3A- Albany Architectural - stamped.pdf

PDF 6 MB Posted

Attached to
Z1DA--528A8-17-805 REPLACE MAIN BOILERS Federal contract opportunity
Solicitation number
36C24224B0047
Issued by
Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 2

About this file

This document is a 100% Construction Documents package for the Replace Main Boilers project (VA project #528A8-17-805) at the Samuel S. Stratton VA Medical Center in Albany, New York. The project includes replacing the three existing 900 HP dual fuel steam water-tube boilers with new boilers, installing two temporary 1,000 BHP dual fuel steam boilers, and upgrading the electrical service to the boiler and chiller plants. The work will be completed in three phases over approximately 730 calendar days. Key requirements include: utilizing the Autodesk Build construction management platform, providing temporary structures and services to maintain operations during the boiler replacement, and commissioning all new systems. The Department of Veterans Affairs Veterans Integrated Service Network 2 is the federal agency managing this project.

View the file

Other files for this federal contract opportunity

Other files attached to Z1DA--528A8-17-805 REPLACE MAIN BOILERS, newest first.
File Type Posted
36C24224B0047 0006.docx DOCX document
36C24224B0047 0005.docx DOCX document
2024-09-09 Walk Through Sign in Sheet .pdf PDF
36C24224B0047 0004.docx DOCX document
262300 Switchgear.pdf PDF
260511ReqForElecInstall.pdf PDF
36C24224B0047 0003.docx DOCX document
263623 Automatic Transfer Switch.pdf PDF
261316 Medium Voltage Fusible Interrupter Switches.pdf PDF
260573 Overcurrent Protective Device Coordination Study.pdf PDF
E-501 Boiler Plant Pre-Purchase One-Line Diagram.pdf PDF
Boiler Plant - Electrcial Purchase.png PNG image
261219 Pad mounted Liquid Filled Medium Voltage Transformers.pdf PDF
36C24224B0047 0002.docx DOCX document
2024-08-23 Walk Through Sign in Sheet .pdf PDF
36C24224B0047 0001.docx DOCX document
8- Albany Fire Protection - Stamped.pdf PDF
WD Albany NY20240002 07-12-2024.docx DOCX document
7- Albany Electrical - stamped.pdf PDF
6A- Albany Mechanical - stamped.pdf PDF
5- Albany Civil - stamped.pdf PDF
10- Albany Specs.pdf PDF
3C- Albany Architectural - stamped.pdf PDF
3B- Albany Architectural - stamped.pdf PDF
6B- Albany Mechanical - stamped.pdf PDF
9- Albany Plumbing - stamped.pdf PDF
4- Albany Structural - stamped.pdf PDF
2- Albany General - stamped.pdf PDF
36C24224B0047_1.docx DOCX document
Show all 29

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

X.X

X

XXX

NAME

X

A

B

C

D

A-0.0

X

A-0.0

ARCHITECTURAL TAG LEGEND:

- DOOR NUMBER

- WINDOW NUMBER

- WALL TAG, SEE WALL LEGEND FOR MORE INFORMATION

- SHEET SPECIFIC KEYNOTES

- INTERIOR ELEVATION TAG

- SECTION TAG

- LIMIT OF WORK

- DETAIL TAG

SHEET NUMBER

- ROOM TAG

DESIGNATION ON SHEET

SHEET NUMBER

DESIGNATION ON SHEET

SHEET NUMBER

DESIGNATION ON SHEET

ROOM NUMBER

ROOM NAME

1. UNLESS OTHERWISE INDICATED IN THE CONSTRUCTION DOCUMENTS AS BEING NOT IN

CONTRACT (N.I.C.) OR EXISTING; ALL ITEMS, MATERIALS AND INSTALLATION OF SAME ARE A

PART OF THE CONTRACT DEFINED BY THE CONSTRUCTION DOCUMENTS. THE

CONTRACTOR SHALL PROVIDE AND INSTALL ALL ACCESSORIES, COMPONENTS AND

ASSEMBLIES REQUIRED FOR THE WORK SHOWN.

2. CONTRACTOR SHALL SUBMIT A DETAILED PROJECT SCHEDULE. CONTRACTOR IS SOLELY

RESPONSIBLE FOR CONSTRUCTION SEQUENCING, METHODS AND TECHNIQUES. PHASING

OF THE WORK SHALL BE REVIEWED WITH THE OWNER AND THE ARCHITECT AND SHALL

INCLUDE MINIMIZING EXPOSURE OF THE STRUCTURE.

3. ANY DAMAGE TO EXISTING WORK WHICH IS NOT SCHEDULED FOR REMOVAL OR

REPLACEMENT, IF CAUSED BY THE CONTRACTOR'S OPERATIONS UNDER THIS CONTRACT

SHALL BE REPAIRED OR REPLACED AT THE CONTRACTOR'S EXPENSE.

4. CONTRACTOR SHALL PROVIDE AND IS SOLELY RESPONSIBLE FOR PUBLIC AND EMPLOYEE

PROTECTION AS NECESSARY AND AS REQUIRED BY THE CODES, ORDINANCES AND

REGULATIONS OF GOVERNMENTAL AGENCIES HAVING JURISDICTION AT THE PROJECT

PLACE.

5. IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO KEEP THE PREMISE CLEAN OF

6. THE CONTRACTOR SHALL NOT CLOSE OR OBSTRUCT ANY STREETS, ALLEYS,

COURTYARDS OR WALKS. NO MATERIAL SHALL BE PLACED OR STORED IN STREETS,

ALLEYS, COURTYARDS OR WALKS. ALL DEBRIS IS TO BE REMOVED COMPLETELY FROM

THE PREMISES.

7. ALL WORK SHALL BE COMPLETED AS SHOWN ON THE DRAWINGS AND EXECUTED IN GOOD

PROFESSIONAL MANNER.

8. WHEN APPLICABLE ALL FIRE-RATED ASSEMBLIES SHALL BE INSTALLED, LABELED, AND

INSPECTED IN ACCORDANCE WITH THE APPLICABLE BUILDING CODE.

9. CONTRACTOR SHALL PROVIDE FIRE EXTINGUISHERS PER THE PROJECT SPECIFICATION AND

NFPA 241 DURING CONSTRUCTION.

10. ALL EXTERIOR DIMENSIONS ARE TO THE FACE OF DRYWALL OR MASONRY AND ALL

INTERIOR DIMENSION ARE TO CENTER OF STUD UNLESS OTHERWISE NOTED.

11. INSTALLATION: EXCEPT AS MORE STRINGENT REQUIREMENTS ARE INDICATED ON THESE

DRAWINGS AND IN THESE NOTES, COMPLY WITH GENERALLY ACCEPTED INDUSTRY

STANDARDS AND INSTALL PRODUCTS IN STRICT COMPLIANCE WITH MANUFACTURER'S

PRINTED INSTRUCTIONS.

ABBREVIATIONS

ACP. - ACOUSTICAL CEILING PANEL

A.A.B. - ARCH. ACCESS BOARD

ADJ. - ADJACENT

A.F.F. - ABOVE FINISHED FLOOR

ALUM. - ALUMINUM

CH. - CHAPTER

CLG. - CEILING

CONC. - CONCRETE

CONT. - CONTINUOUS

CT - CERAMIC TILE

CTCB - CERAMIC TILE COVE BASE

D - DEEP

D/B - DESIGN BUILD

DIA. - DIAMETER

E.J. - EXPANSION JOINT

ELEC. - ELECTRICAL

ETR - EXISTING TO REMAIN - PATCH AND REPAIR AS REQ'D.

EXIST. - EXISTING

F.O.F. - FACE OF FINISH

G.C. - GENERAL CONTRACTOR

G.W.B. - GYPSUM WALL BOARD

H.C. - HANDICAP

H.V.A.C. - HEATING, VENTILATION, AND AIR CONDITIONING

INSUL. - INSULATION

MAAB - MASSACHUSETTS ARCHITECTURAL ACCESS BOARD.

MAX. - MAXIMUM

M.E.P. - MECHANICAL, ELECTRICAL, AND PLUMBING

MIN. - MINIMUM

M.R. - MOISTER RESISTANCE

MTD. - MOUNTED

MTL. - METAL

M.S.B.C. - MASS. STATE BLDG. CODE

N/A - NOT APPLICABLE

N.I.C. - NOT IN CONTRACT

O.A.E. - OR APPROVED EQUAL

O.C.- ON CENTER

O.F.I. - OWNER FURNISHED AND INSTALLED

OPP. - OPPOSITE

P.LAM. - PLASTIC LAMINATE

P.M. - PAINTED METAL

P & R - PATCH AND REPAIR

PTD. - PAINTED

REQ'D - REQUIRED

R.C.P. - REFLECTED CEILING PLAN

S.C. - SOLID CORE

S.S. - STAINLESS STEEL

T.M.E. - TO MATCH EXISTING

T.O. - TO REMAIN

TYP. - TYPICAL

U.N.O. - UNLESS NOTED OTHERWISE

U.S. - UNDERSIDE

V.C.T. - VINYL COMPOSITION TILE

V.I.F. - VERIFY IN FIELD

W. - WIDE

W./ - WITH

GENERAL NOTES: CONSTRUCTION PROCEDURES

DEBRIS, RUBBISH, EXCESS MATERIALS, ETC.. RESULTING FROM THE WORK OF THIS

CONTRACT.

12. ROOF WARRANTY:

12.1. THE MAIN BOILER ROOF SYSTEM IS A TREMCO POWERPLY PREMIUM BUILT-UP ROOF WHICH

WAS INSTALLED IN 2014 AND CURRENTLY UNDER 20 YEAR WARRANTY. CONTRACTOR SHALL

CONSULT WITH THE ROOF MANUFACTURER AND USE THEIR RECOMMENDED TECHNIQUE TO

MAINTAIN ROOF WARRANTY.

12.2. THE SUMMER BOILER ROOF SYSTEM IS BURMASTIC 200-GRAVEL SYSTEM. THE WARRANTY

EXPIRE IN 2017. HOWEVER, CONTRACTOR SHALL CONSULT WITH THE ROOF MANUFACTURER

AND USE THEIR RECOMMENDED TECHNIQUE TO MAINTAIN ROOF CONSISTENCE

FIRE RATING LEGEND

2 HR FIRE RATED WALL

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

248 Copeland Street Quincy, MA 02169 P: 617-481-6390 F: 617-687-5990

200 Brickstone Square Andover, MA 01810 P: 978-296-6227 F: 978-475-5768

100% CONSTRUCTION

DOCUMENTS

REPLACE MAIN BOILERS 528A8-17-805

Samuel S. Stratton VA Medical Center, 113 Holland Ave., Albany, New York 12208

06/05/2024

105 Central Street Stoneham, MA 02180 P: 781-275-6050

C U s e rs \h a u n g \D o c u m e n ts \A lb a n y

B o ile r_

A rc h

B id

S e t_ V h a u n g

G H

V P

.r v t

/4

/2

:2

:1

A

M

AG-001

ARCHITECTURAL GENERAL NOTES,

ABBREVIATIONS, AND SYMBOLS

DM SHRevisions: Date:

15' - 0" 2' - 2" 12' - 10" 2' - 2" 12' - 8" 2' - 2" 11' - 3" 2' - 2"

DEMOLITION KEY NOTES:

1. CUT CONCRETE SLAB FOR NEW FUEL OIL PIPE TRENCH. EXISTING SLAB IS UP TO 24" THICK. THE CONTRACTOR SHALL INCLUDE IN THEIR BID A GROUND PENETRATING RADAR AND/OR VIDEO INSPECTION OF THE EXISTING UNDER SLAB PIPING AS REQUIRED TO VERIFY THE LOCATIONS OF ALL UNDERSLAB PIPING IN

THE AREA OF WORK PRIOR TO THE START OF SLAB CUTTING WORK.

2. CONTRACTOR SHALL USE WET SAW TO MINIMIZE THE DUST THAT MAY AFFECT THE COMPRESSORS AND

BOILERS.K.

3' - 2"

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

248 Copeland Street Quincy, MA 02169 P: 617-481-6390 F: 617-687-5990

200 Brickstone Square Andover, MA 01810 P: 978-296-6227 F: 978-475-5768

100% CONSTRUCTION

DOCUMENTS

REPLACE MAIN BOILERS 528A8-17-805

Samuel S. Stratton VA Medical Center, 113 Holland Ave., Albany, New York 12208

06/05/2024

N

105 Central Street Stoneham, MA 02180 P: 781-275-6050

C U s e rs \h a u n g \D o c u m e n ts \A lb a n y

B o ile r_

A rc h

B id

S e t_ V h a u n g

G H

V P

.r v t

/4

/2

:2

:5

A

M

AD-201

ARCHITECTURAL PHASE 2 - SUB-BASEMENT

DEMOLITION PLAN

DM SHRevisions: Date:

AI-101

DEMOLITION KEY NOTES:

1. DEMOLISH SECTION OF IN-FILLED WALL TO CREATE OPENING FOR NEW DOUBLE DOOR 6'X7''. REFER TO SECTIONS VIEW FOR MORE

DETAILS.

2. REMOVE EXISTING LOUVER AND ELARGE OPENING FOR INSTALLATION OF NEW EXHAUST AIR LOUVER 10'X8''. REFER TO SECTION

VIEWS FOR MORE DETAILS.

3. REMOVE EXISTING OVERHEAD COILING DOOR AND MODIFY OPENING FOR INSTALLATION OF OUTSIDE AIR INTAKE LOUVER. REFER TO

SECTION FOR DETAILS.

4. REMOVE AND REINSTALL DOOR TO SWING OUTWARD FROM THE ELEC ROOM INTO THE GENERATOR ROOM.

5. 1/AI-101 : GENERATOR ROOM NEW WORK INTERIOR EAST WALL 4/AI-101 : GENERATOR ROOM DEMOLITION INTERIOR EAST WALL

6. 2/AI-101 : GENERATOR ROOM NEW WORK INTERIOR WEST WALL 5/AI-101 : GENERATOR ROOM DEMOLITION INTERIOR WEST WALL

7. 3/AI-101 : BOILER ROOM NEW WORK INTERIOR WEST WALL 6/AI-101 : BOILER ROOM DEMOLITION INTERIOR WEST WALL

AI-101

AI-101

AI-101

AI-101

AI-101

AI-104

AI-104

AI-204

AI-204

(V E

R

IF

Y I

N F

IE

L

D

EDGES OF

PREVIOUSLY IN-FILLED

SECTION OF WALL

AI-104

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

248 Copeland Street Quincy, MA 02169 P: 617-481-6390 F: 617-687-5990

200 Brickstone Square Andover, MA 01810 P: 978-296-6227 F: 978-475-5768

100% CONSTRUCTION

DOCUMENTS

REPLACE MAIN BOILERS 528A8-17-805

Samuel S. Stratton VA Medical Center, 113 Holland Ave., Albany, New York 12208

06/05/2024

N

105 Central Street Stoneham, MA 02180 P: 781-275-6050

C U s e rs \h a u n g \D o c u m e n ts \A lb a n y

B o ile r_

A rc h

B id

S e t_ V h a u n g

G H

V P

.r v t

/4

/2

:2

:5

A

M

AD-301

ARCHITECTURAL PHASE 3 - SUB-BASEMENT

DEMOLITION PLAN

DM SH

N

Revisions: Date:

AI-101

AI-101

DEMOLITION KEY NOTES:

1. DEMOLISH SECTION OF WALL FOR RIGGING BOILER IN AND OUT OF THE BOILER ROOM. OPENING SHALL BE THE SAME SIZE AS THE PREVIOUSLY IN-FILLED OPENING (13 10 1/2" X 16 8 1/2"). CONTRACTOR SHALL COORDINATE WITH RIGGING COMPANY FOR CORRECT OPENING SIZE REQUIRED. PROVIDE OUTSIDE AIR INTAKE LOUVER WHEN FINISH. LOVER SIZE SHALL BE 11'X16'-8". REFER TO DRAWING AI-301 FOR ADDITIONAL INFORMATION. THE CONTRACTOR SHALL CLOSE THE OPENINGS WHEN THEY ARE NOT IN USE.

2. HANDRAIL ON EXISTING CATWALK MAY NEED TO BE TEMPORARILY REMOVED DURING RIGGING AND RE-INSTALLED WHEN FINISH.

3. SUMMER BOILER STACK TO BE REMOVED IN THEIR ENTIRETY. ROOF OPENING SHALL BE PREPARED FOR INSTALLATION OF NEW

GENERATOR EXHAUST EQUIPEMENT. SEE AI-201 FOR DETAILS.

4. SUMMER BOILER VENT PIPES TO BE REMOVED IN THEIR ENTIRETY. PATCH ONE OF THE OPENINGS. ENLARGE ONE OF THE OPENINGS

TO ACCOMODATE GENERATOR VENT PIPE. SEE AI-201 FOR DETAILS.

5. 1/AI-101 : GENERATOR ROOM NEW WORK INTERIOR EAST WALL 4/AI-101 : GENERATOR ROOM DEMOLITION INTERIOR EAST WALL

6. 2/AI-101 : GENERATOR ROOM NEW WORK INTERIOR WEST WALL 5/AI-101 : GENERATOR ROOM DEMOLITION INTERIOR WEST WALL

7. 3/AI-101 : BOILER ROOM NEW WORK INTERIOR WEST WALL 6/AI-101 : BOILER ROOM DEMOLITION INTERIOR WEST WALL

8. SECTION OF HANDRAIL TO BE DEMOLISHED FOR CONNECTION TO NEW CATWALK. SEE STRUCTURAL DRAWINGS FOR MORE INFO.

AI-101

AI-101

AI-101

R O

U G

H O

P E

N

IN

G

V

IF

AI-104

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

248 Copeland Street Quincy, MA 02169 P: 617-481-6390 F: 617-687-5990

200 Brickstone Square Andover, MA 01810 P: 978-296-6227 F: 978-475-5768

100% CONSTRUCTION

DOCUMENTS

REPLACE MAIN BOILERS 528A8-17-805

Samuel S. Stratton VA Medical Center, 113 Holland Ave., Albany, New York 12208

06/05/2024

N

105 Central Street Stoneham, MA 02180 P: 781-275-6050

C U s e rs \h a u n g \D o c u m e n ts \A lb a n y

B o ile r_

A rc h

B id

S e t_ V h a u n g

G H

V P

.r v t

/4

/2

:2

:5

A

M

AD-302

ARCHITECTURAL PHASE 3 - BASEMENT

DEMOLITION PLAN

DM SH

DEMOLITION KEY NOTES:

1. EXISTING EXHAUST FANS TO BE REMOVED IN THEIR ENTIRETY. REFER TO DRAWING AI-201 FOR ADDITIONAL INFORMATION.

2. EXISTING OUTSIDE AIR INTAKE LOUVERS TO BE REMOVED IN THEIR INTIRELY. ROOF SHALL BE PREPARED FOR INSTALLATION OF

NEW EQUIPMENT. REFER TO DRAWING AI-201 FOR ADDITIONAL INFORMATION.

3. EXSTING VENT PIPINGS TO BE REMOVED. ROOF SHALLED BE PATCHED AS NOTES. REFER TO DRAWING AI-201 FOR ADDITIONAL

INFORMATION.

4. EXISTING DOMESTIC WATER HEATERS AND STACKS TO BE REMOVED IN THEIR ENTIRETY. ROOF SHALL BE PATCHED AS NOTES.

5. EXSTING VENT PIPINGS TO BE REMAIN.

6. NEW VENT PIPINGS INSTALLED IN PHASE 1.

7. 3/AI-101 : BOILER ROOM NEW WORK INTERIOR WEST WALL 6/AI-101 : BOILER ROOM DEMOLITION INTERIOR WEST WALL

2 2 2 2

AI-101

AI-101

3 3 3

6 6

5 5

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

248 Copeland Street Quincy, MA 02169 P: 617-481-6390 F: 617-687-5990

200 Brickstone Square Andover, MA 01810 P: 978-296-6227 F: 978-475-5768

100% CONSTRUCTION

DOCUMENTS

REPLACE MAIN BOILERS 528A8-17-805

Samuel S. Stratton VA Medical Center, 113 Holland Ave., Albany, New York 12208

06/05/2024

N

105 Central Street Stoneham, MA 02180 P: 781-275-6050

C U s e rs \h a u n g \D o c u m e n ts \A lb a n y

B o ile r_

A rc h

B id

S e t_ V h a u n g

G H

V P

.r v t

/4

/2

:2

:5

A

M

AD-303

ARCHITECTURAL PHASE 3 - ROOF DEMOLITION

PLAN

DM SH

AI-1032

AI-103

AI-103

15' - 4" 1' - 6" 13' - 6" 1' - 6" 13' - 0" 2' - 2" 11' - 3" 2' - 2" 4' - 11"

63' - 1" 2' - 2"

AI-103

NEW WORK KEY NOTES:

1. PROVIDE TEMPORARY DUST PARTITION AROUND EXISTING EQUIPMENT BEFORE STARTING

ANY WORK IN BOILER PLANT. REMOVE THE TEMPORARY PARTITION INCLUDING FAN AFTER

ALL THE WORK HAS BEEN DONE IN THE BOILER PLANT. NON-COMBUSTIBLE OR LIMITED

COMBUSTIBLE MATERIAL SHALL BE USED FOR THE DUST PARTITION. THIS WOULD INCLUDE

FIRE RETARDANT TREATED WOOD AND APPROVED FIRE-RESISTANT PLASTIC. SEE SHEET

AI-103 FOR DETAILS.

2. PROVIDE FUEL OIL PIPE TRENCH WITH INTERNAL DIMENSION WXD = 1'-6" X 1'-6". SEE PLAN

FOR LENGTH. THE TRENCH FLOOR SHALL SLIGHTLY SLOPE DOWN TO ONE SIDE OF THE

TRENCH AND SLOPE DOWN TOWARD THE PIT.

AE-201

0' - 4" 2' - 6" 0' - 4"

AE-201

0' - 4" 0' - 4"

FUEL OIL PIT

FUEL OIL TRENCH

0' - 4" 1' - 6"

0' - 4"

EXISTING

ELECTRICAL PANEL

TO BE DEMOLISHED

IN PHASE 3

EXISTING BOILER TO

BE DEMOLISHED IN

PHASE 3

REMOVABLE COVER

3/16" STAINLESS STEEL SLIP-

RESISTANCE.

FUEL OIL PIPES. SEE

MECHANICAL DWG

FOR MORE INFO

FUEL OIL PUMP. SEE

MECHANICAL

DRAWINGS FOR MORE

INFO

FUEL OIL PIT

2' - 6"

REMOVABLE COVER

3/16" STAINLESS STEEL

SLIP-RESISTANCE

FUEL OIL PIPE. SEE

MECHANICAL

DRAWINGS FOR MORE

INFO

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

248 Copeland Street Quincy, MA 02169 P: 617-481-6390 F: 617-687-5990

200 Brickstone Square Andover, MA 01810 P: 978-296-6227 F: 978-475-5768

100% CONSTRUCTION

DOCUMENTS

REPLACE MAIN BOILERS 528A8-17-805

Samuel S. Stratton VA Medical Center, 113 Holland Ave., Albany, New York 12208

06/05/2024

N

105 Central Street Stoneham, MA 02180 P: 781-275-6050

C U s e rs \h a u n g \D o c u m e n ts \A lb a n y

B o ile r_

A rc h

B id

S e t_ V h a u n g

G H

V P

.r v t

/4

/2

:2

:0

A

M

AE-201

ARCHITECTURAL PHASE 2 - SUB-BASEMENT

NEW WORK PLAN

DM SH

3/16" = 1'-0"

1. SUB-BASEMENT PHASE 2 NEW WORK

1/4" = 1'-0"

PIPE TRENCH PHASE 2 SECTION 1

1/4" = 1'-0"

PIPE TRENCH PHASE 2 SECTION 2

NEW WORK KEY NOTES:

1. INSTALL A NEW GENERATOR EXHAUST LOUVER 10' X 6'-6". BOTTOM OF LOUVER SHALL BE AT LEAST 1'-0" ABOVE FLOOR.

2. INSTALL A NEW DOUBLE DOOR 6'X7'. REFER TO DOOR SCHEDULE BELOW.

3. INSTALL A NEW OUTSIDE AIR AIR LOUVER 10'-0" X 8'*0". BOTTOM OF LOUVER SHALL BE AT 3'-3" ABOVE FLOOR

4. PROVIDE NEW SUSPENDED CEILING IN THE EXISTING CONTROL ROOM AND NEW DECKING ON TOP OF EXISTING CONTROL ROOM.

DECKING ONLY TO PROVIDE PROTECTION FOR CONTROL ROOM CEILING, NOT FOR STORGAE. NO ACCESS, GUARDRAILS TO BE

PROVIDED. NEW ROOF DECK SHALL BE 2:12 SLOPE.

5. PROVIDE 6 CONCRETE POST BARRICADES TO PROTECT PROPANE TANK WITH 24" APART. SEE DETAILS ON DWG AI-102 FOR MORE INFO.

AI-101

AI-101

AI-101

AI-101

AI-101

AI-102

AI-104

AI-102

AF-101

AF-102

AF-102

AI-104

AF-103 4AF-103

AF-103

AF-1035

AI-204

AI-204

EDGES TO ALIGN WITH PREVIOUSLY

IN-FILLED SECTION OF WALL.

(V E

R

IF

Y I

N F

IE

L

D

AI-104

AI-102

AI-102

SP SP

LIGHT FIXTURES

SPRINKLER HEAD

2'X2'ACT SYSTEM

8' - 0" A.F.F.

LIGHT FIXTURES

6' - 0"

0' - 2" 0' - 2"

5' - 8"

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

248 Copeland Street Quincy, MA 02169 P: 617-481-6390 F: 617-687-5990

200 Brickstone Square Andover, MA 01810 P: 978-296-6227 F: 978-475-5768

100% CONSTRUCTION

DOCUMENTS

REPLACE MAIN BOILERS 528A8-17-805

Samuel S. Stratton VA Medical Center, 113 Holland Ave., Albany, New York 12208

06/05/2024

N

105 Central Street Stoneham, MA 02180 P: 781-275-6050

C U s e rs \h a u n g \D o c u m e n ts \A lb a n y

B o ile r_

A rc h

B id

S e t_ V h a u n g

G H

V P

.r v t

/4

/2

:2

:0

A

M

AE-301

ARCHITECTURAL PHASE 3 - SUB-BASEMENT

NEW WORK PLAN AND CONTROL ROOM RCP

DM SH

3/16" = 1'-0"

1. SUB-BASEMENT PHASE 3 NEW WORK

3/8" = 1'-0"

CONTROL ROOM PHASE 3 REFLECT CEILING PLAN

N

001 6'-10 5'-8" 1 3/4" IHM PNT HM PNT 2hr HW-E9 PAIR

MARK HEIGHT WIDTH THICK MATERIAL FINISH MATERIAL FINISH

DOOR FRAME

FIRE RATING

HARDWARE

SET

REMARK

DOOR SCHEUDULE

IHM = INSULATED HOLLOW METAL

HM = HOLLOW METAL

PNT = PAINT

DOOR SCHEDULE NOTES

1. REFER TO SHEET AI-202 FOR HEAD, JAMB AND THRESHOLD DETAILS.

3/8" = 1'-0"

DOOR FRAME ELEVATION

3/8" = 1'-0"

DOOR ELEVATION

AI-101

AI-101

NEW WORK KEY NOTES:

1. INSTALL A NEW OUTSIDE AIR INTAKE LOUVER WHEN FINISH RIGGING. LOUVER SIZE IS 11'X16'-8"

2. SUMMER BOILER STACK TO BE REMOVED IN IT'S ENTIRETY. PREPARE OPENING FOR INSTALLATION OF NEW GENERATOR FLUE EXHAUST

STACK. SEE AI-201 FOR EXHAUST DETAILS.

3. REMOVE SUMMER BOILER VENT PIPLE AND ENLARGE EXISTING VENT OPENING TO PREPARE FOR NEW GENERATOR VENT PIPE. SEE

AI-201 FOR DETAILS.

4. REMOVE SUMMER BOILER VENT PIPE AND PATCH OPENING. SEE AI-201 FOR INFILL DETAILS.

5. PROVIDE DECKING ON TOP OF EXISTING CONTROL ROOM. DECKING ONLY TO PROVIDE PROTECTION FOR CONTROL ROOM CEILING, NOT FOR STORGAE. NO ACCESS, GUARDRAILS TO BE PROVIDED. ROOF DECK SHALL BE 2:12 SLOPE.

6. WELD IN A 4' SECTIONI OF RAILING LOCATED ON MEZZANINE NORTH OF DA TANK.

AI-101

AI-101

AI-101

AI-104

AI-104

AI-104

GENERAL NOTES:

1. DIMENSIONS ARE FOR REFERENCE. CONTRACTOR SHALL COORDINATE WITH ALL TRADES FOR EXACT VENT PIPE LOCATIONS.

2. OPENINGS SHALL BE AT LEAST 12'' AWAY FROM ANY BEAM IN ANY DIRECTION.

3. REFER TO MEP PLANS FOR PIPE SIZE.

AI-204

AI-204

AI-104

COLD FORM C SECTION 800S200-54 @ 16" O.C.

AE-201

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

248 Copeland Street Quincy, MA 02169 P: 617-481-6390 F: 617-687-5990

200 Brickstone Square Andover, MA 01810 P: 978-296-6227 F: 978-475-5768

100% CONSTRUCTION

DOCUMENTS

REPLACE MAIN BOILERS 528A8-17-805

Samuel S. Stratton VA Medical Center, 113 Holland Ave., Albany, New York 12208

06/05/2024

N

105 Central Street Stoneham, MA 02180 P: 781-275-6050

C U s e rs \h a u n g \D o c u m e n ts \A lb a n y

B o ile r_

A rc h

B id

S e t_ V h a u n g

G H

V P

.r v t

/4

/2

:2

:0

A

M

AE-302

ARCHITECTURAL PHASE 3 - BASEMENT NEW

WORK PLAN

DM SH

3/16" = 1'-0"

2. BASEMENT PHASE 3 NEW WORK

N

3/8" = 1'-0"

CONTROL ROOM-ROOF FRAMING

NEW WORK KEY NOTES:

1. MODIFY ROOF OPENING TO FIT WITH NEW EXHAUST FANS. REFER TO EXHAUST FAN ROOF DETAIL 5 ON AI-201

FOR INFORMATION.

2. PROVIDE NEW ROOF OPENING FOR NEW VENT PIPING. REFER TO APPLICABLE VENT STACK DETAIL ON AI-201 FOR

INFORMATION. CORED HOLES MUST BE A MINIMUM OF 12" APART.

3. PROVIDE NEW ROOF OPENING FOR NEW 6 - 1.5" VENT PIPING. REFER TO APPLICABLE VENT STACK DETAIL ON

AI-201 DETAIL #6 FOR INFORMATION.

4. PROVIDE NEW ROOF OPENING FOR NEW VENT PIPING. REFER TO APPLICABLE VENT STACK DETAIL ON AI-201 FOR

INFORMATION.

5. EXISTING ROOF OPENINGS FOR EXSTING VENT PIPING TO REMAIN.

6. 3/AI-101 :BOILER ROOM NEW WORK INTERIOR WEST WALL

1 1 1 1

22∅

3" TYP.

25' - 0"

4"

3 3

3 3

1' - 9"

6"4

15' - 5" 15' - 9" 15' - 10" 15' - 0"

6 -

1.5" TYP.

10"

6 -

1.5" TYP. 6 -

1.5" TYP.

6 -

1.5" TYP.

5 4

3" TYP.

3" TYP.

3" TYP.

27' - 1"

16' - 11"

3" TYP.

3" TYP. 2

GENERAL NOTES:

• DIMENSIONS ARE FOR REFERENCE . CONTRACTOR SHALL COORDINATE WITH ALL TRADES FOR EXACT VENT PIPE

LOCATIONS.

• OPENINGS SHALL BE AT LEAST 12'' AWAY FROM ANY BEAM IN ANY DIRECTION.

• REFER TO MEP PLANS FOR PIPE SIZE AND AI-401 FOR MORE DETAILS.

15' - 0" 14' - 0" 13' - 6" 20' - 9"21' - 7"

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

248 Copeland Street Quincy, MA 02169 P: 617-481-6390 F: 617-687-5990

200 Brickstone Square Andover, MA 01810 P: 978-296-6227 F: 978-475-5768

100% CONSTRUCTION

DOCUMENTS

REPLACE MAIN BOILERS 528A8-17-805

Samuel S. Stratton VA Medical Center, 113 Holland Ave., Albany, New York 12208

06/05/2024

N

105 Central Street Stoneham, MA 02180 P: 781-275-6050

C U s e rs \h a u n g \D o c u m e n ts \A lb a n y

B o ile r_

A rc h

B id

S e t_ V h a u n g

G H

V P

.r v t

/4

/2

:2

:0

A

M

AE-303

ARCHITECTURAL PHASE 3 - ROOF NEW WORK

PLAN

DM SH

Sub-basement 178' - 9"

Basement Mezzanie 190' - 7"

Level 1 202' - 6"

NEW DOUBLE DOOR 6'X7'

AI-104

PROVIDE STRUCTURAL SUPPORT.

REFER TO STRUCTURAL

DRAWINGS FOR MORE INFO.

10' - 0"

AREA OF WALL TO BE PATCHED

AFTER RIGGING. REFER TO HEAD

AND SILL DETAILS AI-202

AI-104

NEW GENERATOR EXHAUST

LOUVER 10'-0" X 6'-6"

Sub-basement 178' - 9"

Basement Mezzanie 190' - 7"

Level 1 202' - 6"

NEW GENERATOR

OUTSIDE AIR INTAKE

LOUVER. LOUVER SIZE

11' X 10' (WXH).

PROVIDE STRUCTURAL SUPPORT.

REFER TO STRUTURAL DRAWINGS

FOR MORE INFO

AI-104

(V .I

.F

11' - 0"

EQ EQ

Sub-basement 178' - 9"

Basement Mezzanie 190' - 7"

Level 1 202' - 6"

Roof 216' - 6"

AREA OF WALL TO BE

PATCHED AFTER RIGGING.

REFER TO HEAD AND SILL

DETAILS A1-202

NOTE: USE THE SALVAGE

BRICKS FOR REPAIRING

AND PATCHING WORK

NEW BOILER OUTSIDE AIR

INTAKE LOUVER. LOUVER

SIZE 11'X16'-8" (WXH).

REFER TO DETAIL ON AI-202

EXISTING (VIF)

4' - 3"

11' - 0"

EXISTING (VIF)

13' - 11"

E X

IS

T

IN

G

V

IF

AI-104

Sub-basement 178' - 9"

Basement Mezzanie 190' - 7"

Level 1 202' - 6"

NEW 6'X7' OPENING FOR NEW

DOUBLE DOOR, CUT FROM

PREVIOUS INFILLED WALL. SEE

PHOTO #1

6' - 0"

REMOVE EXISTING OVERHEAD

COILING DOOR AND MODIFY

OPENING FOR NEW GENERATOR

EXHAUST LOUVER. SEE PHOTO #2

10' - 0"

Sub-basement 178' - 9"

Basement Mezzanie 190' - 7"

Level 1 202' - 6"

NEW 11'-0" X 10'-0" OPENING FOR

NEW OUTDOOR INTAKE LOUVER.

REMOVE EXISTING LOUVER AND

ENLARGE OPENING.

(3) 3/4" ELECTRICAL CONDUITS,

(2) FIRE ALARM CONDUITS

LOCATED ABOVE AND SIDE OF

EXISTING LOUVER SHALL BE

RELOCATED. SEE ELECTRICAL

DRAWINGS FOR MORE INFO.

(V .I

.F

11' - 0"

EQ EQ

Sub-basement 178' - 9"

Basement Mezzanie 190' - 7"

Level 1 202' - 6"

Roof 216' - 6"

13' - 11" 4' - 3"

DEMOLISH THE (E) WINDOW

AND THE PREVIOUS IN-

FILLED WALL 13' 10 1/2" X

16' 8 1/2" FOR RIGGING

OPENING. SEE PHOTO 3.

TOP OF FOUNDATION

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

248 Copeland Street Quincy, MA 02169 P: 617-481-6390 F: 617-687-5990

200 Brickstone Square Andover, MA 01810 P: 978-296-6227 F: 978-475-5768

100% CONSTRUCTION

DOCUMENTS

REPLACE MAIN BOILERS 528A8-17-805

Samuel S. Stratton VA Medical Center, 113 Holland Ave., Albany, New York 12208

06/05/2024

105 Central Street Stoneham, MA 02180 P: 781-275-6050

C U s e rs \h a u n g \D o c u m e n ts \A lb a n y

B o ile r_

A rc h

B id

S e t_ V h a u n g

G H

V P

.r v t

/4

/2

:2

:1

A

M

AI-101

ARCHITECTURAL PHASE 3 - NEW WORK

SECTIONS

DM SH

3/16" = 1'-0"

GENERATOR ROOM PHASE 3 NEW WORK ON EAST WALL

3/16" = 1'-0"

GENERATOR ROOM PHASE 3 NEW WORK ON WEST WALL

3/16" = 1'-0"

BOILER ROOM PHASE 3 NEW WORK ON WEST WALL

3/16" = 1'-0"

GENERATOR ROOM PHASE 3 DEMOLITION ON EAST WALL

3/16" = 1'-0"

GENERATOR ROOM PHASE 3 DEMOLITION ON WEST WALL

3/16" = 1'-0"

BOILER ROOM PHASE 3 DEMOLITION ON WEST WALL

REFER TO DRAWING AD-302 FOR DEMOLITION NOTES.

PHOTO 1: SECTION OF GENERATOR ROOM EAST WALL TO BE

REMOVED FOR NEW DOUBLE DOOR (VIEW FROM OUTSIDE)

PHOTO 2: SECTION OF BOILER ROOM WEST WALL TO BE

REMOVED FOR RIGGING. (LOOK FROM OUTSIDE)

F

E E

T

6 FEET

14 FEET

.7

F E

E T

3.25 FEET

PHOTO 2: OVERHEAD COILING DOOR TO BE REMOVED AND OPENING TO BE

MODIFIED FOR NEW AIR EXHAUST LOUVER (VIEW FROM OUTSIDE)

F E

E T

10 FEET