This document is a Solicitation for a federal contract opportunity to replace the primary boilers at the Albany VA Medical Center. The project includes construction services to replace three 900 HP dual-fuel steam boilers with two temporary 1,000 BHP steam boilers. The work will be executed in three phases: 1) Replace the electrical equipment and install new switchgear, 2) Install the temporary boilers and related infrastructure, and 3) Remove the existing 900 HP boilers and install the new boilers. The contract requires the use of the Autodesk Build construction management platform and completion of all submittals prior to mobilization. The work must be substantially complete within 730 calendar days of the notice to proceed. The contracting agency is the Department of Veterans Affairs, Veterans Integrated Service Network 2. No set-asides are specified, and the incumbent contractor is not identified.

View the file

Other files for this federal contract opportunity

Other files attached to Z1DA--528A8-17-805 REPLACE MAIN BOILERS, newest first.
File Type Posted
36C24224B0047 0006.docx DOCX document
36C24224B0047 0005.docx DOCX document
36C24224B0047 0004.docx DOCX document
2024-09-09 Walk Through Sign in Sheet .pdf PDF
263623 Automatic Transfer Switch.pdf PDF
261316 Medium Voltage Fusible Interrupter Switches.pdf PDF
E-501 Boiler Plant Pre-Purchase One-Line Diagram.pdf PDF
Boiler Plant - Electrcial Purchase.png PNG image
261219 Pad mounted Liquid Filled Medium Voltage Transformers.pdf PDF
262300 Switchgear.pdf PDF
260511ReqForElecInstall.pdf PDF
36C24224B0047 0003.docx DOCX document
260573 Overcurrent Protective Device Coordination Study.pdf PDF
36C24224B0047 0002.docx DOCX document
2024-08-23 Walk Through Sign in Sheet .pdf PDF
36C24224B0047 0001.docx DOCX document
7- Albany Electrical - stamped.pdf PDF
5- Albany Civil - stamped.pdf PDF
9- Albany Plumbing - stamped.pdf PDF
4- Albany Structural - stamped.pdf PDF
2- Albany General - stamped.pdf PDF
36C24224B0047_1.docx DOCX document
8- Albany Fire Protection - Stamped.pdf PDF
3A- Albany Architectural - stamped.pdf PDF
WD Albany NY20240002 07-12-2024.docx DOCX document
10- Albany Specs.pdf PDF
3C- Albany Architectural - stamped.pdf PDF
3B- Albany Architectural - stamped.pdf PDF
6B- Albany Mechanical - stamped.pdf PDF
Show all 29

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

D Y

H

H H E

D Y H

H H E

EL

EL

EL

MYRTLE AVE

BUILDING 5

BUILDING 4

BOILER PLANT

CHILLER AND ELEC.

EQUIPMENT

BUILDING 3

UTILITIES

BUILDING 54

CHILLER PLANT

GAZEBO

S U B S U R F A C E

C O N C R E T E

H V A C

T U N N E L

HVAC

TUNNEL

ACCESS

SHED

ABANDONED HVAC PIPING

N52° 10' 05"W 457.55

V C P

SAN MH E1

RIM: ??INV (A): ??

INV (B): 166.2

INV (C): ??

EXISTING CITY OF ALBANY 96"

DIA. CONCRETE SEWER

(A)

(B)

4" P

VC

D

RA

IN

L

IN

E

(C)

THE CHARLES HEALY

MEMORIAL ELECTRIC

GENERATION FACILITY

CONCRETE SIDEWALK

CONCRETE SIDEWALK

CONCRETE SIDEWALK

APPROX. 6" GAS LINE

2"

UG

GAS

8B

XX

BUILDING 5TRANSFORMER

13.2 - 208V R437 - R336

CHILLER TRANSFORMERS

13.2 - 480V R538 - R639

BOILER PLANT

TRANSFORMERS

13.2 - 480V

R134 - R235

FIRE PUMP

UNDERGROUNDELECTRIC

APPROX. LOCATION OF UNDERGROUND

4" DIA. FIBER OPTIC CABLE. 2 ROWS

OF 6 FOR 12 CABLES TOTAL.

HIGH

VOLTAGEFEED LINE13.2kV

COMM.

COMMUNICATION

CABLE ALIGNMENTUNKNOWN

COMMUNICATION

CABLE ALIGNMENTUNKNOWN

COMMUNICATIONS

CABLE (TYP.)

VALVE 30(CAPPED)

VALVE 31

VALVE 28

HYDRANT 10

VALVE 29

HYDRANT 09

APPROX. LOCATION OF 30" CITY WATER MAIN

W

W

W

W

W

W

S

S

J

J

A /C

A /C

Level 1 0' - 0"

Level 2 10' - 0"

Level 1 0' - 0"

Level 2 10' - 0"

F

F

OS

S

OS

TC

F

S

F

S 15cd L

15cd F

F

F

GFI,C

B

CD-ELP2-7

VIA TIMECLOCK

WP,GFI

CD-ELP2-6

CD-ELP2-5

CD-ELP2-3

B

CD-ELP2-8

WP,GFI

CD-ELP2-1

B

CD-ELP2-2,4

P B

CD-ELP2-11

J

CD-ELP2-10,12

J

CD-ELP2-14,16

J

J

J

J

CD-ELP2-18,20

V

V

V

V

FA PULL STATION

FA HORN/STROBE

TIMECLOCK

PUSH

BUTTON

PANEL "CD-ELP2"

TO NEXT FIRE ALARM

DEVICE

FA PULL STATION

12"x12"x6"

SURFACE MOUNTED

BOX WITH PIANO-

HINGE COVER

12"x12"x6"

SURFACE MOUNTED

BOX WITH PIANO-

HINGE COVER

MAIN CONTROL

ROOM

TOILET

MAIN

CONTROL

ROOM

TOILET

A/C

ANN ANN

BB

A/C

ANN ANN ANN

BB

DD

AA AA

S

DD

L

S

P

HH

BB

S

BB

PR GG FF EE

OQ

O

BB CC

P

K

L L

J

K M

S

T U

BB

VV

V V

A /C

A /C

KEY NOTES: #

GENERAL NOTE :

- CONTROL POWER BY CONTROLS CONTRACTOR. REFER TO DIV.26 DWGS FOR 120/1/60

JUNCTION BOX LOCATIONS.

- TRAILER SHALL BE EQUIPPED WITH ELECTRIC BASEBOARD FOR HEATING. WITH POWER

208/1/60

-- (4) 500W BASEBOARD IN BIG ROOM

-- (2) 500W BASEBOARD IN SMALL ROOM

- AC UNIT SHALL BE SIZE TO MAINTAIN 72°F ± 2°F ALL YEAR ROUND. INTERNAL LOAD 5 W/SFT.

- PROVIDE FIRE EXTINGUISHER.

- PROVIDE INSULATED SKIRT AROUND THE BOTTOM OF THE TRAILER

- PROVIDE LANDING (4X6), HANDRAIL AND STAIR AT TRAILER ENTRANCE DOOR

A. TEMPORARY BOILER ANNUNCIATOR PANELS (TYP. 2) PROVIDED BY TEMPORARY BOILER

CONTRACTOR, INSTALLED BY CONTROLS CONTRACTOR. ELECTRICAL CONTRACTOR TO PROVIDE

BRANCH CIRCUIT AS SHOWN.

B. PROVIDE NEW BMS ETHERNET CONNECTION SWITCH AND CONNECT EXISTING ONE IN CONTROL

ROOM, PROVIDED BY CONTROLS CONTRACTOR. ELECTRICAL CONTRACTOR TO PROVIDE RACEWAY.

C. VA NETWORK ETHERNET CONNECTION PROVIDED BY CONTROLS CONTRACTOR. ELECTRICAL

CONTRACTOR TO PROVIDE RACEWAY.

D. A/C UNIT PROVIDED BY TEMPORARY BOILER CONTRACTOR, WIRED BY ELECTRICAL CONTRACTOR.

SIMPLEX RECEPTACLE SHOWN, COORDINATE EXACT ELECTRICAL CONNECTION REQUIREMENTS WITH

TEMPORARY BOILER CONTRACTOR AND PROVIDE AS REQUIRED.

E. BULK OIL STORAGE AND TANK ALARM HORN PROVIDED BY CONTROLS CONTRACTOR. ELECTRICAL

CONTRACTOR TO PROVIDE RACEWAY.

F. LOW AIR PRESSURE ALARM HORN PROVIDED BY CONTROLS CONTRACTOR. ELECTRICAL

CONTRACTOR TO PROVIDE RACEWAY.

G. MAIN GAS VALVE ALARM HORN PROVIDED BY CONTROLS CONTRACTOR. ELECTRICAL CONTRACTOR

TO PROVIDE RACEWAY.

H. VAC-1/2 ALARM HORN PROVIDED BY CONTROLS CONTRACTOR. ELECTRICAL CONTRACTOR TO

PROVIDE RACEWAY.

I. WORK STATION FOR BOILER ROOM OPERATOR.

J. CHEMICAL WORK STATION, PROVIDED BY MECHANICAL CONTRACTOR.

K. POINT OF USE WATER HEATER, FURNISHED AND INSTALLED BY PLUMBING CONTRACTOR, WIRED BY

E.C.

L. PROVIDE NEW PARALLEL GENERATOR ANNUNCIATORS (TYP.3) AND CONNECT TO EXISTING ONES IN

CONTROL ROOM, PROVIDED BY ELECTRICAL CONTRACTOR. COORDINATE RELOCATION WITH THE COR M. DUAL-CHANNEL STEEL WIREMOLD (LEGRAND-WIREMOLD 4000 SERIES OR APPROVED EQUAL). WITH

DUPLEX GFI RECEPTACLES AT 18 INCREMENTS AND TELECOMMUNICATION PROVISION AT 24

INCREMENTS. PROVIDE BOTTOM CHANNEL 3" ABOVE TABLE TOP HEIGHT. COORDINATE LIGHTING

CONNECTION REQUIREMENTS WITH TEMPORARY BOILER CONTRACTOR.

N. COORDINATE LIGHTING CONNECTION REQUIREMENT WITH TEMPORARY BOILER CONTRACTOR.

O. FIRE ALARM CONDUIT.

P. 6 ” SQUARE EMPTY RECESS-FLUSH MOUNTED WALL BOX WITH BLANK COVER. PROVIDE 1 BELOW

CEILING AND LABEL.

Q. BOILER ROOM COMMUNICATION CONDUIT FOR LOW-VOLTAGE WIRING,

R. PROVIDE NEW EMERGENCY SHUT-OFF MAIN GAS VALVE AND CONNECT TO EXISTING ONE IN CONTROL

ROOM VIA LOW-VOLTAGE CONDUIT (SEE KEY NOTE "O" ABOVE).

S. COORDINATE WITH MECHANICAL CONTRACTOR AND PROVIDE CONNECTION TO ELECTRIC

BASEBOARD.

T. MEDICAL GAS MASTER ALARM PANEL BY PLUMBING CONTRACTOR.

U. WIRED MEDICAL ALARM PANEL BY PLUMBING CONTRACTOR.

V. PORTABLE FIRE EXTINGUISHER.

A-A VIEW

B-B VIEW

B A

B A b c b b

S b

S

9,b

F

,a

F9 7,a

9,b

9,c

F9 7,a

9,b

N

18"

H

D

D

N

PANEL

"CD-ELP2"

G

F

E O

B C

Q

48"

P

N

AA

L

L

L

I

72"

P

K a

R

10,12

14,16

18,20

18,20

10,12

10,12

S

S

S

S

S

S

WP

J

M

N T

U

K

NTEMPORARY BOILER DESIGN REQUIREMENTS:

• RENTAL FIRM: POWERHOUSE AS BASIS OF DESIGN.

• TEMPORARY BOILERS SHALL BE COMPLIANT WITH ALL VA BOILER REGULATIONS

• STEAM LOAD:

WINTER PEAK LOAD: 890 BHP

WINTER MIN LOAD: 229 BHP

SUMMER PEAK LOAD: 459 BHP

SUMMER MIN LOAD: 67 BHP

• PRESSURE:

BOILER DESIGN PRESSURE: 150 PSI

OPERATING PRESSURE: 120 PSI

• TEMPORARY BOILER, CONTROL ROOM, SITE ACCESSORIES SHALL BE REMOVED BACK TO BUILDING WALL AFTER THE PROJECT IS

COMPLETE. PIPING SHALL BE REMOVED BACK TO BUILDING WALL .

TEMPORARY 1000 HP BOILERS

• CONTRACTOR SHALL CHECK TIRE PRESSURE BI-WEEKLY AND

REFILL IF NEED.

• PROVIDE PADS UNDER TIRES AND SUPPORTING LEGS TO

PREVENT DAMAGING TO DRIVEWAY ASPHALT. REPAIR

ASPHALT AS NEEDED, AFTER THE TEMPORARY BOILERS ARE

REMOVED.

• ANY OTHER DRAIN FROM THE TEMPORARY BOILERS SHOULD

BE BROUGHT TO THE MANHOLE AND NOT DISCHARGED ON

THE GROUND.

• WHEN TEMPORARY BOILERS ARE OPERATING AND ONE

REQUIRES MAINTENANCE, WE WILL BE DOWN TO ONE

OPERATING BOILER. ALL SCHEDULED MAINTENANCE HAS TO

BE ACCOMPLISHED DURING ONE WORK DAY

TEMPORARY CONTROL

ROOM. APPROX 224 SQF

CONSTRUCTION FENCE AND LOCKING

GATE

• CONSTRUCTION FENCE SHALL

BE 6 FOOT HEIGHT

• PROVIDE HEAVY LEADED BASES

FOR THE POSTS.

• PROVIDE MAIN GATES WITH KEY

LOCKS AND PANIC HARDWARE.

PROVIDE BEST 7 CORE LOCK

WITH CORE BY VA.

• PROVIDE SIGNAGE AT

CONSTRUCTION FENCE GATE

AND AT DOOR BY CHIMNEY

STATING "PLEASE CALL (518)

XXX-XXXX BOILER OPERATORS

OR (518) XXX-XXXX FOR

SECURITY"

CONSTRUCTION

STORAGE AND

LAYDOWN AREA

DROP BOILER BLOWDOWN

TEMPORARY HOSE TO THIS

MANHOLE. PROVIDE MEANS

OF PROTECTION AROUND

MANHOLE

TEMPORARY ACCESS PLATFORM.

APPROX 5' X 56'.

• PROVIDE HANDRAIL AT THE

OPEN END.

• PROVIDE ROOFING TO COVER

ENTIRE ELEVATED PLATFORM.

PLATFORM ROOF SHALL BE

DESIGNED AND SIZED FOR

SNOW LOAD (AT LEAST

40LBS/SQF) AND OPERATING

WEIGHT OF ALL PIPING.

• THE BOILER SHALL BE

SLIGHTLY TILTED AWAY FROM

THE PLATFORM THE AVOID

RAIN WATER ENTERING

PLATFORM.

12' - 0"

' - 2

6' - 6"

22' - 1"

CHIMNEY

CRANE

23' - 0"

CRANE FOR FLUE STACK LINER INSTALLATION REQUIREMENTS:

• BASIS OF DESIGN: LIEBHERR LTM1095-5.1

• SPECIFICATIONS:

190' MAIN BOOM AT 74°

62' FOLDING JIB (NZK) (0° OFFSET)

BASE: 100% OUTRIGGERS (24 X 23)

COUNTERWEIGHT: 14100 LBS

LIFT RADIUS (360°): 63.4'

CRANE CAPACITY AT 63.4' = 4,200 LBS

• TOTAL LOAD: APPROXIMATE 3500 LBS

TEMPORARY BOILER AND CONTROL ROOM LOCATION

CRANE FOR STACK LINER INSTALLATION LOCATION

DIMENSIONS FOR THE

TEMPORARY BOILERS ARE LISTED

ARE THE MAXIMUM SIZE THAT WILL

FIT IN THIS AREA. VERIFY IN FIELD.

"5

" 8

53' - 0"

TEMPORARY BOILER TRAILER SITE

ACCESS

• DETACH PILLAR CLOSEST TO

DRIVEWAY FROM FOUNDATION

AND STORE.

• REMOVE FENCE AND STORE.

• FILL AREA WITH GRAVEL.

• REMOVE TRAFFIC SIGN AND

STORE.

• PROVIDE TRAFFIC CONTROL.

• SEE PHOTO FOR DETAIL.

MS-201

6" STAINLESS STEEL BRAIDED

HOSES FOR TEMPORARY

BOILER BLOWDOWN. HOSES

SHALL BE RATED FOR STEAM

TEMPERATURE AND

PRESSURE UPTO 150 PSI.

CRANE FALL AREA

MS-201

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

248 Copeland Street Quincy, MA 02169 P: 617-481-6390 F: 617-687-5990

200 Brickstone Square Andover, MA 01810 P: 978-296-6227 F: 978-475-5768

100% CONSTRUCTION

DOCUMENTS

REPLACE MAIN BOILERS 528A8-17-805

Samuel S. Stratton VA Medical Center, 113 Holland Ave., Albany, New York 12208

06/05/2024

N

105 Central Street Stoneham, MA 02180 P: 781-275-6050

C U se rs

\h a u n g \D o c u m e n ts

\A lb a n y_ B o ile r_ M e c h

E le ct ri c a l U p g ra d e

V h a u n g

G H

V P

.r v t

/3

/2

:1

:0

A

M

MS-200

TEMPORARY BOILERS, TRAILER AND UTILITIES

LOCATION PLAN

ND HL

1" = 20'-0"

SITE PLAN 1/4" = 1'-0"

TEMPORARY CONTROL TRAILER

ITEMS ON MYRTLE STREET TO BE

REMOVED AND RE-INSTALLED WHEN

TEMPORARY BOILERS ARE SET AND

AFTER TEMPORARY BOILERS ARE

REMOVED

- TRAFFIC SIGN

- PILLARS

- FENCE

Revisions: Date:

EXCELS IOR

084767-1

A /C

A /C

W

W

W W

S

BENCHMARK -BURY TAG

ON HYDRANT

ELEVATION=189.53'

SMH

'E2'

V C P

12"VC

P

15"

STEE

L

V C P

P V C

GRAVEL

TRACKS

R E T

W A L L

C

ONC

RETE W

ALK AND

STEPS

CB

'E2A'

8"X8" RAIL ROAD TIE

GENERAL NOTES:

1. ROOF SHALL BE DESIGNED AND SIZED FOR SNOW LOAD (MIN. 40 LBS/SQF). PROVIDE ICE AND WATER SHEILD.

2. PROVIDE 1/2" CHICKEN WIRE ALONG SIDES TO PREVENT ANIMAL ACCESS BETWEEN RAILROAD TIES INTO

THE ENCLOSURE. FASTEN TO PLYWOOD SHEATHING AND SECURE WITH 3/4" GRAVEL.

8" Ø HPS

6" Ø NG

1 1/2" Ø FOS

1 1/2" Ø FOR

4" Ø BF

1" Ø PCW

ELECTRICAL CONDUITS:

(4) 3" Ø

(6) 2" Ø

UNITSTRUT

OUTDOOR 3/4"

PLYWOOD

(TYP.)

PT 2X4 (TYP.)

1/2" CHICKEN

WIRE

3/4" GRAVEL

3. PROVIDE SHOP DRAWINGS FOR A/E REVIEW

2" Ø NPCW

8" Ø SONOTYPE

1'-6"

3/4" HEADED

PROVIDE MINIMUM 8" OVERHANG.

ANCHOR (TYP.)

APPROXIMATELY 15'

ELEVATION DROP FROM

BUILDING 54 TO TEMPORARY

BOILERS. PROVIDE STEAM

TRAP.

PROVIDE HEAT TRACE FOR

CONDENSATE LINE AND

STEAM TRAP. PROVIDE POINT

ON BMS FOR TROUBLE

SIGNAL AND HEAT TRACE

OPERATION.

GENERAL NOTES:

1. REFER TO TEMPORARY BOILER PID ON SHEET MI-305 FOR BOILER HOOK UP DETAILS

2. PROVIDE (2) PORTABLE FIRE EXTINGUISHER IN EACH TRAILER.

3. ALL SCHEDULED MAINTENANCE HAS TO BE ACCOMPLISHED DURING ONE WORK DAY.

CONDUITS QUANTITY AND SIZE:

1. (4) 3”

2. (6) 2”

• CONDUITS LISTED ABOVE SHALL BE IN A 3-ACROSS X

3-DEEP CONFIGURATION (SPACERS EVERY 10-FEET).

• RUN CONDUITS INSIDE TEMPORARY PIPE

ENCLOSURE (SEE DWG C-101-3).

4"ø (BF)

1 1/2"ø (FOR#2)

1 1/2"ø (FOS#2)

MS-201

3" BF AND 1-1/2"

FOS/FOR TO

TEMPORARY

BOILER FUEL OIL

CONNECTION

PROVIDE ROOFING

TO COVER ENTIRE

ELEVATED

PLATFORM

PROVIDE LANDING,

HANDRAIL, AND

STAIR.

PROVIDE INSULATED

SKIRTING AROUND

THE BOTTOM OF THE

TRAILER

HYDRONIC PIPING SIZE:

1. 8" HPS

2. 1-1/2" FOS/FOR

3. 4" BF1/BF2

• FROM MECHANICAL ROOM . REFER TO MH-103 FOR

CONTINUATION.

• RUN PIPES INSIDE TEMPORARY PIPE ENCLOSURE

(SEE DWG C-101-3).

• PROVIDE HEAT TRACE FOR BF-1 AND BF-2. PROVIDE

POINT ON BMS FOR TROUBLE SIGNAL AND HEAT

TRACE OPERATION.

8" HPS TO TEMPORARY BOILER

STEAM CONNECTION. PROVIDE

THREE ELBOW SWING OR

RECOMMENDED BY BOILER

MANUFACTURER. EACH

TEMPORARY BOILER SHALL HAVE A

NONE-RETURN STOP-CHECK VALVE.

3" BF AND 1-1/2"

FOS/FOR TO

TEMPORARY

BOILER FUEL OIL

CONNECTION

PIPING ROUTING IS DESIGN INTENT.

CONTRACTOR SHALL PROVIDE DELEGATE

DESIGN FOR REVIEW AND APPROVE.

CONTRACTOR SHALL PROVIDE EXPANSION

LOOP AS REQUIRED BY SPECS.

OTHER PIPING SIZES:

1. 6" NG

2. 1" PCW

3. 2" NPCW

• FROM MECHANICAL ROOM. REFER TO DWG PP-101

FOR CONTINUATION.

• RUN PIPES INSIDE TEMPORARY PIPE ENCLOSURE

(SEE DWG C-101-3).

• PROVIDE HEAT TRACE FOR PCW AND NPCW.

PROVIDE POINT ON BMS FOR TROUBLE SIGNAL AND

HEAT TRACE OPERATION.

CONDUITS FROM

MECHANICAL ROOM. REFER

TO DWG ESP-101 FOR

CONTINUATION

PROVIDE 3/4" INVERT BUCKET STEAM

TRAP WITH REMOVABLE INSULATION

JACKET

PROVIDE HEAT TRACE FOR

CONDENSATE LINE AND STEAM TRAP.

PROVIDE POINT ON BMS FOR

TROUBLE SIGNAL AND HEAT TRACE

OPERATION.

PROVIDE STEAM TRAP

OUTDOOR PIPING ENCLOSURE:

• CONSTRUCT WITH PT 2X4, 3/4" OUTDOOR PLYWOOD, AND UNISTRUT.

• PROVIDE TAPER TOP FOR PROPER DRAINAGE.

• PROVIDE SCREW FASTENERS FOR REMOVAL.

• PROVIDE 8"X8" RAILROAD TIE TO SUPPORT ENCLOSURE SPACED

EVERY 8 FEET.

• SONOTUBE SHALL BE FILLED WITH CONCRETE AND SHALL BE

PULLED OUT AT END OF PROJECT. LAND SHALL BE BACK FILLED TO

MATCH EXISTING .

• PROVIDE OUTDOOR PAINT TO PROTECT ENCLOSURE DURING

CONSTRUCTION.

• PROVIDE DIVIDER TO SEPARATE ELECTRICAL CONDUITS AND PIPES.

SEE DWG C-101-3 FOR MORE DETAILS.

PIPE DROP OF APPROXIMATELY 15'.

PROVIDE 3/4" INVERT BUCKET STEAM

TRAP WITH REMOVABLE INSULATION

JACKET

PROVIDE HEAT TRACE FOR CONDENSATE

LINE AND STEAM TRAP. PROVIDE POINT

ON BMS FOR TROUBLE SIGNAL AND HEAT

TRACE OPERATION. FOR CONTINUATION

AND MORE DETAIL, REFER TO:

- MH-203 FOR MECHANICAL SYSTEM

- PP-202 FOR PLUMBING SYSTEM

- ESP-102 FOR ELECTRICAL SYSTEM

6" STAINLESS STEEL BRAIDED HOSES FOR

TEMPORARY BOILER BLOWDOWN. HOSES

SHALL BE RATED FOR STEAM TEMPERATURE

AND PRESSURE UPTO 150 PSI.

MS-201

PROVIDE CROSS OVER STAIR

PROVIDE CROSS

OVER STAIR

PROVIDE 7"X9"X9' RAIL

ROAD TIES AND 6" LAYER

OF GRAVEL TO SUPPORT

TRAILER (TYP.)

MS-201

BUILDING 5

8" Ø SONO TUBE (TYP.)

PLATFORM ROOF

ELECTRICAL CONDUITS SERVING

TEMPORARY BOILERS

4"ø (BF)

1 1/2"ø (FOS#2)

6"ø (NG)

1"ø (CW)

GENERAL NOTES:

1. PLATFORM ROOF SHALL BE DESIGNED AND SIZED FOR SNOW LOAD (AT LEAST 40LBS/SQF).

2. THE BOILER SHALL BE SLIGHTLY TILTED AWAY FROM THE PLATFORM TO AVOID RAIN WATER

ENTERING THE PLATFORM.

3. PROVIDE SHOP DRAWINGS FOR A/E REVIEW

8"ø (HPS)8"ø (HPS)

PROVIDE

STEAM

TRAP PROVIDE

STEAM

TRAP

MS-201

RAIL-ROAD TIES

PROVIDE 8"-THICK LAYER OF SAND AND 6"-

THICK LAYER OF CRUSHED STONE BELOW RAIL

ROAD TIES. FILL THE GAPS BETWEEN RAIL

ROAD TIES WITH CURSH STONE. THE BASE

SHALL BE AT LEAST 2 FEET WIDER THAN

TRAILER IN BOTH DIRECTIONS.

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

248 Copeland Street Quincy, MA 02169 P: 617-481-6390 F: 617-687-5990

200 Brickstone Square Andover, MA 01810 P: 978-296-6227 F: 978-475-5768

100% CONSTRUCTION

DOCUMENTS

REPLACE MAIN BOILERS 528A8-17-805

Samuel S. Stratton VA Medical Center, 113 Holland Ave., Albany, New York 12208

06/05/2024

N

105 Central Street Stoneham, MA 02180 P: 781-275-6050

C U se rs

\h a u n g \D o c u m e n ts

\A lb a n y_ B o ile r_ M e c h

E le ct ri c a l U p g ra d e

V h a u n g

G H

V P

.r v t

/3

/2

:1

:0

A

M

MS-201

TEMPORARY BOILERS, TRAILER AND UTILITIES

LOCATION PLAN

HL

3/16" = 1'-0"

TEMPORARY BOILER HOOK UP 1/4" = 1'-0"

MECHANICAL PHASE 2 TEMPORARY BOILER SECTION 1

NTS

TEMPORARY PIPING ENCLOSURE

1/4" = 1'-0"

MECHANICAL PHASE 2 TEMPORARY BOILER SECTION 2

Revisions: Date:

P

/2 "ø

/2 "ø

/2 "ø

/2 "ø

EXISTING

BOILER 1

EXISTING

BOILER 2

EXISTING

BOILER 3

2"ø (PR)

3"ø (PR)

6"ø (HPS)

1 1/4"ø

"ø

"ø

"ø

"ø

8"ø (HPS) 2"ø (PR)

4"ø

10"ø (HPS)

4"ø

6"ø

"ø

"ø

"ø

1 1/2"ø

3"ø

"ø

P

P

P

P

P

12"ø

COGEN

"ø 6 "ø

EXISTING SUMMER

BOILER

BOILER CONTROL

ROOM

VFD

P1

VFD

P3

"ø

"ø

1 1/2"ø

S

"ø

1 1/2"ø1 1/2"ø

3"ø (PR)

/2 "ø

1 1/2"ø

1 1/2"ø (HPR)

/2 "ø

H

P R

2"ø (LPR)

1 1/2"ø

"ø

3"ø (LPR)

"ø

"ø

"ø

1 1/2"ø (HPR) 1 1/2"ø (LPR)

"ø

"ø

/2 "ø

"ø

"ø

"ø

"ø

H

P S

DEMOLITION GENERAL NOTES:

1. REFER TO DRAWING GI-003 FOR LEGEND.

2. COORDINATE ALL SHUTDOWN REQUIREMENTS WITH THE VA COR. PROVIDE AT LEAST 2 WEEK

OF WRITTEN NOTICE IN ADVANCE TO THE VA COR.

3. CONTRACTOR IS RESPONSIBLE FOR PROVIDING STAGING REQUIREMENTS TO PERFORM

DEMOLITION WORK.

4. CONTRACTOR SHOULD ASSUME ALL PIPING IN THIS SYSTEM IS FULL OF #4 OIL, ALL SHUT OFF

VALVES DO NOT WORK, INCLUDE FREEZING PIPING AS PART OF THE BID.

5. ALL REMOVED MATERIALS, EQUIPMENT SHALL BE DISPOSED OFF SITE PER LOCAL CODES

AND VA STANDARDS.

6. REFER TO PHASING AND SHUTDOWN MATRIX ON DWG GI-004.

7. CONTRACTOR TO PROVIDE LUMP SUM TO ACCOUNT FOR UP TO 200 LF OF 4" AND BELOW

PIPING, INSULATION, SUPPORTS, AND APPURTENANCES TO BE REMOVED WHERE IDENTIFIED

BY COR. PROVIDE SHUT OFFS AND CAPS ON ACTIVE SYSTEMS.

8. CONTRACTOR SHALL MAINTAIN SUPPORT AND OPERATION OF EXISTING-TO-REMAIN ITEMS

DURING CONSTRUCTION.

"ø

PHASE 1 DEMOLITION KEY NOTES:

1. DEMOLISH SECTION OF 2"Ø PUMPED CONDENSATE PIPE BACK TO THE POINT AS INDICATED

ON THE FLOOR PLAN.

2. DEMOLISH EXISTING WINDOW AC SERVING ROOM U3 TO MAKE ROOM FOR NEW ELETRICAL

CONDUITS. TURN THE WINDOW AC OVER TO AC SHOP. SEE ELECTRICAL DRAWINGS EP-103

FOR MORE INFORMATION.

CHIMNEY

P

8A&B

(EXISTING)

P

(EXISTING)

P

6&7

(L

P R

(P R

(L P

R

(L P

R

(P R

(L P

R

2"HPS TO

LAUNDRY ROOM

EXISTING BRINE TANK AND

SOFTENER

6"HPS TO LAUNDRY

4" LPR FROM HOSPITAL

2" LPR FROM HOSPITAL

1-1/2" LPR FROM ARF

(ABANDONED)

6" LPS UP

10" HPS TO HOSPITAL

1-1/2" HPR FROM HTG

PUMP ROOM

4" PR FROM HTG PUMP

ROOM

5" LPS TO UTILITY

HEATING SYSTEM

1-1/2" LPR FROM HOSPITAL

CONDENSATE TANK

(H P

R

(B F

-0

(B F

-0

(F O

S

(F O

R

(B D

(HPS)

(HPS)

(BO)

(F O

S

(F O

R

(F O

S

(F O

R ) (F

O R

(F O

S

(M P

R

(P R

(L P

R

(L P

R

(HPS)

(LPR)

(LPR)

U3

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

248 Copeland Street Quincy, MA 02169 P: 617-481-6390 F: 617-687-5990

200 Brickstone Square Andover, MA 01810 P: 978-296-6227 F: 978-475-5768

100% CONSTRUCTION

DOCUMENTS

REPLACE MAIN BOILERS 528A8-17-805

Samuel S. Stratton VA Medical Center, 113 Holland Ave., Albany, New York 12208

06/05/2024

N

105 Central Street Stoneham, MA 02180 P: 781-275-6050

C U se rs

\h a u n g \D o c u m e n ts

\A lb a n y_ B o ile r_ M e c h

E le ct ri c a l U p g ra d e

V h a u n g

G H

V P

.r v t

/3

/2

:1

:0

A

M

MD-101

MECHANICAL - PHASE 1 - SUB-BASEMENT

DEMOLITION PLAN

3/16" = 1'-0"

PHASE 1 - SUB-BASEMENT DEMOLITION PLAN

Revisions: Date:

ABANDONED

8" HPS

HWS/R AND

CHWS/R TO/FROM

HOSPITAL

6" ETR VTR 6" ETR VTRU

"ø

H

P S

CHILLER ROOM

BOILER ROOM

CHIMNEY

A L

L E

Y

2" VTR

"ø

PHASE 1 DEMOLITION KEY NOTES:

1. DEMOLISH ABANDONED PIPE AND ACCESSORIES BACK TO

ISOLATION VALVE AS INDICATED ON THE PLAN.

2. DEMOLISH 8" Ø LPS AND CROSS CONNECTING PIPING BETWEEN

TWO LOW PRESSURE STEAM HEADERS BACK TO ISOLATION

VALVE AS INDICATED ON THE PLAN.

3. DEMOLISH DRIP LEG STEAM TRAPS AT PRVs AND HIGH PRESSURE

RETURN PIPING.

4. DEMOLISH PRV-1 AND ASSOCIATE PIPING AND ACCESSORIES.

5. DEMOLISH HPS SERVING PRV-1 BACK TO THIS POINT, AS

INDICATED ON PLAN, AND CAP.

6. DEMOLISH LPS/LPR SERVING UNIT HEATER BACK TO THIS POINT AS

INDICATED ON THE PLAN AND CAP.

7. DEMOLISH 8" Ø VENT PIPE FROM CONDENSATE PUMPS CP-2.

PATCH ROOF PENETRATION. NEW VENT SHALL BE INSTALLED

CONNECTED PRIOR TO REMOVING EXISTING VENT.

8. DEMOLISH UNIT HEATER, ASSOCIATE PIPING CONTROLS,

SUPPORTS, AND ACCESSORIES.

9. DEMOLISH CONDENSATE PUMP CP-1, AND ASSOCIATE PIPING AND

ACCESSORIES, INCLUDING VENT PIPE THRU ROOF. PATCH ROOF

PENETRATION. TURN OVER CP-1 TO VA.

10. DEMOLISH SECTION OF 5"Ø HWS/R FROM/TO COGEN TO THE

POINTS AS INDICATED ON THE PLAN. SEAL EXISTING WALL

PENETRATIONS. REMOVE EXISTING HEAT TRACE FROM CURRENT

PENETRATION TO CHP. WORK SHALL BE COMPLETED DURING

SUMMER MONTHS.

11. DEMOLISH FLASH TANK ENTIRELY, INCLUDING VENT PIPE THRU

ROOF. PATCH ROOF PENETRATION.

12. DEMOLISH HEAT EXCHANGERS HX-1 & 2, AND ASSOCIATE PIPING

ACCESSORIES, CONTROLS AND SUPPORTS. CONTRACTOR SHALL

HIRE TRANE TO REMOVE CONTROLS FROM BMS.

13. DEMOLISH LOW PRESSURE STEAM HEADER AND VENT PIPE THRU

ROOF. PATCH ROOF PENETRATION.

14. DEMOLISH LPS/LPR SERVING UNIT HEATERS BACK TO THIS POINT

AS INDICATED ON THE PLAN AND CAP.

15. DEMOLISH HWS/R FROM/TO HX-1 & 2, INCLUDING ACCESSORIES,

BACK THE POINT AS INDICATED ON THE PLAN.

16. DEMOLISH 2" Ø PR PIPE FROM CONDENSATE PUMP CP-1 BACK TO

THIS POINT AS INDICATED ON THE PLAN.

17. REMOVE AND DECOMMISSION EXISTING CONTROLS ASSOCIATED

WITH HX-1 & 2 PACKAGE.

"ø

P

R

2"ø (PR)

3"ø (PR) 2 "ø

P

R

3"ø (PR)

"ø

P

R

10"ø (HWR) 2"ø (LPS)

1"ø (LPR)

10"ø (HWS) 10"ø

10"ø

"ø

"ø

5"ø (HWR)

5"ø (HWS)

5"ø 5"ø

"ø

"ø

L

P S

"ø

L

P R

"ø

L P

S

"ø

L P

S

14"ø (LPS)12"ø (LPS)

"ø

L P

S

8"ø (HPS)

(CHWS)

(CHWR)

(HWS)

(HWR)

EXISTING

PRVs

GENERAL NOTES:

1. A COORDINATE SHUTDOWN REQUIREMENTS WITH THE OWNER.

PROVIDE A WRITTEN NOTICE AT LEAST 15 WORKING DAYS IN

ADVANCE FOR ANY REQUIRED SHUTDOWN.

2. CONTRACTOR SHALL MAINTAIN SUPPORT AND OPERATION OF

EXISTING-TO-REMAIN ITEMS DURING CONSTRUCTION.

EXISTING CONTROL PANEL

FOR HX-1 & 2 17

"ø

P

R

EXISTING

STEAM TRAP

(H P

R

EXISTING

PRV-1

PRV

PRV

EV-2.1

EV-3.1

EV-1

EV-3.2

EV-2.2

8"ø (DCW)

5"ø (HWR)

5"ø (HWS)

8"ø (DCW) 5"ø (HWR)

5"ø (HWS)

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

248 Copeland Street Quincy, MA 02169 P: 617-481-6390 F: 617-687-5990

200 Brickstone Square Andover, MA 01810 P: 978-296-6227 F: 978-475-5768

100% CONSTRUCTION

DOCUMENTS

REPLACE MAIN BOILERS 528A8-17-805

Samuel S. Stratton VA Medical Center, 113 Holland Ave., Albany, New York 12208

06/05/2024

N

105 Central Street Stoneham, MA 02180 P: 781-275-6050

C U se rs

\h a u n g \D o c u m e n ts

\A lb a n y_ B o ile r_ M e c h

E le ct ri c a l U p g ra d e

V h a u n g

G H

V P

.r v t

/3

/2

:1

:0

A

M

MD-103

MECHANICAL - PHASE 1 - LEVEL 1 DEMOLITION

PLAN

ND HL

3/16" = 1'-0"

PHASE 1 - LEVEL 1 - DEMOLITION PLAN

Revisions: Date:

UP

/2 "ø

/2 "ø

/2 "ø

/2 "ø

EXISTING

BOILER 1

EXISTING

BOILER 2

EXISTING

BOILER 3

2"ø (PR)

3"ø (PR)

6"ø (HPS)

1 1/4"ø

"ø

"ø

"ø

"ø

8"ø (HPS) 2"ø (PR)

4"ø

10"ø (HPS)

4"ø

6"ø

"ø

"ø

"ø

1 1/2"ø

3"ø

"ø

P

P

P

P

P

12"ø

COGEN

"ø 6 "ø

EXISTING SUMMER

BOILER

BOILER CONTROL

ROOM

VFD

P1

VFD

P3

"ø

"ø

1 1/2"ø

S

"ø

1 1/2"ø1 1/2"ø

3"ø (PR)

/2 "ø

1 1/2"ø

1 1/2"ø (HPR)

/2 "ø

H

P R

1 1/2"ø

"ø

3"ø (LPR)

"ø

"ø

1 1/2"ø (HPR)

1 1/2"ø (LPR)

"ø

"ø

/2 "ø

"ø

"ø

"ø

MAIN BOILER

FUEL OIL

PUMP SETS

SUMMER BOILER

FUEL OIL PUMP

SETS (P-8)

"ø

H

P S

2"HPS TO

LAUNDRY ROOM

DEMOLITION GENERAL NOTES:

1. COORDINATE ALL SHUTDOWN REQUIREMENTS WITH THE VA COR. PROVIDE AT LEAST 2 WEEK

OF WRITTEN NOTICE IN ADVANCE TO THE VA COR.

2. CONTRACTOR IS RESPONSIBLE FOR PROVIDING STAGING REQUIREMENTS TO PERFORM

DEMOLITION WORK.

3. CONTRACTOR SHOULD ASSUME ALL PIPING IN THIS SYSTEM IS FULL OF #4 OIL, ALL SHUT OFF

VALVES DO NOT WORK, INCLUDE FREEZING PIPING AS PART OF THE BID.

4. ALL REMOVED MATERIALS, EQUIPMENT SHALL BE DISPOSED OFF SITE PER LOCAL CODES

AND VA STANDARDS.

5. REFER TO PHASING AND SHUTDOWN MATRIX ON DWG GI-004.

6. CONTRACTOR SHALL MAINTAIN SUPPORT AND OPERATION OF EXISTING-TO-REMAIN ITEMS

DURING CONSTRUCTION.

EXISTING BRINE TANK AND

SOFTENER

6"HPS TO LAUNDRY

4" LPR FROM HOSPITAL

2" LPR FROM HOSPITAL

1-1/2" LPR FROM ARF

(ABANDONED)

6" LPS UP

10" HPS TO HOSPITAL

1-1/2" HPR FROM HTG

PUMP ROOM

4" PR FROM HTG PUMP

ROOM

5" LPS TO UTILITY

HEATING SYSTEM

1-1/2" LPR FROM HOSPITAL

2" MPR UP

"ø

PHASE 2 DEMOLITION KEY NOTES:

1. PROVIDE TEMPORARY DUST BARRIER AROUND AIR COMPRESSORS AND OTHER EQUIPMENT

PRIOR TO DEMOLITION WORK. REFER TO ARCHITECT DWG FOR MORE INFO.

2. DEMOLISH FUEL OIL # 4 PUMP / HEATER SKID AND PIPING. INCLUDE REMOVING PIPING AND

SUPPORTS TO #4 TANKS AND CAP AT TANKS. SEAL WALL PENETRATIONS TO MATCH

EXISTING. REMOVE 1-1/2" STEAM PIPE FROM MEZZANINE TO SERVE #4 FUEL OIL HEATER.

REMOVE FROM SHUT OFF TO HTX. CAP VALVE.

3. DEMOLISH LOW PRESSURE CONDENSATE, PUMPED CONDENSATE AND MEDIUM

CONDENSATE PIPING BACK TO THE POINTS AS INDICATED ON THE DRAWINGS. TEMPORARY

MANAGEMENT OF CONDENSATE RETURN FROM HOSPITAL, BOILER PLANT, CHILLER PLANT

SHALL BE PROVIDED BY THE CONTRACTOR IN COORDINATION WITH THE VA, INCLUDING BUT

NOT LIMITED TO TEMPORARY DRAINAGE OF CONDENSATE AT ALL SOURCES, AND EQUIPMENT

LOCK OUT. PUMPED CONDENSATE SHOULD BE DUMPED TO FLOOR DRAIN. FOR HIGH

PRESSURE CONDENSATE, CONTRACTOR SHALL PROVIDE TEMPORARY FLASH TANK TO

FLASH STEAM TO ATMOSPHERE BEFORE DUMPING TO DRAIN. MAXIMUM TEMPERATURE TO

DRAIN SHALL BE 140⁰F. PROVIDE DCW AND CONTROLS AS NEEDED.

4. DEMOLISH WINTER BOILER FUEL OIL PUMP P-9 AFTER CROSS CONNECTING TO SUMMER

BOILER PUMPS. PROVIDE MODIFICATIONS TO SUMMER BOILER PUMPS AS INDICATE ON

EQUIPMENT SCHEDULE TO ALLOW PUMPS TO RUN SIMULTANEOUSLY.

5. DEMOLISH 1-1/2" HPR FROM GENERATOR ROOM AND SUMMER BOILER ROOM BACK TO THE

POINT AS INDICATED ON THE DRAWING.

6. DEMOLISH CONDENSATE TANK, TANK SUPPORT AND ALL ASSOCIATE PIPING AS NOTED ON

THE DRAWINGS

7. DEMOLISH EXISTING FEED WATER PUMP P-1, P-2, P-3 AND ASSOCIATE VFD-P1, VFD-P3

INCLUDE CONCRETE PADS.

8. DEMOLISH EXISTING CONDENSATE TRANSFER PUMP P-4 & P-5, INCLUDE CONCRETE PAD.

9. REFER TO PART PLAN MD-301A FOR PHASE I DEMOLITION IN CONTROL ROOM

10. DEMOLISH EXISTING FLASH TANK AND ASSOCIATE PIPING AS SHOWN ON THE DEMO PLAN.

11. TUNE B-4 SO THAT IT CAN RUN ON 100 PSI FUEL OIL. REVISE SUMMER FUEL OIL SETTING TO

100 PSI TO MATCH BOILERS 1, 2, AND 3.

CHIMNEY

CONDENSATE TANK

FO #4

PUMP SET

P

8A&B

(EXISTING)

P

(EXISTING)

P

6&7

(L P

R

(P R

(L P

R

(L P

R

(LPR)

(L P

R

(LPR)

(L P

R

(F O

S

(L P

R

(P R

)(F O

R

(F O

S

(F O

R

(F O

R

(F O

S

(HPR)

(H P

R

(HPS)

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

248 Copeland Street Quincy, MA 02169 P: 617-481-6390 F: 617-687-5990

200 Brickstone Square Andover, MA 01810 P: 978-296-6227 F: 978-475-5768

100% CONSTRUCTION

DOCUMENTS

REPLACE MAIN BOILERS 528A8-17-805

Samuel S. Stratton VA Medical Center, 113 Holland Ave., Albany, New York 12208

06/05/2024

N

105 Central Street Stoneham, MA 02180 P: 781-275-6050

C U se rs

\h a u n g \D o c u m e n ts

\A lb a n y_ B o ile r_ M e c h

E le ct ri c a l U p g ra d e

V h a u n g

G H

V P

.r v t

/3

/2

:1

:0

A

M

MD-201

MECHANICAL - PHASE 2 - SUB-BASEMENT

DEMOLITION PLAN

HL

3/16" = 1'-0"

PHASE 2 - SUB-BASEMENT DEMOLITION PLAN

Revisions: Date:

3"ø

3"ø (HWR)

3"ø (HWS)

3"ø (CHWR)

3"ø (CHWS)

1 1/2"ø

2 1/2"ø 2 1/2"ø

1 1/2"ø

10"ø (HPS)

"ø

"ø

H P

S

"ø

6"ø

"ø

ABANDONED 8" HPS

QTR &

RES.

PRV

UTILITY

HTG

PRV

QTR &

RES.

PRV

IN

-H

O U

S E

P R

V

DA

TANK

8"ø

/4 "ø

/4 "ø

/4 "ø

"ø

"ø

"ø

"ø

"ø 2 "ø

"ø

"ø

6"ø (V) 8"ø 10"ø (HPS) 8"ø 8"ø 4"ø (HPS)

8"ø

"ø

1"ø

"ø

EXISTING

BOILER 1

EXISTING

BOILER 2

EXISTING

BOILER 3

"ø

H

W S

"ø

H

W R

SUMMER BOILER

MUA-1

"x

"x

"ø

3"ø

"ø 3 "ø

"ø

/2 "ø

/2 "ø

/2 "ø

HWS/R AND

CHWS/R TO/FROM

HOSPITAL

CO

CO AND HYDRO CARBON

SENSORS

HC

2 1/2"ø 2 1/2"ø

1 1/2"ø

1"ø 1"ø

2"ø 2"ø

COGEN

1 1/2"ø (HPR) 2"ø

1"ø (LPR)

2" LPR FROM HOSPITAL

1-1/2" LPR FROM ARF

(ABANDONED)

3/4"ø

1 1/2"ø (LPR)

6"HPS DN

CHEMICAL TREATMENT

"ø

"ø

1 1/2"ø

6" LPS DN

10" HPS DN

DWH PACKAGES. REFER TO

PLUMBING DWGS FOR

DETAILS

1-1/2" HPS TO

ECONOMIZER SOOT

BLOWER. (TYP.)

BREECHING

RELIEF VALVES

DISCHARGE 7'-0"

ABOVE ROOF. (TYP.)

2"Ø BF-2 DN

2"Ø BF-1 DN

1"Ø FOS#2 DN

1"Ø FOR#2 DN

2" NG DN

3" LPR DN

1-1/2" HPR DN

1-1/2" LPR DN

1" V UP

1/2" HPS DN TO

STEAM METER

TRANSMITTER FOR

B1

1/2" HPS DN TO

STEAM METER

TRANSMITTER FOR

B2 & B3

EXISTING 6"

VTR

2" MPR FROM

TANK VAULT

2"Ø BF-2 DN

2"Ø BF-1 DN

1"Ø FOS#2 DN

1"Ø FOR#2 DN

"ø

FOS/FOR TO/FM

GENERATORS

FOS/FOR

FROM/TO TANK

VAULT

1 1/4"ø (DS) 1 1/2"ø (DR)

PHASE 2 DEMOLITION KEY NOTES:

1. DEMOLISH FUEL OIL # 6 PUMP / HEATER SKID AND PIPING

2. DEMOLISH EXISTING UH-3 WITH ALL ACCESSORIES

3. DEMOLISH EXISTING UH-4 WITH ALL ACCESSORIES.

4. DEMOLISH EXISTING UH-5 WITH ALL ACCESSORIES.

5. DEMOLISH ALL HPS PIPING SERVING UNIT HEATER.

6. DEMOLISH 1-1/2" HPR BACK TO THE POINT AS INDICATED ON THE DRAWING.

7. DEMOLISH EXISTING PRV AND ALL ASSOCIATED HPS, HPR AND VENT PIPING.

8. DEMOLISH HEAT RECOVERY AND 4" VENT THRU ROOF. PATCH THE ROOF.

9. REMOVE MUA-1 VFD (460/3/60, 20 HP). REFER TO SHEET MH-201 FOR NEW MUA-1 VFD

LOCATION.

10. DOMESTIC WATER HEATERS, ACCESSORIES AND FLUE STACKS TO BE DEMOLISHED. REFER

TO PLBG DWG SHEET PD-201 FOR MORE INFO.

11. RELOCATE SECTION EXISTING HOT WATER AND CHILLED WATER PIPING TO YIELD SPACE FOR

RIGGING. THESE PIPES SERVE AREAS THAT ARE OUT OF SCOPE IN THIS PROJECT.

RELOCATING THE CHW PIPES CAN OCCUR IN THE WINTER AND THE HHW LINES CAN BE

RELOCATED IN THE SUMMER.

1"ø

/2 "ø

UH

UH

UH

3 5

2"ø (LPS)

4"ø (HPS)

6"HPS DN

DEMOLITION GENERAL NOTES:

1. COORDINATE ALL SHUTDOWN REQUIREMENTS WITH THE VA COR. PROVIDE AT LEAST 2 WEEK

OF WRITTEN NOTICE IN ADVANCE TO THE VA COR.

2. CONTRACTOR IS RESPONSIBLE FOR PROVIDING STAGING REQUIREMENTS TO PERFORM

DEMOLITION WORK.

3. ALL REMOVED MATERIALS, EQUIPMENT SHALL BE DISPOSED OFF PER LOCAL CODES AND VA

STANDARDS.

4. REFER TO PHASING AND SHUTDOWN MATRIX ON DWG GI-005 & GI-006.

5. CONTRACTOR SHALL MAINTAIN SUPPORT AND OPERATION OF EXISTING-TO-REMAIN ITEMS

DURING CONSTRUCTION.

CHIMNEY

EXISTING SWITCH

AND CONTROL

PANEL

EXISTING 6"

VTR

(FOS#6)

(FOS#6)

(FOR#2)

(FOS#2)

(FW-2)

(FW-1)

8"ø (DCW) 5"ø (HWR)

5"ø (HWS)

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

248 Copeland Street Quincy, MA 02169 P: 617-481-6390 F: 617-687-5990

200 Brickstone Square Andover, MA 01810 P: 978-296-6227 F: 978-475-5768

100% CONSTRUCTION

DOCUMENTS

REPLACE MAIN BOILERS 528A8-17-805

Samuel S. Stratton VA Medical Center, 113 Holland Ave., Albany, New York 12208

06/05/2024

N

105 Central Street Stoneham, MA 02180 P: 781-275-6050

C U se rs

\h a u n g \D o c u m e n ts

\A lb a n y_ B o ile r_ M e c h

E le ct ri c a l U p g ra d e

V h a u n g

G H

V P

.r v t

/3

/2

:1

:1

A

M

MD-202

MECHANICAL - PHASE 2 - BASEMENT

DEMOLITION PLAN

ND HL

3/16" = 1'-0"

PHASE 2 - BASEMENT DEMOLITION PLAN

Revisions: Date:

/2 "ø

/2 "ø

EXISTING

BOILER 1

EXISTING

BOILER 2

EXISTING

BOILER 3

2"ø (PR)

3"ø (PR)

6"ø (HPS)

1 1/4"ø

"ø

"ø

"ø

"ø

8"ø (HPS) 2"ø (PR)

10"ø (HPS)

6"ø

12"ø

COGEN

"ø 6 "ø

EXISTING SUMMER

BOILER

BOILER CONTROL

ROOM

S

"ø

1 1/2"ø1 1/2"ø

3"ø (PR)

1 1/2"ø (HPR)

/2 "ø

H

P R

3"ø (LPR)

1 1/2"ø (HPR)

1 1/2"ø (LPR)

"ø

"ø

"ø

"ø

"ø

PHASE 3 DEMOLITION KEY NOTE:

1. DEMOLISH EXISTING BLOWDOWN TANK AND ALL

BLOWDOWN PIPING. BLOWDOWN TANK VENT PIPING

THRU ROOF SHALL REMAIN.

2. DEMOLISH IN-HOUSE PRV (SERVES DA TANK), INCLUDE

ALL UPSTREAM PIPING AND ACCESSORIES.

3. DEMOLISH BOILER SURFACE BLOWDOWN CONDUCTIVITY

SENSORS, CONTROL VALVES AND SAMPLE COOLERS.

4. REFER TO DWG MD-201A FOR DEMOLITION WORK IN

CONTROL ROOM.

5. DEMOLISH ALL BOILERS B-1 TO B-3 AND SUMMER

BOILER, INCLUDING ACCESSORIES: SUPPLY STEAM

PIPES, VENT PIPES, FEED WATER PIPES, ELECTRICAL

PANELS, NATURAL GAS, COMPRESSED AIR, FLOOR

DRAINS, STEAM METERS, CO/HC SENSORS, WIRING AND

ALL ASSOCIATE CONTROL & WIRING ALL THE WAY TO

CONTROL ROOM.

6. DEMOLISH STEAM HEADER AND ALL DRIP LEGS.

7. DEMOLISH EXISTING SUMMER BOILER FUEL OIL PUMP

P-8 INCLUDING ACCESSORIES

8. DEMOLISH EXISTING GENERATOR DIESEL PUMP.

9. DEMOLISH ADVANCE METERING SYSTEM PANELS.

CONTRACTORS SHALL PALLETIZE STEAM METERS AND

SYSTEM PANELS, SHRINK WRAP, AND TURN OVER TO VA.

10. DEMOLISH EXISTING EMERGENCY SWITCH WITH

ASSOCIATED WIRING & CONTROL AND REPLACE WITH

NEW.

11. DEMOLISH CARBON MONOXIDE AND COMBUSTIBLE GAS

SENSORS WITH ASSOCIATED WIRING & CONTROLS.

12. DEMOLISH CHEMICAL DRUMS AND PUMPS.

13. DEMOLISH SUMMER BOILER CONTROL PANEL.

14. DEMOLISH EXISTING EXHAUST FAN AND ASSOCIATE

DUCTWORK.

15. DEMOLISH EXISTING 6"Ø SERVING LAUNDRY ROOM UP

TO BOILER ROOM WALL.

16. DEMOLISH HPC PIPE FROM HEADER DRIP LEG TO DA

TANK IN ITS ENTIRE.

17. THE EXISTING SPLIT SYSTEM SHALL BE PROTECTED

DURING CONSTRUCTION OF THE CONTROL ROOM. THEY

MAY HAVE TO BE TEMPORARY REMOVED AND RE-

INSTALLED WHEN THE CONTROL ROOM IS FINISHED.

1 1/2"ø (LPR) 4"ø (PR)

5"ø (HPS)

DEMOLITION GENERAL NOTES:

1. COORDINATE ALL SHUTDOWN REQUIREMENTS WITH

THE VA COR. PROVIDE AT LEAST 2 WEEK OF WRITTEN

NOTICE IN ADVANCE TO THE VA COR.

2. CONTRACTOR IS RESPONSIBLE FOR PROVIDING

STAGING REQUIREMENTS TO PERFORM DEMOLITION

WORK.

3. ALL REMOVED MATERIALS, EQUIPMENT SHALL BE

DISPOSED OFF SITE PER LOCAL CODES AND VA

STANDARDS.

4. REFER TO PHASING AND SHUTDOWN MATRIX ON DWG

GI-004.

5. CONTRACTOR TO COORDINATE WITH LOCAL DIESEL

DELIVERY COMPANIES TO ENSURE THAT FUEL

DELIVERY TRUCKS ARE AVAILABLE ON STANDBY TO

ENSURE THAT FUEL OIL IS AVAILABLE AT ALL TIMES TO

FILL THE EXISTING GENERATOR BELLY TANKS DURING

SYSTEM SHUTDOWN.

6. THERE ARE SIX EXISTING STEAM METERS THAT ARE

CONNECTED TO THE ADVANCED METERING SYSTEM

DATA COLLECTION CABINET, 1-ALB-1-RTU-1, LOCATED IN

THE BOILER PLANT. REMOVE THE WIRING TO SERVING

THE STEAM METERS TO THE METERING SYSTEM.

CAREFULLY REMOVE THE STEAM METERS, SHRINK

WRAP THEM, AND ATTACH TO PALLETS. TWO METERS

TO A PALLET. THIS INCLUDES ALL SENSORS AND

CONTROLLERS. TURN OVER TO VA.

7. CONTRACTOR SHALL MAINTAIN SUPPORT AND

OPERATION OF EXISTING-TO-REMAIN ITEMS DURING

CONSTRUCTION.

M M M

HC HC

CO CO

S

S

S

SM-06 SM-05 SM-01 SM-02 SM-03 SM-04

99 9

CHIMNEY

S

HC CO

HC

CO

11 11 11

12 12 12

FOP

3&4

(NEW)

P

8A&B

(EXISTING)

10S

(F O

S

(F O

R

)(F O

S

(F O

R

(HPS)

(F W

-1

(F W

-2

(F O

S

) (F

O R

REPLACE EXISTING

PUMPS WITH NEW AS

INDICATE ON DWG

MI-401

EXISTING

CONTROL

ROOM

TANK

VAULT

ACCESS

DOOR

1 1/4"ø (DS)

DS/DR FROM / TO

DIESEL OIL TANK

FOR PUMP TO REMAIN

CHECK VALVE

CHECK VALVE

1 1/2"ø (DR)

1 1/4"ø (DS)

/4 "ø

D

S

/2 "ø

D

R

3-WAY VALVE

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

248 Copeland Street Quincy, MA 02169 P: 617-481-6390 F: 617-687-5990

200 Brickstone Square Andover, MA 01810 P: 978-296-6227 F: 978-475-5768

100% CONSTRUCTION

DOCUMENTS

REPLACE MAIN BOILERS 528A8-17-805

Samuel S. Stratton VA Medical Center, 113 Holland Ave., Albany, New York 12208

06/05/2024

N

105 Central Street Stoneham, MA 02180 P: 781-275-6050

C U se rs

\h a u n g \D o c u m e n ts

\A lb a n y_ B o ile r_ M e c h

E le ct ri c a l U p g ra d e

V h a u n g

G H

V P

.r v t

/3

/2

:1

:1

A

M

MD-301

MECHANICAL - PHASE 3 - SUB-BASEMENT

DEMOLITION PLAN

ND HL

3/16" = 1'-0"

PHASE 3 - SUB-BASEMENT - DEMOLITION PLAN

3/16" = 1'-0"

PHASE 3 - TANK VAULT - DEMOLITION PLAN

Revisions: Date:

FA STROBE

MED TOUCH

MEDICAL GAS ALARM

MEDPLUS

TOTAL ALERT

BEACON MED/GAS

EMERGENCY LIGHT -

BATTERY #2

EMERGENCY SHUT

DOWN CIRCUIT

(POWER MAIN GAS

VALVE &

EMERGENCY

SHUT-OFF)

POWER FOR FUEL

MANAGEMENT CONTROLS

GENERATOR 1, 2, 3

INTERCOM (NOT

WORKING)

BREAKERS FOR

LIGHTS, CONTROLS

AND GAS VALVES

TV

LIGHT FIXTURE

FUEL TANK MONITORING

POWER SUPPLY

LP-1 C/R # 1/3/5

EXISTING

ABANDONED OLD

GENERATOR PANEL

FUNCTION DISPLAY

PANEL

GEN1 GEN2 GEN3

HAND WHEEL AND

CABLE MECHANISM

ELECTRICAL PULL

BOX

EXISTING

ABANDONED

GENERATOR PANEL

G

H

WALL MOUNTED AC

UNITCARBON MONOXIDE (CO)

AND COMBUSTIBLE GAS

ALARM

MAIN NETWORK

SWITCH

DOMESTIC

WATER

BOILER ALARM

DRAGER CLS-3000 CO

DETECTION

RECORDER

LAUNDRY

RECORDER

HOSPITAL

RECORDER

DA TANK

ALARM HORN

COND.

TANK HIGH

LEVEL

COND.

TANK LOW

LEVEL

FW HTR

HIGH LEVEL

LOW AIR

PRESSURE

FW HTR

LOW LEVEL

MAIN GAS

VALVE

O2

ANALYZER

FAIL

LOW O2

CONTROLLER FAILN#4 BOILER

FAULT

COMBUSTIBLES ACTUATOR

FAIL

HOSPITAL 10 PSI

ZONE VALVES (N.I.S.)

VAC-1/2 ALARM

MASTER DRAFT

AIR/O2/VFD CONTROL

DRUM LEVEL

ALARM

STEAM HEADER

PRESSURE

FEED WATER

PRESSURE

#2 OIL PRESSURE

B-3

ALARM TEST

ALARM ACKNOWLEDGE

FW

P-1

FW

P-2

FW

P-3

CP

P-4

CP

P-5

#6

FOP

P-6

COMP

#1

#2

FOP

P-2

#2

FOP

P-1

COMP

#2

HIGH GAS

PRESSURE

ACK

TEST

#DEMOLITION NOTES :

A. ELECTRICAL SCOPE: REFER TO ELEC DWG FOR MORE INFO

A

DEMOLITION NOTES :

A. MECH SCOPE: CARBON MONOXIDE (CO) AND COMBUSTIBLE GAS

ALARM ONLY AFTER REMOVAL OF EXISTING BOILERS AND WATER

HEATERS AS PART OF PHASE II.

B. ELECTRICAL SCOPE: REFER TO ELEC DWG FOR MORE INFO.

C. RELOCATE TANK ALARM AND EXTEND WIRING IN TEMPORARY

CONTROL ROOM IN PHASE II.

B

A

# DEMOLITION NOTES :

A. THE EXISTING SPLIT SYSTEM SHALL BE PROTECTED DURING

CONSTRUCTION OF THE CONTROL ROOM. THEY MAY HAVE TO BE

TEMPORARY REMOVED AND RE-INSTALLED WHEN THE CONTROL

ROOM IS FINISHED.

B. ELECTRICAL SCOPE: REFER TO ELEC DWG FOR MORE INFO.

B

A

DEMOLITION NOTES :

A. MECH SCOPE: SAME NOTE AS C-VIEW

B. ELECTRICAL SCOPE: REFER TO ELEC DWG FOR MORE INFO.

(XM)

(XM)

DEMOLITION NOTES :

A. DUPLICATE DIESEL CONTROL PANEL TO TEMPORARY CONTROL ROOM AS PART OF PHASE I. AFTER CONSTRUCTION, LOCATE PANEL TO CONTROL ROOM AT THE SAME LOCATION AS INDICATED ON DWG MH-201A.

B. REMOVE CO/HC DETECTION PANEL IN PHASE II WITH ASSOCIATE ELECTRICAL WIRING.

C. REPLACE DIESEL GENERATOR CONTROL SYSTEM WITH GUI DURING PHASE II TO ACCOMMODATE THE NEW

GENERATOR AND DAY TANK.

D. REMOVE DOMESTIC WATER ALARM IN PHASE I. REMOVE AFTER EXISTING HEATERS ARE COMPLETELY

REMOVED.

E. ELECTRICAL SCOPE: REFER TO ELEC DWG FOR MORE INFO.

E

(X)

(X)

D

DEMOLITION NOTES :

A. RELOCATE MAIN NETWORK SWITCH, ALL ASSOCIATE CONNECTION AND ITS UPS TO NEW CONTROLLER

SHOWN ON MH-201A AS PART OF PHASE I.

B. ELECTRICAL SCOPE: REFER TO ELEC DWG FOR MORE INFO

# DEMOLITION NOTES :

A. ELECTRICAL SCOPE: REFER TO ELEC DWG FOR MORE INFO.

B. PLBG/FP SCOPE: REFER TO PLBG/FP DWG FOR MORE INFO.

A B

DEMOLITION NOTES :

A. REMOVE EXISTING FLOOR MOUNTED CABINET IN ITS ENTIRETY,

REMOVE PAD AND PATCH THE FLOOR TO MATCH EXISTING FINISH

B. EXTEND ALL DIGITAL INPUTS, ALARMS TO A NEW WALL MOUNTED

DDC CONTROL PANEL IN CONTROL ROOM AS PART OF PHASE I. SEE

DWG MH-201A FOR NEW LOCATION. NEW CONTROL PANEL SHALL E

TIED TO EXISTING ALC CONTROL SYSTEM. CONTROL CONTRACTOR

(ALC) SHALL PROVIDE GRAPHIC FOR EACH STATUS AND ALARM

POINT. REMOVE LIGHT INDICATOR AFTER POINTS ARE EXTENDED

TO NEW CONTROL SYSTEM.

C. EXTEND EXISTING SUMMER BOILER FUEL OIL PUMP STATUS AND

ON/OFF INPUT/OUTPUT TO CONTROLLER.

D. EXTEND THE FOLLOWING POINTS FROM THE CONDENSATE TANK

CONTROLLER INSTALLED AS PART OF PHASE II:

SCP-1&2 STATUS

SCP-1&2 FAULT

ENABLE (START/STOP) SCP-1&2

TANK WATER LEVEL

TANK WATER LEVEL ALARM

TANK WATER TEMPERATURE

TANK WATER TEMPERATURE ALARM

E. DUPLICATE ALARM HORN TO TEMPORARY CONTROL ROOM IN

PHASE II. AFTER CONSTRUCTION, LOCATE PANEL BACK TO

CONTROL ROOM AT NEW LOCATION AS INDICATED ON DWG

MH-201A.

F. PLBG/FP SCOPE: REFER TO PLBG/FP DWG FOR MORE INFO.

B

C

(XR)

(XR)

(XR)

B

(XR)

(XR)

DEMOLITION GENERAL NOTES :

1. ALL EQUIPMENT ALARMS SHOWN TO BE REMOVED SHALL STAY

OPERATIONAL UNTIL EQUIPMENT IS DECOMMISSIONED FOR

REMOVAL.

2. REFER TO PLBG AND ELECTRICAL DWGS FOR DEMOLITION OF

PLGB AND ELECTRICAL ITEMS.

3. TEMPORARILY PROTECT ALL EQUIPMENT THROUGHOUT

CONSTRUCTION. COORDINATE WITH THE VA COR ON

PROTECTION REQUIREMENTS.

4. REFER TO TEMPORARY CONTROL TRAILER ON DWD MI-305 FOR

EQUIPMENT, CONTROLS AND DEVICES THAT NEED TO BE

TEMPORARILY RELOCATED / EXTENDED.

5. ABBREVIATIONS

X - REMOVE

XM - EXISTING TO REMAIN

XR - EXISTING TO BE RELOCATED

6. COORDINATE WITH FINAL PHASING PLAN DEVELOPED BY

CONTRACTOR.

7. EVERY SENSOR, ALARM AND PANEL THAT THE BOILER HOUSE

REQUIRES FOR THE OPERATION OF THE BOILERS,

GENERATORS, AND ALL OTHER ALARMS THAT COME INTO THE

BOILER HOUSE SHALL BE COPIED AND OPERATIONAL IN THE

TEMPORARY TRAILER PRIOR TO THE BOILER OPERATORS

LEAVING THE CONTROL ROOM

(X) (XM)

(X)

(XR)

(X)

(X)

(X)

(X)

(X)

(X)

(X)

(X)

(X)

(X)

(X)

(X)

(X) (X) (X) (X) (X) (X)

(X) (X)(X) (X)

(X) (X) (X)

(X) (X) (X)

(X) (X)

(X)

(X)

(X) (X) (X)

(X)

(X)

(XR)

B-2 (X)

B-1 (X)

A A A

E A

B

B

A

B

D D

B

B

B

A

B

#DEMOLITION NOTES :

A. ELECTRICAL SCOPE: REFER TO ELEC DWG FOR MORE INFO

A

A

A

E

E

E

E

B

A

A

C

B

C

(X)

B

D

E

B

F C

A

CONTROL ROOM OVERALL VIEW

NTS

A-VIEW

NTS

B-VIEW

NTS

C-VIEW

NTS

D-VIEW

NTS

E-VIEW 6

NTS

F-VIEW

NTS

G-VIEW

NTS

H-VIEW

EMERGENCY LIGHT -

BATTERY #2

TP-1 CKTS 19, 21, 23

RP CKTS 25,27,29 PNL

2B-SD-LS

BULK OIL STORAGE

AND TANK ALARM

EMERGENCY LIGHT

-BATTERY #8

DIESEL CONTROL PANEL

W/GUI

DIESEL GENERATOR

CONTROL SYSTEM

KEY BOX

CONSOLIDATOR AND TANK

ALARM PANEL

J

PORTABLE MSA CO

SENSORS

NTS

J-VIEW

NTS

(XM)

(XM)

(XM)

(XM)

(XM)

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

248 Copeland Street Quincy, MA 02169 P: 617-481-6390 F: 617-687-5990

200 Brickstone Square Andover, MA 01810 P: 978-296-6227 F: 978-475-5768

100% CONSTRUCTION

DOCUMENTS

REPLACE MAIN BOILERS 528A8-17-805

Samuel S. Stratton VA Medical Center, 113 Holland Ave., Albany, New York 12208

06/05/2024

N

105 Central Street Stoneham, MA 02180 P: 781-275-6050

C U se rs

\h a u n g \D o c u m e n ts

\A lb a n y_ B o ile r_ M e c h

E le ct ri c a l U p g ra d e

V h a u n g

G H

V P

.r v t

/3

/2

:1

:1

A

M

MD-301A

BOILER CONTROL ROOM - PHASE

3-DEMOLITION

ND HLRevisions: Date:

1 1/2"ø 1 1/2"ø

10"ø (HPS)

"ø

"ø

H P

S

"ø

4"ø (HPS)

6"ø

"ø

QTR &

RES.

PRV

UTILITY

HTG

PRV

QTR &

RES.

PRV

IN

-H

O U

S E

P R

V

DA

TANK

/4 "ø

/4 "ø

/4 "ø

"ø

"ø

"ø

"ø

"ø

"ø

6"ø (V) 8"ø 10"ø (HPS) 8"ø 8"ø 4"ø (HPS)

8"ø

"ø

"ø

EXISTING

BOILER 1

EXISTING

BOILER 2

EXISTING

BOILER 3

"ø

H

W S

"ø

H

W R

SUMMER BOILER

MUA-1

"x

"x

"ø

3"ø

"ø 3 "ø

"ø

/2 "ø

/2 "ø

/2 "ø

CO

HC

1 1/2"ø

1"ø 1"ø

2"ø 2"ø

COGEN

1 1/2"ø (HPR)

1"ø (LPR)

3/4"ø

1 1/2"ø (LPR)

"ø

PHASE 3 DEMOLITION KEY NOTE:

1. DEMOLISH DA TANK, INCLUDING TANK SUPPORT AND

ASSOCIATE PIPING.

2. DEMOLISH IN-PRV, INCLUDING ALL PIPING AND

ACCESSORIES.

3. DEMOLISH PRESSURE RELIEF VALVE. RETAIN VENT PIPE

THRU ROOF.

4. DEMOLISH BOILER FEED PIPING AND ALL ACCESSORIES

AS NOTED ON THE DRAWING6.

5. DEMOLISH FUEL OIL PIPING

6. DEMOLISH BREECHING SYSTEM BACK TO CHIMNEY.

DEMOLISH EXISTING DAMPER WITH ASSOCIATED

ELECTRICAL WIRING AND ACCESSORIES (120/1/60).

7. BOILER STEAM PIPE AND ACCESSORIES SHALL BE

DEMOLISHED ENTIRELY AS NOTED ON THE DRAWINGS

8. DEMOLISH 6" HPS SERVING LAUNDRY ROOM.

9. DEMOLISH 4" HPS BACK TO THE POINT AS INDICATED ON

THE DRAWING

10. HEADER VENT PIPE THRU ROOF SHALL REMAIN

11. 10" HPS SERVING HOSPITAL SHALL REMAIN

12. DEMOLISH BOILER #4 FLUE EXHAUST STACK AND VENT

PIPES ON LOW ROOF. ROOF SHALL BE PATCHED

13. DEMOLISH EXISTING EMERGENCY SWITCH

14. DEMOLISH EXISTING EXHAUST FAN ON LOW ROOF

15. DEMOLISH CHEMICAL TREATMENT TANKS AND

ASSOCIATED PUMPS

16. DEMOLISH EXISTING EXHAUST DUCTWORK

17. DEMOLISH CARBON MONOXIDE AND COMBUSTIBLE GAS

SENSORS WITH ASSOCIATED WIRING & CONTROLS

8 910 11

7 7

DEMOLITION GENERAL NOTES:

1. COORDINATE ALL SHUTDOWN REQUIREMENTS WITH THE VA COR. PROVIDE AT LEAST 2 WEEK

OF WRITTEN NOTICE IN ADVANCE TO THE VA COR.

2. CONTRACTOR IS RESPONSIBLE FOR PROVIDING STAGING REQUIREMENTS TO PERFORM

DEMOLITION WORK.

3. ALL REMOVED MATERIALS, EQUIPMENT SHALL BE DISPOSED OFF SITE PER LOCAL CODES

AND VA STANDARDS.

4. REFER TO PHASING AND SHUTDOWN MATRIX ON DWG GI-004

5. CONTRACTOR TO COORDINATE WITH LOCAL DIESEL DELIVERY COMPANIES TO ENSURE THAT

FUEL DELIVERY TRUCKS ARE AVAILABLE ON STANDBY TO ENSURE THAT FUEL OIL IS

AVAILABLE AT ALL TIMES TO FILL THE EXISTING GENERATOR BELLY TANKS DURING SYSTEM

SHUTDOWN.

6. EVERY SENSOR, ALARM AND PANEL THAT THE BOILER HOUSE REQUIRES FOR THE

OPERATION OF THE BOILERS, GENERATORS, AND ALL OTHER ALARMS THAT COME INTO THE

BOILER HOUSE SHALL BE COPIED AND OPERATIONAL IN THE TEMPORARY TRAILER PRIOR TO

THE BOILER OPERATORS LEAVING THE CONTROL ROOM.

7. CONTRACTOR SHALL MAINTAIN SUPPORT AND OPERATION OF EXISTING-TO-REMAIN ITEMS

DURING CONSTRUCTION.

CHIMNEY

S

S

(HPS)

6"ø

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

248 Copeland Street Quincy, MA 02169 P: 617-481-6390 F: 617-687-5990

200 Brickstone Square Andover, MA 01810 P: 978-296-6227 F: 978-475-5768

100% CONSTRUCTION

DOCUMENTS

REPLACE MAIN BOILERS 528A8-17-805

Samuel S. Stratton VA Medical Center, 113 Holland Ave., Albany, New York 12208

06/05/2024

N

105 Central Street Stoneham, MA 02180 P: 781-275-6050

C U se rs

\h a u n g \D o c u m e n ts

\A lb a n y_ B o ile r_ M e c h

E le ct ri c a l U p g ra d e

V h a u n g

G H

V P

.r v t

/3

/2

:1

:1

A

M

MD-302

MECHANICAL - PHASE 3 - BASEMENT

DEMOLITION PLAN

ND HL

3/16" = 1'-0"

PHASE 3 - BASEMENT - DEMOLITION PLAN

Revisions: Date:

PHASE 3 DEMOLITION KEY NOTE:

1. DEMOLISH BOILER STEAM PIPES AND VENT PIPES

2. DEMOLISH ABANDONED 8" HPS ENTIRELY

3. DEMOLISH FOUR ABANDONED PIPES RUNNING JUST BELOW THE ROOF. REMOVE

SUPPORTS AND PIPING INTO U22. SEAL WALL PENETRATIONS WITH CONCRETE TO

MAINTAIN 2 HOUR RATING.

4. DEMOLISH DA TANK, INCLUDING PIPING AND ACCESSORIES.

5. DEMOLISH BREECHING SYSTEM BACK TO CHIMNEY.

6. DEMOLISH EXISTING EXHAUST DUCTWORK.

1 1

DA

TANK

CHIMNEY

BREECHING

SYSTEM

DEMOLITION GENERAL NOTES:

1. CONTRACTOR TO COORDINATE WITH LOCAL DIESEL DELIVERY COMPANIES TO

ENSURE THAT FUEL DELIVERY TRUCKS ARE AVAILABLE ON STANDBY TO ENSURE

THAT FUEL OIL IS AVAILABLE AT ALL TIMES TO FILL THE EXISTING GENERATOR

BELLY TANKS DURING SYSTEM SHUTDOWN.

2. CONTRACTOR SHALL MAINTAIN SUPPORT AND OPERATION OF EXISTING-TO-

REMAIN ITEMS DURING CONSTRUCTION.

(F W

-1

"ø

"ø

(F W

-2

8"ø 8"ø 8"ø(HPS) (HPS) (HPS)

3"ø (BF-1) 3"ø (BF-2) 6"ø (LPS)

3"ø (CHWS)

3"ø (CHWR)

3"ø (HWS)

3"ø (HWR)

8"ø (DCW) 5"ø (HWR)

5"ø (HWS)

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

248 Copeland Street Quincy, MA 02169 P: 617-481-6390 F: 617-687-5990

200 Brickstone Square Andover, MA 01810 P: 978-296-6227 F: 978-475-5768

100% CONSTRUCTION

DOCUMENTS

REPLACE MAIN BOILERS 528A8-17-805

Samuel S. Stratton VA Medical Center, 113 Holland Ave., Albany, New York 12208

06/05/2024

N

105 Central Street Stoneham, MA 02180 P: 781-275-6050

C U se rs

\h a u n g \D o c u m e n ts

\A lb a n y_ B o ile r_ M e c h

E le ct ri c a l U p g ra d e

V h a u n g

G H

V P

.r v t

/3

/2

:1

:1

A

M

MD-303

MECHANICAL - PHASE 3 - LEVEL 1 DEMOLITION

PLAN

ND HL

3/16" = 1'-0"

PHASE 3 - LEVEL 1 - DEMOLITION PLAN

Revisions: Date:

PHASE 3 DEMOLITION KEY NOTE:

1. DEMOLISH EXISTING GRAVITY VENTILATORS. ROOF

CURB SHALL BE REPLACED TO ACCOMMODATE NEW

EXHAUST FANS.

2. DEMOLISH EXISTING EXHAUST FANS IN ITS ENTIRELY,

INCLUDING ROOF CUB. ROOF SHALL BE PATCHED.

3. DEMOLISH VENT THRU ROOF FROM BOILERS AND STEAM

SYSTEM. ROOF SHALL BE PATCHED

4. DEMOLISH EXISTING VENT HEAD.

5. CONTRACTOR SHALL MAINTAIN SUPPORT AND

OPERATION OF EXISTING-TO-REMAIN ITEMS DURING

CONSTRUCTION.

1 1 1

3 3 3

CHIMNEY

10" VTR

INSTALLED IN

PHASE 2

4" VTR INSTALLED

IN PHASE 2

EXISTING VTR

TO REMAIN

EXISTING VTR

TO REMAIN

EXISTING VTR

TO REMAIN EXISTING VTR

TO REMAIN

(2) 2" VTR

INSTALLED IN

PHASE 2

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

248 Copeland Street Quincy, MA 02169 P: 617-481-6390 F: 617-687-5990

200 Brickstone Square Andover, MA 01810 P: 978-296-6227 F: 978-475-5768

100% CONSTRUCTION

DOCUMENTS

REPLACE MAIN BOILERS 528A8-17-805

Samuel S. Stratton VA Medical Center, 113 Holland Ave., Albany, New York 12208

06/05/2024

N

105 Central Street Stoneham, MA 02180 P: 781-275-6050

C U se rs

\h a u n g \D o c u m e n ts

\A lb a n y_ B o ile r_ M e c h

E le ct ri c a l U p g ra d e

V h a u n g

G H

V P

.r v t

/3

/2

:1

:1

A

M

MD-304

MECHANICAL - PHASE 3 - ROOF DEMOLITION

PLAN

ND HL

3/16" = 1'-0"

PHASE 3 - ROOF - DEMOLITION PLAN

Revisions: Date:

"ø

H

P S

PHASE 1 NEW WORK KEY NOTES:

1. REPLACE EXISTING HIGH PRESSURE STEAM TRAPS IN KIND. ALL

NEW TRAPS SHALL BE STEEL OR STAINLESS STEEL

2. PROVIDE DRIP LEGS AND RUN HPR BACK TO THE EXISTING FLASH

TANK IN SUB-BASEMENT VIA EXISTING 2" PR. REFER TO DETAIL 1

ON SHEET MI-102 FOR MORE CONNECTION DETAILS.

3. PROVIDE NEW 6" VENT PIPE THROUGH ROOF AND CONNECT TO

EXISTING CONDENSATE PUMP CP-2 VENT CONNECTION.

COORDINATE ROOF OPENING LOCATION WITH OTHER EXISTING

EQUIPMENT ON ROOF. TERMINATE VENT PIPING WITH CODE

COMPLIANT TERMINATION DEVICE. TERMINATE MINIMUM 3'-0"

ABOVE ROOF.

4. RE-ROUTE 5"Ø HWS/R TO AVOID NEW ELECTRICAL EQUIPMENT

BELOW. PROVIDE NEW WALL PENETRATIONS AS NEEDED.

PROVIDE NEW HEAT TRACE FROM NEW PENETRATION TO CHP.

PROVIDE POINT ON BMS FOR TROUBLE SIGNAL AND HEAT TRACE

OPERATION. RE-INSULATE PIPING TO MATCH EXISTING INCLUDING

LABELING.

5. PROVIDE 2" LPS SERVING UNIT HEATERS AND CONNECT TO

EXISTING LOW PRESSURE STEAM HEADER

6. PROVIDE 1-1/2" LPR FROM UNIT HEATERS AND CONNECT TO

EXISTING LOW PRESSURE RETURN HEADER AT CONDENSATE

PUMP CP-2.

7. INSTALL (3) 1" CAPPED AND VALVED CONNECTION AT THE 2" PR

LINE FOPR FUTURE CONNECTION IN PHASE 1

CHILLER ROOM

BOILER ROOM

CHIMNEY

A L

L E

Y

2"ø (LPS)

1"ø (LPR)

6"ø (V)

5"ø (HWS)

5"ø (HWR)

"ø

L

P S

1 1/2"ø (LPR)

"ø

L

P R

"ø

L

P R

5"ø (HWR)

5"ø (HWS)

"ø

L

P R

"ø

L P

S

"ø

P

R

(CHWS)

(CHWR)

(HWS)

(HWR)

GENERAL NOTES:

1. A COORDINATE SHUTDOWN REQUIREMENTS WITH THE OWNER.

PROVIDE A WRITTEN NOTICE AT LEAST 15 WORKING DAYS IN

ADVANCE FOR ANY REQUIRED SHUTDOWN.

NEW ELECTRICAL

SWITCHBOARD. SEE

ELECTRICAL DWGS FOR MORE

INFO

"ø

L P

S

"ø

L P

S

"ø

P

R

CP-2

5"ø (HWR)

5"ø (HWS)

8"ø (DCW)

8"ø (DCW) 5"ø (HWR)

5"ø (HWS)

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

248 Copeland Street Quincy, MA 02169 P: 617-481-6390 F: 617-687-5990

200 Brickstone Square Andover, MA 01810 P: 978-296-6227 F: 978-475-5768

100% CONSTRUCTION

DOCUMENTS

REPLACE MAIN BOILERS 528A8-17-805

Samuel S. Stratton VA Medical Center, 113 Holland Ave., Albany, New York 12208

06/05/2024

N

105 Central Street Stoneham, MA 02180 P: 781-275-6050

C U se rs

\h a u n g \D o c u m e n ts

\A lb a n y_ B o ile r_ M e c h

E le ct ri c a l U p g ra d e

V h a u n g

G H

V P

.r v t

/3

/2

:1

:2

A

M

MH-103

MECHANICAL - PHASE 1- LEVEL 1 NEW WORK

PLAN

ND HL

3/16" = 1'-0"

PHASE 1 - LEVEL 1 - NEW WORK PLAN

Revisions: Date:

P$

/2 "ø

/2 "ø

EXISITNG

BOILER 1

EXISITNG

BOILER 2

EXISITNG

BOILER 3

2"ø (PR)

3"ø (PR)

6"ø (HPS)

1 1/4"ø

"ø

"ø

"ø

"ø

8"ø (HPS) 2"ø (PR)

10"ø (HPS)

6"ø

12"ø

COGEN

"ø 6 "ø

EXISITNG SUMMER

BOILER

BOILER CONTROL

ROOM

S

"ø

1 1/2"ø1 1/2"ø

3"ø (PR)

1 1/2"ø (HPR)

/2 "ø

H

P R

3"ø (LPR)

1 1/2"ø (HPR) 1 1/2"ø (LPR)

"ø

"ø

"ø

"ø

"ø

PHASE 2 NEW WORK KEY NOTES:

1. NOT USE.

2. CROSS-CONNECT 4" HPS SERVING BOILER ROOM EQUIPMENT TO 6" SECONDARY HEADER. PROVIDE

ISOLATION VALVES.

3. INSTALL FIRST BLOCK OF GV-6 ON 10" HPS AS ISOLATION VALVE TO PREVENT SHUTDOWN TO HOSPITAL WHEN REPLACING HEADER. VALVE BLOCK SHALL BE BELOW CROSS CONNECT TO 6" HPS

AND CROSS CONNECTION TO 8"HPS. SEE SECTIONS AND DIAGRAM FOR MORE DETAILS.

4. CONNECT ALL EXISTING CONDENSATE PIPING TO NEW CONDENSATE TANK HEADER RESPECTIVELY.

PROVIDE CHECK VALVES AND ISOLATION VALVES.

5. INSTALL CONDENSATE TANK, PUMPS AND BOILER FEED WATER PIPING FROM CONDENSATE PUMPS TO TEMPORARY BOILERS. PROVIDE TEEs AND VALVES AS INDICATE ON THE DRAWINGS FOR FUTURE CONNECTIONS TO PERMANENT BOILERS AND BOILER FEED SYSTEM. PROVIDE TEE AND VALVE FOR

TESTING. INSTALL VENT PIPING THRU ROOF. COORDINATE TO PLBG FOR FLOOR DRAIN. THE

CONDENSATE TANK WILL HAVE TO BE BROUGHT INTO THE BOILER PLANT THROUGH THE REMOVED

WINDOW. THE CONTRACTOR SHALL ACCOUNT FOR RIGGING.

6. PROVIDE DRIP LEG ON 6" SECONDARY HEADER AND TIE TO EXISTING 1-1/2" HPR.

7. CROSS CONNECT EXISTING SUMMER BOILER FUEL OIL PIPES WITH EXISTING WINTER FUEL OIL PIPES.

SINCE EXISTING WINTER FUEL OIL PIPES WILL BE EXTENDED TO TEMPORARY BOILERS, SO SUMMER BOILER FUEL OIL PUMP WILL BE UTILIZED TO FEED TEMPORARY BOILERS. THIS WILL ALLOW TO REPLACE WINTER FUEL OIL PUMPS WITH NEW, BUT MUST BE DONE DURING LOWEST STEAM DEMAND

MONTHS AND MUST BE COORDINATED WITH THE VA.

8. PROVIDE 2" COLD WATER (CW) AND SOFT WATER (ZW) TO CONDENSATE TANK. PROVIDE A TEE AND

VALVE ON ZW FOR FUTURE CONNECTION TO NEW HEAT RECOVERY UNIT.

9. PROVIDE PRV-26 CONNECT 6" HPS TO 6" HPS SECONDARY HEADER,…