HSFTIC_J-4_Applicable_and_Reference_Document_List.xlsx
XLSX spreadsheet 44 KB Posted
- Attached to
- Human Space Flight Technical Integration Contract (HSFTIC) Federal contract opportunity
- Solicitation number
- 80JSC019R0023
About this file
This document provides details regarding a solicitation for the Human Space Flight Technical Integration Contract (HSFTIC). The solicitation is seeking technical integration services to support NASA's Johnson Space Center. Key information includes that the solicitation number is 80JSC019R0023 and will be released on or around November 1, 2019, with proposals due by December 11, 2019. The NAICS code is 541715 with a size standard of 1,250 employees. The procurement is set aside for small businesses. Offerors should monitor the identified websites for solicitation documents and amendments. All technical questions must be submitted in writing. The Center Ombudsman information is also provided.
J-4 Applicable and Reference Document List
View the file
Other files for this federal contract opportunity
Show all 50
Human Space Flight Technical Integration Contract (HSFTIC) has more files on GovTribe.
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Cover Page 80JSC019R0023 SECTION J, Attachment J-4
| HUMAN SPACE FLIGHT TECHNICALINTEGRATION CONTRACT |
| Attachment J-4 |
Applicable and Reference Documents Lists
Forward 80JSC019R0023 SECTION J, Attachment J-4
HUMAN SPACE FLIGHT TECHNICALINTEGRATION CONTRACT
| Table A: Applicable Documents List |
| Table B Reference Documents List |
| Table C: Book Coordinated and Managed Documents List |
The documents identified within Table A or within a document listed in this table (second tier) are applicable to this contract. Requirements written in these documents have full force and effect as if their text were written in this contract to the extent that the requirements relate to context of the work to be performed within the scope of this contract. When a document is classified as “reference,” the document is provided for information about the ISS Program execution and the Mission and Program Integration Contract’s role in the ISS Program.
The general approach for interpreting whether a document impacts the contractor’s performance is that if a document is “applicable,” then the contractor has solid requirements that derive from that document. Applicable documents contain additional requirements and are considered binding to the extent specified. Applicable documents cited in the text of the document in a manner that indicates applicability such as follows:
| · In accordance with |
| · As stated in |
| · As specified in |
| · As defined in |
| · Per |
| · In conformance with |
When a document is classified as “reference,” the document is provided for general context of the ISS Program execution and for influence on the performance of the Human Space Flight Integration Contract (HSFTIC) in its role of support to the Programs. Sample documentation that may be used or produced by the contractor is included as reference documents to allow the contractor to gain insight into the HSFTIC’s functions and products. Reference documents shall not contain additional requirements and will not be considered binding. Citations of Reference documents shall clearly indicate that the material is for information or reference only such as follows:
| · Reference |
| · Using (as a guide) |
| · For additional information |
Table C - Book Coordinated and Managed Documents List, contains a listing of documents that will require book coordination functions and/or book management functions in accordance with SSP 41170, SSP 50010, and Section J, Attachment J-2, Key Terms.
Table A-Applicable
| 80JSC019R0023 | SECTION J, Attachment J-4 | |
| HUMAN SPACE FLIGHT TECHNICALINTEGRATION CONTRACT | ||
| Document Number | Document Title | |
| D684-10020-01 | Program Master Integration and Verification Plan | |
| Executive Order 12600 | Predisclosure Notification Procedures for Confidential Commercial Information | |
| Executive Order 13201 | Notification of Employee Rights Concerning Payment of Union Dues and Fees | |
| Executive Order 13496 | Notification of Employee Rights Under Federal Labor Laws | |
| FIPS PUB 199 | Standards for Security Categorization of Federal Information and Information Systems | |
| FIPS PUB 201 | Personal Identity Verification (PIV) of Federal Employees and Contractors | |
| IMCOH | ISS Management Center Operations Handbook | |
| ITS-HBK-1382.03-02 | Privacy Risk Management and Compliance | |
| ITS-HBK-2810.02 | Security Assessment and Authorization | |
| ITS-HBK-2810.03 | Planning | |
| ITS-HBK-2810.04 | Risk Assessment: Security Categorization, Risk Assessment, Vulnerability Scanning, Expedited Patching, & Organizationally Defined Values | |
| ITS-HBK-2810.05 | System and Services Acquisition | |
| ITS-HBK-2810.06 | Security Awareness and Training | |
| ITS-HBK-2810.07 | Configuration Management | |
| ITS-HBK-2810.08 | Contingency Planning | |
| ITS-HBK-2810.09 | Incident Response and Management | |
| ITS-HBK-2810.10-02A | System and Information Integrity | |
| ITS-HBK-2810.10-02B | Maintenance | |
| ITS-HBK-2810.11 | Media Protection | |
| ITS-HBK-2810.12 | Physical and Environmental Protection | |
| ITS-HBK-2810.13 | Personnel Security | |
| ITS-HBK-2810.15 | Access Control | |
| ITS-HBK-2810.16 | Audit and Accountability | |
| ITS-HBK-2810.17 | Identification and Authentication | |
| ITS-HBK-2810.18 | System and Communication Protection | |
| ITS-HBK-2841.03 | Identity, Credential, and Access Management (ICAM) Services Handbook | |
| JSC-28222 | EVA Office Certification of Flight & EVA Readiness Requirements and Implementation Plan | |
| JSC 28225 | Certification of Flight Readiness (CoFR) Implementation Plan | |
| JSC 28140 | Flight Operations Directorate International Space Station Certification of Flight Readiness Implementation Plan | |
| JPD 8500.1 | JSC Environmental Excellence Policy | |
| JPR 1040.4 | JSC Emergency Management Plan | |
| JPR 1281.7 | Control of Customer Property | |
| JPR 1281.15 | Idenfication, Handling, Storage, Packaging, Preservation, and Delivery | |
| JPR 1440.3 | JSC Records Management | |
| JPR 1700.1 | JSC Safety and Health Handbook | |
| JPR 2310.1 | JSC Organizational Learning Program | |
| JPR 8550.1 | Johnson Space Center Environmental Compliance Procedural Requirements | |
| JPR 8553.1 | Environmental Management System Manual | |
| JWI 1040.26 | JSC Emergency Plan Appendix 4 - Oil and Hazardous Substance Release/Spills | |
| JWI 1282.1 | Organizational Master List Instructions | |
| JWI 4200.1 | Management of Controlled Equipment | |
| JWI 4210.2 | JSC Instructions for Control of Program Stock | |
| JWI 4300.1 | JSC Instructions for Excess and Disposal | |
| JWI 6050.1 | Procedures for Processing Shipments | |
| JWI 8553.1 | Environmental Management System (EMS) Aspect/Impact Assessment and Environmental Management Program (EMP) Process | |
| JWI 8831.1 | Facility Manager Program | |
| KPL-PLN-50001 | Kennedy Space Center ISS Exploration Research and Technology Programs Certification of Flight Readiness (CoFR) Implementation Plan | |
| MD-1009 | International Space Station (ISS) Policy for NASA Control Board and Control Panel Operations | |
| MD-114 | Guidelines for Russian & Kazakhstan Travel Support of ISS Program Meetings | |
| MGT-OH-018 | On-Orbit Vehicle Configuration Discrepancy Resolution Process Work Instruction | |
| NASA-HDBK-6003 | NASA Technical Handbook | |
| NASA/SP-2007-6105 | NASA Systems Engineering Handbook | |
| NASA-STD-2804 | Minimum Interoperability Software Suite | |
| NASA-STD-2805 | Minimum Hardware Configurations | |
| NID 7150-113 | NASA Interim Directive (NID) Software License Management | |
| NIST-SP-800-18 | Guide for Developing Security Plans for Information Technology Systems | |
| NIST-SP-800-30 | Risk Management Guide for Information Technology Systems | |
| NIST-SP-800-34 | Contingency Planning Guide for Federal Information Systems | |
| NIST-SP-800-37 | Guide for Applying the Risk Management Framework to Federal Information Systems: A Security Life Cycle Approach | |
| NIST-SP-800-53 | Guide for Assessing the Security Controls in Federal Information Systems and Organizations: Building Effective Security Assessment Plans | |
| NIST-SP-800-60 Volume 1 | Volume I: Guide for Mapping Types of Information and Information Systems to Security Categories | |
| NIST-SP-800-60 Volume 2 | Volume II: Appendices to Guide for Mapping Types of Information and Information Systems to Security Categories | |
| No Number | Facility Summary Form (FSF) | |
| No Number | Investigation Summary Form (ISF) | |
| No Number | Railway Labor Act | |
| No Number | Section 508 of the Rehabilitation Act of 1974 | |
| No Number | Service Contract Act of 1965 | |
| No Number | Increment Integration and Operations Handbook | |
| No Number | NASA Style Guide | |
| No Number | Guidelines for Impact Statement | |
| No Number | ISS Program Science Forum Results Processing Guidelines | |
| No Number | Program Science Forum guidelines for the counting of investigations | |
| No Number | ISS Program Science Forum - USOS Investigation Data Toolbox Inputs Protocol | |
| NPD 1440.6 | NASA Records Management | |
| NPD 2521.1 | Communications and Material Review | |
| NPD 2810.1 | NASA Information Security Policy | |
| NPD 7120.7 | NASA Information Technology and Institutional Infrastructure Program and Project Management Requirements | |
| NPD 8500.1 | NASA Environmental Management | |
| NPR 1441.1 | NASA Records Retention Schedules | |
| NPR 1600.1 | NASA Security Program Procedural Requirements | |
| NPR 1600.2 | NASA Classified National Security Information (CNSI) | |
| NPR 1600.3 | Personnel Security | |
| NPR 1600.4 | Identity and Credential Management | |
| NPR 1600.6 | Communications Security (COMSEC) [Document is Sensitive but Unclassified (SBU) and can not be provided] | |
| NPR 1660.1 | NASA Counterintellingence and Counterterrorism | |
| NPR 1620.3 | Physical Security Requirements for NASA Facilities and Property [Document is Sensitive but Unclassified (SBU) and can not be provided] | |
| NPR 2200.2 | Requirements for Documentation, Approval, and Dissemination of Scientific and Technical Information (STI) | |
| NPR 2800.1 | Managing Information Technology | |
| NPR 2800.2 | Electronic and Information Technology Accessibility | |
| NPR 2810.1 | Security of Information Technology | |
| NPR 2830.1 | NASA Enterprise Architecture Procedures | |
| NPR 2841.1 | Identity, Credential, and Access Management | |
| NPR 4100.1 | NASA Supply Support and Material Management | |
| NPR 4200.1 | NASA Equipment Management Procedural Requirements | |
| NPR 4300.1 | NASA Personal Property Disposal Procedural Requirements | |
| NPR 4310.1 | Artifact Indefication and Disposition | |
| NPR 7120.5 | NASA Space Flight Program and Project Management Requirements | |
| NPD 1600.3 | Policy on Prevention of and Response to Workplace Violence | |
| NPD 1600.9 | NASA Insider Threat Program | |
| NPD 7120.6 | Knowledge Policy on Programs and Projects | |
| NPR 7123.1 | NASA Systems Engineering Processes and Requirements | |
| NPR 7150.2 | NASA Software Engineering Requirements | |
| NPR 8000.4 | Agency Risk Management Procedural Requirements | |
| NPR 8530.1 | NASA Sustainable Acquisitions | |
| NPR 8553.1 | NASA Environmental Management System | |
| NPR 8570.1 | NASA Energy Management Program | |
| NPR 8580.1 | Implementing the National Environmental Policy Act and Executive Order 12114 | |
| NPR 8621.1 | NASA Procedural Requirements for Mishap and Close Call Reporting, Investigating, and Recordkeeping | |
| NPR 8705.5 | Technical Probabilistic Risk Assessment Procedures for S&MA for NASA Programs and Projects | |
| NPR 8715.3 | NASA General Safety Program Requirements | |
| NPR 9501.2 | NASA Contractor Financial Management Reporting | |
| NRRS 1441.1 | Retention Schedule | |
| OB-MER-006 | ISS MER Support Definition Document | |
| OSHA CSP 03-001-003 | Voluntary Protection Program (VPP): Policies and Procedures Manual | |
| PMDO-OFRI-PLAN-001 | HP20 Payload and Mission Operations Division Operations and Flight Readiness Plan | |
| PPD 1011 | ISS Jettison Policy | |
| PPD 522 | International Space Station (ISS) Policy for Multilateral Control Board and Control Panel Operations | |
| SAE AS9100 | Quality Systems - Aerospace - Model for Quality Assurance in Design, Development, Production, Installation and Servicing | |
| SSP 30219 | Space Station Reference Coordinate Systems | |
| SSP 30223 | Problem Reporting and Corrective Action for the Space Station Program | |
| SSP 30309 | Safety Analysis and Risk Assessment Requirements Document | |
| SSP 30459 | International Space Station Interface Control Plan | |
| SSP 30599 | Safety Review Process | |
| SSP 41000 | System Specification for the International Space Station | |
| SSP 41170 | Configuration Management Requirements | |
| SSP 41171 | Preparation of Program-Unique Specifications | |
| SSP 41172 | Qualifications and Acceptance Environmental Test Requirements | |
| SSP 41173 | Space Station Quality Assurance Requirements | |
| SSP 41174 | International Space Station Interface Control Operating Procedures | |
| SSP 50005 | International Space Station Flight Crew Integration Standard (NASA-STD-3000/T) | |
| SSP 50010 | Standards for ISS Program Documentation | |
| SSP 50013 | Information Systems Plan | |
| SSP 50013-ANXA | Information Systems Plan Annex A: SharePoint Governance | |
| SSP 50021 | Safety Requirements Document | |
| SSP 50101 | NASA RSA Phase 2-3 Bilateral Integration | |
| SSP 50108 | ISS Program Certification of Flight Readiness Process Document | |
| SSP 50123 | Configuration Management Handbook | |
| SSP 50123-ASI | Configuration Management Handbook, Agenzia Spaziale Italiana Annex | |
| SSP 50123-CSA | Configuration Management Handbook, Canadian Space Agency Annex | |
| SSP 50123-ESA | Configuration Management Handbook, European Space Agency Annex | |
| SSP 50123-JAXA | Configuration Management Handbook, Japan Aerospace Exploration Agency Annex | |
| SSP 50123-ROSCOSMOS | Configuration Management Handbook Federal Space Agency Annex | |
| SSP 50124 | NASA/CSA Bilateral Data Exchange Agreements, Lists and Schedules | |
| SSP 50126 | NASA/JAXA Bilateral Data Exchange, Agreements, Lists and Schedules for the Japanese Experiment Module (JEM) | |
| SSP 50127 | NASA/ESA Bilateral Data Exchange Agreements, Lists, and Schedules for Columbus | |
| SSP 50135 | International Space Station Interface Control Plan - NASA/RSA | |
| SSP 50137 | NASA/RSA Bilateral Data Exchange Agreement, List and Schedule | |
| SSP 50168 | Post Mission Planning and Execution Requirements | |
| SSP 50174 | Mission Integration Database Applications System to Vehicle Master Database Interface Control Document | |
| SSP 50175 | ISS Risk Management Plan | |
| SSP 50177 Part 1 | Government Furnished Data (GFD) Description Document Part 1 U.S. Sources | |
| SSP 50200-01 | Station Program Implementation Plan, Volume 1: Station Program Management Plan | |
| SSP 50200-01-ANX B | Station Program Implementation Plan (SPIP), Volume 1: Station Program Management Plan Annex B: Vehicle Office Plan | |
| SSP 50200-01-ANX D | Station Program Implementation Plan (SPIP), Volume 1: Station Program Management Plan Annex D:Avionics and Software Office Plan | |
| SSP 50200-01-ANX C | Station Program Implementation Plan (SPIP), Volume 1: Station Program Management Plan Annex C: Mission Integration and Operations | |
| SSP 50200-01-ANX E | Station Program Implementation Plan (SPIP) Volume 1: Station Program Management Plan Annex E: Safety & Mission Assurance/Program Risk Plan | |
| SSP 50200-01-ANX G | Station Program Implementation Plan (SPIP) Volume 1: Station Program Management Plan Annex G: International Space Station Program Planning and Control Office | |
| SSP 50200-01-ANX I | Station Program Implementation Plan (SPIP) Volume 1: Station Program Management Plan Annex I: International Space Station External Integration Office Plan | |
| SSP 50200-01-ANX K | Station Program Implementation Plan (SPIP), Volume 1: Station Program Management Plan Annex K: Human Space Flight Program - Russia and Moscow Technical Liaison Office | |
| SSP 50200-01-ANX M | Station Program Implementation Plan Volume 1: Station Program Management Plan, Annex M: Systems Engineering & Integration Office Plan | |
| SSP 50200-01-ANX N | Station Program Implementation Plan, Volume 1: Station Program Management Plan, Annex N: ISS Transportation Integration Plan | |
| SSP 50200-01-ANX Z | Station Program Implementation Plan, Volume 1: Station Program Management Plan, Annex Z: ISS Rsearch Program Plan | |
| SSP 50200-02 | Station Program Implementation Plan, Volume 2: Program Planning and Manifesting | |
| SSP 50200-11 | Station Program Implementation Plan, Volume 11: ISS Cargo Integration Processes | |
| SSP 50222 | Information Technology Capital Investment Process | |
| SSP 50230 | Mission Integration and Operations Office Certification of Flight Readiness Implementation Plan | |
| SSP 50231 | ISS Safety and Mission Assurance/Program Risk Certification of Flight Readiness Implementation Plan | |
| SSP 50261-01 | Generic Groundrules, Requirements, and Constraints Part 1: Strategic and Tactical Planning | |
| SSP 50261-02 | ISS Generic Groundrules and Constraints Part 2: Execute Planning | |
| SSP 50322 | ISS Vehicle Office Certification of Flight Readiness Implementation Plan | |
| SSP 50344 | Systems Engineering and Integration Office Certification of Flight Readiness Implementation Plan | |
| SSP 50359 | NASA/ESA Bilateral Data Exchange Agreements, Lists and Schedules for Node 3 | |
| SSP 50407 | NASA/ESA Bilateral Data Exchange Agreements, Lists and Schedules for Cupola 1 and 2 | |
| SSP 50409 | Crew Provisioning Management Plan | |
| SSP 50415 | MRS Base System Common Attach System Specification | |
| SSP 50416 | Mobile Transporter (MT) Capture Latch (MTCL) Specification | |
| SSP 50421 | Program Planning and Control Office Certification of Flight Readiness (CoFR) Implementation Plan | |
| SSP 50450 | Multi-increment Payload Resupply and Outfitting Model (MiPROM) | |
| SSP 50477 | Joint Crew Provisioning Catalog | |
| SSP 50481 | Management Plan for Waste Collection and Disposal | |
| SSP 50484 | Avionics and Software Office Certification of Flight Readiness (CoFR) Implementation Plan | |
| SSP 50489 | ISS Mission Integration Template | |
| SSP 50502 | International Space Station Hardware Preflight Imagery Requirements | |
| SSP 50521 | Return, Processing, Distribution and Archiving of Imagery Products from the International Space Station | |
| SSP 50578 | International Space Station Cargo Certification Process | |
| SSP 50614 | NASA/JAXA Bilateral Data Exchange Agreements, Lists, and Schedules for H-II Transfer Vehicle (HTV) | |
| SSP 50647 | Mission Integration Database Applications System to Cargo Local Database Interface Control Document | |
| SSP 50650 | Program Management Operations Integration Procedures | |
| SSP 50699-03 | ISS Certification Baseline Volume 3: Flight Attitudes | |
| SSP 50725 | Mission Integration Database Applications System/Property Operations Workflow Enhancement Real-Time (MIDAS/POWER) Interface Control Document | |
| SSP 50808 | International to Commercial Orbital Transportation System (COTS) Interface Requirements Document (IRD) | |
| SSP 50833 | International Space Station Program Cargo Transport Interface Requirements Document | |
| SSP 50834 | ISS Vehicle Office Management and Hardware Development Plan | |
| SSP 50835 | ISS Pressurized Volume Hardware Common Interface Requirements Document | |
| SSP 50849 | Mission Integration Database Applications System to JAXA HTV Cargo Integration System Interface Control Document | |
| SSP 50863 | Multilateral Yellow Tag Process | |
| SSP 50864 | NASA Yellow Tag Process | |
| SSP 50872 | Multilateral Cargo Interface Certification Process for International Space Station | |
| SSP 50902 | Transportation Integration Office Certification of Flight Readiness Implementation Plan | |
| SSP 50914 | NASA/ASI Bilateral Data Exchange Agreements, List and Schedules for the Permanent Multipurpose Module PMM | |
| SSP 50935 | ISS Hardware Operations and Maintenance Requirements and Specifications Document (OMRSD) FILE I, Volume 1 - Introduction to OMRSD | |
| SSP 50964 | Visiting Vehicle ISS Integration Plan | |
| SSP 52054 | ISS Research Integration Office Certification of Flight Readiness Implementation Plan | |
| SSP 54004 | Increment Definition and Requirements Review Document for Increments XX and YY Standard Blank Book | |
| SSP 54061-54062 – ANX 5 | Increment Definition and Requirements Document for Increments 61_62, Annex 5: Payload Tactical Plan | |
| SSP 54061_54062 | Increment Definition and Requirements Document for Increments 61_62 | |
| SSP 54100 | Multi-Increment Planning Document | |
| SSP 543XX 543YY | Post Increment Evaluation Report, Increments XX and YY | |
| SSP 54059_54060-ANX 3 | Increment Definition and Requirements Document for Increments 59_60, Annex 3: Imagery Requirements | |
| SSP 54055-54056-ANX 2 | Increment Definition and Requirements Document for Increments 55_56, Annex 2: On-Orbit Maintenance Plan and Operations Support | |
| SSP 54059-54060-ANX 4 | Increment Definition and Requirements Document for Increment 55_56 Annex 4: Medical Operations and Environmental Monitoring | |
| IDRD ANX 1 Manifest Report - NG-10 | Increment Definition and Requirements Document, Annex 1: Manifest Report Flight NG-10 | |
| SSP 54504 | Increment Definition and Requirements Document, Annex 5: Payload Tactical Plan Blank Book | |
| SSP 57057 | ISS Science, Technology, and Exploration (ST&E) Integration Flow | |
| SSP 57061 | Standard Payload Integration Agreements for ISS Payloads |
Table B-Reference
| 80JSC019R0023 | SECTION J, Attachment J-4 | |
| HUMAN SPACE FLIGHT TECHNICALINTEGRATION CONTRACT | ||
| Document Number | Document Title | |
| BASEPLATE | Beta Altitude Significant Event Planning Template | |
| CCT-REQ-1130 | ISS Crew Transportation and Services Requirements | |
| DSG-Plan-004 | Gateway Configuration and Data Management Plan Baseline | |
| DSG-Conop-001 | Gateway Concept of Operations - initial baseline | |
| JSC 1240 (Form) | JSC Notice of Safety or Health and Action Plan | |
| 26557 Vol 1 | On-Orbit Assembly Modeling and Mass Properties Data Book Volume 1 | |
| 26557 Vol 2 | On-Orbit Assembly Modeling and Mass Properties Data Book Volume 2 | |
| JSC 288 (Form) | Statistical Information – Contractor Safety and Health Program | |
| MD 1034 | Charter for the Research Integration Control Board (RICB) | |
| MD 1036 | Charter for Payload Integration Panel (PIP) | |
| MD 1040 | Charter for ISS Program Science Forum - U.S. | |
| MD 1054 | Charter for ISS Program Science Forum Control Board | |
| MD-101 | International Space Station (ISS) Program Directive System | |
| MD-1015 | ISS Risk Assessment Policy | |
| MD-106 | Charter for the Space Station Program Control Board (SSPCB) | |
| No Number | ISS 1 pager template | |
| No Number | Gateway Program Organizational Chart | |
| No Number | ISS Program Organizational Chart | |
| No Number | Orion Program Organizational Chart | |
| No Number | APA Style Website Reference | |
| No Number | GPO Website Reference | |
| No Number | ISS Program Flight Rate Chart | |
| No Number | Ground Rules and Assumptions for Gateway | |
| No Number | Subsystem & Mission Functions to Modules | |
| No Number | International Space Station Research OZ/OX Strategic Communications Plan | |
| NPR 9501.2 | NASA Contractor Financial Management Reporting | |
| OM-WI-02 | VIPER Interface Document Volume 1: Altitude and Propellant | |
| POIF-1005 | Payload Operations Integration Center - Payload Operations Handbook, Volume 2: Increment Operations | |
| PPD 1019 | Charter for ISS Program Science Forum | |
| PPD 524 | Charter for the Multilateral Research Integration Control Board | |
| PPD 541 | Charter for Research Planning Working Group | |
| PPD-517 | Charter for the Crew Provisioning Working Group (CPWG) | |
| PPD-521 | Charter for the Space Station Control Board (SSCB) | |
| PPD-1081 | Charter for Dynamic Event Working Group | |
| RPWG-01 | Charter for the Research Planning Working Group Increment Research Team | |
| RPWG-02-Inc XX/YY | Increment Utilization Accomplishment Report Blank Book | |
| RPWG-IRT-01 | Research Planning Working Group Increment Research Team Processes | |
| SSP 30234 | Failure Modes and Effect Analysis and Critical Items List Requirements for Space Station | |
| SSP 30550 | Space Station Program Robotic Systems Integration Standards Volume 1: Robotic Accommodation Requirements | |
| SSP 30559 | Structural Design and Verification Requirements | |
| SSP 30575 | Space Station Interior and Exterior Operational Location Coding System | |
| SSP 41002 | International Standard Payload Rack to NASA/ESA/JAXA Modules Interface Control Document | |
| SSP 41004 Part 1 | Common Berthing Mechanism to Pressurized Elements Interface Control Document Part 1 | |
| SSP 41004 Part 2 | Common Berthing Mechanism to Pressurized Elements Interface Control Document Part 2 | |
| SSP 41015 Part 1 | Common Hatch and Mechanisms to Pressurized Elements Interface Control Document Part 1 | |
| SSP 41015 Part 2 | Common Hatch and Mechanisms to Pressurized Elements Interface Control Document Part 2 | |
| SSP 41017 Part 1 | Rack to Mini Pressurized Logistics Module Interface Control Document (ICD) Part 1 | |
| SSP 41017 Part 2 | Rack to Mini Pressurized Logistics Module Interface Control Document (ICD) Part 2 | |
| SSP 41140 Part 1 | Space Station Program Node Element 1 to Node element 3 Interface Control Document, Part 1 | |
| SSP 41140 Part 2 | Space Station Program Node Element 1 to Node element 3 Interface Control Document, Part 2 | |
| SSP 41142 Part 1 | Space Station Program Node elements to Cupola Element Interface Control Document, Part 1 | |
| SSP 41142 Part 2 | Space Station Program Node elements to Cupola Element Interface Control Document, Part 2 | |
| SSP 41143 Part 1 | Space Station Program Node Element 2 to U.S. Laboratory Element Interface Control Document Part 1 | |
| SSP 41143 Part 1 App D | Space Station Program Node Element 2 to U.S. Laboratory Element Interface Control Document Part 2 | |
| SSP 41143 Part 2 | Space Station Program Node Element 2 to U.S. Laboratory Element Interface Control Document Part 2 | |
| SSP 41147 Part 1 | Space Station Program Node Element 2 to Centrifuge Accommodation Module Interface Control Document Part 1 | |
| SSP 41147 Part 2 | Space Station Program Node Element 2 to Centrifuge Accommodation Module Interface Control Document Part 2 | |
| SSP 41148 Part 1 | Active Common Berthing Mechanism To Passive Common Berthing Mechanism Interface Control Document, Part 1 | |
| SSP 41150 | Interface Requirements Document United Station On-Orbit Segment (USOS) to Columbus Attached Pressurized Module (APM) | |
| SSP 41151 | Interface Requirements Document Space Station Manned Base to Japanese Experiment Module | |
| SSP 41151 App D | Space Station Manned Base to Japanese Experiment Module Interface Requirements Document Appendix D Software Interfaces | |
| SSP 41152 | Interface Requirements Document International Standard Payload Rack (ISPR) | |
| SSP 41160 | European Space Agency Segment Specification for Columbus | |
| SSP 41162 | Segment Specification for the United States On-Orbit | |
| SSP 41163 | Russian Segment Specification | |
| SSP 41165 | Segment Specification for the Japanese Experiment Module | |
| SSP 41167 | Mobile Servicing System Segment Specification for the International Space Station Program | |
| SSP 41172 | Qualification and Acceptance Environmental Test Requirements | |
| SSP 42000 | Space Station Manned Base to Japanese Experiment Module Interface Control Document | |
| SSP 42001 | Space Station Manned Base to Columbus Attached Pressurized Module Interface Control Document | |
| SSP 42003 Part 1 | Space Station Manned Base (SSMB) to Mobile Servicing System (MSS) Interface Control Document Part 1 | |
| SSP 42003 Part 2 | Space Station Manned Base to Mobile Servicing System Interface Control Document Part 2 | |
| SSP 42004 Part 1 | Mobile Servicing System (MSS) to User (Generic) Interface Control Document Part 1 | |
| SSP 42004 Part 2 | Mobile Servicing System to User (Generic) Interface Control Document Part 2 | |
| SSP 42007 Part 1 | United States On-Orbit Segment to Italian Mini Pressurized Logistics Module Interface Control Document Part 1 | |
| SSP 42007 Part 2 | United States On-Orbit Segment to Permanent Multi-Purpose Module Interface Control Document Part 2 | |
| SSP 42097 Part 1 | Space Station Program Pressurized Mating Adapter 2 & 3 to U.S. Pressurized Elements CORE (Node 2 to PMA 2) Interface Control Document, Part 1 | |
| SSP 42097 Part 1, App E | Space Station Program Pressurized Mating Adapter 2 & 3 to United States Pressurized Elements (Node Element 3 to Pressurized Mating Adapter 3) Interface Control Document, Part 1, Appendix E | |
| SSP 42097 Part 2 | Space Station Program Pressurized Mating Adapter 2 & 3 to U.S. Pressurized Elements CORE (Node 2 to PMA 2) Interface Control Document, Part 2 | |
| SSP 42097 Part 2, App E | Space Station Program Pressurized Mating Adapter 2 & 3 to U.S. Pressurized Elements (Node 3 to PMA 3) Interface Control Document, Part 2, Appendix E | |
| SSP 42121 Part 1 | U.S. On-Orbit Segment Pressurized Mating Adapter-1 to Russian Segment FGB Interface Control Document Part 1 | |
| SSP 42121 Part 2 | U.S. On-Orbit Segment Pressurized Mating Adapter-1 to Russian Segment FGB Interface Control Document Part 2 | |
| SSP 42124 Part 1 | Space Station Program Integrated Truss Segment S0 to Node 2 Interface Control Document Part 1 | |
| SSP 42124 Part 2 | Space Station Program Integrated Truss Segment S0 to Node 2 Interface Control Document Part 2 | |
| SSP 42137 Part 1 | Space Station Program Integrated Truss Segment S0 to Node 3 Interface Control Document, Part 1 | |
| SSP 42137 Part 2 | Space Station Program Integrated Truss Segment S0 to Node 3 Interface Control Document, Part 2 | |
| SSP 50033 | NASA/CSA Bilateral Integration and Verification Plan | |
| SSP 50034 | NASA/ESA Bilateral Integration and Verification Plan | |
| SSP 50035 | NASA-NASDA JEM Bilateral Integration and Verification Plan | |
| SSP 50038 | Computer-Based Control System Safety Requirements | |
| SSP 50062 | NASA/CSA Bilateral Safety and Mission Assurance Requirements | |
| SSP 50094 | NASA/RSA Joint Specifications Standards Document for the ISS Russian Segment | |
| SSP 50098 Part 1 | Robotic Workstation to Space Station Manned Base (SSMB) Interface Control Document Part 1 | |
| SSP 50098 Part 2 | Robotic Workstation to Space Station Manned Base (SSMB) Interface Control Document Part 2 | |
| SSP 50101 | NASA-RSA Phase 2-3 Bilateral Integration and Verification Plan | |
| SSP 50102 | NASA/ASI Bilateral Integration and Verification Plan | |
| SSP 50104 | Portable Breathing Apparatus Standard Interface Control Document | |
| SSP 50128 | Specification of Technical Requirements for the FGB, Functional Cargo Block | |
| SSP 50136 | NASA/Roscosmos Bilateral Hardware and Software Exchange Agreements, Lists and Schedules | |
| SSP 50145 | NASA/JAXA Bilateral Safety and Product Assurance Requirements | |
| SSP 50146 | NASA/RSA Bilateral S&MA Process Requirements for International Space Station | |
| SSP 50182 | NASA/ASI Bilateral Safety and Product Assurance Requirements | |
| SSP 50190 | Contingency Action Plan | |
| SSP 50191 | NASA/ESA Bilateral Safety and Product Assurance Requirements | |
| SSP 50200-08 | Station Program Implementation Plan, Volume 8: Increment Execution Preparation | |
| SSP 50220 | NASA/CSA Bilateral Hardware and Software Exchange Agreements, Lists and Schedules | |
| SSP 50227 | Russian Segment to PDGF/PVGF/SSRMS Interface Control Document | |
| SSP 50251 Part 1 | ARIS to Pressurized Element Interface Control Document Part 1 | |
| SSP 50251 Part 2 | ARIS to Pressurized Element Interface Control Document Part 2 | |
| SSP 50264 | NASA/JAXA Bilateral Hardware and Software Exchange Agreements, Lists, and Schedules for the Japanese Experiment Module (JEM) | |
| SSP 50273 | Segment Specification for the H-II Transfer Vehicle | |
| SSP 50281 | Node 2 NASA/ASI Bilateral Integration and Verification Plan | |
| SSP 50309 Part 1 | Space Station Program Node 3 to Habitation Module Interface Control Document, Part 1 | |
| SSP 50309 Part 2 | Node Element 3 to Habitation Module Element Interface Control Document, Part 2 | |
| SSP 50310 | Atmosphere Revitalization Subsystem Rack to Node 3 Interface Control Document | |
| SSP 50314 | Water Recovery System Rack #2 to Node 3 Interface Control Document | |
| SSP 50315 | Water Recovery System Rack #1 to Node 3 Interface Control Document | |
| SSP 50316 | Oxygen Generation System Rack to Node 3 Interface Control Document | |
| SSP 50318 | Prime Item Development Specification for Node 3 | |
| SSP 50333 | Cupola Segment Specification | |
| SSP 50347 | Node 3 NASA/ESA Bilateral Integration & Verification Plan | |
| SSP 50357 | Node 2 to Crew Quarters Interface Control Document | |
| SSP 50397 | Node 3 to Waste and Hygiene Compartment Interface Control Document | |
| SSP 50406 | NASA/ESA Bilateral Integration and Verification Plan for Cupola | |
| SSP 50420 | NASA/JAXA Bilateral Integration and Verification Plan for HTV | |
| SSP 50420-HTV 1 | NASA/JAXA Bilateral Integration and Verification Plan for HTV, Annex 1: HTV1 | |
| SSP 50420-HTV 2 | NASA/JAXA Bilateral Integration and Verification Plan For HTV, Annex 2: HTV2 | |
| SSP 50420-HTV 3 | NASA/JAXA Bilateral Integration and Verification Plan For HTV, Annex 3: HTV3 | |
| SSP 50438 Part 1 | International Space Station to H-II Transfer Vehicle Interface Control Document, Part 1 | |
| SSP 50438 Part 2 | International Space Station to H-II Transfer Vehicle Interface Control Document, Part 2 | |
| SSP 50469 | Operations Control Software (OCS) to Robotic Workstation (RWS) Interface Control Document (ICD) | |
| SSP 50470 | Crew Health Care System (CHECS) Specification | |
| SSP 50477 | Joint Crew Provisioning Catalog | |
| SSP 50615 | NASA/JAXA Bilateral Hardware and Software Exchange Agreements, Lists and Schedules for the H-II Transfer Vehicle (HTV) | |
| SSP 50621 | Generic On-Orbit Stowage Capabilities and Requirements: Pressurized Volume | |
| SSP 50627 | Generic International Space Station (ISS) Plug-in Plan (IPiP) Integration Process for Future Portable Loads | |
| SSP 50659 | International Space Station Work Breakdown Structure | |
| SSP 50670 | Advanced Resistive Exercise Device (ARED) to the International Space Station Interface Control Document | |
| SSP 50699-04 | Certification Baseline Document Volume 4: International Space Station Lifetime Extension | |
| SSP 57000 | Pressurized Payloads Interface Requirements Document | |
| SSP 57003 | External Payload Interface Requirements Document | |
| SSP 50715 | International Space Station Crew Reduction, De-Crewing, and Re-crewing Plan | |
| SSP 50744 | Data Impoundment and Processing Procedures | |
| SSP 50754 | Crew Monitoring Requirements for the H-II Transfer Vehicle System Requirements Document | |
| SSP 50781 | Project Technical Requirements Specification for the ISS Crew Quarters | |
| SSP 50803 | Generic NASA/ESA Bilateral Hardware and Software Exchange Agreements, Lists and Schedules | |
| SSP 50821 | Requirements Specification for the International Space Station (ISS) Second Treadmill (T2) | |
| SSP 50826 | International Space Station 6-Crew Strategic Planning Document: ISS Crew Augmentation Strategic Plan for 2009-2011 | |
| SSP 50839 | ISS Program Operations Description (IPOD) | |
| SSP 50852 | H-II Transfer Vehicle (HTV) 1 Verification Matrix | |
| SSP 50869 | Prime Item Development Specification for the Permanent Multipurpose Module (PMM) | |
| SSP 50875 | Oxygen Generation System Rack to Rack Components Interface Control Document | |
| SSP 50901 | Integrated Stowage Platform (ISP) to Multi-Purpose Logistics Module (MPLM) Interface Control Document (ICD) Part 1 | |
| SSP 50908 | NASA/ASI Permanent Multipurpose Module (PMM) Project Joint Implementation Plan (JIP) | |
| SSP 50911 | PMM Bilateral Hardware and Software Exchange Agreements, Lists, and Schedules | |
| SSP 50949 | ISS Configuration Document | |
| SSP 52055 | ExPRESS Logistics Carrier (ELC) Development Specification | |
| SSP 54353_54354 | Post Increment Evaluation Report Increments 53 and 54 | |
| SSP 57011 | Payload Verification Program Plan, ISS Program |
Table C-Book Coordinate-Managed
| 80JSC019R0023 | SECTION J, Attachment J-4 | |
| HUMAN SPACE FLIGHT TECHNICALINTEGRATION CONTRACT |
| CAM Owner | Document Number | Document Title | Book Coordination Required | Book Managed |
| ISS/OB | IDSS Guide 001 | Navigation and Alignment Aids Concept of Operations and Supplemental Design Information | X | X |
| ISS/OB | IDSS IDD | International Docking System Standard (IDSS) Interface Definition Document (IDD) | X | X |
| ISS/OC | IMCOH | ISS Management Center Operations Handbook | X | X |
| ISS/OC | ISS IVA 0202 | Intravehicular Activity (IVA) Crewmember Injury and Hardware Damage from Impact/Collision Hazard Report | X | X |
| ISS/OE | ISS STO 0801 | Injury of Crew or Damage to ISS During Transfer and Stowage of Loose Hardware | X | X |
| ISS/OM | JSC 26557 Vol 1 | On-Orbit Assembly Modeling and Mass Properties Data Book Volume 1 | X | X |
| ISS/OM | JSC 26557 Vol 2 | On-Orbit Assembly Modeling and Mass Properties Data Book Volume 2 | X | X |
| ISS/OH | MGT OH 018 | On-Orbit Vehicle Configuration Discrepancy Resolution Process Work Instruction | X | |
| ISS/OM | No Number | VIPER Interface Document Main Volume | X | X |
| ISS/OM | No Number | VIPER Interface Document Volume 2: Consumables | X | X |
| ISS/OM | No Number | VIPER Interface Document Volume 3: Energy Balance | X | X |
| ISS/OM | No Number | VIPER Interface Document Volume 4 | X | X |
| ISS/OH | OH WI 002 | Work Instruction To Develop and Control ISS Forms For Configuration Management (CM) and Data Management (DM) | X | X |
| ISS/OM | OM WI 02 | VIPER Interface Document Volume 1: Altitude and Propellant | X | X |
| ISS/OM | SSP 30219 | Space Station Reference Coordinate Systems | X | X |
| ISS/OE | SSP 30223 | Problem Reporting and Corrective Action for the Space Station Program | X | |
| ISS/OE | SSP 30234 | Failure Modes and Effect Analysis and Critical Items List Requirements for Space Station | X | |
| ISS/OE | SSP 30309 | Safety Analysis and Risk Assessment Requirements Document | X | |
| ISS/OM | SSP 30550 | Space Station Program Robotic Systems Integration Standards Volume 1: Robotic Accommodation Requirements | X | X |
| ISS/OC | SSP 30575 | Space Station Interior and Exterior Operational Location Coding System | X | X |
| ISS/OE | SSP 30599 | Safety Review Process | X | |
| ISS/OE | SSP 30695 | Acceptance Data Package Requirements Specification | X | |
| ISS/OM | SSP 41000 | System Specification for the International Space Station | X | |
| ISS/OM | SSP 41002 | International Standard Payload Rack to NASA/ESA/JAXA Modules Interface Control Document | X | |
| ISS/OM | SSP 41140 PART 1 | Space Station Program Node Element 1 to Node element 3 Interface Control Document, PART 1 | X | X |
| ISS/OM | SSP 41140 PART 2 | Space Station Program Node Element 1 to Node element 3 Interface Control Document, PART 2 | X | X |
| ISS/OM | SSP 41142 PART 1 | Space Station Program Node elements to Cupola Element Interface Control Document, PART 1 | X | X |
| ISS/OM | SSP 41142 PART 2 | Space Station Program Node elements to Cupola Element Interface Control Document, PART 2 | X | X |
| ISS/OM | SSP 41150 | Interface Requirements Document United Station On-Orbit (USOS) to Columbus Attached Pressurized Module (APM) | X | |
| ISS/OM | SSP 41151 | Interface Requirements Document Space Station Manned Base to Japanese Experiment Module | X | |
| ISS/OM | SSP 41151 APP D | Space Station Manned Base to Japanese Experiment Module Interface Requirements Document APPendix D Software Interfaces | X | |
| ISS/OM | SSP 41152 | Interface Requirements Document International Standard Payload Rack (ISPR) | X | |
| ISS/OM | SSP 41160 | European Space Agency Segment Specification for Columbus | X | |
| ISS/OM | SSP 41163 | Russian Segment Specification | X | |
| ISS/OM | SSP 41165 | Segment Specification for the Japanese Experiment Module | X | |
| ISS/OM | SSP 41167 | Mobile Servicing System Segment Specification for the International Space Station Program | X | |
| ISS/OH | SSP 41170 | Configuration Management Requirements | X | X |
| ISS/OE | SSP 41173 | Space Station Quality Assurance Requirements | X | |
| ISS/OM | SSP 41174 | International Space Station Interface Control Operating Procedures | X | |
| ISS/OM | SSP 42000 | Space Station Manned Base To Japanese Experiment Module Interface Control Document | X | |
| ISS/OM | SSP 42001 | Space Station Manned Base to Columbus Attached Pressurized Module Interface Control Document | X | |
| ISS/OM | SSP 42003 PART 1 | Space Station Manned Base (SSMB) to Mobile Servicing System (MSS) Interface Control Document PART 1 | X | |
| ISS/OM | SSP 42003 PART 2 | Space Station Manned Base to Mobile Servicing System Interface Control Document PART 2 | X | |
| ISS/OM | SSP 42004 PART 1 | Mobile Servicing System (MSS) to User (Generic) Interface Control Document PART 1 | X | |
| ISS/OM | SSP 42004 PART 2 | Mobile Servicing System to User (Generic) Interface Control Document PART 2 | X | |
| ISS/OM | SSP 42007 PART 1 | United States On Orbit Segment to Italian Mini Pressurized Logistics Module Interface Control Document PART 1 | X | |
| ISS/OM | SSP 42007 PART 2 | United States On Orbit Segment to Permanent Multi Purpose Module Interface Control Document PART 2 | X | |
| ISS/OM | SSP 42097 PART 1, APP E | Space Station Program Pressurized Mating Adapter 2 & 3 to United States Pressurized Elements (Node Element 3 to Pressurized Mating Adapter 3) Interface Control Document, PART 1, Appendix E | X | |
| ISS/OM | SSP 42097 PART 2, APP. E | Space Station Program Pressurized Mating Adapter 2 & 3 to U.S. Pressurized Elements (Node 3 to PMA 3) Interface Control Document, PART 2, APPendix E | X | |
| ISS/OM | SSP 42121 PART 1 | U.S. On Orbit Segment Pressurized Mating Adapter 1 to Russian Segment FGB Interface Control Document PART 1 | X | |
| ISS/OM | SSP 42121 PART 2 | U.S. On Orbit Segment Pressurized Mating Adapter 1 to Russian Segment FGB Interface Control Document PART 2 | X | |
| ISS/OM | SSP 42137 PART 1 | Space Station Program Integrated Truss Segment S0 to Node 3 Interface Control Document, PART 1 | X | |
| ISS/OM | SSP 42137 PART 2 | Space Station Program Integrated Truss Segment S0 to Node 3 Interface Control Document, PART 2 | X | |
| ISS/OH | SSP 50010 | Standards for ISS Program Documentation | X | X |
| ISS/OH | SSP 50013 | Information Systems Plan | X | X |
| ISS/OH | SSP 50013 ANXA | Information Systems Plan Annex A: SharePoint Governance | X | X |
| ISS/OE | SSP 50021 | Safety Requirements Document | X | |
| ISS/OM | SSP 50033 | NASA/CSA Bilateral Integration and Verification Plan | X | |
| ISS/OE | SSP 50038 | Computer Based Control System Safety Requirements | X | |
| ISS/OE | SSP 50062 | NASA/CSA Bilateral Safety and Mission assurance Requirements | X | |
| ISS/OM | SSP 50094 | NASA/RSA Joint Specifications Standards Document for the ISS Russian Segment | X | X |
| ISS/OM | SSP 50098 PART 1 | Robotic Workstation to Space Station Manned Base (SSMB) Interface Control Document PART 1 | X | X |
| ISS/OM | SSP 50098 PART 2 | Robotic Workstation to Space Station Manned Base (SSMB) Interface Control Document PART 2 | X | X |
| ISS/OB | SSP 50101 | NASA RSA Phase 2 3 Bilateral Integration and Verification Plan | X | |
| ISS/OB | SSP 50102 | NASA/ASI Bilateral Integration and Verification Plan | X | |
| ISS/OX | SSP 50107 | NASA/RSA JOINT MANAGEMENT PLAN | X | |
| ISS/OC | SSP 50108 | ISS Program Certification of Flight Readiness Process Document | X | X |
| ISS/OH | SSP 50123 | Configuration Management Handbook | X | X |
| ISS/OH | SSP 50123 ASI | Configuration Management Handbook, Agenzia Spaziale Italiana Annex | X | X |
| ISS/OH | SSP 50123 CSA | Configuration Management Handbook, Canadian Space Agency Annex | X | X |
| ISS/OH | SSP 50123 ESA | Configuration Management Handbook, European Space Agency Annex | X | X |
| ISS/OH | SSP 50123 JAXA | Configuration Management Handbook, Japan Aerospace Exploration Agency Annex | X | X |
| ISS/OH | SSP 50123 ROSCOSMOS | Configuration Management Handbook Federal Space Agency Annex | X | X |
| ISS/OM | SSP 50124 | NASA/CSA Bilateral Data Exchange Agreements, Lists and Schedules | X | |
| ISS/OB | SSP 50126 | NASA/JAXA Bilateral Data Exchange, Agreements, Lists and Schedules for the Japanese Experiment Module (JEM) | X | |
| ISS/OB | SSP 50127 | NASA/ESA Bilateral Data Exchange Agreements, Lists, and Schedules for Columbus | X | |
| ISS/OM | SSP 50128 | Specification of Technical Requirements for the FGB, Functional Cargo Block | X | X |
| ISS/OM | SSP 50135 | International Space Station Interface Control Plan - NASA/RSA | X | X |
| ISS/OC | SSP 50136 | NASA/Roscosmos Bilateral Hardware and Software Exchange Agreements, Lists and Schedules | X | |
| ISS/OH | SSP 50137 | NASA/RSA Bilateral Data Exchange Agreement, List, and Schedule | X | |
| ISS/OE | SSP 50145 | NASA/JAXA Bilateral Safety and Product Assurance Requirements | X | |
| ISS/OE | SSP 50146 | NASA/RSA Bilateral S&MA Process Requirements for International Space Station | X | |
| ISS/OC | SSP 50168 | Post Mission Planning and Execution Requirements | X | X |
| ISS/OH4 | SSP 50174 | Mission Integration Database APPlications System To Vehicle Master Database Interface Control Document | X | X |
| ISS/OE | SSP 50175 | ISS Risk Management Plan | X | |
| ISS/OH | SSP 50177 PART 1 | Government Furnished Data (GFD) Description Document PART 1 U.S. Sources | X | |
| ISS/OE | SSP 50182 | NASA/ASI Bilateral Safety and Product Assurance Requirements | X | |
| ISS/OE | SSP 50190 | Contingency Action Plan | X | X |
| ISS/OE | SSP 50190 CRS | Contingency Action Plan, Annex A: Commercial Resupply Service | X | X |
| ISS/OE | SSP 50191 | NASA/ESA Bilateral Safety and Product Assurance Requirements | X | |
| ISS/OA | SSP 50200 01 | Station Program Implementation Plan, Volume 1: Station Program Management Plan | X | |
| ISS/OB | SSP 50200 01 ANX B | Station Program Implementation Plan (SPIP), Volume 1: Station Program Management Plan Annex B: ISSP Vehicle Office Overview | X | |
| ISS/OC | SSP 50200 01 ANX C | Station Program Implementation Plan (SPIP), Volume 1: Station Program Management Plan Annex C: Mission Integration and Operations | X | |
| ISS/OD | SSP 50200 01 ANX D | Station Program Implementation Plan (SPIP) Volume 1: Station Program Management Plan Annex D: Avionics & Software Office Plan | X | |
| ISS/OE | SSP 50200 01 ANX E | Station Program Implementation Plan (SPIP) Volume 1: Station Program Management Plan Annex E: Safety & Mission Assurance/Program Risk Plan | X | |
| ISS/OH | SSP 50200 01 ANX G | Station Program Implementation Plan (SPIP) Volume 1: Station Program Management Plan Annex G: International Space Station Program Planning and Control Office | X | |
| ISS/OK | SSP 50200 01 ANX K | Station Program Implementation Plan (SPIP), Volume 1: Station Program Management Plan Annex K: Human Space Flight Program Russia and Moscow Technical Liaison Office | X | |
| ISS/OM | SSP 50200 01 ANX M | Station Program Implementation Plan Volume 1: Station Program Management Plan, Annex M: Systems Engineering & Integration Office Plan | X | X |
| ISS/ON | SSP 50200 01 ANX N | Station Program Implementation Plan, Volume 1: Station Program Management Plan, Annex N: ISS Transportation Integration Plan | X | |
| ISS/OZ | SSP 50200 01 ANX Z | Station Program Implementation Plan (SPIP), Volume 1: Station Program Management Plan Annex Z: ISSP Research Program Plan | X | |
| ISS/OC | SSP 50200 08 | Station Program Implementation Plan, Volume 8: Increment Execution Preparation | X | |
| ISS/OC | SSP 50200 09 | Station Program Implementation Plan, Volume 9: Real Time Operations | X | |
| ISS/OB | SSP 50219 | NASA/ASI Bilateral Hardware and Software Exchange Agreements List & Schedules | X | |
| ISS/OM | SSP 50220 | NASA/CSA Bilateral Hardware and Software Exchange Agreements, Lists and Schedules | X | |
| ISS/OH | SSP 50222 | Information Technology Capital Investment Process | X | X |
| ISS/OX | SSP 50223 | International Space Station Export Control Plan | X | |
| ISS/OM | SSP 50227 PART 1 | Russian Segment to PDGF/PVGF/SSRMS Interface Control Document | X | |
| ISS/OC | SSP 50230 | Mission Integration and Operations Office Certification of Flight Readiness Implementation Plan | X | X |
| ISS/OE | SSP 50232 | ISS Safety and Mission Assurance/Program Risk Certification of Flight Readiness Implementation Plan | X | X |
| ISS/OC | SSP 50260 | International Space Station Medical Operations Requirements Document (ISS MORD) | X | |
| ISS/OC | SSP 50261 01 | Generic Groundrules, Requirements, and Constraints PART 1: Strategic and Tactical Planning | X | X |
| ISS/OC | SSP 50264 | NASA/JAXA Bilateral Hardware and Software Exchange Agreements, Lists, and Schedules for the Japanese Experiment Module (JEM) | X | |
| ISS/ON | SSP 50273 | Segment Specification for the H II Transfer Vehicle | X | |
| ISS/OC | SSP 50281 | Node 2 NASA/ASI Bilateral Integration and Verification Plan | X | |
| ISS/OE | SSP 50287 | Hardware/Software Acceptance Process | X | |
| ISS/OM | SSP 50309 PART 1 | Space Station Program Node 3 to Habitation Module Interface Control Document, PART 1 | X | |
| ISS/OM | SSP 50309 PART 2 | Node Element 3 to Habitation Module Element Interface Control Document, PART 2 | X | |
| ISS/OM | SSP 50310 | Atmosphere Revitalization Subsystem Rack to Node 3 Interface Control Document | X | X |
| ISS/OB | SSP 50314 | Water Recovery System Rack #2 to Node 3 Interface Control Document | X | |
| ISS/OB | SSP 50315 | Water Recovery System Rack #1 to Node 3 Interface Control Document | X | |
| ISS/OB | SSP 50316 | Oxygen Generation System Rack to Node 3 Interface Control Document | X | |
| ISS/OB | SSP 50318 | Prime Item Development Specification for Node 3 | X | |
| ISS/OB | SSP 50322 | ISS Vehicle Office Certification of Flight Readiness Implementation Plan | X | X |
| ISS/OB | SSP 50333 | Cupola Segment Specification | X | |
| ISS/OM | SSP 50344 | System Engineering and Integration Office Certificate of Flight Readiness Implementation Plan | X | X |
| ISS/OM | SSP 50350 | Robotic Workstation CCTV Screen Overlay Requirements | X | |
| ISS/OM | SSP 50350 ANX2 | Robotic Workstation CCTV Screen Overlay Requirements, Annex 2: Generic Visiting Vehicle Dynamic Overlay Requirements | X | |
| ISS/OB | SSP 50357 | Node 2 to Crew Quarters Interface Control Document | X | |
| ISS/OB | SSP 50397 | Node 3 to Waste and Hygiene ComPARTment Interface Control Document | X | |
| ISS/OB | SSP 50406 | NASA/ESA Bilateral Integration and Verification Plan for Cupola | X | |
| ISS/OX | SSP 50407 | NASA/ESA Bilateral Data Exchange Agreements, Lists and Schedules for Cupola 1 and 2 | X | |
| ISS/OC | SSP 50409 | Crew Provisioning Management Plan | X | |
| ISS/ON | SSP 50420 | NASA/JAXA Bilateral Integration and Verification Plan for HTV | X | |
| ISS/OH | SSP 50421 | Program Planning and Control Office Certification of Flight Readiness (CoFR) Implementation Plan | X | X |
| ISS/ON | SSP 50438 PART 1 | International Space Station to H II Transfer Vehicle Interface Control Document, PART 1 | X | |
| ISS/ON | SSP 50438 PART 2 | International Space Station to H II Transfer Vehicle Interface Control Document, PART 2 | X | |
| ISS/OZ | SSP 50450 | Multi increment Payload Resupply and Outfitting Model (MiPROM) | X | |
| ISS/OB | SSP 50470 | Crew Health Care System (CHECS) Specification | X | |
| ISS/OC | SSP 50477 | Joint Crew Provisioning Catalog | X | X |
| ISS/OC | SSP 50481 | Management Plan for Waste Collection and Disposal | X | X |
| ISS/OD | SSP 50484 | Avionics and Software Office Certification of Flight Readiness (CoFR) Implementation Plan | X | X |
| ISS/OC | SSP 50489 | ISS Mission Integration Template | X | X |
| ISS/OC | SSP 50502 | International Space Station Hardware Preflight Imagery Requirements | X | X |
| ISS/OB | SSP 50507 | NASA/International PARTners Plan for ISS Modules Pressure Integrity Verification | X | |
| ISS/OC | SSP 50521 | Return, Processing, Distribution and Archiving of Imagery Products from the International Space Station | X | X |
| ISS/OB | SSP 50578 | International Space Station Cargo Certification Process | X | X |
| ISS/ON | SSP 50614 | NASA/JAXA Bilateral Data Exchange Agreements, Lists, and Schedules for H II Transfer Vehicle (HTV) | X | |
| ISS/ON | SSP 50615 | NASA/JAXA Bilateral Hardware and Software Exchange Agreements, Lists and Schedules for the H-II Transfer Vehicle (HTV) | X | |
| ISS/OC | SSP 50621 | Generic On Orbit Stowage Capabilities and Requirements: Pressurized Volume | X | X |
| ISS/OM | SSP 50627 | Generic International Space Station (ISS) Plug in Plan (IPiP) Integration Process for Future Portable Loads | X | |
| ISS/OD | SSP 50645 ANXB | ANNEX B NASA/EUROPEAN SPACE AGENCY BILATERAL AGREEMENT, INTERNATIONAL SPACE STATION (ISS) COMMAND AND TELEMETRY TEAM (ICATT) STANDARDS | X | |
| ISS/OH4 | SSP 50647 | Mission Integration Database APPlications System to Cargo Local Database Interface Control Document | X | X |
| ISS/OC | SSP 50650 | Program Management Operations Integration Procedures | X | |
| ISS/OH | SSP 50659 | International Space Station Work Breakdown Structure | X | |
| ISS/OD | SSP 50664 | FLOATING POTENTIAL MEASUREMENT UNIT TO TELEVISION CAMERA INTERFACE CONVERTER ICD | X | |
| ISS/OB | SSP 50670 | Advanced Resistive Exercise Device (ARED) to the International Space Station Interface Control Document | X | |
| ISS/OM | SSP 50699 03 | ISS Certification Baseline Volume 3: Flight Attitudes | X | X |
| ISS/OD | SSP 50705 | Software Transition Process - International Space Station | X | |
| ISS/OC | SSP 50715 | International Space Station Crew Reduction, De Crewing, and Re crewing Plan | X | |
| ISS/OH4 | SSP 50725 | Mission Integration Database APPlications System/Property Operations Workflow Enhancement Real-Time (MIDAS/POWER) Interface Control Document | X | X |
| ISS/OC | SSP 50746 | United States On-Orbit Stowage Allocation Requirements | X | X |
| ISS/OM | SSP 50754 | Crew Monitoring Requirements for the H II Transfer Vehicle System Requirements Document | X | X |
| ISS/OB | SSP 50781 | Project Technical Requirements Specification for the ISS Crew Quarters | X | X |
| ISS/OZ | SSP 50795 | RESEARCH PLANNING WORKING GROUP OPERATIONS PLAN | X | |
| ISS/ON | SSP 50808 | International Space Station (ISS) to Commercial Orbital Transportation Services (COTS) Interface Requirements Document (IRD) | X | |
| ISS/ON | SSP 50809 | International Space Station (ISS) to Commercial Orbital Transportation Services (COTS) Interface Control Document (ICD) for Dragon | X | |
| ISS/OC | SSP 50826 | International Space Station 6 Crew Strategic Planning Document: ISS Crew Augmentation Strategic Plan for 2009 2011 | X | |
| ISS/ON | SSP 50831 | International Space Station (ISS) To Commercial Orbital Transportation Services (COTS) Ultra High Frequency Communications Unit (CUCU) Interface Requirements Document (IRD) | X | |
| ISS/ON | SSP 50833 | International Space Station Program Cargo Transport Interface Requirements Document | X | |
| ISS/OM | SSP 50837 | Robotic Workstation (RWS) Configuration File Requirements | X | |
| ISS/OM | SSP 50837 ANX2 | Video Graphics Software (VGS) Overlay Configuration File Requirements Annex 2: Generic Visiting Vehicle | X | |
| ISS/OH | SSP 50839 | ISS Program Operations Description (IPOD) | X | |
| ISS/ON | SSP 50844 PART 1 | Space Station Control Center to SpaceX Ground Segment Interface Control Document, PART 1 | X | X |
| ISS/ON | SSP 50844 PART 2 | Space Station Control Center to SpaceX Ground Segment Interface Control Document, PART 2 | X | X |
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .