This document is a Scope of Work for a federal contract opportunity to replace the main boilers at the Albany VA Medical Center. The project includes construction services to replace three 900 HP dual fuel-fired steam boilers that date to 1978. Two temporary 1,000 BHP steam boilers will be staged during construction, and a newer 400 HP boiler is anticipated to remain in service. The work will be completed in three phases, including replacing electrical equipment, installing the temporary boilers, and then removing and replacing the 900 HP boilers. The contractor will be required to use the Autodesk Build construction management platform and meet specific submittal and commissioning requirements. The contract has a period of performance of 730 calendar days from notice to proceed.
View the file
Other files for this federal contract opportunity
Show all 29
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
MOTOR & CONTROLS
ONE LINE SYMBOLS LEGEND
DISCONNECT SWITCH, UNFUSED
FUSE
POTENTIAL TRANSFORMER "2" INDICATES QUANTITY
CURRENT TRANSFORMER
"3" - INDICATES QUANTITY
"500:5A" - INDICATES PRIMARY TO SECONDARY TURNS RATIO
3 PHASE, 4 WIRE WYE SOLIDLY GROUNDED
PANELBOARD
R21A
HG4
SITE LEGEND
CABLE TO GROUND CONNECTION
3/4" x 10'-0" COPPER CLAD GROUND ROD
CABLE TO CABLE CONNECTION
CABLE TO STRUCTURAL STEEL CONNECTION
ELECTRIC MANHOLE
TELEPHONE MANHOLE
ELECTRIC HAND HOLE
TELEPHONE HAND HOLE
EM
TM
EH
TH
G GROUND CABLE
UE UNDERGROUND ELECTRIC
'UE-EX' DENOTES EXISTING UNDERGROUND ELECTRIC
UT UNDERGROUND TELEPHONE
UNDERGROUND SECTION, REFER TO SECTION DETAIL
"A" INDICATES DETAIL LETTER
"#" INDICATES DRAWING NUMBER
AUTOMATIC TRANSFER SWITCH
MOTOR WITH DISCONNECT
EQUIPMENT CONTROL PANEL
MOTOR, NUMERAL INDICATES HORSEPOWER
"2" - INDICATES HORSEPOWER RATING
DISCONNECT SWITCH RATED 30AMP, 3-POLE, IN NEMA TYPE
1 ENCLOSURE, UNLESS OTHERWISE NOTED
"3R" - INDICATES NEMA TYPE 3R ENCLOSURE
"2P" - INDICATES 2 POLE SINGLE PHASE DISCONNECT
"60AS" - INDICATES 60A SWITCH
VARIABLE SPEED DRIVE
MANUAL MOTOR STARTING SWITCH WITH THERMAL
OVERLOAD PROTECTION
FUSED DISCONNECT SWITCH, 3-POLE, IN NEMA TYPE 1
ENCLOSURE, UNLESS OTHERWISE NOTED.
"3R" - INDICATES NEMA TYPE 3R ENCLOSURE
"60AS" - INDICATES 60AMP SWITCH
"50AF" - INDICATES 50AMP FUSES
M
CP
VFD
ATS
WIRING DEVICES
JUNCTION BOX
PULL BOX
DUPLEX RECEPTACLE, GROUNDING TYPE, RATED 20A, 125V
"5"- INDICATES CIRCUIT NUMBER
"GFI"- INDICATES INTEGRAL GROUND FAULT CIRCUIT INTERRUPTER
"WP" - INDICATES WEATHERPROOF
"C" - INDICATES COUNTER HEIGHT
"XP" - INDICATES EXPLOSION PROOF - CLASS I, DIVISION 2
PB
J
GFI
POWER DISTRIBUTION
CUSTOMER METER
DRY TYPE TRANSFORMER
"T5" - INDICATES KVA RATING OF TRANSFORMER
REFER TO DRY TYPE K-RATED TRANSFORMER SCHEDULE
GROUND BAR
480Y/277 VOLT PANELBOARD, SURFACE MOUNTED
REFER TO SCHEDULE OF PANELBOARDS
208Y/120 VOLT PANELBOARD, SURFACE MOUNTED
REFER TO SCHEDULE OF PANELBOARDS
G
T5
M
EXISTING EQUIPMENT LEGEND
XM EXISTING EQUIPMENT TO REMAIN
X EXISTING EQUIPMENT TO BE REMOVED
XR EXISTING EQUIPMENT TO BE RELOCATED
XN NEW LOCATION OF EXISTING RELOCATED EQUIPMENT
NR EXISTING EQUIPMENT TO BE REMOVED AND NEW EQUIPMENT TO BE
INSTALLED ON EXISTING BRANCH/FEEDER
EXISTING EQUIPMENT FOR INFORMATION ONLY-
INDICATED BY SYMBOL WITH LIGHT AND OUT OF FUNCTION LINE
TYPE
EXISTING EQUIPMENT TO BE REWORKED-
INDICATED BY SYMBOL WITH DASHED AND IN FUNCTION LINE TYPE
EPO
LV
WP
a
THREE WAY SWITCH, RATED 20A, 120/277V
SWITCHES
SINGLE POLE SWITCH, RATED 20A, 120/277V
"a" LOWER CASE LETTER INDICATES FIXTURE SWITCH CONTROL
LOW VOLTAGE
PUSH BUTTON STATION. "EPO" INDICATES EMERGENCY POWER OFF
SINGLE POLE SWITCH, WEATHERPROOF
OCCUPANCY SENSOR, RECESS WALL MOUNTED
"01"-INDICATES SINGLE CIRCUIT OUTPUT.
"02"-INDICATES DUAL CIRCUIT OUTPUT.
a a a a
AMPEREA/AMP
ALTERNATION CURRENTAC
AMERICAN WITH DISABILITIES ACTADA
AMPERE FRAMEAF
ABOVE FINISHED FLOORAFF
ABOVE FINISHED GRADEAFG
AMPERE INTERRUPTING CAPACITYAIC
ALUMINUMAL
AMPERE INTERRUPTING CAPACITYAT
AUTOMATIC TRANSFER SWITCHATS
AMERICAN WIRE GAUGEAWG
BURIEDB
CONDUITC
CABLECA
CABLE TELEVISIONCATV
CLOSED CIRCUIT TELEVISION SYSTEMCCTV
CIRCUIT BREAKERCB
CIRCUITSCKT
CENTRAL PROCESSING UNITCPU
CENTERLINEC
DECIBELdB
DIRECT CURRENTDC
DRAWINGDWG
ELECTRICAL CONTRACTOREC
ELECTRIC METALLIC TUBINGEMT
FEEDERFDR
FLEXIBLE LIQUID TIGHT METALLIC TUBINGFLMT
FREQUENCYFREQ
GROUNDING ELECTRODE CONDUCTORGEC
GROUND FAULT INTERRUPTINGGFI
GROUNDGND
HANDHOLEHH
HORSEPOWERHP
HEATING, VENTILATING, AND AIR
CONDITIONING
HVAC
ABBREVIATIONS
KILOWATT HOURSKWH
LIGHTINGLTG
MAIN CIRCUIT BREAKERMCB
MASSACHUSETTS ELECTRICAL CODEMEC
MOTOR/GENERATOR SETM/G
MANHOLEMH
MAIN LUGS ONLYMLO
MOUNTEDMTD
MOUNTINGMTG
NORMALLY CLOSED CONTACTNC
NATIONAL ELECTRICAL CODENEC
NORMALLY OPEN CONTACTNO
NOT TO SCALENTS
NUMBER#
OVER CURRENT PROTECTION DEVICEOPD
PROVIDED UNDER OTHER SECTIONSPOS
POLYVINYL CHLORIDEPVC
POWERPWR
RIGID GALVANIZED STEELRGS
ROOT MEAN SQUARE VALUERMS
REVOLUTIONS PER MINUTERPM
SOLID NEUTRALSN
SWITCHBOARDSWBD
TERMINAL BLOCKTB
TELEPHONETEL
TERMINALTERMN
TWISTED SHIELDED-PAIRTSP
TRANSIENT VOLTAGE SURGE SUPPRESSERTVSS
TYPICALTYP
UNDERGROUNDUG
UNLESS OTHERWISE NOTEDUNO
UNINTERRUPTIBLE POWER SUPPLYUPS
UNSHIELDED TWISTED-PAIRUTP
VOLTSV
HERTZHZ
ISOLATED GROUNDIG
JUNCTION BOXJB
KILOVOLT-AMPEREKVA
KILOWATTKW
VOLT-AMPEREVA
VARIABLE SPEED DRIVEVSD
WATTSW
WEATHERPROOFWP
BRANCH CIRCUIT OR FEEDER CONCEALED IN FINISHED AREAS
BRANCH CIRCUIT OR FEEDER, CONCEALED IN OR UNDER FLOOR SLAB
BRANCH CIRCUIT OR FEEDER TURNING UP TOWARDS OBSERVER
BRANCH CIRCUIT OR FEEDER TURNING DOWN AWAY FROM OBSERVER
CONDUIT STUBBED ABOVE CEILING
R22A-1,3,5
BRANCH CIRCUIT HOME RUN TICKS INDICATE QUANTITY OF CONDUCTORS,
GROUND CONDUCTORS ARE NOT INDICATED. NO TICKS INDICATES 2#12 &
1#12G IN 3/4"C MINIMUM. R22A-1,3,5 INDICATES PANEL AND CIRCUIT
DESIGNATION FROM WHICH HOMERUN SHALL ORIGINATE. EACH CIRCUIT
SHALL BE 20A-1P (20AMP SINGLE POLE) UNLESS NOTED OTHERWISE.
H42B-1 100A-3P
FEEDER HOMERUN. REFER TO LEGEND OF FEEDER SIZES FOR
CONDUCTOR AND RACEWAY REQUIREMENTS DESIGNATED INSIDE TAG.
H42B-1 INDICATES PANEL AND CIRCUIT NUMBER DESIGNATION FROM
WHICH HOME RUN SHALL ORIGINATE, 100A-3P INDICATES 100 AMPERE, 3
POLE CIRCUIT BREAKER.
FLEXIBLE CONNECTION TO EQUIPMENT. RACEWAY AND CONDUCTOR
RATING TO MATCH ASSOCIATED BRANCH CIRCUIT OR FEEDER
BRANCH CIRCUIT AND FEEDER
FR1
2,a
AR1
2,a
LIGHTING FIXTURES
LIGHTING FIXTURE (SEE LIGHTING FIXTURE SCHEDULE)
"FR2" - INDICATES LIGHTING FIXTURE TYPE
"2" - INDICATES CIRCUIT NUMBER
"a" - INDICATES SWITCH CONTROL
"NL" - INDICATES NIGHT LIGHT (UNSWITCHED) CIRCUIT
RECESSED DIRECTIONALLY ORIENTED WALLWASH
TYPE LIGHTING FIXTURE.
LIGHTING FIXTURE WALL MOUNTED
EXIT SIGN LIGHTING FIXTURE, CEILING, PENDANT MOUNTED,
ARROWS, AND EXIT FACE (SHADED) AS INDICATED
EXIT SIGN LIGHTING FIXTURE, WALL MOUNTED, ARROWS
AND EXIT FACE AS (SHADED) AS INDICATED
EMERGENCY LIGHTING REMOTE LAMP HEADS, SINGLE OR DOUBLE
EMERGENCY LIGHTING BATTERY UNIT WITH DOUBLE LAMP HEADS
HW
EB
FR2
2,NL
A
30AS
60AS
60AF
MECHANICAL EQUIPMENT TAG , ALPHANUMERIC CORRESPONDS
TO EQUIPMENT ID. SEE MECHANICAL EQUIPMENT SCHEDULE FOR
ADDITIONAL INFORMATION.
TYPE
L
SURGE PROTECTIVE DEVICESPD
CONTACTOR IN NEMA 1 ENCLOSURE UNLESS OTHERWISE NOTED C
MOTOR CONTROL CENTER
MCC
ENCLOSED CIRCUIT BREAKER IN NEMA TYPE 1
ENCLOSURE, UNLESS OTHERWISE NOTED
CB
EXISTING EQUIPMENT TO BE REWORKED
GENERATORG
TRANSFORMER
AUTOMATIC TRANSFER SWITCHN
L
E
A. ALL RECESSED LIGHTING FIXTURES IN LAY-IN CEILINGS SHALL BE INSTALLED WITH A 6’LONG
FLEXIBLE METALLIC CONDUIT.
B. LIGHTING FIXTURE LOCATIONS AND ELEVATION SHALL ACCOMMODATE THREE LEVELS OF
LIGHTING THROUGHOUT THE BOILER PLANT. COORDINATE ANY CONFLICTS WITH OTHER
TRADES WITH MECHANICAL AND ELECTRICAL ENGINEERS.
C. COORDINATE THE PLACEMENT OF ALL PENDENT, SURFACE OR SEMI-FLUSH FIXTURES AND
DEVICES WITH THE FIRE PROTECTION CONTRACTOR TO MAINTAIN NFPA 13 REQUIRED
SEPARATION BETWEEN SPRINKLER DEADS AND OBSTRUCTIONS.
D. CIRCUIT NUMBERS ARE DIAGRAMMATIC, EXACT NUMBERS SHALL BE DETERMINED IN THE
FIELD AND REFLECTED ON AS-BUILT DOCUMENTATION BY THE ELECTRICAL CONTRACTOR.
THE ASSOCIATED CIRCUIT NYMBER AND SWITCH LEG NOMENCLATURE THAT ARE APPLIED
TO EACH LIGHTING FIXTURE AND CONTROLLING DEVICE INFER INTERCONNECTING BRANCH
CIRCUITRY.
E. VOLTAGE DROP HAS BEEN CONSIDERED IN THE DESIGN OF ALL BRANCH CIRCUIT AND
FEEDER SIZES BASED UPON THE ILLUSTRATED EQUIPMENT LAYOUTS AND SHORTEST
CONDUCTOR/RACEWAY ROUTING. THE CONTRACTOR SHALL BE RESPONSIBLE FOR
DEVIATIONS TAKEN THAT WILL INCREASE CONDUCTOR/RACEWAY ROUTING LENGTHS.
BRANCH CIRCUIT LONGER THAN 75’ FOR 120-VOLT, AND 175’ FOR 277-VOLT FROM PANEL TO
LAST DEVICE SHALL BE INCREASED A MINIMUM OF ONE-SIZE ABOVE THAT SPECIFIED TO
LIMIT VOLTAGE DROP TO LESS THAN 3%.
F. PROVIDE CONSTANTLY ENERGIZED (UNSWITCHED) BRANCH CIRCUITRY TO ALL EXIT SIGNS
AND EGRESS LIGHTS FROM THE DESIGNATED SOURCE.
G. LIGHTING BRANCH CIRCUITRY SHALL BE INSTALLED IN CONDUIT FROM THE PANELBOARD
TO ALL FIXTURES AND DEVICES. LIGHTING BRANCH CIRCUITRY MAY BE IN TYPE MC CABLE
ONLY WHERE CONCEALED ABOVE SUSPENDED CEILINGS AND ONLY FOR THE LAST 6-FOOT
WHIP.
ELECTRICAL LIGHTING NOTES
A. REFER TO THIS SHEET FOR LEGEND, ABBREVIATIONS, AND GENERAL NOTES.
B. CIRCUIT NUMBERS ARE DIAGRAMMATIC, EXACT NUMBERS SHALL BE DETERMINED IN
THE FIELD AND REFLECTED ON AS-BUILT DOCUMENTATION BY THE ELECTRICAL
CONTRACTOR. THE ASSOCIATED CIRCUIT NYMBER AND SWITCH LEG NOMENCLATURE
THAT ARE APPLIED TO EACH DEVICE AND PIECE OF EQUIPMENT INFER
INTERCONNECTING BRANCH CIRCUITRY. INTERCONNECTING BRANCH CIRCUIT WIRING
SHALL BE SIZES EQUAL TO THE HOMERUN UNLESS NOTED OTHERWISE.
C. VOLTAGE DROP HAS BEEN CONSIDERED IN THE DESIGN OF ALL BRANCH CIRCUITRY AND
FEEDER SIZES BASED UPON THE ILLUSTRATED EQUIPMENT LAYOUTS AND SHORTEST
CONDUCTOR/RACEWAY ROUTING. THE ELECTRICAL CONTRACTOR SHALL BE
RESPONSIBLE FOR DEVIATIONS TAKEN THAT WILL INCREASE CONDUCTOR/RACEWAY
ROUTING LENGTHS. BRANCH CIRCUITS LONGER THAN 75’ FOR 120-VOLT, AND 175’ FOR
277-VOLT FROM PANEL TO LAST OUTLET SHALL BE INCREASED A MINIMUM OF ONE-SIZE
ABOVE THAT SPECIFIED TO LIMIT VOLTAGE DROP TO LESS THAN 3%.
D. POWER BRANCH CIRCUITRY SHALL BE INSTALLED IN CONDUIT FROM THE PANEL TO THE
LAST DEVICE, MC CABLE IS PROHIBITED.
E. SWITCHGEAR, SWITCHBOARDS, PANELBOARDS, AND DISCONNECT SWITCHES SHALL BE
FIELD MARKED TO WARN QUALIFIED PERSONS OF POTENITAL ELECTRIC ARC FLASH
HAZARDS. THE MARKING SHALL BE LOCATED SO AS TO BE CLEARLY VISIBLE TO
QUALIFIED PERSONS BEFORE EXAMINATION, ADJUSTMENT, SERVICING, OR
MAINTENANCE OF THE EQUIPMENT.
F. ALL EXPOSED BRANCH CIRCUITRY ON THE ROOF SHALL BE INSTALLED IN RIGID METAL
CONDUIT WITH FLEXIBLE CONNECTIONS TO ALL MECHANICAL EQUIPMENT UTILIZING
LIQUID TIGHT FLEXIBLE METAL CONDUIT NOT TO EXCEED 18”. ALL PENETRATIONS OF
WEATHER TIGHT BOXES SHALL UTILIZE WEATHERPROOF HUBS. ALL CONDUIT
SUPPORTS SHALL BE HOT DIPPED GALVANIZED. ALL FASTENERS, MISCELLANEOUS
SUPPORTS (UNITSTRUT OR EQUAL) AND HARDWARE UTILIZED FOR THE ELECTRICAL
INSTALLATION SHALL BE STAINLESS STEEL.
G. EVERY PENETRATION (INCLUDING BUT NOT LIMITED TO DUCTS, PIPES, CONDUITS,
SLEECES, AND BOXES) THROUGH EXTERIOR WALLS AND SOFFITS MUST BE SEALED TO
THE AIR BARRIER/WATER RESISTIVE BARRIER REQUIRED.
ELECTRICAL POWER NOTES
1. REFER TO THE MECHANICAL DRAWINGS FOR THE EXTENT OF THE DEMOLITION SCOPE OF
WORK AND AREA. THE DEMOLITION PLANS INDICATE THE GENERAL INTENT AND ARE NOT
INTENDED TO SHOW ALL ITEMS TO BE REMOVED OR RETAINED. THE ELECTRICAL SCOPE
MAY EXTEND BEYOND THE AREA DEFINED BY THE MECHANICAL DEMOLITION LIMITS TO
FULLY COMPLY WITH VARIOUS REQUIREMENTS OF THE CONTRACT DOCUMENTS.
2. THE ELECTRICAL DEMOLITION PLANS ARE NOT INTENDED TO SHOW ALL ITEMS TO BE
REMOVED OR RETAINED. DISCONNECT AND MAKE SAFE DEVICES AND EQUIPMENT LOCATED
ON WALLS AND/OR CEILINGS TO BE REMOVED. NOTIFY THE OWNER'S REPRESENTATIVE
IMMEDIATELY OF ANY UNANTICIPATED HIDDEN CONDITIONS ENCOUNTERED DURING THE
DEMOLITION.
3. PERFORM ELECTRICAL DEMOLITION WORK AS SHOWN ON THE DRAWINGS AND AS
SPECIFIED IN COOPERATION WITH THE OTHER TRADES AND AS SCHEDULED AND
APPROVED BY THE OWNER'S REPRESENTATIVE. DISCONNECT AND MAKE SAFE ALL
ELECTRICAL EQUIPMENT IDENTIFIED FOR REMOVAL ON THE ELECTRICAL, HVAC, PLUMBING,
CIVIL, AND FIRE PROTECTION PLANS. CONTRACTOR SHALL PERFORM A THOROUGH PRE-
CONSTRUCTION SURVEY PRIOR TO COMMENCMENT OF DEMOLITION WORK AND NOTIFY
THE OWNER/ENGINEER OF ANY HIDDEN CONDITIONS NOT ILLUSTRATED ON THE DRAWINGS.
4. THE LOCATIONS OF EXISTING EQUIPMENT INCLUDING PIPING, DUCTWORK, EQUIPMENT,
CONDUITS, ETC ARE SHOWN IN AN APPROXIMATE WAY ONLY. VISIT THE SITE PRIOR TO
SUBMISSION OF THE BIDS AND COMMENCEMENT OF WORK TO BECOME FAMILIAR WITH THE
ACTUAL CONDITIONS AND EXTENT OF THE WORK.
5. POWER OUTAGES CAUSED BY DEMOLITION THAT AFFECT OTHER AREAS SHALL BE HELD TO
A MINIMUM. SHUTDOWNS SHALL BE COORDINATED WITH USERS AND THE OWNER. NIGHT,
WEEKEND, AND/OR HOLIDAY TIME REQUIRED TO PERFORM ELECTRICAL DEMOLITION WORK
OR NEW ELECTRICAL WORK SHALL BE CARRIED AS PART OF THE CONTRACT COST.
6. CIRCUIT TRACE AND LABEL ALL EXISTING BRANCH CIRCUITS AND FEEDERS WITHIN THE
AREA OF DEMOLITION SCOPE PRIOR TO DE-ENERGIZING AND DISCONNECTION. ALL
CIRCUITS WITHIN PANELBOARDS IDENTIFIED FOR REMOVAL SHALL BE TRACED AND
LABELED TO ENSURE THAT NO AREA OUTSIDE THE DEMOLITION SCOPE LIMIT IS AFFECTED.
THERE SHALL BE NO INTERRUPTION OF SERVICES OUTSIDE THE DEMOLITION AREA
WITHOUT APPROVAL FROM THE OWNER'S REPRESENTATIVE.
7. DE-ENERGIZE AND REMOVE ALL CONDUCTORS AND RACEWAYS TO THEIR POINTS OF
ORIGIN WITHIN THE AREA OF DEMOLITION SCOPE. ITEMS IDENTIFIED FOR DEMOLITION
SHALL NOT BE ABANDONED IN PLACE. RACEWAYS THAT ENTER MASONRY WALLS AND
FLOORS SHALL BE CUT FLUSH AT THE SURFACE FOR PATCHING BY OTHERS. ALL CIRCUIT
BREAKERS ASSOCIATED WITH THE DEMOLITION SCOPE SHALL BE DE-ENERGIZED AND
LABELED SPARE.
8. PROMPTLY REPAIR ANY DAMAGE CAUSED DURING/BY THE EXECUTION OF WORK. DAMAGE
INCLUDES BUT IS NOT LIMITED TO DESTRUCTION OF ITEMS INTENDED TO REMAIN OR TO BE
SALVAGED.
9. EXERCISE CARE WITH EQUIPMENT THAT IS TO BE RELOCATED OR TURNED OVER TO THE
OWNER. EXAMINE THE EQUIPMENT BEFORE REMOVAL IN THE PRESENCE OF THE OWNER'S
REPRESENTATIVE TO DETERMINE ITS CONDITION. DELIVER OWNER-RETAINED EQUIPMENT
TO AN ON-SITE LOCATION DESIGNATED BY THE OWNER AND OBTAIN ACKNOWLEDGMENT OF
RECEIPT IN ORIGINAL CONDITION.
10. ALL ITEMS REMOVED SHALL BE OFFERED TO THE OWNER FOR SALVAGE. IF THE OWNER
DOES NOT TAKE POSSESSION, DISPOSE OF THE ITEMS IN A SAFE AND LEGAL MANNER. ALL
ITEMS CLASSIFIED AS HAZARDOUS SHALL BE DISPOSED AS HAZARDOUS WASTES AND A
UNIFORM HAZARDOUS WASTE MANIFEST SHALL BE PROVIDED TO THE OWNER.
11. ENSURE THE SAFE PASSAGE OF PERSONS IN AND AROUND THE BUILDING DURING
DEMOLITION. PREVENT INJURY TO PERSONS AND DAMAGE TO PROPERTY. PROVIDE
ADEQUATE SHORING AND BRACING TO PREVENT COLLAPSE. IMMEDIATELY REPAIR
DAMAGED PROPERTY TO THE CONDITION BEFORE BEING DAMAGED. TAKE EFFECTIVE
MEASURES TO PREVENT WINDBLOWN DUST.
12. ALL DEMOLITION SCOPE ASSOCIATED WITH LOW VOLTAGE SYSTEMS INCLUDING BUT NOT
LIMITED TO TELEPHONE, DATA, SECURITY, PAGING, CCTV, ETC. SHALL BE INCLUDED IN THIS
CONTRACT.
13. THE EXISTING FIRE ALARM SYSTEM SHALL REMAIN FULLY FUNCTIONAL DURING THE ENTIRE
DEMOLITION AND CONSTRUCTION PERIOD. REUSE OF EXISTING FIRE ALARM SYSTEM
RACEWAYS SHALL NOT BE ALLOWED. ALL REQUIRED SYSTEM SHUTDOWNS SHALL BE
COORDINATED WITH AND APPROVED BY THE OWNER'S REPRESENTATIVE AND THE
AUTHORITY HAVING JURISDICTION. DEMOLITION OF THE EXISTING SYSTEM SHALL NOT
COMMENCE UNTIL THE NEW SYSTEM HAS BEEN COMPLETELY INSTALLED, TESTED AND
APPROVED BY THE AUTHORITY HAVING JURISDICTION.
14. CREATE AND SUBMIT IMPAIRMENT PLANS TO THE OWNER AND AHJ IF ANY PORTION OF THE
EXISTING FIRE ALARM SYSTEM IS TAKEN OUT OF SERVICE DURING THE EXECUTION OF THE
PROJECT.
15. REMOVED FLUORESCENT AND HID LAMPS AND BATTERIES SHALL BE RECYCLED BY A
FACILITY APPROVED BY THE OWNER'S REPRESENTATIVE.
16. ALL BALLASTS IN LIGHTING FIXTURES TO BE DISPOSED SHALL BE VERIFIED TO BE PCB FREE.
ALL BALLASTS MANUFACTURED PRIOR TO 1979 AND NOT LABELED AS PCB FREE SHALL BE
CONSIDERED TO CONTAIN PCBS. PROVIDE WRITTEN VERIFICATION TO THE OWNER'S
REPRESENTATIVE THAT CONFIRMS PCB FREE WASTE. WHERE PCB FREE WASTE CANNOT
BE VERIFIED, BALLASTS SHALL BE RECYCLED BY A FACILITY APPROVED BY THE OWNER'S
REPRESENTATIVE, WITH PCB COMPONENTS ELIMINATED BY A HIGH TEMPERATURE
INCINERATION.
17. TYPICAL FOR BOILER PLANT AND CHILLER PLANT: PROVIDE LUMP SUM AND ALLOW FOR THE
REMOVAL OF 400LF OF INACTIVE BRANCH CIRCUIT WIRING/CONDUIT AND RELATED
SUPPORTS BACK TO SOURCE. RELATED CIRCUIT BREAKERS SHALL BE TURNED TO OFF
POSITION AND LABELED AS 'SPARE'. ALL PENETRATIONS SHALL BE SEALED TO MATCH
EXISTING ADJACENT CONDITIONS. SCOPE OF WORK SHALL BE IDENTIFIED BY CIRCUIT
TRACING AND DOCUMENTED IN AN RFI OR BY THE VAMC COR.
ELECTRICAL DEMOLITION NOTES
A. ALL WORK WITHIN DESIGNATED AREA SHALL BE IN ACCORDANCE WITH ARTICLE 500 AND
501 OF NEC. CARRY IN BID ALL COSTS ASSOCIATED FOR A COMPLETE INSTALLATION TO
MEET/EXCEED ALL OF THOSE REQUIREMENTS.
B. ALL CONDUITS WITHIN THESE DESIGNATED AREAS SHALL BE RIGID GALVANIZED STEEL.
C. ALL POWER CONDUCTORS SHALL BE TWHN INSULATION, RATED FOR EXPLOSION-PROOF
AREAS.
D. PROVIDE CONDUIT SEALS AT ALL CLASSIFIED BOUNDARIES, ENCLOSURES AND
EQUIPMENT IN ACCORDANCE WITH NEC ARTICLE 501.
EXPLOSION PROOF INSTALLATION NOTES
LD LOW VOLTAGE DIMMER SWITCHa
FIRE ALARM
FIRE ALARM SMOKE DETECTOR, PHOTO ELECTRIC UNLESS NOTED
OTHERWISE
FIRE ALARM ANNUNCIATOR
FIRE ALARM BELL
ANN
B
S
FIRE ALARM COMBINED STROBE AND HORN DEVICE,
NUMERAL INDICATES CANDELA VALUE
"WG" INDICATES WIRE GUARD
FIRE ALARM MANUAL PULL STATION
"SC" INDICATES STOPPER COVER
F SC
15cd
WGF
B
HOT WATER HEATERHWH
EXPLOSION PROOFXP
ANNUNCIATORANN
XRW
DISCONNECT SWITCH, FUSED
"XXAF" INDICATES FUSE RATING "XXAS" INDICATES SWITCH SIZE
XXAS
XXAT
XXAF
XXAT CIRCUIT BREAKER, FIXED
"XXAF" INDICATES FRAME SIZE "XXAT" INDICATES TRIP
XXAF
XXAT CIRCUIT BREAKER, DRAW OUT
"XXAF" INDICATES FRAME SIZE "XXAT" INDICATES TRIP
XXAF
XXAT PRIMARY DRAWOUT CIRCUIT BREAKER
"XXAF" INDICATES FRAME SIZE "XXAT" INDICATES TRIP
LIGHTNING ARRESTOR
GROUND CONNECTION
KIRK KEY INTERLOCKK
SURGE PROTECTIVE DEVICE
TELEPHONE OUTLET
SEE TELECOMMUNICATIONS NOTE A
TELECOMMUNICATIONS LEGEND
DATA OUTLET
SEE TELECOMMUNICATIONS NOTE A
COMBINATION TELEPHONE/DATA OUTLET
SEE TELECOMMUNICATIONS NOTE A
TV OUTLET, WALL MOUNTED TV
TELECOMMUNICATIONS NOTES
A. PROVIDE 4" SQUARE WORK BOX AND 1" EMPTY CONDUIT WITH PULLWIRE TO IT RACK.
SPD
CCTV
CCTV CAMERA
SEE TELECOMMUNICATIONS NOTE A
COMBINATION FUSED DISCONNECT MAGNETIC MOTOR
STARTER.
REFER TO MAGNETIC MOTOR STARTER AND VFD SCHEDULE
FOR TYPE, SIZE AND ENCLOSURE
60AS
50AF
MOTOR STARTER
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
248 Copeland Street Quincy, MA 02169 P: 617-481-6390 F: 617-687-5990
200 Brickstone Square Andover, MA 01810 P: 978-296-6227 F: 978-475-5768
100% CONSTRUCTION
DOCUMENTS
REPLACE MAIN BOILERS 528A8-17-805
Samuel S. Stratton VA Medical Center, 113 Holland Ave., Albany, New York 12208
06/05/2024
105 Central Street Stoneham, MA 02180 P: 781-275-6050
C U s e rs \k e v in
.i n g
\D o c u m e n ts
\Y
A lb a n y B o ile r_ E
K e v in
.I n g
V
U B
V
P E
U Z
.r v t
/4
/2
:4
:2
P M
E-000
ELECTRICAL - LEGEND & ABBREVIATIONS
DJC MVM
ELECTRICAL DRAWING LIST
SHEET
NUMBER SHEET NAME
E-000 ELECTRICAL - LEGEND & ABBREVIATIONS
ESP-101 ELECTRICAL - PHASE 1 - SITE PLAN - CHILLER PLANT AND BOILER PLANT SERVICE UPGRADE -
NEW WORK
ESP-102 ELECTRICAL - PHASE 1 - SITE PLAN - TEMPORARY BOILERS
ESP-103 ELECTRICAL - PHASE 1 - SITE DETAILS
ESP-104 ELECTRICAL - PHASE 1 - TEMPORARY BOILER CONTROL ROOM
ELD-201 ELECTRICAL - PHASE 2 - SUB-BASEMENT LIGHTING DEMOLITION PLAN
ELD-202 ELECTRICAL - PHASE 2 - BASEMENT LIGHTING DEMOLITION PLAN
ELD-301 ELECTRICAL - PHASE 3 - SUB-BASEMENT LIGHTING DEMOLITION PLAN
ELD-302 ELECTRICAL - PHASE 3 - BASEMENT LIGHTING DEMOLITION PLAN
EPD-100 ELECTRICAL - BOILER PLANT CONTROL ROOM DEMOLITION
EPD-101 ELECTRICAL - BOILER PLANT - PHASE 1 - SUB-BASEMENT DEMOLITION
EPD-102 ELECTRICAL - PHASE 1 - BASEMENT POWER DEMOLITION PLAN
EPD-201 ELECTRICAL - PHASE 2 - SUB-BASEMENT POWER DEMOLITION PLAN
EPD-202 ELECTRICAL - PHASE 2 - BASEMENT POWER DEMOLITION PLAN
EPD-301 ELECTRICAL - PHASE 3 - SUB-BASEMENT POWER DEMOLITION PLAN
EPD-302 ELECTRICAL - PHASE 3 - BASEMENT POWER DEMOLITION PLAN
EPD-303 ELECTRICAL - PHASE 3 - ROOF POWER DEMOLITION PLAN
EPD-511 ELECTRICAL - PHASE 1 - BOILER PLANT ONE-LINE DIAGRAM - DEMOLITION
EPD-512 ELECTRICAL - PHASE 1 - CHILLER PLANT ONE-LINE DIAGRAM - DEMOLITION
EPD-520 ELECTRICAL - PHASE 2 - BOILER PLANT ONE-LINE DIAGRAM - DEMOLITION
EPD-530 ELECTRICAL - PHASE 3 - BOILER PLANT ONE-LINE DIAGRAM - DEMOLITION
EPD-531 ELECTRICAL - PHASE 3 - BOILER PLANT ONE-LINE DIAGRAM -TEMPORARY BOILERS
DEMOLITION
EPSD-101 ELECTRICAL PHASE 1 - SITE PLAN - CHILLER PLANT AND BOILER PLANT SERVICE UPGRADE -
NEW WORK
EL-201 ELECTRICAL - PHASE 2 - SUB-BASEMENT LIGHTING NEW WORK PLAN
EL-202 ELECTRICAL - PHASE 2 - BASEMENT LIGHTING NEW WORK PLAN
EL-301 ELECTRICAL - PHASE 3 - SUB-BASEMENT LIGHTING NEW WORK PLAN
EL-302 ELECTRICAL - PHASE 3 - BASEMENT LIGHTING NEW WORK PLAN
EP-100 ELECTRICAL - BOILER PLANT CONTROL ROOM NEW WORK
EP-101 ELECTRICAL - PHASE 1 - SUB-BASEMENT NEW WORK PLAN
EP-102 ELECTRICAL - PHASE 1 - BASEMENT NEW WORK PLANS
EP-103 ELECTRICAL - PHASE 1 - OVERALL SUB-BASEMENT POWER NEW WORK PLAN
EP-201 ELECTRICAL - PHASE 2 - SUB-BASEMENT POWER NEW WORK PLAN
EP-202 ELECTRICAL - PHASE 2 - BASEMENT POWER NEW WORK PLAN
EP-301 ELECTRICAL - PHASE 3 - SUB-BASEMENT POWER NEW WORK PLAN
EP-302 ELECTRICAL - PHASE 3 - BASEMENT POWER NEW WORK PLAN
EP-303 ELECTRICAL - PHASE 3 - ROOF POWER NEW WORK PLAN
EP-510 ELECTRICAL - PHASE 1 - BOILER PLANT ONE-LINE DIAGRAM - TEMPORARY BOILERS
EP-511 ELECTRICAL - PHASE 1 - BOILER PLANT ONE-LINE DIAGRAM - NEW WORK
EP-512 ELECTRICAL - PHASE 1 - CHILLER PLANT ONE-LINE DIAGRAM - TEMPORARY POWER
EP-513 ELECTRICAL - PHASE 1 - CHILLER PLANT ONE-LINE DIAGRAM - NEW WORK
EP-521 ELECTRICAL - PHASE 2 - BOILER PLANT ONE-LINE DIAGRAM - NEW WORK
EP-531 ELECTRICAL - PHASE 3 - CHILLER PLANT ONE-LINE DIAGRAM - NEW WORK
EP-532 BOILER PLANT - PHASE 3 - ONE-LINE DIAGRAM - NEW WORK
E-301 ELECTRICAL - DETAILS
E-302 ELECTRICAL - DETAILS
E-401 ELECTRICAL - SCHEDULES
E-402 ELECTRICAL - PANEL SCHEDULES
E-403 ELECTRICAL - PANEL SCHEDULES
Sheet Count: 48
Revisions: Date: 06/04/2024
PB PB
EM
J
BP-P2A-20
EM
PB PB J
BP-P2A-15
PB
EH
J
EM
EM
T4 ATS
BUILDING 5
BUILDING 4
BOILER PLANT
CHILLER AND ELEC.
EQUIPMENT
BUILDING 3
UTILITIES
BUILDING 54
CHILLER PLANT
GAZEBO
MYRTLE AVE
N52° 10' 05"W 457.55
THE CHARLES HEALY
MEMORIAL ELECTRIC
GENERATION FACILITY
CONCRETE SIDEWALK
CONCRETE SIDEWALK
CONCRETE SIDEWALK
J
"YIELDTO PED"
40'20'0 1" = 20' - 0"
EXISTING EMERGENCY DISTRIBUTION
ENCLOSURE (BLDG #14A).
NOTES:
1. FOR SYMBOLS AND NOTES, SEE DRAWING E-000.
2. REFER TO CIVIL DRAWINGS FOR EXACT LOCATION OF
MANHOLES AND DUCTBANK ROUTING.
3. REFER TO DRAWING ESP-103 FOR RELATED DETAILS.
4. PROVIDE TESTING OF EXISTING FEEDERS R538 AND R639
PRIOR TO COMMENCEMENT OF WORK. REFER TO
SPECIFICATION 260513-3.7 FOR TESTING CRITERIA.
APPROXIMATE LOCATION OF EXISTING
SUBSTATION TRANSFORMER VAULT
ROOM U-11
XM
XM
XM
XM
EXISTING ELECTRIC
MANHOLE EMH-3
EXISTING ELECTRIC
MANHOLE EMH-1
XM
XM
EXISTING CAMPUS
13.2kV MV SWITCHGEAR
R
R
UE
UE
TO NEW
DOUBLE-ENDED
SWITCHGEAR
'52-SWGR'
WP WP
EXISTING
1000kW GENERATOR G1
EXISTING
1000kW GENERATOR G2
EXISTING
1000kW GENERATOR G3
NEW ELECTRIC MANHOLE
'EMH-1A'
WP
UE
2#10+#10G-1"C
UE
T -R
T -R
T-R235T-R134
(TYPICAL)
NEW ELECTRIC
MANHOLE EMH-2A
WP
WP
2#10+#10G-1"C
WP
U E
U E
U E
(TYP OF 2)
(TYP OF 2)
TO NEW
'BP-SWGR'
P S
P S
T T
L B
WP
EXISTING GENERATOR
PARALLEL SWITCHGEAR
EXISTING PANEL ' 14A-IL--LS'
EXISTING 'ATS-14A-LS'
XMXM
XMXM
XM
XM
XM
XM
XM
U E
TO NEW DISTRIBUTION BOARD
'DP-14A-HCC'.
SEE DRAWING EP-103 FOR
CONTINUATION
ESP-103
A
ES
P-
C
ESP-103
ESP-103
A
B
UE
NEW LOADBANK
WP
TO NEW STANDBY
GENERATOR
U E
ES
P-
E
PS-639
PS-538
PS-134
PS-235
UE
UE
UE UE UE UE
ESP-103
A
EXISTING UTILITY CO
PAD-MOUNTED TRANSFORMER
EXISTING UTILITY CO
PRIMARY SWITCH.
EXISTING UTILITY CO
PRIMARY SWITCH.
EXISTING UTILITY CO.
PAD-MOUNTED TRANSFORMER.XMXM
XM XMT T
PS PS
EXISTING POWER CONDITIONER
XM
ES
P-
D
PB PB
EM
J
BP-P2A-20
EM
PB PB J
BP-P2A-15
PB
EH
J
EM
EM
T4 ATS
BUILDING 5
BUILDING 4
BOILER PLANT
CHILLER AND ELEC.
EQUIPMENT
BUILDING 3
UTILITIES
BUILDING 54
CHILLER PLANT
GAZEBO
MYRTLE AVE
N52° 10' 05"W 457.55
THE CHARLES HEALY
MEMORIAL ELECTRIC
GENERATION FACILITY
CONCRETE SIDEWALK
CONCRETE SIDEWALK
CONCRETE SIDEWALK
J
"YIELDTO PED"
40'20'0 1" = 20' - 0"
EXISTING EMERGENCY DISTRIBUTION
ENCLOSURE (BLDG #14A).
NOTES:
1. FOR SYMBOLS AND NOTES, SEE DRAWING E-000.
2. REFER TO CIVIL DRAWINGS FOR EXACT LOCATION OF
MANHOLES AND DUCTBANK ROUTING.
3. REFER TO DRAWING ESP-103 FOR RELATED DETAILS.
4. PROVIDE TESTING OF EXISTING FEEDERS R538 AND R639
PRIOR TO COMMENCEMENT OF WORK. REFER TO
SPECIFICATION 260513-3.7 FOR TESTING CRITERIA.
APPROXIMATE LOCATION OF EXISTING
SUBSTATION TRANSFORMER VAULT
ROOM U-11
XM
XM
XM
XM
EXISTING ELECTRIC
MANHOLE EMH-3
EXISTING ELECTRIC
MANHOLE EMH-1
XM
XM
EXISTING CAMPUS
13.2kV MV SWITCHGEAR
R
R
UE
UE
TO NEW
DOUBLE-ENDED
SWITCHGEAR
'52-SWGR'
WP WP
EXISTING
1000kW GENERATOR G1
EXISTING
1000kW GENERATOR G2
EXISTING
1000kW GENERATOR G3
NEW ELECTRIC MANHOLE
'EMH-1A'
WP
UE
2#10+#10G-1"C
UE
T -R
T -R
T-R235T-R134
(TYPICAL)
NEW ELECTRIC
MANHOLE EMH-2A
WP
WP
2#10+#10G-1"C
WP
U E
U E
U E
(TYP OF 2)
(TYP OF 2)
TO NEW
'BP-SWGR'
P S
P S
T T
L B
WP
EXISTING GENERATOR
PARALLEL SWITCHGEAR
EXISTING PANEL ' 14A-IL--LS'
EXISTING 'ATS-14A-LS'
XMXM
XMXM
XM
XM
XM
XM
XM
U E
TO NEW DISTRIBUTION BOARD
'DP-14A-HCC'.
SEE DRAWING EP-103 FOR
CONTINUATION
ESP-103
A
ES
P-
C
ESP-103
ESP-103
A
B
UE
NEW LOADBANK
WP
TO NEW STANDBY
GENERATOR
U E
ES
P-
E
PS-639
PS-538
PS-134
PS-235
UE
UE
UE UE UE UE
ESP-103
A
EXISTING UTILITY CO
PAD-MOUNTED TRANSFORMER
EXISTING UTILITY CO
PRIMARY SWITCH.
EXISTING UTILITY CO
PRIMARY SWITCH.
EXISTING UTILITY CO.
PAD-MOUNTED TRANSFORMER.XMXM
XM XMT T
PS PS
EXISTING POWER CONDITIONER
XM
ES
P-
D
NOT USED
CONTRACTOR SHALL FIELD DETERMINE SCOPE OF WORK REQUIRED TO ENABLE BOTTOM ENTRY OF NEW FEEDER INTO EXISTING MV SWITCHGEAR WITHOUT IMPACTING STRUCTURAL INTEGRITY OF EXISTING EQUIPMENT OR RELATED HOUSKEEPING PAD. SUBMIT DETAILED NARRATIVE OUTLINING INTENDED SCOPE OF WORK AND ANY ASSOCIATED SHUTDOWNS (DURATION AND AFFECTED LOADS) AS PART OF BID SUBMISSION. ALL COSTS REQUIRED TO ENABLE INSTALLATION OF FEEDERS SHALL BE CARRIED AS
PART OF BID INCLUDING EVALUATION BY STRUCTURAL ENGINEER, TEMPORARY POWER, ETC.
FOR TRANSFORMER HEATER. PROVIDE 2#10+#10G-1"C.
MINIMUM WEATHERPROOF PULLBOX DIMENSIONS SHALL BE 48"X36"X36" . PROVIDE PULLBOX
CALCULATIONS BASED ON ACTUAL CONDUIT CONFIGURATION.
MINIMUM WEATHERPROOF PULLBOX DIMENSIONS SHALL BE 36"X36"X24". PROVIDE PULLBOX
CALCULATIONS BASED ON ACTUAL CONDUIT CONFIGURATION
PROVIDE WEATHERPROOF PULLBOX MOUNTED ON RETAINING WALL AND TRANSITION TO RIGID
GALVANIZED STEEL CONDUIT (RGS) RUN ALONG WALL WITHIN AREAWAY TO PENETRATE EXTERIOR WALL AT SUB-BASEMENT CEILING. PROVIDE CONDUIT SEAL (LINK SEAL) AT WALL PENETRATION TO PROHIBIT WATER INFILTRATION. STUB OUT SPARE CONDUITS AT SUB-BASEMENT LEVEL AND CAP FOR FUTURE
USE.
SPARE CONDUIT SHALL BE STUBBED UP AND CAPPED AT 6' AFF WITHIN BUILDING #14A.
NOTES:
1 REFER TO SPECIFICATIONS AND DETAILS FOR ADDITIONAL INFORMATION.
KEYNOTES
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
248 Copeland Street Quincy, MA 02169 P: 617-481-6390 F: 617-687-5990
200 Brickstone Square Andover, MA 01810 P: 978-296-6227 F: 978-475-5768
100% CONSTRUCTION
DOCUMENTS
REPLACE MAIN BOILERS 528A8-17-805
Samuel S. Stratton VA Medical Center, 113 Holland Ave., Albany, New York 12208
06/05/2024
N
105 Central Street Stoneham, MA 02180 P: 781-275-6050
C U s e rs \k e v in
.i n g
\D o c u m e n ts
\Y
A lb a n y B o ile r_ E
K e v in
.I n g
V
U B
V
P E
U Z
.r v t
/4
/2
:4
:0
P M
ESP-101
ELECTRICAL - PHASE 1 - SITE PLAN - CHILLER
PLANT AND BOILER PLANT SERVICE UPGRADE -
NEW WORK
DJC MVM
1" = 20'-0"
MV ELECTRICAL UPGRADE SITE PLAN - PHASE 1 - BASE BID
BUILDING 5
BUILDING 4
BOILER PLANT
CHILLER AND ELEC.
EQUIPMENT
BUILDING 3
UTILITIES
BUILDING 54
CHILLER PLANT
GAZEBO
A /C
A /C
CONCRETE SIDEWALK
CONCRETE SIDEWALK
N52° 10' 05"W 457.55
THE CHARLES HEALY
MEMORIAL ELECTRIC
GENERATION FACILITY
MYRTLE AVE
APPROX. 6" GAS LINE
2"
UG
GAS
V C P
SAN MH E1
RIM: ??INV (A): ??
INV (B): 166.2
INV (C): ??
EXISTING CITY OF ALBANY 96"
(A)
(B)
4" P
VC
D
RA
IN
L
IN
E
(C)
HVAC
TUNNEL
ACCESS
SHED
ABANDONED HVAC PIPING
J
J
H H E
H H E
"YIELDTO PED"
J
S
S
ST
ST
ST
ST
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
VALVE 30(CAPPED)
VALVE 28
HYDRANT 10
VALVE 29
HYDRANT 09
APPROX. LOCATION OF 30" CITY WATER MAIN
EL
EL
EL
8B
XX
EL
EL
EL
1?
D Y
H
D Y H
BUILDING 5
BUILDING 4
BOILER PLANT
CHILLER AND ELEC.
EQUIPMENT
BUILDING 3
UTILITIES
BUILDING 54
CHILLER PLANT
A /C
A /C
CONCRETE SIDEWALK
CONCRETE SIDEWALK
N52° 10' 05"W 457.55
THE CHARLES HEALY
MEMORIAL ELECTRIC
GENERATION FACILITY
MYRTLE AVE
V C P
SAN MH E1
RIM: ??INV (A): ??
INV (B): 166.2
INV (C): ??
(A)
(B)
4" P
VC
D
RA
IN
L
IN
E
(C)
HVAC
TUNNEL
ACCESS
SHED
ABANDONED HVAC PIPING
J
J
H H E
H H E
J
S
S
ST
ST
ST
ST
ST
SAN
SAN
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
VALVE 30(CAPPED)
VALVE 28
HYDRANT 10
VALVE 29
HYDRANT 09
EL
EL
EL
8B
XX
EL
EL
EL
1?
D Y
H
D Y H
TEMPORARY BOILER TRAILER #2
TEMPORARY BOILER TRAILER #1
TEMPORARY BOILER
CONTROL ROOM
APPROXIMATE LOCATION
OF BOILER PLANT
ESP-104
HEAT TRACED PIPING,
SEE DETAIL E311 ON DRAWING E-301 AND
DRAWING PP-202 FOR ADDITIONAL INFORMATION HT
HT
H T
(1) - 2"C (TRAILER PANEL CD-ELP2)
4#250kCMIL+#4G-3"C (TEMP BOILER #1) 4#250kCMIL+#4G-3"C (TEMP BOILER #2)
(2) - 3"C SPARE (TEMP BOILERS)
(2) - 2"C (CONTROL WIRING)
(1) - 2"C (TELECOM)
(1) - 2"C (TV COAX)
(1) - 2"C (FIRE ALARM)
(1) - 2"C (TEMP GENERATOR ANNUNCIATOR CONTROL WIRING)
ALL CONDUIT SHALL BE RUN ON PIPE RACK WITHIN
TEMPORARY PIPING OUTDOOR ENCLOSURE. REFER
TO DRAWINGS C-200 AND C-201 FOR ADDITIONAL INFORMATION.
J
J
FOR HEAT
TRACE
CP-ELP2-22,24
20A/1P-GF
WP
WP
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
248 Copeland Street Quincy, MA 02169 P: 617-481-6390 F: 617-687-5990
200 Brickstone Square Andover, MA 01810 P: 978-296-6227 F: 978-475-5768
100% CONSTRUCTION
DOCUMENTS
REPLACE MAIN BOILERS 528A8-17-805
Samuel S. Stratton VA Medical Center, 113 Holland Ave., Albany, New York 12208
06/05/2024
N
105 Central Street Stoneham, MA 02180 P: 781-275-6050
C U s e rs \k e v in
.i n g
\D o c u m e n ts
\Y
A lb a n y B o ile r_ E
K e v in
.I n g
V
U B
V
P E
U Z
.r v t
/4
/2
:4
:0
P M
ESP-102
ELECTRICAL - PHASE 1 - SITE PLAN -
TEMPORARY BOILERS
DJC MVM
1" = 20'-0"
ELECTRICAL SITE PLAN
PHASE 3 DEMOLITION NOTES:
1. UPON PROJECT COMPLETION (END OF PHASE 3) ELECTRICAL CONTRACTOR SHALL DISCONNECT ALL THREE TRAILERS AND MAKE THEM ELECTRICALLY SAFE FOR TRANSPORT INCLUDING BUT NOT LIMITED TO THE
FOLLOWING SCOPE;
a. DISCONNECTION OF THE SINGLE-POINT POWER FEED TO EACH TRAILER AND REMOVAL OF
CONDUCTORS BACK TO SOURCE.
b. DISCONNECT AND CUT BACK STUB-UP CONDUIT DOWN TO FLUSH WITH GRADE BELOW AND CAP.
c. DISCONNECT AND FORWARD TO OWNER ALL EXTERIOR ELECTRICAL DEVICES AND EQUIPMENT.
PROVIDE PROPER BLANK COVERPLATES AND SEALS PER TRAILER MANUFACTURER REQUIREMENTS.
d. DISCONNECT AND REMOVE FIRE ALARM NOTIFICATION AND INITIATING DEVICES, REPROGRAM FIRE
ALARM CONTROL PANEL AS REQUIRED.
NOTES:
1. FOR SYMBOLS AND NOTES, SEE DRAWING E-000.
2. REFER TO CIVIL DRAWINGS FOR EXACT LOCATION OF
MANHOLES AND DUCTBANK ROUTING.
3. REFER TO DRAWING ESP-104 FOR RELATED DETAILS
NOTES:
1. FRAME AND COVER SHALL BE CAST IRON BY BOSTON FOUNDRY OR EQUAL BY LEBARON OR NEENAH. COVER
SHALL BE CAST WITH 1 1/2" HIGH LETTERS IDENTIFYING THE SERVICE (PRIMARY, SECONDARY ELECTRIC OR
TELEPHONE).
2. DESIGN LOAD SHALL ACCOMMODATE UP TO AASHTO HS20-44.
3. CONCRETE ENCASED DUCT SHALL BE TIED INTO THE HANDHOLE WALL TO MINIMIZE DIFFERENTIAL
SETTLEMENT. REFER TO SPECIFICATION FOR ADDITIONAL INFORMATION.
SECTION
12"
MIN MIN
12"
6" MIN
BASE
E506TYPICAL PRECAST HANDHOLE DETAIL
CONDUIT DUCT BANK
PLAN VIEW
OPENING IN SLAB
FOR MANHOLE
COVER AND FRAME
4'-6"
5'-10"
8" 8"
CONDUIT DUCT BANK
CRUSHED STONE
BELL ENDS
(TYPICAL)
M
IN
3"-0" 9"9"1
GROUT
FINISH GRADE
30" DIAMETER
MANHOLE FRAME
AND COVER
BRICK CHIMNEY WITH
FULL BREAKING UNDER
FRAME. HEIGHT VARIES
TO SUIT FIELD
CONDITIONS
A A
A A
1'-0"
2'-0"
6"
12"
(TYP)
6'-6"
2"
(TYP)
2"
1'-6"
2"
(TYP)
3" 4"
8" 2'-2"
1'-5"
1'-2"
½"
(TYP)
6"
4"
4" 6"
1'-5" 7'-2"
5'-0"
3"
1'-2"
3'-4"
6" 4"
6"
10" 12"
6"
12"12"
12'-0"
2"
(TYP)
2"
1'-6"
2"
(TYP)
3" 4"
8" 2'-2"
4'-0"3'-0"
1'-2"
0.5"
(TYP)
4"
4"
4" 6"
3'-0"
6'-5"
10'-0"
2'-0"
1'-0"
3"
TAG DESCRIPTION CONDUIT CONDUCTORS
EP1 CHLLER PLANT PRIMARY ELECTRIC - 15kV 4" 3#3/0-EPR(15kV SHIELED-TYPE MV105 +#2-600V G
EP2 BOILER PLANT PRIMARY ELECTRIC - 15kV 4" 3#3/0-EPR(15kV SHIELED-TYPE MV105 +#2-600V G
ES1
CHILLER PLANT SECONDARY ELECTRIC -
480Y/277V 4" 4#500kCMIL
ES2
BOILER PLANT - SECONDARY ELECTRIC -
480Y/277V
4" 4#600KCMIL
E1 TRANSFORMER HEATER 1" 2#10+#10G
E3 DISTRIBUTION BOARD 'DP-14-HCC' 4" SEE ONE-LINE DIAGRAM, DWG EP-510
E4 EXISTING PANEL 'DP-14-LS-2' 2" SEE ONE-LINE DIAGRAM, DWG EP-510
E5 LOAD BANK 2 1_
" SEE ONE-LINE DIAGRAM, DWG EP-532
C1 GENERATOR START 1" SEE ONE-LINE DIAGRAM, DWG EP-510
SP1 SPARE 4" NOTE 6
SP2 SPARE 2" NOTE 6
NOTES:
1. REFER TO DUCT BANK SECTIONS FOR CORRESPONDING CONDUIT AND CONDUCTOR.
2. REFER TO THE TYPICAL DUCTBANK SECTION FOR DETAILS REQUIRED IN THE CONSTRUCTION OF THE
DUCTBANK ENVELOPE.
3. REFER TO THE SPECIFICATIONS FOR ADDITIONAL INFORMATION INCLUDING BUT NOT LIMITED TO DUCT BANK
REINFORCEMENT REQUIRED UNDER PAVED AREAS INTENDED FOR VEHICULAR TRAFFIC AND AT
MANHOLE/BUILDING INTERFACES.
4. ALL CONDUCTORS INSTALLED IN DUCT SHALL BE SUITABLE FOR WET LOCATIONS.
5. ALL SERVICE ENTRANCE AND GENERATOR OUTPUT CONDUCTORS INSTALLED IN DUCT SHALL BE TYPE USE.
6. PROVIDE ALL EMPTY/SPARE CONDUIT WITH NYLON PULL STRING.
DUCT BANK CONDUIT SCHEDULE
SECTION "B-B"SECTION "A-A"
PLAN VIEW
SECTION "A-A"
PLAN VIEW
SECTION "A-A"
SECTION "C-C" SECTION "D-D" SECTION "E-E"
ES1 ES1
ES1 ES1
SP1 SP1
ES1 ES1 SP1
SP1
SP1 ES1
ES1
ES1
ES2 SP1
ES2 SP1 ES2
ES2
SP1
SP1
ES1
ES1
ES1
SP1
SP1
SP1
SP1 SP1
EP2 EP2 EP1 EP1
ES1 ES1 SP1 ES1 ES1 SP1
ES2
E3 E3
E3 E3 SP1
E4
SP2
SP1
E5 SP1
E1
ES2 E1 C1
E5
N.T.S.
E504ELECTRICAL DUCT SECTIONS
N.T.S.
NOTES:
1. REFER TO TYPICAL ELECTRICAL DUCT DETAIL THIS SHEET FOR GENERAL CONSTRUCTION REQUIREMENTS.
2. REFER TO THE DUCT BANK CONDUIT SCHEDULE THIS SHEET FOR CONDUIT AND CONDUCTOR REQUIREMENTS
ASSOCIATED WITH CONDUIT TAG.
INTERMEDIATE TYPE
PLASTIC SPACER
BASE TYPE
PLASTIC SPACER
WARNING TAPE ENTIRE LENGTH OF DUCT WORK
CONCRETE
ENCASEMENT
FINISHED GRADE
"M
IN
M
IN
3"MIN
M A
X
3"MIN
PVC SCHEDULE 40
CONDUIT UNLESS
NOTED OTHERWISE
IN THE SCHEDULE
(4) #6 TOP
(1) #6 EACH FACE
(4) #6 BOTTOM
LAP 2"-1" AT SPLICE
REBAR NOTE:
(QUANTITY INCREASES
PROPORTIONAL TO
CONDUIT QUANTITY)
E502TYPICAL ELECTRICAL DUCT DETAIL
L A
P T
Y P
IC
A
L
#4 18" O.C. IN PAIRS
2" CLEAR CONC. COVER
(TYPICAL)
#6 REBAR
(TYPICAL)
TYPICAL DUCT SECTION
REBAR DETAIL
NOTES:
1. THIS DETAIL IS INTENDED TO ILLUSTRATE CONSTRUCTION OF TYPICAL DUCT BANK. REFER TO REFERENCED
SECTION FOR QUANTITY AND SIZE OF CONDUIT REQUIRED. DUCT CONSTRUCTION SHALL BE MODIFIED TO
ACCOMMODATE REQUIREMENTS ILLUSTRATED IN THE ACTUAL SECTION, UTILIZING THE CRITERIA ESTABLISHED IN
THIS DETAIL AND AS WRITTEN IN THE SPECIFICATIONS.
2. REBAR SHALL BE USED FOR ALL DUCT BANKS INSTALLED UNDER TRAVELED WAYS, ROADWAYS, AND TRANSITIONS
INTO MANHOLES/HANDHOLES AND FOUNDATIONS. REFER TO SPECIFICATIONS FOR ADDITIONAL DETAILS.
3. WARNING TAPE SHALL BE DETECTABLE TYPE FOIL BACKED 4 MIL POLYETHYLENE WITH FADE RESISTANT "BURIED
ELECTRIC LINE BELOW" A MINIMUM OF 12 INCHES ABOVE THE BURIED SERVICE. TAPE SHALL BE EQUAL TO T & B
NAF-0705
TYPICAL MIN
DUCT SPACING
GROUND LINE
2/0 BARE COPPER WIRE
CONNECTING CONDUIT
BONDING BUSHINGS
(TYPICAL)
3/4" CHAMFER
ALL AROUND
GALVANIZED STEEL
SCHEDULE 40 CONDUIT 36"
RADIUS QUARTER BENDS
WITH GROUNDING
BUSHINGS (TYPICAL)
SEE NOTE 6
#4 (1/2"DIA) REBAR
12" O.C. (EACH
WAY) EXCEPT IN
CONDUIT SPACE
(TYP)
1" - 1-1/2" DIA
CRUSHED STONE
WELL TAMPED
NOTES:
1. REFER TO EXACT INSTALLATION REQUIREMENTS OF THE CABINET MANUFACTURER FOR
MODIFICATIONS THAT MAY BE REQUIRED TO THIS PAD LAYOUT. ACCOMMODATE ALL NECESSARY
HARDWARE FOR FASTENING CABINET TO PAD.
2. ALL GROUND GRID CONNECTIONS SHALL BE EXOTHERMIC WELD.
3. CAP ALL CONDUIT ENDS TO PREVENT MOISTURE AND DEBRIS FROM ENTERING CONDUITS
PRIOR TO CABINET INSTALLATION.
4. CONDUIT ENTRY LOCATION IS DIAGRAMMATIC ONLY. PROVIDE DETAILED, DIMENSIONED
DRAWING FOR REVIEW BY THE ENGINEER BASED ON EXACT EQUIPMENT LAYOUT.
5. REFER TO CIVIL DRAWINGS FOR ADDITIONAL REQUIREMENTS.
6. QUARTER BENDS SHALL BE UTILIZED TO TRANSITION FROM PVC SCHEDULE 40 TO GALVANIZED
STEEL. ALL QUARTER BENDS (PRIMARY AND SECONDARY) SHALL BE GALVANIZED STEEL
SCHEDULE 40 WITH GROUNDING BUSHINGS. CAP ALL CONDUIT ENDS TO PREVENT MOISTURE AND
DEBRIS FROM ENTERING CONDUITS PRIOR TO EQUIPMENT INSTALLATION.
TOP OF GROUND ROD
SHALL BE 12"(MIN) BELOW
FINISHED GRADE (BFG).
#4/0 BARE COPPER
WIRE CONNECTING
GROUND RODS 1'-0"
BFG (TYPICAL)
EXOTHERMIC
WELD (TYPICAL)
3000 PSI 28 DAY
CLASS-A CONCRETE
FRONT
3/4"DIA.x 10' COPPER CLAD
GROUND ROD (TYPICAL)
4" DIA. CONDUIT
(TYPICAL)
E510EQUIPMENT PAD DETAIL - 15kV PRIMARY SWITCHES
TYPICAL
SECONDARY SERVICE
4" DIA. CONDUIT
PRIMARY SERVICE
5"DIA CONDUIT
GRADE
E509
NOTES:
1. REFER TO EXACT CIVIL DRAWINGS FOR MODIFICATIONS THAT MAY BE REQUIRED TO THIS PAD
LAYOUT.
2. ALL GROUND GRID CONNECTIONS SHALL BE EXOTHERMIC WELD.
3. DO NOT ALLOW PRIMARY AND SECONDARY CONDUITS TO CROSS EACH OTHER INSIDE OR OUTSIDE
THE PAD. LOCATE SECONDARY CONDUITS AS FAR TO THE RIGHT AS POSSIBLE IN THE PAD OPENING.
4. QUARTER BENDS SHALL BE UTILIZED TO TRANSITION FROM PVC SCHEDULE 40 TO GALVANIZED
STEEL. ALL QUARTER BENDS (PRIMARY AND SECONDARY) SHALL BE GALVANIZED STEEL SCHEDULE 40
WITH GROUNDING BUSHINGS. CAP ALL CONDUIT ENDS TO PREVENT MOISTURE AND DEBRIS FROM
ENTERING CONDUITS PRIOR TO TRANSFORMER INSTALLATION.
5. PRIMARY DUCT GROUND SHALL BE CONNECTED TO PAD GROUND GRID.
6. CONDUIT ENTRY LOCATION IS DIAGRAMMATIC ONLY. PROVIDE DETAILED, DIMENSIONED DRAWINGS
FOR REVIEW BY THE ENGINEER BASED ON EXACT EQUIPMENT LAYOUT.
TOP OF GROUND
ROD SHALL BE
12"(MIN) BELOW
FINISHED GRADE
(BFG).
(TYPICAL)
1" - 1 1/2" DIA
CRUSHED STONE
(WELL TAMPED)
#4/0 BARE
COPPER WIRE
CONNECTING
GROUND RODS
3/4" CHAMFER
ALL AROUND
GALVANIZED STEEL
SCHEDULE 40 CONDUIT
QUARTER BENDS WITH
CONDUIT BUSHINGS AND
GROUND CLAMPS (TYPICAL
SEE NOTE 4)
#4 (1/2"DIA) REBAR 12"
O.C. (EACH WAY)
EXCEPT IN CONDUIT
SPACE (TYP)
#4/0 BARE
COPPER WIRE
CONNECTING
GROUND RODS
1'-0" BFG (TYPICAL)
3000 PSI
28 DAY
CLASS-A
CONCRETE
3/4"DIA.x 10'
COPPER CLAD
GROUND ROD
(TYPICAL)
2/0 BARE COPPER
WIRE CONNECTING
GROUND RODS
(TYPICAL)
EXOTHERMIC WELD (TYPICAL)
TRANSFORMER PAD DETAIL THREE PHASE 750 THRU 2500 KVA
CONCRETE CAP (PAINTED)
6"DIAMETER GALV. STEEL
PIPE SCHEDULE 40
FILLED W/CONCRETE
1'-2"
4'-0"
FINISH GRADE
3'-0"
6'-9"
3"
1'-6"DIAMETER CONCRETE FOOTING
PRIME & PAINT BOLLARD YELLOW (TYP.)
E512PROTECTION BOLLARD DETAIL
#2/0 BARE COPPER GROUND TO
TRANSFORMER GROUNDING GRID
%%130
E507
CONDUIT DUCT BANK
36" OPENING IN SLAB
FOR MANHOLE
COVER AND FRAME
10'-0"
11'-0"
6" 6"
6'-0"
6"
NOTES:
1. FRAME AND COVER SHALL BE CAST IRON BY BOSTON FOUNDRY OR EQUAL BY LEBARON OR NEENAH. COVER
SHALL BE CAST WITH 1 1/2" HIGH LETTERS IDENTIFYING THE SERVICE (PRIMARY, SECONDARY ELECTRIC OR
TELEPHONE).
2. DESIGN LOAD SHALL ACCOMMODATE UP TO AASH TO HS20-44.
3. CONCRETE ENCASED DUCT SHALL BE TIED INTO THE HANDHOLE WALL WITH REBAR TO MINIMIZE
DIFFERENTIAL SETTLEMENT. REFER TO SPECIFICATION FOR ADDITIONAL INFORMATION.
4. REFER TO SPECIFICATION FOR PULLING IRONS AND CABLE RACK REQUIREMENTS.
5. BOND ALL METAL COMPONENTS WITHIN MANHOLE INCLUDING COVER FRAME TO 2/0 GROUND LOOP WITH #6
BARE COPPER CONDUCTOR.
ELECTRIC
SECTION
PULLING IRONS
CABLE RACKS
5'-0"
7'-0"
7"
8'-2"
7"
6"
3/4"x10'0" COPPER CLAD
GROUND ROD NO
GREATER THAN 2"
ABOVE FLOOR
(TYPICAL FOR 2)
G
G G
G
G
GROUND
COVER
FRAME
EXOTHERMIC
WELD (TYPICAL)
#2/0 BARE COPPER
42"
42"
MIN
12"
BASE
CRUSHED STONE
12"
MIN
PLAN VIEW
12" DIA X 4" DEEP
SUMP (TYPICAL OF 2)
MIN
6"
CONDUIT DUCTBANK
(REFER TO DUCT SECTION FOR
ACTUAL CONDUIT REQUIREMENTS)
TYPICAL PRECAST ELECTRIC MANHOLE
DETAIL
N.T.S. N.T.S. N.T.S.
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
248 Copeland Street Quincy, MA 02169 P: 617-481-6390 F: 617-687-5990
200 Brickstone Square Andover, MA 01810 P: 978-296-6227 F: 978-475-5768
100% CONSTRUCTION
DOCUMENTS
REPLACE MAIN BOILERS 528A8-17-805
Samuel S. Stratton VA Medical Center, 113 Holland Ave., Albany, New York 12208
06/05/2024
105 Central Street Stoneham, MA 02180 P: 781-275-6050
C U s e rs \k e v in
.i n g
\D o c u m e n ts
\Y
A lb a n y B o ile r_ E
K e v in
.I n g
V
U B
V
P E
U Z
.r v t
/4
/2
:4
:1
P M
ESP-103
ELECTRICAL - PHASE 1 - SITE DETAILS
DJC MVMRevisions: Date: 06/04/2024
C C
T V
TV
S
S 15cd L
15cd F
F
F
FATC
OS
S
OS
TC
GFI,C
J
CD-ELP2-7
VIA TIMECLOCK
WP,GFI
CP-ELP2-6
CP-ELP2-5
CP-ELP2-3
CP-ELP2-8
WP,GFI
J
CP-ELP2-2,4
P B
CP-ELP2-11
J
CP-ELP2-10,12
J
CP-ELP2-14,16
J
J
J
J
CP-ELP2-18,20
CP-ELP2-26
CP-ELP2-1
CP-ELP2-9
b c b b
S b
S
9,b
F
,a
F9 7,a
9,b
9,c
F9 7,a
9,b
N
18"
H
D
D
N
PANEL "CP-ELP2"
G
F
E O
B C
Q
N
A
L
L
L
I
72"
P
K a
R
10,12
14,16
18,20
18,20
TEMPORARY CONTROL ROOM TRAILER,
REFER TO DRAWINGS MS-200 AND
MI-405 FOR ADDITIONAL INFORMATION
10,12
10,12
S
S
S
S
S
M
J
N
K N
T
U
EWH-1
EWH-2
S
V
A C
A C
Level 1 0' - 0"
Level 2 10' - 0"
Level 1 0' - 0"
Level 2 10' - 0"
CP-ELP2-26
FATC
FATC
S FS
15cd F
15cd F
NEW FIRE
ALARM
TERMINAL
CABINET
WITH POWER
BOOSTER
EXISTING
FIRE
ALARM
CONTROL
PANEL
FIBEROPTIC CABLE
IN 2"C. SEE NOTE 7
XM
LOCATED AT THE BOILER
PLANT BASEMENT LEVEL -
ROOM U22. SEE DRAWING
EP-102 FOR LOCATION.
SEE NOTE 6
LOCATED IN TEMP
BOILER CONTROL
ROOM
NOTES:
1. 1THIS DRAWING IS INTENDED TO ILLUSTRATE MAJOR EQUIPMENT AND THE INTENDED INTERCONNECTIONS. REFER TO THE FLOOR PLANS FOR EXACT LOCATIONS AND QUANTITIES OF DEVICES. REFER TO THE
MANUFACTURER'S WIRING DIAGRAMS FOR INTERCONNECTION REQUIREMENTS. INTERCONNECTION DETAILS SHALL BE INCLUDED IN THE SHOP DRAWINGS WITH COMPONENT CUT SHEETS FOR REVIEW AND
APPROVAL.
2. ALL FINAL CONNECTIONS INTO THE EXISTING FIRE ALARM SYSTEM SHALL BE PERFORMED BY THE OWNER'S FIRE ALARM MAINTENANCE CONTRACTOR. THE ELECTRICAL CONTRACTOR SHALL CARRY ALL
ASSOCIATED COSTS FOR FINAL CONNECTION AND ASSOCIATED TESTING.
3. ALL NEW FIRE ALARM DEVICES SHALL MATCH EXISTING MANUFACTURER AND BE CROSSED LISTED FOR CONNECTION TO THE EXISTING SYSTEM.
4. EXISTING SMOKE DETECTORS, PULL STATIONS, AUDIO/VISUAL DEVICES, HEAT DETECTORS, ETC. WITHIN THE BUILDING SHALL BE MAINTAINED, UNLESS OTHERWISE NOTED. DEVICES IDENTIFIED FOR REMOVAL
SHALL BE RETAINED UNTIL NEW SYSTEM OPERATIONAL AND APPROVED. PROVIDE CONTROL MODULES, WIRING, PROGRAMMING OF SYSTEM AS REQUIRED TO MAINTAIN SYSTEM OPERATION OF EXISTING
DEVICES. REPROGRAM SYSTEM AND MODIFY EXISTING ANNUNCIATOR(S) TO ACCOMMODATE THE NEW DEVICES AND FUNCTIONS.
5. FIRE ALARM SYSTEM MODIFICATION SHALL BE IN CONFORMANCE WITH NFPA 72, 2022 EDITION AND THE VA FIRE PROTECTION DESIGN MANUAL 9TH EDITION, NOVEMBER 2023.
6. PROVIDE UL LISTED LOCKING DEVICE FOR POWER SOURCE CIRCUIT BREAKER AND LABEL AS "FIRE ALARM CONTROL CIRCUIT" IN THE PANELBOARD DIRECTORY. REFER TO FLOOR PLAN FOR CIRCUIT
DESIGNATION.
7. CONFIRM EXACT CABLING REQUIREMENTS WITH FIRE ALARM MANUFACTURER PRIOR TO COMMENCEMENT OF WORK.
E801TEMPORARY BOILER CONTROL ROOM - FIRE ALARM RISER DIAGRAM
7F9
CP-ELP2-7
VIA TIMECLOCK
7F9,a ,a
B A
C K
O F
T R
A
IL
E R
F R
O N
T O
F T
R A
IL
E
R
F R
O N
T O
F T
R A
IL
E
R B
A C
K O
F T
R A
IL
E
R
TEMPORARY BOILER FEEDER FROM PANEL
CP-EDP2 VIA TEMPORARY PIPING ENCLOSURE
AND UNDER THE TRAILERS. REFER TO
DRAWING EP-501 FOR CIRCUIT INFORMATION
TEMPORARY BOILER TRAILER,
REFER TO DRAWINGS C-101 AND
MI-305 FOR ADDITIONAL
INFORMATION.
STUB-UP VIA LB CONDUIT BODY TO 400-AMP
FRAME/225-AMP FUSED, 480-V HEAVY DUTY
DISCONNECT SWITCH IN TYPE 3R ENCLOSURE.
COORDINATE EXACT REQUIREMENTS WITH
TRAILER MANUFACTURER.
SEE SITE PLAN, DRAWING ESP-102
FOR CONTINUATION
4#250kCMIL +#4G-3"C
(1)-3"C SPARE
4#2+#8G-2"C (PANEL CP-ELP2)
(2)-2"C (LV COMMUNICATIONS)
(1)-2"C (TELECOM)
(1)-2"C (FIRE ALARM)
(1)-2"C (TEMP GENERATOR
ANNUNCIATOR CONTROL WIRING)
A B
BA
A/C
ANN ANN
BB
A/C
ANN ANN ANN
BB
DD
AA AA
SS
DD
LL LL LL
SS
F
PP
HH
FA PULL STATION
FA HORN/STROBE
KK KK
MM
JJ
S b
BB
SS
BB
F
RR GG FF EE
OO
BB CC
PP
TIMECLOCK
PUSH
BUTTON
PANEL "CP-ELP2"
TO NEXT FIRE ALARM
DEVICE
FA PULL STATION
12"x12"x6"
SURFACE MOUNTED
BOX WITH PIANO-
HINGE COVER
12"x12"x6"
SURFACE MOUNTED
BOX WITH PIANO-
HINGE COVER
SS
TT UU
Sb
FIBEROPTIC TO
CAT6 CONVERTER
TYPICAL DATA OUTLET MOUNTED IN DUAL-CHANNEL WIREMOLD.
SEE KEY NOTE M.
TO EXISTING IT RACK
LOCATED IN ROOM U-22A.
SEE DRAWING EP-102
FOR LOCATION.
CAT6
FIBEROPTIC CABLE IN 2"C
CONFIRM EXACT REQUIREMENTS
WITH VAMC IT DEPARTMENT.
CP-ELP2-13
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
248 Copeland Street Quincy, MA 02169 P: 617-481-6390 F: 617-687-5990
200 Brickstone Square Andover, MA 01810 P: 978-296-6227 F: 978-475-5768
100% CONSTRUCTION
DOCUMENTS
REPLACE MAIN BOILERS 528A8-17-805
Samuel S. Stratton VA Medical Center, 113 Holland Ave., Albany, New York 12208
06/05/2024
105 Central Street Stoneham, MA 02180 P: 781-275-6050
C U s e rs \k e v in
.i n g
\D o c u m e n ts
\Y
A lb a n y B o ile r_ E
K e v in
.I n g
V
U B
V
P E
U Z
.r v t
/4
/2
:4
:1
P M
ESP-104
ELECTRICAL - PHASE 1 - TEMPORARY BOILER
CONTROL ROOM
DJC MVM
1/4" = 1'-0"
TEMPORARY BOILER TRAILERS PART PLAN
GENERAL NOTES:
1. COORDINATE LOCATION OF ALL WIRING AND FIRE ALARM
DEVICES WITH TEMPORARY CONTROL ROOM MANUFACTURER PRIOR TO ORDERING.
2. ALL DEVICES WHERE POSSIBLE SHALL BE FLUSH-RECESS MOUNTED; ALL BACKBOXES AND CONCEALED RACEWAY SHALL BE FACTORY-PROVIDED
BY THE MANUFACTURER. ELECTRICAL CONTRACTOR SHALL PROVIDE ALL WIRING,
DEVICES, AND COVERPLATES IN THE FIELD.
KEY NOTES:
A. TEMPORARY BOILER ANNUNCIATOR PANELS (TYP. 2) PROVIDED BY TEMPORARY BOILER CONTRACTOR, INSTALLED BY CONTROLS CONTRACTOR.
ELECTRICAL CONTRACTOR TO PROVIDE BRANCH CIRCUIT AS SHOWN.
B. BMS ETHERNET CONNECTION FROM NETWORK SWITCH, PROVIDED BY CONTROLS CONTRACTOR. ELECTRICAL CONTRACTOR TO PROVIDE
RACEWAY.
C. VA NETWORK ETHERNET CONNECTION PROVIDED BY CONTROLS CONTRACTOR. ELECTRICAL CONTRACTOR TO PROVIDE RACEWAY.
D. A/C (TYP. 2) UNIT PROVIDED BY TEMPORARY BOILER CONTRACTOR, WIRED BY ELECTRICAL CONTRACTOR. SIMPLEX RECEPTACLE SHOWN, COORDINATE EXACT ELECTRICAL CONNECTION REQUIREMENTS WITH TEMPORARY BOILER CONTRACTOR AND PROVIDE AS REQUIRED.
E. BULK OIL STORAGE AND TANK ALARM HORN PROVIDED BY CONTROLS CONTRACTOR. ELECTRICAL CONTRACTOR TO PROVIDE RACEWAY.
F. LOW AIR PRESSURE ALARM HORN PROVIDED BY CONTROLS CONTRACTOR. ELECTRICAL CONTRACTOR TO PROVIDE RACEWAY.
G. MAIN GAS VALVE ALARM HORN PROVIDED BY CONTROLS CONTRACTOR. ELECTRICAL CONTRACTOR TO PROVIDE RACEWAY.
H. VAC-1/2 ALARM HORN PROVIDED BY CONTROLS CONTRACTOR. ELECTRICAL CONTRACTOR TO PROVIDE RACEWAY.
I. WORK STATION FOR BOILER ROOM OPERATOR.
J. CHEMICAL WORK STATION, PROVIDED BY MECHANICAL CONTRACTOR.
K. POINT OF USE WATER HEATER, FURNISHED AND INSTALLED BY PLUMBING CONTRACTOR, WIRED BY E.C.
L. ELECTRICAL CONTRACTOR SHALL PROVIDE NEW PARALLEL GENERATOR ANNUNCIATORS (TYPICAL OF 3) TO MATCH EXISTING. PROVIDE 2"C AND
INTERCEPT/EXTEND EXISTING CONTROL WIRING FROM EXISTING ANNUNCIATORS LOCATED IN CONTROL ROOM TO NEW ANNUNCIATORS IN
TEMPORARY BOILER CONTROL ROOM.
M. DUAL-CHANNEL STEEL WIREMOLD (LEGRAND-WIREMOLD 4000 SERIES OR APPROVED EQUAL). WITH DUPLEX GFI RECEPTACLES A 18” INCREMENTS AND TELECOMMUNICATION PROVISION AT 24” INCREMENTS. PROVIDE BOTTOM OF CHANNEL 3” ABOVE TABLE TOP HEIGHT.
N. COORDINATE LIGHTING CONNECTION REQUIREMENTS WITH TEMPORARY BOILER CONTRACTOR.
O. FIRE ALARM CONDUIT, REFER TO ELEVATION B, ON THIS SHEET.
P. NOT USED.
Q. BOILER ROOM COMMUNICATION CONDUIT FOR LOW-VOLTAGE WIRING.
R. NEW EMERGENCY SHUT-OFF MAIN GAS VALVE. EXTEND EXISTING COMMUNICATION WIRING FROM BOILER PLANT CONTROL ROOM VIA LOW-
VOLTAGE CONDUIT (SEE KEY NOTE "O" ABOVE).
S. COORDINATE WITH MECHANICAL CONTRACTOR AND PROVIDE CONNECTION TO ELECTRIC BASEBOARD.
T. MEDICAL GAS MASTER ALARM PANEL. PROVIDE CONTROL WIRING TO INTERFACE EXISTING GAS METER ALARM PANEL LOCATED IN THE EXISTING
BOILER PLANT CONTROL ROOM. SEE DRAWING EP-101 FOR LOCATION.
U. MEDICAL OXYDEN ALARM PANEL. PROVIDE CONTROL WIRING TO INTERFACE EXISTING MEDICAL OXYGEN ALARM PANEL LOCATED IN THE EXISTING
BOILER PLANT CONTROL ROOM. SEE DRAWING EP-100 AND EP-101 FOR LOCATION.
V. PROVIDE 1" EMPTY CONDUIT WITH PULLWIRE TO BOILER PLANT CONTROL ROOM. CABLING AND RELATED TERMINATIONS SHALL BE PROIVDED BY
OTHERS.
1/4" = 1'-0" A
ELEVATION "A" - TEMPORARY CONTROL ROOM SOUTH WALL
1/4" = 1'-0" B
ELEVATION "B" - TEMPORARY CONTROL ROOM NORTH WALL
TELECOM PARTIAL RISER DIAGRAM
NTS
UP
EB EB
E B
E B
EB
E B
EB
EB
EB
S S S
S
S
MOTOR CONTROL CENTER (MCC-1)
WITH TRANSFER SWITCH
PANEL LP-1 INTEGRAL TO MCC
PANEL
LP-2
MOUNTED TO
BOILER.
MOUNTED TO UNDERSIDE
OF LANDING.
XM XM XM
XMXMXM
XM
XM
XM
XM
XM
XMXM
XM
XM
XM
XM
XM XM
XM
XM
XM XM
XM
XM
XM
XM
XM
XM
XM
XM
XM
XM XM
XM
XM XM XM
XMXM
XM
XM XM
XM XM
XM
XM XM XM
XMXMXM
XM XM
XM XM
XM
XM
X
XM
XM
STORAGE CAGE
XM
XM
XM
XM
XM
b,NR b,NR b,NR b,NR b,NR b,NR b,NR a,NR a,NR a,NR a,NR a,NR a,NR b,NR b,NR b,NR b,NR b,NR a,NR a,NR a,NR a,NR b,NR b,NR b,NR a,NR b,NR b,NR b,NR a,NR c,NR c,NR c,NR c,NR c,NR c,NR c,NR c,NR c,NR c,NRc,NRc,NR
XM
XM
XM
XM
EXISTING EXPLOSION PROOF LIGHTING FIXTURES
IN UNDERGROUND TANK VAULT TO BE REPLACED
IN EXISTING LOCATIONS, SEE DRAWING EL-201
FOR ADDITIONAL REQUIREMENTS.
DRAWING NOTES:
1. REFER TO DRAWING E-000 FOR LEGEND, ELECTRICAL DEMOLITION NOTES
AND ABBREVIATIONS.
XM
XM
UNDERGROUND TANK VAULT
LIGHTING SWITCHES
XM
XM
XM
a b c
UNDERGROUND TANK VAULT, ELECTRICALLY CLASSIFIED CLASS I, DIVISION 2 SPACE
COGEN
B-1 B-2 B-3
M C
C
ACCESS LADDER TO
EQUIPMENT MEZZANINE
ACCESS LADDER TO
EQUIPMENT MEZZANINE
VAULT CATWALK
HATCHWAY TO TANK VAULT
XM
XM
XM
XM
XM XM
XM
XM
XM
XM
XM
XM
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
248 Copeland Street Quincy, MA 02169 P: 617-481-6390 F: 617-687-5990
200 Brickstone Square Andover, MA 01810 P: 978-296-6227 F: 978-475-5768
100% CONSTRUCTION
DOCUMENTS
REPLACE MAIN BOILERS 528A8-17-805
Samuel S. Stratton VA Medical Center, 113 Holland Ave., Albany, New York 12208
06/05/2024
N
105 Central Street Stoneham, MA 02180 P: 781-275-6050
C U s e rs \k e v in
.i n g
\D o c u m e n ts
\Y
A lb a n y B o ile r_ E
K e v in
.I n g
V
U B
V
P E
U Z
.r v t
/4
/2
:4
:2
P M
ELD-201
ELECTRICAL - PHASE 2 - SUB-BASEMENT
LIGHTING DEMOLITION PLAN
DJC MVM
8' 16'4'0
1/8" = 1'-0"ELD-201
1 SUB-BASEMENT LIGHTING DEMOLITION PLAN - PHASE 2
DN
DN
DN
S
S
CHILLER PLANT
COGEN
ENCLSOURE
HIGH BAY FIXTURES AT
STRUCTURAL CEILING
XM XM XM
XM XM XM
XM XM XM
XM
XM
XM XM
XM
XM
XM
XM
XM
XM
XM
XM XM
COGEN
XM
VERTICAL-MOUNTED 4'
INDUSTRIAL STRIP
XM XM XM
DRAWING NOTES:
1. REFER TO DRAWING E-000 FOR LEGEND, ELECTRICAL DEMOLITION NOTES
AND ABBREVIATIONS.
2. NO SCOPE OF WORK ON THIS FLOOR IN PHASE 2; SHOWN FOR REFERENCE.
EXTERIOR WALL MOUNTED
ABOVE GRADE
(TYP. FOR 3)
XM
ACCESS LADDER TO
EQUIPMENT MEZZANINE
ACCESS LADDER TO
EQUIPMENT MEZZANINE
FOR EQUIPMENT
MEZZANINE LIGHTING
XM
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
248 Copeland Street Quincy, MA 02169 P: 617-481-6390 F: 617-687-5990
200 Brickstone Square Andover, MA 01810 P: 978-296-6227 F: 978-475-5768
100%…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .