Attachment L-6 EPM Workbook MOD FRFP-1.xlsx

XLSX spreadsheet 394 KB Posted

Attached to
Human Space Flight Technical Integration Contract (HSFTIC) Federal contract opportunity
Solicitation number
80JSC019R0023
Issued by
National Aeronautics and Space Administration Johnson Space Center

About this file

This document provides templates for a federal contract opportunity for a Human Space Flight Technical Integration Contract. The templates include a Technical Resources Template to identify proposed labor resources and non-labor resources by Standard Labor Category and SOW section for Contract Year 1. Additional templates include a Fully Burdened Rates Template to show calculations for fully burdened labor rates by Standard Labor Category, an Incumbency Retention and Pay Template to identify proposed direct labor rates, and minor subcontractor, overhead, and G&A templates. The templates appear to be for use in responding to Solicitation Number 80JSC019R0023, a request for proposal from NASA's Johnson Space Center for a total small business set-aside Human Space Flight Technical Integration Contract, with an anticipated RFP release of November 1, 2019 and offer due date of December 11, 2019.

View the file

Other files for this federal contract opportunity

Other files attached to Human Space Flight Technical Integration Contract (HSFTIC), newest first.
File Type Posted
SF30 - RFP - Amendment 3.pdf PDF
Attachment L-6 EPM Workbook - Amendment 4 12-2-19 - FRFP-3.xlsx XLSX spreadsheet
Attachment L-7 Cost Estimating Wookbook Amendment 4 12-2-19 - FRFP-3.xlsx XLSX spreadsheet
80JSC019R0023 - SF33 FRFP-2.pdf PDF
80JSC019R0023_-_Cover_Letter.pdf PDF
80JSC019R0023_-_SF33.pdf PDF
HSFTIC_J-13_List_of_Government_Furnished_Data.xlsx XLSX spreadsheet
HSFTIC_Pre-Proposal_Conference_Information.docx DOCX document
7.0.zip ZIP file
1pager_template.xlsx XLSX spreadsheet
SSP_41152-RevG.pdf PDF
ISS_Program_Org_Chart.pdf PDF
SSP_41151-RevH.docx DOCX document
SSP_50145.docx DOCX document
SSP_30219-RevK.pdf PDF
41015P1RG.pdf PDF
OM-WI-02_-_VID_Strat_Alt_Prop_2017.doc DOC document
SSP_50357_Rev_A.doc DOC document
SSP_50420-Rev_B.docx DOCX document
SSP_50438-Part_1-Rev_F-ITAR.docx DOCX document
SSP_50098P1_B.pdf PDF
SSP_50347-Rev_B-DCN002-CollatedMaster.docx DOCX document
PSF_Charter_PPD_1019_FINAL.doc DOC document
SSP_50852_Baseline.Doc DOC document
SSP_50911-Baseline.docx DOCX document
Aging_Changes.pptx PPTX presentation
Applicable_4_-.zip ZIP file
SSP_50101-RevB.docx DOCX document
SSP-50699-04_Rev_A.docx DOCX document
SSP_50808-RevG.pdf PDF
SSP50251P1.pdf PDF
PPD_1081_FINAL.docx DOCX document
SSP_50191.DOC DOC document
SSP_50470-RevD-DCN006-Collated_Master.docx DOCX document
SSP_41150-RevL.pdf PDF
SSP42137_P2_RB_CD_012231.pdf PDF
SSP_42003-RevJ.docx DOCX document
SSP_50420-HTV2-Baseline.docx DOCX document
SSP-50220_RevC.doc DOC document
BASEPLATE-Mobile_Front-1.png PNG image
SSP_50438-Part_2-Rev_B-ITAR.docx DOCX document
ISS_Cost_Changes_Status.xlsx XLSX spreadsheet
SSP_50315-Rev_C.docx DOCX document
SSP_50397.doc DOC document
Comm-StrategyPlan-2013-draft.pdf PDF
SSP-41172_Rev_AD.docx DOCX document
SSP_50200-08-RevB-DCN008-Collated_Master.docx DOCX document
SSP_41151-Appendix_D-RevH.docx DOCX document
SSP_50137-RevA.docx DOCX document
SSP_50098_Part_2_Rev_A.pdf PDF
Show all 50

Human Space Flight Technical Integration Contract (HSFTIC) has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

TRT-SOW 1.0

TECHNICAL RESOURCES TEMPLATE (TRT)SOW 1.0
Prime Offeror Company Name:
COMBINED RESOURCES FOR THE ENTIRE TEAM -- PRIME OFFEROR AND ALL SUBCONTRACTORS (INCLUDING MINOR SUBCONTRACTORS)INSTRUCTIONS TO OFFERORS
This template is required from the Prime Offeror only. It is used to identify and summarize all proposed labor resources, by SLC, and all non-labor resources (NLRs) for all SOW sections for Contract Year (CY) 1. The format is automated and only requires the Prime Offeror to include source data (FTES and NLRs) in areas shaded in blue. Resources should be allocated to the appropriate SOW sections in accordance with your Management and Technical approach. The resources identified by the Prime Offeror are the combined resources for your entire team (Prime Offeror and ALL subcontractors). ***Note: The TRT templates function as a link between Volume I, Mission Suitability, and Volume III, Cost/Price***
Total CY 1Skill mix
Standard Labor Category (SLC)SOW 1.0 WYEsRatio
WYEs
Ex: Business Specialist 34.5
Analyst I0.00%
Analyst I - Overtime0.00%
Analyst II0.00%
Analyst III0.00%
Business Specialist I0.00%
Business Specialist II0.00%
Business Specialist III0.00%
Business Specialist IV0.00%
Clerk0.00%
Deputy Program Manager0.00%
Engineer I0.00%
Engineer II0.00%
Engineer III0.00%
Engineer IV0.00%
Engineer V0.00%
IT Professional I0.00%
IT Professional II0.00%
IT Professional III0.00%
IT Professional IV0.00%
Manager0.00%
Program Manager0.00%
Secretary0.00%
Supervisor0.00%
Support Specialist0.00%
Support Specialist - Overtime0.00%
Technical Professional I0.00%
Technical Professional III0.00%
Technical Professional III0.00%
Technical Professional IV0.00%
Other: (Specify)0.00%
Total FTE Prime and All Subs0.00.00%
Non-Labor Resources (NLR) Cost ($)Total CY 1 SOW 1.0 NLR Cost
Travel
Material
Other Direct Cost
Total NLR Cost$ - 0
NOTE: Examples are highlighted in red font. IMPORTANT: Self-calculating formulas MUST BE PROVIDED for all grey shaded areas.
Please remember to remove the red highlighted examples from the templates prior to your official proposal submission.

TRT-SOW 2.0

TECHNICAL RESOURCES TEMPLATE (TRT)SOW 2.0
Prime Offeror Company Name:
COMBINED RESOURCES FOR THE ENTIRE TEAM -- PRIME OFFEROR AND ALL SUBCONTRACTORS (INCLUDING MINOR SUBCONTRACTORS)INSTRUCTIONS TO OFFERORS
This template is required from the Prime Offeror only. It is used to identify and summarize all proposed labor resources, by SLC, and all non-labor resources (NLRs) for all SOW sections for Contract Year (CY) 1. The format is automated and only requires the Prime Offeror to include source data (WYES and NLRs) in areas shaded in blue. Resources should be allocated to the appropriate SOW sections in accordance with your Management and Technical approach. The resources identified by the Prime Offeror are the combined resources for your entire team (Prime Offeror and ALL subcontractors). ***Note: The TRT templates function as a link between Volume I, Mission Suitability, and Volume III, Cost/Price***
Total CY 1Skill mix
Standard Labor Category (SLC)SOW 2.0 WYEsRatio
WYEs
Ex: Business Specialist 34.5
Analyst I0.00%
Analyst I - Overtime0.00%
Analyst II0.00%
Analyst III0.00%
Business Specialist I0.00%
Business Specialist II0.00%
Business Specialist III0.00%
Business Specialist IV0.00%
Clerk0.00%
Deputy Program Manager0.00%
Engineer I0.00%
Engineer II0.00%
Engineer III0.00%
Engineer IV0.00%
Engineer V0.00%
IT Professional I0.00%
IT Professional II0.00%
IT Professional III0.00%
IT Professional IV0.00%
Manager0.00%
Program Manager0.00%
Secretary0.00%
Supervisor0.00%
Support Specialist0.00%
Support Specialist - Overtime0.00%
Technical Professional I0.00%
Technical Professional III0.00%
Technical Professional III0.00%
Technical Professional IV0.00%
Other: (Specify)0.00%
Total WYE Prime and All Subs0.00.00%
Non-Labor Resources (NLR) Cost ($)Total CY 1 SOW 2.0 NLR Cost
Travel
Material
Other Direct Cost
Total NLR Cost$ - 0
NOTE: Examples are highlighted in red font. IMPORTANT: Self-calculating formulas MUST BE PROVIDED for all grey shaded areas.
Please remember to remove the red highlighted examples from the templates prior to your official proposal submission.

TRT-SOW 3.0

TECHNICAL RESOURCES TEMPLATE (TRT)SOW 3.0
Prime Offeror Company Name:
COMBINED RESOURCES FOR THE ENTIRE TEAM -- PRIME OFFEROR AND ALL SUBCONTRACTORS (INCLUDING MINOR SUBCONTRACTORS)INSTRUCTIONS TO OFFERORS
This template is required from the Prime Offeror only. It is used to identify and summarize all proposed labor resources, by SLC, and all non-labor resources (NLRs) for all SOW sections for Contract Year (CY) 1. The format is automated and only requires the Prime Offeror to include source data (WYES and NLRs) in areas shaded in blue. Resources should be allocated to the appropriate SOW sections in accordance with your Management and Technical approach. The resources identified by the Prime Offeror are the combined resources for your entire team (Prime Offeror and ALL subcontractors). ***Note: The TRT templates function as a link between Volume I, Mission Suitability, and Volume III, Cost/Price***
Total CY 1Skill mix
Standard Labor Category (SLC)SOW 3.0 WYEsRatio
WYEs
Ex: Business Specialist 34.5
Analyst I0.00%
Analyst I - Overtime0.00%
Analyst II0.00%
Analyst III0.00%
Business Specialist I0.00%
Business Specialist II0.00%
Business Specialist III0.00%
Business Specialist IV0.00%
Clerk0.00%
Deputy Program Manager0.00%
Engineer I0.00%
Engineer II0.00%
Engineer III0.00%
Engineer IV0.00%
Engineer V0.00%
IT Professional I0.00%
IT Professional II0.00%
IT Professional III0.00%
IT Professional IV0.00%
Manager0.00%
Program Manager0.00%
Secretary0.00%
Supervisor0.00%
Support Specialist0.00%
Support Specialist - Overtime0.00%
Technical Professional I0.00%
Technical Professional III0.00%
Technical Professional III0.00%
Technical Professional IV0.00%
Other: (Specify)0.00%
Total WYE Prime and All Subs0.00.00%
Non-Labor Resources (NLR) Cost ($)Total CY 1 SOW 3.0 NLR Cost
Travel
Material
Other Direct Cost
Total NLR Cost$ - 0
NOTE: Examples are highlighted in red font. IMPORTANT: Self-calculating formulas MUST BE PROVIDED for all grey shaded areas.
Please remember to remove the red highlighted examples from the templates prior to your official proposal submission.

TRT-SOW 4.0

TECHNICAL RESOURCES TEMPLATE (TRT)SOW 4.0
Prime Offeror Company Name:
COMBINED RESOURCES FOR THE ENTIRE TEAM -- PRIME OFFEROR AND ALL SUBCONTRACTORS (INCLUDING MINOR SUBCONTRACTORS)INSTRUCTIONS TO OFFERORS
This template is required from the Prime Offeror only. It is used to identify and summarize all proposed labor resources, by SLC, and all non-labor resources (NLRs) for all SOW sections for Contract Year (CY) 1. The format is automated and only requires the Prime Offeror to include source data (WYES and NLRs) in areas shaded in blue. Resources should be allocated to the appropriate SOW sections in accordance with your Management and Technical approach. The resources identified by the Prime Offeror are the combined resources for your entire team (Prime Offeror and ALL subcontractors). ***Note: The TRT templates function as a link between Volume I, Mission Suitability, and Volume III, Cost/Price***
Total CY 1Skill mix
Standard Labor Category (SLC)SOW 4.0 WYEsRatio
WYEs
Ex: Business Specialist 34.5
Analyst I0.00%
Analyst I - Overtime0.00%
Analyst II0.00%
Analyst III0.00%
Business Specialist I0.00%
Business Specialist II0.00%
Business Specialist III0.00%
Business Specialist IV0.00%
Clerk0.00%
Deputy Program Manager0.00%
Engineer I0.00%
Engineer II0.00%
Engineer III0.00%
Engineer IV0.00%
Engineer V0.00%
IT Professional I0.00%
IT Professional II0.00%
IT Professional III0.00%
IT Professional IV0.00%
Manager0.00%
Program Manager0.00%
Secretary0.00%
Supervisor0.00%
Support Specialist0.00%
Support Specialist - Overtime0.00%
Technical Professional I0.00%
Technical Professional III0.00%
Technical Professional III0.00%
Technical Professional IV0.00%
Other: (Specify)0.00%
Total WYE Prime and All Subs0.00.00%
Non-Labor Resources (NLR) Cost ($)Total CY 1 SOW 4.0 NLR Cost
Travel
Material
Other Direct Cost
Total NLR Cost$ - 0
NOTE: Examples are highlighted in red font. IMPORTANT: Self-calculating formulas MUST BE PROVIDED for all grey shaded areas.
Please remember to remove the red highlighted examples from the templates prior to your official proposal submission.

TRT-SOW 5.0

TECHNICAL RESOURCES TEMPLATE (TRT)INSTRUCTIONS TO OFFERORS
Prime Offeror Company Name:SOW 5.0This template is required from the Prime Offeror only. It is used to identify and summarize all proposed labor resources, by SLC, and all non-labor resources (NLRs) for all SOW sections for Contract Year (CY) 1. The format is automated and only requires the Prime Offeror to include source data (WYES and NLRs) in areas shaded in blue. Resources should be allocated to the appropriate SOW sections in accordance with your Management and Technical approach. The resources identified by the Prime Offeror are the combined resources for your entire team (Prime Offeror and ALL subcontractors). ***Note: The TRT templates function as a link between Volume I, Mission Suitability, and Volume III, Cost/Price***

COMBINED RESOURCES FOR THE ENTIRE TEAM -- PRIME OFFEROR AND ALL SUBCONTRACTORS (INCLUDING MINOR SUBCONTRACTORS)

SOWSOWSOWSOWSOWSOWSOWSOWSOWSOWSOWSOWSOWSOWSOWSOWSOWSOWSOWSOWSOWSOWTotal CY 1Skill mix
Standard Labor Category (SLC)5.15.25.35.45.55.65.75.85.95.105.115.125.135.145.155.165.175.185.195.205.215.22SOW 5.0 WYEsRatio
WYEs
Ex: Business Specialist 30.50.00.00.00.00.00.50.50.00.00.00.00.00.00.00.00.00.00.00.00.00.01.5
Analyst I0.00.00%
Analyst I - Overtime0.00.00%
Analyst II0.00.00%
Analyst III0.00.00%
Business Specialist I0.00.00%
Business Specialist II0.00.00%
Business Specialist III0.00.00%
Business Specialist IV0.00.00%
Clerk0.00.00%
Deputy Program Manager0.00.00%
Engineer I0.00.00%
Engineer II0.00.00%
Engineer III0.00.00%
Engineer IV0.00.00%
Engineer V0.00.00%
IT Professional I0.00.00%
IT Professional II0.00.00%
IT Professional III0.00.00%
IT Professional IV0.00.00%
Manager0.00.00%
Program Manager0.00.00%
Secretary0.00.00%
Supervisor0.00.00%
Support Specialist0.00.00%
Support Specialist - Overtime0.00.00%
Technical Professional I0.00.00%
Technical Professional III0.00.00%
Technical Professional III0.00.00%
Technical Professional IV0.00.00%
Other: (Specify)0.00.00%
Total WYE Prime and All Subs0.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00%
Non-Labor Resources (NLR) Cost ($)SOW 5.1SOW 5.2SOW 5.3SOW 5.4SOW 5.5SOW 5.6SOW 5.7SOW 5.8SOW 5.9SOW 5.10SOW 5.11SOW 5.12SOW 5.13SOW 5.14SOW 5.15SOW 5.16SOW 5.17SOW 5.18SOW 5.19SOW 5.20SOW 5.21SOW 5.22Total CY 1 SOW 5.0 NLR Cost
Travel$ - 0
Material$ - 0
Other Direct Cost$ - 0
Total NLR Cost$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
NOTE: Examples are highlighted in red font. IMPORTANT: Self-calculating formulas MUST BE PROVIDED for all grey shaded areas.
Please remember to remove the red highlighted examples from the templates prior to your official proposal submission.

TRT-SOW 6.0

TECHNICAL RESOURCES TEMPLATE (TRT)SOW 6.0INSTRUCTIONS TO OFFERORS
Prime Offeror Company Name:This template is required from the Prime Offeror only. It is used to identify and summarize all proposed labor resources, by SLC, and all non-labor resources (NLRs) for all SOW sections for Contract Year (CY) 1. The format is automated and only requires the Prime Offeror to include source data (WYES and NLRs) in areas shaded in blue. Resources should be allocated to the appropriate SOW sections in accordance with your Management and Technical approach. The resources identified by the Prime Offeror are the combined resources for your entire team (Prime Offeror and ALL subcontractors). ***Note: The TRT templates function as a link between Volume I, Mission Suitability, and Volume III, Cost/Price***

COMBINED RESOURCES FOR THE ENTIRE TEAM -- PRIME OFFEROR AND ALL SUBCONTRACTORS (INCLUDING MINOR SUBCONTRACTORS)

SOWSOWSOWSOWSOWSOWSOWSOWSOWSOWTotal CY 1Skill mix
Standard Labor Category (SLC)6.16.26.36.46.56.66.76.86.96.10SOW 6.0 WYEsRatio
WYEs
Ex: Business Specialist 30.50.01.50.00.00.01.50.00.00.03.5
Analyst I0.00.00%
Analyst I - Overtime0.00.00%
Analyst II0.00.00%
Analyst III0.00.00%
Business Specialist I0.00.00%
Business Specialist II0.00.00%
Business Specialist III0.00.00%
Business Specialist IV0.00.00%
Clerk0.00.00%
Deputy Program Manager0.00.00%
Engineer I0.00.00%
Engineer II0.00.00%
Engineer III0.00.00%
Engineer IV0.00.00%
Engineer V0.00.00%
IT Professional I0.00.00%
IT Professional II0.00.00%
IT Professional III0.00.00%
IT Professional IV0.00.00%
Manager0.00.00%
Program Manager0.00.00%
Secretary0.00.00%
Supervisor0.00.00%
Support Specialist0.00.00%
Support Specialist - Overtime0.00.00%
Technical Professional I0.00.00%
Technical Professional III0.00.00%
Technical Professional III0.00.00%
Technical Professional IV0.00.00%
Other: (Specify)0.00.00%
Total WYE Prime and All Subs0.00.00.00.00.00.00.00.00.00.00.00.00%
Non-Labor Resources (NLR) Cost ($)SOW 6.1SOW 6.2SOW 6.3SOW 6.4SOW 6.5SOW 6.6SOW 6.7SOW 6.8SOW 6.9SOW 6.10Total CY 1 SOW 6.0 NLR Cost
Travel$ - 0
Material$ - 0
Other Direct Cost$ - 0
Total NLR Cost$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
NOTE: Examples are highlighted in red font. IMPORTANT: Self-calculating formulas MUST BE PROVIDED for all grey shaded areas.
Please remember to remove the red highlighted examples from the templates prior to your official proposal submission.

TRT-SOW 7.0

TECHNICAL RESOURCES TEMPLATE (TRT)INSTRUCTIONS TO OFFERORS
Prime Offeror Company Name:This template is required from the Prime Offeror only. It is used to identify and summarize all proposed labor resources, by SLC, and all non-labor resources (NLRs) for all SOW sections for Contract Year (CY) 1. The format is automated and only requires the Prime Offeror to include source data (WYES and NLRs) in areas shaded in blue. Resources should be allocated to the appropriate SOW sections in accordance with your Management and Technical approach. The resources identified by the Prime Offeror are the combined resources for your entire team (Prime Offeror and ALL subcontractors). ***Note: The TRT templates function as a link between Volume I, Mission Suitability, and Volume III, Cost/Price***

COMBINED RESOURCES FOR THE ENTIRE TEAM -- PRIME OFFEROR AND ALL SUBCONTRACTORS (INCLUDING MINOR SUBCONTRACTORS)

SOWSOWSOWSOWSOWSOWTotal CY 1Skill mix
Standard Labor Category (SLC)7.17.27.37.47.57.6SOW 7.0 WYEsRatio
WYEs
Ex: Business Specialist 30.50.00.00.00.00.00.5
Analyst I0.00.00%
Analyst I - Overtime0.00.00%
Analyst II0.00.00%
Analyst III0.00.00%
Business Specialist I0.00.00%
Business Specialist II0.00.00%
Business Specialist III0.00.00%
Business Specialist IV0.00.00%
Clerk0.00.00%
Deputy Program Manager0.00.00%
Engineer I0.00.00%
Engineer II0.00.00%
Engineer III0.00.00%
Engineer IV0.00.00%
Engineer V0.00.00%
IT Professional I0.00.00%
IT Professional II0.00.00%
IT Professional III0.00.00%
IT Professional IV0.00.00%
Manager0.00.00%
Program Manager0.00.00%
Secretary0.00.00%
Supervisor0.00.00%
Support Specialist0.00.00%
Support Specialist - Overtime0.00.00%
Technical Professional I0.00.00%
Technical Professional III0.00.00%
Technical Professional III0.00.00%
Technical Professional IV0.00.00%
Other: (Specify)0.00.00%
Total WYE Prime and All Subs0.00.00.00.00.00.00.00.00%
Non-Labor Resources (NLR) Cost ($)SOW 7.1SOW 7.2SOW 7.3SOW 7.4SOW 7.5SOW 7.6Total CY 1 SOW 7.0 NLR Cost
Travel$ - 0
Material$ - 0
Other Direct Cost$ - 0
Total NLR Cost$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
NOTE: Examples are highlighted in red font. IMPORTANT: Self-calculating formulas MUST BE PROVIDED for all grey shaded areas.
Please remember to remove the red highlighted examples from the templates prior to your official proposal submission.

TRT-SOW 8.0

TECHNICAL RESOURCES TEMPLATE (TRT)SOW 8.0
Prime Offeror Company Name:
COMBINED RESOURCES FOR THE ENTIRE TEAM -- PRIME OFFEROR AND ALL SUBCONTRACTORS (INCLUDING MINOR SUBCONTRACTORS)INSTRUCTIONS TO OFFERORS
This template is required from the Prime Offeror only. It is used to identify and summarize all proposed labor resources, by SLC, and all non-labor resources (NLRs) for all SOW sections for Contract Year (CY) 1. The format is automated and only requires the Prime Offeror to include source data (WYES and NLRs) in areas shaded in blue. Resources should be allocated to the appropriate SOW sections in accordance with your Management and Technical approach. The resources identified by the Prime Offeror are the combined resources for your entire team (Prime Offeror and ALL subcontractors). ***Note: The TRT templates function as a link between Volume I, Mission Suitability, and Volume III, Cost/Price***
Total CY 1Skill mix
Standard Labor Category (SLC)SOW 8.0 WYEsRatio
WYEs
Ex: Business Specialist 34.5
Analyst I0.00%
Analyst I - Overtime0.00%
Analyst II0.00%
Analyst III0.00%
Business Specialist I0.00%
Business Specialist II0.00%
Business Specialist III0.00%
Business Specialist IV0.00%
Clerk0.00%
Deputy Program Manager0.00%
Engineer I0.00%
Engineer II0.00%
Engineer III0.00%
Engineer IV0.00%
Engineer V0.00%
IT Professional I0.00%
IT Professional II0.00%
IT Professional III0.00%
IT Professional IV0.00%
Manager0.00%
Program Manager0.00%
Secretary0.00%
Supervisor0.00%
Support Specialist0.00%
Support Specialist - Overtime0.00%
Technical Professional I0.00%
Technical Professional III0.00%
Technical Professional III0.00%
Technical Professional IV0.00%
Other: (Specify)0.00%
Total WYE Prime and All Subs0.00.00%
Non-Labor Resources (NLR) Cost ($)Total CY 1 SOW 8.0 NLR Cost
Travel
Material
Other Direct Cost
Total NLR Cost$ - 0
NOTE: Examples are highlighted in red font. IMPORTANT: Self-calculating formulas MUST BE PROVIDED for all grey shaded areas.
Please remember to remove the red highlighted examples from the templates prior to your official proposal submission.

TRT-SOW 9.0

TECHNICAL RESOURCES TEMPLATE (TRT)SOW 9.0INSTRUCTIONS TO OFFERORS
Prime Offeror Company Name:This template is required from the Prime Offeror only. It is used to identify and summarize all proposed labor resources, by SLC, and all non-labor resources (NLRs) for all SOW sections for Contract Year (CY) 1. The format is automated and only requires the Prime Offeror to include source data (WYES and NLRs) in areas shaded in blue. Resources should be allocated to the appropriate SOW sections in accordance with your Management and Technical approach. The resources identified by the Prime Offeror are the combined resources for your entire team (Prime Offeror and ALL subcontractors). ***Note: The TRT templates function as a link between Volume I, Mission Suitability, and Volume III, Cost/Price***
SOWSOWSOWSOWSOWSOWSOWSOWSOWSOWTotal CY 1Skill mix
Standard Labor Category (SLC)9.19.29.39.49.59.69.79.89.99.10SOW 9.0 WYEsRatio
WYEs
Ex: Business Specialist 30.50.00.00.00.00.00.00.00.00.00.5
Analyst I0.00.00%
Analyst I - Overtime0.00.00%
Analyst II0.00.00%
Analyst III0.00.00%
Business Specialist I0.00.00%
Business Specialist II0.00.00%
Business Specialist III0.00.00%
Business Specialist IV0.00.00%
Clerk0.00.00%
Deputy Program Manager0.00.00%
Engineer I0.00.00%
Engineer II0.00.00%
Engineer III0.00.00%
Engineer IV0.00.00%
Engineer V0.00.00%
IT Professional I0.00.00%
IT Professional II0.00.00%
IT Professional III0.00.00%
IT Professional IV0.00.00%
Manager0.00.00%
Program Manager0.00.00%
Secretary0.00.00%
Supervisor0.00.00%
Support Specialist0.00.00%
Support Specialist - Overtime0.00.00%
Technical Professional I0.00.00%
Technical Professional III0.00.00%
Technical Professional III0.00.00%
Technical Professional IV0.00.00%
Other: (Specify)0.00.00%
Total WYE Prime and All Subs0.00.00.00.00.00.00.00.00.00.00.00.00%
Non-Labor Resources (NLR) Cost ($)SOW 9.1SOW 9.2SOW 9.3SOW 9.4SOW 9.5SOW 9.6SOW 9.7SOW 9.8SOW 9.9SOW 9.10Total CY 1 SOW 9.0 NLR Cost
Travel$ - 0
Material$ - 0
Other Direct Cost$ - 0
Total NLR Cost$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
NOTE: Examples are highlighted in red font. IMPORTANT: Self-calculating formulas MUST BE PROVIDED for all grey shaded areas.
Please remember to remove the red highlighted examples from the templates prior to your official proposal submission.

TRST-CORE

Technical Resources Summary Template - Core (TRST-CORE)
Prime Offeror Company Name:
INSTRUCTIONS TO OFFERORS
COMBINED RESOURCES FOR THE ENTIRE TEAM -- PRIME OFFEROR AND ALL SUBCONTRACTORS (INCLUDING MINOR SUBCONTRACTORS)This template is required from the Prime Offeror only. It is used to summarize all proposed resources for CYs 1 - 5. The format is automated and only requires the Prime Offeror to include source data (Productive Hours per WYE and the Incumbent Retention %) for the areas shaded blue. ***Note: The TRST-CORE template functions as a link between Volume I, Mission Suitability, and Volume III, Cost/Price***
Standard Labor CategoryIncumbent Retention % (CY 1 Only)Base PeriodOption Period 1Option Period 2Option Period 3
Contract Year 1Contract Year 2Contract Year 3Contract Year 4Contract Year 5Total Contract (CYs 1 - 5)
Proposed WYEsProposed HoursProposed WYEsProposed HoursProposed WYEsProposed HoursProposed WYEsProposed HoursProposed WYEsProposed HoursProposed WYEsProposed Hours

Ex: Productive Hours per WYE Conversion Factor 1840 1840 1840 1840 1840

Ex: Business Specialist 3 100% 11.8 21,712 11.8 21,712 11.8 21,712 11.8 21,712 11.8 21,712 59.0 108,560

PRODUCTIVE HOURS PER WYE CONVERSION FACTOR

Analyst I- 0- 0- 0- 0- 0- 0- 0- 0- 0- 0- 0- 0
Analyst I - Overtime- 0- 0- 0- 0- 0- 0- 0- 0- 0- 0- 0- 0
Analyst II- 0- 0- 0- 0- 0- 0- 0- 0- 0- 0- 0- 0
Analyst III- 0- 0- 0- 0- 0- 0- 0- 0- 0- 0- 0- 0
Business Specialist I- 0- 0- 0- 0- 0- 0- 0- 0- 0- 0- 0- 0
Business Specialist II- 0- 0- 0- 0- 0- 0- 0- 0- 0- 0- 0- 0
Business Specialist III- 0- 0- 0- 0- 0- 0- 0- 0- 0- 0- 0- 0
Business Specialist IV- 0- 0- 0- 0- 0- 0- 0- 0- 0- 0- 0- 0
Clerk- 0- 0- 0- 0- 0- 0- 0- 0- 0- 0- 0- 0
Deputy Program Manager- 0- 0- 0- 0- 0- 0- 0- 0- 0- 0- 0- 0
Engineer I- 0- 0- 0- 0- 0- 0- 0- 0- 0- 0- 0- 0
Engineer II- 0- 0- 0- 0- 0- 0- 0- 0- 0- 0- 0- 0
Engineer III- 0- 0- 0- 0- 0- 0- 0- 0- 0- 0- 0- 0
Engineer IV- 0- 0- 0- 0- 0- 0- 0- 0- 0- 0- 0- 0
Engineer V- 0- 0- 0- 0- 0- 0- 0- 0- 0- 0- 0- 0
IT Professional I- 0- 0- 0- 0- 0- 0- 0- 0- 0- 0- 0- 0
IT Professional II- 0- 0- 0- 0- 0- 0- 0- 0- 0- 0- 0- 0
IT Professional III- 0- 0- 0- 0- 0- 0- 0- 0- 0- 0- 0- 0
IT Professional IV- 0- 0- 0- 0- 0- 0- 0- 0- 0- 0- 0- 0
Manager- 0- 0- 0- 0- 0- 0- 0- 0- 0- 0- 0- 0
Program Manager- 0- 0- 0- 0- 0- 0- 0- 0- 0- 0- 0- 0
Secretary- 0- 0- 0- 0- 0- 0- 0- 0- 0- 0- 0- 0
Supervisor- 0- 0- 0- 0- 0- 0- 0- 0- 0- 0- 0- 0
Support Specialist- 0- 0- 0- 0- 0- 0- 0- 0- 0- 0- 0- 0
Support Specialist - Overtime- 0- 0- 0- 0- 0- 0- 0- 0- 0- 0- 0- 0
Technical Professional I- 0- 0- 0- 0- 0- 0- 0- 0- 0- 0- 0- 0
Technical Professional III- 0- 0- 0- 0- 0- 0- 0- 0- 0- 0- 0- 0
Technical Professional III- 0- 0- 0- 0- 0- 0- 0- 0- 0- 0- 0- 0
Technical Professional IV- 0- 0- 0- 0- 0- 0- 0- 0- 0- 0- 0- 0
Other: (Specify)- 0- 0- 0- 0- 0- 0- 0- 0- 0- 0- 0- 0
Totals- 0- 0- 0- 0- 0- 0- 0- 0- 0- 0- 0- 0
Base PeriodOption Periods
Contract Year 1Contract Year 2Contract Year 3Contract Year 4Contract Year 5Total Contract (CYs 1 - 5)
Non-Labor Resources (NLR) Cost ($)Total NLR CostTotal NLR CostTotal NLR CostTotal NLR CostTotal NLR CostTotal NLR Cost
Travel$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Material$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Other Direct Cost$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Total NLR Cost$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Note: Examples are highlighted in red font. IMPORTANT: Self-calculating formulas MUST BE PROVIDED for all grey shaded areas.
Please remember to remove the red highlighted examples from the templates prior to your official proposal submission.

LPT

Labor Pricing Template (LPT)INSTRUCTIONS TO OFFERORS
This template is required from the Prime Offeror and each Major Subcontractor. It is used to identify the proposed productive hours that are compensated at staight-time direct labor rates, by SLC, per Contract Year. The format is partially automated and only requires the Offeror to link the areas shaded in blue to the appropriate tabs (i.e., "TRST-CORE" and "IRAP"). See the example in red for for linking details.
Prime Offeror Company Name:
Major Subcontractor CompanyName:
CORE BASELINE EFFORT
STRAIGHT-TIME DIRECT LABOR COST
Base PeriodOption Period 1Option Period 2Option Period 3
Standard Labor Category (SLC)Contract Year 1Contract Year 2Contract Year 3Contract Year 4Contract Year 5Total (CYs 1 - 5)Ref.The hours and costs shown on this template shall support and reconcile to the hours and cost shown on either the Prime Offeror's Prime Cost Summary Template (PCST) or the Major Subcontractor's Major Subcontractor Cost Summary Template (MSCST). The hours shall also support and reconcile the proposed hours shown on the TRST-CORE tab.
Link From EPM Tab"TRST-CORE""TRST-CORE""TRST-CORE""TRST-CORE""TRST-CORE"
Ex: Business Specialist 321,71221,71221,71221,71221,712
STRAIGHT-TIME PRODUCTIVE HOURS
Analyst I- 0
Analyst I - Overtime- 0
Analyst II- 0
Analyst III- 0
Business Specialist I- 0
Business Specialist II- 0
Business Specialist III- 0
Business Specialist IV- 0
Clerk- 0
Deputy Program Manager- 0
Engineer I- 0
Engineer II- 0
Engineer III- 0
Engineer IV- 0
Engineer V- 0
IT Professional I- 0
IT Professional II- 0
IT Professional III- 0
IT Professional IV- 0
Manager- 0
Program Manager- 0
Secretary- 0
Supervisor- 0
Support Specialist- 0
Support Specialist - Overtime- 0
Technical Professional I- 0
Technical Professional III- 0
Technical Professional III- 0
Technical Professional IV- 0
Transition Interface- 0
Other: (Specify)- 0
Total Straight-Time Productive Hours- 0- 0- 0- 0- 0- 0
Link From EPM Tab"IRAP""IRAP""IRAP""IRAP""IRAP"
Proposed Rate of EscalationN/A2.80%2.80%2.80%2.80%
Ex: Business Specialist 3$27.17$27.93$28.71$29.51$30.34

Proposed Rate of Escalation N/A 0.00% 0.00% 0.00% 0.00%

STRAIGHT-TIME DIRECT LABOR RATES
Analyst I$0.00$0.00$0.00$0.00
Analyst I - Overtime$0.00$0.00$0.00$0.00
Analyst II$0.00$0.00$0.00$0.00
Analyst III$0.00$0.00$0.00$0.00
Business Specialist I$0.00$0.00$0.00$0.00
Business Specialist II$0.00$0.00$0.00$0.00
Business Specialist III$0.00$0.00$0.00$0.00
Business Specialist IV$0.00$0.00$0.00$0.00
Clerk$0.00$0.00$0.00$0.00
Deputy Program Manager$0.00$0.00$0.00$0.00
Engineer I$0.00$0.00$0.00$0.00
Engineer II$0.00$0.00$0.00$0.00
Engineer III$0.00$0.00$0.00$0.00
Engineer IV$0.00$0.00$0.00$0.00
Engineer V$0.00$0.00$0.00$0.00
IT Professional I$0.00$0.00$0.00$0.00
IT Professional II$0.00$0.00$0.00$0.00
IT Professional III$0.00$0.00$0.00$0.00
IT Professional IV$0.00$0.00$0.00$0.00
Manager$0.00$0.00$0.00$0.00
Program Manager$0.00$0.00$0.00$0.00
Secretary$0.00$0.00$0.00$0.00
Supervisor$0.00$0.00$0.00$0.00
Support Specialist$0.00$0.00$0.00$0.00
Support Specialist - Overtime$0.00$0.00$0.00$0.00
Technical Professional I$0.00$0.00$0.00$0.00
Technical Professional III$0.00$0.00$0.00$0.00
Technical Professional III$0.00$0.00$0.00$0.00
Technical Professional IV$0.00$0.00$0.00$0.00
Transition Interface$0.00$0.00$0.00$0.00
Other: (Specify)$0.00$0.00$0.00$0.00
Weighted Average Straight-Time D. L. Rate

Ex: Business Specialist 3 $ 589,832 $ 606,347 $ 623,325 $ 640,778 $ 658,719

STRAIGHT-TIME DIRECT LABOR COST
Analyst I$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Analyst I - Overtime$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Analyst II$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Analyst III$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Business Specialist I$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Business Specialist II$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Business Specialist III$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Business Specialist IV$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Clerk$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Deputy Program Manager$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Engineer I$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Engineer II$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Engineer III$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Engineer IV$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Engineer V$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
IT Professional I$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
IT Professional II$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
IT Professional III$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
IT Professional IV$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Manager$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Program Manager$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Secretary$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Supervisor$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Support Specialist$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Support Specialist - Overtime$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Technical Professional I$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Technical Professional III$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Technical Professional III$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Technical Professional IV$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Transition Interface$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Other: (Specify)$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Total Straight-Time Direct Labor Cost$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
NOTE: Examples are highlighted in red font. IMPORTANT: Self-calculating formulas MUST BE PROVIDED for all grey shaded areas.
Please remember to remove the red highlighted examples from the templates in your official proposal submission.

MSCST

Major Subcontractor Cost Summary Template (MSCST)INSTRUCTIONS TO OFFERORS
This template is required for each Major Subcontractor. It is used to identify each Major Subcontractor's proposed hours, cost, and fee, by Contract Year, for the entire period of performance. A reference column has been provided on the template for the Offeror to use in identifying where the supporting data for each cost element is located in the Offeorr's Volume III, Cost/Price Proposal. The cost and price data submitted shall be clearly displayed and detailed so that the Government may fully understand the cost development and computations. Offeror's are to provide the cost and rate data (NLR cost, FCCOM and Fee rates, and any additional resources identified by the Offeror) and complete all links to the appropriate Tabs (i.e., "LPT", "OHT", "G&A", etc.) for all ares shaded in blue.
Major Subcontractor Company Name:
CORE BASELINE EFFORT
MAJOR SUBCONTRACTOR TOTAL COST AND FEE
BaseOption Period 1Option Period 2
Cost ElementContract Year 1Contract Year 2Contract Year 3Contract Year 4Contract Year 5Total Contract (CYs 1-5)Ref.
Direct Labor Hours:
Major Sub Straight-Time HoursLink to Major Subcontractor's "LPT" Tab- 0
Major Sub Overtime HoursLink to Major Subcontractor's "OPT" Tab- 0
Total Direct Labor Hours- 0- 0- 0- 0- 0- 0
Direct Labor Cost:
Major Sub Direct Labor CostLink to Major Subcontractor's "LPT" Tab$ - 0
Major Sub Overtime CostLink to Major Subcontractor's "OPT" Tab$ - 0
Total Direct Labor Cost$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Overhead (OH) and Service Center (SC) Cost:
Major Sub OH or SC No. 1 (identify by name)
Base***IMPORTANT*** Provide the formula used to calculate the Overhead or Service Center Base dollars
RateLink to Major Subcontractor's appropriate indirect Tab (i.e., "OHT" or "GAT" or other indirect Tab created by the Offeror)
Sub-Total CostERROR:#VALUE!$ - 0$ - 0$ - 0$ - 0ERROR:#VALUE!
Major Sub OH or SC No. 2 (identify by name)
Base***IMPORTANT*** Provide the formula used to calculate the Overhead or Service Center Base dollars
RateLink to Major Subcontractor's appropriate indirect Tab (i.e., "OHT" or "GAT" or other indirect Tab created by the Offeror)
Sub-Total CostERROR:#VALUE!$ - 0$ - 0$ - 0$ - 0ERROR:#VALUE!
Major Sub OH or SC No. 3 (identify by name)
Base***IMPORTANT*** Provide the formula used to calculate the Overhead or Service Center Base dollars
RateLink to Major Subcontractor's appropriate indirect Tab (i.e., "OHT" or "GAT" or other indirect Tab created by the Offeror)
Sub-Total CostERROR:#VALUE!$ - 0$ - 0$ - 0$ - 0ERROR:#VALUE!
Total OH and SC CostERROR:#VALUE!$ - 0$ - 0$ - 0$ - 0ERROR:#VALUE!
Non-Labor Resources (NLRs):
Identify NLR Item (or remove excess rows)$ - 0
Identify NLR Item (or remove excess rows)$ - 0
Identify NLR Item (or remove excess rows)$ - 0
Identify NLR Item (or remove excess rows)$ - 0
Total NLR Cost$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0

Sub-Total Cost ERROR:#VALUE! $ - 0 $ - 0 $ - 0 $ - 0 ERROR:#VALUE!

G&A Cost:
G&A Base***IMPORTANT*** Provide the formula used to calculate the G&A Base dollars
G&A RateLink to Major Subcontractor's "GAT" Tab
Total G&A CostERROR:#VALUE!$ - 0$ - 0$ - 0$ - 0ERROR:#VALUE!
Facilities Capital Cost of Money (FCCOM):
FCCOM Base***IMPORTANT*** Provide the formula used to calculate the FCCOM Base dollars
FCCOM Rate
Total FCCOM CostERROR:#VALUE!$ - 0$ - 0$ - 0$ - 0ERROR:#VALUE!
Total Estimated CostERROR:#VALUE!$ - 0$ - 0$ - 0$ - 0ERROR:#VALUE!
Fee (identify type of fee):
Fee Base***IMPORTANT*** Provide the formula used to calculate the Fee Base dollars
Fee Rate
Total Fee DollarsERROR:#VALUE!$ - 0$ - 0$ - 0$ - 0ERROR:#VALUE!
Total Major Sub Estimated Cost and FeeERROR:#VALUE!$ - 0$ - 0$ - 0$ - 0ERROR:#VALUE!

NOTE: IMPORTANT: Self-calculating formulas MUST BE PROVIDED for all grey shaded areas.

PCST

Prime Cost Summary Template (PCST)INSTRUCTIONS TO OFFERORS
This template is required for the Prime Offeror only. It is used to identify the Prime Offeror's proposed hours, cost, and fee, by Contract Year, for the entire period of performance. A reference column has been provided on the template for the Offeror to use in identifying where the supporting data for each cost element is located in the Offeorr's Volume III, Cost/Price Proposal. The cost and price data submitted shall be clearly displayed and detailed so that the Government may fully understand the cost development and computations. Offeror's are to provide the cost and rate data (Subcontractor and NLR cost, FCCOM and Fee rates, and any additional resources identified by the Offeror) and complete all links to the appropriate Tabs (i.e., "LPT", "OHT", "G&A", etc.) for all ares shaded in blue. ***IMPORTANT: The Prime Offeror's hours and cost identified in the PCST by the Prime Offeror for each Major Subcontractor should match the hours and cost identified in each Major Subcontractor's cost proposal. If not, differences MUST BE explained.
Prime Offerors Company Name:
CORE BASELINE EFFORT
PRIME OFFEROR TOTAL COST AND FEE
BaseOption Period 1Option Period 2
Cost ElementContract Year 1Contract Year 2Contract Year 3Contract Year 4Contract Year 5Total Contract (CYs 1-5)Ref.
Direct Labor Hours:
Prime Contractor Straight-Time HoursLink to Prime Offeror's "LPT" Tab- 0
Prime Contractor Overtime HoursLink to Prime Offeror's "OPT" Tab- 0
Major Subcontractor Straight-Time Hours- 0
Major Subcontractor Overtime Hours- 0
Minor Subcontractor Straight-Time Hours- 0
Minor Subcontractor Overtime Hours- 0
Total Direct Labor Hours- 0- 0- 0- 0- 0- 0
Direct Labor Cost:
Prime Contractor Direct Labor CostLink to Prime Offeror's "LPT" Tab$ - 0
Prime Contractor Overtime CostLink to Prime Offeror's "OPT" Tab$ - 0
Total Direct Labor Cost$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Overhead (OH) and Service Center (SC) Cost:
Prime OH or SC No. 1 (identify by name)
Base***IMPORTANT*** Provide the formula used to calculate the Overhead or Service Center Base dollars
RateLink to Prime Offeror's appropriate indirect Tab (i.e., "OHT" or "GAT" or other indirect Tab created by the Offeror)
Sub-Total CostERROR:#VALUE!$ - 0$ - 0$ - 0$ - 0ERROR:#VALUE!
Prime OH or SC No. 2 (identify by name)
Base***IMPORTANT*** Provide the formula used to calculate the Overhead or Service Center Base dollars
RateLink to Prime Offeror's appropriate indirect Tab (i.e., "OHT" or "GAT" or other indirect Tab created by the Offeror)
Sub-Total CostERROR:#VALUE!$ - 0$ - 0$ - 0$ - 0ERROR:#VALUE!
Prime OH or SC No. 3 (identify by name)
Base***IMPORTANT*** Provide the formula used to calculate the Overhead or Service Center Base dollars
RateLink to Prime Offeror's appropriate indirect Tab (i.e., "OHT" or "GAT" or other indirect Tab created by the Offeror)
Sub-Total CostERROR:#VALUE!$ - 0$ - 0$ - 0$ - 0ERROR:#VALUE!
Total OH and SC CostERROR:#VALUE!$ - 0$ - 0$ - 0$ - 0ERROR:#VALUE!
Subcontractor Cost:
Major Subcontractor No. 1 Cost (identify by name)$ - 0
Major Subcontractor No. 2 Cost (identify by name)$ - 0
Major Subcontractor No. 3 Cost (identify by name)$ - 0
Sub-Total Major Subcontractor Cost$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Minor Subcontractor No. 1 Cost (identify by name)$ - 0
Minor Subcontractor No. 2 Cost (identify by name)$ - 0
Minor Subcontractor No. 3 Cost (identify by name)$ - 0
Sub-Total Minor Subcontractor Cost$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Total Subcontractor Cost$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Non-Labor Resources (NLRs):
Identify NLR Item (or remove excess rows)$ - 0
Identify NLR Item (or remove excess rows)$ - 0
Identify NLR Item (or remove excess rows)$ - 0
Identify NLR Item (or remove excess rows)$ - 0
Total NLR Cost$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0

Sub-Total Cost ERROR:#VALUE! $ - 0 $ - 0 $ - 0 $ - 0 ERROR:#VALUE!

G&A Cost:
G&A Base***IMPORTANT*** Provide the formula used to calculate the G&A Base dollars
G&A RateLink to Prime Offeror's "GAT" Tab
Total G&A CostERROR:#VALUE!$ - 0$ - 0$ - 0$ - 0ERROR:#VALUE!
Facilities Capital Cost of Money (FCCOM):
FCCOM Base***IMPORTANT*** Provide the formula used to calculate the G&A Base dollars
FCCOM Rate
Total FCCOM CostERROR:#VALUE!$ - 0$ - 0$ - 0$ - 0ERROR:#VALUE!
Total Estimated CostERROR:#VALUE!$ - 0$ - 0$ - 0$ - 0ERROR:#VALUE!
Fee (identify type of fee):
Fee Base***IMPORTANT*** Provide the formula used to calculate the G&A Base dollars
Fee Rate
Total Fee DollarsERROR:#VALUE!$ - 0$ - 0$ - 0$ - 0ERROR:#VALUE!
Total Prime Estimated Cost and FeeERROR:#VALUE!$ - 0$ - 0$ - 0$ - 0ERROR:#VALUE!

NOTE: IMPORTANT: Self-calculating formulas MUST BE PROVIDED for all grey shaded areas.

TOPT-SR

Task Order Pricing Template - Specified Resources (TOPT-SR)

Prime Contractor Name:
THIS TOPT-SR & NLRs WILL BE USED FOR SOURCE SELECTION PURPOSES.
NASA Standard Labor Categories (SLCs)Contract Year 1Contract Year 2Contract Year 3Contract Year 4Contract Year 5TotalTemplate Instructions
CY 1 - 5Ref.This template is for pricing the Government specified level of resources identified in Table L-6 (direct labor hours) and Table L7 (NLRs) and is required of the prime Offeror only. This template covers the estimated price (cost and fee) to perform the IDIQ portion of the SOW.

The template is divided into three main sections. The first section addresses Productive Hours. The hours included for each contract year shall match the hours provided in Table L-6. The second section addresses the Contract Rates. The contract rates are the fully burdened rates that were calculated in the FBR and MUST MATCH the rates proposed in Section B.6 of the Model Contract. The third section addresses the Labor Cost and is developed by multiplying the productive hours by the contract rates. This will be the fully burdened labor cost per labor category.

The bottom of the template addresses the NLR and fee dollars. The NLR dollars included for each contract year shall match the NLR dollars provided in Table L-7. Offerors shall apply any applicable burdens to the proposed NLR dollars. The bottom of the template also provides for the prime Offeror NTE fee rate input (subcontractor fee shall be included in the FBRs unless a fee sharing arrangement is being proposed) and calculates the fee dollars. The template currently assumes that the NTE fee rate is applied to all proposed dollars. Offerors may adjust the NTE fee rate application to match their proposal. However, the NTE fee rate proposed here shall match the NTE fee rate proposed in Section B.6 of the Model Contract. Any cost elements proposed to be non-fee bearing here must contain the same contractual language in Section B.6 of the Model Contract.

Full Contract Year 2 through Contract Year 5 requirements may not be indicative of Contract Year 1 estimates prorated to a twelve month time period. Therefore this consideration shall be included in developing the Offeror’s FBRs. The pricing of Contract Year 2 through Contract Year 5 is for proposal purposes only and is intended to provide the Government visibility regarding the effect of the proposed rates in the out years. The total price estimate for all contract years will be used for selection purposes.

Table L-6 hours are used in each Contract Year

PRODUCTIVE HOURS
Analyst I3003003003003001,500
Analyst I - Overtime3003003003003001,500
Analyst II3003003003003001,500
Analyst III3003003003003001,500
Business Specialist I3003003003003001,500
Business Specialist II3003003003003001,500
Business Specialist III3003003003003001,500
Business Specialist IV3003003003003001,500
Clerk3003003003003001,500
Deputy Program Manager3003003003003001,500
Engineer I3003003003003001,500
Engineer II3003003003003001,500
Engineer III3003003003003001,500
Engineer IV3003003003003001,500
Engineer V3003003003003001,500
IT Professional I3003003003003001,500
IT Professional II3003003003003001,500
IT Professional III3003003003003001,500
IT Professional IV3003003003003001,500
Manager3003003003003001,500
Program Manager3003003003003001,500
Secretary3003003003003001,500
Supervisor3003003003003001,500
Support Specialist3003003003003001,500
Support Specialist - Overtime3003003003003001,500
Technical Professional I3003003003003001,500
Technical Professional III3003003003003001,500
Technical Professional III3003003003003001,500
Technical Professional IV3003003003003001,500
Transition Interface3003003003003001,500
Total Straight Hours9,0009,0009,0009,0009,00045,000

CONTRACT RATES

EXAMPLE: Analyst 2 Link to FBR Link to FBR Link to FBR Link to FBR Link to FBR

Analyst I
Analyst I - Overtime
Analyst II
Analyst III
Business Specialist I
Business Specialist II
Business Specialist III
Business Specialist IV
Clerk
Deputy Program Manager
Engineer I
Engineer II
Engineer III
Engineer IV
Engineer V
IT Professional I
IT Professional II
IT Professional III
IT Professional IV
Manager
Program Manager
Secretary
Supervisor
Support Specialist
Support Specialist - Overtime
Technical Professional I
Technical Professional III
Technical Professional III
Technical Professional IV
Transition Interface

LABOR COST

Analyst I$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Analyst I - Overtime$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Analyst II$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Analyst III$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Business Specialist I$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Business Specialist II$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Business Specialist III$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Business Specialist IV$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Clerk$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Deputy Program Manager$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Engineer I$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Engineer II$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Engineer III$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Engineer IV$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Engineer V$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
IT Professional I$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
IT Professional II$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
IT Professional III$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
IT Professional IV$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Manager$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Program Manager$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Secretary$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Supervisor$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Support Specialist$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Support Specialist - Overtime$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Technical Professional I$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Technical Professional III$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Technical Professional III$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Technical Professional IV$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Transition Interface$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Total Fully Burdened Labor Cost$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Non Labor Resources (NLRs):
Materials- 0- 0- 0- 0- 0- 0
Travel- 0- 0- 0- 0- 0- 0
Training- 0- 0- 0- 0- 0- 0
Other- 0- 0- 0- 0- 0- 0
Total NLR Dollars- 0- 0- 0- 0- 0- 0
Burden Rate on NLRs0.00%0.00%0.00%0.00%0.00%
Burden Dollars on NLRs$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Total Cost$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
NTE Fee Rate0.00%0.00%0.00%0.00%0.00%
Fee Dollars$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Total Cost and Fee$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
NOTE: Examples are highlighted in red font. IMPORTANT: Self-calculating formulas MUST BE PROVIDED for all grey shaded areas,
whether or not in red font. Please remember to remove red highlighted examples from the templates.

FBR

FULLY BURDENED RATES TEMPLATE (FBR)

Prime Contractor Name:[x] Contract Year 1 (12 months)Template Instructions
Major Subcontractor Name:[ ] Contract Year 2 (12 months)A separate FBR is required for each contract year of the effort from both the prime Offeror and each major subcontractor(s). This template is provided so that each Offeror may show how they arrived at their individually proposed fully burdened rates including profit/fee.

As noted towards the top of this template, the columns below the blue area shall be completed by the prime contractor; likewise, the columns below the yellow area shall be completed by the major subcontractor.

The first two columns address the Offeror’s direct labor categories and the NASA Standard Labor Categories (SLCs).

The Incumbent Retention % Column allows the Offeror to propose the percentage retention of the existing workforce per SLC. The Offeror may propose any percentage per labor category that is based upon their proposed management and technical approach required for the statement of work. In the example, 100% is placed against a Business Specialist 3 for illustrative purposes.

The Retention % of Incumbents at Current Direct Labor Rates Column allows the Offeror to indicate the percentage of the incumbent workforce that the Offeror intends to pay at the current incumbent direct labor rates per SLC. The percentage indicated in this column cannot be greater than the percentage indicated in the Incumbent Retention % column discussed in the paragraph above and if the percentage is less the Offeror MUST provide detailed calculations and detailed supporting justification for the lower percentage.

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .