This is a notice for a Request for Proposal for the Human Space Flight Technical Integration Contract. NASA/JSC plans to issue an RFP for technical integration services to support human space flight. The solicitation is a total small business set-aside with a NAICS code of 541715 and size standard of 1,250 employees. The anticipated RFP release date is November 1, 2019 with offers due around December 11, 2019. Prospective offerors should monitor the listed websites for the RFP and amendments. All technical questions must be submitted in writing.
SSP 50200-08-RevB-DCN008-Collated Master
View the file
Other files for this federal contract opportunity
Show all 50
Human Space Flight Technical Integration Contract (HSFTIC) has more files on GovTribe.
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SSP 50200-08 06 June 2000 Revision B Station Program Implementation Plan, Volume 8: Increment Execution Preparation
International Space Station Program
Revision B
Incorporates DCN 008
April 1998
National Aeronautics and Space Administration International Space Station Program Johnson Space Center Houston, Texas
| SSP 50200-08 |
| Revision B |
REVISION AND HISTORY PAGE
| REV. |
| DESCRIPTION |
| PUB. DATE |
| - |
| Initial Release (Reference per SSCD 000389, EFF. 10/22/96) |
| 12-06-96 |
| A |
| Revision A (Reference per SSCD 000865, EFF. 12/10/97) |
| 03-05-98 |
| B |
| Revision B (Reference per SSCD 001148, EFF. 09/17/98) |
| 11-30-98 |
| DCN 001 (Reference per SSCD 001695, EFF. 03/24/00) |
| 07-06-00 |
(SSCD 001695 authorized an administrative action to upgrade the documentation software applied to SSP 50200-08 to MS Office 97. All pages which have been affected by the implementation of Office 97 have been included in this package and reflect the package release date header. No technical content has been impacted.)
| DCN 002 (Reference per SSCD 003089, EFF. 07-27-00) |
| 01-18-01 |
| DCN 003 (Reference per SSCD 003088, EFF. 07-27-00) |
| 12-11-01 |
| DCN 004 (Reference per SSCD 003090, EFF. 07-27-00) |
| 04-30-02 |
| DCN 005 (Reference per SSCD 005146, EFF. 08-09-01) |
| 05-24-02 |
DCN 006 (Reference per SSCD 005347, EFF. 05-30-02;
SSCD 003376, EFF. 05-31-02)
06-28-02
| DCN 007 (Reference per SSCD 006238, EFF. 03-19-02) |
| 06-05-03 |
DCN 008 (Reference per SSCD 007777, EFF. 10-08-03)
| Early Release |
| 12-04-03 |
| Program Release |
| 10-28-04 |
SSP 50200-08 07 November 2003
SSP 50200-08
Revision B
International Space Station Program
STATION PROGRAM IMPLEMENTATION PLAN,
VOLUME 8: INCREMENT EXECUTION PREPARATION
April 1998
SSP 50200-08
Revision B i
PREFACE
STATION PROGRAM IMPLEMENTATION PLAN,
VOLUME 8: INCREMENT EXECUTION PREPARATION
DCN
)This document is the Station Program Implementation Plan, Volume 8: Increment Execution Preparation. The purpose of this document is to define the products, activities, roles, responsibilities, and interfaces required to develop flight products premission to be used by the flight crew and the real-time operations teams in the Space Station Control Center (SSCC), Payload Operations Integration Center (POIC), Mission Control Center - Moscow (MCC-M), Space Operations Support Center (SOSC), Space Station Integration and Promotion Center (SSIPC), and Columbus Control Center (Col-CC).
DCN
)The contents of this document are intended to be consistent with the tasks and products to be prepared by the International Space Station (ISS) Program Partners and Participants as defined in the SSP 50011, Concept of Operation and Utilization. This document is under the control of the Multilateral Operations and Utilization Control Board (MO&UCB).
SSP 50200-08 07 November 2003 Revision B xvii
MO&UCB APPROVAL NOTICE
INTERNATIONAL SPACE STATION PROGRAM
STATION PROGRAM IMPLEMENTATION PLAN,
VOLUME 8: INCREMENT EXECUTION PREPRATION
APRIL 1998
/s/ Frank Culbertson, Jr.
/s/ Chirold D. Epp
K. Chilton, Chair National Aeronautics and Space Administration
C. Epp, Member National Aeronautics and Space Administration
/s/ Michael G. Conley for
Valeri Grigoriev Member Russian Space Agency
K. Reiley, Member National Aeronautics and Space Administration
/s/ G. Frappier
/s/ Charles W. Lloyd for
G. Frappier, Member Canadian Space Agency
M. Suffredini, Member National Aeronautics and Space Administration for
T. Yokoyama, Member National Space Development Agency of Japan
S. Yoshitomi, Member National Space Development Agency of Japan
/s/ Hiltrud Pieterek for
/s/ Hiltrud Pieterek for
R. Chesson, Member European Space Agency
D. Andresen, Member European Space Agency
INTERNATIONAL SPACE STATION PROGRAM
STATION PROGRAM IMPLEMENTATION PLAN,
VOLUME 8: INCREMENT EXECUTION PREPARATION
CONCURRENCE
APRIL 1998
| Prepared by: |
| Payload Operations Group |
JSC/OZ3
orgN
| Prepared by: |
| Roxanna Sherwin |
OZ3
BOOK MANAGER
orgN
/s/ Roxanna Sherwin signature
DATE
| Controlled by: |
| Rick Cissom |
JSC/OZ3
LEAD, Payload Operations
ORGn
/s/ Doug Sander for
SIGNATURE
DATE
| Concurred by: |
| Michael Kearney |
JSC/OC
Chair, ground segment control board
ORGn
SIGNATURE
DATE
| Concurred by: |
| Roger Billica |
JSC/SD2
CHAIR, MULTILATERAL MEDICAL
OPERATIONS PANEL
ORGN
SIGNATURE
DATE
| Concurred by: |
| Gary Zoener |
JSC/DM
chair, flight mechanics working group org
SIGNATURE
DATE
VOLUME 8: INCREMENT EXECUTION PREPARATION
CONCURRENCE
april 1998
| Concurred by: |
| Frank Hughes |
JSC/DT
CHAIR, INTERNATIONAL TRAINING
CONTROL BOARD
ORGN
/s/ F.E. Hughes
10-8-98
SIGNATURE
DATE
| Concurred by: |
| Richard Snyder |
JSC/DO
CHAIR, OPERATIONS DATA CONTROL
BOARD
ORGN
/s/ Richard Snyder
10-9-98
SIGNATURE
DATE
| Concurred by: |
| Gerald Shinkle |
JSC/DO
CHAIR, EXECUTE PLANNING CONTROL
PANEL
ORGN
/s/ Gerald L. Shinkle
10-6-98
SIGNATURE
DATE
| Concurred by: |
| Tina Melton |
MSFC/EO02
CHAIR, PAYLOAD OPERATIONS CONTROL
BOARD
ORGN
SIGNATURE
DATE
| Concurred by: |
| Charles Shaw |
JSC/DA8
CHAIR, JOINT OPERATIONS PANEL
ORGN
SIGNATURE
DATE
VOLUME 8: INCREMENT EXECUTION PREPARATION
CONCURRENCE
april 1998 International Partner Concurrence by:
Alexander Kotov
RSC-E
RSC-E
AGENCY DESIGNATION
SIGNATURE
DATE
International Partner Concurrence by:
Colleen Dubont
CSA
CSA
AGENCY DESIGNATION
SIGNATURE
DATE
International Partner Concurrence by:
Koichi Masuda
NASDA
AGENCY DESIGNATION
SIGNATURE
DATE
International Partner Concurrence by:
Rolf Schulze
ESA
ESA
AGENCY DESIGNATION
SIGNATURE
DATE
International Participant Concurrence by:
Claudio Canu
ASI
ASI
AGENCY DESIGNATION
/s/ Canu Claudio
6/28/98
SIGNATURE
DATE
VOLUME 8: INCREMENT EXECUTION PREPARATION
CONCURRENCE
april 1998
| DQA: |
| Richard Delgado |
OL
configuration mangement
ORGN
/s/ Richard D. Delgado
4-28-98
SIGNATURE
DATE
SSP 50200-08
INTERNATIONAL SPACE STATION PROGRAM
STATION PROGRAM IMPLEMENTATION PLAN,
VOLUME 8: INCREMENT EXECUTION PREPARATION
LIST OF CHANGES
april 1998 All changes to paragraphs, tables, and figures in this document are shown below:
MO&UCB
Entry Date
Change
Paragraph(s)
December 1996
Baseline
ALL
March 1997
Revision A
ALL
November 1998
Revision B
ALL
June 2000
DCN 001
January 2001
DCN 002
November 2001
DCN 003
April 2002
DCN 004
May 2002
DCN 005
June 2002
DCN 006
June 2003
DCN 007
November 2003
DCN 008
SSP 50200-08 07 November 2003
TABLE OF CONTENTS
DCN
DCN
DCN
DCN
DCN
| )PARAGRAPH | PAGE | ||
| 1.0 | INTRODUCTION | 1-1 | |
| 1.1 | PURPOSE | 1-1 | |
| 1.2 | SCOPE | 1-1 | |
| 1.3 | PRECEDENCE | 1-1 | |
| 1.4 | DELEGATION OF AUTHORITY | 1-1 | |
| 1.5 | Issues and open work | 1-2 | |
| 2.0 | DOCUMENTS | 2-1 | |
| 2.1 | APPLICABLE DOCUMENTS | 2-1 | |
| 2.2 | Reference documents | 2-3 | |
| 2.3 | SPIP documentation tree | 2-5 | |
| 2.4 | PROGRAM ROLES AND RESPONSIBILITIES | 2-6 | |
| 2.5 | PROGRAM LEVEL INCREMENT EXECUTION PREPARATION DOCUMENTS | 2-7 | |
| 3.0 | Increment Planning Development and Management | 3-1 | |
| 3.1 | principles of the increment planning process | 3-1 | |
| 3.2 | Overview of the increment planning process | 3-2 | |
| 3.2.1 | Inputs to the Increment Planning Process | 3-2 | |
| 3.2.2 | Outputs of the Increment Planning Process | 3-3 | |
| 3.2.3 | Increment Planning Process Description | 3-4 | |
| 3.3 | Responsible Organizations | 3-6 | |
| 3.3.1 | INTERNATIONAL EXECUTE PLANNING TEAM | 3-7 | |
| 3.3.2 | Execute Planning Control Panel | 3-8 | |
| 3.3.3 | Joint Operations Panel | 3-8 | |
| 3.3.4 | Multilateral Operations and utilization Control Board | 3-9 | |
| 3.3.5 | National Aeronautics and Space Administration | 3-9 | |
| 3.3.5.1 | SPACE STATION CONTROL CENTER | 3-9 | |
| 3.3.5.2 | Payload Operations Integration Center | 3-9 | |
| 3.3.6 | rUSSIAN SPACE AGENCY | 3-9 | |
| 3.3.6.1 | MISSION CONTROL CENTER IN MOSCOW | 3-10 | |
| 3.3.6.2 | Russian segment lead operations Control team | 3-10 | |
| 3.3.7 | European Space Agency | 3-11 | |
| 3.3.8 | National Space Development Agency of Japan | 3-11 | |
| 3.3.9 | Canadian Space Agency | 3-11 | |
| 3.4 | PLANNING Process Management | 3-12 | |
| 3.5 | Process Differences for the Early Increment Phase | ||
| (Up to Flight 5A) | 3-14 | ||
| 3.6 | CONTINUOUS PAYLOAD OPERATIONS INTEGRATION | 3-15 | |
| 4.0 | OPERATIONS DATA FILE DEVELOPMENT AND MANAGEMENT | 4-1 | |
| SSP 50200-08 | 06 June 2000 |
Revision B
| 4.1 | Operations data file Definition | 4-1 |
| 4.2 | Operations data file Content | 4-1 |
| 4.2.1 | CSA Payload Operations Data File | 4-2 |
| 4.2.2 | ESA Operations Data File | 4-3 |
| 4.2.3 | NASDA Operations Data File | 4-3 |
| 4.2.4 | RSA Operations Data File | 4-3 |
| 4.2.5 | U.S. Payload Operations Data File | 4-4 |
| 4.2.6 | U.S. Systems Operations Data File | 4-5 |
| 4.2.7 | Language | 4-5 |
| 4.2.8 | Type of Operations Data File Contents | 4-6 |
| 4.3 | Operations Data File Control Board | 4-6 |
DCN
| )4.3.1 | Partner Operations Data File Control Boards | 4-7 |
| 4.3.2 | Operations data file Standards and Operations Nomenclature | 4-8 |
| 4.4 | Pre-Increment Operations | 4-9 |
DCN
)4.4.1 Development of the Contents of the Operations Data File 4-10
DCN
)4.4.2 Operations Data File Validation 4-10
DCN
)4.4.3 Operations Data File Certification 4-11
DCN
)4.4.4 Operations Data File Configuration control 4-11
DCN
)4.4.5 Operations Data File Production 4-11
DCN
)4.4.6 Access to Contents of the Operations Data File 4-12
DCN
| )4.4.7 | Operations Data File Preflight Production Template | 4-12 |
| 5.0 | SYSTEMS PRODUCT DEVELOPMENT AND MANAGEMENT | 5-1 |
| 5.1 | PURPOSE | 5-1 |
| 5.2 | POWER MANAGEMENT | 5-1 |
| 5.2.1 | Energy Management Process | 5-1 |
DCN
| )5.2.2 | Load Shed Definition | 5-2 | |
| 5.2.3 | Load Shed Table Development and Management Process | 5-2 | |
| 5.3 | thermal resource management | 5-3 | |
| 5.3.1 | thermal resource management process | 5-3 | |
| 5.3.2 | thermal load shed table development and management process | 5-3 | |
| 5.4 | environmental controls and life support systems resource | ||
| management | 5-4 | ||
| 5.5 | communications and tracking management | 5-5 | |
| 5.6 | command and data handling management | 5-5 | |
| 5.7 | extravehicular activity development and management | 5-6 | |
| 5.7.1 | procedures and task development | 5-6 | |
| 5.7.1.1 | detailed procedures process | 5-6 | |
| 5.7.1.2 | timeline process | 5-6 | |
| 5.8 | robotics management | 5-7 | |
| 5.9 | Microgravity Management | 5-7 | |
| SSP 50200-08 | 27 June 2002 |
Revision B
DCN
| )5.9.1 | (deleted) | 5-7 |
| 6.0 | ISS MISSION OPERATIONS INTEGRATION PROCESS | 6-1 |
| 6.1 | Purpose | 6-1 |
| 6.2 | Overview | 6-1 |
| 6.3 | Joint operations panel | 6-1 |
| 6.3.1 | Flight Techniques | 6-1 |
| 6.3.2 | Flight Rules | 6-1 |
| 6.3.3 | Execution Plans | 6-1 |
| 6.3.4 | Operations Data File | 6-2 |
| 6.3.5 | Joint Operations Panel Process | 6-2 |
DCN
| )6.3.6 | Operations Interface Procedures | 6-2 |
| 6.4 | PAYLOAD OPERATIONS CONTROL BOARD | 6-3 |
| 6.5 | Flight Operations Readiness Panel | 6-3 |
| 6.6 | INTEGRATED DISPLAY AND GRAPHIC STANDARDS PANEL | 6-4 |
| 6.7 | integrated Operations Plan | 6-4 |
| 6.7.1 | General Description | 6-4 |
| 6.7.2 | Management and Control | 6-5 |
DCN
| )6.8 | ISS hierarchy | 6-8 |
| 7.0 | Payload Operations Processes, Functions, and Documentation | 7-1 |
| 7.1 | PAYLOAD OPERATIONS PROCESSES | 7-1 |
| 7.1.1 | PREPARATION PROCESSES | 7-2 |
| 7.1.2 | GENERIC PROCESSES | 7-2 |
DCN
| )7.2 | Payload Operations Integration | 7-5 | |
| 7.2.1 | (Deleted) | 7-8 | |
| 7.2.2 | payload operations integration functions | 7-8 | |
| 7.2.2.1 | Station-wide Payload Operations Integration Functions | 7-9 | |
| 7.2.2.1.1 | Station-wide Payload Operations Requirements and Changes | ||
| Preparation | 7-9 | ||
| 7.2.2.1.2 | Station-wide Payload Operations Safety Preparation | 7-10 | |
| 7.2.2.1.3 | Station-wide Payload Operations Plans and Procedures | ||
| Preparation | 7-11 | ||
| 7.2.2.1.4 | Station-wide Payload Operations Onboard Systems Preparation | 7-11 | |
| 7.2.2.1.5 | Station-wide Payload Operations Ground System Preparation | 7-12 | |
| 7.2.2.1.6 | Station-wide Payload Operations Ground Procedures and Rules Preparation | 7-12 |
DCN
| )7.2.2.2 | NASA Payload Operations Integration | 7-13 |
| 7.2.2.2.1 | NASA Complement Payload Operations Integration | 7-13 |
DCN
| )7.2.2.2.2 | U.S. Element Payload Operations Integration | 7-14 |
| 7.2.2.2.3 | NASA Payload Operations Integration Functions | 7-14 |
DCN
| )7.2.2.2.3.1 | NASA Payload Operations Requirements and Changes Preparation | 7-14 |
| 7.2.2.2.3.2 | NASA Payload Operations Safety Preparation | 7-15 |
DCN
| )7.2.2.2.3.3 | NASA Payload Operations Plans and Procedures Preparation | 7-16 |
| 7.2.2.2.3.4 | NASA Payload Operations Onboard Systems Preparation | 7-17 |
| 7.2.2.2.3.5 | NASA Payload Operations Ground System Preparation | 7-17 |
DCN
| )7.2.2.2.3.6 | NASA Payload Operations Ground Procedures and Rules | ||
| Preparation | 7-17 | ||
| 7.2.2.3 | RSA Payload Operations Integration | 7-18 | |
| 7.2.2.3.1 | RSA Complement Operations Integration | 7-18 |
DCN
| )7.2.2.3.2 | Russian Element Payload Operations Integration | 7-19 |
| 7.2.2.3.3 | RSA Payload Operations Integration Functions | 7-19 |
DCN
| )7.2.2.3.3.1 | RSA Requirements and Changes Preparation | 7-19 |
| 7.2.2.3.3.2 | RSA Payload Operations Safety - Preparation | 7-20 |
DCN
| )7.2.2.3.3.3 | RSA Plans and Procedures Preparation and Execution | 7-21 |
| 7.2.2.3.3.4 | RSA Onboard Systems Preparation | 7-22 |
DCN
)7.2.2.3.3.5 RSA Ground Systems Preparation 7-22
DCN
)7.2.2.3.3.6 RSA Ground Procedures and Rules Preparation 7-23
DCN
| )7.2.2.4 | NASDA Payload Operations Integration | 7-23 |
| 7.2.2.4.1 | nasda Complement Operations Integration | 7-23 |
DCN
| )7.2.2.4.2 | Japanese element Payload Operations Integration | 7-24 |
| 7.2.2.4.3 | nasda Payload Operations Integration Functions | 7-24 |
DCN
| )7.2.2.4.3.1 | NASDA of japan Requirements and Changes Preparation | 7-24 |
| 7.2.2.4.3.2 | NASDA Safety - Preparation | 7-25 |
DCN
| )7.2.2.4.3.3 | NASDA Plans and Procedures Preparation and Execution | 7-26 |
| 7.2.2.4.3.4 | NASDA Onboard Systems Preparation | 7-27 |
| 7.2.2.4.3.5 | NASDA Ground Systems Preparation | 7-27 |
| 7.2.2.4.3.6 | NASDA Ground Procedures and Rules Preparation | 7-28 |
DCN
| )7.2.2.5 | ESA Payload Operations Integration | 7-28 |
| 7.2.2.5.1 | ESA Complement Operations Integration | 7-28 |
DCN
| )7.2.2.5.2 | European element Payload Operations Integration | 7-29 |
| 7.2.2.5.3 | ESA Payload Operations Integration Functions | 7-29 |
| 7.2.2.5.3.1 | ESA Requirements and Changes Preparation | 7-29 |
| 7.2.2.5.3.2 | ESA Payload Operations Safety - Preparation | 7-30 |
| 7.2.2.5.3.3 | ESA Plans and Procedures Preparation and Execution | 7-31 |
| 7.2.2.5.3.4 | ESA Onboard Systems Preparation | 7-32 |
| 7.2.2.5.3.5 | ESA Ground Systems Preparation | 7-32 |
| 7.2.2.5.3.6 | ESA Ground Procedures and Rules Preparation | 7-33 |
| 7.2.2.6 | CSA Payload Operations Integration | 7-33 |
| 7.2.2.6.1 | CSA Complement Operations Integration | 7-33 |
| 7.2.2.6.2 | Canadian element Payload Operations Integration | 7-33 |
| 7.2.2.7 | User Payload Operations Integration | 7-34 |
| 7.3 | STATION-WIDE PAYLOAD OPERATIONS DOCUMENTATION | 7-34 |
DCN
| )7.3.1 | Cadre Operations product Verification Plan | 7-34 |
| 7.3.2 | payload operations integration center payload Ground command procedures Book | 7-34 |
| 7.3.3 | Payload Operations Planning Products | 7-35 |
DCN
)7.3.4 (Deleted) 7-35
DCN
)7.4 U.S. Partner Payload Operations Documentation 7-35
DCN
| )7.4.1 | ISS PAYLOAD REGULATIONS | 7-35 | |
| 7.4.2 | Payload Operations Data Set | 7-35 | |
| 7.4.3 | Ground Data Services data set | 7-35 | |
| 7.4.4 | planning Data Set | 7-35 | |
| 7.4.5 | Payload Procedures and Displays Data Set | 7-35 | |
| 7.4.6 | Increment Specific U.S. Payload Planning Groundrules and | ||
| Constraints | 7-35 | ||
| 7.4.7 | Payload Operations Handbook | 7-35 | |
| 7.4.8 | Payload executive software Tables | 7-36 | |
| 7.4.9 | u.s. payload operations data file Management Plan and Annex | 7-36 | |
| 7.5 | (deleted) | 7-36 | |
| 8.0 | FLIGHT MECHANICS PRODUCT DEVELOPMENT AND MANAGEMENT | 8-1 | |
| 8.1 | trajectory | 8-1 | |
| 8.1.1 | ISS EPHEMERIS | 8-2 | |
| 8.1.2 | trajectory Ancillary Data | 8-3 | |
| 8.1.3 | TRANSLATIONAL Maneuver Management | 8-3 | |
| 8.1.4 | Debris Avoidance | 8-3 | |
| 8.1.5 | Propellant Logistics | 8-3 | |
| 8.1.6 | External Vehicle Operations | 8-3 |
DCN
| )8.2 | Motion control system | 8-3 |
| 8.2.1 | motion control Ancillary Data | 8-5 |
| 8.2.2 | ROTATIONAL Maneuver Management | 8-5 |
| 8.2.3 | PropELLANT AND THRUSTER Management | 8-5 |
| 9.0 | ISS Flight Rules | 9-1 |
| 9.1 | Purpose | 9-1 |
| 9.2 | Overview | 9-1 |
| 9.3 | Flight Rules Description | 9-1 |
| 9.4 | Flight Rules Development and Control Process | 9-1 |
| 9.5 | Flight Rules Production Process AND SCHEDULE | 9-2 |
| 9.5.1 | Flight Rules Structure | 9-2 |
| 9.5.2 | Flight Rules Process | 9-2 |
DCN
| )9.5.3 | Flight Rules Production Schedule | 9-3 |
| 10.0 | MEDICAL OPERATIONS | 10-1 |
| SSP 50200-08 | 07 November 2003 |
Revision B
| 10.1 | PURPOSE | 10-1 |
| 10.2 | SCOPE | 10-1 |
| 10.3 | ISS MEDICAL MANAGEMENT STRUCTURE | 10-1 |
| 10.3.1 | Multilateral Medical Policy Board | 10-1 |
| 10.3.2 | Multilateral Medical Operations Panel | 10-1 |
| 10.3.3 | Multilateral Space medical Board | 10-2 |
| 10.4 | MEDICAL SELECTION OF ISS CREWMEMBERS | 10-2 |
| 10.4.1 | Medical Requirements for Crew Selection <TBD 10-2> | 10-2 |
| 10.4.2 | Medical Selection and Endorsement | 10-2 |
| 10.5 | MEDICAL SUPPORT | 10-2 |
| 10.5.1 | Preflight Training Period | 10-2 |
| 10.5.2 | In-Flight Medical Support | 10-3 |
| 10.5.3 | Post-Flight Medical Support | 10-3 |
| 10.5.4 | Flight Surgeon Training | 10-3 |
| 10.6 | OPERATIONAL MEDICAL REQUIREMENTS | 10-3 |
| 10.6.1 | Requirements Documentation | 10-3 |
DCN
| )10.6.2 | operational preflight medical assessment tests | 10-4 | |
| 11.0 | iss SAFETY | 11-1 | |
| 11.1 | Overview | 11-1 | |
| 11.2 | Compliance Safety | 11-1 | |
| 11.2.1 | Vehicle Systems | 11-1 | |
| 11.2.1.1 | safety process for operational controls pertaining to nasa | ||
| designs | 11-1 | ||
| 11.2.1.2 | safety process for operational controls pertaining to rsa | ||
| designs | 11-2 | ||
| 11.2.1.3 | safety process for operational controls pertaining to nasda | ||
| designs | 11-2 | ||
| 11.2.1.4 | safety process for operational controls pertaining to esa | ||
| designs | 11-2 | ||
| 11.2.1.5 | safety process for operational controls pertaining to csa | ||
| designs | 11-2 |
DCN
| )11.2.1.6 | SAFETY PROCESS FOR OPERATIONAL CONTROLS PERTAINING TO ASI | ||
| DESIGNS | 11-3 | ||
| 11.2.2 | ISS Payloads | 11-9 | |
| 11.2.2.1 | safety process for operational controls pertaining to payloads | 11-9 | |
| 11.2.2.2 | (Deleted) | 11-9 | |
| 11.2.2.3 | (Deleted) | 11-9 | |
| 11.2.2.4 | (Deleted) | 11-9 | |
| 11.2.3 | ISs ground safety review board | 11-9 | |
| 11.3 | INTEGRATED SAFETY | 11-10 | |
| 11.4 | Operations Safety | 11-10 | |
| 12.0 | Flight Software Reconfiguration <TBR 12-1> | 12-1 | |
| SSP 50200-08 | 27 June 2002 |
Revision B
| 12.1 | INTRODUCTION | 12-1 |
| 12.2 | Scope | 12-1 |
| 12.3 | Overview | 12-1 |
| 12.4 | Mission Build Facility | 12-2 |
| 12.5 | ISS Mission Operations Avionics and Reconfiguration System | 12-3 |
| 13.0 | GROUND SYSTEMS OPERATIONS | 13-1 |
| 13.1 | OVERVIEW | 13-1 |
| 13.1.1 | Program Control Boards | 13-1 |
| 13.1.2 | Overall support agreements | 13-1 |
| 13.1.3 | Security | 13-2 |
DCN
)13.1.3.1 Security Coordination 13-2
DCN
)13.1.3.2 Security Precautions 13-3
DCN
| )13.1.4 | Ground Systems Test and Verification | 13-3 |
| 13.2 | NASA space station control center | 13-3 |
| 13.2.1 | Scheduling | 13-3 |
| 13.2.2 | Facility Support | 13-3 |
DCN
DCN
| )13.2.3 | Ground Communications Coordination Through Mission control | |
| center - Houston | 13-4 | |
| 13.2.4 | NASA tracking and data relay satellite system Network | |
| Scheduling | 13-4 |
DCN
| )13.3 | NASA payload operations integration center | 13-4 |
| 13.3.1 | Scheduling of Networks and Facilities | 13-4 |
| 13.3.2 | Payload Ground Requirements Collections and Allocation | 13-4 |
DCN
| )13.3.3 | Payloads Operations and Integration Center | 13-5 | |
| 13.3.4 | Payload Data Services System | 13-5 | |
| 13.3.5 | United States Operations Center | 13-5 | |
| 13.4 | NASA Planning Systems (Integrated planning system and Payload | ||
| planning system) | 13-5 | ||
| 13.5 | RSA Mission Control Center - MOSCOW | 13-5 | |
| 13.5.1 | Scheduling | 13-5 | |
| 13.5.2 | Mission Control Center - Moscow | 13-5 | |
| 13.5.3 | RSA Payload Operations Control Center | 13-6 | |
| 13.6 | NASDA Space Station Integration and Promotion Center | 13-6 | |
| 13.7 | ESA Columbus Operations Facility CONTROL CENTER AND Automated | ||
| Transfer Vehicle CONTROL CENTER | 13-7 | ||
| 13.7.1 | Scheduling | 13-7 | |
| 13.7.2 | attached pressurized module control center and automated | ||
| transfer vehicle control center facility support | 13-7 | ||
| 13.7.3 | ESA ground communication coordination | 13-7 | |
| 13.7.4 | ESA planning system | 13-8 | |
| 13.8 | CSA SPACE OPERATIONS SUPPORT CENTER | 13-8 | |
| 13.9 | ASI mini-pressurized logistics module technical support center | 13-8 | |
| 14.0 | FLIGHT PREPARATION SCHEDULE INTEGRATION (Shuttle) | 14-1 | |
| 14.1 | SPACE SHUTTLE | 14-1 | |
| 14.1.1 | PURPOSE | 14-1 | |
| 14.1.2 | OVERVIEW | 14-1 |
DCN
| )14.1.3 | SCHEDULE INITIALIZATION | 14-1 |
| 14.1.4 | SCHEDULE MANAGEMENT AND CONTROL | 14-2 |
DCN
| )14.1.5 | integration process | 14-2 |
| 14.1.5.1 | Flight/Increment Preparation | 14-3 |
| 14.1.5.2 | Transfer Activities Procedure Preparation | 14-3 |
| 14.1.5.3 | (deleted) | 14-3 |
| 14.2 | Soyuz <TBD 14-2> | 14-3 |
| 14.3 | Progress <TBD 14-2> | 14-3 |
| 14.4 | Automated transfer vehicle <TBD 14-2> | 14-3 |
| 14.5 | H-II transfer vehicle <TBD 14-2> | 14-3 |
| 15.0 | INVENTORY MANAGEMENT <TBR 15-1> | 15-1 |
DCN
DCN
)APPENDIX
| a | Acronyms and abbreviations | a-1 | |
| b | GLOssary of terms | b-1 | |
| c | NASA/CSA BILATERAL INCREMENT EXECUTION PREPARATION | c-1 | |
| d | open work | d-1 | |
| e | security products to be | ||
| exchanged by the international partners | e-1 |
DCN
DCN
DCN
DCN
)TABLE
| 2.5-1 | PROGRAM LEVEL INCREMENT EXECUTION PREPARATION DOCUMENTS | 2-10 | |
| 4.4.7-1 | Operations data file PUBLICATION TEMPLATE | 4-12 | |
| 6.7.2-1 | Integrated operations plan Set Cross-Reference | 6-6 | |
| 7.2-1 | levels of payload operations integration | 7-7 | |
| C.5-1 | INCREMENT-SPECIFIC PRODUCTS | c-8 | |
| D-1 | TO BE RESOLVED issues | d-2 | |
| D-2 | TO BE DETERMINED ITEMS | d-3 | |
| E-1 | Security Products to be Exchanged by the International | ||
| Partners <TBD E-1> | e-2 | ||
| SSP 50200-08 | 07 November 2003 |
Revision B
DCN
DCN
DCN
DCN
)FIGURE
| 2.3-1 | SPIP DOCUMENTATION TREE | 2-5 |
| 2.4-1 | INCREMENT EXECUTION PREPARATION AND REAL-TIME Operations |
and utilization CONTROL BOARDs AND teams (unless otherwise noted,
| all boards and panels are multilateral in membership) | 2-6 | ||
| 2.5-1 | PROGRAM LEVEL INCREMENT EXECUTION PREPARATION DOCUMENTS | 2-8 | |
| 3.2.2-1 | PRE-INcrement Planning Product Overview | 3-4 | |
| 3.2.3-1 | Increment Planning Development and Management Process | ||
| Overview | 3-6 | ||
| 3.4-1 | Planning Product Approval and Issue Resolution Hierarchy | 3-13 | |
| 3.4-2 | Increment Plan Development and Management Template | 3-14 | |
| 4.3.1-1 | partner operations data file Control board/operations data file | ||
| control board relationships | 4-8 | ||
| 4.4-1 | Operations data file development and management process | ||
| overview | 4-9 | ||
| 7.1.1-1 | payload operations preparation process | 7-3 | |
| 7.1.2-1 | increment execution preparation operations Change Process | 7-4 | |
| 7.2-1 | Payload Operations/Integration coordination interfaces | 7-6 | |
| 8.1-1 | FLIGHT MECHANICS TRAJECTORY Increment Execution | ||
| PREPARATION AND INTEGRATION PROCESS | 8-2 | ||
| 8.2-1 | FLIGHT MECHANICS MOTION CONTROL Increment Execution | ||
| PREPARATION AND INTEGRATION PROCESS | 8-4 | ||
| 11.2.1.2-1 | U.S./russian joint operations hazard controls | 11-4 | |
| 11.2.1.3-1 | U.S./nasda joint operations hazard controls | 11-5 | |
| 11.2.1.4-1 | U.S./esa joint operations hazard controls | 11-6 | |
| 11.2.1.5-1 | U.S./csa joint operations hazard controls | 11-7 | |
| 11.2.1.6-1 | Management of US-Russian Joint Operations Controls and Recovery Operations | 11-8 | |
| 12.5-1 | ISS Mission operations avionics and reconfiguration system | ||
| INTERFACES | 12-3 | ||
| 14.1.3-1 | FLIGHT PREPARATION INITIALIZATION | 14-2 |
SSP 50200-08 27 June 2002 Revision B
INTRODUCTION
PURPOSE
This document defines the products, activities, roles, responsibilities, and interfaces required to implement the increment preparation tasks for the International Space Station (ISS). Specifically, this document defines how requirements defined in the Increment Definition and Requirements Document (IDRD) series are implemented by all International Partner (IP) execution organizations.
SCOPE
DCN
DCN
)This Increment Execution Preparation Implementation Plan contains operations and utilization activities performed by the National Aeronautics and Space Administration (NASA), the Russian Space Agency (RSA), the Canadian Space Agency (CSA), the European Space Agency (ESA), the National Space and Development Agency of Japan (NASDA), and the Italian Space Agency (ASI) in preparation for real-time execution. This document begins with the delivery of the IDRD from the tactical planning organization; then ends with the delivery of flight products that meet these requirements, and are to be used by the flight crew and the real-time operations teams in the Space Station Control Center (SSCC), Mission Control Center - Moscow (MCCM), Space Operations Support Center (SOSC), Columbus Control Center (ColCC), Space Station Integration and Promotion Center (SSIPC), and Payload Operations Integration Center (POIC). This document contains implementation details for activities that are multilateral, bilateral, and internal to NASA; and which must be controlled by the ISS Program. This document does not contain implementation details for those activities that do not need to be controlled by the ISS Program and which are internal to an IP. Throughout this document, the Mini-Pressurized Logistics Module (MPLM) is considered part of the United States On-Orbit Segment (USOS).
PRECEDENCE
DCN
)Information contained in this document is consistent with ISS Program documentation. In case of conflict with this document and SSP 50011, Concept of Operation and Utilization, Concept of Operation and Utilization (COU) shall take precedence. In case of conflict with this document and SSP 5020001, Station Program Implementation Plan, Volume 1: Station Program Management Plan, Station Program Implementation Plan (SPIP) Volume 1 shall take precedence.
DELEGATION OF AUTHORITY
DCN
)This document is approved by, and is subject to, the Multilateral Operations and Utilization Control Board (MO&UCB) change control process. This document is developed jointly by NASA, RSA, CSA, ESA, NASDA, and ASI increment execution preparation personnel. The ISS Program Payload Operations Office will serve as the book manager for this document.
SSP 50200-08 07 November 2003 Revision B
1-2
Issues and open work Because of the complex and dynamic nature of ISS development and implementation, there can be unresolved issues concerning new or existing processes. These unresolved issues are identified by a “<TBR X-X>” in the text. Table D-1, To Be Resolved Issues, lists the To Be Resolved (TBR) issues associated with this implementation plan. Processes associated with a TBR issue are not considered baselined operating processes until the issue is resolved and the implementation plan text is updated.
Not all processes have been defined when discussing IP roles and responsibilities. As this document evolves, the processes become better defined and are incorporated into the implementation plan. Open work is identified by a “<TBD X-X>” in the text. Table D-2, To Be Determined Items, lists the To Be Determined (TBD) items associated with this implementation plan. Once the TBD information is defined, the updated text is inserted in place of the TBD in the document.
SSP 50200-08 06 June 2000 Revision B
DOCUMENTS
APPLICABLE DOCUMENTS
DCN
)The following documents include specifications, models, standards, guidelines, handbooks, and other special publications. The current issue of the following documents is identified in the Program Automated Library System (PALS) (issa-www.jsc.nasa.gov/cgi-bin/dsql+/ORAP?-h+palshome). The documents listed in this paragraph are applicable to the extent specified herein. Inclusion of applicable documents herein does not in any way supersede the order of precedence identified in Paragraph 1.3 of this document.
| SSP 30599 |
| Safety Review Process |
| SSP 41160 |
| Segment Specification for the European Space Agency Attached Pressurized Module |
| SSP 41163 |
| Russian Segment Specification |
| SSP 41165 |
| Segment Specification for the Japanese Experiment Module |
| SSP 41167 |
| Mobile Servicing System Segment Specification for the International Space Station Program |
| SSP 50011 |
| Concept of Operation and Utilization |
| SSP 50038 |
| Computer-Based Control System Safety Requirements |
| SSP 50094 |
| NASA/RSA Joint Specifications Standards Document for the ISSA Russian Segment |
| SSP 50146 |
| NASA/RSA Bilateral Safety and Mission Assurance Process Requirements for International Space Station |
| SSP 50200-01 |
| Station Program Implementation Plan, |
Volume 1: Station Program Implementation Plan
| SSP 50200-02 |
| Station Program Implementation Plan, |
Volume 2: Program Planning and Manifesting
| SSP 50200-03 |
| Station Program Implementation Plan, |
Volume 3: Cargo Analytical Integration
| SSP 50200-04 |
| Station Program Implementation Plan, |
Volume 4: Payload Engineering Integration
| SSP 50200-05 |
| Station Program Implementation Plan, |
Volume 5: Logistics and Maintenance
| SSP 50200-06 |
| Station Program Implementation Plan, |
Volume 6: Cargo Physical Processing
| SSP 50200-07 |
| Station Program Implementation Plan, |
Volume 7: Training
| SSP 50200-09 |
| Station Program Implementation Plan, |
Volume 9: Real-Time Operations
| SSP 50200-10 |
| Station Program Implementation Plan, |
Volume 10: Sustaining Engineering
| SSP 50252 |
| Operations Data File Management Plan |
| SSP 50253 |
| Operations Data File Standards |
| SSP 50254 |
| Operations Nomenclature |
| SSP 50255 |
| Flight Mechanics - Trajectory Plan |
| SSP 50256 |
| Flight Mechanics - Motion Control Plan |
| SSP 50260 |
| International Space Station Medical Operations Requirements Document (ISS MORD) |
DCN
)SSP 50261-02
<TBD 2-2>
Generic Groundrules, Requirements and Constraints Part 2: Execute Planning
| SSP 50291 |
| Facility and Communications Requirements for MCCH/MCCM Intercenter Operations |
DCN
)SSP 50401
Multilateral Distributed Planning Interface Specification
DCN
)SSP 50480
ISS Joint Medical Operations Implementation Plan (JMOIP)
DCN
)SSP 50501
Pre-Increment Execute Planning Process Definition, Generic
| SSP 52056 |
| Increment Operations Plan Implementation Plan |
DCN
)SSP 57057
ISS Payload Integration Template
| SSP 75000 |
| Load Shed Tables Development and Maintenance Document |
| NSTS 1700.7B |
| Safety Policy and Requirements for Payloads Using the Space Transportation System |
DCN
)NSTS 13830
Payload Safety Review and Data Submittal Requirements For Payloads Using the:
- Space Transportation System
- International Space Station
| JSC-25187 |
| Flight Preparation Schedules Development |
| JSC-36292 |
| Avionics Recon Operations Concept |
| D684-10020V01RA |
| Program Master Integration and Verification Plan |
| D684-10086-1 |
| Integrated Schedule Planning Process Document (ISPPD) |
| MIL-STD-1189 |
| Standard Department of Defense Bar Code Symbology |
| RSOC 87-0029E |
| MCC Configuration Management Manual |
| WG-3/RSC E/NASA/004/3233 |
| Requirements for Network, MCC Communications Systems, Ground Facilities and Consulting Groups for Joint USA/Russia Manned Space Flight |
| No Number |
| Astronaut Medical Evaluation Requirements Document (AMERD) |
DCN
)No Number Joint Operations Interface Procedures
Reference documents The following documents contain supplemental information to guide the user in the application of this document. These documents may or may not be specifically cited within the text of this document.
DCN
)SSP 41164
Italian Mini-Pressurized Logistics Module Segment Specification
| SSP 50010-02 |
| Documentation Requirements, Standards and Guidelines, Volume 2: Guidelines |
| SSP 50007 |
| Space Station Inventory Management System Label Specifications |
| SSP 50021 |
| Safety Requirements Document |
DCN
)SSP 50261-01
Generic Groundrules, Requirements, and Constraints Part 1: Strategic and Tactical Planning
DCN
)SSP 50313
Display and Graphics Commonality Standard
DCN
)SSP 50417
On-Orbit Integrated Experiment Hazard Assessment Report
DCN
)SSP 50562
ISS Program Off-Nominal Situation Plan
| SSP 54500 |
| International Ground Segment Specification |
| SSP 50234 |
| Sustaining Engineering Plan |
DCN
)SSP 58301
Cadre Operations Product Verification Plan
| SSP 58312 |
| Payload Operations Integration Center Payload Operations Handbook Volume 2: Increment Operations |
| SSP 58313 |
| NASA Payload Regulations |
| SSP 58700 |
| U.S. Payload Operations Data File Management Plan |
| SSP 58703-01 |
| POIC Ground Command Procedures Book Volume 1: Payload Support System (PLSS) Procedures, All Flights |
| SSP 58703-02 |
| POIC Ground Command Procedures Book Volume 2: EXPRESS/ARIS Procedures, All Flights |
| SSP 58703-03 |
| POIC Ground Command Procedures Book Volume 3: Payload Procedures, Increment 3 |
| JSC-27099 |
| Flight Crew Operations Concept |
| No Number |
| Assembly Sequence Document |
| No Number |
| CSA/NASA Bilateral Operations Agreement |
| No Number |
| On-Orbit Inventory Stowage Implementation Plan |
SSP 50200-08 07 November 2003
2-6
SPIP documentation tree
DCN
)Figure 2.3-1, SPIP Documentation Tree, illustrates the relationship between the ISS Program documentation hierarchy and the SPIP documents.
Figure 2.3-1 SPIP DOCUMENTATION TREE
PROGRAM ROLES AND RESPONSIBILITIES
This Increment Execution Preparation Implementation Plan covers a wide range of activities being controlled by various Operations and Utilization (O&U) Control Boards (CBs) and panels as shown in Figure 2.4-1, Increment Execution Preparation and Real-Time Operations and Utilization Control Board and Teams.
The roles and responsibilities of these control boards and panels are covered in SPIP Volume 1 and in appropriate subparagraphs of this document. In addition, the Flight Mechanics Working Group (FM WG) is responsible for all flight mechanics product development and management. This includes all facets of trajectory and motion control.
FIGURE 2.4-1 INCREMENT EXECUTION PREPARATION AND REAL-TIME Operations and utilization CONTROL BOARDs AND teams (unless otherwise noted, all boards and panels are multilateral in membership) SSP 50200-08 06 June 2000 Revision B
PROGRAM LEVEL INCREMENT EXECUTION PREPARATION DOCUMENTS
This section details documentation of the increment execution preparation process. Where applicable, the processes, concepts, and agreements established during the Phase 1 Program have been utilized to the greatest extent possible in development of the processes contained in these documents. The documents, identified in Figure 2.51, Program Level Increment Execution Preparation Documents, and Table 2.5-1, Program Level Increment Execution Preparation Documents, are not specific to a mission, but cover agreements, concepts, requirements, Interface Control Documents (ICDs), plans, and implementation strategies throughout the life of the ISS. Because of the interrelationship between pre-increment and real-time operations, all documents supporting both phases are shown below. These lower-level documents will be considered as Program level documents requiring IP concurrence, but will be controlled and managed by one of the control boards and panels listed above. Explanation of these documents and their content is covered in the appropriate sections of this document.
DCN
)All Partners shall use SSP 50254, Operations Nomenclature, document for denoting all hardware and software and associated data when producing ISS mission operations products, including but not limited to the following: Operations Data File (ODF) procedures and reference data, onboard Portable Computer System (PCS) and ground displays, onboard equipment decals, Onboard Short-Term Plan (OSTP), inventory management database and plans, up-linked messages to the crew, inter-center communications, pre-flight checkout, Flight Rules, console handbooks, Mission Integration Plan (MIP), command and telemetry lists, high level schematics and other graphics provided for operational use, and crew and ground controller training resources to the extent onboard systems are involved.
SSP 50200-08 20 June 2003
2-8
DCN
DCN
DCN
DCN
DCN
DCN
SSP 50200-08 07 November 2003 Revision B FIGURE 2.5-1 PROGRAM LEVEL INCREMENT EXECUTION PREPARATION DOCUMENTS (page 1 of 2)
DCN
DCN
FIGURE 2.5-1 PROGRAM LEVEL INCREMENT EXECUTION PREPARATION DOCUMENTS (page 2 of 2) SSP 50200-08 06 June 2000 Revision B
2-9
TABLE 2.5-1 PROGRAM LEVEL INCREMENT EXECUTION PREPARATION DOCUMENTS (PAGE 1 OF 5)
| Document Title |
| Section |
| Purpose |
| Controlled by |
| Document Number |
| Status |
| Earth-to-Orbit Vehicle Joint Operations Plans |
| 3.2.2 |
| Provide detailed definition of operations for the period of joint operations between the ETOVs and the ISS as described in the On-Orbit Operations Summary. |
| JOP |
| <TBD 2-1> |
DCN
)ISS Generic Execute Planning Groundrules and Constraints Document
| 3.2.2 |
| Provide the increment dependent groundrules and constraints to systems and payload operations summary. |
| ExPCP |
| SSP 50261-02 |
<TBD 2-2>
| Increment Specific Planning Groundrules and Constraints |
| 3.2.2, 3.2.3 |
| Identifies specific resource distribution decisions that have been determined in accordance with resource allocations in the IDRD. |
| JOP |
| No Number |
| Segment-Specific (systems and payloads) On-Orbit Operations Summary |
| 3.2.3 |
| Segment plan developed by each segment’s planning group and will plan function’s proposal for systems and payload operations. |
No Number
| Integrated Systems On-Orbit Operations Summary |
| 3.2.3 |
No Number
| Integrated Payload On-Orbit Operations Summary |
| 3.2.3 |
No Number
| Integrated Systems and Payload On-Orbit Operations Summary |
| 3.2.3 |
No Number
SSP 50200-08 07 November 2003
2-10
TABLE 2.5-1 PROGRAM LEVEL INCREMENT EXECUTION PREPARATION DOCUMENTS (PAGE 2 OF 5)
| Document Title |
| Section |
| Purpose |
| Controlled by |
| Document Number |
| Status |
| Operations Data File Management Plan |
| 4.0 |
| The purpose is to document the processes, protocols, guidelines, and groundrules for all ODF related activities. It also defines the roles and responsibilities of the ISS community members of the ODFCB in the development, maintenance, control and production of the ODF. |
| ODFCB |
| SSP 50252 |
| Rev A baselined by ODFCB. |
| Operations Data File |
| 4.2 |
| Collection of procedures and reference information required to operate and maintain the ISS |
| ODFCB |
| No Number |
| Operations Data File Standards |
| 4.3.2 |
| The purpose is to define the formats and conventions used by all International Partners in developing ODF procedures. |
| ODFCB |
| SSP 50253 |
| Rev A baselined by ODFCB. |
| Operations Nomenclature |
| 4.3.2 |
| The purpose is to define operations nomenclature that must be used by all International Partners in the development of all operations products. |
| SSCB |
| SSP 50254 |
| Baselined by SSCB. |
| Load Shed Table Development and Maintenance Document |
| 5.2.3 |
| The purpose is to describe the overall approach to be employed by the Mission Operations Directorate (MOD) toward development and maintenance of the ISS electrical power system load shed table. This document is completed. |
| JOP |
| SSP 75000 |
| MOD Operations Baseline |
| 6.3.5 |
| Collection of early operations plans and procedures used to assess the ISS design during the design cycle. |
| JOP |
| No Number |
| Joint Operations Interface Procedures |
| 6.3.6 |
| Sets of procedures used to govern the interaction between individual flight control teams. |
| JOP |
| <TBD 2-1> |
| Display and Graphic Commonality Standards |
| 6.6 |
| Identify display requirements and application requirements for all onboard computer systems. |
| IDAGS |
| <TBD 2-1> |
SSP 50200-08 06 June 2000
2-11
TABLE 2.5-1 PROGRAM LEVEL INCREMENT EXECUTION PREPARATION DOCUMENTS (PAGE 3 OF 5)
| Document Title |
| Section |
| Purpose |
| Controlled by |
| Document Number |
| Status |
| Increment Operations Plan, Implementation Plan |
| 6. 7 |
| Information relative to the contents of the IOP. |
| ExPCP |
| SSP 52056 |
| Executive Summary |
| 6. 7.2 |
<TBD 2-1>
| Cadre Operations Product Verification Plan |
| 7.3.1 |
| Describes the operational verification of the POIC systems and services including the facility, data routing, data processing, voice and video systems, and network interface. |
| POCB |
| SSP 58301 |
)POIC Payload Ground Command Procedures Book
| 7.3.2 |
| Contains procedures to be used by the POIC to perform nominal and contingency operations by ground command for Station-wide payload operations. |
| U.S. PODF CB |
| SSP 58703-01 |
SSP 58703-02
SSP 58703-03
)ISS Payload Regulations
| 7.4.1 |
| Describes NASA complement and element payload operations regulations and constraints for pre-increment and increment planning and execution. |
| POCB |
| SSP 58313 |
DCN
DCN
)Payload Operations Data Set
| 7.4.2 |
| Detailed U.S. payload operations requirements used to develop operations support products (flight rules and regulations). |
No Number
| Ground Data Services Data Set |
| 7.4.3 |
| Detailed U.S. payload data services requirements used to develop data system configuration and networking requirements. |
| POCB |
| No Number |
| Payload Planning Data Set |
| 7.4.4 |
| Detailed U.S. payload operations and resource requirements specifications used to develop mission planning products. |
| POCB |
| No Number |
DCN
)Payload Procedures and Displays Data Set
| 7.4.4.A |
| Detailed U.S. procedures and crew display operations used to develop U.S. PODF and U.S. payload crew displays. |
| U.S. PODFCB |
| No Number |
TABLE 2.5-1 PROGRAM LEVEL INCREMENT EXECUTION PREPARATION DOCUMENTS (PAGE 4 OF 5)
| Document Title |
| Section |
| Purpose |
| Controlled by |
| Document Number |
| Status |
DCN
DCN
)Increment Specific U.S. Payload Planning Groundrules and Constraints
| 7.4.5 |
| Provides the U.S. Payload increment-dependent groundrules and constraints pertaining to systems and payload operations planning. Provided as an input to the Increment Specific Planning Groundrules and Constraints. |
| POCB |
| No Number |
| Payload Operations Handbook |
| 7.4.6 |
| Establishes internal US PCC and POIC-to-U.S. user and ASI operations centers standard operations procedures. Defines interfaces for planning, procedure maintenance, data management, and operations execution. |
| POCB |
| SSP 58312 |
)PES Tables
| 7.4.7 |
| Payload command and telemetry formats for the PLMDM. |
| U.S. PODF CB |
| No Number |
DCN
)U.S. PODF Management Plan and Annexes
| 7.4.8 |
| Controlling document used by the POIC at MSFC for U.S. PODF management, contents definition, configuration management, procedure verification and publication. |
| U.S. PODFCB |
| SSP 58700 |
| Flight Mechanics - Trajectory Plan |
| 8.1 |
| This document describes the roles and responsibilities of NASA, RSA and IPs to support trajectory planning and operations. |
| FM WG |
| SSP 50255 |
| 25-Apr-97 Draft version in review between RSA and NASA. |
SSP 50200-08 07 November 2003
2-13
TABLE 2.5-1 PROGRAM LEVEL INCREMENT EXECUTION PREPARATION DOCUMENTS (PAGE 5 OF 5)
| Document Title |
| Section |
| Purpose |
| Controlled by |
| Document Number |
| Status |
| Flight Mechanics - Motion Control Plan |
| 8.2 |
| This document describes how system management roles and responsibilities are split between NASA, RSA, and IPs in the planning and operation of the ISS motion control system and propulsion system. |
| FM WG |
| SSP 50256 |
| 25-Apr-97 Baseline version incorporated initial Russian comments. Currently in signature review between RSA and NASA. |
Space Station Flight Rules Volume A Volume B Volume C
| 9.0 |
| Documents the real-time operations participants, planned responses to off-nominal situations, and programmatic priorities for ISS flight operations. |
| FRCB |
| International Space Station Medical Operations Requirements Document (ISS MORD) |
| 10.6 |
| Contains specific operational requirements. |
SSP 50260
)On-Orbit Inventory Stowage Implementation Plan
| 15.0 |
| Contains a detailed description of the ISS inventory process. |
| OIS Teams |
| ISS Inventory Transfer List |
| 15.2.4 |
| Describes what items are to be transferred to and from the ISS during a particular resupply mission. |
| ISS Inventory Audit List |
| 15.2.4 |
| Describes inventory to be checked, the quantity, location and operational status, if applicable. |
| ISS Inventory Reference File |
| 15.2.4 |
| Describes configuration of inventory items onboard the ISS. |
SSP 50200-08 06 June 2000
3-1
Increment Planning Development and Management The purpose of increment planning development and management is to develop increment-specific operations products and associated information necessary to conduct real-time operations. The information generated through this process is used by users, IPs, sponsors, flight crew, ground controllers, ground processing, training, and management to plan the preparation and execution of an increment and to help make management decisions.
principles of the increment planning process The principles that govern the increment planning process are listed below. These principles are the philosophies that will be followed during the increment planning process.
| A. | The increment planning development and management process implements the IDRD requirements. |
| B. | The Station-wide plans are developed in an integrated manner by the geographically distributed Participants in the planning process. |
| C. | The plans that result from the increment planning process provide the high-level definition of planned ISS operations for the entire increment, to include assembly, systems and payloads and detailed definition of planned operations for the attached phases of the increment. |
| D. | Planning will be based on a single integrated planning database of activity definitions, planning rules, etc., developed and agreed upon by the geographically distributed Participants in the planning process. |
| E. | Participants must provide planning input in accordance with the agreed to planning process definition. Late inputs to the planning process will be considered in a subsequent planning cycle. Contingency situations will be addressed as required. |
| F. | RSA will retain full use of its research modules, the electrical power generated by the Russian Segment (RS), and the command and telemetry links provided by the RS as defined in the NASA/RSA MOU. |
| G. | The planning process must ensure: |
| 1. | The safe execution of planned operations |
| 2. | The elimination of conditions that may cause cross-interference between planned operations |
| 3. | The utilization of all integrated ISS resources |
| 4. | The maximization of the overall effectivity of the ISS utilization |
SSP 50200-08 06 June 2000 Revision B
Overview of the increment planning process The increment planning development and management process is defined in detail in lower-level documents. These documents, including the Preincrement Planning Product Development Process and the Planning Groundrules and Constraints Development and Control Processes, are prepared under the authority of the Execute Planning Control Panel (ExPCP).
Increment planning development and management is initiated from 18 to 12 months prior to the proposed increment start date. (Refer to Figure 3.4-2, Increment Plan Development and Management Template.) The inputs to and the results of the increment planning development and management process are described below, followed by the process major milestones. The process flow and the detailed process description are provided in the increment planning development and management process documentation.
The following terms are included to provide clarification in the description of the increment planning process:
| A. | Resource allocation: The portion of resources to be made available to individual IPs over the course of the planning period. The allocation of resources is the function of strategic and tactical planning and is documented in the IDRD for each increment. |
| B. | Resource distribution: The defined set of resources, quantified by time and magnitude, being made available to support operations planning. Resource distribution is a function of execution planning. |
DCN
DCN
DCN
)During the assembly phase of the Program, increment definition and Earth-to-Orbit Vehicle (ETOV) flights form the basis for some aspects of payload operations. The evolving nature of the ISS vehicle, the buildup of payloads, and the buildup of ground payload operations facilities to support payload operations, make the assembly phase a time of changing configurations. Operations personnel will develop increment-based products such as the Integrated Operations Plan (IOP), increment databases to document payload activity, and requirement assessments needed for payload operations. The ISS Program will conduct increment reviews to assure readiness of payload complements and launch packages.
Inputs to the Increment Planning Process Increment planning begins with the increment and flight specific requirements, guidelines, and resource allocations documented in the IDRD, MIPs, and ISS Generic Execute Planning Groundrules and Constraints Document defined in SSP 50200-02, Station Program Implementation Plan, Volume 2: Program Planning and Manifesting, and operations requirements specifications. These planning data inputs are needed to develop the various operations planning products. The multilateral documents SSP 50562, ISS Program Off-Nominal Situation Plan, and the IDRD should be considered as references in the development of operational responses for off-nominal situations.
SSP 50200-08 20 June 2003 Revision B
3-2
Outputs of the Increment Planning Process The two major end products of the Increment Plan development and management process are the ETOV Joint Operations Plans and the On-Orbit Operations Summary (OOS). OOSs are high-level plans that provide a summary of system and payload activities information for the entire increment. The ETOV Joint Operations Plans provide the detailed definition of operations for the period of joint operations described at a high-level in the OOS.
Both the ETOV Joint Operations Plans and the OOSs are provided to the IOP for global access. Other planning data is provided to the IOP as necessary in support of these products and the planning process in general. The IOP and the data sets are described in Section 6.5.
DCN
)Planning Groundrules and Constraints (GR&Cs) will be developed and will be of two types: generic GR&Cs, discussed in Section 3.2.1, which are independent of a specific increment, and Increment Specific GR&Cs. The Generic Planning GR&Cs include rules for crew scheduling, resource distribution and management, Extravehicular Activity (EVA) planning, trajectory planning, robotics operations planning, and integrated and ETOV joint operations. Increment Specific Planning GR&Cs include specific resource distribution decisions determined in accordance with the resource allocations in the IDRD.
All planning data, to include activity requirements, planning groundrules and constraints, and planning product data, are contained in a single integrated planning database. The International Execute Planning Team (IEPT) develops and maintains the integrated database throughout the increment plan development and management process.
DCN
)A planning product overview depicting the relationship of the OOSs, ETOV Joint Operations Plans, and the ETOV visits during an increment is provided in Figure 3.2.21, Pre-Increment Planning Product Overview.
SSP 50200-08 07 November 2003
3-3
Figure 3.2.2-1 PRE-INcrement Planning Product Overview Increment Planning Process Description
DCN
DCN
)Presented at a high-level, the increment planning development and management process is comprised of the following sequence of activities. All IEPT activities defined in the following sequence are to be performed in accordance with the integrated planning process agreed to by all Partners and documented in the ExPCP controlled SSP 50501, Pre-Increment Execute Planning Process Definition, Generic document.
| A. | The IEPT reviews the increment constraints and requirements contained in the IDRD and other planning initialization data. From this information, the IEPT develops Increment Specific Planning GR&Cs. |
| B. | Using the GR&Cs, each ISS element planning function develops the Segment Plan Increment OOS that includes systems and payloads. Each of these plans represents that ISS elements planning function’s proposal for operations and provides input to the integrated OOS. |
| SSP 50200-08 | 07 November 2003 |
Revision B
3-7
| C. | The IEPT, under the leadership of the Lead Operations Planner (LOP) (SSCC representative),develops the Integrated Systems OOS based on the plans provided by each ISS element planning function and identifies the resources available for payload operations. |
| D. | The IEPT, in coordination with the ETOV planning function, develops the ETOV Joint Operations Plans, and planning rules. |
| E. | The IEPT, under the leadership of the Lead Payload Planner (POIC representative), determines the distribution of resources available for payloads across ISS elements. Each ISS element planning function refines its payload operations plan based on these resource distributions. |
| F. | Each element planning function develops its element-specific OOS. The element payload activities in this OOS are based on the element payload resource distribution. |
| G. | The IEPT, under the leadership of the Lead Payload Planner (POIC representative), develops the Integrated Payload OOS based on the element-specific OOSs and element inputs to the Integrated Payload OOS. |
| H. | The Marshall Space Flight Center (MSFC) Payload Operations Director (POD) approves the Integrated Payload OOS. |
| I. | The IEPT, under the leadership of the Lead Operations Planner (SSCC representative), integrates the systems and payload OOSs to produce the Integrated Systems and Payload OOS. |