The file's text, extracted by GovTribe without its formatting.
80JSC019R0023 SECTION M
HUMAN SPACE FLIGHT TECHNICAL INTEGRATION CONTRACT
National Aeronautics and Space Administration Lyndon B. Johnson Space Center 2101 NASA Parkway Houston, Texas 77058-3696
Reply to Attn of: BG-19-193
To: All Prospective Offerors
From: BG/Contracting Officer
Subject: Final Request for Proposal (RFP) 80JSC019R0023, Human Space Flight Technical Integration Contract (HSFTIC)
The National Aeronautics and Space Administration (NASA), Lyndon B. Johnson Space Center (JSC), is hereby issuing the Final RFP for qualified firms that meet the classification described below for HSFTIC.
Offerors are advised to read all the Final RFP requirements contained in the RFP. The following information should be considered in proposal preparation:
ACQUISITION STRUCTURE:
The HSFTIC is a single-award Cost Plus Award Fee/Incentive Fee contract with International Space Station (ISS), Orion, and Gateway, and includes Indefinite Delivery Indefinite Quantity task orders which apply to the mission and program integration services for the ISS Program, Orion Program, and Gateway Program with the potential for supporting additional NASA Human Space Flight Programs and Projects. As stated in Industry Day, prospective Offerors are encouraged to propose solutions that effectively and efficiently execute the requirements across the multiple Human Space Flight Programs.
The HSFTIC has been assigned the North American Industry Classification System code 541715, with a size standard of 1,250 employees.
| Anticipated Dates |
| Duration |
| Contractual Coverage |
| 08/02/2020 – 09/30/2020 |
| 60-days |
| Phase-In |
| 10/01/2020 - 09/30/2022 |
| 2-years |
| Base Period |
| 10/01/2022 – 09/30/2023 |
| 1-year |
| Option 1 |
| 10/01/2023 – 09/30/2024 |
| 1-year |
| Option 2 |
| 10/01/2024 – 09/30/2025 |
| 1-year |
| Option 3 |
BG-SEB-FY19-193 2
The following are separately priced option periods for SOW 10.0, Cost Estimating. For contracting purposes:
| Anticipated Dates |
| Duration |
| Contractual Coverage |
| SOW |
| 10/01/2020 – 09/30/2021 |
| 1-year |
| Year 1 |
| 10.0 |
| 10/01/2021 - 09/30/2022 |
| 1-year |
| Year 2 |
| 10.0 |
| 10/01/2022 – 09/30/2023 |
| 1-year |
| Year 3 |
| 10.0 |
| 10/01/2023 – 09/30/2024 |
| 1-year |
| Year 4 |
| 10.0 |
| 10/01/2024 – 09/30/2025 |
| 1-year |
| Year 5 |
| 10.0 |
Throughout the Final RFP, the Government shall use “TBD” to designate a Government Fill-in and “Offeror fill-in (OFI)” to designate a section to be filled-in by the Offeror. The Government will update Clause B.4, “CONTRACT FUNDING” prior to contract award.
The Government will review the Offerors’ information in the following on-line databases during the evaluation process. This list is not all-inclusive:
· System for Award Management (SAM): https://www.sam.gov/
· The Office of Federal Contract Compliance Programs’ (OFCCP) National Pre-award Registry: http://www.dol-esa.gov/preaward/ (Note: The Contracting Officer will request clearance from the appropriate OFCCP regional office before award of any contract, and all first-tier subcontracts, of $10 million or more in accordance with Federal Acquisition Regulation (FAR) 22.805.)
· VETS-4212 Federal Contractor Reporting: https://vets4212.dol.gov/vets4212/ (Note: Before a contract can be awarded, the Contracting Officer will verify that the Offerors in the Competitive Range, or the apparent Successful Offeror only has submitted their VETS-4212 report).
· Contract Performance Assessment Reporting System (CPARS): https://www.cpars.gov/ppirs/ppirsmain.htm
ORGANIZATIONAL CONFLICTS OF INTEREST (OCI)
HSFTIC supports current and future programs and projects performed across the agency. This acquisition may give rise to a potential OCI. Accordingly, the attention of prospective Offeror is invited to FAR Subpart 9.5 – Organizational Conflicts of Interest. The Contracting Officer shall not award a contract until NASA determines any conflict of interest is reasonably mitigated. The Contracting Officer has the sole authority to determine whether an OCI exists and to determine whether the OCI has been reasonably mitigated.
In accordance with the instructions in Section L.16.6, “Responsibility Considerations” for DRD- HSFTIC-PM-09, ensure you describe in detail how you will identify and manage OCI issues.
BG-SEB-FY19-193 3
ELECTRONIC ACCESS:
An electronic Technical Reference Library (TRL) is available for various types of historical data and other pertinent applicable documents and information regarding this procurement and its requirements. The HSFTIC electronic library is available at https://procurement.jsc.nasa.gov/hsftic/ and at FBO.Gov. To promote competition and understanding of the RFP, Offerors are encouraged to suggest any additional information they would like to see made available in the TRL.
FBO is moving to beta.SAM.gov starting on November 8, 2019. Until then, FBO.gov remains the authoritative source for Federal Business Opportunities. Once FBO has fully transitioned, you will be directed to beta.SAM.gov for contracting opportunities. Visit beta.SAM.gov today to preview new features like saved searches and the ability to follow notices. For more information, please visit the beta.SAM.gov learning center.
Please note that Section L.9, JSC 52.215-108 Proposal Marking and Delivery Through Federal Business Opportunities (FBO) (Aug 2018) (JSC Procurement Instruction) of the HSFTIC RFP is subject to change once Beta.Sam.gov becomes fully operational.
PROPOSAL SUBMISSIONS:
Proposal submitted in response to this solicitation shall include the Offer’s name and complete address, including street, city, state, and 9-digit zip code. The telephone and fax numbers and e-mail address of the contact person responsible for the proposal shall be included in the proposal.
Offerors are required to have a Commercial and Government Entity (CAGE) code that matches the corporate address submitted with its proposal. Insert the company’s CAGE code in Block 15A on Standard Form 33. Block 15A will appear next to the name and address of the Offeror.
Only one proposal per Offeror will accepted. If more than one proposal is received from a single Offeror, the Government will accept the last proposal received before the submission deadline. All other versions will be regarded as unacceptable. Additionally, all parties to a Joint Venture must sign the Standard Form 33.
Offerors must deliver their proposal in accordance with Section L.9, Proposal Marking and Delivery Through Beta.SAM.gov.
Proposals are due at NASA JSC no later than 1:00 p.m. Eastern/12:00 p.m. (noon) Central Time on December 11, 2019.
Proposals that arrive after the prescribed time for receipt of proposals will be considered late and treated in accordance with FAR clause 52.215-1, “Instructions to Offerors-Competitive Acquisitions.”
COMMUNICATION WITH INDUSTRY:
In order for answers and additional TRL information to be obtained and disseminated in a timely manner, questions and suggested TRL information must be submitted in writing by November 22, 2019, 1:00 p.m. Eastern/12:00 p.m. (noon) Central Time. The Government will not respond to questions or TRL requests for information that are marked as containing confidential, proprietary, competition sensitive, or business information.
BG-SEB-FY19-193 4
Anonymous questions to the Contracting Officer are no longer allowable as of the release of this RFP. The anonymous question link on the acquisition website has been removed. Therefore, all questions shall be submitted in writing to the Contracting Officer at jsc-hsftic@mail.nasa.gov. Please title the e-mail “Questions – HSFTIC RFP” (or “Questions HSFTIC TRL”) in the subject block. The Government will provide verification that questions have been received via email.
All questions and answers in response to the RFP may be found on the FBO website at: https://www.fbo.gov/ until November 8, 2019. Thereafter, all questions and answers to the RFP may be found on Beta.SAM.gov.
The RFP does not commit the Government to award a contract nor does it obligate the Government for costs incurred in the preparation and submittal of proposals in anticipation of a contract in response to this RFP.
Offerors are responsible for monitoring the FBO website and HSFTIC website, (https://procurement.jsc.nasa.gov/hsftic/), for any amendments to the Final RFP, additional information, and changes to the schedule. Information will be posted as it becomes publicly available.
Enclosed with this letter is a Document Change Log which documents notable changes made to the RFP since the release of the Draft RFP. Although every effort was made to include even minor changes, there may be some edits that are not recorded in the log. Therefore, all potential Offerors are advised to carefully read the entire RFP. In the event of a discrepancy between this letter and HSFTIC Final RFP, the HSFTIC Final RFP shall govern.
Thank you for your participation and interest in this procurement.
La Toy J. Jones Contracting Officer
SECTION A -TABLE OF CONTENTS
SECTION A - AWARD FORM, CONTENTS, AND STRUCTURE
| CONTRACT COVER PAGE (AWARD FORM) | A-1 |
| TABLE OF CONTENTS – HSFTIC CONTRACT STRUCTURE | A-2 |
PART I – THE SCHEDULE
SECTION B - SUPPLIES OR SERVICES AND PRICE/COSTS
| B.1 | LISTING OF CLAUSES INCORPORATED BY REFERENCE | B-1 |
| B.2 | FIRM-FIXED PRICE PHASE-IN, ESTIMATED COST AND FEE | B-1 |
| ARRANGEMENT | |
| B.3 | IDIQ MINIMUM AND MAXIMUM ORDERING LIMITS (JPI 52.216-90) | B-3 |
| B.4 | CONTRACT FUNDING (NFS 1852.232-81) | B-4 |
| B.5 | FULLY BURDENED RATE TABLE FOR PRICING COST REIMBURSABLE | |
| (CR) IDIQ TASK ORDERS | B-4 |
SECTION C - STATEMENT OF WORK C-1
SECTION D - PACKAGING AND MARKING
| D.1 | LISTING OF CLAUSES INCORPORATED BY REFERENCE | D-1 |
| D.2 | IDENTIFICATION AND MARKING OF GOVERNMENT EQUIPMENT | |
| (NFS 1852.245-74) | D-1 |
SECTION E - INSPECTION AND ACCEPTANCE
E.1 LISTING OF CLAUSES INCORPORATED BY REFERENCE E-1
SECTION F - DELIVERIES OR PERFORMANCE
| F.1 | LISTING OF CLAUSES INCORPORATED BY REFERENCE | F-1 |
| F.2 | PERIOD OF PERFORMANCE | F-1 |
| F.3 | OPTION TO EXTEND PERIOD OF PERFORMANCE | F-1 |
| F.3.A | OPTION TO EXTEND PERIOD OF PERFORMANCE FOR COST | F-3 |
| ESTIMATING – SOW 10.0 | |
| F.4 | PLACE OF PERFORMANCE | F-3 |
| F.5 | SHIPPING INSTRUCTIONS | F-3 |
| F.6 | PHASE-IN AND CLOSE-OUT | F-4 |
SECTION G - CONTRACT ADMINISTRATION DATA
| G.1 | LISTING OF CLAUSES INCORPORATED BY REFERENCE | G-1 | |
| G.2 | AWARD FEE FOR SERVICE CONTRACTS (NFS 1852.216-76) | G-1 | |
| G.3 | SUBMISSION OF VOUCHERS/INVOICES FOR PAYMENT (NFS 1852.232-80) | G-3 | |
| G.4 | INSTALLATION-ACCOUNTABLE GOVERNMENT PROPERTY | G-4 | |
| (NFS 1852.245-71) ALTERNATE I | | |
| G.5 | FINANCIAL REPORTING OF NASA PROPERTY IN THE CUSTODY OF | G-6 | |
| CONTRACTORS (NFS 1852.245-73) | | |
| G.6 | | LIST OF GOVERNMENT PROPERTY FURNISHED PURSUANT TO FAR | G-8 |
| 52.245-1 (NFS 1852.245-76) | | |
| G.7 | NASA SECURITY PROGRAM AND IDENTIFICATION OF EMPLOYEES | G-8 | |
| (JSC 52.204-92) | | |
| G.8 | INFORMATION INCIDENTAL TO CONTRACT ADMINISTRATION | G-10 | |
SECTION H - SPECIAL CONTRACT REQUIREMENTS
| H.1 | LISTING OF CLAUSES INCORPORATED BY REFERENCE | H-1 |
| H.2 | LIMITATION OF FUTURE CONTRACTING (NFS 1852.209-71) | H-1 |
| H.3 | TASK ORDERING PROCEDURE (NFS 1852.216-80) | H-2 |
| H.4 | EXPORT LICENSES (NFS 1852.225-70) ALTERNATE I | H-3 |
| H.5 | KEY PERSONNEL AND FACILITIES (NFS 1852.235-71) | H-4 |
| H.5.A | PROGRAM MANAGER AND DEPUTY PROGRAM MANAGER | H-5 |
| REPLACEMENT(S) | |
| H.6 | ENVIRONMENTAL AND ENERGY CONSERVATION REQUIREMENTS | H-5 |
| (JPI 52.223-94) | |
| H.7 | ADMINISTRATIVE LEAVE (JSC 52.242-94) | H-8 |
| H.8 | REPRESENTATIONS, CERTIFICATIONS, AND OTHER STATEMENTS OF OFFEROR | H-8 |
| H.9 | ASSOCIATE CONTRACTOR AGREEMENT FOR INTERNATIONAL | H-9 |
| SPACE STATION (ISS) | |
| H.10 | ADDITIONAL EXPORT CONTROL REQUIREMENTS | H-12 |
| H.11 | RE-PROCUREMENT DATA PACKAGE | H-15 |
| H.12 | EVIDENCE OF COMPLETION MATRIX | H-16 |
| H.13 | UNDERLIMIT CHANGES – SPECIAL PROVISION FOR CONTRACT | H-16 |
| CHANGES | |
| H.14 | UNIDENTIFIED DATA CONTAINING RESTRICTIVE OR LIMITING MARKINGS | H-16 |
| H.15 | IDENTIFICATION AND REPRESENTATION OF LIMITED RIGHTS DATA AND RESTRICTED COMPUTER SOFTWARE (PRE-AWARD) | H-17 |
| H.16 | IDENTIFICATION AND REPRESENTATION OF LIMITED RIGHTS DATA AND RESTRICTED COMPUTER SOFTWARE (POST AWARD) | H-19 |
PART II – CONTRACT CLAUSES
SECTION I - CONTRACT CLAUSES
| I.1 | LISTING OF CLAUSES INCORPORATED BY REFERENCE | I-1 |
| I.2 | APPROVAL OF CONTRACT (FAR 52.204-1) | I-5 |
| I.3 | PROHIBITION ON CONTRACTING FOR CERTAIN | I-6 |
| TELECOMMUNICATIONS AND VIDEO SURVEILLANCE SERVICES OR EQUIPMENT (FAR 52.204-25) | |
| I.4 | SUBCONTRACTOR CERTIFIED COST OR PRICING DATA— | I-8 |
| MODIFICATIONS (DEVIATION 18-04) (FAR 52.215-13) | |
| I.5 | ORDERING (FAR 52.216-18) | I-9 |
| I.6 | ORDER LIMITATIONS (FAR 52.216-19) | I-9 |
| I.7 | INDEFINITE QUANTITY (FAR 52.216-22) | I-10 |
| I.8 | OPTION TO EXTEND THE TERM OF THE CONTRACT (FAR 52.217-9) | I-10 |
| I.9 | NOTICE OF TOTAL SMALL BUSINESS SET-ASIDE (DEVIATION 19-02) (FAR 52.219-6) | I-11 |
| I.10 | LIMITATIONS ON SUBCONTRACTING (DEVIATION 19-02) (FAR 52.219-14) | I-12 |
| I.11 | EQUAL OPPORTUNITY FOR VETERANS (FAR 52.222-35) | I-13 |
| I.12 | EQUAL OPPORTUNITY FOR WORKERS WITH DISABILITIES | I-14 |
| (FAR 52.222-36) | |
| I.13 | STATEMENT OF EQUIVALENT RATES FOR FEDERAL HIRES | I-14 |
| (FAR 52.222-42) | |
| I.14 | COST ACCOUNTING STANDARDS (FAR 52.230-2) | I-15 |
| I.15 | CLAUSES INCORPORATED BY REFERENCE (FAR 52.252-2) | I-17 |
| I.16 | AUTHORIZED DEVIATIONS IN CLAUSES (FAR 52.252-6) | I-17 |
| I.17 | TECHNICAL INFORMATION RELEASES AND PUBLICATIONS | I-17 |
| I.18 | DATA RIGHTS NOTICE | I-18 |
| I.19 | ACCESS TO CONTRACTOR DATA | I-18 |
PART III – LIST OF DOCUMENTS, EXHIBITS, AND OTHER ATTACHMENTS
SECTION J - LIST OF ATTACHMENTS
| TABLE OF CONTENTS | J-1 | | |
| ATTACHMENT J-1: DATA REQUIREMENTS LIST AND DATA REQUIREMENTS | J-A1-1 | | |
| | DESCRIPTIONS (DRDS) | |
| ATTACHMENT J-2: KEY TERMS | J-A2-1 | | |
| ATTACHMENT J-3: ACRONYM LIST | J-A3-1 | | |
| ATTACHMENT J-4: APPLICABLE AND REFERENCE DOCUMENTS LIST | J-A4-1 | | |
| ATTACHMENT J-5: STANDARD LABOR CATEGORIES | J-A5-1 | | |
| ATTACHMENT J-6: CONTRACT SURVEILLANCE PLAN | J-A6-1 | | |
| ATTACHMENT J-7: MEETING SERVICES | J-A7-1 | | |
| ATTACHMENT J-8: CONFERENCE FACILITIES MANAGEMENT | J-A8-1 | | |
| ATTACHMENT J-9: ORGANIZATIONAL CONFLICT OF INTEREST (OCI) | J-A9-1 | | |
| | | AVOIDANCE PLAN |
| ATTACHMENT J-10: TOTAL COMPENSATION PLAN | J-A10-1 | | |
| ATTACHMENT J-11: AWARD FEE AND INCENTIVE FEE EVALUATION PLAN | J-A11-1 | | |
| ATTACHMENT J-12: LIST OF INSTALLATION ACCOUNTABLE GOVERNMENT PROPERTY AND GOVERNMENT FURNISHED PROPERTY | J-A12-1 | | |
| ATTACHMENT J-13: LIST OF GOVERNMENT FURNISHED DATA | J-A13-1 | | |
| ATTACHMENT J-14: SAFETY AND HEALTH PLAN | J-A14-1 | | |
| ATTACHMENT J-15: PROGRAM MANAGEMENT PLAN | J-A15-1 | | |
| ATTACHMENT J-16: CONTRACT PHASE-IN PLAN | J-A16-1 | | |
| ATTACHMENT J-17: SECURITY REQUIREMENTS | J-A17-1 | | |
| ATTACHMENT J-18: DEPARTMENT OF LABOR WAGE DETERMINATION | J-A18-1 | | |
PART IV – REPRESENTATIONS AND INSTRUCTIONS
SECTION K - REPRESENTATIONS, CERTIFICATIONS AND OTHER STATEMENTS OF OFFERORS
| K.1 | LISTING OF CLAUSES INCORPORATED BY REFERENCE | K-1 |
| K.2 | ANNUAL REPRESENTATIONS AND CERTIFICATIONS (FAR 52.204-8) | K-1 |
| K.3 | REPRESENTATION REGARDING CERTAIN TELECOMMUNICATIONS | K-6 |
| AND VIDEO SURVEILLANCE SERVICES OR EQUIPMENT (FAR 52.204-24) | |
| K.4 | INFORMATION REGARDING RESPONSIBILITY MATTERS | |
| (FAR 52.209-7) | K-7 |
| K.5 | CERTIFICATION REGARDING TAX MATTERS (FAR 52.209-12) | K-9 |
| K.6 | VIOLATION OF ARMS CONTROL TREATIES OR AGREEMENTS— | K-9 |
| CERTIFICATION (FAR 52.209-13) | |
| K.7 | RESTRICTION ON FUNDING ACTIVITY WITH CHINA – | K-11 |
| REPRESENTATION (DEVIATION) (NFS 1852.225-72) | |
SECTION L – INSTRUCTIONS, CONDITIONS, AND NOTICES TO OFFERORS
| L.1 | LISTING OF PROVISIONS INCORPORATED BY REFERENCE | L-1 |
| L.2 | REQUIREMENTS FOR CERTIFIED COST OR PRICING DATA AND DATA | L-2 |
| OTHER THAN CERTIFIED COST OR PRICING DATA (ALT II) (ALT IV) (FAR 52.215-20) | |
| L.3 | TYPE OF CONTRACT (FAR 52.216-1) | L-2 |
| L.4 | SERVICE OF PROTEST (FAR 52.233-2) | L-2 |
| L.5 | SOLICITATION PROVISIONS INCORPORATED BY REFERENCE | L-3 |
| (FAR 52.252-1) | |
| L.6 | AUTHORIZED DEVIATIONS IN PROVISIONS (FAR 52.252-5) | L-3 |
| L.7 | DETERMINATION OF COMPENSATION REASONABLENESS | |
| (NFS 1852.231-71) | L-3 |
| L.8 | PROTESTS TO NASA (NFS 1852.233-70) | L-4 |
| L.9 | PROPOSAL MARKING AND DELIVERY THROUGH FEDERAL BUSINESS | L-5 |
| OPPORTUNITIES (FBO) (JSC 52.215-108) | |
| L.10 | AVAILABILITY OF SPECIFICATIONS (JSC 52.215-123) | L-5 |
| L.11 | COMMUNICATIONS REGARDING THIS SOLICITATION (JSC 52.215-124) | L-6 |
| L.12 | OFFEROR ACCEPTANCE PERIOD (JSC 52.215-125) | L-6 |
| L.13 | PERIOD COVERED BY PROCUREMENT (JSC 52.215-126) | L-7 |
| L.14 | ACCOUNTING FOR LEASE COSTS | L-7 |
| L.15 | SAFETY AND HEALTH PLAN | L-8 |
| L.16 | INSTRUCTIONS FOR PROPOSAL PREPARATION | L-9 |
| L.16.1 | INTRODUCTION | L-9 |
| L.16.1.1 GENERAL INSTRUCTIONS FOR PREPARATION OF PROPOSAL | L-9 | |
| (JSC 52.215-107) | |
| L.16.2 | PROPOSAL ARRANGEMENT, PAGE LIMITATIONS, AND DUE DATES | L-10 |
| L.16.2.1 PROPOSAL FORMATTING INSTRUCTIONS (JSC 52.215-113) | L-12 | |
| L.16.3 | VOLUME I - MISSION SUITABILITY (FACTOR 1) | L-13 |
| L.16.3.1 TECHNICAL APPROACH, MISSION SUITABILITY (SUB-FACTOR A) | L-14 | |
| L.16.3.2 MANAGEMENT APPROACH, MISSION SUITABILITY (SUB-FACTOR B) | L-15 | |
| L.16.3.3 CONTRACT PHASE-IN APPROACH, MISSION SUITABILITY | L-17 | |
| (SUB-FACTOR C) | |
| L.16.4 | VOLUME II - PAST PERFORMANCE (FACTOR 2) | L-18 |
| L.16.4.1 PAST PERFORMANCE INFORMATION (JSC 52.215-114) | L-18 | |
| L.16.4.2 KEY PERSONNEL RESUMES | L-20 | |
| L.16.5 | VOLUME III, COST AND PRICE (FACTOR 3) | L-21 |
| L.16.6 | VOLUME IV, RESPONSIBILITY CONSIDERATIONS | L-33 |
| L.16.7 VOLUME V, MODEL CONTRACT | L-37 | |
SECTION L – LIST OF ATTACHMENTS
| Attachment L-1 PAST PERFORMANCE INFORMATION FORMS | L-39 |
| Attachment L-2 PAST PERFORMANCE CONSENT LETTERS | L-42 |
| Attachment L-3 PAST PERFORMANCE QUESTIONAIRRE | L-43 |
| Attachment L-4 KEY PERSONNEL RESUMES | L-52 |
| Attachment L-5 SAMPLE LETTER OF COMMITMENT | L-53 |
| Attachment L-6 EXCEL PRICING MODULE (EPM) TEMPLATE WORKBOOK | L-54 |
| Attachment L-7 COST ESTIMATING TEMPLATE WORKBOOK | L-55 |
| Attachment L-8 PREAWARD SURVEY OF PROSPECTIVE CONTRACTOR | L-56 |
ACCOUNTING SYSTEM (SF 1408 – REV 1/2014)
SECTION M – EVALUATION FACTORS FOR AWARD TO OFFERORS
| M.1 | LISTING OF PROVISIONS INCORPORATED BY REFERENCE | M-1 | |
| M.2 | AWARD WITHOUT DISCUSSIONS | M-1 | |
| M.3 | EVALUATION FACTORS AND CRITERIA | M-1 | |
| M.3.1 | VOLUME I - MISSION SUITABILITY (FACTOR 1) | M-2 | |
| M.3.1.1 TECHNICAL APPROACH, MISSION SUITABILITY (SUB-FACTOR A) | M-3 | | |
| M.3.1.2 MANAGEMENT APPROACH, MISSION SUITABILITY (SUB-FACTOR B) | M-3 | | |
| M.3.1.3 CONTRACTOR PHASE-IN APPROACH, MISSION SUITABILITY | M-4 | | |
| (SUB-FACTOR C) | | |
| M.3.2 | VOLUME II - PAST PERFORMANCE (FACTOR 2) | M-4 | |
| M.3.2.1 PAST PERFORMANCE EVALUATION (JSC 52.215-115) | M-4 | | |
| M.3.3 | VOLUME III, COST AND PRICE FACTOR (FACTOR 3) | M-8 | |
| M.3.4 | VOLUME IV, RESPONSIBILITY CONSIDERATIONS | M-10 | |
| M.3.5 | VOLUME V, MODEL CONTRACT | | M-12 |
80JSC019R0023 SECTION A
HUMAN SPACE FLIGHT TECHNICAL INTEGRATION CONTRACT (HSFTIC)
A-5
PART I – THE SCHEDULE
SECTION B – SUPPLIES OR SERVICES AND PRICE/COSTS
B.1 LISTING OF CLAUSES INCORPORATED BY REFERENCE
I. FEDERAL ACQUISITION REGULATION (48 CFR CHAPTER 1)
CLAUSE
NUMBER
DATE
TITLE
None included by reference
II. NASA FAR SUPPLEMENT (48 CFR CHAPTER 18) CLAUSES
CLAUSE
NUMBER
DATE
TITLE
None included by reference
(End of clause)
B.2 FIRM-FIXED PRICE PHASE-IN, ESTIMATED COST AND FEE ARRANGEMENT
(a) The total firm fixed-price of the phase-in is $[OFI]. The contract phase-in period is August 2, 2020 through September 30, 2020.
(b) Through the Base period, the estimated cost of this contract is $[OFI]. The maximum available award fee is $[OFI]. The award fee earned is $TBD. The target incentive fee available is $[OFI]. The incentive fee earned is $TBD. Total estimated cost, maximum award fee, and target incentive fee is $[OFI].
(c) The total Cost Estimating - SOW 10.0 value is $[OFI] for Contract Year 1 period October 1, 2020 through September 30, 2021.
(d) The total contract value is as follows:
Table B-1: Base Period
| FFP |
| Estimated Cost (1) |
| Maximum Award Fee Available (2) |
| Award Fee Earned (3) |
| Target Incentive Fee Available (4) |
| Incentive Fee |
Earned (5) Total Contract Value
FFP Phase-In
| $[OFI] |
| N/A |
| N/A |
| N/A |
| N/A |
| N/A |
| $[OFI] |
| Cost Reimbursable - (Baseline effort) (1) |
| N/A |
| $[OFI] |
| $[OFI] |
| TBD |
| $[OFI] |
| TBD |
| $[OFI] |
| Cost Reimbursable - IDIQ (6) |
| N/A |
| $[OFI] |
| $[OFI] |
| TBD |
| $[OFI] |
| TBD |
| TBD |
| Cost Estimating - SOW 10.0 (CY1) |
| N/A |
| $[OFI] |
| $[OFI] |
| TBD |
| $[OFI] |
| TBD |
| $[OFI] |
| Total Contract Value |
| $[OFI] |
| $[OFI] |
| $[OFI] |
| TBD |
| $[OFI] |
| TBD |
| $[OFI] |
NOTE: The values in Table B-1 will be updated as Award Fee and Incentive Fee are earned, IDIQ is ordered, and with the exercise of options. Cost Estimating SOW 10.0 for Year 2 is a separately priced option and will be added to the Base period when exercised (see Section F, Clause F.3.A).
1 The baseline effort shall include closeout costs.
2Award fee in this table is the total amount available for work in the contract baseline effort and any task orders that have been issued.
3The award fee will be determined in accordance with Attachment J-11, Award Fee and Incentive Fee Evaluation Plan for the Human Space Flight Technical Integration Contract.
4Incentive Fee in this table is the target incentive fee available for the work in the contract baseline effort and any task orders that have been issued.
5The incentive fee will be determined in accordance with Section J, Attachment J-11, Award Fee and Incentive Fee Evaluation Plan for the Human Space Flight Technical Integration Contract.
The Incentive Fee Earned is calculated as the Target Incentive Fee and the Incentive Fee shared (based on overrun/underrun) after each evaluation period. The incentive fee will be determined in accordance with Section J, Attachment J-11, Award Fee and Incentive Fee Evaluation Plan for the Human Space Flight Technical Integration Contract.
6Amounts for estimated cost, award fee, and incentive fee for cost reimbursable IDIQ task orders issued will be updated unilaterally as these IDIQ task orders are issued and amended, or at the end of each evaluation period.
Table B-2: Total Estimated Cost
| FFP |
| Estimated Cost |
| Maximum Award Fee Available |
| Target Incentive Fee |
| The Total Estimated Cost, Max AF, Target IF |
| FFP Phase-In |
| $[OFI] |
| N/A |
| N/A |
| N/A |
| $[OFI] |
| Base Period:(CY1 and 2) |
| N/A |
| $[OFI] |
| $[OFI] |
| $[OFI] |
| $[OFI] |
| SOW 10.0: Base Period (CY 1) |
| N/A |
| $[OFI] |
| $[OFI] |
| $[OFI] |
| $[OFI] |
| SOW 10.0:Option 1 (CY2)* |
| N/A |
| $[OFI] |
| $[OFI] |
| $[OFI] |
| $[OFI] |
| Option 1 (CY 3) |
| N/A |
| $[OFI] |
| $[OFI] |
| $[OFI] |
| $[OFI] |
| SOW 10.0: Option 2 (CY3) |
| N/A |
| $[OFI] |
| $[OFI] |
| $[OFI] |
| $[OFI] |
| Option 2 (CY 4) |
| N/A |
| $[OFI] |
| $[OFI] |
| $[OFI] |
| $[OFI] |
| SOW 10.0: Option 3 (CY4) |
| N/A |
| $[OFI] |
| $[OFI] |
| $[OFI] |
| $[OFI] |
| Option 3 (CY 5) |
| N/A |
| $[OFI] |
| $[OFI] |
| $[OFI] |
| $[OFI] |
SOW 10.0:Option 4 (CY 5
| N/A |
| $[OFI] |
| $[OFI] |
| $[OFI] |
| $[OFI] |
H.13 Underlimit Pool Value 10/1/2020 – 9/30/2025
| N/A |
| $[OFI] |
| $[OFI] |
| $[OFI] |
| $10,000,000 |
The Total Estimated Cost, Max AF, Target IF
| $[OFI] |
| $[OFI] |
| $[OFI] |
| $[OFI] |
* SOW 10.0 for Contract Year 2 is a separately priced option and will be added to the Base period when exercised (see Section F, Clause F.3.A).
B.3 JPI 52.216-90 IDIQ MINIMUM AND MAXIMUM ORDERING LIMITS (NOV 2018)
In accordance with FAR 52.216-22, Indefinite Quantity, the contract guaranteed minimum amount* to be ordered under this contract is $100,000 and the contract Not to Exceed (NTE) amount* which may be ordered under this contract is $100,000,000. The Government is not obligated to order more than the minimum specified, but may order up to the NTE amount. The Contractor is obligated to fulfill orders issued, up to the NTE amount within the limits specified in FAR 52.216-19 Order Limitations.
* These values are based on dollars.
B.4 NFS 1852.232-81 CONTRACT FUNDING (JUN 1990)
(a) For purposes of payment of cost, exclusive of fee, in accordance with the Limitation of Funds clause, the total amount allotted by the Government to this contract is $[TBD]. This allotment is for Human Space Flight Technical Integration and covers the following estimated period of performance: October 1, 2020 through [TBD].
(b) An additional amount of $[TBD] is obligated under this contract for payment of fee.
(c) An additional amount of $[TBD] is obligated under this contract for payment of the Firm-Fixed Price phase-in.
B.5 FULLY BURDENED RATE TABLE FOR PRICING COST REIMBURSABLE (CR) IDIQ TASK ORDERS
The purpose of this clause is to set forth the rates to be utilized in the subsequent negotiation of IDIQ task orders in accordance with H.3 Task Ordering Procedure and the Statement of Work (SOW). Pricing of all task orders shall be in accordance with the negotiated fully burdened rates in Table B-3. Under no circumstances shall the rates used to price out task exceed the agreed upon rates in the Table B-3.
The labor, indirect, and fee rates shall be used in establishment of the estimated cost of individual task orders. The labor rates are fully burdened composite team rates (prime and all subcontractors); but exclude prime fee. The indirect cost rates shown at the bottom of the tables shall also be used in negotiation of task orders, whenever applicable.
Table B-3 IDIQ Rate per Hour Table (All labor rates are fully burdened exclusive of fee)
Hourly Rate (Burdened excluding Fee)
| SLC |
| CY1 10/1/20 - 9/30/21 |
| CY2 10/1/21 - 9/30/22 |
| CY3 10/1/22 - 9/30/23 |
| CY4 10/1/23 - 9/30/24 |
| CY5 10/1/24 - 9/30/25 |
| Program Manager |
| $[OFI] |
| $[OFI] |
| $[OFI] |
| $[OFI] |
| $[OFI] |
| Deputy Program Manager |
| $[OFI] |
| $[OFI] |
| $[OFI] |
| $[OFI] |
| $[OFI] |
| Manager |
| $[OFI] |
| $[OFI] |
| $[OFI] |
| $[OFI] |
| $[OFI] |
| Supervisor |
| $[OFI] |
| $[OFI] |
| $[OFI] |
| $[OFI] |
| $[OFI] |
| Engineer V |
| $[OFI] |
| $[OFI] |
| $[OFI] |
| $[OFI] |
| $[OFI] |
| Engineer IV |
| $[OFI] |
| $[OFI] |
| $[OFI] |
| $[OFI] |
| $[OFI] |
| Engineer III |
| $[OFI] |
| $[OFI] |
| $[OFI] |
| $[OFI] |
| $[OFI] |
| Engineer II |
| $[OFI] |
| $[OFI] |
| $[OFI] |
| $[OFI] |
| $[OFI] |
| Engineer I |
| $[OFI] |
| $[OFI] |
| $[OFI] |
| $[OFI] |
| $[OFI] |
| Technical Professional IV |
| $[OFI] |
| $[OFI] |
| $[OFI] |
| $[OFI] |
| $[OFI] |
| Technical Professional III |
| $[OFI] |
| $[OFI] |
| $[OFI] |
| $[OFI] |
| $[OFI] |
| Technical Professional II |
| $[OFI] |
| $[OFI] |
| $[OFI] |
| $[OFI] |
| $[OFI] |
| Technical Professional I |
| $[OFI] |
| $[OFI] |
| $[OFI] |
| $[OFI] |
| $[OFI] |
| IT Professional IV |
| $[OFI] |
| $[OFI] |
| $[OFI] |
| $[OFI] |
| $[OFI] |
| IT Professional III |
| $[OFI] |
| $[OFI] |
| $[OFI] |
| $[OFI] |
| $[OFI] |
| IT Professional II |
| $[OFI] |
| $[OFI] |
| $[OFI] |
| $[OFI] |
| $[OFI] |
| IT Professional I |
| $[OFI] |
| $[OFI] |
| $[OFI] |
| $[OFI] |
| $[OFI] |
| Business Specialist IV |
| $[OFI] |
| $[OFI] |
| $[OFI] |
| $[OFI] |
| $[OFI] |
| Business Specialist III |
| $[OFI] |
| $[OFI] |
| $[OFI] |
| $[OFI] |
| $[OFI] |
| Business Specialist II |
| $[OFI] |
| $[OFI] |
| $[OFI] |
| $[OFI] |
| $[OFI] |
| Business Specialist I |
| $[OFI] |
| $[OFI] |
| $[OFI] |
| $[OFI] |
| $[OFI] |
| Analyst III |
| $[OFI] |
| $[OFI] |
| $[OFI] |
| $[OFI] |
| $[OFI] |
| Analyst II |
| $[OFI] |
| $[OFI] |
| $[OFI] |
| $[OFI] |
| $[OFI] |
| Analyst I |
| $[OFI] |
| $[OFI] |
| $[OFI] |
| $[OFI] |
| $[OFI] |
| Support Specialist |
| $[OFI] |
| $[OFI] |
| $[OFI] |
| $[OFI] |
| $[OFI] |
| Analyst I - Overtime |
| $[OFI] |
| $[OFI] |
| $[OFI] |
| $[OFI] |
| $[OFI] |
| Other (Non-Labor Indirect Rates) |
| $[OFI] |
| $[OFI] |
| $[OFI] |
| $[OFI] |
| $[OFI] |
| Offeror Indirect (s) |
| [OFI] % |
| [OFI] % |
| [OFI] % |
| [OFI] % |
| [OFI] % |
| Maximum Award Fee % |
| [OFI] % |
| [OFI] % |
| [OFI] % |
| [OFI] % |
| [OFI] % |
| Target Incentive Fee % |
| [OFI] % |
| [OFI] % |
| [OFI] % |
| [OFI] % |
| [OFI] % |
80JSC019R0023 SECTION B
HUMAN SPACE FLIGHT TECHNICAL INTEGRATION CONTRACT (HSFTIC)
[END OF SECTION]
B-1
Section C Statement of Work (SOW)
TABLE OF CONTENTS
| 1.0 |
| Program Management and Administration |
| 8 |
| 1.1 |
| ISS Program Management and Administration |
| 9 |
| 1.2 |
| ISS Certification of Flight Readiness (CoFR) |
| 10 |
| 1.3 |
| ISS Risk Management |
| 10 |
| 1.4 |
| ISS Export Control |
| 11 |
| 1.5 |
| ISS Program Schedule Development and Integration |
| 12 |
| 1.6 |
| ISS Meeting Services |
| 13 |
| 1.8 |
| ISS Program Reviews, Boards, Panels |
| 13 |
| 1.9 |
| ISS Special Studies |
| 13 |
| 1.10 |
| ISS Technical Writing |
| 14 |
| 1.11 |
| ISS Mission Assurance and Risk Management Plan |
| 14 |
| 1.12 |
| ISS Quality Management |
| 14 |
| 1.13 |
| ISS Audit and Surveillance |
| 14 |
| 1.14 |
| ISS Lessons Learned |
| 15 |
| 1.15 |
| ISS Document Management |
| 15 |
| 1.16 |
| ISS Organizational Records |
| 15 |
| 1.17 |
| ISS Program Reserved |
| 16 |
| 1.18 |
| ISS Program Reserved |
| 16 |
| 1.19 |
| Orion Program Management and Administration |
| 16 |
| 1.20 |
| Orion Program Risk Management |
| 17 |
| 1.21 |
| Orion Program Export Control |
| 17 |
| 1.22 |
| Orion Program Scheduling |
| 18 |
| 1.23 |
| Orion Program Schedule Management and Assessment |
| 18 |
| 1.24 |
| Orion Meeting Services |
| 19 |
| 1.25 |
| Orion Program Reserved |
| 19 |
| 1.26 |
| Orion Program Reserved |
| 19 |
| 1.27 |
| Gateway Program Management and Administration |
| 20 |
| 1.28 |
| Gateway Program Reviews |
| 20 |
| 1.29 |
| Gateway Program Integration Management |
| 20 |
| 1.30 |
| Gateway Program Work Instructions |
| 20 |
| 1.31 |
| Gateway Certification of Flight Readiness (CoFR) – Reserved |
| 21 |
| 1.32 |
| Gateway Export Control - Reserved |
| 21 |
| 1.33 |
| Gateway Program Scheduling |
| 21 |
| 1.34 |
| Gateway Meeting Services |
| 21 |
| 1.35 |
| Gateway Technical Writing |
| 21 |
| 1.36 |
| Gateway Document Management |
| 22 |
| 1.37 |
| Gateway Program Reviews, Boards, and Panels |
| 22 |
| 1.38 |
| Gateway Program Reserved |
| 22 |
| 1.39 |
| Gateway Program Reserved |
| 22 |
| 1.40 |
| Commercial Crew Program (CCP) Meeting Services, Technical Writing And Mission Support Administration |
| 22 |
| 2.0 |
| Business Management |
| 24 |
| 2.1 |
| ISS Management and Business Administration |
| 24 |
| 2.2 |
| ISS Resources Management |
| 24 |
| 2.3 |
| ISS Program Budget |
| 25 |
| 2.4 |
| ISS Program Property Management |
| 31 |
| 2.5 |
| ISS Conference Facility Management |
| 32 |
| 2.6 |
| ISS Building 4-North and 4-South Facility Management |
| 32 |
| 2.7 |
| ISS Program Reserved |
| 32 |
| 2.8 |
| ISS Program Reserved |
| 32 |
| 2.9 |
| Orion Program Management and Business Administration |
| 32 |
| 2.10 |
| Orion Program Reserved |
| 35 |
| 2.11 |
| Orion Program Reserved |
| 35 |
| 3.0 |
| Configuration Management/Data Management and Integration |
| 36 |
| 3.1 |
| ISS Configuration Management |
| 36 |
| 3.2 |
| ISS Data Management and Integration |
| 39 |
| 3.3 |
| ISS Program Reserved |
| 41 |
| 3.4 |
| ISS Program Reserved |
| 41 |
| 3.5 |
| Orion Program Configuration Management |
| 41 |
| 3.6 |
| Orion Program Data Management |
| 41 |
| 3.7 |
| Orion Program Reserved |
| 42 |
| 3.8 |
| Orion Program Reserved |
| 42 |
| 3.9 |
| Gateway Configuration Management/Data Management and Integration |
| 42 |
| 3.10 |
| Gateway Data Management and Administration and Data Management Integration (DMI) |
| 44 |
| 3.11 |
| Gateway Program Reserved |
| 44 |
| 3.12 |
| Gateway Program Reserved |
| 44 |
| 4.0 |
| Information Technology (IT) |
| 45 |
| 4.1 |
| ISS Program Integration |
| 45 |
| 4.2 |
| ISS IT Management and Administration |
| 45 |
| 4.3 |
| ISS IT Strategic Management |
| 47 |
| 4.4 |
| ISS IT Systems Operations |
| 48 |
| 4.5 |
| ISS Applications Sustaining and Development |
| 49 |
| 4.7 |
| ISS Program Customer Support |
| 52 |
| 4.8 |
| ISS MER IT Support |
| 53 |
| 4.9 |
| ISS Program Reserved |
| 54 |
| 4.10 |
| ISS Program Reserved |
| 54 |
| 4.11 |
| Human Spaceflight International Partner and External Customer Support and Integration |
| 54 |
| 4.12 |
| Orion Program Information Technology (IT) |
| 55 |
| 4.13 |
| Orion Program IT Security |
| 56 |
| 4.14 |
| Orion Program Reserved |
| 56 |
| 4.15 |
| Orion Program Reserved |
| 56 |
| 4.16 |
| Gateway Program Information Technology (IT) |
| 56 |
| 4.17 |
| Gateway IT Management and Administration |
| 57 |
| 4.18 |
| Gateway IT Systems Operations |
| 57 |
| 4.19 |
| Gateway Application Sustaining and Development |
| 58 |
| 4.20 |
| Gateway IT Security |
| 59 |
| 4.21 |
| Gateway Customer Support |
| 59 |
| 4.22 |
| Gateway Program Reserved |
| 59 |
| 4.23 |
| Gateway Program Reserved |
| 59 |
| 5.0 |
| Systems Engineering and Integration (SE&I) |
| 60 |
| 5.1 |
| ISS Program Systems Engineering and Integration (SE&I) |
| 60 |
| 5.2 |
| ISS Program Requirements and Interfaces |
| 60 |
| 5.3 |
| ISS System Performance Analysis and Integration |
| 61 |
| 5.4 |
| ISS External Configuration Analysis Modeling and Mass Properties |
| 63 |
| 5.5 |
| ISS External Volume Configuration (IVC) |
| 64 |
| 5.6 |
| ISS Joint Cargo Certification (JCC) |
| 65 |
| 5.7 |
| ISS Test and Verification Integration |
| 65 |
| 5.9 |
| ISS Visiting Vehicles, IP Element, and Robotic Systems |
| 66 |
| 5.10 |
| ISS Vehicle Office Project Integration Support |
| 68 |
| 5.11 |
| ISS Vehicle Office Work Life Cycles (WLC) Support |
| 68 |
| 5.12 |
| ISS Vehicle Office Support for Payload Facilities, Technology Demonstrations and Commercial Elements |
| 69 |
| 5.13 |
| ISS Vehicle Office Commercial Elements Integration Support |
| 69 |
| 5.14 |
| ISS Vehicle Office Supplier Inventory Specialist Support |
| 70 |
| 5.15 |
| ISS Program Reserved |
| 71 |
| 5.16 |
| ISS Program Reserved |
| 71 |
| 5.17 |
| Orion Program Systems Engineering and Integration (SE&I) |
| 71 |
| 5.18 |
| Orion Program Reserved |
| 80 |
| 5.19 |
| Orion Program Reserved |
| 80 |
| 5.20 |
| Gateway Systems Engineering and Integration (SE&I)/Vehicle Systems Integration (VSI) |
| 81 |
| 5.21 |
| Gateway Program Reserved |
| 83 |
| 5.22 |
| Gateway Program Reserved |
| 83 |
| 6.0 |
| Mission Integration |
| 84 |
| 6.1 |
| ISS Flight Planning |
| 84 |
| 6.2 |
| ISS Generic Groundrules, Requirements, and Constraints (GGR&C) |
| 85 |
| 6.3 |
| ISS Increment/Stage Integration |
| 85 |
| 6.4 |
| ISS On-orbit Intravehicular Activity (IVA) Stowage |
| 86 |
| 6.5 |
| ISS Waste Management (WM) |
| 87 |
| 6.6 |
| ISS Inventory Management System (IMS) |
| 87 |
| 6.8 |
| ISS Crew Provisioning and Housekeeping |
| 89 |
| 6.9 |
| ISS Flight Rule Evaluation |
| 90 |
| 6.10 |
| ISS Flight Operations Documentation |
| 90 |
| 7.1 |
| ISS Unpressurized Cargo Ground Processing |
| 91 |
| 7.2 |
| ISS Mission Evaluation Room and International Space Station Management Center |
| 91 |
| 7.3 |
| ISS Increment Engineer Integration |
| 92 |
| 7.4 |
| ISS Visiting Vehicle Integration and Operations |
| 93 |
| 7.6 |
| ISS Post Mission Process |
| 94 |
| 8.0 |
| Safety and Mission Assurance (S&MA)/Program Risk |
| 95 |
| 8.1 |
| ISS Safety and Health |
| 95 |
| 8.2 |
| ISS Mishap Investigating and Reporting/Corrective Action |
| 95 |
| 8.3 |
| ISS Probabilistic Risk Assessment (PRA) |
| 95 |
| 8.4 |
| ISS Safety Integration |
| 96 |
| 8.5 |
| ISS Increment and Operations Integration |
| 97 |
| 8.6 |
| ISS Problem Analysis Reporting Tool Database |
| 98 |
| 9.0 |
| Program Research and Communication |
| 99 |
| 9.1 |
| ISS Outreach and Research Tracking |
| 99 |
| 9.2 |
| ISS Research Planning |
| 103 |
| 9.3 |
| ISS Research Portfolio Integration |
| 104 |
| 9.4 |
| ISS NASA Payloads Client Service Helpdesk |
| 104 |
| 9.5 |
| ISS Amateur Radio (HAM Radio) Payload Developer |
| 105 |
| 9.6 |
| ISS Program Reserved |
| 105 |
| 9.7 |
| ISS Program Reserved |
| 105 |
| 9.8 |
| Orion Education and Outreach |
| 105 |
| 9.9 |
| Orion Program Reserved |
| 107 |
| 9.10 |
| Orion Program Reserved |
| 107 |
| 10.0 |
| Cost Estimating and Assessments |
| 108 |
| 10.1 |
| ISS Program Cost Estimating |
| 108 |
| 10.2 |
| ISS Program Assessments |
| 108 |
| 10.3 |
| Orion Program Cost Estimating |
| 109 |
| 10.4 |
| Orion Program Assessments |
| 109 |
| 10.5 |
| Gateway Program Cost Estimating |
| 111 |
| 11.0 |
| Indefinite Delivery Indefinite Quantity (IDIQ) Task Ordering |
| 112 |
INTRODUCTION
The Human Space Flight Technical Integration Contract (HSFTIC) provides the National Aeronautics and Space Administration (NASA) with products and services to support mission and program technical integration activities and the necessary infrastructure functions for the International Space Station (ISS) Program, Orion Program, and Gateway Program with the potential for supporting additional Human Space Flight Programs or Projects via the issuance of task orders.
The purpose and mission of the ISS Program is to advance science and technology research, expand human knowledge, inspire and educate the next generation, foster the commercial development of space, and demonstrate capabilities to enable future exploration missions beyond low Earth orbit.
The Orion Program has been tasked by the NASA Administrator to accelerate the return of astronauts to the moon’s surface by 2024. The Orion Program’s environment is dynamic with many moving parts across multiple stages of development, integration, and testing each affected by critical deadlines toward the development of its spacecraft.
The Gateway Program will be an outpost in lunar orbit and will enable the return of astronauts to the surface of the Moon by 2024. The Program is currently in its formulation phase and faced with a host of new challenges and changing requirements as concepts are developed, analyzed and dispositioned. The Gateway Program will be NASA’s subsequent step from low Earth orbit to lunar orbit.
Thorough knowledge and expertise about the Programs will be necessary to perform this contract. The contractor must maintain flexibility and responsiveness to changing requirements across multiple Programs and different priorities while also maintaining performance of activities in the most cost-effective and efficient manner with safety, mission success, and customer satisfaction as priorities.
The contractor is to provide products and services in support of the following:
· Program Management
· Business Management
· Configuration Management and Data Management
· Information Technology
· Systems Engineering and Integration
· Mission Integration
· Operations
· Safety and Mission Assurance/Program Risk
· Program Research and Communication
· Cost Estimating and Assessments
· Indefinite Delivery Indefinite Quantity (IDIQ) Ordering The following Statement Of Work (SOW) defines the tasks to be performed by the contractor. The contractor shall be responsible for the overall successful performance of HSFTIC and provide all necessary resources to meet contract requirements. The contractor shall be responsible for all training and certifications required to accomplish contract requirements. All work completed under this contract shall comply with requirements contained in the applicable documents delineated in Section J, Attachment J-4, Applicable and Reference Documents Lists, Table A. The release of new revisions of applicable and reference documents during the performance of the contract will supersede those defined in Attachment J-4, Table A and Table B, at the start of the contract.
Sections 1.0 through Section 11.0 of the SOW establish requirements for providing mission and program technical integration services described in the SOW and any future task orders issued under this contract. All requirements contained within this SOW are considered to be within the contract baseline effort. Additional services, if required, may be ordered via IDIQ Task Ordering.
The SOW is organized as follows:
· SOW Sections 1.0 through 10.0 are considered to be within the contract baseline effort, these requirements are required on a day-to-day basis to support the ISS, Orion, and Gateway Programs. Performance of these requirements are (generally) required for the entire contract Period of Performance (PoP).
· Section 11.0 contains the specific SOW for discrete tasks authorized under SOW sections 1.0 through 10.0.
· Contract modifications for all SOW sections will be implemented as follows. All contract modifications require Contracting Officer authorization:
· Contract baseline (SOW 1.0 through 10.0) lasting the entire PoP: will be implemented via the Changes Clause or the Special Provision for Contract Changes (Clause H.13)
· Discrete tasks (a specific end date; not continuous): Will be implemented via the Special Provision for Contract Changes (Clause H.13) or as Indefinite Delivery/Indefinite Quantity (IDIQ) Task Orders (TOs). TOs will be authorized per clauses 52.216-90, IDIQ Minimum and Maximum Ordering Limits (Clause B.3) and 1852.216-80, Task Ordering Procedure (Clause H.3)
· Sections noted with RESERVED are to serve as a post-award administrative placeholder for the Contracting Officer.
· Requirements designated as Human Spaceflight apply to the ISS, Orion and Gateway Programs.
· When ISS Program documentation (e.g. SSP documents, Data Requirements Document (DRD), etc.) is referenced in the Orion or Gateway SOW sections, it is intentional. Use of SSP documents for Orion and Gateway is expeditious to the implementation of required support activities for these Programs as their respective program development matures.
| 1.0 |
| PROGRAM MANAGEMENT AND ADMINISTRATION |
In overall performance of contract management and administration of this contract and in carrying out of the SOW, the contractor shall conduct program management, including risk management, in order to develop and deliver the required products and services as defined for HSFTIC. The contractor shall be required to implement the following tasks at the contract level:
| 1.0.1 |
| Technical Direction |
Performance of the work under this contract is subject to the written technical direction of the NASA Contracting Officer’s Representative (COR), who will be specifically appointed by the NASA Contracting Officer (CO) in writing. “Technical direction” means a directive to the contractor that approves approaches, solutions, designs, or refinements; fills in details or otherwise completes the general description of work or documentation items; shifts emphasis among work areas or tasks; or furnishes similar instruction to the contractor. Technical direction includes requiring studies and pursuit of certain lines of inquiry regarding matters within the general tasks and requirements in the contract SOW.
The COR does not have the authority to, and shall not, issue any instructions purporting to be technical direction that:
(1) Constitutes an assignment of additional work outside the Statement of Work;
(2) Constitutes a change as defined in the “Changes” clause (contract Section I) or Underlimit Changes (Clause H.13);
(3) Constitutes a basis for any increase or decrease in the total estimated contract cost, the fixed fee (if any), or the time required for contract performance;
(4) Changes any of the expressed terms, conditions, or specifications of the contract;
(5) Interferes with the contractor’s rights to perform the terms and conditions of the contract.
All technical direction shall be issued in writing by the COR. The contractor shall proceed promptly with the performance of the technical direction duly issued by the COR in the manner prescribed above and within the COR’s authority. If, in the contractor’s opinion, any instruction or direction by the COR falls within any of the categories defined above, the contractor shall not proceed but shall notify the CO in writing within 5 days after receiving it and shall request the CO to either issue an appropriate contract modification within a reasonable time or advise the contractor in writing within 30 days that the instruction or direction is rescinded in its entirety or within the requirements of the contract and does not constitute a change under the “Changes” clause of the contract, and that the contractor should proceed promptly with its performance.
A failure of the contractor and CO to agree that the instruction or direction is both within the requirements of the contract and does not constitute a change under the “Changes” clause, or a failure to agree upon the contract action to be taken with respect to the instruction or direction, shall be subject to the Disputes clause of this contract.
Any action(s) taken by the contractor in response to any direction given by any person other than the CO or the COR shall be at the contractor’s risk.
| 1.0.2 |
| The contractor shall develop, maintain and implement a Management Plan in accordance with Data Requirements Description (DRD) HSFTIC-PM-01, Program Management Plan. |
| 1.0.3 |
| The contractor shall provide a contract Phase-In Plan in accordance with DRD HSFTIC-PM-03, Phase-In Plan. |
| 1.0.4 |
| The contractor shall provide a Contract Close-Out Plan in accordance with DRD HSFTIC-PR-01, Contract Close-Out Plan. |
| 1.0.5 |
| The contractor shall conduct Integrated Management Reviews (IMR) for NASA, and provide integrated management review of the contractor’s overall technical, schedule and cost performance in accordance with DRD HSFTIC-PM-02, Integrated Management Review. |
| 1.0.6 |
| The contractor shall provide performance metrics in accordance with DRD HSFTIC-PM-04, Performance Assessment Plan and Performance Assessment Reports. |
| 1.0.7 |
| The contractor shall provide a SOW Evidence of Completion Matrix in accordance with DRD HSFTIC-PM-11, SOW Evidence of Completion Matrix. |
| 1.0.8 |
| The contractor shall deliver DRD content that is compatible with the NASA Management Information System (MIS). |
| 1.0.9 |
| The contractor shall develop, implement, and deliver annual work plans per DRD HSFTIC-PM-08, Annual Work Plans. |
| 1.1 |
| ISS PROGRAM MANAGEMENT AND ADMINISTRATION |
The contractor shall provide and maintain program management systems, as outlined below, for the planning, organization, control and reporting of all activities required by this contract, to include all outcomes and deliverable products.
| 1.1.1 |
| The contractor shall, in accordance with SAE AS9100, Quality Systems – Aerospace – Model for Quality Assurance in Design, Development, Production, Installation and Servicing, develop and provide work instructions and maintain the ISS Program Master List of work instructions, processes, and procedures in accordance with JPR 1281.5, Document and Data Control, and JWI, 1282.1 Organizational Master List Instructions, and provide administrative functions for work instructions in accordance with SSP 41170, Configuration Management Requirements. |
| 1.2 |
| ISS CERTIFICATION OF FLIGHT READINESS (CoFR) |
The contractor shall provide an auditable approach and statement of flight readiness for the work performed under this contract in accordance with SSP 50108, ISS Program Certification of Flight Readiness Process Document and with DRD HSFTIC-PM-06, Certification of Flight Readiness (CoFR) Implementation Plan.
| 1.2.1 |
| ISS Program CoFR Process: |
For the ISS CoFR process, the contractor shall:
A. Manage ISS Program CoFR reviews.
B. Maintain the ISS Program CoFR schedule and calendar.
C. Develop and distribute CoFR announcement memorandums.
D. Develop and distribute ISS Readiness memoranda for the International Partners and Commercial Vehicles.
E. Maintain CoFR distribution lists.
F. Perform CoFR meeting logistics.
| 1.2.2 |
| The contractor shall track and maintain status of open paper, waivers, CoFR actions and CoFR Exceptions. |
| 1.2.3 |
| The contractor shall implement the CoFR requirements identified in each NASA Control Account Manager (CAM) CoFR implementation plan and in accordance with SSP 50108, ISS Program Certification of Flight Readiness Process Document, to provide for consistent data collection, presentation, and archival of CoFR data. |
| 1.2.4 |
| The contractor shall perform compliance verification audits of each NASA ISS Program Office and ISS Program contractor CoFR Implementation Plans. |
| 1.2.5 |
| The contractor shall integrate CoFR documentation at the ISS Program Office CAM level, for all ISS Program Offices, except Marshall Space Flight Center (MSFC) HP20/Payload and Mission Operations, for presentation at the ISS Program CoFR Reviews. |
| 1.2.6 |
| The contractor shall collect CoFR documentation from every ISS Program Office into a presentation for the ISS Program CoFR Reviews. |
The Risk Management function consists of qualitative and quantitative processes and methodologies.
| 1.3.1 |
| The contractor shall develop, maintain and implement the ISS Program risk management processes and procedures and integrate the identification, quantification, and mitigation of risks across the ISS Program, including the following: |
A. Define, maintain and implement the risk management process.
B. Maintain the ISS Risk Database in accordance with SSP 50175, ISS Risk Management Plan, and NASA Procedural Requirement (NPR) 8000.4, Agency Risk Management Procedural Requirements, integrate all data, and maintain data integrity of the ISS Risk Database and associated linkage with the Management Information System (MIS).
C. Provide training of risk management principles across the ISS Program community.
D. Develop and integrate inputs, resolve discrepancies, and provide risk metrics and Integrated Risk Management Application (IRMA) data packages for the Program Risk Advisory Board (PRAB).
E. Track liens and threats as related to the ISS Risk Database, and provide Program and Project status, including reports from the ISS Risk Database, provide status of functional area risks (CAMs, i.e. Vehicle Office Manager), track changes, and make updates to risks to reflect the current status.
In addition, the contractor shall coordinate liens and threats and facilitate categorization for ISS Vehicle Office risks with the Vehicle Office technical organizations.
F. Identify safety, mission success, cost, and schedule risks and documentation in the ISS Risk Database, identify new risk initiatives, and provide risk guidance, identify issues, and address concerns.
G. Develop and provide ISS risk management techniques in response to NASA Agency risk activities and initiatives including any external/internal audits.
H. Integrate and perform qualitative risk assessments of flights, stages, specific operations, specific configurations, and change requests.
I. Integrate Program-wide risk inputs for the CoFR/Stage Operations Readiness Review (SORR) and resolve discrepancies, provide risk data by flight and stage, and confirm risk acceptance rationale is documented for open CoFR/SORR risk
| 1.4.1 |
| The contractor shall develop, provide, and implement an Export Control Plan (ECP) in accordance with DRD HSFTIC-EC-02, Export Control Plan, and conduct self-audits in accordance with DRD HSFTIC-EC-01, Export Control Audit Results. |
| 1.4.2 |
| The contractor shall assist data originators and Designating Officials with the assessment of ISS Program documentation to determine sensitivity and appropriate markings for export and by interfacing with the JSC Export Services Team to export controlled items. |
| 1.4.3 |
| The contractor shall, in coordination with the JSC Export Services Team, recommend the export classification and export authority (license, exemption or exception) for commodities that they are responsible for exporting on behalf of NASA or that NASA ISS Program will export. |
| 1.4.4 |
| The contractor shall administer and maintain control logs of export activities consistent with the DRD HSFTIC-EC-02, Export Control Plan and associated export compliance requirements. Export control logs shall include as a minimum, commodities classifications, license information, transaction status, compliance activities, and records of process completion for license exceptions or exemptions. |
| 1.5 |
| ISS PROGRAM SCHEDULE DEVELOPMENT AND INTEGRATION |
| 1.5.1 |
| The contractor shall provide overall Program schedule management, analysis, and assessments in accordance with DRD HSFTIC-PC-04, Program Schedules, to support the continued development and operation of the ISS. |
| 1.5.2 |
| The contractor shall integrate schedule milestone requirements with affected Program providers and resolve issues, and identify potential schedule impacts and notify affected performing organizations to ensure timely Program awareness and resolution. |
| 1.5.3 |
| ISS Schedule Management |
A. The contractor shall develop, maintain, and status Program Flight Schedules and Program level activity schedule products (i.e. Quarterly Program Level Presentations for IMPR, CAM level schedules, etc.).
B. The contractor shall perform schedule trade studies or create ad hoc schedules.
C. The contractor shall develop and maintain integrated schedules and project schedules, and report upcoming deliverables and impacts associated with delays.
D. The contractor shall develop and maintain integrated schedules and project schedules, and report the upcoming scheduled deliverables and impacts associated with delays for each Visiting Vehicle.
| 1.5.3.1 |
| ISS Vehicle Office Environmental Control And Life Support System (ECLSS) Project |
The contractor shall develop and maintain (e.g. status and report) an integrated schedule for the ECLSS Project by providing the following tasks:
A. Analyze the initial project schedules (developed by other performing organizations) for quality review, critical path identification, and selection of critical high-level milestones for management level tracking.
B. Develop an integrated schedule with milestone links to project schedules maintained by performing organizations.
C. Provide day-to-day schedule maintenance and development of monthly status and reporting (e.g., impact of changes to critical milestones in performing organizations’ schedules).
D. Develop and maintain reporting for the integrated schedule for management use.
E. Provide analysis for special studies (e.g., analyzing, evaluating, documenting, and providing input for reviews and management questions) on the integrated schedule.
The contractor shall provide meeting services, in accordance with ISS Program Policy Directive (PPD) 522, ISS Policy for Multilateral Control Board and Control Panel Operations, for the NASA identified control boards and panels as identified in Section J, Attachment J-7, Meeting Services.
1.7
ISS NASA REVIEWS
The contractor shall develop and deliver briefing materials and analyses including Program technical, cost, and schedule status, specific safety or risk issues for ISS Program presentations and meetings with internal and external review groups.
This is the start of the file's text. The full file is on GovTribe.