6A- Albany Mechanical - stamped.pdf
PDF 19 MB Posted
- Attached to
- Z1DA--528A8-17-805 REPLACE MAIN BOILERS Federal contract opportunity
- Solicitation number
- 36C24224B0047
About this file
This document is a Solicitation for a federal contract opportunity to replace the primary boilers at the Albany VA Medical Center. The project includes construction services to replace three 900 HP dual-fuel steam boilers with two temporary 1,000 BHP steam boilers. The work will be executed in three phases: 1) Replace the electrical equipment and install new switchgear, 2) Install the temporary boilers and related infrastructure, and 3) Remove the existing 900 HP boilers and install the new boilers. The contract requires the use of the Autodesk Build construction management platform and completion of all submittals prior to mobilization. The work must be substantially complete within 730 calendar days of the notice to proceed. The contracting agency is the Department of Veterans Affairs, Veterans Integrated Service Network 2. No set-asides are specified, and the incumbent contractor is not identified.
View the file
Other files for this federal contract opportunity
Show all 29
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
D Y
H
H H E
D Y H
H H E
EL
EL
EL
MYRTLE AVE
BUILDING 5
BUILDING 4
BOILER PLANT
CHILLER AND ELEC.
EQUIPMENT
BUILDING 3
UTILITIES
BUILDING 54
CHILLER PLANT
GAZEBO
S U B S U R F A C E
C O N C R E T E
H V A C
T U N N E L
HVAC
TUNNEL
ACCESS
SHED
ABANDONED HVAC PIPING
N52° 10' 05"W 457.55
V C P
SAN MH E1
RIM: ??INV (A): ??
INV (B): 166.2
INV (C): ??
EXISTING CITY OF ALBANY 96"
DIA. CONCRETE SEWER
(A)
(B)
4" P
VC
D
RA
IN
L
IN
E
(C)
THE CHARLES HEALY
MEMORIAL ELECTRIC
GENERATION FACILITY
CONCRETE SIDEWALK
CONCRETE SIDEWALK
CONCRETE SIDEWALK
APPROX. 6" GAS LINE
2"
UG
GAS
8B
XX
BUILDING 5TRANSFORMER
13.2 - 208V R437 - R336
CHILLER TRANSFORMERS
13.2 - 480V R538 - R639
BOILER PLANT
TRANSFORMERS
13.2 - 480V
R134 - R235
FIRE PUMP
UNDERGROUNDELECTRIC
APPROX. LOCATION OF UNDERGROUND
4" DIA. FIBER OPTIC CABLE. 2 ROWS
OF 6 FOR 12 CABLES TOTAL.
HIGH
VOLTAGEFEED LINE13.2kV
COMM.
COMMUNICATION
CABLE ALIGNMENTUNKNOWN
COMMUNICATION
CABLE ALIGNMENTUNKNOWN
COMMUNICATIONS
CABLE (TYP.)
VALVE 30(CAPPED)
VALVE 31
VALVE 28
HYDRANT 10
VALVE 29
HYDRANT 09
APPROX. LOCATION OF 30" CITY WATER MAIN
W
W
W
W
W
W
S
S
J
J
A /C
A /C
Level 1 0' - 0"
Level 2 10' - 0"
Level 1 0' - 0"
Level 2 10' - 0"
F
F
OS
S
OS
TC
F
S
F
S 15cd L
15cd F
F
F
GFI,C
B
CD-ELP2-7
VIA TIMECLOCK
WP,GFI
CD-ELP2-6
CD-ELP2-5
CD-ELP2-3
B
CD-ELP2-8
WP,GFI
CD-ELP2-1
B
CD-ELP2-2,4
P B
CD-ELP2-11
J
CD-ELP2-10,12
J
CD-ELP2-14,16
J
J
J
J
CD-ELP2-18,20
V
V
V
V
FA PULL STATION
FA HORN/STROBE
TIMECLOCK
PUSH
BUTTON
PANEL "CD-ELP2"
TO NEXT FIRE ALARM
DEVICE
FA PULL STATION
12"x12"x6"
SURFACE MOUNTED
BOX WITH PIANO-
HINGE COVER
12"x12"x6"
SURFACE MOUNTED
BOX WITH PIANO-
HINGE COVER
MAIN CONTROL
ROOM
TOILET
MAIN
CONTROL
ROOM
TOILET
A/C
ANN ANN
BB
A/C
ANN ANN ANN
BB
DD
AA AA
S
DD
L
S
P
HH
BB
S
BB
PR GG FF EE
OQ
O
BB CC
P
K
L L
J
K M
S
T U
BB
VV
V V
A /C
A /C
KEY NOTES: #
GENERAL NOTE :
- CONTROL POWER BY CONTROLS CONTRACTOR. REFER TO DIV.26 DWGS FOR 120/1/60
JUNCTION BOX LOCATIONS.
- TRAILER SHALL BE EQUIPPED WITH ELECTRIC BASEBOARD FOR HEATING. WITH POWER
208/1/60
-- (4) 500W BASEBOARD IN BIG ROOM
-- (2) 500W BASEBOARD IN SMALL ROOM
- AC UNIT SHALL BE SIZE TO MAINTAIN 72°F ± 2°F ALL YEAR ROUND. INTERNAL LOAD 5 W/SFT.
- PROVIDE FIRE EXTINGUISHER.
- PROVIDE INSULATED SKIRT AROUND THE BOTTOM OF THE TRAILER
- PROVIDE LANDING (4X6), HANDRAIL AND STAIR AT TRAILER ENTRANCE DOOR
A. TEMPORARY BOILER ANNUNCIATOR PANELS (TYP. 2) PROVIDED BY TEMPORARY BOILER
CONTRACTOR, INSTALLED BY CONTROLS CONTRACTOR. ELECTRICAL CONTRACTOR TO PROVIDE
BRANCH CIRCUIT AS SHOWN.
B. PROVIDE NEW BMS ETHERNET CONNECTION SWITCH AND CONNECT EXISTING ONE IN CONTROL
ROOM, PROVIDED BY CONTROLS CONTRACTOR. ELECTRICAL CONTRACTOR TO PROVIDE RACEWAY.
C. VA NETWORK ETHERNET CONNECTION PROVIDED BY CONTROLS CONTRACTOR. ELECTRICAL
CONTRACTOR TO PROVIDE RACEWAY.
D. A/C UNIT PROVIDED BY TEMPORARY BOILER CONTRACTOR, WIRED BY ELECTRICAL CONTRACTOR.
SIMPLEX RECEPTACLE SHOWN, COORDINATE EXACT ELECTRICAL CONNECTION REQUIREMENTS WITH
TEMPORARY BOILER CONTRACTOR AND PROVIDE AS REQUIRED.
E. BULK OIL STORAGE AND TANK ALARM HORN PROVIDED BY CONTROLS CONTRACTOR. ELECTRICAL
CONTRACTOR TO PROVIDE RACEWAY.
F. LOW AIR PRESSURE ALARM HORN PROVIDED BY CONTROLS CONTRACTOR. ELECTRICAL
CONTRACTOR TO PROVIDE RACEWAY.
G. MAIN GAS VALVE ALARM HORN PROVIDED BY CONTROLS CONTRACTOR. ELECTRICAL CONTRACTOR
TO PROVIDE RACEWAY.
H. VAC-1/2 ALARM HORN PROVIDED BY CONTROLS CONTRACTOR. ELECTRICAL CONTRACTOR TO
PROVIDE RACEWAY.
I. WORK STATION FOR BOILER ROOM OPERATOR.
J. CHEMICAL WORK STATION, PROVIDED BY MECHANICAL CONTRACTOR.
K. POINT OF USE WATER HEATER, FURNISHED AND INSTALLED BY PLUMBING CONTRACTOR, WIRED BY
E.C.
L. PROVIDE NEW PARALLEL GENERATOR ANNUNCIATORS (TYP.3) AND CONNECT TO EXISTING ONES IN
CONTROL ROOM, PROVIDED BY ELECTRICAL CONTRACTOR. COORDINATE RELOCATION WITH THE COR M. DUAL-CHANNEL STEEL WIREMOLD (LEGRAND-WIREMOLD 4000 SERIES OR APPROVED EQUAL). WITH
DUPLEX GFI RECEPTACLES AT 18 INCREMENTS AND TELECOMMUNICATION PROVISION AT 24
INCREMENTS. PROVIDE BOTTOM CHANNEL 3" ABOVE TABLE TOP HEIGHT. COORDINATE LIGHTING
CONNECTION REQUIREMENTS WITH TEMPORARY BOILER CONTRACTOR.
N. COORDINATE LIGHTING CONNECTION REQUIREMENT WITH TEMPORARY BOILER CONTRACTOR.
O. FIRE ALARM CONDUIT.
P. 6 ” SQUARE EMPTY RECESS-FLUSH MOUNTED WALL BOX WITH BLANK COVER. PROVIDE 1 BELOW
CEILING AND LABEL.
Q. BOILER ROOM COMMUNICATION CONDUIT FOR LOW-VOLTAGE WIRING,
R. PROVIDE NEW EMERGENCY SHUT-OFF MAIN GAS VALVE AND CONNECT TO EXISTING ONE IN CONTROL
ROOM VIA LOW-VOLTAGE CONDUIT (SEE KEY NOTE "O" ABOVE).
S. COORDINATE WITH MECHANICAL CONTRACTOR AND PROVIDE CONNECTION TO ELECTRIC
BASEBOARD.
T. MEDICAL GAS MASTER ALARM PANEL BY PLUMBING CONTRACTOR.
U. WIRED MEDICAL ALARM PANEL BY PLUMBING CONTRACTOR.
V. PORTABLE FIRE EXTINGUISHER.
A-A VIEW
B-B VIEW
B A
B A b c b b
S b
S
9,b
F
,a
F9 7,a
9,b
9,c
F9 7,a
9,b
N
18"
H
D
D
N
PANEL
"CD-ELP2"
G
F
E O
B C
Q
48"
P
N
AA
L
L
L
I
72"
P
K a
R
10,12
14,16
18,20
18,20
10,12
10,12
S
S
S
S
S
S
WP
J
M
N T
U
K
NTEMPORARY BOILER DESIGN REQUIREMENTS:
• RENTAL FIRM: POWERHOUSE AS BASIS OF DESIGN.
• TEMPORARY BOILERS SHALL BE COMPLIANT WITH ALL VA BOILER REGULATIONS
• STEAM LOAD:
WINTER PEAK LOAD: 890 BHP
WINTER MIN LOAD: 229 BHP
SUMMER PEAK LOAD: 459 BHP
SUMMER MIN LOAD: 67 BHP
• PRESSURE:
BOILER DESIGN PRESSURE: 150 PSI
OPERATING PRESSURE: 120 PSI
• TEMPORARY BOILER, CONTROL ROOM, SITE ACCESSORIES SHALL BE REMOVED BACK TO BUILDING WALL AFTER THE PROJECT IS
COMPLETE. PIPING SHALL BE REMOVED BACK TO BUILDING WALL .
TEMPORARY 1000 HP BOILERS
• CONTRACTOR SHALL CHECK TIRE PRESSURE BI-WEEKLY AND
REFILL IF NEED.
• PROVIDE PADS UNDER TIRES AND SUPPORTING LEGS TO
PREVENT DAMAGING TO DRIVEWAY ASPHALT. REPAIR
ASPHALT AS NEEDED, AFTER THE TEMPORARY BOILERS ARE
REMOVED.
• ANY OTHER DRAIN FROM THE TEMPORARY BOILERS SHOULD
BE BROUGHT TO THE MANHOLE AND NOT DISCHARGED ON
THE GROUND.
• WHEN TEMPORARY BOILERS ARE OPERATING AND ONE
REQUIRES MAINTENANCE, WE WILL BE DOWN TO ONE
OPERATING BOILER. ALL SCHEDULED MAINTENANCE HAS TO
BE ACCOMPLISHED DURING ONE WORK DAY
TEMPORARY CONTROL
ROOM. APPROX 224 SQF
CONSTRUCTION FENCE AND LOCKING
GATE
• CONSTRUCTION FENCE SHALL
BE 6 FOOT HEIGHT
• PROVIDE HEAVY LEADED BASES
FOR THE POSTS.
• PROVIDE MAIN GATES WITH KEY
LOCKS AND PANIC HARDWARE.
PROVIDE BEST 7 CORE LOCK
WITH CORE BY VA.
• PROVIDE SIGNAGE AT
CONSTRUCTION FENCE GATE
AND AT DOOR BY CHIMNEY
STATING "PLEASE CALL (518)
XXX-XXXX BOILER OPERATORS
OR (518) XXX-XXXX FOR
SECURITY"
CONSTRUCTION
STORAGE AND
LAYDOWN AREA
DROP BOILER BLOWDOWN
TEMPORARY HOSE TO THIS
MANHOLE. PROVIDE MEANS
OF PROTECTION AROUND
MANHOLE
TEMPORARY ACCESS PLATFORM.
APPROX 5' X 56'.
• PROVIDE HANDRAIL AT THE
OPEN END.
• PROVIDE ROOFING TO COVER
ENTIRE ELEVATED PLATFORM.
PLATFORM ROOF SHALL BE
DESIGNED AND SIZED FOR
SNOW LOAD (AT LEAST
40LBS/SQF) AND OPERATING
WEIGHT OF ALL PIPING.
• THE BOILER SHALL BE
SLIGHTLY TILTED AWAY FROM
THE PLATFORM THE AVOID
RAIN WATER ENTERING
PLATFORM.
12' - 0"
' - 2
6' - 6"
22' - 1"
CHIMNEY
CRANE
23' - 0"
CRANE FOR FLUE STACK LINER INSTALLATION REQUIREMENTS:
• BASIS OF DESIGN: LIEBHERR LTM1095-5.1
• SPECIFICATIONS:
190' MAIN BOOM AT 74°
62' FOLDING JIB (NZK) (0° OFFSET)
BASE: 100% OUTRIGGERS (24 X 23)
COUNTERWEIGHT: 14100 LBS
LIFT RADIUS (360°): 63.4'
CRANE CAPACITY AT 63.4' = 4,200 LBS
• TOTAL LOAD: APPROXIMATE 3500 LBS
TEMPORARY BOILER AND CONTROL ROOM LOCATION
CRANE FOR STACK LINER INSTALLATION LOCATION
DIMENSIONS FOR THE
TEMPORARY BOILERS ARE LISTED
ARE THE MAXIMUM SIZE THAT WILL
FIT IN THIS AREA. VERIFY IN FIELD.
"5
" 8
53' - 0"
TEMPORARY BOILER TRAILER SITE
ACCESS
• DETACH PILLAR CLOSEST TO
DRIVEWAY FROM FOUNDATION
AND STORE.
• REMOVE FENCE AND STORE.
• FILL AREA WITH GRAVEL.
• REMOVE TRAFFIC SIGN AND
STORE.
• PROVIDE TRAFFIC CONTROL.
• SEE PHOTO FOR DETAIL.
MS-201
6" STAINLESS STEEL BRAIDED
HOSES FOR TEMPORARY
BOILER BLOWDOWN. HOSES
SHALL BE RATED FOR STEAM
TEMPERATURE AND
PRESSURE UPTO 150 PSI.
CRANE FALL AREA
MS-201
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
248 Copeland Street Quincy, MA 02169 P: 617-481-6390 F: 617-687-5990
200 Brickstone Square Andover, MA 01810 P: 978-296-6227 F: 978-475-5768
100% CONSTRUCTION
DOCUMENTS
REPLACE MAIN BOILERS 528A8-17-805
Samuel S. Stratton VA Medical Center, 113 Holland Ave., Albany, New York 12208
06/05/2024
N
105 Central Street Stoneham, MA 02180 P: 781-275-6050
C U se rs
\h a u n g \D o c u m e n ts
\A lb a n y_ B o ile r_ M e c h
E le ct ri c a l U p g ra d e
V h a u n g
G H
V P
.r v t
/3
/2
:1
:0
A
M
MS-200
TEMPORARY BOILERS, TRAILER AND UTILITIES
LOCATION PLAN
ND HL
1" = 20'-0"
SITE PLAN 1/4" = 1'-0"
TEMPORARY CONTROL TRAILER
ITEMS ON MYRTLE STREET TO BE
REMOVED AND RE-INSTALLED WHEN
TEMPORARY BOILERS ARE SET AND
AFTER TEMPORARY BOILERS ARE
REMOVED
- TRAFFIC SIGN
- PILLARS
- FENCE
Revisions: Date:
EXCELS IOR
084767-1
A /C
A /C
W
W
W W
S
BENCHMARK -BURY TAG
ON HYDRANT
ELEVATION=189.53'
SMH
'E2'
V C P
12"VC
P
15"
STEE
L
V C P
P V C
GRAVEL
TRACKS
R E T
W A L L
C
ONC
RETE W
ALK AND
STEPS
CB
'E2A'
8"X8" RAIL ROAD TIE
GENERAL NOTES:
1. ROOF SHALL BE DESIGNED AND SIZED FOR SNOW LOAD (MIN. 40 LBS/SQF). PROVIDE ICE AND WATER SHEILD.
2. PROVIDE 1/2" CHICKEN WIRE ALONG SIDES TO PREVENT ANIMAL ACCESS BETWEEN RAILROAD TIES INTO
THE ENCLOSURE. FASTEN TO PLYWOOD SHEATHING AND SECURE WITH 3/4" GRAVEL.
8" Ø HPS
6" Ø NG
1 1/2" Ø FOS
1 1/2" Ø FOR
4" Ø BF
1" Ø PCW
ELECTRICAL CONDUITS:
(4) 3" Ø
(6) 2" Ø
UNITSTRUT
OUTDOOR 3/4"
PLYWOOD
(TYP.)
PT 2X4 (TYP.)
1/2" CHICKEN
WIRE
3/4" GRAVEL
3. PROVIDE SHOP DRAWINGS FOR A/E REVIEW
2" Ø NPCW
8" Ø SONOTYPE
1'-6"
3/4" HEADED
PROVIDE MINIMUM 8" OVERHANG.
ANCHOR (TYP.)
APPROXIMATELY 15'
ELEVATION DROP FROM
BUILDING 54 TO TEMPORARY
BOILERS. PROVIDE STEAM
TRAP.
PROVIDE HEAT TRACE FOR
CONDENSATE LINE AND
STEAM TRAP. PROVIDE POINT
ON BMS FOR TROUBLE
SIGNAL AND HEAT TRACE
OPERATION.
GENERAL NOTES:
1. REFER TO TEMPORARY BOILER PID ON SHEET MI-305 FOR BOILER HOOK UP DETAILS
2. PROVIDE (2) PORTABLE FIRE EXTINGUISHER IN EACH TRAILER.
3. ALL SCHEDULED MAINTENANCE HAS TO BE ACCOMPLISHED DURING ONE WORK DAY.
CONDUITS QUANTITY AND SIZE:
1. (4) 3”
2. (6) 2”
• CONDUITS LISTED ABOVE SHALL BE IN A 3-ACROSS X
3-DEEP CONFIGURATION (SPACERS EVERY 10-FEET).
• RUN CONDUITS INSIDE TEMPORARY PIPE
ENCLOSURE (SEE DWG C-101-3).
4"ø (BF)
1 1/2"ø (FOR#2)
1 1/2"ø (FOS#2)
MS-201
3" BF AND 1-1/2"
FOS/FOR TO
TEMPORARY
BOILER FUEL OIL
CONNECTION
PROVIDE ROOFING
TO COVER ENTIRE
ELEVATED
PLATFORM
PROVIDE LANDING,
HANDRAIL, AND
STAIR.
PROVIDE INSULATED
SKIRTING AROUND
THE BOTTOM OF THE
TRAILER
HYDRONIC PIPING SIZE:
1. 8" HPS
2. 1-1/2" FOS/FOR
3. 4" BF1/BF2
• FROM MECHANICAL ROOM . REFER TO MH-103 FOR
CONTINUATION.
• RUN PIPES INSIDE TEMPORARY PIPE ENCLOSURE
(SEE DWG C-101-3).
• PROVIDE HEAT TRACE FOR BF-1 AND BF-2. PROVIDE
POINT ON BMS FOR TROUBLE SIGNAL AND HEAT
TRACE OPERATION.
8" HPS TO TEMPORARY BOILER
STEAM CONNECTION. PROVIDE
THREE ELBOW SWING OR
RECOMMENDED BY BOILER
MANUFACTURER. EACH
TEMPORARY BOILER SHALL HAVE A
NONE-RETURN STOP-CHECK VALVE.
3" BF AND 1-1/2"
FOS/FOR TO
TEMPORARY
BOILER FUEL OIL
CONNECTION
PIPING ROUTING IS DESIGN INTENT.
CONTRACTOR SHALL PROVIDE DELEGATE
DESIGN FOR REVIEW AND APPROVE.
CONTRACTOR SHALL PROVIDE EXPANSION
LOOP AS REQUIRED BY SPECS.
OTHER PIPING SIZES:
1. 6" NG
2. 1" PCW
3. 2" NPCW
• FROM MECHANICAL ROOM. REFER TO DWG PP-101
FOR CONTINUATION.
• RUN PIPES INSIDE TEMPORARY PIPE ENCLOSURE
(SEE DWG C-101-3).
• PROVIDE HEAT TRACE FOR PCW AND NPCW.
PROVIDE POINT ON BMS FOR TROUBLE SIGNAL AND
HEAT TRACE OPERATION.
CONDUITS FROM
MECHANICAL ROOM. REFER
TO DWG ESP-101 FOR
CONTINUATION
PROVIDE 3/4" INVERT BUCKET STEAM
TRAP WITH REMOVABLE INSULATION
JACKET
PROVIDE HEAT TRACE FOR
CONDENSATE LINE AND STEAM TRAP.
PROVIDE POINT ON BMS FOR
TROUBLE SIGNAL AND HEAT TRACE
OPERATION.
PROVIDE STEAM TRAP
OUTDOOR PIPING ENCLOSURE:
• CONSTRUCT WITH PT 2X4, 3/4" OUTDOOR PLYWOOD, AND UNISTRUT.
• PROVIDE TAPER TOP FOR PROPER DRAINAGE.
• PROVIDE SCREW FASTENERS FOR REMOVAL.
• PROVIDE 8"X8" RAILROAD TIE TO SUPPORT ENCLOSURE SPACED
EVERY 8 FEET.
• SONOTUBE SHALL BE FILLED WITH CONCRETE AND SHALL BE
PULLED OUT AT END OF PROJECT. LAND SHALL BE BACK FILLED TO
MATCH EXISTING .
• PROVIDE OUTDOOR PAINT TO PROTECT ENCLOSURE DURING
CONSTRUCTION.
• PROVIDE DIVIDER TO SEPARATE ELECTRICAL CONDUITS AND PIPES.
SEE DWG C-101-3 FOR MORE DETAILS.
PIPE DROP OF APPROXIMATELY 15'.
PROVIDE 3/4" INVERT BUCKET STEAM
TRAP WITH REMOVABLE INSULATION
JACKET
PROVIDE HEAT TRACE FOR CONDENSATE
LINE AND STEAM TRAP. PROVIDE POINT
ON BMS FOR TROUBLE SIGNAL AND HEAT
TRACE OPERATION. FOR CONTINUATION
AND MORE DETAIL, REFER TO:
- MH-203 FOR MECHANICAL SYSTEM
- PP-202 FOR PLUMBING SYSTEM
- ESP-102 FOR ELECTRICAL SYSTEM
6" STAINLESS STEEL BRAIDED HOSES FOR
TEMPORARY BOILER BLOWDOWN. HOSES
SHALL BE RATED FOR STEAM TEMPERATURE
AND PRESSURE UPTO 150 PSI.
MS-201
PROVIDE CROSS OVER STAIR
PROVIDE CROSS
OVER STAIR
PROVIDE 7"X9"X9' RAIL
ROAD TIES AND 6" LAYER
OF GRAVEL TO SUPPORT
TRAILER (TYP.)
MS-201
BUILDING 5
8" Ø SONO TUBE (TYP.)
PLATFORM ROOF
ELECTRICAL CONDUITS SERVING
TEMPORARY BOILERS
4"ø (BF)
1 1/2"ø (FOS#2)
6"ø (NG)
1"ø (CW)
GENERAL NOTES:
1. PLATFORM ROOF SHALL BE DESIGNED AND SIZED FOR SNOW LOAD (AT LEAST 40LBS/SQF).
2. THE BOILER SHALL BE SLIGHTLY TILTED AWAY FROM THE PLATFORM TO AVOID RAIN WATER
ENTERING THE PLATFORM.
3. PROVIDE SHOP DRAWINGS FOR A/E REVIEW
8"ø (HPS)8"ø (HPS)
PROVIDE
STEAM
TRAP PROVIDE
STEAM
TRAP
MS-201
RAIL-ROAD TIES
PROVIDE 8"-THICK LAYER OF SAND AND 6"-
THICK LAYER OF CRUSHED STONE BELOW RAIL
ROAD TIES. FILL THE GAPS BETWEEN RAIL
ROAD TIES WITH CURSH STONE. THE BASE
SHALL BE AT LEAST 2 FEET WIDER THAN
TRAILER IN BOTH DIRECTIONS.
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
248 Copeland Street Quincy, MA 02169 P: 617-481-6390 F: 617-687-5990
200 Brickstone Square Andover, MA 01810 P: 978-296-6227 F: 978-475-5768
100% CONSTRUCTION
DOCUMENTS
REPLACE MAIN BOILERS 528A8-17-805
Samuel S. Stratton VA Medical Center, 113 Holland Ave., Albany, New York 12208
06/05/2024
N
105 Central Street Stoneham, MA 02180 P: 781-275-6050
C U se rs
\h a u n g \D o c u m e n ts
\A lb a n y_ B o ile r_ M e c h
E le ct ri c a l U p g ra d e
V h a u n g
G H
V P
.r v t
/3
/2
:1
:0
A
M
MS-201
TEMPORARY BOILERS, TRAILER AND UTILITIES
LOCATION PLAN
HL
3/16" = 1'-0"
TEMPORARY BOILER HOOK UP 1/4" = 1'-0"
MECHANICAL PHASE 2 TEMPORARY BOILER SECTION 1
NTS
TEMPORARY PIPING ENCLOSURE
1/4" = 1'-0"
MECHANICAL PHASE 2 TEMPORARY BOILER SECTION 2
Revisions: Date:
P
/2 "ø
/2 "ø
/2 "ø
/2 "ø
EXISTING
BOILER 1
EXISTING
BOILER 2
EXISTING
BOILER 3
2"ø (PR)
3"ø (PR)
6"ø (HPS)
1 1/4"ø
"ø
"ø
"ø
"ø
8"ø (HPS) 2"ø (PR)
4"ø
10"ø (HPS)
4"ø
6"ø
"ø
"ø
"ø
1 1/2"ø
3"ø
"ø
P
P
P
P
P
12"ø
COGEN
"ø 6 "ø
EXISTING SUMMER
BOILER
BOILER CONTROL
ROOM
VFD
P1
VFD
P3
"ø
"ø
1 1/2"ø
S
"ø
1 1/2"ø1 1/2"ø
3"ø (PR)
/2 "ø
1 1/2"ø
1 1/2"ø (HPR)
/2 "ø
H
P R
2"ø (LPR)
1 1/2"ø
"ø
3"ø (LPR)
"ø
"ø
"ø
1 1/2"ø (HPR) 1 1/2"ø (LPR)
"ø
"ø
/2 "ø
"ø
"ø
"ø
"ø
H
P S
DEMOLITION GENERAL NOTES:
1. REFER TO DRAWING GI-003 FOR LEGEND.
2. COORDINATE ALL SHUTDOWN REQUIREMENTS WITH THE VA COR. PROVIDE AT LEAST 2 WEEK
OF WRITTEN NOTICE IN ADVANCE TO THE VA COR.
3. CONTRACTOR IS RESPONSIBLE FOR PROVIDING STAGING REQUIREMENTS TO PERFORM
DEMOLITION WORK.
4. CONTRACTOR SHOULD ASSUME ALL PIPING IN THIS SYSTEM IS FULL OF #4 OIL, ALL SHUT OFF
VALVES DO NOT WORK, INCLUDE FREEZING PIPING AS PART OF THE BID.
5. ALL REMOVED MATERIALS, EQUIPMENT SHALL BE DISPOSED OFF SITE PER LOCAL CODES
AND VA STANDARDS.
6. REFER TO PHASING AND SHUTDOWN MATRIX ON DWG GI-004.
7. CONTRACTOR TO PROVIDE LUMP SUM TO ACCOUNT FOR UP TO 200 LF OF 4" AND BELOW
PIPING, INSULATION, SUPPORTS, AND APPURTENANCES TO BE REMOVED WHERE IDENTIFIED
BY COR. PROVIDE SHUT OFFS AND CAPS ON ACTIVE SYSTEMS.
8. CONTRACTOR SHALL MAINTAIN SUPPORT AND OPERATION OF EXISTING-TO-REMAIN ITEMS
DURING CONSTRUCTION.
"ø
PHASE 1 DEMOLITION KEY NOTES:
1. DEMOLISH SECTION OF 2"Ø PUMPED CONDENSATE PIPE BACK TO THE POINT AS INDICATED
ON THE FLOOR PLAN.
2. DEMOLISH EXISTING WINDOW AC SERVING ROOM U3 TO MAKE ROOM FOR NEW ELETRICAL
CONDUITS. TURN THE WINDOW AC OVER TO AC SHOP. SEE ELECTRICAL DRAWINGS EP-103
FOR MORE INFORMATION.
CHIMNEY
P
8A&B
(EXISTING)
P
(EXISTING)
P
6&7
(L
P R
(P R
(L P
R
(L P
R
(P R
(L P
R
2"HPS TO
LAUNDRY ROOM
EXISTING BRINE TANK AND
SOFTENER
6"HPS TO LAUNDRY
4" LPR FROM HOSPITAL
2" LPR FROM HOSPITAL
1-1/2" LPR FROM ARF
(ABANDONED)
6" LPS UP
10" HPS TO HOSPITAL
1-1/2" HPR FROM HTG
PUMP ROOM
4" PR FROM HTG PUMP
ROOM
5" LPS TO UTILITY
HEATING SYSTEM
1-1/2" LPR FROM HOSPITAL
CONDENSATE TANK
(H P
R
(B F
-0
(B F
-0
(F O
S
(F O
R
(B D
(HPS)
(HPS)
(BO)
(F O
S
(F O
R
(F O
S
(F O
R ) (F
O R
(F O
S
(M P
R
(P R
(L P
R
(L P
R
(HPS)
(LPR)
(LPR)
U3
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
248 Copeland Street Quincy, MA 02169 P: 617-481-6390 F: 617-687-5990
200 Brickstone Square Andover, MA 01810 P: 978-296-6227 F: 978-475-5768
100% CONSTRUCTION
DOCUMENTS
REPLACE MAIN BOILERS 528A8-17-805
Samuel S. Stratton VA Medical Center, 113 Holland Ave., Albany, New York 12208
06/05/2024
N
105 Central Street Stoneham, MA 02180 P: 781-275-6050
C U se rs
\h a u n g \D o c u m e n ts
\A lb a n y_ B o ile r_ M e c h
E le ct ri c a l U p g ra d e
V h a u n g
G H
V P
.r v t
/3
/2
:1
:0
A
M
MD-101
MECHANICAL - PHASE 1 - SUB-BASEMENT
DEMOLITION PLAN
3/16" = 1'-0"
PHASE 1 - SUB-BASEMENT DEMOLITION PLAN
Revisions: Date:
ABANDONED
8" HPS
HWS/R AND
CHWS/R TO/FROM
HOSPITAL
6" ETR VTR 6" ETR VTRU
"ø
H
P S
CHILLER ROOM
BOILER ROOM
CHIMNEY
A L
L E
Y
2" VTR
"ø
PHASE 1 DEMOLITION KEY NOTES:
1. DEMOLISH ABANDONED PIPE AND ACCESSORIES BACK TO
ISOLATION VALVE AS INDICATED ON THE PLAN.
2. DEMOLISH 8" Ø LPS AND CROSS CONNECTING PIPING BETWEEN
TWO LOW PRESSURE STEAM HEADERS BACK TO ISOLATION
VALVE AS INDICATED ON THE PLAN.
3. DEMOLISH DRIP LEG STEAM TRAPS AT PRVs AND HIGH PRESSURE
RETURN PIPING.
4. DEMOLISH PRV-1 AND ASSOCIATE PIPING AND ACCESSORIES.
5. DEMOLISH HPS SERVING PRV-1 BACK TO THIS POINT, AS
INDICATED ON PLAN, AND CAP.
6. DEMOLISH LPS/LPR SERVING UNIT HEATER BACK TO THIS POINT AS
INDICATED ON THE PLAN AND CAP.
7. DEMOLISH 8" Ø VENT PIPE FROM CONDENSATE PUMPS CP-2.
PATCH ROOF PENETRATION. NEW VENT SHALL BE INSTALLED
CONNECTED PRIOR TO REMOVING EXISTING VENT.
8. DEMOLISH UNIT HEATER, ASSOCIATE PIPING CONTROLS,
SUPPORTS, AND ACCESSORIES.
9. DEMOLISH CONDENSATE PUMP CP-1, AND ASSOCIATE PIPING AND
ACCESSORIES, INCLUDING VENT PIPE THRU ROOF. PATCH ROOF
PENETRATION. TURN OVER CP-1 TO VA.
10. DEMOLISH SECTION OF 5"Ø HWS/R FROM/TO COGEN TO THE
POINTS AS INDICATED ON THE PLAN. SEAL EXISTING WALL
PENETRATIONS. REMOVE EXISTING HEAT TRACE FROM CURRENT
PENETRATION TO CHP. WORK SHALL BE COMPLETED DURING
SUMMER MONTHS.
11. DEMOLISH FLASH TANK ENTIRELY, INCLUDING VENT PIPE THRU
ROOF. PATCH ROOF PENETRATION.
12. DEMOLISH HEAT EXCHANGERS HX-1 & 2, AND ASSOCIATE PIPING
ACCESSORIES, CONTROLS AND SUPPORTS. CONTRACTOR SHALL
HIRE TRANE TO REMOVE CONTROLS FROM BMS.
13. DEMOLISH LOW PRESSURE STEAM HEADER AND VENT PIPE THRU
ROOF. PATCH ROOF PENETRATION.
14. DEMOLISH LPS/LPR SERVING UNIT HEATERS BACK TO THIS POINT
AS INDICATED ON THE PLAN AND CAP.
15. DEMOLISH HWS/R FROM/TO HX-1 & 2, INCLUDING ACCESSORIES,
BACK THE POINT AS INDICATED ON THE PLAN.
16. DEMOLISH 2" Ø PR PIPE FROM CONDENSATE PUMP CP-1 BACK TO
THIS POINT AS INDICATED ON THE PLAN.
17. REMOVE AND DECOMMISSION EXISTING CONTROLS ASSOCIATED
WITH HX-1 & 2 PACKAGE.
"ø
P
R
2"ø (PR)
3"ø (PR) 2 "ø
P
R
3"ø (PR)
"ø
P
R
10"ø (HWR) 2"ø (LPS)
1"ø (LPR)
10"ø (HWS) 10"ø
10"ø
"ø
"ø
5"ø (HWR)
5"ø (HWS)
5"ø 5"ø
"ø
"ø
L
P S
"ø
L
P R
"ø
L P
S
"ø
L P
S
14"ø (LPS)12"ø (LPS)
"ø
L P
S
8"ø (HPS)
(CHWS)
(CHWR)
(HWS)
(HWR)
EXISTING
PRVs
GENERAL NOTES:
1. A COORDINATE SHUTDOWN REQUIREMENTS WITH THE OWNER.
PROVIDE A WRITTEN NOTICE AT LEAST 15 WORKING DAYS IN
ADVANCE FOR ANY REQUIRED SHUTDOWN.
2. CONTRACTOR SHALL MAINTAIN SUPPORT AND OPERATION OF
EXISTING-TO-REMAIN ITEMS DURING CONSTRUCTION.
EXISTING CONTROL PANEL
FOR HX-1 & 2 17
"ø
P
R
EXISTING
STEAM TRAP
(H P
R
EXISTING
PRV-1
PRV
PRV
EV-2.1
EV-3.1
EV-1
EV-3.2
EV-2.2
8"ø (DCW)
5"ø (HWR)
5"ø (HWS)
8"ø (DCW) 5"ø (HWR)
5"ø (HWS)
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
248 Copeland Street Quincy, MA 02169 P: 617-481-6390 F: 617-687-5990
200 Brickstone Square Andover, MA 01810 P: 978-296-6227 F: 978-475-5768
100% CONSTRUCTION
DOCUMENTS
REPLACE MAIN BOILERS 528A8-17-805
Samuel S. Stratton VA Medical Center, 113 Holland Ave., Albany, New York 12208
06/05/2024
N
105 Central Street Stoneham, MA 02180 P: 781-275-6050
C U se rs
\h a u n g \D o c u m e n ts
\A lb a n y_ B o ile r_ M e c h
E le ct ri c a l U p g ra d e
V h a u n g
G H
V P
.r v t
/3
/2
:1
:0
A
M
MD-103
MECHANICAL - PHASE 1 - LEVEL 1 DEMOLITION
PLAN
ND HL
3/16" = 1'-0"
PHASE 1 - LEVEL 1 - DEMOLITION PLAN
Revisions: Date:
UP
/2 "ø
/2 "ø
/2 "ø
/2 "ø
EXISTING
BOILER 1
EXISTING
BOILER 2
EXISTING
BOILER 3
2"ø (PR)
3"ø (PR)
6"ø (HPS)
1 1/4"ø
"ø
"ø
"ø
"ø
8"ø (HPS) 2"ø (PR)
4"ø
10"ø (HPS)
4"ø
6"ø
"ø
"ø
"ø
1 1/2"ø
3"ø
"ø
P
P
P
P
P
12"ø
COGEN
"ø 6 "ø
EXISTING SUMMER
BOILER
BOILER CONTROL
ROOM
VFD
P1
VFD
P3
"ø
"ø
1 1/2"ø
S
"ø
1 1/2"ø1 1/2"ø
3"ø (PR)
/2 "ø
1 1/2"ø
1 1/2"ø (HPR)
/2 "ø
H
P R
1 1/2"ø
"ø
3"ø (LPR)
"ø
"ø
1 1/2"ø (HPR)
1 1/2"ø (LPR)
"ø
"ø
/2 "ø
"ø
"ø
"ø
MAIN BOILER
FUEL OIL
PUMP SETS
SUMMER BOILER
FUEL OIL PUMP
SETS (P-8)
"ø
H
P S
2"HPS TO
LAUNDRY ROOM
DEMOLITION GENERAL NOTES:
1. COORDINATE ALL SHUTDOWN REQUIREMENTS WITH THE VA COR. PROVIDE AT LEAST 2 WEEK
OF WRITTEN NOTICE IN ADVANCE TO THE VA COR.
2. CONTRACTOR IS RESPONSIBLE FOR PROVIDING STAGING REQUIREMENTS TO PERFORM
DEMOLITION WORK.
3. CONTRACTOR SHOULD ASSUME ALL PIPING IN THIS SYSTEM IS FULL OF #4 OIL, ALL SHUT OFF
VALVES DO NOT WORK, INCLUDE FREEZING PIPING AS PART OF THE BID.
4. ALL REMOVED MATERIALS, EQUIPMENT SHALL BE DISPOSED OFF SITE PER LOCAL CODES
AND VA STANDARDS.
5. REFER TO PHASING AND SHUTDOWN MATRIX ON DWG GI-004.
6. CONTRACTOR SHALL MAINTAIN SUPPORT AND OPERATION OF EXISTING-TO-REMAIN ITEMS
DURING CONSTRUCTION.
EXISTING BRINE TANK AND
SOFTENER
6"HPS TO LAUNDRY
4" LPR FROM HOSPITAL
2" LPR FROM HOSPITAL
1-1/2" LPR FROM ARF
(ABANDONED)
6" LPS UP
10" HPS TO HOSPITAL
1-1/2" HPR FROM HTG
PUMP ROOM
4" PR FROM HTG PUMP
ROOM
5" LPS TO UTILITY
HEATING SYSTEM
1-1/2" LPR FROM HOSPITAL
2" MPR UP
"ø
PHASE 2 DEMOLITION KEY NOTES:
1. PROVIDE TEMPORARY DUST BARRIER AROUND AIR COMPRESSORS AND OTHER EQUIPMENT
PRIOR TO DEMOLITION WORK. REFER TO ARCHITECT DWG FOR MORE INFO.
2. DEMOLISH FUEL OIL # 4 PUMP / HEATER SKID AND PIPING. INCLUDE REMOVING PIPING AND
SUPPORTS TO #4 TANKS AND CAP AT TANKS. SEAL WALL PENETRATIONS TO MATCH
EXISTING. REMOVE 1-1/2" STEAM PIPE FROM MEZZANINE TO SERVE #4 FUEL OIL HEATER.
REMOVE FROM SHUT OFF TO HTX. CAP VALVE.
3. DEMOLISH LOW PRESSURE CONDENSATE, PUMPED CONDENSATE AND MEDIUM
CONDENSATE PIPING BACK TO THE POINTS AS INDICATED ON THE DRAWINGS. TEMPORARY
MANAGEMENT OF CONDENSATE RETURN FROM HOSPITAL, BOILER PLANT, CHILLER PLANT
SHALL BE PROVIDED BY THE CONTRACTOR IN COORDINATION WITH THE VA, INCLUDING BUT
NOT LIMITED TO TEMPORARY DRAINAGE OF CONDENSATE AT ALL SOURCES, AND EQUIPMENT
LOCK OUT. PUMPED CONDENSATE SHOULD BE DUMPED TO FLOOR DRAIN. FOR HIGH
PRESSURE CONDENSATE, CONTRACTOR SHALL PROVIDE TEMPORARY FLASH TANK TO
FLASH STEAM TO ATMOSPHERE BEFORE DUMPING TO DRAIN. MAXIMUM TEMPERATURE TO
DRAIN SHALL BE 140⁰F. PROVIDE DCW AND CONTROLS AS NEEDED.
4. DEMOLISH WINTER BOILER FUEL OIL PUMP P-9 AFTER CROSS CONNECTING TO SUMMER
BOILER PUMPS. PROVIDE MODIFICATIONS TO SUMMER BOILER PUMPS AS INDICATE ON
EQUIPMENT SCHEDULE TO ALLOW PUMPS TO RUN SIMULTANEOUSLY.
5. DEMOLISH 1-1/2" HPR FROM GENERATOR ROOM AND SUMMER BOILER ROOM BACK TO THE
POINT AS INDICATED ON THE DRAWING.
6. DEMOLISH CONDENSATE TANK, TANK SUPPORT AND ALL ASSOCIATE PIPING AS NOTED ON
THE DRAWINGS
7. DEMOLISH EXISTING FEED WATER PUMP P-1, P-2, P-3 AND ASSOCIATE VFD-P1, VFD-P3
INCLUDE CONCRETE PADS.
8. DEMOLISH EXISTING CONDENSATE TRANSFER PUMP P-4 & P-5, INCLUDE CONCRETE PAD.
9. REFER TO PART PLAN MD-301A FOR PHASE I DEMOLITION IN CONTROL ROOM
10. DEMOLISH EXISTING FLASH TANK AND ASSOCIATE PIPING AS SHOWN ON THE DEMO PLAN.
11. TUNE B-4 SO THAT IT CAN RUN ON 100 PSI FUEL OIL. REVISE SUMMER FUEL OIL SETTING TO
100 PSI TO MATCH BOILERS 1, 2, AND 3.
CHIMNEY
CONDENSATE TANK
FO #4
PUMP SET
P
8A&B
(EXISTING)
P
(EXISTING)
P
6&7
(L P
R
(P R
(L P
R
(L P
R
(LPR)
(L P
R
(LPR)
(L P
R
(F O
S
(L P
R
(P R
)(F O
R
(F O
S
(F O
R
(F O
R
(F O
S
(HPR)
(H P
R
(HPS)
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
248 Copeland Street Quincy, MA 02169 P: 617-481-6390 F: 617-687-5990
200 Brickstone Square Andover, MA 01810 P: 978-296-6227 F: 978-475-5768
100% CONSTRUCTION
DOCUMENTS
REPLACE MAIN BOILERS 528A8-17-805
Samuel S. Stratton VA Medical Center, 113 Holland Ave., Albany, New York 12208
06/05/2024
N
105 Central Street Stoneham, MA 02180 P: 781-275-6050
C U se rs
\h a u n g \D o c u m e n ts
\A lb a n y_ B o ile r_ M e c h
E le ct ri c a l U p g ra d e
V h a u n g
G H
V P
.r v t
/3
/2
:1
:0
A
M
MD-201
MECHANICAL - PHASE 2 - SUB-BASEMENT
DEMOLITION PLAN
HL
3/16" = 1'-0"
PHASE 2 - SUB-BASEMENT DEMOLITION PLAN
Revisions: Date:
3"ø
3"ø (HWR)
3"ø (HWS)
3"ø (CHWR)
3"ø (CHWS)
1 1/2"ø
2 1/2"ø 2 1/2"ø
1 1/2"ø
10"ø (HPS)
"ø
"ø
H P
S
"ø
6"ø
"ø
ABANDONED 8" HPS
QTR &
RES.
PRV
UTILITY
HTG
PRV
QTR &
RES.
PRV
IN
-H
O U
S E
P R
V
DA
TANK
8"ø
/4 "ø
/4 "ø
/4 "ø
"ø
"ø
"ø
"ø
"ø 2 "ø
"ø
"ø
6"ø (V) 8"ø 10"ø (HPS) 8"ø 8"ø 4"ø (HPS)
8"ø
"ø
1"ø
"ø
EXISTING
BOILER 1
EXISTING
BOILER 2
EXISTING
BOILER 3
"ø
H
W S
"ø
H
W R
SUMMER BOILER
MUA-1
"x
"x
"ø
3"ø
"ø 3 "ø
"ø
/2 "ø
/2 "ø
/2 "ø
HWS/R AND
CHWS/R TO/FROM
HOSPITAL
CO
CO AND HYDRO CARBON
SENSORS
HC
2 1/2"ø 2 1/2"ø
1 1/2"ø
1"ø 1"ø
2"ø 2"ø
COGEN
1 1/2"ø (HPR) 2"ø
1"ø (LPR)
2" LPR FROM HOSPITAL
1-1/2" LPR FROM ARF
(ABANDONED)
3/4"ø
1 1/2"ø (LPR)
6"HPS DN
CHEMICAL TREATMENT
"ø
"ø
1 1/2"ø
6" LPS DN
10" HPS DN
DWH PACKAGES. REFER TO
PLUMBING DWGS FOR
DETAILS
1-1/2" HPS TO
ECONOMIZER SOOT
BLOWER. (TYP.)
BREECHING
RELIEF VALVES
DISCHARGE 7'-0"
ABOVE ROOF. (TYP.)
2"Ø BF-2 DN
2"Ø BF-1 DN
1"Ø FOS#2 DN
1"Ø FOR#2 DN
2" NG DN
3" LPR DN
1-1/2" HPR DN
1-1/2" LPR DN
1" V UP
1/2" HPS DN TO
STEAM METER
TRANSMITTER FOR
B1
1/2" HPS DN TO
STEAM METER
TRANSMITTER FOR
B2 & B3
EXISTING 6"
VTR
2" MPR FROM
TANK VAULT
2"Ø BF-2 DN
2"Ø BF-1 DN
1"Ø FOS#2 DN
1"Ø FOR#2 DN
"ø
FOS/FOR TO/FM
GENERATORS
FOS/FOR
FROM/TO TANK
VAULT
1 1/4"ø (DS) 1 1/2"ø (DR)
PHASE 2 DEMOLITION KEY NOTES:
1. DEMOLISH FUEL OIL # 6 PUMP / HEATER SKID AND PIPING
2. DEMOLISH EXISTING UH-3 WITH ALL ACCESSORIES
3. DEMOLISH EXISTING UH-4 WITH ALL ACCESSORIES.
4. DEMOLISH EXISTING UH-5 WITH ALL ACCESSORIES.
5. DEMOLISH ALL HPS PIPING SERVING UNIT HEATER.
6. DEMOLISH 1-1/2" HPR BACK TO THE POINT AS INDICATED ON THE DRAWING.
7. DEMOLISH EXISTING PRV AND ALL ASSOCIATED HPS, HPR AND VENT PIPING.
8. DEMOLISH HEAT RECOVERY AND 4" VENT THRU ROOF. PATCH THE ROOF.
9. REMOVE MUA-1 VFD (460/3/60, 20 HP). REFER TO SHEET MH-201 FOR NEW MUA-1 VFD
LOCATION.
10. DOMESTIC WATER HEATERS, ACCESSORIES AND FLUE STACKS TO BE DEMOLISHED. REFER
TO PLBG DWG SHEET PD-201 FOR MORE INFO.
11. RELOCATE SECTION EXISTING HOT WATER AND CHILLED WATER PIPING TO YIELD SPACE FOR
RIGGING. THESE PIPES SERVE AREAS THAT ARE OUT OF SCOPE IN THIS PROJECT.
RELOCATING THE CHW PIPES CAN OCCUR IN THE WINTER AND THE HHW LINES CAN BE
RELOCATED IN THE SUMMER.
1"ø
/2 "ø
UH
UH
UH
3 5
2"ø (LPS)
4"ø (HPS)
6"HPS DN
DEMOLITION GENERAL NOTES:
1. COORDINATE ALL SHUTDOWN REQUIREMENTS WITH THE VA COR. PROVIDE AT LEAST 2 WEEK
OF WRITTEN NOTICE IN ADVANCE TO THE VA COR.
2. CONTRACTOR IS RESPONSIBLE FOR PROVIDING STAGING REQUIREMENTS TO PERFORM
DEMOLITION WORK.
3. ALL REMOVED MATERIALS, EQUIPMENT SHALL BE DISPOSED OFF PER LOCAL CODES AND VA
STANDARDS.
4. REFER TO PHASING AND SHUTDOWN MATRIX ON DWG GI-005 & GI-006.
5. CONTRACTOR SHALL MAINTAIN SUPPORT AND OPERATION OF EXISTING-TO-REMAIN ITEMS
DURING CONSTRUCTION.
CHIMNEY
EXISTING SWITCH
AND CONTROL
PANEL
EXISTING 6"
VTR
(FOS#6)
(FOS#6)
(FOR#2)
(FOS#2)
(FW-2)
(FW-1)
8"ø (DCW) 5"ø (HWR)
5"ø (HWS)
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
248 Copeland Street Quincy, MA 02169 P: 617-481-6390 F: 617-687-5990
200 Brickstone Square Andover, MA 01810 P: 978-296-6227 F: 978-475-5768
100% CONSTRUCTION
DOCUMENTS
REPLACE MAIN BOILERS 528A8-17-805
Samuel S. Stratton VA Medical Center, 113 Holland Ave., Albany, New York 12208
06/05/2024
N
105 Central Street Stoneham, MA 02180 P: 781-275-6050
C U se rs
\h a u n g \D o c u m e n ts
\A lb a n y_ B o ile r_ M e c h
E le ct ri c a l U p g ra d e
V h a u n g
G H
V P
.r v t
/3
/2
:1
:1
A
M
MD-202
MECHANICAL - PHASE 2 - BASEMENT
DEMOLITION PLAN
ND HL
3/16" = 1'-0"
PHASE 2 - BASEMENT DEMOLITION PLAN
Revisions: Date:
/2 "ø
/2 "ø
EXISTING
BOILER 1
EXISTING
BOILER 2
EXISTING
BOILER 3
2"ø (PR)
3"ø (PR)
6"ø (HPS)
1 1/4"ø
"ø
"ø
"ø
"ø
8"ø (HPS) 2"ø (PR)
10"ø (HPS)
6"ø
12"ø
COGEN
"ø 6 "ø
EXISTING SUMMER
BOILER
BOILER CONTROL
ROOM
S
"ø
1 1/2"ø1 1/2"ø
3"ø (PR)
1 1/2"ø (HPR)
/2 "ø
H
P R
3"ø (LPR)
1 1/2"ø (HPR)
1 1/2"ø (LPR)
"ø
"ø
"ø
"ø
"ø
PHASE 3 DEMOLITION KEY NOTE:
1. DEMOLISH EXISTING BLOWDOWN TANK AND ALL
BLOWDOWN PIPING. BLOWDOWN TANK VENT PIPING
THRU ROOF SHALL REMAIN.
2. DEMOLISH IN-HOUSE PRV (SERVES DA TANK), INCLUDE
ALL UPSTREAM PIPING AND ACCESSORIES.
3. DEMOLISH BOILER SURFACE BLOWDOWN CONDUCTIVITY
SENSORS, CONTROL VALVES AND SAMPLE COOLERS.
4. REFER TO DWG MD-201A FOR DEMOLITION WORK IN
CONTROL ROOM.
5. DEMOLISH ALL BOILERS B-1 TO B-3 AND SUMMER
BOILER, INCLUDING ACCESSORIES: SUPPLY STEAM
PIPES, VENT PIPES, FEED WATER PIPES, ELECTRICAL
PANELS, NATURAL GAS, COMPRESSED AIR, FLOOR
DRAINS, STEAM METERS, CO/HC SENSORS, WIRING AND
ALL ASSOCIATE CONTROL & WIRING ALL THE WAY TO
CONTROL ROOM.
6. DEMOLISH STEAM HEADER AND ALL DRIP LEGS.
7. DEMOLISH EXISTING SUMMER BOILER FUEL OIL PUMP
P-8 INCLUDING ACCESSORIES
8. DEMOLISH EXISTING GENERATOR DIESEL PUMP.
9. DEMOLISH ADVANCE METERING SYSTEM PANELS.
CONTRACTORS SHALL PALLETIZE STEAM METERS AND
SYSTEM PANELS, SHRINK WRAP, AND TURN OVER TO VA.
10. DEMOLISH EXISTING EMERGENCY SWITCH WITH
ASSOCIATED WIRING & CONTROL AND REPLACE WITH
NEW.
11. DEMOLISH CARBON MONOXIDE AND COMBUSTIBLE GAS
SENSORS WITH ASSOCIATED WIRING & CONTROLS.
12. DEMOLISH CHEMICAL DRUMS AND PUMPS.
13. DEMOLISH SUMMER BOILER CONTROL PANEL.
14. DEMOLISH EXISTING EXHAUST FAN AND ASSOCIATE
DUCTWORK.
15. DEMOLISH EXISTING 6"Ø SERVING LAUNDRY ROOM UP
TO BOILER ROOM WALL.
16. DEMOLISH HPC PIPE FROM HEADER DRIP LEG TO DA
TANK IN ITS ENTIRE.
17. THE EXISTING SPLIT SYSTEM SHALL BE PROTECTED
DURING CONSTRUCTION OF THE CONTROL ROOM. THEY
MAY HAVE TO BE TEMPORARY REMOVED AND RE-
INSTALLED WHEN THE CONTROL ROOM IS FINISHED.
1 1/2"ø (LPR) 4"ø (PR)
5"ø (HPS)
DEMOLITION GENERAL NOTES:
1. COORDINATE ALL SHUTDOWN REQUIREMENTS WITH
THE VA COR. PROVIDE AT LEAST 2 WEEK OF WRITTEN
NOTICE IN ADVANCE TO THE VA COR.
2. CONTRACTOR IS RESPONSIBLE FOR PROVIDING
STAGING REQUIREMENTS TO PERFORM DEMOLITION
WORK.
3. ALL REMOVED MATERIALS, EQUIPMENT SHALL BE
DISPOSED OFF SITE PER LOCAL CODES AND VA
STANDARDS.
4. REFER TO PHASING AND SHUTDOWN MATRIX ON DWG
GI-004.
5. CONTRACTOR TO COORDINATE WITH LOCAL DIESEL
DELIVERY COMPANIES TO ENSURE THAT FUEL
DELIVERY TRUCKS ARE AVAILABLE ON STANDBY TO
ENSURE THAT FUEL OIL IS AVAILABLE AT ALL TIMES TO
FILL THE EXISTING GENERATOR BELLY TANKS DURING
SYSTEM SHUTDOWN.
6. THERE ARE SIX EXISTING STEAM METERS THAT ARE
CONNECTED TO THE ADVANCED METERING SYSTEM
DATA COLLECTION CABINET, 1-ALB-1-RTU-1, LOCATED IN
THE BOILER PLANT. REMOVE THE WIRING TO SERVING
THE STEAM METERS TO THE METERING SYSTEM.
CAREFULLY REMOVE THE STEAM METERS, SHRINK
WRAP THEM, AND ATTACH TO PALLETS. TWO METERS
TO A PALLET. THIS INCLUDES ALL SENSORS AND
CONTROLLERS. TURN OVER TO VA.
7. CONTRACTOR SHALL MAINTAIN SUPPORT AND
OPERATION OF EXISTING-TO-REMAIN ITEMS DURING
CONSTRUCTION.
M M M
HC HC
CO CO
S
S
S
SM-06 SM-05 SM-01 SM-02 SM-03 SM-04
99 9
CHIMNEY
S
HC CO
HC
CO
11 11 11
12 12 12
FOP
3&4
(NEW)
P
8A&B
(EXISTING)
10S
(F O
S
(F O
R
)(F O
S
(F O
R
(HPS)
(F W
-1
(F W
-2
(F O
S
) (F
O R
REPLACE EXISTING
PUMPS WITH NEW AS
INDICATE ON DWG
MI-401
EXISTING
CONTROL
ROOM
TANK
VAULT
ACCESS
DOOR
1 1/4"ø (DS)
DS/DR FROM / TO
DIESEL OIL TANK
FOR PUMP TO REMAIN
CHECK VALVE
CHECK VALVE
1 1/2"ø (DR)
1 1/4"ø (DS)
/4 "ø
D
S
/2 "ø
D
R
3-WAY VALVE
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
248 Copeland Street Quincy, MA 02169 P: 617-481-6390 F: 617-687-5990
200 Brickstone Square Andover, MA 01810 P: 978-296-6227 F: 978-475-5768
100% CONSTRUCTION
DOCUMENTS
REPLACE MAIN BOILERS 528A8-17-805
Samuel S. Stratton VA Medical Center, 113 Holland Ave., Albany, New York 12208
06/05/2024
N
105 Central Street Stoneham, MA 02180 P: 781-275-6050
C U se rs
\h a u n g \D o c u m e n ts
\A lb a n y_ B o ile r_ M e c h
E le ct ri c a l U p g ra d e
V h a u n g
G H
V P
.r v t
/3
/2
:1
:1
A
M
MD-301
MECHANICAL - PHASE 3 - SUB-BASEMENT
DEMOLITION PLAN
ND HL
3/16" = 1'-0"
PHASE 3 - SUB-BASEMENT - DEMOLITION PLAN
3/16" = 1'-0"
PHASE 3 - TANK VAULT - DEMOLITION PLAN
Revisions: Date:
FA STROBE
MED TOUCH
MEDICAL GAS ALARM
MEDPLUS
TOTAL ALERT
BEACON MED/GAS
EMERGENCY LIGHT -
BATTERY #2
EMERGENCY SHUT
DOWN CIRCUIT
(POWER MAIN GAS
VALVE &
EMERGENCY
SHUT-OFF)
POWER FOR FUEL
MANAGEMENT CONTROLS
GENERATOR 1, 2, 3
INTERCOM (NOT
WORKING)
BREAKERS FOR
LIGHTS, CONTROLS
AND GAS VALVES
TV
LIGHT FIXTURE
FUEL TANK MONITORING
POWER SUPPLY
LP-1 C/R # 1/3/5
EXISTING
ABANDONED OLD
GENERATOR PANEL
FUNCTION DISPLAY
PANEL
GEN1 GEN2 GEN3
HAND WHEEL AND
CABLE MECHANISM
ELECTRICAL PULL
BOX
EXISTING
ABANDONED
GENERATOR PANEL
G
H
WALL MOUNTED AC
UNITCARBON MONOXIDE (CO)
AND COMBUSTIBLE GAS
ALARM
MAIN NETWORK
SWITCH
DOMESTIC
WATER
BOILER ALARM
DRAGER CLS-3000 CO
DETECTION
RECORDER
LAUNDRY
RECORDER
HOSPITAL
RECORDER
DA TANK
ALARM HORN
COND.
TANK HIGH
LEVEL
COND.
TANK LOW
LEVEL
FW HTR
HIGH LEVEL
LOW AIR
PRESSURE
FW HTR
LOW LEVEL
MAIN GAS
VALVE
O2
ANALYZER
FAIL
LOW O2
CONTROLLER FAILN#4 BOILER
FAULT
COMBUSTIBLES ACTUATOR
FAIL
HOSPITAL 10 PSI
ZONE VALVES (N.I.S.)
VAC-1/2 ALARM
MASTER DRAFT
AIR/O2/VFD CONTROL
DRUM LEVEL
ALARM
STEAM HEADER
PRESSURE
FEED WATER
PRESSURE
#2 OIL PRESSURE
B-3
ALARM TEST
ALARM ACKNOWLEDGE
FW
P-1
FW
P-2
FW
P-3
CP
P-4
CP
P-5
#6
FOP
P-6
COMP
#1
#2
FOP
P-2
#2
FOP
P-1
COMP
#2
HIGH GAS
PRESSURE
ACK
TEST
#DEMOLITION NOTES :
A. ELECTRICAL SCOPE: REFER TO ELEC DWG FOR MORE INFO
A
DEMOLITION NOTES :
A. MECH SCOPE: CARBON MONOXIDE (CO) AND COMBUSTIBLE GAS
ALARM ONLY AFTER REMOVAL OF EXISTING BOILERS AND WATER
HEATERS AS PART OF PHASE II.
B. ELECTRICAL SCOPE: REFER TO ELEC DWG FOR MORE INFO.
C. RELOCATE TANK ALARM AND EXTEND WIRING IN TEMPORARY
CONTROL ROOM IN PHASE II.
B
A
# DEMOLITION NOTES :
A. THE EXISTING SPLIT SYSTEM SHALL BE PROTECTED DURING
CONSTRUCTION OF THE CONTROL ROOM. THEY MAY HAVE TO BE
TEMPORARY REMOVED AND RE-INSTALLED WHEN THE CONTROL
ROOM IS FINISHED.
B. ELECTRICAL SCOPE: REFER TO ELEC DWG FOR MORE INFO.
B
A
DEMOLITION NOTES :
A. MECH SCOPE: SAME NOTE AS C-VIEW
B. ELECTRICAL SCOPE: REFER TO ELEC DWG FOR MORE INFO.
(XM)
(XM)
DEMOLITION NOTES :
A. DUPLICATE DIESEL CONTROL PANEL TO TEMPORARY CONTROL ROOM AS PART OF PHASE I. AFTER CONSTRUCTION, LOCATE PANEL TO CONTROL ROOM AT THE SAME LOCATION AS INDICATED ON DWG MH-201A.
B. REMOVE CO/HC DETECTION PANEL IN PHASE II WITH ASSOCIATE ELECTRICAL WIRING.
C. REPLACE DIESEL GENERATOR CONTROL SYSTEM WITH GUI DURING PHASE II TO ACCOMMODATE THE NEW
GENERATOR AND DAY TANK.
D. REMOVE DOMESTIC WATER ALARM IN PHASE I. REMOVE AFTER EXISTING HEATERS ARE COMPLETELY
REMOVED.
E. ELECTRICAL SCOPE: REFER TO ELEC DWG FOR MORE INFO.
E
(X)
(X)
D
DEMOLITION NOTES :
A. RELOCATE MAIN NETWORK SWITCH, ALL ASSOCIATE CONNECTION AND ITS UPS TO NEW CONTROLLER
SHOWN ON MH-201A AS PART OF PHASE I.
B. ELECTRICAL SCOPE: REFER TO ELEC DWG FOR MORE INFO
# DEMOLITION NOTES :
A. ELECTRICAL SCOPE: REFER TO ELEC DWG FOR MORE INFO.
B. PLBG/FP SCOPE: REFER TO PLBG/FP DWG FOR MORE INFO.
A B
DEMOLITION NOTES :
A. REMOVE EXISTING FLOOR MOUNTED CABINET IN ITS ENTIRETY,
REMOVE PAD AND PATCH THE FLOOR TO MATCH EXISTING FINISH
B. EXTEND ALL DIGITAL INPUTS, ALARMS TO A NEW WALL MOUNTED
DDC CONTROL PANEL IN CONTROL ROOM AS PART OF PHASE I. SEE
DWG MH-201A FOR NEW LOCATION. NEW CONTROL PANEL SHALL E
TIED TO EXISTING ALC CONTROL SYSTEM. CONTROL CONTRACTOR
(ALC) SHALL PROVIDE GRAPHIC FOR EACH STATUS AND ALARM
POINT. REMOVE LIGHT INDICATOR AFTER POINTS ARE EXTENDED
TO NEW CONTROL SYSTEM.
C. EXTEND EXISTING SUMMER BOILER FUEL OIL PUMP STATUS AND
ON/OFF INPUT/OUTPUT TO CONTROLLER.
D. EXTEND THE FOLLOWING POINTS FROM THE CONDENSATE TANK
CONTROLLER INSTALLED AS PART OF PHASE II:
SCP-1&2 STATUS
SCP-1&2 FAULT
ENABLE (START/STOP) SCP-1&2
TANK WATER LEVEL
TANK WATER LEVEL ALARM
TANK WATER TEMPERATURE
TANK WATER TEMPERATURE ALARM
E. DUPLICATE ALARM HORN TO TEMPORARY CONTROL ROOM IN
PHASE II. AFTER CONSTRUCTION, LOCATE PANEL BACK TO
CONTROL ROOM AT NEW LOCATION AS INDICATED ON DWG
MH-201A.
F. PLBG/FP SCOPE: REFER TO PLBG/FP DWG FOR MORE INFO.
B
C
(XR)
(XR)
(XR)
B
(XR)
(XR)
DEMOLITION GENERAL NOTES :
1. ALL EQUIPMENT ALARMS SHOWN TO BE REMOVED SHALL STAY
OPERATIONAL UNTIL EQUIPMENT IS DECOMMISSIONED FOR
REMOVAL.
2. REFER TO PLBG AND ELECTRICAL DWGS FOR DEMOLITION OF
PLGB AND ELECTRICAL ITEMS.
3. TEMPORARILY PROTECT ALL EQUIPMENT THROUGHOUT
CONSTRUCTION. COORDINATE WITH THE VA COR ON
PROTECTION REQUIREMENTS.
4. REFER TO TEMPORARY CONTROL TRAILER ON DWD MI-305 FOR
EQUIPMENT, CONTROLS AND DEVICES THAT NEED TO BE
TEMPORARILY RELOCATED / EXTENDED.
5. ABBREVIATIONS
X - REMOVE
XM - EXISTING TO REMAIN
XR - EXISTING TO BE RELOCATED
6. COORDINATE WITH FINAL PHASING PLAN DEVELOPED BY
CONTRACTOR.
7. EVERY SENSOR, ALARM AND PANEL THAT THE BOILER HOUSE
REQUIRES FOR THE OPERATION OF THE BOILERS,
GENERATORS, AND ALL OTHER ALARMS THAT COME INTO THE
BOILER HOUSE SHALL BE COPIED AND OPERATIONAL IN THE
TEMPORARY TRAILER PRIOR TO THE BOILER OPERATORS
LEAVING THE CONTROL ROOM
(X) (XM)
(X)
(XR)
(X)
(X)
(X)
(X)
(X)
(X)
(X)
(X)
(X)
(X)
(X)
(X)
(X) (X) (X) (X) (X) (X)
(X) (X)(X) (X)
(X) (X) (X)
(X) (X) (X)
(X) (X)
(X)
(X)
(X) (X) (X)
(X)
(X)
(XR)
B-2 (X)
B-1 (X)
A A A
E A
B
B
A
B
D D
B
B
B
A
B
#DEMOLITION NOTES :
A. ELECTRICAL SCOPE: REFER TO ELEC DWG FOR MORE INFO
A
A
A
E
E
E
E
B
A
A
C
B
C
(X)
B
D
E
B
F C
A
CONTROL ROOM OVERALL VIEW
NTS
A-VIEW
NTS
B-VIEW
NTS
C-VIEW
NTS
D-VIEW
NTS
E-VIEW 6
NTS
F-VIEW
NTS
G-VIEW
NTS
H-VIEW
EMERGENCY LIGHT -
BATTERY #2
TP-1 CKTS 19, 21, 23
RP CKTS 25,27,29 PNL
2B-SD-LS
BULK OIL STORAGE
AND TANK ALARM
EMERGENCY LIGHT
-BATTERY #8
DIESEL CONTROL PANEL
W/GUI
DIESEL GENERATOR
CONTROL SYSTEM
KEY BOX
CONSOLIDATOR AND TANK
ALARM PANEL
J
PORTABLE MSA CO
SENSORS
NTS
J-VIEW
NTS
(XM)
(XM)
(XM)
(XM)
(XM)
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
248 Copeland Street Quincy, MA 02169 P: 617-481-6390 F: 617-687-5990
200 Brickstone Square Andover, MA 01810 P: 978-296-6227 F: 978-475-5768
100% CONSTRUCTION
DOCUMENTS
REPLACE MAIN BOILERS 528A8-17-805
Samuel S. Stratton VA Medical Center, 113 Holland Ave., Albany, New York 12208
06/05/2024
N
105 Central Street Stoneham, MA 02180 P: 781-275-6050
C U se rs
\h a u n g \D o c u m e n ts
\A lb a n y_ B o ile r_ M e c h
E le ct ri c a l U p g ra d e
V h a u n g
G H
V P
.r v t
/3
/2
:1
:1
A
M
MD-301A
BOILER CONTROL ROOM - PHASE
3-DEMOLITION
ND HLRevisions: Date:
1 1/2"ø 1 1/2"ø
10"ø (HPS)
"ø
"ø
H P
S
"ø
4"ø (HPS)
6"ø
"ø
QTR &
RES.
PRV
UTILITY
HTG
PRV
QTR &
RES.
PRV
IN
-H
O U
S E
P R
V
DA
TANK
/4 "ø
/4 "ø
/4 "ø
"ø
"ø
"ø
"ø
"ø
"ø
6"ø (V) 8"ø 10"ø (HPS) 8"ø 8"ø 4"ø (HPS)
8"ø
"ø
"ø
EXISTING
BOILER 1
EXISTING
BOILER 2
EXISTING
BOILER 3
"ø
H
W S
"ø
H
W R
SUMMER BOILER
MUA-1
"x
"x
"ø
3"ø
"ø 3 "ø
"ø
/2 "ø
/2 "ø
/2 "ø
CO
HC
1 1/2"ø
1"ø 1"ø
2"ø 2"ø
COGEN
1 1/2"ø (HPR)
1"ø (LPR)
3/4"ø
1 1/2"ø (LPR)
"ø
PHASE 3 DEMOLITION KEY NOTE:
1. DEMOLISH DA TANK, INCLUDING TANK SUPPORT AND
ASSOCIATE PIPING.
2. DEMOLISH IN-PRV, INCLUDING ALL PIPING AND
ACCESSORIES.
3. DEMOLISH PRESSURE RELIEF VALVE. RETAIN VENT PIPE
THRU ROOF.
4. DEMOLISH BOILER FEED PIPING AND ALL ACCESSORIES
AS NOTED ON THE DRAWING6.
5. DEMOLISH FUEL OIL PIPING
6. DEMOLISH BREECHING SYSTEM BACK TO CHIMNEY.
DEMOLISH EXISTING DAMPER WITH ASSOCIATED
ELECTRICAL WIRING AND ACCESSORIES (120/1/60).
7. BOILER STEAM PIPE AND ACCESSORIES SHALL BE
DEMOLISHED ENTIRELY AS NOTED ON THE DRAWINGS
8. DEMOLISH 6" HPS SERVING LAUNDRY ROOM.
9. DEMOLISH 4" HPS BACK TO THE POINT AS INDICATED ON
THE DRAWING
10. HEADER VENT PIPE THRU ROOF SHALL REMAIN
11. 10" HPS SERVING HOSPITAL SHALL REMAIN
12. DEMOLISH BOILER #4 FLUE EXHAUST STACK AND VENT
PIPES ON LOW ROOF. ROOF SHALL BE PATCHED
13. DEMOLISH EXISTING EMERGENCY SWITCH
14. DEMOLISH EXISTING EXHAUST FAN ON LOW ROOF
15. DEMOLISH CHEMICAL TREATMENT TANKS AND
ASSOCIATED PUMPS
16. DEMOLISH EXISTING EXHAUST DUCTWORK
17. DEMOLISH CARBON MONOXIDE AND COMBUSTIBLE GAS
SENSORS WITH ASSOCIATED WIRING & CONTROLS
8 910 11
7 7
DEMOLITION GENERAL NOTES:
1. COORDINATE ALL SHUTDOWN REQUIREMENTS WITH THE VA COR. PROVIDE AT LEAST 2 WEEK
OF WRITTEN NOTICE IN ADVANCE TO THE VA COR.
2. CONTRACTOR IS RESPONSIBLE FOR PROVIDING STAGING REQUIREMENTS TO PERFORM
DEMOLITION WORK.
3. ALL REMOVED MATERIALS, EQUIPMENT SHALL BE DISPOSED OFF SITE PER LOCAL CODES
AND VA STANDARDS.
4. REFER TO PHASING AND SHUTDOWN MATRIX ON DWG GI-004
5. CONTRACTOR TO COORDINATE WITH LOCAL DIESEL DELIVERY COMPANIES TO ENSURE THAT
FUEL DELIVERY TRUCKS ARE AVAILABLE ON STANDBY TO ENSURE THAT FUEL OIL IS
AVAILABLE AT ALL TIMES TO FILL THE EXISTING GENERATOR BELLY TANKS DURING SYSTEM
SHUTDOWN.
6. EVERY SENSOR, ALARM AND PANEL THAT THE BOILER HOUSE REQUIRES FOR THE
OPERATION OF THE BOILERS, GENERATORS, AND ALL OTHER ALARMS THAT COME INTO THE
BOILER HOUSE SHALL BE COPIED AND OPERATIONAL IN THE TEMPORARY TRAILER PRIOR TO
THE BOILER OPERATORS LEAVING THE CONTROL ROOM.
7. CONTRACTOR SHALL MAINTAIN SUPPORT AND OPERATION OF EXISTING-TO-REMAIN ITEMS
DURING CONSTRUCTION.
CHIMNEY
S
S
(HPS)
6"ø
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
248 Copeland Street Quincy, MA 02169 P: 617-481-6390 F: 617-687-5990
200 Brickstone Square Andover, MA 01810 P: 978-296-6227 F: 978-475-5768
100% CONSTRUCTION
DOCUMENTS
REPLACE MAIN BOILERS 528A8-17-805
Samuel S. Stratton VA Medical Center, 113 Holland Ave., Albany, New York 12208
06/05/2024
N
105 Central Street Stoneham, MA 02180 P: 781-275-6050
C U se rs
\h a u n g \D o c u m e n ts
\A lb a n y_ B o ile r_ M e c h
E le ct ri c a l U p g ra d e
V h a u n g
G H
V P
.r v t
/3
/2
:1
:1
A
M
MD-302
MECHANICAL - PHASE 3 - BASEMENT
DEMOLITION PLAN
ND HL
3/16" = 1'-0"
PHASE 3 - BASEMENT - DEMOLITION PLAN
Revisions: Date:
PHASE 3 DEMOLITION KEY NOTE:
1. DEMOLISH BOILER STEAM PIPES AND VENT PIPES
2. DEMOLISH ABANDONED 8" HPS ENTIRELY
3. DEMOLISH FOUR ABANDONED PIPES RUNNING JUST BELOW THE ROOF. REMOVE
SUPPORTS AND PIPING INTO U22. SEAL WALL PENETRATIONS WITH CONCRETE TO
MAINTAIN 2 HOUR RATING.
4. DEMOLISH DA TANK, INCLUDING PIPING AND ACCESSORIES.
5. DEMOLISH BREECHING SYSTEM BACK TO CHIMNEY.
6. DEMOLISH EXISTING EXHAUST DUCTWORK.
1 1
DA
TANK
CHIMNEY
BREECHING
SYSTEM
DEMOLITION GENERAL NOTES:
1. CONTRACTOR TO COORDINATE WITH LOCAL DIESEL DELIVERY COMPANIES TO
ENSURE THAT FUEL DELIVERY TRUCKS ARE AVAILABLE ON STANDBY TO ENSURE
THAT FUEL OIL IS AVAILABLE AT ALL TIMES TO FILL THE EXISTING GENERATOR
BELLY TANKS DURING SYSTEM SHUTDOWN.
2. CONTRACTOR SHALL MAINTAIN SUPPORT AND OPERATION OF EXISTING-TO-
REMAIN ITEMS DURING CONSTRUCTION.
(F W
-1
"ø
"ø
(F W
-2
8"ø 8"ø 8"ø(HPS) (HPS) (HPS)
3"ø (BF-1) 3"ø (BF-2) 6"ø (LPS)
3"ø (CHWS)
3"ø (CHWR)
3"ø (HWS)
3"ø (HWR)
8"ø (DCW) 5"ø (HWR)
5"ø (HWS)
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
248 Copeland Street Quincy, MA 02169 P: 617-481-6390 F: 617-687-5990
200 Brickstone Square Andover, MA 01810 P: 978-296-6227 F: 978-475-5768
100% CONSTRUCTION
DOCUMENTS
REPLACE MAIN BOILERS 528A8-17-805
Samuel S. Stratton VA Medical Center, 113 Holland Ave., Albany, New York 12208
06/05/2024
N
105 Central Street Stoneham, MA 02180 P: 781-275-6050
C U se rs
\h a u n g \D o c u m e n ts
\A lb a n y_ B o ile r_ M e c h
E le ct ri c a l U p g ra d e
V h a u n g
G H
V P
.r v t
/3
/2
:1
:1
A
M
MD-303
MECHANICAL - PHASE 3 - LEVEL 1 DEMOLITION
PLAN
ND HL
3/16" = 1'-0"
PHASE 3 - LEVEL 1 - DEMOLITION PLAN
Revisions: Date:
PHASE 3 DEMOLITION KEY NOTE:
1. DEMOLISH EXISTING GRAVITY VENTILATORS. ROOF
CURB SHALL BE REPLACED TO ACCOMMODATE NEW
EXHAUST FANS.
2. DEMOLISH EXISTING EXHAUST FANS IN ITS ENTIRELY,
INCLUDING ROOF CUB. ROOF SHALL BE PATCHED.
3. DEMOLISH VENT THRU ROOF FROM BOILERS AND STEAM
SYSTEM. ROOF SHALL BE PATCHED
4. DEMOLISH EXISTING VENT HEAD.
5. CONTRACTOR SHALL MAINTAIN SUPPORT AND
OPERATION OF EXISTING-TO-REMAIN ITEMS DURING
CONSTRUCTION.
1 1 1
3 3 3
CHIMNEY
10" VTR
INSTALLED IN
PHASE 2
4" VTR INSTALLED
IN PHASE 2
EXISTING VTR
TO REMAIN
EXISTING VTR
TO REMAIN
EXISTING VTR
TO REMAIN EXISTING VTR
TO REMAIN
(2) 2" VTR
INSTALLED IN
PHASE 2
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
248 Copeland Street Quincy, MA 02169 P: 617-481-6390 F: 617-687-5990
200 Brickstone Square Andover, MA 01810 P: 978-296-6227 F: 978-475-5768
100% CONSTRUCTION
DOCUMENTS
REPLACE MAIN BOILERS 528A8-17-805
Samuel S. Stratton VA Medical Center, 113 Holland Ave., Albany, New York 12208
06/05/2024
N
105 Central Street Stoneham, MA 02180 P: 781-275-6050
C U se rs
\h a u n g \D o c u m e n ts
\A lb a n y_ B o ile r_ M e c h
E le ct ri c a l U p g ra d e
V h a u n g
G H
V P
.r v t
/3
/2
:1
:1
A
M
MD-304
MECHANICAL - PHASE 3 - ROOF DEMOLITION
PLAN
ND HL
3/16" = 1'-0"
PHASE 3 - ROOF - DEMOLITION PLAN
Revisions: Date:
"ø
H
P S
PHASE 1 NEW WORK KEY NOTES:
1. REPLACE EXISTING HIGH PRESSURE STEAM TRAPS IN KIND. ALL
NEW TRAPS SHALL BE STEEL OR STAINLESS STEEL
2. PROVIDE DRIP LEGS AND RUN HPR BACK TO THE EXISTING FLASH
TANK IN SUB-BASEMENT VIA EXISTING 2" PR. REFER TO DETAIL 1
ON SHEET MI-102 FOR MORE CONNECTION DETAILS.
3. PROVIDE NEW 6" VENT PIPE THROUGH ROOF AND CONNECT TO
EXISTING CONDENSATE PUMP CP-2 VENT CONNECTION.
COORDINATE ROOF OPENING LOCATION WITH OTHER EXISTING
EQUIPMENT ON ROOF. TERMINATE VENT PIPING WITH CODE
COMPLIANT TERMINATION DEVICE. TERMINATE MINIMUM 3'-0"
ABOVE ROOF.
4. RE-ROUTE 5"Ø HWS/R TO AVOID NEW ELECTRICAL EQUIPMENT
BELOW. PROVIDE NEW WALL PENETRATIONS AS NEEDED.
PROVIDE NEW HEAT TRACE FROM NEW PENETRATION TO CHP.
PROVIDE POINT ON BMS FOR TROUBLE SIGNAL AND HEAT TRACE
OPERATION. RE-INSULATE PIPING TO MATCH EXISTING INCLUDING
LABELING.
5. PROVIDE 2" LPS SERVING UNIT HEATERS AND CONNECT TO
EXISTING LOW PRESSURE STEAM HEADER
6. PROVIDE 1-1/2" LPR FROM UNIT HEATERS AND CONNECT TO
EXISTING LOW PRESSURE RETURN HEADER AT CONDENSATE
PUMP CP-2.
7. INSTALL (3) 1" CAPPED AND VALVED CONNECTION AT THE 2" PR
LINE FOPR FUTURE CONNECTION IN PHASE 1
CHILLER ROOM
BOILER ROOM
CHIMNEY
A L
L E
Y
2"ø (LPS)
1"ø (LPR)
6"ø (V)
5"ø (HWS)
5"ø (HWR)
"ø
L
P S
1 1/2"ø (LPR)
"ø
L
P R
"ø
L
P R
5"ø (HWR)
5"ø (HWS)
"ø
L
P R
"ø
L P
S
"ø
P
R
(CHWS)
(CHWR)
(HWS)
(HWR)
GENERAL NOTES:
1. A COORDINATE SHUTDOWN REQUIREMENTS WITH THE OWNER.
PROVIDE A WRITTEN NOTICE AT LEAST 15 WORKING DAYS IN
ADVANCE FOR ANY REQUIRED SHUTDOWN.
NEW ELECTRICAL
SWITCHBOARD. SEE
ELECTRICAL DWGS FOR MORE
INFO
"ø
L P
S
"ø
L P
S
"ø
P
R
CP-2
5"ø (HWR)
5"ø (HWS)
8"ø (DCW)
8"ø (DCW) 5"ø (HWR)
5"ø (HWS)
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
248 Copeland Street Quincy, MA 02169 P: 617-481-6390 F: 617-687-5990
200 Brickstone Square Andover, MA 01810 P: 978-296-6227 F: 978-475-5768
100% CONSTRUCTION
DOCUMENTS
REPLACE MAIN BOILERS 528A8-17-805
Samuel S. Stratton VA Medical Center, 113 Holland Ave., Albany, New York 12208
06/05/2024
N
105 Central Street Stoneham, MA 02180 P: 781-275-6050
C U se rs
\h a u n g \D o c u m e n ts
\A lb a n y_ B o ile r_ M e c h
E le ct ri c a l U p g ra d e
V h a u n g
G H
V P
.r v t
/3
/2
:1
:2
A
M
MH-103
MECHANICAL - PHASE 1- LEVEL 1 NEW WORK
PLAN
ND HL
3/16" = 1'-0"
PHASE 1 - LEVEL 1 - NEW WORK PLAN
Revisions: Date:
P$
/2 "ø
/2 "ø
EXISITNG
BOILER 1
EXISITNG
BOILER 2
EXISITNG
BOILER 3
2"ø (PR)
3"ø (PR)
6"ø (HPS)
1 1/4"ø
"ø
"ø
"ø
"ø
8"ø (HPS) 2"ø (PR)
10"ø (HPS)
6"ø
12"ø
COGEN
"ø 6 "ø
EXISITNG SUMMER
BOILER
BOILER CONTROL
ROOM
S
"ø
1 1/2"ø1 1/2"ø
3"ø (PR)
1 1/2"ø (HPR)
/2 "ø
H
P R
3"ø (LPR)
1 1/2"ø (HPR) 1 1/2"ø (LPR)
"ø
"ø
"ø
"ø
"ø
PHASE 2 NEW WORK KEY NOTES:
1. NOT USE.
2. CROSS-CONNECT 4" HPS SERVING BOILER ROOM EQUIPMENT TO 6" SECONDARY HEADER. PROVIDE
ISOLATION VALVES.
3. INSTALL FIRST BLOCK OF GV-6 ON 10" HPS AS ISOLATION VALVE TO PREVENT SHUTDOWN TO HOSPITAL WHEN REPLACING HEADER. VALVE BLOCK SHALL BE BELOW CROSS CONNECT TO 6" HPS
AND CROSS CONNECTION TO 8"HPS. SEE SECTIONS AND DIAGRAM FOR MORE DETAILS.
4. CONNECT ALL EXISTING CONDENSATE PIPING TO NEW CONDENSATE TANK HEADER RESPECTIVELY.
PROVIDE CHECK VALVES AND ISOLATION VALVES.
5. INSTALL CONDENSATE TANK, PUMPS AND BOILER FEED WATER PIPING FROM CONDENSATE PUMPS TO TEMPORARY BOILERS. PROVIDE TEEs AND VALVES AS INDICATE ON THE DRAWINGS FOR FUTURE CONNECTIONS TO PERMANENT BOILERS AND BOILER FEED SYSTEM. PROVIDE TEE AND VALVE FOR
TESTING. INSTALL VENT PIPING THRU ROOF. COORDINATE TO PLBG FOR FLOOR DRAIN. THE
CONDENSATE TANK WILL HAVE TO BE BROUGHT INTO THE BOILER PLANT THROUGH THE REMOVED
WINDOW. THE CONTRACTOR SHALL ACCOUNT FOR RIGGING.
6. PROVIDE DRIP LEG ON 6" SECONDARY HEADER AND TIE TO EXISTING 1-1/2" HPR.
7. CROSS CONNECT EXISTING SUMMER BOILER FUEL OIL PIPES WITH EXISTING WINTER FUEL OIL PIPES.
SINCE EXISTING WINTER FUEL OIL PIPES WILL BE EXTENDED TO TEMPORARY BOILERS, SO SUMMER BOILER FUEL OIL PUMP WILL BE UTILIZED TO FEED TEMPORARY BOILERS. THIS WILL ALLOW TO REPLACE WINTER FUEL OIL PUMPS WITH NEW, BUT MUST BE DONE DURING LOWEST STEAM DEMAND
MONTHS AND MUST BE COORDINATED WITH THE VA.
8. PROVIDE 2" COLD WATER (CW) AND SOFT WATER (ZW) TO CONDENSATE TANK. PROVIDE A TEE AND
VALVE ON ZW FOR FUTURE CONNECTION TO NEW HEAT RECOVERY UNIT.
9. PROVIDE PRV-26 CONNECT 6" HPS TO 6" HPS SECONDARY HEADER,…