SSP_50489-Rev_G.docx

DOCX document 10 MB Posted

Attached to
Human Space Flight Technical Integration Contract (HSFTIC) Federal contract opportunity
Solicitation number
80JSC019R0023
Issued by
National Aeronautics and Space Administration Johnson Space Center

About this file

This is a solicitation for the Human Space Flight Technical Integration Contract (HSFTIC). Key details include that NASA/JSC plans to issue an RFP for the HSFTIC, which is a total small business set-aside with a NAICS code of 541715 and size standard of 1,250. The anticipated RFP release date is November 1, 2019 with an offer due date of December 11, 2019. The solicitation and related documents will be available at the listed websites. Prospective offerors should notify the office of their intent to submit an offer and are responsible for downloading the solicitation and amendments. All contractual technical questions must be submitted in writing.

SSP 50489-Rev G

View the file

Other files for this federal contract opportunity

Other files attached to Human Space Flight Technical Integration Contract (HSFTIC), newest first.
File Type Posted
HSFTIC_J-4_Applicable_and_Reference_Document_List.xlsx XLSX spreadsheet
Attachment_L-6_EPM_Template_Workbook.xlsx XLSX spreadsheet
SSP_50035_Revision_C_Retired.docx DOCX document
SSP_50314-Rev_C.docx DOCX document
SSP41142P2_RD_CD_012045_2.pdf PDF
SSP-50803.doc DOC document
PPD_524_RB_FINAL_MRICB_Charter.docx DOCX document
GPO_Website_Ref.pptx PPTX presentation
SSP_50481-RevC.docx DOCX document
42124_P2_RC_.pdf PDF
SSP_50094-RevB.pdf PDF
SSP_50659_Rev_E.xlsx XLSX spreadsheet
IMPR_Package_Mar_Apr_18.pptx PPTX presentation
SSP_41167-RevJ.docx DOCX document
SSP_50835_Rev_E.doc DOC document
42097P1_RD.pdf PDF
SSP42003_P2_RevC.pdf PDF
Applicable_3.zip ZIP file
MD_101_RA_FINAL.docx DOCX document
SSP_50477-RevC.pdf PDF
SSP_50670-Rev_A-DCN001-Collated_Master.doc DOC document
SSP_50781-RevA-DCN_003.docx DOCX document
PPD_517.pdf PDF
SSP_41002-RevR.docx DOCX document
SSP_50901.docx DOCX document
SSP_54059_54060-Baseline.docx DOCX document
SSP5003.PDF PDF
SSP30559RD-Errata.pdf PDF
SSP_41000-RevCJ.pdf PDF
42137P1_RC_CD_012230.pdf PDF
SSP_41163-Rev_L.docx DOCX document
9.0.zip ZIP file
SSP_42001-RevW.docx DOCX document
SSP_50875.docx DOCX document
SSP41017p2rJ.pdf PDF
41143Pt2RD.pdf PDF
41015P2RH.pdf PDF
SSP_42121_Part_2.pdf PDF
SSP_50309_Part_1.pdf PDF
SSP_50477-RevC_Joint_Crew_Provisioning_Catalog.pdf PDF
JSC_Form_1240.pdf PDF
SSP_41160-RevH.docx DOCX document
Increment_Utilization_Accomplishment_Report_Blank_Book_RevB(March_2019).docx DOCX document
SSP_50102.pdf PDF
SSP_50146-RevB-SSCD_15566.pdf PDF
SSP_50034_Revision_D.DOC DOC document
SSP_50227-RevC.docx DOCX document
SSP_50621-RevF-DCN001-Collated_Master.pdf PDF
SSP41004_P2_RJ.pdf PDF
DRAFT_HSFTIC_Work_Load_Indicators.xlsx XLSX spreadsheet
Show all 50

Human Space Flight Technical Integration Contract (HSFTIC) has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ISS Mission Integration Template

International Space Station Program

Revision G

June 2017

This document may be used only in the International Space Station (ISS) program to fulfill responsibilities of a Cooperating Agency of an ISS Partner in furtherance of the ISS Intergovernmental Agreement. Re-transfer or disclosure to, or use by, any persons other than citizens of ISS Program International Partner countries, or use for any other purpose, requires prior Governments authorization of all ISS Program Partners who approve this document.

National Aeronautics and Space Administration International Space Station Program Johnson Space Center Houston, Texas Contract Number: NNJ12GA46C

SSP 50489

Revision G

REVISION AND HISTORY PAGE

REV.
DESCRIPTION
PUB. DATE
-
Initial Release (Reference per SSCD 003540, EFF. 01-10-02)
02-21-02
A
Revision A (Reference per SSCD 006944, EFF. 01-14-03)
Early Release
01-23-03
Program Release
09-04-03

DCN 001 (Reference per SSCD 007451, EFF. 04-14-03;

SSCD 007451R1, EFF. 05-15-03)

Early Release
05-22-03
Program Release
05-18-05
B
Revision B (Reference per SSCD 008028, EFF. 01-06-04)
Early Release
01-28-04
Program Release
06-14-05
C
Revision C (Reference per SSCD 008516, EFF. 07-24-04)
Early Release
08-05-04
Program Release
01-11-06

DCN 001 (Reference per SSCD 009876, EFF. 06-14-07)

Early Release
06-28-07
Program Release
04-29-08

(DCN 002 was intentionally omitted due to the DCN numbering policy prior to the MIC Contract)

DCN 003 (Reference per SSCD 010360, EFF. 11-29-07)

Early Release
12-07-07
Program Release
04-29-09

DCN 004 (Reference per SSCD 011280, EFF. 06-11-09)

Early Release
07-02-09
Program Release
10-19-10

DCN 005 (reference per SSCD 011894, EFF. 04-15-10)

Early Release
05-06-11
Program Release
05-19-11

REVISION AND HISTORY PAGE

REV.
DESCRIPTION
PUB. DATE
D
Revision D (Reference per SSCD 012923, EFF. 04-04-12)
Early Release
04-17-12
Program Release
12-17-12
E
Revision E (Reference per SSCD 013552, EFF. 01-10-14)
Early Release
01-16-14
Program Release
XX-XX-XX
F
Revision F (Reference per SSCD 014388, EFF. 02-18-15)
Early Release
03-04-15
Program Release
XX-XX-XX
G
Revision G (Reference per SSCD 15498, EFF06-21-19)
Early Release
06-26-19
Program Release
XX-XX-XX

PREFACE

iss mission integration template The purpose of this document is to define the templates used to develop schedules for the mission integration of United States (U.S.), International Partner (IP), and Visiting Vehicle Provider (VVP) launched hardware and cargo to the International Space Station (ISS). These schedules track products (such as data deliveries and analyses) and major milestones (such as Program-level reviews) and are used to ensure that the mission integration process is completed successfully and in a timely manner.

Need dates for schedule activities are initially calculated based on the templates. The templates identify the activities that will be included on the schedule and when they must occur based on their relation to each other and to the projected launch date, increment, or Increment Definition and Requirements Document (IDRD) period. The generic schedules for all Visiting Vehicle (VV) flights are included in this document.

This document is under the control of the Multilateral Mission Integration and Operations Control Board (MMIOCB).

iii

INTERNATIONAL SPACE STATION PROGRAM

iss mission integration template

CONCURRENCE

june 2017

See Directive Approval

Ryan L. Prouty Manager, Mission Integration and Operations National Aeronautics and Space Administration

Sergey Khumonin Head of Safery, Reliability and Verification Department Rocket Space Corporation - Energia

Date

Date

Bernardo Patti ESA ISS Program Manager European Space Agency

Ken Podwalski Program Manager Canadian Space Station Program

Date

Date

Koichi Wakata ISS Program Manager Japan Aerospace Exploration Agency

Date

INTERNATIONAL SPACE STATION PROGRAM

iss mission integration template

CONCURRENCE

june 2017

TABLE OF CONTENTS

PARAGRAPHPAGE
1.0introduction1-1
1.1purpose1-1
1.2scope1-1
1.3precedence1-1
1.4delegation of authority1-1
1.5milestone explanation1-1
2.0documents2-1
2.1applicable documents2-1
2.2reference documents2-1
3.0Soyuz Missions Launched on a Soyuz Launcher3-1
3.1Generic schedulE3-1
4.0Progress missions Launched on a Soyuz Launcher4-1
4.1Generic ScheDUle4-1
5.0HTV Missions launched on AN h-iib rocket5-1
5.1generic schedule5-1
6.0Spacex CARGO Dragon Missions launched on A Falcon Rocket6-1
6.1generic schedule6-1
7.0orbital ATK Cygnus Missions launched on AN antares Launcher or atlas v rocket7-1
7.1generic schedule7-1
8.0SpaceX Crew Dragon Missions Launched On A Falcon Rocket8-1
8.1generic schedule8-1
9.0Boeing Commercial Crew Transportation (CST)-100 Missions launched on AN ATlas V Rocket9-1
9.1generic schedule9-1
10.0increment schedules10-1
10.1generic schedule10-1
10.2INCREMENTS10-1
11.0Combined milestone definitions table11-1
11.1Milestone definitions11-1
11.1.1VEHICLE or Increment11-1
11.1.2milestone11-1
11.1.3Description11-1
11.1.4Template section11-1
11.1.5Controller/Facilitator(s)11-1
11.1.6Predecessor11-2
11.1.7Successor11-2
11.1.8Waste Management Sections11-2

APPENDIX

aAcronyms and abbreviationsa-1
bGLOSSARY <Reserved>b-1
copen workc-1

TABLE

1.5-1milestone explanation1-1
11.1-1combined milestone definitions (28 pages)11-3
C-1to be determined itemsc-1
C-2TO BE RESOLVED ISSUESc-1

FIGURE

3.1-1iss mission integration template – soyuz (6 pages)3-2
4.1-1iss mission integration template – Progress (7 pages)4-2
5.1-1iss mission integration template – htv (7 pages)5-2
6.1-1iss mission integration template – spacex cargo dragon (6 pages)6-2
7.1-1iss misssion integration template – orbital ATK (5 pages)7-2
8.1-1iss mission integration template – spacex crew dragon (6 pages)8-2
9.1-1iss mission integration template – boeing cst-100 (5 pages)9-1
10.1-1iss mission integration template – increment (10 pages)10-2

1-1 introduction purpose scope The purpose of SSP 50489, ISS Mission Integration Template, is to define the template that is used to develop the hardware and cargo integration schedules for United States (U.S.) and International Partner (IP) provided hardware and cargo for both utilization and logistics which is to be launched for use on the International Space Station (ISS) or brought to orbit for ISS science.

This document defines the schedule templates for the ISS hardware missions. These templates include ISS Mission Integration and Launch Vehicle Integration milestones.

precedence This document is a planning guide. Actual implementation schedules may deviate from the template, if new constraints or requirements develop. In instances of new generic updates to the template schedule, a CR shall be submitted for review and disposition in order to update SSP 50489.

delegation of authority This document is approved by the Multilateral Mission Integration and Operations Control Board (MMIOCB).

milestone explanation A symbol designating the milestone level will be displayed to the left of the milestone in the Mission Integration Template schedules. The Milestone Levels are defined as follows:

table 1.5-1 milestone explanation table

Milestone (event)
Explanation
Planned
Completed
Level 1 Milestone
Program Level Milestones and activities that require Commercial and/or International Partner involvement (SSCB, SORR, FRR, etc)
○
Level 2 Milestone
Milestones reported to various ISS Program Boards (SSPCB, MIOCB, PCB, etc).
Level 3 Milestone
Milestones at the integration or working-level. All milestones being tracked for visibility.
Launch Milestone
The planned launch date is defined and baselined by the ISS FPIP
Progress Bar
Shows amount of progress tracked for specific task

documents applicable documents The following documents include specifications, models, standards, guidelines, handbooks, and other special publications. The documents listed in this paragraph are applicable to the extent specified herein. Inclusion of applicable documents herein does not in any way supersede the order of precedence identified in Paragraph 1.3 of this document.

JSC 25187
Flight Production Schedules Board and Template Working Procedures
SSP 30599
Safety Review Process
SSP 50108
ISS Program Certification of Flight Readiness Process Document

reference documents The following documents contain supplemental information to guide the user in the application of this document. These reference documents may or may not be specifically cited within the text of this document.

6354-PP7100
ISS Commercial Resupply Services (CRS) Mission Integration and Operations Management Plan
DD Form 250
Material Inspection and Receiving Report
JSC 24834
Astronaut Medical Standard Selection and Annual Medical Certification
JSC 25187
Flight Production Schedules Board and Template Working Group Procedures
JSC 27472
Requirements for Submission of Data Needed for Toxicology Assessment of Chemicals and Biologicals to be Flown on Manned Spacecraft
SpX-000045 C1-7
Mission Integration and Operations Management Plan
SSP 30599
Safety Review Process
SSP 50030
NASA/NASDA Joint Management Plan
SSP 50137
NASA/RSA Bilateral Data Exchange Agreement, List, and Schedule
SSP 50200-01
Station Program Implementation Plan,

Volume 1: Station Program Management Plan

SSP 50200-02
Station Program Implementation Plan,

Volume 2: Program Planning and Manifesting

SSP 50200-04
Station Program Implementation Plan,

Volume 4: Payload Engineering Integration

SSP 50200-05

Part 1 Station Program Implementation Plan, Volume 5: Logistics and Maintenance, Part 1: Maintenance

SSP 50200-05

Part 2 Station Program Implementation Plan, Volume 5: Logistics and Maintenance Part 2: Logistics

SSP 50200-07
Station Program Implementation Plan,

Volume 7: Training

SSP 50200-08
Station Program Implementation Plan,

Volume 8: Increment Execution Preparation

SSP 50200-09
Station Program Implementation Plan,

Volume 9: Real-Time Operations

SSP 50200-10
Station Program Implementation Plan,

Volume 10: Sustaining Engineering

SSP 50200-11
Station Program Implementation Plan,

Volume 11: ISS Cargo Integration Processes

SSP 50260
International Space Station Medical Operations Requirements Document (ISS MORD)
SSP 50261-02
ISS Generic Groundrules and Constraints Part 2: Execute Planning
SSP 50266-P
Progress M/M1 Certification of Flight Readiness Implementation Plan
SSP 50273
Segment Specification for the H-II Transfer Vehicle
SSP 50614
NASA/JAXA Bilateral Data Exchange Agreements, Lists, and Schedules for H-II Transfer Vehicle (HTV)
SSP 57057
ISS Payload Integration Template
SSP 50146
NASA/RSA Bilateral S&MA Process Requirements for International Space Station Attachment D NASA/Roscosmos General Principles and Requirements for ISS Cargo Safety
32928 - 103
Requirements for International Partner Cargoes Transported on Russian Progress and Soyuz Vehicles

2-3

Soyuz Missions Launched on a Soyuz Launcher Generic schedulE ISS Mission Integration Template – Soyuz (Figure 3.1-1) details Soyuz missions launched on a Soyuz launcher. This figure details at a high-level a Mission Integration Schedule Template for a Soyuz vehicle. The schedule template is for planning purposes and is the starting point for creating the specific Mission Integration Schedules for Soyuz Missions to the ISS relative to flights and increments. Specific Level I and Level II flight schedule milestones and dates are coordinated by the applicable Visiting Vehicle Leads and Increment Managers and will be approved and baselined by the appropriate ISS panels and control boards.

The schedule template contains the functional sections required to build the ISS flightspecific mission integration schedules for Soyuz missions to the ISS that are launched on a Soyuz Launcher. Flight-specific schedules are obtained by generating a generic template schedule based on the generic template milestones that are applicable for the particular mission. The true calendar dates for each applicable milestone is determined by the appropriate task owners and associated teams and approved by the task owners, associated teams, Visiting Vehicle Leads and Increment Managers.

For the purpose of this document, the term hardware (HW) will be used to identify space bound items that the HW providers send to a U.S. packing facility for processing, packing and/or shipping prior to being loaded onto the vehicle. Once the HW has left the packing facility, it becomes cargo.

Also, for clarity, when two dates are shown, the first one is the anchor date and the other date is the corresponding Launch minus reference date. The task owner will be shown in brackets; e.g.: National Aeronautics and Space Administration [NASA].

Landing occurs dependent on post-undock and/or deorbit burn targeting.

3-1

Figure 3.1-1 iss mission integration template – soyuz (6 pages)

3-7

Progress missions Launched on a Soyuz Launcher Generic ScheDUle ISS Mission Integration Template – Progress (Figure 4.1-1) details Progress missions launched on a Soyuz launcher. This figure details at a high-level a Mission Integration Schedule Template for a Progress vehicle. The schedule template is for planning purposes and is the starting point for creating the specific Mission Integration Schedules for Progress Missions to the ISS relative to flights and increments. Specific Level I and Level II flight schedule milestones and dates are coordinated by the applicable Visiting Vehicle Leads and Increment Managers and will be approved and baselined by the appropriate ISS panels and control boards.

The schedule template contains the functional sections required to build the ISS flightspecific mission integration schedules for Progress missions to the ISS that are launched on a Soyuz Launcher. Flight-specific schedules are obtained by generating a generic template schedule based on the generic template milestones that are applicable for the particular mission. The true calendar dates for each applicable milestone is determined by the appropriate task owners and associated teams and approved by the task owners, associated teams, Visiting Vehicle Leads and Increment Managers.

For the purpose of this document, the term HW will be used to identify space bound items that the H/W providers send to a U.S. packing facility for processing, packing and/or shipping prior to being loaded onto the vehicle. Once the HW has left the packing facility, it becomes cargo.

Also, for clarity, when two dates are shown the first one is the anchor date and the other date is the corresponding Launch minus reference date. The task owner will be shown in brackets; e.g.: [NASA].

4-1 figure 4.1-1 iss mission integration template – Progress (7 pages) figure 4.1-1 iss mission integration template – progress (7 pages) figure 4.1-1 iss mission integration template – Progress (7 pages)

4-3

DCN XXX

DCN XXX

DCN XXX

HTV Missions launched on AN h-iib rocket generic schedule ISS Mission Integration Template – HTV (Figure 5.1-1) details HTV missions launched on an H-IIB rocket. This figure details at a high-level a Mission Integration Schedule Template for an HTV vehicle. The schedule template is for planning purposes and is the starting point for creating the specific Mission Integration Schedules for HTV Missions to the ISS relative to flights and increments. Specific Level I and Level II flight specific schedule milestones and dates are coordinated by the applicable Visiting Vehicle Leads and Increment Managers and will be approved and baselined by the appropriate ISS panels and control boards.

The schedule template contains the functional sections required to build the ISS flightspecific mission integration schedules for HTV missions to the ISS that are launched on the H-IIB Rocket. Flight-specific schedules are obtained by generating a generic template schedule based on the generic template milestones that are applicable for the particular mission. The true calendar date for each applicable milestone is determined by the appropriate task owner and associated teams and approved by the task owners, associated teams, Visiting Vehicle Leads and Increment Managers.

For the purpose of this document, the term HW will be used to identify space bound items that the HW providers send to a U.S. packing facility for processing, packing and/or shipping prior to being loaded onto the vehicle. Once the HW has left the packing facility, it becomes cargo.

Also, for clarity, when two dates are shown the first one is the anchor date and the other date is the corresponding Launch minus reference date. The task owner will be shown in brackets; e.g.: [NASA].

5-1 figure 5.1-1 iss mission integration template – htv (7 pages) figure 5.1-1 iss mission integration template – HTV (7 pages) figure 5.1-1 iss mission integration template - HTV (7 pages) 5-8

Spacex CARGO Dragon Missions launched on A Falcon Rocket generic schedule ISS Mission Integration Template – SpaceX Cargo Dragon (Figure 6.1-1) details SpaceX (SpX) Cargo Dragon missions launched on a Falcon rocket. This figure details at a high-level a Mission Integration Schedule Template for the SpX Cargo Dragon vehicle. The schedule template is for planning purposes and is the starting point for creating the specific Mission Integration Schedules for SpX Cargo Dragon Missions to the ISS relative to flights and increments. Specific Level I and Level II flight specific schedule milestones and dates are coordinated by the applicable Visiting Vehicle Leads and Increment Managers and will be approved and baselined by the appropriate ISS panels and control boards.

The schedule template contains the functional sections required to build the ISS flightspecific mission integration schedules for SpX Cargo Dragon missions to the ISS that are launched on a Falcon Rocket. Flight-specific schedules are obtained by generating a generic template schedule based on the generic template milestones that are applicable for the particular mission. The true calendar date for each applicable milestone is determined by the appropriate task owner and associated teams and approved by the task owners, associated teams, Visiting Vehicle Leads and Increment Managers.

For the purpose of this document, the term HW will be used to identify space bound items that the HW providers send to a U.S. packing facility for processing, packing and/or shipping prior to being loaded onto the vehicle. Once the HW has left the packing facility, it becomes cargo.

Also, for clarity, when two dates are shown the first one is the anchor date and the other date is the corresponding Launch minus reference date. The task owner will be shown in brackets; e.g.: [NASA].

Landing occurs dependent on post-unberth and/or deorbit burn targeting.

6-1 figure 6.1-1 iss mission integration template – spacex cargo dragon (6 pages) figure 6.1-1 iss mission integration template- spacex cargo dragon (6 pages)

6-7 orbital ATK Cygnus Missions launched on AN antares Launcher or atlas v rocket generic schedule ISS Mission Integration Template – Orbital ATK Cygnus (Figure 7.1-1) details Orbital ATK (OA) Cygnus missions launched on either an Antares launcher or an Atlas V rocket. This figure details at a high-level a Mission Integration Schedule Template for the OA Cygnus vehicle. The schedule template is for planning purposes and is the starting point for creating the specific Mission Integration Schedules for Orbital ATK Missions to the ISS relative to flights and increments. Specific Level I and Level II flight specific schedule milestones and dates are coordinated by the applicable Visiting Vehicle Leads and Increment Managers and will be approved and baselined by the appropriate ISS panels and control boards.

The schedule template contains the functional sections required to build the ISS flightspecific mission integration schedules for OA Cygnus missions to the ISS that are launched on either an Antares Launcher or Atlas V Rocket. Flight-specific schedules are obtained first by generating a generic template schedule based on the generic template milestones that are applicable for the particular mission. The true calendar date for each applicable milestone is determined by the appropriate task owner and associated teams and approved by the task owners, associated teams, Visiting Vehicle Leads and Increment Managers.

For the purpose of this document, the term HW will be used to identify space bound items that the HW providers send to a U.S. packing facility for processing, packing and/or shipping prior to being loaded onto the vehicle. Once the HW has left the packing facility, it becomes cargo.

Also, for clarity, when two dates are shown the first one is the anchor date and the other date is the corresponding Launch minus reference date. The task owner will be shown in brackets; e.g.: [NASA].

7-1 figure 7.1-1 iss misssion integration template – orbital ATK (5 pages) figure 7.1-1 iss mission integration template – orbital ATK (5 pages)

7-6

SpaceX Crew Dragon Missions Launched On A Falcon Rocket generic schedule ISS Mission Integration Template – SpaceX Crew Dragon (Figure 8.1-1) details SpaceX (SpX) Crew Dragon missions launched on a Falcon rocket. This figure details at a high-level a Mission Integration Schedule Template for the SpX Crew Dragon vehicle. The schedule template is for planning purposes and is the starting point for creating the specific Mission Integration Schedules for SpX Crew Dragon to the ISS relative to flights and increments. Specific Level I and Level II flight specific schedule milestones and dates are coordinated by the applicable Visiting Vehicle Leads and Increment Managers and will be approved and baselined by the appropriate ISS panels and control boards.

The schedule template contains the functional sections required to build the ISS flightspecific mission integration schedules for SpX Crew Dragon missions to the ISS that are launched on a Falcon Rocket. Flight-specific schedules are obtained by generating a generic template schedule based on the generic template milestones that are applicable for the particular mission. The true calendar date for each applicable milestone is determined by the appropriate task owner and associated teams and approved by the task owners, associated teams, Visiting Vehicle Leads and Increment Managers.

For the purpose of this document, the term HW will be used to identify space bound items that the HW providers send to a U.S. packing facility for processing, packing and/or shipping prior to being loaded onto the vehicle. Once the HW has left the packing facility, it becomes cargo.

Also, for clarity, when two dates are shown the first one is the anchor date and the other date is the corresponding Launch minus reference date. The task owner will be shown in brackets; e.g.: [NASA]. Landing occurs dependent on post-undock and/or deorbit burn targeting.

10-1 figure 8.1-1 iss mission integration template – spacex crew dragon (6 pages) figure 8.1-1 iss mission integration template – space crew dragon (6 pages)

Figure 8.1-1 ISS Mission Integration Template – Spacex Crew-dragon (6 pages)

Boeing Commercial Crew Transportation (CST)-100 Missions launched on AN ATlas V Rocket generic schedule ISS Mission Integration Template – Boeing CST-100 (Figure 9.1-1) details Boeing CST-100 missions launched on an Atlas rocket. This figure details at a high-level a Mission Integration Schedule Template for the Boeing CST-100 vehicle. The schedule template is for planning purposes and is the starting point for creating the specific Mission Integration Schedules for Boeing CST-100 Missions to the ISS relative to flights and increments. Specific Level I and Level II flight specific schedule milestones and dates are coordinated by the applicable Visiting Vehicle Leads and Increment Managers and will be approved and baselined by the appropriate ISS panels and control boards.

The schedule template contains the functional sections required to build the ISS flightspecific mission integration schedules for Boeing CST-100 missions to the ISS that are launched on an Atlas V Rocket. Flight-specific schedules are obtained by generating a generic template schedule based on the generic template milestones that are applicable for the particular mission. The true calendar date for each applicable milestone is determined by the appropriate task owner and associated teams and approved by the task owners, associated teams, Visiting Vehicle Leads and Increment Managers.

For the purpose of this document, the term HW will be used to identify space bound items that the HW providers send to a U.S. packing facility for processing, packing and/or shipping prior to being loaded onto the vehicle. Once the HW has left the packing facility, it becomes cargo.

Also, for clarity, when two dates are shown the first one is the anchor date and the other date is the corresponding Launch minus reference date. The task owner will be shown in brackets; e.g.: [NASA]. Landing occurs dependent on post-undock and/or deorbit burn targeting.

figure 9.1-1 iss mission integration template – boeing cst-100 (5 pages) increment schedules generic schedule ISS Mission Integration Template – Increment (Figure 10.1-1) details the high-level Mission Integration Schedule Template for a two-increment Increment Definition and Requirements Document (IDRD) period as defined by the IDRD. The schedule template is for planning purposes and is the starting point for creating specific Mission Integration Increment Schedules. Specific schedule milestones and dates are coordinated by the applicable Increment Manager and will be approved and baselined by the appropriate ISS panels and control boards.

The schedule template contains the functional sections required to facilitate tracking of planned launches to and departures from the ISS, major milestones, and Change Request (CR) development applicable to ISS Flight Plan, the IDRD and its Annexes 1-5. Increment milestones are obtained by generating a generic template schedule based on the generic template milestones and submitting to the Increment Manager and appropriate task owners where true calendar dates for each applicable milestone are established.

INCREMENTS

An increment is a specific time period on the ISS which combines different operations such as, scientific research, maintenance, and other ISS system and utilization operations. The duration of an increment is the time period from the undocking of a Soyuz to the undocking of the next Soyuz and can support one or more stages. A stage is a designated period during an Increment delineated by a vehicle docking or undocking and is further defined by the number of crew aboard (for example 3, 6, or 7 persons). Specific stage definitions for each Increment are documented for requirement documentation and planning purposes in the Increment IDRD and updated Post-Stage Operations Readiness Review (SORR) in the Current Stage Requirement Document (CSRD).

figure 10.1-1 iss mission integration template – increment (10 pages)

Figure 10.1-1 ISS Mission Integration Template – increment (10 pages)

10-11

Combined milestone definitions table Milestone definitions This section contains the definitions of the milestones in the Mission Integration Template Schedules. The description of each milestone is explained in Table 11.1-1, Combined Milestones Definitions. To the extent possible the milestones in the table are ordered alphabetically by Template Section. Included in the table are the following fields.

VEHICLE or Increment A Visiting Vehicle is defined as a vehicle that docks or berths to the ISS. Currently there are seven (7) Visiting Vehicles. They are Soyuz, Progress, HTV, SpaceX Cargo Dragon, Orbital ATK Cygnus, SpaceX Crew Dragon, and Boeing CST-100. The Soyuz, Progress, SpaceX Crew Dragon, and Boeing CST-100 vehicles dock and undock with the ISS. The HTV, SpaceX Cargo Dragon, and Orbital ATK Cygnus vehicles berth and unberth with the ISS.

An increment is defined as a specific time period on the ISS which combines different operations such as scientific research, maintenance, and other ISS system and utilization operations. The duration of an increment is the time period from the undocking of Soyuz to the undocking of the next Soyuz and can support one or more stages. Specific stage definition for each increment are documented in the increment IDRD and CSRD for requirement documentation and planning purposes.

milestone This is the name of the milestone. These milestones are associated with a schedule template date which is shown in relation to milestones such as On-Dock (O/D)/Increment (I) /Launch (L) /Undock (UD)/ Unberth (UB), Return (R) to name a few. These are schedule template dates in month (m), week (w), day (d) or hours (h) time increments.

Description Defines the “who, what, where and why” of a milestone.

Template section Identifies the section in the Mission Integration Schedule Template where the milestone can be found.

Controller/Facilitator(s) One or more organizations may be included in the Controller/Facilitator(s) column. The first is the organization responsible for, or in control of, the requirements met by the product, review, etc. The second and subsequent organizations are responsible for implementing the requirements or facilitating the review. If only one organization is included in the column, then that organization is both the Controller and the Facilitator.

Predecessor A milestone which occurs prior to, and provides information or products to, the milestone being defined.

Successor A milestone which occurs after the milestone being defined that receives information or products from that milestone.

Waste Management Sections In interest of identifying and describing the Waste Management (WM) milestones in Table 11.1-1, Combined Milestone Definition Table, a letter designation of WM- has been placed before each milestone. Doing so also allows for the Waste Management milestones to remain together when the table is sorted.

11-2

Table 11.1-1 combined milestone definitions (28 pages)

Table 11.1-1 combined milestone definitions (28 pages)

Table 11.1-1 combined milestone definitions (28 pages)

Table 11.1-1 combined milestone definitions (28 pages)

Table 11.1-1 combined milestone definitions (28 pages)

11-30

Appendix a - Acronyms and abbreviations

ACE
Orbiter Audio Central Control Unit
AES
Automated Export System
AKT
Russian Acceptance Document
ANE
Advanced Notice of Export
ANX
Annex
AS
Alternate Shipment
AWB
Air Way Bill
BCR
Baseline Configuration Review
BL
Baseline
BLM
Bag Level Manifest
CAD
Computer Aided Design
CEF
Change Evaluation Form
Chit
Mission Action Request
CIP
Cargo Integration Plan
CIR
Cargo Integration Review
CLA
Coupled Loads Analysis
CM
Configuration Management
CMC
Cargo Mission Contract
CoFR
Certification of Flight Readiness
CR
Change Request
CR
Configuration Review
CR
Cargo Review
CS
Commercial Shipment
CSA
Canadian Space Agency
CSRD
Current Stage Requirements Document
CTB
Cargo Transfer Bag
d
day
DIMS
Digital Imagery Management System
DQA
Document Quality Assurance
DUC
Data Usage Chart
ECLSS
Environmental Control and Life Support System
ECR
Export Control Representative
EEI
Electronic Export Information
EIR
External Integration Review
eLRODS
Electronic Launch Return On-orbit Data Set
ESA
European Space Agency
EST
Export Services Team
EVA
Extravehicular Activity
F
Final
F
Flight
FAR
Federal Acquisition Regulation
FAR
Flight Acceptance Review
FCT
Flight Control Team
FF
First Flight
FOD
Flight Operations Directorate
FOR
Flight Operations Review
FPIP
Flight Plan Integration Panel
FR
Flight Rules
FRAM
Flight Releasable Attach Mechanism
FRCR
Flight Readiness and Certification Review
FRR
Flight Readiness Review
GDR
General Designers Review
GN&C
Guidance Navigation & Control
GOR
Ground Operations Review
GSCL
Ground Safety Checklist
h
Hour
H/W
Hardware
HA
Hardware Audit
HAMR
Hardware Accountability Matrix Report
HTV
H-II Transfer Vehicle
HVAR
HTV Vehicle Assessment Review
HWP
Hardware Provider
I
Increment
IBLHA
Integrated Bag Level Hazard Assessment
ICD
Interface Control Document
IDRD
Increment Definition and Requirements Document
IMS
Inventory Management System
IMT
Increment Management Team
Inc
Increment
IO
Imagery Online
IO
Internal Provider
IOR
Increment Operations Review
IP
International Partner
IP/P
International Partner/Participant
IPIP
International Space Station Plug-In Plan
IPT
Integrated Product Team
ISO
Inventory & Stowage Officer
ISS
International Space Station
IWG
Imagery Working Group
JAXA
Japan Aerospace Exploration Agency
JOP
Joint Operations Plan
JPIA
Joint Payload Integration Agreement
JSC
Johnson Space Center
kg
kilogram
L
Launch
LD
Landing
LL
Late Load
LON
Launch on Need
LRODS
Launch/Return/On-orbit Data Set
LRR
Launch Readiness Review
m
meter
m
month
MCC-H
Mission Control Center - Houston
MCC-M
Mission Control Center - Moscow
MCR
Mission Certification Review
MFT
Multimedia File Transfer
MIDAS
Mission Integration Data Accountability System
MIOCB
Missions Integration and Operations Board
MIP
Mission Integration Plan
MIPD
Multi Increment Planning Document
MIR
Mission Integration Review
MITR
MIDAS Inventory Tracking Report
MMIOCB
Multilateral Mission Integration and Operations Control Board
MPR
Mass Properties Report
MR
Manifest Request
MRAD
Mission Requirements and Allocation Document
MRICB
Multilateral Research Integration Control Board
MRPWG
Mission Research and Planning Working Group
MRR
Mission Readiness Review
MSFC
Marshall Space Flight Center
MTLO
Moscow Technical Liaison Office
NASA
National Aeronautics and Space Administration
NL
Nominal Loan
NLI
Next Level Integrator
NLT
No Later Than
NT
New Technology
OA
Orbital ATK
OCR
On-orbit Checkout Requirement
OD
On-dock
ODF
Operations Data File
OOS
On-orbit Operations Summary
OOS-F
Final On-Orbit Operations Summary
OOS-P
Preliminary On-Orbit Operations Summary
Ops
Operations
OpsNom
Operations Nomenclature
Orbital
Orbital Sciences Corporation
ORU
On-Orbit Replaceable Unit
OSB
Outside of Board
OV
Overview
P
Progress
P/TV
Photo/TV
PAL
Program Authorization Letter
PCB
Payloads Control Board
PD
Payload Developer
PDR
Packing Data Report
PFR
Post Flight Review
PIER
Post Increment Evaluation Report
PLC
Payload Logistics Carrier
POI
Payloads Operations Integration
PQR
Posst Qualification Review
PRR
Packing Readiness Review
PTP
Payload Tactical Plan
R
Return
Rev
Revision
RF
Rack Front
RFID
Radio Frequency Identification
RFL
Rack Front Late
RFS
Request for Service
RI
Rack Internal
RICB
Research Integration Control Board
RMDP
Return Manifest Disposition Plan
RODF
Russian Operations Data File
RPO
Research Program Office
RPWG
Research Planning Working Group
RRF
Requirement Request Form
RS
Russian Segment
RSA
Russian Space Agency
RSC-E
Rocket Space Corporation - Energia
RV
Russian Vehicle
SCH
Space Center Houston
SDP
Safety Data Package
SDS
Safety Data Sheet
SMART
Safery and Mission Assurance Review Team
SODF
Systems Operations Data File
SOIP
Station Operations Interface Procedures
SORR
Stage Operations Readiness Review
SpX
Space X Exploration Technologies Corporation
SRP
Safety Review Panel
SSCB
Space Station Control Board
SSMVF
Space Station Mockup Vehicle Facility
SSPCB
Space Station Program Control Board
SUP
Standard Utility Panel
TBC
To Be Confirmed
TBD
To Be Determined
TBR
To Be Resolved
TC
Time Critical
TCL
Transfer Cushion List
TCM
Technical Change Meeting
TDS
Technical Data Sheets
Tech
Technical
TGHR
Time-Critical Ground Handling Requirements
TIM
Technical Interchange Meeting
TNSC
Tanegashima Space Center
TO
Turnover
Tox
Toxicity
TWIG
Trash/Waste Integration Group
U.S.
United States
UB
Unberth
UD
Undock
UOP
Utility Outlet Point
USCV
United States Crew Vehicle
USOS
United States On-orbit Segment
VAR
Verification Analysis Review
VBR
Vehicle Baseline Review
VCN
Verificaiton Completion Notice
VLA
Verification Loads Analysis
VV
Visiting Vehicle
VVL
Visiting Vehicle Lead
VVP
Visiting Vehicle Provider
VVT
Visiting Vehicle Team
w
Week
WM
Waste Management
WMR
Waste Manifest Request
WMT
Waste Management Team

B-1

APPENDIX b - GLOSSARY <Reserved>

Appendix c - open work Table C-1 lists the specific To Be Determined (TBD) items in the document that are not yet known. The TBD is inserted as a placeholder wherever the required data is needed and is formatted in bold type within brackets. The TBD item is numbered based on the section where the first occurrence of the item is located as the first digit and a consecutive number as the second digit (i.e., <TBD 4-1> is the first undetermined item assigned in Section 4 of the document). As each TBD is solved, the updated text is inserted in each place that the TBD appears in the document and the item is removed from this table. As new TBD items are assigned, they will be added to this list in accordance with the above described numbering scheme. Original TBDs will not be renumbered.

Table C-1 to be determined items

TBD
Section / Paragraph
Description

Table C-2 lists the specific To Be Resolved (TBR) issues in the document that are not yet known. The TBR is inserted as a placeholder wherever the required data is needed and is formatted in bold type within brackets. The TBR issue is numbered based on the section where the first occurrence of the issue is located as the first digit and a consecutive number as the second digit (i.e., <TBR 4-1> is the first unresolved issue assigned in Section 4 of the document). As each TBR is resolved, the updated text is inserted in each place that the TBR appears in the document and the issue is removed from this table. As new TBR issues are assigned, they will be added to this list in accordance with the above described numbering scheme. Original TBRs will not be renumbered.

table C-2 TO BE RESOLVED ISSUES

TBR
Section / Paragraph
Description

C-1 image3.png

Row Title

72 Nominal Load (NL)

75 NASA Provided Supplies

78 Late Load (LL)

83 Imagery

85 Operations

89 MIDAS Inventory Tracking Report (MITR)

PRR [CMC] (HW OD at Packing Facility (NL)-2w)

Release Layouts (Baseline) [CMC] (PRR+1w)

Deliver MPR to NASA [CMC] (L-6w-2d)

HW OD at Packing Facility [CMC] (Cargo Ships to NLI (NL)-5w)

Cargo Ships to NLI [CMC] (Cargo TO to NLI (NL)-1w)

Cargo TO to NLI [CMC] (L-14d)

NASA Provided Supplies OD at Packing Facility [CMC] (NASA Provided Supplies Ships to NLI-5w)

NASA Provided Supplies Ships to NLI [CMC] (NASA Provided Supplies TO to NLI-1w)

NASA Provided Supplies TO to NLI [CMC] (L-3w)

HW OD at Packing Facility [CMC] (Cargo Ships to NLI (LL)-24d)

Cargo Ships to NLI [CMC] (Cargo TO to NLI (Unpowered) (LL)-2d)

Cargo TO to NLI (Unpowered) [CMC] (L-9h)

Cargo TO to NLI (Cold Bags) [Cold Stowage] (L-9h)

Cargo TO to NLI (Powered) [HWP] (L-9h)

Submit Pre-Flight HW Imagery [HWP] (L-2w)

Submittal through MFT for Posting on IO [NASA] (L+2w) Operations

Flight Rules (Basic) [FOD/SpaceX] (L-6m)

Flight Rules (Rev A) [FOD/SpaceX] (L-4m)

Flight Rules (Final) [FOD/SpaceX] (L-7w) MIDAS Inventory Tracking Report (MITR)

Deliver TCL and WMR to FOD and TWIG [CMC] (Cargo Ships to NLI (NL)+1w)

Deliver MITR to FOD (Interim) [CMC] (L-14d)

Legend: Progress Bar Level 1 Milestone - Level 2 Milestone -

Level 3 Milestone - Launch Milestone -

SpaceX Crew Dragon

(SSP 50489)

As of Mon 6/26/17 image42.emf

95 Cargo Return

111 Post Landing/Recovery

Deliver TCL and WMR to FOD and TWIG [CMC] (L-1d)

Deliver MITR to FOD (Final) [CMC] (L-5d)

Deliver MITR to FOD [CMC] (L+36h) Cargo Return

Request FOD to Review Return Complement and Provide Inputs [CMC] (LD-19w)

CMC Receives Inputs for Return Layouts [FOD] (Request FOD to Review Return Complement and Provide Inputs+3w)

Return PRR [CMC] (LD-14w)

Final Return Layouts Review [NASA/FOD/CMC] (LD-6.5w)

Deliver RMDP (Draft #1) [CMC] (LD-3m)

Deliver RMDP (Draft #2) [CMC] (LD-2m)

Deliver RMDP (Draft #3) [CMC] (LD-1m) (If Required)

Deliver RMDP (Draft Updates) [CMC] (UD) (If Required)

Present Prioritization of Early and Priority Items Destow at IPT [CMC] (LD-4w)

Present Prioritization of Early and Priority Items Destow at MIOCB [CMC] (LD-2w)

Export Request Approved by NASA ECR/EST for HW Returning to IPs [NASA] (LD-2w)

Deliver RMDP (Baseline Release) [CMC] (LD)

RMDP Status to MIOCB (Early) [CMC] (LD+2w) (If Required)

RMDP Status to MIOCB (Nominal) [CMC] (LD+10w) (If Required)

Deliver RMDP (As-Flown) [CMC] (LD+13w) Post Landing/Recovery

Ambient Early Destow Operations Review with HW Providers [CMC] (Early Destow HW TO to CMC-3w)

Early Destow Hardware TO to CMC [SpaceX] (LD+3h)

Early Destow Return Hardware TO to HW Providers [CMC] (LD+1d - LD+14d) image43.emf

Nominal Destow HW TO to CMC [SpaceX] (LD+3h)

Return Cargo Packing and Shipping to CMC [SpaceX] (LD+1d)

Return HW TO to HW Providers [CMC] (LD+2d) image44.emf

1 Major Milestones

21 Safety

Major Milestones

IOR [NASA] (IX-4m)

VBR [CST-100] (L-18m)

MIR [CST-100] (L-13m)

Crew Complement Definition [FOD] (L-11m)

FOR [FOD] (L-5m) (If Required)

MCR [NASA/CST-100] (L-4m)

CIR [CST-100] (L-4m)

ISS PQR [NASA/ON] (L-6w)

SORR [NASA] (L-3.5w)

IP FRR [CST-100] (L-7d)

FRR [NASA] (L-7d)

LRR [CST-100] (L-2d)

Launch (L-0)

Dock (L+1d)

Undock (L+180d)

Landing (UD+4h)

SORR (for Return) [NASA] (UD-2.5w)

FRR (for Return) [NASA] (UD-1w)

Lesson Learned [OP] (UD+90d) Safety

Deliver IBLHA to NASA (Baseline Launch) [CMC] (L-3m-1d)

Deliver IBLHA to NASA (Rev. A Launch) [CMC] (L-6w-1d)

Boeing CST-100 image45.emf

26 Time-Critical Ground Handling Requirements

31 Mission Integration (Reference Increment Template)

38 Cargo Mission Milestones

Deliver IBLHA to NASA (Baseline Return) [CMC] (L-6w-1d)

Deliver IBLHA to NASA (Rev. A Return) [CMC] (L-1.5w) Time-Critical Ground Handling Requirements (TGHR)

Present Draft TGHR at CIR [NASA] (L-4m)

Update TGHR [NASA] (L-4m to L-2m)

TGHR Review at MIOCB [NASA] (L-2.25m) (If Required)

Baseline TGHR [NASA] (L-2m) Mission Integration (Reference Increment Template)

IDRD Main Volume

IDRD Annex 1 (Manifest)

IDRD Annex 2 (On-Orbit Maintenance Plan and Operations Support)

IDRD Annex 3 (Imagery Requirements)

IDRD Annex 4 (Medical Operations)

IDRD Annex 5 (Payloads Tactical Plan)

Cargo Mission Milestones

Pressurized Cargo Complement (Preliminary) [NASA] (L-13m)

MRAD (Initial) [CST-100] (L-10m)

Pressurized Cargo Complement (Update) [NASA] (L-5m)

MRAD (Update) [CST-100] (L-3m)

Pressurized Cargo Complement (Final) [NASA] (L-6w)

MRAD (Final) [CST-100] (L-4w)

Cargo Map from NASA to CMC [NASA] (L-2w) image46.emf image4.png

46 Cargo Processing

Documentation 47 Nominal Load (NL)

49 Late Load (LL)

51 Return Cargo

55 Cargo Processing

64 Nominal Load (NL)

67 NASA Provided Supplies

Cargo Processing Documentation eLabel Request Approved [HWP] (HW OD at Packing Facility (NL)-5w) eLRODS Approved (Launch) [HWP/CMC] (HW OD at Packing Facility (NL)-4w) eLabel Request Approved [HWP] (HW OD at Packing Facility (LL)-5w) eLRODS Approved (Launch) [HWP/CMC] (HW OD at Packing Facility (LL)-4w)

Return Packing Data [HWP] (L-11w)

Return Export Submitted [HWP] (L-2w) eLRODS Approved (Return) [HWP/CMC] (LD-10w)

Return Export Approved [HWP/NASA] (LD-2w) Cargo Processing

Deliver MPR to NASA [CMC] (L-5m-2d)

Deliver HAMR [CMC] (HW OD at Packing Facility (NL)-7w)

Hardware Audit [CMC] (HW OD at Packing Facility (NL)-6w)

Release Layouts [CMC] (HW OD at Packing Facility (NL)-5w)

Release Layouts (Baseline) [CMC] (HW OD at Packing Facility (NL)-3w)

PRR [CMC] (HW OD at Packing Facility (NL)-2w)

Release Layouts [CMC] (PRR+1w)

Deliver MPR to NASA [CMC] (L-6w-2d)

HW OD at Packing Facility [CMC] (Cargo Ships to NLI (NL)-5w)

Cargo Ships to NLI [CMC] (Cargo TO to NLI (NL)-1w)

Cargo TO to NLI [CMC] (L-8w)

NASA Provided Supplies OD at Packing Facility [CMC] (NASA Provided Supplies Ships to NLI-5w)

NASA Provided Supplies Ships to NLI [CMC] (NASA Provided Supplies TO to NLI-1w) image47.emf

70 Late Load (LL)

73 Time Critical (TC)

78 Imagery

80 Operations

84 MIDAS Inventory Tracking Report

(MITR)

90 Cargo Return

NASA Provided Supplies TO to NLI [CMC] (L-3w)

HW OD at Packing Facility [CMC] (Cargo Ships to NLI (LL)-24d)

Cargo Ships to NLI [CMC] (Cargo TO to NLI (LL)-1w)

Cargo TO to NLI [CMC] (L-11d)

HW OD at Packing Facility [CMC] (Cargo Ships to NLI (TC)-2w)

Cargo Ships to NLI [CMC] (Cargo TO to NLI (Unpowered) (TC)-2d)

Cargo TO to NLI (Unpowered) [CMC] (L-17h)

Cargo TO to NLI (Cold Bags) [Cold Stowage] (L-17h)

Cargo TO to NLI (Powered) [HWP] (L-17h)

Flight Rules (Basic) [FOD/CST-100] (L-6m)

Flight Rules (Rev A) [FOD/CST-100] (L-4m)

Flight Rules (Final) [FOD/CST-100] (L-7w)

Deliver TCL and WMR to FOD and TWIG [CMC] (Cargo Ship to NLI (NL)+1w)

Deliver MITR to FOD (Interim) [CMC] (L-30d)

Deliver TCL and WMR to FOD and TWIG [CMC] (L-1d)

Deliver MITR to FOD [CMC] (L+36h) Cargo Return

Request FOD to Review Return Complement and Provide Inputs [CMC] (LD-19w) image48.emf

106 Post Landing/Recovery

CMC Receives Inputs for Return Layouts [FOD] (Request FOD to Review Return Complement and Provide Inputst+3w)

Return PRR [CMC] (LD-14w)

Final Return Layouts Review [NASA/FOD/CMC] (LD-6.5w)

Deliver RMDP (Draft Updates) [CMC] (Launch to Undock) (If Required)

Present Prioritization of Early and Priority Items Destow at IPT [CMC] (LD-4w)

Present Prioritization of Early and Priority Items Destow at MIOCB [CMC] (LD-2w)

Export Request Approved by NASA ECR/EST for HW Returning to Ips [NASA] (LD-2w)

Deliver RMDP (Baseline Release) [CMC] (LD)

RMDP Status to MIOCB (Early) [CMC] (LD+2w) (If Required)

RMDP Status to MIOCB (Nominal) [CMC] (LD+10w) (If Required)

Deliver RMDP (As-Flown) [CMC] (LD+13w)

Ambient Early Destow Operations Review with HW Providers [CMC] (Early Destow HW TO to CMC-3w)

Early Destow HW TO to CMC [CST-100] (LD+3h)

Early Destow Return HW TO to HW Providers [CMC] (LD+1d - LD+14d)

Nominal Destow HW TO to CMC [CST-100] (LD+3h)

Return Cargo Packing & Shipping to CMC [CST-100] (LD+1d)

Return HW TO to HW Providers [CMC] (LD+2d) image49.emf

1 IDRD Period

4 Launch/Depart

5 ISS Flight Program Sequence

11 Extra Vehicular Activity

(EVA)

14 Major Milestones

15 Major Milestones- Increment Specific

IDRD Period

Increment X (IX)

Increment Y (IY) Launch/Depart

ISS Flight Program Sequence

Launch

Dock

Berth

Undock

Unberth Extra Vehicular Activity (EVA)

Russian EVA #

USOS EVA #

Increment Specific

IOR [NASA] ( IX-4m)

Program Direction Letter for Preliminary OOS Development (Published) [OC] (IX-18w)

OOS (Preliminary Planning TIM) [FOD/POI/IP] (IX-16w)

OOS (Preliminary Published) [FOD/POI/IP] (IX-14w)

Program Direction Letter for Final OOS Development (Published) [OC] (IX-8w)

OOS (Final Planning TIM) [FOD/POI/IP] (IX-6w)

OOS (Final Published) [FOD/POI/IP] (IX-4w)

Increment image50.emf

27 Major Milestones - Flight Specific

37 PIER

40 ISS Flight Plan

44 Mission Integration

Program Direction Letter for OOS Update Development (Published) [OC] (IX+4w)

OOS (Update Planning Telecons) [FOD/POI/IP] (IX+6w to IX+7w)

OOS (Update Published) [FOD/POI/IP] (IX+7w)

Lessons Learned (Russian‐If needed) [OP] (Soyuz UD+60d) Flight Specific

FOR [FOD] (L-4m) (If Required)

GDR [RSC-E] - Soyuz (L-21d)

GDR [RSC-E] - Progress (L-21d) (If Required)

FRR [NASA] (L-7d) (If Required)

State Commission Review #1 [Roscosmos] (L-2w)

State Commission Review #2 [Roscosmos] (L-6h)

PIER

IX and IY PIER CR Release [NASA] (IY Comp.+4.5m)

IX and IY PIER CR at MIOCB for Approval [NASA] (IY Comp.+6m) ISS Flight Plan

MIPD CR Release (CRXXXXX) (IX-67w)

MIPD CR to MIOCB for Approval (CRXXXXX) (IX-62w)

MIPD CR to SSPCB for Approval (CRXXXXX) (IX-61w) Mission Integration image51.emf image5.wmf

45 Program Authorization

Letter

48 IDRD Main Volume

55 IDRD Annex 1 (Manifest)

56 IDRD Annex 1 (Manifest)

- Soyuz

Program Authorization Letter

PAL Call for Inputs [OP] (IX-52w) (If Required)

PAL Release [OP] (IX-43w) (If Required)

Baseline Call for Inputs [OP] (IX-43w)

CR Release (CRXXXXX) [OP] (IX-39w)

MIOCB for Approval (CRXXXXX) [OP] (IX-30w)

Rev A Call for Inputs [OP] (IX-19w)

CR Release (CRXXXXX) [OP] (IX-13w)

MIOCB to Support SORR (CRXXXXX) [OP] (IX-4.5w)

IDRD Annex 1 (Manifest) - Soyuz

Present L-4.5m U.S. Cargo List at MIOCB for Approval [OP/NASA] (L-4.5m)

Send L-4.5m U.S. Cargo List Request to RSC-E [OP] (L-4.5m)

Present L-2m U.S. Cargo List at MIOCB for Status [OP] (L-2.25m)

Present L-2m U.S. Cargo List at MIOCB for Approval [OP/NASA] (L-2m)

Send L-2m U.S. Cargo List to RSC-E [OP] (L-2m)

Rec. RSC-E Input [OP] (L-1.5m)

Release IDRD Annex 1 BL Manifest [OP] (L-2m)

IDRD Annex 1 Haz/Tox Codes [OP] (L-2m)

IDRD Annex 1 BL Approval at MIOCB [OP/NASA] (L-1m)

Rec. RSC-E As Launch Manifest Inputs [OP] (L+2w) image52.emf

81 IDRD Annex 1 (Manifest)

- Progress

Release IDRD Annex 1 As Launch Manifest [OP] (L+4w)

IDRD Annex 1 As Launch Manifest Approval at MIOCB [OP/NASA] (L+2m)

Present UD-3.5m Return U.S. Cargo List at MIOCB for Approval [OP/NASA] (UD-3.5m)

Send UD-3.5m Return U.S. Cargo List to RSC-E [OP] (UD-3.5m)

Present UD-2m Return U.S. Cargo List at MIOCB for Status [OP] (UD-2.25m)

Present UD-2m Return U.S. Cargo List at MIOCB for Approval [OP] (UD-2m)

Send UD-2m Return U.S. Cargo List to RSC-E [OP] (UD-2m)

Release IDRD Annex 1 Return Manifest [OP] (UD-2m)

Rec RSC-E Return Manifest Input [OP] (UD-40d)

IDRD Annex 1 Return Manifest Technical Concurrence at MIOCB [OP/NASA] (UD-1m)

Rec. RSC-E Post Flight Manifest Inputs [OP] (UD+3w)

Post Flight IDRD Annex 1 CR Release [OP] (UD+2.5m)

Post Flight IDRD Annex 1 CR Package to OC2 [OP] (UD+3.5m)

Post Flight IDRD Annex 1 CR Package to MIOCB OSB [OP] (UD+4m) IDRD Annex 1 (Manifest) - Progress

Present L-4.5m U.S. Cargo List at MIOCB for Approval [OP/NASA] (L-4.5m)

Send L-4.5m U.S. Cargo List Request to RSC-E [OP] (L-4.5m)

Rec. RSC-E Input [OP] (L-3m)

Present L-2m U.S. Cargo List at MIOCB for Status [OP] (L-2.25m)

Present L-2m U.S. Cargo List at MIOCB for Approval [OP/NASA] (L-2m)

Send L-2m U.S. Cargo List to RSC-E [OP] (L-2m)

Release IDRD Annex 1 BL Manifest [OP] (L-2m) image53.emf

98 IDRD Annex 1 (Manifest)

- SpaceX Cargo

109 IDRD Annex 1 (Manifest)

- Orbital ATK

IDRD Annex 1 Haz/Tox Codes [OP] (L-2m)

IDRD Annex 1 BL Approval at MIOCB [OP/NASA] (L-1m)

Rec. RSC-E As Launch Manifest Inputs [OP] (L+2w)

Release IDRD Annex 1 As Launch Manifest [OP] (L+4w)

IDRD Annex 1 As Launch Manifest Approval at MIOCB [OP/NASA] (L+2m)

Rec. RSC-E Post Flight Manifest Inputs [OP] (UD+3w)

Post Flight IDRD Annex 1 CR Release [OP] (UD+2.5m)

Post Flight IDRD Annex 1 CR Package to OC2 [OP] (UD+3.5m)

Post Flight IDRD Annex 1 CR Package to MIOCB OSB [OP] (UD+4m) IDRD Annex 1 (Manifest) - SpaceX Cargo

L-3m Working Manifest to Distribution [OP] (L-3.5m)

L-3m Stowage Assessment and Working Manifest to MIOCB for Approval [OP/NASA] (L-3m)

Release IDRD Annex 1 Manifest L-6w CR [OP] (L-10w)

IDRD Annex 1 Haz/Tox Codes [OP] (L-10w)

IDRD Annex 1 Approval at MIOCB [OP/NASA] (L-6w)

L-2w Working Manifest to Distribution [OP] (L-4w)

L-2w Working Manifest to MIOCB for Approval [OP/NASA] (L-2w)

Post Flight IDRD Annex 1 CR Release [OP] (LD+3m)

Post Flight IDRD Annex 1 CR Package to OC2 [OP] (LD+4m)

Post Flight IDRD Annex 1 CR Package to MIOCB OSB [OP] (LD+4.5m) IDRD Annex 1 (Manifest) -…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .