This document is a 100% Construction Documents package for the Replace Main Boilers project (VA project #528A8-17-805) at the Samuel S. Stratton VA Medical Center in Albany, New York. The project includes replacing the three existing 900 HP dual fuel steam water-tube boilers with new boilers, installing two temporary 1,000 BHP dual fuel steam boilers, and upgrading the electrical service to the boiler and chiller plants. The work will be completed in three phases over approximately 730 calendar days. Key requirements include: utilizing the Autodesk Build construction management platform, providing temporary structures and services to maintain operations during the boiler replacement, and commissioning all new systems. The Department of Veterans Affairs Veterans Integrated Service Network 2 is the federal agency managing this project.
View the file
Other files for this federal contract opportunity
Show all 29
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
X.X
X
XXX
NAME
X
A
B
C
D
A-0.0
X
A-0.0
ARCHITECTURAL TAG LEGEND:
- DOOR NUMBER
- WINDOW NUMBER
- WALL TAG, SEE WALL LEGEND FOR MORE INFORMATION
- SHEET SPECIFIC KEYNOTES
- INTERIOR ELEVATION TAG
- SECTION TAG
- LIMIT OF WORK
- DETAIL TAG
SHEET NUMBER
- ROOM TAG
DESIGNATION ON SHEET
SHEET NUMBER
DESIGNATION ON SHEET
SHEET NUMBER
DESIGNATION ON SHEET
ROOM NUMBER
ROOM NAME
1. UNLESS OTHERWISE INDICATED IN THE CONSTRUCTION DOCUMENTS AS BEING NOT IN
CONTRACT (N.I.C.) OR EXISTING; ALL ITEMS, MATERIALS AND INSTALLATION OF SAME ARE A
PART OF THE CONTRACT DEFINED BY THE CONSTRUCTION DOCUMENTS. THE
CONTRACTOR SHALL PROVIDE AND INSTALL ALL ACCESSORIES, COMPONENTS AND
ASSEMBLIES REQUIRED FOR THE WORK SHOWN.
2. CONTRACTOR SHALL SUBMIT A DETAILED PROJECT SCHEDULE. CONTRACTOR IS SOLELY
RESPONSIBLE FOR CONSTRUCTION SEQUENCING, METHODS AND TECHNIQUES. PHASING
OF THE WORK SHALL BE REVIEWED WITH THE OWNER AND THE ARCHITECT AND SHALL
INCLUDE MINIMIZING EXPOSURE OF THE STRUCTURE.
3. ANY DAMAGE TO EXISTING WORK WHICH IS NOT SCHEDULED FOR REMOVAL OR
REPLACEMENT, IF CAUSED BY THE CONTRACTOR'S OPERATIONS UNDER THIS CONTRACT
SHALL BE REPAIRED OR REPLACED AT THE CONTRACTOR'S EXPENSE.
4. CONTRACTOR SHALL PROVIDE AND IS SOLELY RESPONSIBLE FOR PUBLIC AND EMPLOYEE
PROTECTION AS NECESSARY AND AS REQUIRED BY THE CODES, ORDINANCES AND
REGULATIONS OF GOVERNMENTAL AGENCIES HAVING JURISDICTION AT THE PROJECT
PLACE.
5. IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO KEEP THE PREMISE CLEAN OF
6. THE CONTRACTOR SHALL NOT CLOSE OR OBSTRUCT ANY STREETS, ALLEYS,
COURTYARDS OR WALKS. NO MATERIAL SHALL BE PLACED OR STORED IN STREETS,
ALLEYS, COURTYARDS OR WALKS. ALL DEBRIS IS TO BE REMOVED COMPLETELY FROM
THE PREMISES.
7. ALL WORK SHALL BE COMPLETED AS SHOWN ON THE DRAWINGS AND EXECUTED IN GOOD
PROFESSIONAL MANNER.
8. WHEN APPLICABLE ALL FIRE-RATED ASSEMBLIES SHALL BE INSTALLED, LABELED, AND
INSPECTED IN ACCORDANCE WITH THE APPLICABLE BUILDING CODE.
9. CONTRACTOR SHALL PROVIDE FIRE EXTINGUISHERS PER THE PROJECT SPECIFICATION AND
NFPA 241 DURING CONSTRUCTION.
10. ALL EXTERIOR DIMENSIONS ARE TO THE FACE OF DRYWALL OR MASONRY AND ALL
INTERIOR DIMENSION ARE TO CENTER OF STUD UNLESS OTHERWISE NOTED.
11. INSTALLATION: EXCEPT AS MORE STRINGENT REQUIREMENTS ARE INDICATED ON THESE
DRAWINGS AND IN THESE NOTES, COMPLY WITH GENERALLY ACCEPTED INDUSTRY
STANDARDS AND INSTALL PRODUCTS IN STRICT COMPLIANCE WITH MANUFACTURER'S
PRINTED INSTRUCTIONS.
ABBREVIATIONS
ACP. - ACOUSTICAL CEILING PANEL
A.A.B. - ARCH. ACCESS BOARD
ADJ. - ADJACENT
A.F.F. - ABOVE FINISHED FLOOR
ALUM. - ALUMINUM
CH. - CHAPTER
CLG. - CEILING
CONC. - CONCRETE
CONT. - CONTINUOUS
CT - CERAMIC TILE
CTCB - CERAMIC TILE COVE BASE
D - DEEP
D/B - DESIGN BUILD
DIA. - DIAMETER
E.J. - EXPANSION JOINT
ELEC. - ELECTRICAL
ETR - EXISTING TO REMAIN - PATCH AND REPAIR AS REQ'D.
EXIST. - EXISTING
F.O.F. - FACE OF FINISH
G.C. - GENERAL CONTRACTOR
G.W.B. - GYPSUM WALL BOARD
H.C. - HANDICAP
H.V.A.C. - HEATING, VENTILATION, AND AIR CONDITIONING
INSUL. - INSULATION
MAAB - MASSACHUSETTS ARCHITECTURAL ACCESS BOARD.
MAX. - MAXIMUM
M.E.P. - MECHANICAL, ELECTRICAL, AND PLUMBING
MIN. - MINIMUM
M.R. - MOISTER RESISTANCE
MTD. - MOUNTED
MTL. - METAL
M.S.B.C. - MASS. STATE BLDG. CODE
N/A - NOT APPLICABLE
N.I.C. - NOT IN CONTRACT
O.A.E. - OR APPROVED EQUAL
O.C.- ON CENTER
O.F.I. - OWNER FURNISHED AND INSTALLED
OPP. - OPPOSITE
P.LAM. - PLASTIC LAMINATE
P.M. - PAINTED METAL
P & R - PATCH AND REPAIR
PTD. - PAINTED
REQ'D - REQUIRED
R.C.P. - REFLECTED CEILING PLAN
S.C. - SOLID CORE
S.S. - STAINLESS STEEL
T.M.E. - TO MATCH EXISTING
T.O. - TO REMAIN
TYP. - TYPICAL
U.N.O. - UNLESS NOTED OTHERWISE
U.S. - UNDERSIDE
V.C.T. - VINYL COMPOSITION TILE
V.I.F. - VERIFY IN FIELD
W. - WIDE
W./ - WITH
GENERAL NOTES: CONSTRUCTION PROCEDURES
DEBRIS, RUBBISH, EXCESS MATERIALS, ETC.. RESULTING FROM THE WORK OF THIS
CONTRACT.
12. ROOF WARRANTY:
12.1. THE MAIN BOILER ROOF SYSTEM IS A TREMCO POWERPLY PREMIUM BUILT-UP ROOF WHICH
WAS INSTALLED IN 2014 AND CURRENTLY UNDER 20 YEAR WARRANTY. CONTRACTOR SHALL
CONSULT WITH THE ROOF MANUFACTURER AND USE THEIR RECOMMENDED TECHNIQUE TO
MAINTAIN ROOF WARRANTY.
12.2. THE SUMMER BOILER ROOF SYSTEM IS BURMASTIC 200-GRAVEL SYSTEM. THE WARRANTY
EXPIRE IN 2017. HOWEVER, CONTRACTOR SHALL CONSULT WITH THE ROOF MANUFACTURER
AND USE THEIR RECOMMENDED TECHNIQUE TO MAINTAIN ROOF CONSISTENCE
FIRE RATING LEGEND
2 HR FIRE RATED WALL
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
248 Copeland Street Quincy, MA 02169 P: 617-481-6390 F: 617-687-5990
200 Brickstone Square Andover, MA 01810 P: 978-296-6227 F: 978-475-5768
100% CONSTRUCTION
DOCUMENTS
REPLACE MAIN BOILERS 528A8-17-805
Samuel S. Stratton VA Medical Center, 113 Holland Ave., Albany, New York 12208
06/05/2024
105 Central Street Stoneham, MA 02180 P: 781-275-6050
C U s e rs \h a u n g \D o c u m e n ts \A lb a n y
B o ile r_
A rc h
B id
S e t_ V h a u n g
G H
V P
.r v t
/4
/2
:2
:1
A
M
AG-001
ARCHITECTURAL GENERAL NOTES,
ABBREVIATIONS, AND SYMBOLS
DM SHRevisions: Date:
15' - 0" 2' - 2" 12' - 10" 2' - 2" 12' - 8" 2' - 2" 11' - 3" 2' - 2"
DEMOLITION KEY NOTES:
1. CUT CONCRETE SLAB FOR NEW FUEL OIL PIPE TRENCH. EXISTING SLAB IS UP TO 24" THICK. THE CONTRACTOR SHALL INCLUDE IN THEIR BID A GROUND PENETRATING RADAR AND/OR VIDEO INSPECTION OF THE EXISTING UNDER SLAB PIPING AS REQUIRED TO VERIFY THE LOCATIONS OF ALL UNDERSLAB PIPING IN
THE AREA OF WORK PRIOR TO THE START OF SLAB CUTTING WORK.
2. CONTRACTOR SHALL USE WET SAW TO MINIMIZE THE DUST THAT MAY AFFECT THE COMPRESSORS AND
BOILERS.K.
3' - 2"
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
248 Copeland Street Quincy, MA 02169 P: 617-481-6390 F: 617-687-5990
200 Brickstone Square Andover, MA 01810 P: 978-296-6227 F: 978-475-5768
100% CONSTRUCTION
DOCUMENTS
REPLACE MAIN BOILERS 528A8-17-805
Samuel S. Stratton VA Medical Center, 113 Holland Ave., Albany, New York 12208
06/05/2024
N
105 Central Street Stoneham, MA 02180 P: 781-275-6050
C U s e rs \h a u n g \D o c u m e n ts \A lb a n y
B o ile r_
A rc h
B id
S e t_ V h a u n g
G H
V P
.r v t
/4
/2
:2
:5
A
M
AD-201
ARCHITECTURAL PHASE 2 - SUB-BASEMENT
DEMOLITION PLAN
DM SHRevisions: Date:
AI-101
DEMOLITION KEY NOTES:
1. DEMOLISH SECTION OF IN-FILLED WALL TO CREATE OPENING FOR NEW DOUBLE DOOR 6'X7''. REFER TO SECTIONS VIEW FOR MORE
DETAILS.
2. REMOVE EXISTING LOUVER AND ELARGE OPENING FOR INSTALLATION OF NEW EXHAUST AIR LOUVER 10'X8''. REFER TO SECTION
VIEWS FOR MORE DETAILS.
3. REMOVE EXISTING OVERHEAD COILING DOOR AND MODIFY OPENING FOR INSTALLATION OF OUTSIDE AIR INTAKE LOUVER. REFER TO
SECTION FOR DETAILS.
4. REMOVE AND REINSTALL DOOR TO SWING OUTWARD FROM THE ELEC ROOM INTO THE GENERATOR ROOM.
5. 1/AI-101 : GENERATOR ROOM NEW WORK INTERIOR EAST WALL 4/AI-101 : GENERATOR ROOM DEMOLITION INTERIOR EAST WALL
6. 2/AI-101 : GENERATOR ROOM NEW WORK INTERIOR WEST WALL 5/AI-101 : GENERATOR ROOM DEMOLITION INTERIOR WEST WALL
7. 3/AI-101 : BOILER ROOM NEW WORK INTERIOR WEST WALL 6/AI-101 : BOILER ROOM DEMOLITION INTERIOR WEST WALL
AI-101
AI-101
AI-101
AI-101
AI-101
AI-104
AI-104
AI-204
AI-204
(V E
R
IF
Y I
N F
IE
L
D
EDGES OF
PREVIOUSLY IN-FILLED
SECTION OF WALL
AI-104
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
248 Copeland Street Quincy, MA 02169 P: 617-481-6390 F: 617-687-5990
200 Brickstone Square Andover, MA 01810 P: 978-296-6227 F: 978-475-5768
100% CONSTRUCTION
DOCUMENTS
REPLACE MAIN BOILERS 528A8-17-805
Samuel S. Stratton VA Medical Center, 113 Holland Ave., Albany, New York 12208
06/05/2024
N
105 Central Street Stoneham, MA 02180 P: 781-275-6050
C U s e rs \h a u n g \D o c u m e n ts \A lb a n y
B o ile r_
A rc h
B id
S e t_ V h a u n g
G H
V P
.r v t
/4
/2
:2
:5
A
M
AD-301
ARCHITECTURAL PHASE 3 - SUB-BASEMENT
DEMOLITION PLAN
DM SH
N
Revisions: Date:
AI-101
AI-101
DEMOLITION KEY NOTES:
1. DEMOLISH SECTION OF WALL FOR RIGGING BOILER IN AND OUT OF THE BOILER ROOM. OPENING SHALL BE THE SAME SIZE AS THE PREVIOUSLY IN-FILLED OPENING (13 10 1/2" X 16 8 1/2"). CONTRACTOR SHALL COORDINATE WITH RIGGING COMPANY FOR CORRECT OPENING SIZE REQUIRED. PROVIDE OUTSIDE AIR INTAKE LOUVER WHEN FINISH. LOVER SIZE SHALL BE 11'X16'-8". REFER TO DRAWING AI-301 FOR ADDITIONAL INFORMATION. THE CONTRACTOR SHALL CLOSE THE OPENINGS WHEN THEY ARE NOT IN USE.
2. HANDRAIL ON EXISTING CATWALK MAY NEED TO BE TEMPORARILY REMOVED DURING RIGGING AND RE-INSTALLED WHEN FINISH.
3. SUMMER BOILER STACK TO BE REMOVED IN THEIR ENTIRETY. ROOF OPENING SHALL BE PREPARED FOR INSTALLATION OF NEW
GENERATOR EXHAUST EQUIPEMENT. SEE AI-201 FOR DETAILS.
4. SUMMER BOILER VENT PIPES TO BE REMOVED IN THEIR ENTIRETY. PATCH ONE OF THE OPENINGS. ENLARGE ONE OF THE OPENINGS
TO ACCOMODATE GENERATOR VENT PIPE. SEE AI-201 FOR DETAILS.
5. 1/AI-101 : GENERATOR ROOM NEW WORK INTERIOR EAST WALL 4/AI-101 : GENERATOR ROOM DEMOLITION INTERIOR EAST WALL
6. 2/AI-101 : GENERATOR ROOM NEW WORK INTERIOR WEST WALL 5/AI-101 : GENERATOR ROOM DEMOLITION INTERIOR WEST WALL
7. 3/AI-101 : BOILER ROOM NEW WORK INTERIOR WEST WALL 6/AI-101 : BOILER ROOM DEMOLITION INTERIOR WEST WALL
8. SECTION OF HANDRAIL TO BE DEMOLISHED FOR CONNECTION TO NEW CATWALK. SEE STRUCTURAL DRAWINGS FOR MORE INFO.
AI-101
AI-101
AI-101
R O
U G
H O
P E
N
IN
G
V
IF
AI-104
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
248 Copeland Street Quincy, MA 02169 P: 617-481-6390 F: 617-687-5990
200 Brickstone Square Andover, MA 01810 P: 978-296-6227 F: 978-475-5768
100% CONSTRUCTION
DOCUMENTS
REPLACE MAIN BOILERS 528A8-17-805
Samuel S. Stratton VA Medical Center, 113 Holland Ave., Albany, New York 12208
06/05/2024
N
105 Central Street Stoneham, MA 02180 P: 781-275-6050
C U s e rs \h a u n g \D o c u m e n ts \A lb a n y
B o ile r_
A rc h
B id
S e t_ V h a u n g
G H
V P
.r v t
/4
/2
:2
:5
A
M
AD-302
ARCHITECTURAL PHASE 3 - BASEMENT
DEMOLITION PLAN
DM SH
DEMOLITION KEY NOTES:
1. EXISTING EXHAUST FANS TO BE REMOVED IN THEIR ENTIRETY. REFER TO DRAWING AI-201 FOR ADDITIONAL INFORMATION.
2. EXISTING OUTSIDE AIR INTAKE LOUVERS TO BE REMOVED IN THEIR INTIRELY. ROOF SHALL BE PREPARED FOR INSTALLATION OF
NEW EQUIPMENT. REFER TO DRAWING AI-201 FOR ADDITIONAL INFORMATION.
3. EXSTING VENT PIPINGS TO BE REMOVED. ROOF SHALLED BE PATCHED AS NOTES. REFER TO DRAWING AI-201 FOR ADDITIONAL
INFORMATION.
4. EXISTING DOMESTIC WATER HEATERS AND STACKS TO BE REMOVED IN THEIR ENTIRETY. ROOF SHALL BE PATCHED AS NOTES.
5. EXSTING VENT PIPINGS TO BE REMAIN.
6. NEW VENT PIPINGS INSTALLED IN PHASE 1.
7. 3/AI-101 : BOILER ROOM NEW WORK INTERIOR WEST WALL 6/AI-101 : BOILER ROOM DEMOLITION INTERIOR WEST WALL
2 2 2 2
AI-101
AI-101
3 3 3
6 6
5 5
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
248 Copeland Street Quincy, MA 02169 P: 617-481-6390 F: 617-687-5990
200 Brickstone Square Andover, MA 01810 P: 978-296-6227 F: 978-475-5768
100% CONSTRUCTION
DOCUMENTS
REPLACE MAIN BOILERS 528A8-17-805
Samuel S. Stratton VA Medical Center, 113 Holland Ave., Albany, New York 12208
06/05/2024
N
105 Central Street Stoneham, MA 02180 P: 781-275-6050
C U s e rs \h a u n g \D o c u m e n ts \A lb a n y
B o ile r_
A rc h
B id
S e t_ V h a u n g
G H
V P
.r v t
/4
/2
:2
:5
A
M
AD-303
ARCHITECTURAL PHASE 3 - ROOF DEMOLITION
PLAN
DM SH
AI-1032
AI-103
AI-103
15' - 4" 1' - 6" 13' - 6" 1' - 6" 13' - 0" 2' - 2" 11' - 3" 2' - 2" 4' - 11"
63' - 1" 2' - 2"
AI-103
NEW WORK KEY NOTES:
1. PROVIDE TEMPORARY DUST PARTITION AROUND EXISTING EQUIPMENT BEFORE STARTING
ANY WORK IN BOILER PLANT. REMOVE THE TEMPORARY PARTITION INCLUDING FAN AFTER
ALL THE WORK HAS BEEN DONE IN THE BOILER PLANT. NON-COMBUSTIBLE OR LIMITED
COMBUSTIBLE MATERIAL SHALL BE USED FOR THE DUST PARTITION. THIS WOULD INCLUDE
FIRE RETARDANT TREATED WOOD AND APPROVED FIRE-RESISTANT PLASTIC. SEE SHEET
AI-103 FOR DETAILS.
2. PROVIDE FUEL OIL PIPE TRENCH WITH INTERNAL DIMENSION WXD = 1'-6" X 1'-6". SEE PLAN
FOR LENGTH. THE TRENCH FLOOR SHALL SLIGHTLY SLOPE DOWN TO ONE SIDE OF THE
TRENCH AND SLOPE DOWN TOWARD THE PIT.
AE-201
0' - 4" 2' - 6" 0' - 4"
AE-201
0' - 4" 0' - 4"
FUEL OIL PIT
FUEL OIL TRENCH
0' - 4" 1' - 6"
0' - 4"
EXISTING
ELECTRICAL PANEL
TO BE DEMOLISHED
IN PHASE 3
EXISTING BOILER TO
BE DEMOLISHED IN
PHASE 3
REMOVABLE COVER
3/16" STAINLESS STEEL SLIP-
RESISTANCE.
FUEL OIL PIPES. SEE
MECHANICAL DWG
FOR MORE INFO
FUEL OIL PUMP. SEE
MECHANICAL
DRAWINGS FOR MORE
INFO
FUEL OIL PIT
2' - 6"
REMOVABLE COVER
3/16" STAINLESS STEEL
SLIP-RESISTANCE
FUEL OIL PIPE. SEE
MECHANICAL
DRAWINGS FOR MORE
INFO
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
248 Copeland Street Quincy, MA 02169 P: 617-481-6390 F: 617-687-5990
200 Brickstone Square Andover, MA 01810 P: 978-296-6227 F: 978-475-5768
100% CONSTRUCTION
DOCUMENTS
REPLACE MAIN BOILERS 528A8-17-805
Samuel S. Stratton VA Medical Center, 113 Holland Ave., Albany, New York 12208
06/05/2024
N
105 Central Street Stoneham, MA 02180 P: 781-275-6050
C U s e rs \h a u n g \D o c u m e n ts \A lb a n y
B o ile r_
A rc h
B id
S e t_ V h a u n g
G H
V P
.r v t
/4
/2
:2
:0
A
M
AE-201
ARCHITECTURAL PHASE 2 - SUB-BASEMENT
NEW WORK PLAN
DM SH
3/16" = 1'-0"
1. SUB-BASEMENT PHASE 2 NEW WORK
1/4" = 1'-0"
PIPE TRENCH PHASE 2 SECTION 1
1/4" = 1'-0"
PIPE TRENCH PHASE 2 SECTION 2
NEW WORK KEY NOTES:
1. INSTALL A NEW GENERATOR EXHAUST LOUVER 10' X 6'-6". BOTTOM OF LOUVER SHALL BE AT LEAST 1'-0" ABOVE FLOOR.
2. INSTALL A NEW DOUBLE DOOR 6'X7'. REFER TO DOOR SCHEDULE BELOW.
3. INSTALL A NEW OUTSIDE AIR AIR LOUVER 10'-0" X 8'*0". BOTTOM OF LOUVER SHALL BE AT 3'-3" ABOVE FLOOR
4. PROVIDE NEW SUSPENDED CEILING IN THE EXISTING CONTROL ROOM AND NEW DECKING ON TOP OF EXISTING CONTROL ROOM.
DECKING ONLY TO PROVIDE PROTECTION FOR CONTROL ROOM CEILING, NOT FOR STORGAE. NO ACCESS, GUARDRAILS TO BE
PROVIDED. NEW ROOF DECK SHALL BE 2:12 SLOPE.
5. PROVIDE 6 CONCRETE POST BARRICADES TO PROTECT PROPANE TANK WITH 24" APART. SEE DETAILS ON DWG AI-102 FOR MORE INFO.
AI-101
AI-101
AI-101
AI-101
AI-101
AI-102
AI-104
AI-102
AF-101
AF-102
AF-102
AI-104
AF-103 4AF-103
AF-103
AF-1035
AI-204
AI-204
EDGES TO ALIGN WITH PREVIOUSLY
IN-FILLED SECTION OF WALL.
(V E
R
IF
Y I
N F
IE
L
D
AI-104
AI-102
AI-102
SP SP
LIGHT FIXTURES
SPRINKLER HEAD
2'X2'ACT SYSTEM
8' - 0" A.F.F.
LIGHT FIXTURES
6' - 0"
0' - 2" 0' - 2"
5' - 8"
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
248 Copeland Street Quincy, MA 02169 P: 617-481-6390 F: 617-687-5990
200 Brickstone Square Andover, MA 01810 P: 978-296-6227 F: 978-475-5768
100% CONSTRUCTION
DOCUMENTS
REPLACE MAIN BOILERS 528A8-17-805
Samuel S. Stratton VA Medical Center, 113 Holland Ave., Albany, New York 12208
06/05/2024
N
105 Central Street Stoneham, MA 02180 P: 781-275-6050
C U s e rs \h a u n g \D o c u m e n ts \A lb a n y
B o ile r_
A rc h
B id
S e t_ V h a u n g
G H
V P
.r v t
/4
/2
:2
:0
A
M
AE-301
ARCHITECTURAL PHASE 3 - SUB-BASEMENT
NEW WORK PLAN AND CONTROL ROOM RCP
DM SH
3/16" = 1'-0"
1. SUB-BASEMENT PHASE 3 NEW WORK
3/8" = 1'-0"
CONTROL ROOM PHASE 3 REFLECT CEILING PLAN
N
001 6'-10 5'-8" 1 3/4" IHM PNT HM PNT 2hr HW-E9 PAIR
MARK HEIGHT WIDTH THICK MATERIAL FINISH MATERIAL FINISH
DOOR FRAME
FIRE RATING
HARDWARE
SET
REMARK
DOOR SCHEUDULE
IHM = INSULATED HOLLOW METAL
HM = HOLLOW METAL
PNT = PAINT
DOOR SCHEDULE NOTES
1. REFER TO SHEET AI-202 FOR HEAD, JAMB AND THRESHOLD DETAILS.
3/8" = 1'-0"
DOOR FRAME ELEVATION
3/8" = 1'-0"
DOOR ELEVATION
AI-101
AI-101
NEW WORK KEY NOTES:
1. INSTALL A NEW OUTSIDE AIR INTAKE LOUVER WHEN FINISH RIGGING. LOUVER SIZE IS 11'X16'-8"
2. SUMMER BOILER STACK TO BE REMOVED IN IT'S ENTIRETY. PREPARE OPENING FOR INSTALLATION OF NEW GENERATOR FLUE EXHAUST
STACK. SEE AI-201 FOR EXHAUST DETAILS.
3. REMOVE SUMMER BOILER VENT PIPLE AND ENLARGE EXISTING VENT OPENING TO PREPARE FOR NEW GENERATOR VENT PIPE. SEE
AI-201 FOR DETAILS.
4. REMOVE SUMMER BOILER VENT PIPE AND PATCH OPENING. SEE AI-201 FOR INFILL DETAILS.
5. PROVIDE DECKING ON TOP OF EXISTING CONTROL ROOM. DECKING ONLY TO PROVIDE PROTECTION FOR CONTROL ROOM CEILING, NOT FOR STORGAE. NO ACCESS, GUARDRAILS TO BE PROVIDED. ROOF DECK SHALL BE 2:12 SLOPE.
6. WELD IN A 4' SECTIONI OF RAILING LOCATED ON MEZZANINE NORTH OF DA TANK.
AI-101
AI-101
AI-101
AI-104
AI-104
AI-104
GENERAL NOTES:
1. DIMENSIONS ARE FOR REFERENCE. CONTRACTOR SHALL COORDINATE WITH ALL TRADES FOR EXACT VENT PIPE LOCATIONS.
2. OPENINGS SHALL BE AT LEAST 12'' AWAY FROM ANY BEAM IN ANY DIRECTION.
3. REFER TO MEP PLANS FOR PIPE SIZE.
AI-204
AI-204
AI-104
COLD FORM C SECTION 800S200-54 @ 16" O.C.
AE-201
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
248 Copeland Street Quincy, MA 02169 P: 617-481-6390 F: 617-687-5990
200 Brickstone Square Andover, MA 01810 P: 978-296-6227 F: 978-475-5768
100% CONSTRUCTION
DOCUMENTS
REPLACE MAIN BOILERS 528A8-17-805
Samuel S. Stratton VA Medical Center, 113 Holland Ave., Albany, New York 12208
06/05/2024
N
105 Central Street Stoneham, MA 02180 P: 781-275-6050
C U s e rs \h a u n g \D o c u m e n ts \A lb a n y
B o ile r_
A rc h
B id
S e t_ V h a u n g
G H
V P
.r v t
/4
/2
:2
:0
A
M
AE-302
ARCHITECTURAL PHASE 3 - BASEMENT NEW
WORK PLAN
DM SH
3/16" = 1'-0"
2. BASEMENT PHASE 3 NEW WORK
N
3/8" = 1'-0"
CONTROL ROOM-ROOF FRAMING
NEW WORK KEY NOTES:
1. MODIFY ROOF OPENING TO FIT WITH NEW EXHAUST FANS. REFER TO EXHAUST FAN ROOF DETAIL 5 ON AI-201
FOR INFORMATION.
2. PROVIDE NEW ROOF OPENING FOR NEW VENT PIPING. REFER TO APPLICABLE VENT STACK DETAIL ON AI-201 FOR
INFORMATION. CORED HOLES MUST BE A MINIMUM OF 12" APART.
3. PROVIDE NEW ROOF OPENING FOR NEW 6 - 1.5" VENT PIPING. REFER TO APPLICABLE VENT STACK DETAIL ON
AI-201 DETAIL #6 FOR INFORMATION.
4. PROVIDE NEW ROOF OPENING FOR NEW VENT PIPING. REFER TO APPLICABLE VENT STACK DETAIL ON AI-201 FOR
INFORMATION.
5. EXISTING ROOF OPENINGS FOR EXSTING VENT PIPING TO REMAIN.
6. 3/AI-101 :BOILER ROOM NEW WORK INTERIOR WEST WALL
1 1 1 1
22∅
3" TYP.
25' - 0"
4"
3 3
3 3
1' - 9"
6"4
15' - 5" 15' - 9" 15' - 10" 15' - 0"
6 -
1.5" TYP.
10"
6 -
1.5" TYP. 6 -
1.5" TYP.
6 -
1.5" TYP.
5 4
3" TYP.
3" TYP.
3" TYP.
27' - 1"
16' - 11"
3" TYP.
3" TYP. 2
GENERAL NOTES:
• DIMENSIONS ARE FOR REFERENCE . CONTRACTOR SHALL COORDINATE WITH ALL TRADES FOR EXACT VENT PIPE
LOCATIONS.
• OPENINGS SHALL BE AT LEAST 12'' AWAY FROM ANY BEAM IN ANY DIRECTION.
• REFER TO MEP PLANS FOR PIPE SIZE AND AI-401 FOR MORE DETAILS.
15' - 0" 14' - 0" 13' - 6" 20' - 9"21' - 7"
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
248 Copeland Street Quincy, MA 02169 P: 617-481-6390 F: 617-687-5990
200 Brickstone Square Andover, MA 01810 P: 978-296-6227 F: 978-475-5768
100% CONSTRUCTION
DOCUMENTS
REPLACE MAIN BOILERS 528A8-17-805
Samuel S. Stratton VA Medical Center, 113 Holland Ave., Albany, New York 12208
06/05/2024
N
105 Central Street Stoneham, MA 02180 P: 781-275-6050
C U s e rs \h a u n g \D o c u m e n ts \A lb a n y
B o ile r_
A rc h
B id
S e t_ V h a u n g
G H
V P
.r v t
/4
/2
:2
:0
A
M
AE-303
ARCHITECTURAL PHASE 3 - ROOF NEW WORK
PLAN
DM SH
Sub-basement 178' - 9"
Basement Mezzanie 190' - 7"
Level 1 202' - 6"
NEW DOUBLE DOOR 6'X7'
AI-104
PROVIDE STRUCTURAL SUPPORT.
REFER TO STRUCTURAL
DRAWINGS FOR MORE INFO.
10' - 0"
AREA OF WALL TO BE PATCHED
AFTER RIGGING. REFER TO HEAD
AND SILL DETAILS AI-202
AI-104
NEW GENERATOR EXHAUST
LOUVER 10'-0" X 6'-6"
Sub-basement 178' - 9"
Basement Mezzanie 190' - 7"
Level 1 202' - 6"
NEW GENERATOR
OUTSIDE AIR INTAKE
LOUVER. LOUVER SIZE
11' X 10' (WXH).
PROVIDE STRUCTURAL SUPPORT.
REFER TO STRUTURAL DRAWINGS
FOR MORE INFO
AI-104
(V .I
.F
11' - 0"
EQ EQ
Sub-basement 178' - 9"
Basement Mezzanie 190' - 7"
Level 1 202' - 6"
Roof 216' - 6"
AREA OF WALL TO BE
PATCHED AFTER RIGGING.
REFER TO HEAD AND SILL
DETAILS A1-202
NOTE: USE THE SALVAGE
BRICKS FOR REPAIRING
AND PATCHING WORK
NEW BOILER OUTSIDE AIR
INTAKE LOUVER. LOUVER
SIZE 11'X16'-8" (WXH).
REFER TO DETAIL ON AI-202
EXISTING (VIF)
4' - 3"
11' - 0"
EXISTING (VIF)
13' - 11"
E X
IS
T
IN
G
V
IF
AI-104
Sub-basement 178' - 9"
Basement Mezzanie 190' - 7"
Level 1 202' - 6"
NEW 6'X7' OPENING FOR NEW
DOUBLE DOOR, CUT FROM
PREVIOUS INFILLED WALL. SEE
PHOTO #1
6' - 0"
REMOVE EXISTING OVERHEAD
COILING DOOR AND MODIFY
OPENING FOR NEW GENERATOR
EXHAUST LOUVER. SEE PHOTO #2
10' - 0"
Sub-basement 178' - 9"
Basement Mezzanie 190' - 7"
Level 1 202' - 6"
NEW 11'-0" X 10'-0" OPENING FOR
NEW OUTDOOR INTAKE LOUVER.
REMOVE EXISTING LOUVER AND
ENLARGE OPENING.
(3) 3/4" ELECTRICAL CONDUITS,
(2) FIRE ALARM CONDUITS
LOCATED ABOVE AND SIDE OF
EXISTING LOUVER SHALL BE
RELOCATED. SEE ELECTRICAL
DRAWINGS FOR MORE INFO.
(V .I
.F
11' - 0"
EQ EQ
Sub-basement 178' - 9"
Basement Mezzanie 190' - 7"
Level 1 202' - 6"
Roof 216' - 6"
13' - 11" 4' - 3"
DEMOLISH THE (E) WINDOW
AND THE PREVIOUS IN-
FILLED WALL 13' 10 1/2" X
16' 8 1/2" FOR RIGGING
OPENING. SEE PHOTO 3.
TOP OF FOUNDATION
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
248 Copeland Street Quincy, MA 02169 P: 617-481-6390 F: 617-687-5990
200 Brickstone Square Andover, MA 01810 P: 978-296-6227 F: 978-475-5768
100% CONSTRUCTION
DOCUMENTS
REPLACE MAIN BOILERS 528A8-17-805
Samuel S. Stratton VA Medical Center, 113 Holland Ave., Albany, New York 12208
06/05/2024
105 Central Street Stoneham, MA 02180 P: 781-275-6050
C U s e rs \h a u n g \D o c u m e n ts \A lb a n y
B o ile r_
A rc h
B id
S e t_ V h a u n g
G H
V P
.r v t
/4
/2
:2
:1
A
M
AI-101
ARCHITECTURAL PHASE 3 - NEW WORK
SECTIONS
DM SH
3/16" = 1'-0"
GENERATOR ROOM PHASE 3 NEW WORK ON EAST WALL
3/16" = 1'-0"
GENERATOR ROOM PHASE 3 NEW WORK ON WEST WALL
3/16" = 1'-0"
BOILER ROOM PHASE 3 NEW WORK ON WEST WALL
3/16" = 1'-0"
GENERATOR ROOM PHASE 3 DEMOLITION ON EAST WALL
3/16" = 1'-0"
GENERATOR ROOM PHASE 3 DEMOLITION ON WEST WALL
3/16" = 1'-0"
BOILER ROOM PHASE 3 DEMOLITION ON WEST WALL
REFER TO DRAWING AD-302 FOR DEMOLITION NOTES.
PHOTO 1: SECTION OF GENERATOR ROOM EAST WALL TO BE
REMOVED FOR NEW DOUBLE DOOR (VIEW FROM OUTSIDE)
PHOTO 2: SECTION OF BOILER ROOM WEST WALL TO BE
REMOVED FOR RIGGING. (LOOK FROM OUTSIDE)
F
E E
T
6 FEET
14 FEET
.7
F E
E T
3.25 FEET
PHOTO 2: OVERHEAD COILING DOOR TO BE REMOVED AND OPENING TO BE
MODIFIED FOR NEW AIR EXHAUST LOUVER (VIEW FROM OUTSIDE)