACK TO SOURCE.

b. DISCONNECT AND CUT BACK STUB-UP CONDUIT DOWN TO FLUSH WITH GRADE BELOW AND CAP.

c. DISCONNECT AND FORWARD TO OWNER ALL EXTERIOR ELECTRICAL DEVICES AND EQUIPMENT.

PROVIDE PROPER BLANK COVERPLATES AND SEALS PER TRAILER MANUFACTURER REQUIREMENTS.

d. DISCONNECT AND REMOVE FIRE ALARM NOTIFICATION AND INITIATING DEVICES, REPROGRAM FIRE

ALARM CONTROL PANEL AS REQUIRED.

NOTES:

1. FOR SYMBOLS AND NOTES, SEE DRAWING E-000.

2. REFER TO CIVIL DRAWINGS FOR EXACT LOCATION OF

MANHOLES AND DUCTBANK ROUTING.

3. REFER TO DRAWING ESP-104 FOR RELATED DETAILS

NOTES:

1. FRAME AND COVER SHALL BE CAST IRON BY BOSTON FOUNDRY OR EQUAL BY LEBARON OR NEENAH. COVER

SHALL BE CAST WITH 1 1/2" HIGH LETTERS IDENTIFYING THE SERVICE (PRIMARY, SECONDARY ELECTRIC OR

TELEPHONE).

2. DESIGN LOAD SHALL ACCOMMODATE UP TO AASHTO HS20-44.

3. CONCRETE ENCASED DUCT SHALL BE TIED INTO THE HANDHOLE WALL TO MINIMIZE DIFFERENTIAL

SETTLEMENT. REFER TO SPECIFICATION FOR ADDITIONAL INFORMATION.

SECTION

12"

MIN MIN

12"

6" MIN

BASE

E506TYPICAL PRECAST HANDHOLE DETAIL

CONDUIT DUCT BANK

PLAN VIEW

OPENING IN SLAB

FOR MANHOLE

COVER AND FRAME

4'-6"

5'-10"

8" 8"

CONDUIT DUCT BANK

CRUSHED STONE

BELL ENDS

(TYPICAL)

M

IN

3"-0" 9"9"1

GROUT

FINISH GRADE

30" DIAMETER

MANHOLE FRAME

AND COVER

BRICK CHIMNEY WITH

FULL BREAKING UNDER

FRAME. HEIGHT VARIES

TO SUIT FIELD

CONDITIONS

A A

A A

1'-0"

2'-0"

6"

12"

(TYP)

6'-6"

2"

(TYP)

2"

1'-6"

2"

(TYP)

3" 4"

8" 2'-2"

1'-5"

1'-2"

½"

(TYP)

6"

4"

4" 6"

1'-5" 7'-2"

5'-0"

3"

1'-2"

3'-4"

6" 4"

6"

10" 12"

6"

12"12"

12'-0"

2"

(TYP)

2"

1'-6"

2"

(TYP)

3" 4"

8" 2'-2"

4'-0"3'-0"

1'-2"

0.5"

(TYP)

4"

4"

4" 6"

3'-0"

6'-5"

10'-0"

2'-0"

1'-0"

3"

TAG DESCRIPTION CONDUIT CONDUCTORS

EP1 CHLLER PLANT PRIMARY ELECTRIC - 15kV 4" 3#3/0-EPR(15kV SHIELED-TYPE MV105 +#2-600V G

EP2 BOILER PLANT PRIMARY ELECTRIC - 15kV 4" 3#3/0-EPR(15kV SHIELED-TYPE MV105 +#2-600V G

ES1

CHILLER PLANT SECONDARY ELECTRIC -

480Y/277V 4" 4#500kCMIL

ES2

BOILER PLANT - SECONDARY ELECTRIC -

480Y/277V

4" 4#600KCMIL

E1 TRANSFORMER HEATER 1" 2#10+#10G

E3 DISTRIBUTION BOARD 'DP-14-HCC' 4" SEE ONE-LINE DIAGRAM, DWG EP-510

E4 EXISTING PANEL 'DP-14-LS-2' 2" SEE ONE-LINE DIAGRAM, DWG EP-510

E5 LOAD BANK 2 1_

" SEE ONE-LINE DIAGRAM, DWG EP-532

C1 GENERATOR START 1" SEE ONE-LINE DIAGRAM, DWG EP-510

SP1 SPARE 4" NOTE 6

SP2 SPARE 2" NOTE 6

NOTES:

1. REFER TO DUCT BANK SECTIONS FOR CORRESPONDING CONDUIT AND CONDUCTOR.

2. REFER TO THE TYPICAL DUCTBANK SECTION FOR DETAILS REQUIRED IN THE CONSTRUCTION OF THE

DUCTBANK ENVELOPE.

3. REFER TO THE SPECIFICATIONS FOR ADDITIONAL INFORMATION INCLUDING BUT NOT LIMITED TO DUCT BANK

REINFORCEMENT REQUIRED UNDER PAVED AREAS INTENDED FOR VEHICULAR TRAFFIC AND AT

MANHOLE/BUILDING INTERFACES.

4. ALL CONDUCTORS INSTALLED IN DUCT SHALL BE SUITABLE FOR WET LOCATIONS.

5. ALL SERVICE ENTRANCE AND GENERATOR OUTPUT CONDUCTORS INSTALLED IN DUCT SHALL BE TYPE USE.

6. PROVIDE ALL EMPTY/SPARE CONDUIT WITH NYLON PULL STRING.

DUCT BANK CONDUIT SCHEDULE

SECTION "B-B"SECTION "A-A"

PLAN VIEW

SECTION "A-A"

PLAN VIEW

SECTION "A-A"

SECTION "C-C" SECTION "D-D" SECTION "E-E"

ES1 ES1

ES1 ES1

SP1 SP1

ES1 ES1 SP1

SP1

SP1 ES1

ES1

ES1

ES2 SP1

ES2 SP1 ES2

ES2

SP1

SP1

ES1

ES1

ES1

SP1

SP1

SP1

SP1 SP1

EP2 EP2 EP1 EP1

ES1 ES1 SP1 ES1 ES1 SP1

ES2

E3 E3

E3 E3 SP1

E4

SP2

SP1

E5 SP1

E1

ES2 E1 C1

E5

N.T.S.

E504ELECTRICAL DUCT SECTIONS

N.T.S.

NOTES:

1. REFER TO TYPICAL ELECTRICAL DUCT DETAIL THIS SHEET FOR GENERAL CONSTRUCTION REQUIREMENTS.

2. REFER TO THE DUCT BANK CONDUIT SCHEDULE THIS SHEET FOR CONDUIT AND CONDUCTOR REQUIREMENTS

ASSOCIATED WITH CONDUIT TAG.

INTERMEDIATE TYPE

PLASTIC SPACER

BASE TYPE

PLASTIC SPACER

WARNING TAPE ENTIRE LENGTH OF DUCT WORK

CONCRETE

ENCASEMENT

FINISHED GRADE

"M

IN

M

IN

3"MIN

M A

X

3"MIN

PVC SCHEDULE 40

CONDUIT UNLESS

NOTED OTHERWISE

IN THE SCHEDULE

(4) #6 TOP

(1) #6 EACH FACE

(4) #6 BOTTOM

LAP 2"-1" AT SPLICE

REBAR NOTE:

(QUANTITY INCREASES

PROPORTIONAL TO

CONDUIT QUANTITY)

E502TYPICAL ELECTRICAL DUCT DETAIL

L A

P T

Y P

IC

A

L

#4 18" O.C. IN PAIRS

2" CLEAR CONC. COVER

(TYPICAL)

#6 REBAR

(TYPICAL)

TYPICAL DUCT SECTION

REBAR DETAIL

NOTES:

1. THIS DETAIL IS INTENDED TO ILLUSTRATE CONSTRUCTION OF TYPICAL DUCT BANK. REFER TO REFERENCED

SECTION FOR QUANTITY AND SIZE OF CONDUIT REQUIRED. DUCT CONSTRUCTION SHALL BE MODIFIED TO

ACCOMMODATE REQUIREMENTS ILLUSTRATED IN THE ACTUAL SECTION, UTILIZING THE CRITERIA ESTABLISHED IN

THIS DETAIL AND AS WRITTEN IN THE SPECIFICATIONS.

2. REBAR SHALL BE USED FOR ALL DUCT BANKS INSTALLED UNDER TRAVELED WAYS, ROADWAYS, AND TRANSITIONS

INTO MANHOLES/HANDHOLES AND FOUNDATIONS. REFER TO SPECIFICATIONS FOR ADDITIONAL DETAILS.

3. WARNING TAPE SHALL BE DETECTABLE TYPE FOIL BACKED 4 MIL POLYETHYLENE WITH FADE RESISTANT "BURIED

ELECTRIC LINE BELOW" A MINIMUM OF 12 INCHES ABOVE THE BURIED SERVICE. TAPE SHALL BE EQUAL TO T & B

NAF-0705

TYPICAL MIN

DUCT SPACING

GROUND LINE

2/0 BARE COPPER WIRE

CONNECTING CONDUIT

BONDING BUSHINGS

(TYPICAL)

3/4" CHAMFER

ALL AROUND

GALVANIZED STEEL

SCHEDULE 40 CONDUIT 36"

RADIUS QUARTER BENDS

WITH GROUNDING

BUSHINGS (TYPICAL)

SEE NOTE 6

#4 (1/2"DIA) REBAR

12" O.C. (EACH

WAY) EXCEPT IN

CONDUIT SPACE

(TYP)

1" - 1-1/2" DIA

CRUSHED STONE

WELL TAMPED

NOTES:

1. REFER TO EXACT INSTALLATION REQUIREMENTS OF THE CABINET MANUFACTURER FOR

MODIFICATIONS THAT MAY BE REQUIRED TO THIS PAD LAYOUT. ACCOMMODATE ALL NECESSARY

HARDWARE FOR FASTENING CABINET TO PAD.

2. ALL GROUND GRID CONNECTIONS SHALL BE EXOTHERMIC WELD.

3. CAP ALL CONDUIT ENDS TO PREVENT MOISTURE AND DEBRIS FROM ENTERING CONDUITS

PRIOR TO CABINET INSTALLATION.

4. CONDUIT ENTRY LOCATION IS DIAGRAMMATIC ONLY. PROVIDE DETAILED, DIMENSIONED

DRAWING FOR REVIEW BY THE ENGINEER BASED ON EXACT EQUIPMENT LAYOUT.

5. REFER TO CIVIL DRAWINGS FOR ADDITIONAL REQUIREMENTS.

6. QUARTER BENDS SHALL BE UTILIZED TO TRANSITION FROM PVC SCHEDULE 40 TO GALVANIZED

STEEL. ALL QUARTER BENDS (PRIMARY AND SECONDARY) SHALL BE GALVANIZED STEEL

SCHEDULE 40 WITH GROUNDING BUSHINGS. CAP ALL CONDUIT ENDS TO PREVENT MOISTURE AND

DEBRIS FROM ENTERING CONDUITS PRIOR TO EQUIPMENT INSTALLATION.

TOP OF GROUND ROD

SHALL BE 12"(MIN) BELOW

FINISHED GRADE (BFG).

#4/0 BARE COPPER

WIRE CONNECTING

GROUND RODS 1'-0"

BFG (TYPICAL)

EXOTHERMIC

WELD (TYPICAL)

3000 PSI 28 DAY

CLASS-A CONCRETE

FRONT

3/4"DIA.x 10' COPPER CLAD

GROUND ROD (TYPICAL)

4" DIA. CONDUIT

(TYPICAL)

E510EQUIPMENT PAD DETAIL - 15kV PRIMARY SWITCHES

TYPICAL

SECONDARY SERVICE

4" DIA. CONDUIT

PRIMARY SERVICE

5"DIA CONDUIT

GRADE

E509

NOTES:

1. REFER TO EXACT CIVIL DRAWINGS FOR MODIFICATIONS THAT MAY BE REQUIRED TO THIS PAD

LAYOUT.

2. ALL GROUND GRID CONNECTIONS SHALL BE EXOTHERMIC WELD.

3. DO NOT ALLOW PRIMARY AND SECONDARY CONDUITS TO CROSS EACH OTHER INSIDE OR OUTSIDE

THE PAD. LOCATE SECONDARY CONDUITS AS FAR TO THE RIGHT AS POSSIBLE IN THE PAD OPENING.

4. QUARTER BENDS SHALL BE UTILIZED TO TRANSITION FROM PVC SCHEDULE 40 TO GALVANIZED

STEEL. ALL QUARTER BENDS (PRIMARY AND SECONDARY) SHALL BE GALVANIZED STEEL SCHEDULE 40

WITH GROUNDING BUSHINGS. CAP ALL CONDUIT ENDS TO PREVENT MOISTURE AND DEBRIS FROM

ENTERING CONDUITS PRIOR TO TRANSFORMER INSTALLATION.

5. PRIMARY DUCT GROUND SHALL BE CONNECTED TO PAD GROUND GRID.

6. CONDUIT ENTRY LOCATION IS DIAGRAMMATIC ONLY. PROVIDE DETAILED, DIMENSIONED DRAWINGS

FOR REVIEW BY THE ENGINEER BASED ON EXACT EQUIPMENT LAYOUT.

TOP OF GROUND

ROD SHALL BE

12"(MIN) BELOW

FINISHED GRADE

(BFG).

(TYPICAL)

1" - 1 1/2" DIA

CRUSHED STONE

(WELL TAMPED)

#4/0 BARE

COPPER WIRE

CONNECTING

GROUND RODS

3/4" CHAMFER

ALL AROUND

GALVANIZED STEEL

SCHEDULE 40 CONDUIT

QUARTER BENDS WITH

CONDUIT BUSHINGS AND

GROUND CLAMPS (TYPICAL

SEE NOTE 4)

#4 (1/2"DIA) REBAR 12"

O.C. (EACH WAY)

EXCEPT IN CONDUIT

SPACE (TYP)

#4/0 BARE

COPPER WIRE

CONNECTING

GROUND RODS

1'-0" BFG (TYPICAL)

3000 PSI

28 DAY

CLASS-A

CONCRETE

3/4"DIA.x 10'

COPPER CLAD

GROUND ROD

(TYPICAL)

2/0 BARE COPPER

WIRE CONNECTING

GROUND RODS

(TYPICAL)

EXOTHERMIC WELD (TYPICAL)

TRANSFORMER PAD DETAIL THREE PHASE 750 THRU 2500 KVA

CONCRETE CAP (PAINTED)

6"DIAMETER GALV. STEEL

PIPE SCHEDULE 40

FILLED W/CONCRETE

1'-2"

4'-0"

FINISH GRADE

3'-0"

6'-9"

3"

1'-6"DIAMETER CONCRETE FOOTING

PRIME & PAINT BOLLARD YELLOW (TYP.)

E512PROTECTION BOLLARD DETAIL

#2/0 BARE COPPER GROUND TO

TRANSFORMER GROUNDING GRID

%%130

E507

CONDUIT DUCT BANK

36" OPENING IN SLAB

FOR MANHOLE

COVER AND FRAME

10'-0"

11'-0"

6" 6"

6'-0"

6"

NOTES:

1. FRAME AND COVER SHALL BE CAST IRON BY BOSTON FOUNDRY OR EQUAL BY LEBARON OR NEENAH. COVER

SHALL BE CAST WITH 1 1/2" HIGH LETTERS IDENTIFYING THE SERVICE (PRIMARY, SECONDARY ELECTRIC OR

TELEPHONE).

2. DESIGN LOAD SHALL ACCOMMODATE UP TO AASH TO HS20-44.

3. CONCRETE ENCASED DUCT SHALL BE TIED INTO THE HANDHOLE WALL WITH REBAR TO MINIMIZE

DIFFERENTIAL SETTLEMENT. REFER TO SPECIFICATION FOR ADDITIONAL INFORMATION.

4. REFER TO SPECIFICATION FOR PULLING IRONS AND CABLE RACK REQUIREMENTS.

5. BOND ALL METAL COMPONENTS WITHIN MANHOLE INCLUDING COVER FRAME TO 2/0 GROUND LOOP WITH #6

BARE COPPER CONDUCTOR.

ELECTRIC

SECTION

PULLING IRONS

CABLE RACKS

5'-0"

7'-0"

7"

8'-2"

7"

6"

3/4"x10'0" COPPER CLAD

GROUND ROD NO

GREATER THAN 2"

ABOVE FLOOR

(TYPICAL FOR 2)

G

G G

G

G

GROUND

COVER

FRAME

EXOTHERMIC

WELD (TYPICAL)

#2/0 BARE COPPER

42"

42"

MIN

12"

BASE

CRUSHED STONE

12"

MIN

PLAN VIEW

12" DIA X 4" DEEP

SUMP (TYPICAL OF 2)

MIN

6"

CONDUIT DUCTBANK

(REFER TO DUCT SECTION FOR

ACTUAL CONDUIT REQUIREMENTS)

TYPICAL PRECAST ELECTRIC MANHOLE

DETAIL

N.T.S. N.T.S. N.T.S.

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

248 Copeland Street Quincy, MA 02169 P: 617-481-6390 F: 617-687-5990

200 Brickstone Square Andover, MA 01810 P: 978-296-6227 F: 978-475-5768

100% CONSTRUCTION

DOCUMENTS

REPLACE MAIN BOILERS 528A8-17-805

Samuel S. Stratton VA Medical Center, 113 Holland Ave., Albany, New York 12208

06/05/2024

105 Central Street Stoneham, MA 02180 P: 781-275-6050

C U s e rs \k e v in

.i n g

\D o c u m e n ts

\Y

A lb a n y B o ile r_ E

K e v in

.I n g

V

U B

V

P E

U Z

.r v t

/4

/2

:4

:1

P M

ESP-103

ELECTRICAL - PHASE 1 - SITE DETAILS

DJC MVMRevisions: Date: 06/04/2024

C C

T V

TV

S

S 15cd L

15cd F

F

F

FATC

OS

S

OS

TC

GFI,C

J

CD-ELP2-7

VIA TIMECLOCK

WP,GFI

CP-ELP2-6

CP-ELP2-5

CP-ELP2-3

CP-ELP2-8

WP,GFI

J

CP-ELP2-2,4

P B

CP-ELP2-11

J

CP-ELP2-10,12

J

CP-ELP2-14,16

J

J

J

J

CP-ELP2-18,20

CP-ELP2-26

CP-ELP2-1

CP-ELP2-9

b c b b

S b

S

9,b

F

,a

F9 7,a

9,b

9,c

F9 7,a

9,b

N

18"

H

D

D

N

PANEL "CP-ELP2"

G

F

E O

B C

Q

N

A

L

L

L

I

72"

P

K a

R

10,12

14,16

18,20

18,20

TEMPORARY CONTROL ROOM TRAILER,

REFER TO DRAWINGS MS-200 AND

MI-405 FOR ADDITIONAL INFORMATION

10,12

10,12

S

S

S

S

S

M

J

N

K N

T

U

EWH-1

EWH-2

S

V

A C

A C

Level 1 0' - 0"

Level 2 10' - 0"

Level 1 0' - 0"

Level 2 10' - 0"

CP-ELP2-26

FATC

FATC

S FS

15cd F

15cd F

NEW FIRE

ALARM

TERMINAL

CABINET

WITH POWER

BOOSTER

EXISTING

FIRE

ALARM

CONTROL

PANEL

FIBEROPTIC CABLE

IN 2"C. SEE NOTE 7

XM

LOCATED AT THE BOILER

PLANT BASEMENT LEVEL -

ROOM U22. SEE DRAWING

EP-102 FOR LOCATION.

SEE NOTE 6

LOCATED IN TEMP

BOILER CONTROL

ROOM

NOTES:

1. 1THIS DRAWING IS INTENDED TO ILLUSTRATE MAJOR EQUIPMENT AND THE INTENDED INTERCONNECTIONS. REFER TO THE FLOOR PLANS FOR EXACT LOCATIONS AND QUANTITIES OF DEVICES. REFER TO THE

MANUFACTURER'S WIRING DIAGRAMS FOR INTERCONNECTION REQUIREMENTS. INTERCONNECTION DETAILS SHALL BE INCLUDED IN THE SHOP DRAWINGS WITH COMPONENT CUT SHEETS FOR REVIEW AND

APPROVAL.

2. ALL FINAL CONNECTIONS INTO THE EXISTING FIRE ALARM SYSTEM SHALL BE PERFORMED BY THE OWNER'S FIRE ALARM MAINTENANCE CONTRACTOR. THE ELECTRICAL CONTRACTOR SHALL CARRY ALL

ASSOCIATED COSTS FOR FINAL CONNECTION AND ASSOCIATED TESTING.

3. ALL NEW FIRE ALARM DEVICES SHALL MATCH EXISTING MANUFACTURER AND BE CROSSED LISTED FOR CONNECTION TO THE EXISTING SYSTEM.

4. EXISTING SMOKE DETECTORS, PULL STATIONS, AUDIO/VISUAL DEVICES, HEAT DETECTORS, ETC. WITHIN THE BUILDING SHALL BE MAINTAINED, UNLESS OTHERWISE NOTED. DEVICES IDENTIFIED FOR REMOVAL

SHALL BE RETAINED UNTIL NEW SYSTEM OPERATIONAL AND APPROVED. PROVIDE CONTROL MODULES, WIRING, PROGRAMMING OF SYSTEM AS REQUIRED TO MAINTAIN SYSTEM OPERATION OF EXISTING

DEVICES. REPROGRAM SYSTEM AND MODIFY EXISTING ANNUNCIATOR(S) TO ACCOMMODATE THE NEW DEVICES AND FUNCTIONS.

5. FIRE ALARM SYSTEM MODIFICATION SHALL BE IN CONFORMANCE WITH NFPA 72, 2022 EDITION AND THE VA FIRE PROTECTION DESIGN MANUAL 9TH EDITION, NOVEMBER 2023.

6. PROVIDE UL LISTED LOCKING DEVICE FOR POWER SOURCE CIRCUIT BREAKER AND LABEL AS "FIRE ALARM CONTROL CIRCUIT" IN THE PANELBOARD DIRECTORY. REFER TO FLOOR PLAN FOR CIRCUIT

DESIGNATION.

7. CONFIRM EXACT CABLING REQUIREMENTS WITH FIRE ALARM MANUFACTURER PRIOR TO COMMENCEMENT OF WORK.

E801TEMPORARY BOILER CONTROL ROOM - FIRE ALARM RISER DIAGRAM

7F9

CP-ELP2-7

VIA TIMECLOCK

7F9,a ,a

B A

C K

O F

T R

A

IL

E R

F R

O N

T O

F T

R A

IL

E

R

F R

O N

T O

F T

R A

IL

E

R B

A C

K O

F T

R A

IL

E

R

TEMPORARY BOILER FEEDER FROM PANEL

CP-EDP2 VIA TEMPORARY PIPING ENCLOSURE

AND UNDER THE TRAILERS. REFER TO

DRAWING EP-501 FOR CIRCUIT INFORMATION

TEMPORARY BOILER TRAILER,

REFER TO DRAWINGS C-101 AND

MI-305 FOR ADDITIONAL

INFORMATION.

STUB-UP VIA LB CONDUIT BODY TO 400-AMP

FRAME/225-AMP FUSED, 480-V HEAVY DUTY

DISCONNECT SWITCH IN TYPE 3R ENCLOSURE.

COORDINATE EXACT REQUIREMENTS WITH

TRAILER MANUFACTURER.

SEE SITE PLAN, DRAWING ESP-102

FOR CONTINUATION

4#250kCMIL +#4G-3"C

(1)-3"C SPARE

4#2+#8G-2"C (PANEL CP-ELP2)

(2)-2"C (LV COMMUNICATIONS)

(1)-2"C (TELECOM)

(1)-2"C (FIRE ALARM)

(1)-2"C (TEMP GENERATOR

ANNUNCIATOR CONTROL WIRING)

A B

BA

A/C

ANN ANN

BB

A/C

ANN ANN ANN

BB

DD

AA AA

SS

DD

LL LL LL

SS

F

PP

HH

FA PULL STATION

FA HORN/STROBE

KK KK

MM

JJ

S b

BB

SS

BB

F

RR GG FF EE

QQ

OO

BB CC

PP

TIMECLOCK

PUSH

BUTTON

PANEL "CP-ELP2"

TO NEXT FIRE ALARM

DEVICE

FA PULL STATION

12"x12"x6"

SURFACE MOUNTED

BOX WITH PIANO-

HINGE COVER

12"x12"x6"

SURFACE MOUNTED

BOX WITH PIANO-

HINGE COVER

SS

TT UU

Sb

FIBEROPTIC TO

CAT6 CONVERTER

TYPICAL DATA OUTLET MOUNTED IN DUAL-CHANNEL WIREMOLD.

SEE KEY NOTE M.

TO EXISTING IT RACK

LOCATED IN ROOM U-22A.

SEE DRAWING EP-102

FOR LOCATION.

CAT6

FIBEROPTIC CABLE IN 2"C

CONFIRM EXACT REQUIREMENTS

WITH VAMC IT DEPARTMENT.

CP-ELP2-13

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

248 Copeland Street Quincy, MA 02169 P: 617-481-6390 F: 617-687-5990

200 Brickstone Square Andover, MA 01810 P: 978-296-6227 F: 978-475-5768

100% CONSTRUCTION

DOCUMENTS

REPLACE MAIN BOILERS 528A8-17-805

Samuel S. Stratton VA Medical Center, 113 Holland Ave., Albany, New York 12208

06/05/2024

105 Central Street Stoneham, MA 02180 P: 781-275-6050

C U s e rs \k e v in

.i n g

\D o c u m e n ts

\Y

A lb a n y B o ile r_ E

K e v in

.I n g

V

U B

V

P E

U Z

.r v t

/4

/2

:4

:1

P M

ESP-104

ELECTRICAL - PHASE 1 - TEMPORARY BOILER

CONTROL ROOM

DJC MVM

1/4" = 1'-0"

TEMPORARY BOILER TRAILERS PART PLAN

GENERAL NOTES:

1. COORDINATE LOCATION OF ALL WIRING AND FIRE ALARM

DEVICES WITH TEMPORARY CONTROL ROOM MANUFACTURER PRIOR TO ORDERING.

2. ALL DEVICES WHERE POSSIBLE SHALL BE FLUSH-RECESS MOUNTED; ALL BACKBOXES AND CONCEALED RACEWAY SHALL BE FACTORY-PROVIDED

BY THE MANUFACTURER. ELECTRICAL CONTRACTOR SHALL PROVIDE ALL WIRING,

DEVICES, AND COVERPLATES IN THE FIELD.

KEY NOTES:

A. TEMPORARY BOILER ANNUNCIATOR PANELS (TYP. 2) PROVIDED BY TEMPORARY BOILER CONTRACTOR, INSTALLED BY CONTROLS CONTRACTOR.

ELECTRICAL CONTRACTOR TO PROVIDE BRANCH CIRCUIT AS SHOWN.

B. BMS ETHERNET CONNECTION FROM NETWORK SWITCH, PROVIDED BY CONTROLS CONTRACTOR. ELECTRICAL CONTRACTOR TO PROVIDE

RACEWAY.

C. VA NETWORK ETHERNET CONNECTION PROVIDED BY CONTROLS CONTRACTOR. ELECTRICAL CONTRACTOR TO PROVIDE RACEWAY.

D. A/C (TYP. 2) UNIT PROVIDED BY TEMPORARY BOILER CONTRACTOR, WIRED BY ELECTRICAL CONTRACTOR. SIMPLEX RECEPTACLE SHOWN, COORDINATE EXACT ELECTRICAL CONNECTION REQUIREMENTS WITH TEMPORARY BOILER CONTRACTOR AND PROVIDE AS REQUIRED.

E. BULK OIL STORAGE AND TANK ALARM HORN PROVIDED BY CONTROLS CONTRACTOR. ELECTRICAL CONTRACTOR TO PROVIDE RACEWAY.

F. LOW AIR PRESSURE ALARM HORN PROVIDED BY CONTROLS CONTRACTOR. ELECTRICAL CONTRACTOR TO PROVIDE RACEWAY.

G. MAIN GAS VALVE ALARM HORN PROVIDED BY CONTROLS CONTRACTOR. ELECTRICAL CONTRACTOR TO PROVIDE RACEWAY.

H. VAC-1/2 ALARM HORN PROVIDED BY CONTROLS CONTRACTOR. ELECTRICAL CONTRACTOR TO PROVIDE RACEWAY.

I. WORK STATION FOR BOILER ROOM OPERATOR.

J. CHEMICAL WORK STATION, PROVIDED BY MECHANICAL CONTRACTOR.

K. POINT OF USE WATER HEATER, FURNISHED AND INSTALLED BY PLUMBING CONTRACTOR, WIRED BY E.C.

L. ELECTRICAL CONTRACTOR SHALL PROVIDE NEW PARALLEL GENERATOR ANNUNCIATORS (TYPICAL OF 3) TO MATCH EXISTING. PROVIDE 2"C AND

INTERCEPT/EXTEND EXISTING CONTROL WIRING FROM EXISTING ANNUNCIATORS LOCATED IN CONTROL ROOM TO NEW ANNUNCIATORS IN

TEMPORARY BOILER CONTROL ROOM.

M. DUAL-CHANNEL STEEL WIREMOLD (LEGRAND-WIREMOLD 4000 SERIES OR APPROVED EQUAL). WITH DUPLEX GFI RECEPTACLES A 18” INCREMENTS AND TELECOMMUNICATION PROVISION AT 24” INCREMENTS. PROVIDE BOTTOM OF CHANNEL 3” ABOVE TABLE TOP HEIGHT.

N. COORDINATE LIGHTING CONNECTION REQUIREMENTS WITH TEMPORARY BOILER CONTRACTOR.

O. FIRE ALARM CONDUIT, REFER TO ELEVATION B, ON THIS SHEET.

P. NOT USED.

Q. BOILER ROOM COMMUNICATION CONDUIT FOR LOW-VOLTAGE WIRING.

R. NEW EMERGENCY SHUT-OFF MAIN GAS VALVE. EXTEND EXISTING COMMUNICATION WIRING FROM BOILER PLANT CONTROL ROOM VIA LOW-

VOLTAGE CONDUIT (SEE KEY NOTE "O" ABOVE).

S. COORDINATE WITH MECHANICAL CONTRACTOR AND PROVIDE CONNECTION TO ELECTRIC BASEBOARD.

T. MEDICAL GAS MASTER ALARM PANEL. PROVIDE CONTROL WIRING TO INTERFACE EXISTING GAS METER ALARM PANEL LOCATED IN THE EXISTING

BOILER PLANT CONTROL ROOM. SEE DRAWING EP-101 FOR LOCATION.

U. MEDICAL OXYDEN ALARM PANEL. PROVIDE CONTROL WIRING TO INTERFACE EXISTING MEDICAL OXYGEN ALARM PANEL LOCATED IN THE EXISTING

BOILER PLANT CONTROL ROOM. SEE DRAWING EP-100 AND EP-101 FOR LOCATION.

V. PROVIDE 1" EMPTY CONDUIT WITH PULLWIRE TO BOILER PLANT CONTROL ROOM. CABLING AND RELATED TERMINATIONS SHALL BE PROIVDED BY

OTHERS.

1/4" = 1'-0" A

ELEVATION "A" - TEMPORARY CONTROL ROOM SOUTH WALL

1/4" = 1'-0" B

ELEVATION "B" - TEMPORARY CONTROL ROOM NORTH WALL

TELECOM PARTIAL RISER DIAGRAM

NTS

UP

EB EB

E B

E B

EB

E B

EB

EB

EB

S S S

S

S

MOTOR CONTROL CENTER (MCC-1)

WITH TRANSFER SWITCH

PANEL LP-1 INTEGRAL TO MCC

PANEL

LP-2

MOUNTED TO

BOILER.

MOUNTED TO UNDERSIDE

OF LANDING.

XM XM XM

XMXMXM

XM

XM

XM

XM

XM

XMXM

XM

XM

XM

XM

XM XM

XM

XM

XM XM

XM

XM

XM

XM

XM

XM

XM

XM

XM

XM XM

XM

XM XM XM

XMXM

XM

XM XM

XM XM

XM

XM XM XM

XMXMXM

XM XM

XM XM

XM

XM

X

XM

XM

STORAGE CAGE

XM

XM

XM

XM

XM

b,NR b,NR b,NR b,NR b,NR b,NR b,NR a,NR a,NR a,NR a,NR a,NR a,NR b,NR b,NR b,NR b,NR b,NR a,NR a,NR a,NR a,NR b,NR b,NR b,NR a,NR b,NR b,NR b,NR a,NR c,NR c,NR c,NR c,NR c,NR c,NR c,NR c,NR c,NR c,NRc,NRc,NR

XM

XM

XM

XM

EXISTING EXPLOSION PROOF LIGHTING FIXTURES

IN UNDERGROUND TANK VAULT TO BE REPLACED

IN EXISTING LOCATIONS, SEE DRAWING EL-201

FOR ADDITIONAL REQUIREMENTS.

DRAWING NOTES:

1. REFER TO DRAWING E-000 FOR LEGEND, ELECTRICAL DEMOLITION NOTES

AND ABBREVIATIONS.

XM

XM

UNDERGROUND TANK VAULT

LIGHTING SWITCHES

XM

XM

XM

a b c

UNDERGROUND TANK VAULT, ELECTRICALLY CLASSIFIED CLASS I, DIVISION 2 SPACE

COGEN

B-1 B-2 B-3

M C

C

ACCESS LADDER TO

EQUIPMENT MEZZANINE

ACCESS LADDER TO

EQUIPMENT MEZZANINE

VAULT CATWALK

HATCHWAY TO TANK VAULT

XM

XM

XM

XM

XM XM

XM

XM

XM

XM

XM

XM

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

248 Copeland Street Quincy, MA 02169 P: 617-481-6390 F: 617-687-5990

200 Brickstone Square Andover, MA 01810 P: 978-296-6227 F: 978-475-5768

100% CONSTRUCTION

DOCUMENTS

REPLACE MAIN BOILERS 528A8-17-805

Samuel S. Stratton VA Medical Center, 113 Holland Ave., Albany, New York 12208

06/05/2024

N

105 Central Street Stoneham, MA 02180 P: 781-275-6050

C U s e rs \k e v in

.i n g

\D o c u m e n ts

\Y

A lb a n y B o ile r_ E

K e v in

.I n g

V

U B

V

P E

U Z

.r v t

/4

/2

:4

:2

P M

ELD-201

ELECTRICAL - PHASE 2 - SUB-BASEMENT

LIGHTING DEMOLITION PLAN

DJC MVM

8' 16'4'0

1/8" = 1'-0"ELD-201

1 SUB-BASEMENT LIGHTING DEMOLITION PLAN - PHASE 2

DN

DN

DN

S

S

CHILLER PLANT

COGEN

ENCLSOURE

HIGH BAY FIXTURES AT

STRUCTURAL CEILING

XM XM XM

XM XM XM

XM XM XM

XM

XM

XM XM

XM

XM

XM

XM

XM

XM

XM

XM XM

COGEN

XM

VERTICAL-MOUNTED 4'

INDUSTRIAL STRIP

XM XM XM

DRAWING NOTES:

1. REFER TO DRAWING E-000 FOR LEGEND, ELECTRICAL DEMOLITION NOTES

AND ABBREVIATIONS.

2. NO SCOPE OF WORK ON THIS FLOOR IN PHASE 2; SHOWN FOR REFERENCE.

EXTERIOR WALL MOUNTED

ABOVE GRADE

(TYP. FOR 3)

XM

ACCESS LADDER TO

EQUIPMENT MEZZANINE

ACCESS LADDER TO

EQUIPMENT MEZZANINE

FOR EQUIPMENT

MEZZANINE LIGHTING

XM

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

248 Copeland Street Quincy, MA 02169 P: 617-481-6390 F: 617-687-5990

200 Brickstone Square Andover, MA 01810 P: 978-296-6227 F: 978-475-5768

100%…