About this file

This document summarizes a forthcoming solicitation for the Human Space Flight Technical Integration Contract (HSFTIC). NASA/JSC plans to issue a Request for Proposal for technical integration services to support human space flight programs. The total small business set-aside solicitation will use NAICS code 541715 with a size standard of 1,250 employees. The anticipated RFP release date is November 1, 2019 with a proposal due date of December 11, 2019. The solicitation and any amendments will be available at the NASA procurement website and FBO.gov. Offerors must monitor for the RFP release and are responsible for downloading documents. All technical questions must be submitted in writing.

CR 16052 ATTA SSP 54353 54354 Baseline

View the file

Other files for this federal contract opportunity

Other files attached to Human Space Flight Technical Integration Contract (HSFTIC), newest first.
File Type Posted
FRFP Industry Questions and Responses 120419.pdf PDF
HSFTIC L Instructions 11.22.19 FRFP-2.docx DOCX document
Attachment L-7 Cost Estimating Wookbook 11.21.19 FRFP-2.xlsx XLSX spreadsheet
SF30 - RFP - Amendment 2.pdf PDF
Attachment L-6 EPM Workbook 11.21.19 FRFP-2.xlsx XLSX spreadsheet
Attachment L-6 EPM Workbook MOD FRFP-1.xlsx XLSX spreadsheet
80JSC019R0023 HSFTIC RFP with MOD FRFP-1.docx DOCX document
HSFTIC Pre-Proposal Conference - Posting.pdf PDF
80JSC019R0023_Request_for_Proposal.pdf PDF
Attachment_L-7_Cost_Estimating_Workbook.xlsx XLSX spreadsheet
50104a.pdf PDF
SSP-50136_RevA.doc DOC document
SSP_50821.doc DOC document
APA_Style_Website_Ref.pptx PPTX presentation
MD_106_RB_FINAL.docx DOCX document
MD_1036_RA_FINAL_PIP_Charter.docx DOCX document
SSP_50869-Rev_A.docx DOCX document
SSP-57003_Rev_L.docx DOCX document
MD_1054_PSCB_Charter.pdf PDF
SSP_30234-RevH.docx DOCX document
SSP_42007-Part_1-RevK.pdf PDF
SSP_50318_RevJ.docx DOCX document
SSP_41162BA.pdf PDF
SSP41148_IRN.pdf PDF
CCT-REQ-1130_Rev_F.docx DOCX document
BASEPLATE-Mobile_Back-1.png PNG image
SSP_50908-Baseline.docx DOCX document
SSP_50420-HTV1-Baseline.docx DOCX document
Applicable_1.zip ZIP file
OrionProgramOrg.pdf PDF
SSP_42004_Part_2-Update_to_Cover.pdf PDF
SSP_50333-RevH.docx DOCX document
SSP_50406_Rev_B_.doc DOC document
SSP_42000-RevU.docx DOCX document
SSP50251P2.pdf PDF
MD_1034_RA_FINAL_2__RICB_Charter.docx DOCX document
SSP_42004_Part_1_Revision_L.docx DOCX document
SSP_50128-C3.doc DOC document
GRA_for_Gateway.xlsx XLSX spreadsheet
SSP_41140_P1_RF_final.pdf PDF
41004P1_H-1.pdf PDF
SSP_50627-RevA.docx DOCX document
SSP-50264.doc DOC document
19AA0613D_MAPI_Abstract_Blue_Book_Rev_EE.pdf PDF
SSP_50182.RTF RTF text file
Applicable_2.zip ZIP file
SSP_57000_Revision_S.docx DOCX document
SSP_50035_Revision_C_Retired.docx DOCX document
DRAFT_HSFTIC_Cover_Letter.pdf PDF
DRAFT_HSFTIC_Work_Load_Indicators.xlsx XLSX spreadsheet
Show all 50

Human Space Flight Technical Integration Contract (HSFTIC) has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Post Increment Evaluation Report Increments 53 and 54 Review Copy

International Space Station Program

Baseline (Draft – February 2019) March 2019

EAR 99. This document may be used only in the International Space Station (ISS) program to fulfill responsibilities of a Cooperating Agency of an ISS Partner in furtherance of the ISS Intergovernmental Agreement. Re-transfer or disclosure to, or use by, any persons other than citizens of ISS Program International Partner countries, or use for any other purpose, requires prior Governments authorization of all ISS Program Partners who approve this document.

National Aeronautics and Space Administration International Space Station Program Johnson Space Center Houston, Texas Contract Number: NNJ12GA46C

SSP 54353_54354

Baseline (Draft – February 2019)

REVISION AND HISTORY PAGE

REV.
DESCRIPTION
PUB. DATE
-
Initial Release (Reference per SSCD 16052, EFF. XX-XX-XX)
XX-XX-XX

Baseline (Draft – February 2019)

PREFACE

Post Increment Evaluation Report Increments 53 and 54 This document is the Post Increment Evaluation Report Increments 53 and 54. Official delivery of this document is under the control of the Space Station Control Board (SSCB). Any changes or revisions will be jointly agreed to and signed by the National Aeronautics and Space Administration (NASA) and the affected International Partners (IPs).

i

SSCB APPROVAL NOTICE

INTERNATIONAL SPACE STATION PROGRAM

post Increment evaluation report Increments 53 and 54 march 2019Review Copy

Kirk A. Shireman Manager, International Space Station National Aeronautics and Space Administration

Alexey Strelnikov Director, Department of Human Space Programs, State Space Corporation Roscosmos

Date

Date

Ken Podwalski Program Manager Canadian Space Station Program

Fumiya Tsutsui ISS Program Manager Japan Aerospace Exploration Agency

Date

Date

Bernardo Patti Program Manager European Space Agency

Date

INTERNATIONAL SPACE STATION PROGRAM

post Increment evaluation report Increments 53 and 54 CONCURRENCEReview Copy march 2019

Prepared by:
Courtney Hoffman

OP

book coordinator/ Document Quality Assurance (DQA) Representative org signature

DATE

Prepared by:
Jarrett Quasny

OP

Increments 53 and 54 increment Engineer org signature

DATE

Concurred by:
Ryan Lien

OC

Increments 53 and 54 increment manager

ORG

SIGNATURE

DATE

Concurred by:
Bradley Files

OC

Increment Integration and Operations Manager

ORG

SIGNATURE

DATE

Concurred by:
Ryan L. Prouty

OC

mission integration and operations office manager

ORG

SIGNATURE

DATE

Post Increment evaluation report Increments 53 and 54

CONCURRENCE

march 2019Review Copy

Developer Concurrence:
Aleksey Bideev

RSC-E

Russian Modules Manager

ORG

SIGNATURE

DATE

Developer Concurrence:
Mikhail Shutikov

RSC-E

International Programs integration org

SIGNATURE

DATE

Developer Concurrence:
Konstantin Grigoriev

RSC-E

Russian segment integration org

SIGNATURE

DATE

Developer Concurrence:
Marina Sycheva

RSC-E

PLANNING AND MANIFEST MANAGER

org

SIGNATURE

DATE

Developer Concurrence:

Vitali Chernov

RSC-E

program analysis and assessment org signature

DATE

Increments 53 and 54

CONCURRENCE

march 2019Review Copy

Developer Concurrence:
Igor Pustovoy

RSC-E

International Programs Integration org

SIGNATURE

DATE

Developer Concurrence:

Irina Manaeva

RSC-E

program analysis and assessment, specialist

ORG

SIGNATURE

DATE

Developer Concurrence:

Elena Timokhina

RSC-E

TECHNICAL SPECIALIST

ORG

SIGNATURE

DATE

Developer Concurrence:

Nadezha Gorbova

RSC-E

MANIFEST AND CREW PROVISIONING SPECIALIST

ORG

SIGNATURE

DATE

Developer Concurrence:

Natalia Uspenskaya

RSC-E

cargo stowage manager

ORG

SIGNATURE

DATE

Increments 53 and 54

CONCURRENCE

march 2019Review Copy

Developer Concurrence:

Sergei Yaroshenko

RSC-E

vehicle integrated performance and resources org signature

DATE

Developer Concurrence:
Ekaterina Makhneva

RSC-E

СОЖ manager org signature

DATE

Developer Concurrence:
Svetlana Novikova

RSC-E

PAYLOAD INTEGRATION AND OPERATION

org signature

DATE

Developer Concurrence:
Elena Demina

RSC-E

Payload Integration

ORG

SIGNATURE

DATE

Developer Concurrence:
Svetlana Smirnova

RSC-E

operations MANAGEMENT

ORG

SIGNATURE

DATE

Increments 53 and 54

CONCURRENCE

march 2019Review Copy

Developer Concurrence:
Elena Zapryagaylo

RSC-E

water specialist

ORG

SIGNATURE

DATE

iii

TABLE OF CONTENTS

PARAGRAPHPAGE
1.0Introduction1-1
1.1Purpose1-1
1.2SCOPE1-1
1.3PRECEDENCE1-1
1.4DELEGATION OF AUTHORITY1-1
2.0documents2-1
2.1applicable documents2-1
2.2reference documents2-1
3.0Increments 53 and 54 summary3-1
4.0ON-ORBIT RESOURCE Assumptions and allocations4-1
4.1power transfer to the russian segment assessment4-1
4.2Increments 53 and 54 crew time4-10
4.3Stowage4-14
4.4Cargo, Water and Propellant Transfer4-15
5.0<Reserved>5-1
6.0extravehicular activity6-1
7.0IDRD PERIOD AND TASK REQUIREMENTS SUMMARY7-1
7.1IDRD Period Summary7-1
7.2Increment 53 Requirements7-15
7.2.1<Reserved>7-15
7.2.2Increment 53 tasks (IN DESCENDING prioritized ORDER)7-15
7.3Increment 54 Requirements7-29
7.3.1<Reserved>7-29
7.3.2Increment 54 tasks (IN DESCENDING prioritized ORDER)7-29

APPENDIX

aAcronyms and abbreviationsa-1
bglossary of termsb-1
copen workc-1
dIncrements 53 and 54 Violations, waivers and deviationsd-1
eIncrements 53 and 54 final crew time graphs for maintenance,
medical operations and utilizatione-1

TABLE

3.0-1INCREMENTS 53 and 54 SUMMARY3-1
3.0-2INCREMENTS 53 and 54 FLIGHT SUMMARY3-2
3.0-2INCREMENTS 53 and 54 FLIGHT SUMMARY3-3
4.1-1BALANCE of contributions (electrical Power) accounting4-2
4.1-2USOS TO RUSSIAN POWER TRANSFERS4-4
4.1-3U.S. to FGB POWER transfers4-6
4.1-4RUSSIAN HARDWARE OPERATIONAL EFFECTS ON RUSSIAN POWER TRANSFERS4-8
4.2-1increments 53 and 54 Operations (4 Pages)4-10
4.2-2increments 53 and 54 CROSS-STATION Crew Time (CSCT)4-14
4.2-3increments 53 and 54 Joint research4-14
4.3-1HARDWARE Stowed on iss during IncrementS 53 and 544-14
4.4-1MASS USOS VEHICLES DELIVERED TO ISS4-15
4.4-1AMASS USOS VEHICLES DELIVERED TO ISS (NASA/CSA/ESA/JAXA Dry Cargo Only)4-16
4.4-2mass USOS VEHICLES RETURNED FROM ISS4-17
4.4-2AMASS USOS VEHICLES RETURNED FROM ISS (NASA/CSA/ESA/JAXA dry cargo only)4-18
4.4-3mass ROSCOSMOS vEHICLES DELIVERED TO ISS4-19
4.4-3AMASS ROSCOSMOS VEHICLES DELIVERED TO ISS (NASA/CSA/ESA/JAXA) (dry cargo only)4-20
4.4-4mass ROSCOSMOS VEHICLES RETURNED FROM ISS4-21
4.4-4AMASS ROSCOSMOS VEHICLES RETURNED FROM ISS (NASA/CSA/ESA/JAXA dry cargo only)4-22
4.4-5mass From Common Spare Pool Hardware by nasa/csa/esa/jaxa4-23
4.4-6Water deliveries, consumption and surplus consumption4-24
4.4-7Cold Stowage Transportation Usage4-25
4.4-8JEMAL Cycles in Increments 53 and 54 (Russian Review not Required)4-25
4.4-9Propellant Consumption and Availability4-25
6.0-1EXTRAVEHICULAR ACTIVITY SUMMARY (2 PAGES)6-1
J-1Increments 53 and 54 Robotics Tasks (3 Pages)7-51
C-1to be determined itemsc-1
C-2TO BE RESOLVED ISSUESc-1
D-1Violations, Waivers and Deviations (18 Pages)d-1

FIGURE

4.1-1PROFILE of RS (IDRD Allocation) power transfers for Increments 53_544-5
4.1-2PROFILE OF FGB POWER TRANSFERS FOR Increments 53_544-7
4.1-3ISS As Flown Altitude Profile4-9
7.1-1Investigations by Science Discipline7-14
E-1Increments 53 and 54 usos utilization crew time totals (Russian review not required)e-2
E-2Increments 53 and 54 maintenance crew time totals(Russian review not required)e-3
e-4Increments 53 and 54 USOS preventative maintenance Crew time totals(Russian review not required)e-4
e-5Increments 53 and 54 USOS corrective maintenance Crew time totals(Russian review not required)e-5
e-6Increments 53 and 54 USOS system maintenance Crew time totals(Russian review not required)e-6
e-7Increments 53 and 54 USOS med ops Crew time totals
(Russian review not required)e-7

Introduction Purpose SSP 54353_54354, Post Increment Evaluation Report (PIER) for Increments 53 and 54, documents the Increment Definition and Requirements Document (IDRD) Period executed requirements and resource usage. This report includes a summary of actual launch dates with major milestones that occurred within the IDRD Period and summaries of the resource and accommodations, including transfer of power, cargo, and propellant for the International Space Station (ISS). Section 7.0, IDRD Period and Task Requirements Summary, and Appendix D, Increments 53 and 54 Violations, Waivers and Deviations are provided for reference only and are not part of the Program’s obligations accounting data.

SCOPE

This report covers Increments 53 and 54, and includes both joint ISS/mated vehicle operations and ISS-only continuous operational phases (i.e., stages) of the Increments. Increment 53 began in September 2017 with the undocking of Soyuz Flight 50. Increment 53 ended and Increment 54 began with the undocking of Soyuz Flight 51 in December of 2017. Increment 54 ended in February 2018 with the undocking of Soyuz Flight 52.

PRECEDENCE

Information contained in this document shall be consistent with ISS Program documentation, including the Memorandum of Understandings (MOU), Balance of Contributions (BoC), and other higher-level agreements. In case of conflicts between this document (excluding Section 7.0 and Appendix D) and SSP 50826, ISS 6-Crew Strategic Planning Document: ISS Crew Augmentation Strategic Plan for 2009-2011; SSP 50261-01, Generic Groundrules, Requirements, and Constraints, Part 1: Strategic and Tactical Planning; SSP 54100, Multi-Increment Planning Document; and SSP 54053_54054, Increment Definition and Requirements Document for Increments 53 and 54, this document shall take precedence.

DELEGATION OF AUTHORITY

The Space Station Control Board (SSCB) has formal control and approval of this document. All changes to this document will be processed in accordance with the procedures as specified in SSP 50123, Configuration Management Handbook.

3-3 documents applicable documents The following documents include specifications, models, standards, guidelines, handbooks, and other special publications. The documents listed in this paragraph are applicable to the extent specified herein. Inclusion of applicable documents herein does not in any way supersede the order of precedence identified in Paragraph 1.2 of this document.

DOCUMENT
TITLE
TYPE
SSP 50123
Configuration Management Handbook
Multilateral
SSP 50261-01
Generic Groundrules, Requirements, and Constraints, Part 1: Strategic and Tactical Planning
Multilateral
SSP 50826
International Space Station 6-Crew Strategic Planning Document: ISS Crew Augmentation Strategic Plan for 2009-2011
Multilateral
SSP 54053_54054
Increment Definition and Requirements Document for Increments 53 and 54
Multilateral
SSP 54053_54054-ANX2
Increment Definition and Requirements Document for Increments 53 and 54, Annex 2: On-Orbit Maintenance Plan
Multilateral
SSP 54053_54054-ANX4
Increment Definition and Requirements Document for Increments 53 and 54, Annex 4: Medical Operations and Environmental Monitoring
Multilateral
SSP 54053 _54054-ANX5
Increment Definition and Requirements Document for Increment 53 and 54, Annex 5: Payload Tactical Plan [List here if called out by title in Section 7 (ex. per SSP 540XX _540YY-ANX5 )]
Multilateral
SSP 54100
Multi-Increment Planning Document
Multilateral

reference documents The following documents contain supplemental information to guide the user in the application of this document. These reference documents may or may not be specifically cited within the text of this document.

DOCUMENT
TITLE
TYPE
SSP 54052-51S
Increment Definition and Requirements Document for Increment 52, Annex 1: Station Manifest, Flight 51 Soyuz
Multilateral
SSP 54052-67P
Increment Definition and Requirements Document for Increment 52, Annex 1: Station Manifest, Flight 67 Progress
Multilateral
SSP 54052-SpX-12
Increment Definition and Requirements Document for Increment 52, Annex 1: Station Manifest, Flight SpX-12
Multilateral
SSP 54053-52S
Increment Definition and Requirements Document for Increment 53, Annex 1: Station Manifest, Flight 52 Soyuz
Multilateral
SSP 54053-68P
Increment Definition and Requirements Document for Increment 53, Annex 1: Station Manifest, Flight 68 Progress
Multilateral
SSP 54053-OA-8
Increment Definition and Requirements Document for Increment 53, Annex 1: Station Manifest, Flight OA-8
Multilateral
SSP 54054-53S
Increment Definition and Requirements Document for Increment 54, Annex 1: Station Manifest, Flight 53 Soyuz
Multilateral
SSP 54054-69P
Increment Definition and Requirements Document for Increment 54, Annex 1: Station Manifest, Flight 69 Progress
Multilateral
SSP 54054-SpX-13
Increment Definition and Requirements Document for Increment 54, Annex 1: Station Manifest, Flight SpX-13
Multilateral
NAS15-10110
Contract NAS15-10110 between the National Aeronautics and Space Administration of the United States of America and the Russian Space Agency of the Russian Federation for Supplies and Services Relating to MIR-1 and the International Space Station: Phase One and Selected Phase Two Activities
Bilateral

Increments 53 and 54 summary Increment 53 began with the undocking of 50 Soyuz, which reduced the Expedition crew to 3. Expedition 53 crewmembers increased to 6 with the docking of 52 Soyuz. When 51 Soyuz undocked, Expedition crew size was reduced to 3, Increment 53 ended and Increment 54 began. Expedition 54 crewmembers increased to 6 with the docking of 53 Soyuz. When 52 Soyuz undocked, Increment 54 ended and Increment 55 began.

Table 3.0-1, Increments 53 and 54 Summary, includes crew rotation plans, the Multilateral Crew Operations Panel (MCOP) defined crew assignments and respective agencies.

TABLE 3.0-1 INCREMENTS 53 and 54 SUMMARY

Increment 53 Start
Undocking of 50 Soyuz (02 September 2017)
Increment 53 End
Undocking of 51 Soyuz (14 December 2017)
Increment Duration (days)
103
Increment 54 Start
Undocking of 51 Soyuz (14 December 2017)
Increment 54 End
Undocking of 52 Soyuz ( 27 February 2018)
Increment Duration (days)
75
Crew Plan
Expedition 53 Crew
E53 CDR (R. Bresnik)
51S (launch/return)
E53 FE-4 (S. Ryazanskiy)
51S (launch/return)
E53 FE-6 (P. Nespoli)
51S (launch/return)
E53 FE-1 (A. Misurksin)
52S (launch/return)
E53 FE-2 (M. Vande Hei)
52S (launch/return)
E53 FE-3 (J. Acaba)
52S (launch/return)

Expedition 54 Crew

E54 CDR (A. Misurksin)
52S (launch/return)
E54 FE-2 (M. Vande Hei)
52S (launch/return)
E53 FE-3 (J. Acaba)
52S (launch/return)
E54 FE-4 (A. Shkaplerov)
53S (launch/return)
E54 FE-5 (S. Tingle)
53S (launch/return)
E54 FE-6 (N. Kanai)
53S (launch/return)

Table 3.0-2, Increments 53 and 54 Flight Summary, identifies the actual dates and mission data for all flights that visited the ISS during this Increment.

TABLE 3.0-2 INCREMENTS 53 and 54 FLIGHT SUMMARY

Increment 53 Definition

Start Event
End Event
Duration
50S Undock
51S Undock
103 days
Flight
Event
Date (GMT) dd/mmm/yy
Location
Mission Duration (days)
Docked Duration (days)
Crew Size

Vehicle/ISS External Cargo

52S
Launch
12 Sep 17
Baikonur
168
-
3
3

52S launches just prior to midnight GMT on 12 Sep 17 and docks just after midnight GMT on 13 Sep 17

52S
Dock
13 Sep 17
MRM2
-
168
0
6

52S launches just prior to midnight GMT on 12 Sep 17 and docks just after midnight GMT on 13 Sep 17

SpX-12
Unberth
17 Sep 17
N2-Nadir
34
32
-
6
68P
Launch
14 Oct 17
Baikonur
165
-
-
6
68P
Dock
16 Oct 17
DC1
-
163
-
6
OA-8
Launch
12 Nov 17
Wallops
24
-
-
6
OA-8
Berth
14 Nov 17
N1-Nadir
-
22
-
6
OA-8
Unberth
06 Dec 17
N1-Nadir
24
22
-
6
51S
Undock
14 Dec 17
MRM1
139
139
3
3

TABLE 3.0-2 INCREMENTS 53 and 54 FLIGHT SUMMARY

Increment 54 Definition

Start Event
End Event
Duration
51S Undock
52S Undock
75 days
Flight
Event
Date (GMT) dd/mmm/yy
Location
Mission Duration (days)
Docked Duration (days)
Crew Size

Vehicle/ISS

External Cargo
Notes/TBR Summary
SpX-13
Launch
15 Dec 17
KSC
29
-
-
3
SDS, TSIS, 1 x Empty FRAM
SpX-13
Berth
17 Dec 17
N2-Nadir
-
27
-
3
53S
Launch
17 Dec 17
Baikonur
168
-
3
3
53S
Dock
19 Dec 17
MRM1
-
166
0
6
67P
Undock
28 Dec 17
SM-Aft
197
195
-
6
SpX-13
Unberth
13 Jan 18
N2-Nadir
29
27
-
6
Rapid Scat (2 FRAMs), 1 x Empty FRAM
69P
Launch
13 Feb 18
Baikonur
191
-
-
6
69P
Dock
15 Feb 18
SM-Aft
-
189
-
6
52S
Undock
27 Feb 18
MRM2
168
168
3
3

ON-ORBIT RESOURCE Assumptions and allocations This section defines the allocation of the on-orbit ISS capabilities between systems and utilization across the increments. Allocations are limited to power, crew time, and on-orbit accommodation. Sub-allocations of utilization allocations are provided in the SSP 54053_54054-ANX5. Any non-standard requirements of resources are also provided in Paragraph 4.4. The allocation guidelines are baselined in the SSP 5026101. All data contained in this section represent operational requirements.

power transfer to the russian segment assessment The amount of electrical power transferred from the U.S. segment to the Service Module (SM) during Increment 53_54 (177 days) equals 16064.4 kWh (according to measurements at the output of the USOS electrical power system). In accordance with Addendum 2 of the protocol on the balance of contributions and ISS partner rights, the amount of electrical power transferred to the Russian segment is calculated according to values at the input to the SM voltage and current stabilizer [СНТ]. Since the loss in cables during the transfer from the USOS to the SM CHT input is approximately 3%, the amount of electrical power transferred to the SM, calculated as stipulated by the balance of contributions, is 15582.5 kWh.

The “expansion to 6 crew” also increased the number of docked Soyuz Transportation Modified Anthropometric (TMA), usually at MRM2 and one at MRM1. By having provided electrical power to one of the Soyuz vehicles continuously docked to Functional Cargo Block (FGB) during Increments 53 and 54, NASA fulfilled for this period in Increments 53 and 54, its obligation to provide electrical power for 1 equivalent Soyuz continuously docked to ISS as stipulated in the NASA-Roscosmos Program Managers’ understanding of February 10, 2010. Therefore the relevant amount of power is not accounted against Roscosmos’ original 615,000 kWh allocation.

The amount of electrical power transferred from the USOS to the FGB and consumed by the MRM1 during Increment 53_54 (177 days) equals 2209 kWh (based on the IDRD allocation, MRM1 plus Multipurpose Laboratory Module (MLM) equipment, of 520w average load). Given the loss of capacity in the FGB voltage converter [ARCU] of 13%, the amount of electrical power, calculated as transferred from the USOS to FGB ARCU input in support of the MRM1 plus MLM equipment at the FGB nadir port, is 2539 kWh (output ÷87%).

The total amount of electrical power, calculated as stipulated by the balance of contributions as transferred from the U.S. segment, during Increment 53_54 (177 days) equals 18125.8 kWh.

Per the July 1st, 2006 2nd Addendum Balance of Contributions section D (Electrical Power) an accounting of power transfer/usage will begin on the first day of 2006 and should show progressive deficits from an initial 615,000 kWh. Table 4.1-1 shows the incremental accounting. At the conclusion of Increment 53_54 the remaining balance of power transfer is 268972 kWh.

Table 4.1-1 BALANCE of contributions (electrical Power) accounting

Table 4.1-2, USOS to Russian Power Transfers, and Figure 4.1-1 compare IDRD power transfer allocation to the Russian Segment (RS) from the USOS versus actual power transfer levels as reported by telemetry. Telemetry values were averaged over a 6-hour period. The comparison shows that, in general, IDRD power transfer allocations overestimated actual power transfer levels during Increments 53 and 54 and previous increments. Various factors contributed to these conservative differences, including Russian hardware operational constraints and actual versus predicted Russian systems operations and assumptions.

Russian hardware operational constraints are a result of the power regulation hierarchy in the Russian Electrical Power System (EPS) power architecture, which causes ARCU to saturate during eclipse periods. Saturated ARCUs transfer power at their maximum capability, above the needed power transfer deficit. The power transfer allocation in the IDRD has been set to the minimum number of ARCUs needed to support the Russian power deficits.

The power transfer allocation also assumes all RS systems loads are operating nominally. Therefore, any RS hardware failures or power-downs may contribute to differences in power transferred to the RS. Some of these instances are capture in table 4.1-4. There were times that Elektron and/or Vozdukh were off during these increments that most likely reduced the estimated planned power transfer. Elektron and Vozdukh operational modes were determined from telemetry and documented in D684-12237-53_54 spreadsheet, RS Averages workbook.

Another factor for over allocating power transfers is due to the power allocation in the IDRD having only three solar beta ranges, which takes the more conservative value for each range.

Table 4.1-3, USOS to FGB Power Transfers, and Figure 4.1-2 compare IDRD power transfer allocation to the FGB Segment from the USOS versus actual power transfer levels as reported by telemetry. The comparison shows the IDRD power transfer allocations overestimate actual power transfer levels during Increments 53 and 54. For most of the time during Increments 53 and 54 power transfer is approximately 1.5 kW average (2.4kW peak), which is below IDRD power transfer allocation of 3.0 kW. An explanation of the difference is that the FGB allocation assumed the FGB arrays are retracted and generating minimal power. However, the FGB arrays generate moderate power and batteries support during eclipse periods. It is important to note that the 3.0 kW allocation was selected to mitigate a catastrophic hazard condition. This condition is for a one string channel failure in the USOS.

In summary, the IDRD power transfer allocations significantly overestimate actual power transfer levels. Accounting for the factors discussed above, the gap between IDRD allocations versus actuals can be explained. However, due to FGB safety concerns and to increase the time to respond to failures, it is acceptable to plan for conservatism within the IDRD. For the USOS to RS Power Transfer, based on telemetry during Increments 53 and 54, recommend no change in the IDRD allocation.

TABLE 4.1-2 USOS TO RUSSIAN POWER TRANSFERS

Power Transfer

Telemetry Start Date
Telemetry End Date
As Flown Flight Attitude
Solar Beta Range

[1] Telemetry Average (kW) [2]

IDRD Allocation (kW)[3][4]
IDRD Flight/Stage
Increments 53_54

Events

9/02/17
9/12/17
XVV
Low
2.4
5.9
{5} 53-3[7]
50S undock (9/02/17). Increment 53 starts
9/13/17
9/14/17
XVV
Low
3.7
5.9
{10} 53-6[14]
52S Docking (9/13/17)
9/15/17
9/15/17
XVV
Mid
3.8
5.9
{10} 53-6[14]
SpaceX-12 Departure (9/16/17)
9/16/17
9/28/17
XVV
Mid
4.3
5.9
{6} 53-6[8]
9/28/17
10/14/17
XVV
Low
3.2
5.9
{6} 53-6[8]
U.S. EVA LEE A R&R (10/5), U.S. EVA CP9 R&R (10/10)
10/14/17
10/15/17
XVV
Mid
4.0
5.9
{6} 53-6[8]
10/16/17
10/17/17
XVV
Mid
4.6
5.9
{8} 53-6[11]
68P Docking (10/16/17)
10/18/17
10/28/17
XVV
High
5.0
7.8
{8} 53-6[11]
U.S. EVA 46 (10/20/17)
10/28/17
10/31/17
XVV
Mid
4.2
5.9
{8} 53-6[11]
10/31/17
11/14/17
XVV
Low
3.5
5.9
{8} 53-6[11]
11/14/17
12/5/17
XVV
Low
3.5
5.9
{7} 53-6[9]
Cygnus-8 Capture (11/14/18)
12/5/17
12/11/17
XVV
Low
3.5
5.9
{8} 53-6[11]
Cygnus-8 Departure (12/05/18)
12/11/17
12/14/17
XVV
Mid
3.9
5.9
{8} 53-6[11]
12/14/17
12/14/17
XVV
Mid
3.8
5.9
{9} 54-3[12]
51S Undocking (12/14/17). Increment 54 starts
12/14/17
12/17/17
XVV
High
3.7
7.8
{9} 54-3[12]
12/17/17
12/19/17
XVV
High
4.9
7.8
{9} 54-3[12]
SpaceX-13 Capture (12/17/17)
12/19/17
12/27/17
XVV
High
5.2
7.8
{7} 54-6[9]
53S Docking (12/19/17)
12/27/17
12/28/17
XVV
High
4.5
7.8
{10} 54-6[14]
67P Undocking (12/27/17)
12/28/17
12/31/17
XVV
Mid
4.0
5.9
{10} 54-6[14]
12/31/17
01/12/18
XVV
Low
3.3
5.9
{10} 54-6[14]
01/12/18
02/09/18
XVV
Low
3.2
5.9
{6} 54-6[8]
SpaceX-13 Departure (1/12/18). LEE B R&R U.S. EVA (1/23). RS EVA 44 (2/2).
02/10/18
02/13/18
XVV
Mid
4.0
5.9
{6} 54-6[8]
02/13/18
02/15/18
XVV
High
5.0
7.8
{8} 54-6[11]
02/15/18
02/23/18
XVV
High
5.0
7.8
{8} 54-6[11]
69P Docking (2/15/18)
02/23/18
02/27/18
XVV
Mid
4.4
5.9
{8} 54-6[11]
52S Undocking (02/27/18)

Notes:

[1] IDRD (SSP 54053_54054) Solar beta definitions are defined as follows: Low < 37º, Mid between 37º and 52º, High >52º.

[2] All values from the input side of the ARCU/CHT.

[3] IDRD RS allocation. Excludes power transfer to the FGB segment.

[4] Per IDRD, RS Allocation assumes SM solar array in sun tracking mode.

{5} [IDRD note 7] 1 Progress attached to SM and 1 Soyuz attached to FGB/MRM1 and 1 CRS vehicle attached to USOS.

{6} [IDRD note 8] 1 Progress and 1 Soyuz attached to SM and 1 Soyuz attached to FGB/MRM1.

{7} [IDRD note 9] 2 Progress and 1 Soyuz attached to SM and 1 Soyuz attached to FGB/MRM1 and 1 CRS vehicle attached to USOS.

{8} [IDRD note 11] 2 Progress and 1 Soyuz attached to SM and 1 Soyuz attached to FGB/MRM1 and 2 CRS vehicles attached to USOS.

{9} [IDRD note 12] 2 Progress and 1 Soyuz attached to SM.

{10} [IDRD note 14] 1 Progress and 1 Soyuz attached to SM and 1 Soyuz attached to FGB/MRM1 and 1 Soyuz attached to FGB/MRM1.

Example figure 4.1-1 PROFILE of RS (IDRD Allocation) power transfers for Increments 53_54 table 4.1-3 U.S. to FGB POWER transfers

Power Transfer

Telemetry Start Date
Telemetry End Date
As Flown Flight Attitude
Solar Beta Range

[1] Telemetry Average (kW) [2]

IDRD Allocation (kW)[3][4] [5]
IDRD Flight/Stage
Increments 53_54

Events

9/02/17
9/12/17
XVV
Low
1.1
3.0
53-3[6]
50S undock (9/02/17). Increment 53 starts
9/13/17
9/14/17
XVV
Low
1.2
3.0
53-6[6]
52S Docking (9/13/17)
9/15/17
9/15/17
XVV
Mid
1.1
3.0
53-6[6]
SpaceX-12 Departure (9/16/17)
9/16/17
9/28/17
XVV
Mid
1.0
3.0
53-6[6]
9/28/17
10/14/17
XVV
Low
1.2
3.0
53-6[6]
U.S. EVA LEE A R&R (10/5), U.S. EVA CP9 R&R (10/10)
10/14/17
10/15/17
XVV
Mid
1.2
3.0
53-6[6]
10/16/17
10/17/17
XVV
Mid
1.3
3.0
53-6[6]
68P Docking (10/16/17)
10/18/17
10/28/17
XVV
High
1.5
3.0
53-6[6]
U.S. EVA 46 (10/20/17)
10/28/17
10/31/17
XVV
Mid
1.3
3.0
53-6[6]
10/31/17
11/14/17
XVV
Low
1.4
3.0
53-6[6]
11/14/17
12/5/17
XVV
Low
1.3
3.0
53-6[6]
Cygnus-8 Capture (11/14/18)
12/5/17
12/11/17
XVV
Low
1.4
3.0
53-6[6]
Cygnus-8 Departure (12/05/18)
12/11/17
12/14/17
XVV
Mid
1.2
3.0
53-6[6]
12/14/17
12/14/17
XVV
Mid
1.0
3.0
54-3[7]
51S Undocking (12/14/17). Increment 54 starts
12/14/17
12/17/17
XVV
High
1.0
3.0
54-3[7]
12/17/17
12/19/17
XVV
High
1.4
3.0
54-3[7]
SpaceX-13 Capture (12/17/17)
12/19/17
12/27/17
XVV
High
1.4
3.0
54-6[6]
53S Docking (12/19/17)
12/27/17
12/28/17
XVV
High
1.1
3.0
54-6[6]
67P Undocking (12/27/17)
12/28/17
12/31/17
XVV
Mid
1.0
3.0
54-6[6]
12/31/17
01/12/18
XVV
Low
1.2
3.0
54-6[6]
01/12/18
02/09/18
XVV
Low
1.2
3.0
54-6[6]
SpaceX-13 Departure (1/12/18). LEE B R&R U.S. EVA (1/23). RS EVA 44 (2/2).
02/10/18
02/13/18
XVV
Mid
1.3
3.0
54-6[6]
02/13/18
02/15/18
XVV
High
1.5
3.0
54-6[6]
02/15/18
02/23/18
XVV
High
1.5
3.0
54-6[6]
69P Docking (2/15/18)
02/23/18
02/27/18
XVV
Mid
1.3
3.0
54-6[6]
52S Undocking (02/27/18)

Notes:

Generic:

[1] IDRD (SSP 54053_54054) Solar beta definitions are defined as follows; Low < 37º, Mid between 37º and 52º, High >52º.

[2] All values from the input side of the ARCU.

[3] IDRD FGB allocation.

[4] Per IDRD, FGB Allocation assumes FGB solar arrays are retracted, do not generate power, and FGB batteries are off-line.

[5] Per IDRD, FGB loads and Power Generation values provided by Khrunichev and include the Soyuz transport vehicle docked to FGB.

Flight/Stage Specific:

[6] 1 Soyuz on FGB/MRM1.

[7] No vehicle on FGB/MRM1.

Example figure 4.1-2 PROFILE OF FGB POWER TRANSFERS FOR Increments 53_54

TABLE 4.1-4 RUSSIAN HARDWARE OPERATIONAL EFFECTS ON RUSSIAN POWER TRANSFERS

Date/GMT

Russian Hardware Operational Status from RS On-Orbit Telemetry
Increment/ Solar Beta Range
Notes

Russian transfers indicated are daily averages for the specified day(s) unless noted otherwise.

9/3-9/12
Elektron off, Vozdukh on.
S53/Low
Russian transfer (~2.5 kW) within allocation (5.9 kW).
9/13-9/14
Elektron on (23 amps), Vozdukh on.
S53/Low
Russian transfer (~3.7 kW) within allocation (5.9 kW).
9/16-9/28
Elektron on (23 amps), Vozdukh on.
S53/Mid
Russian transfer (~4.3 kW) within allocation (5.9 kW).
9/28-10/14
Elektron on (23 amps), Vozdukh on.
S53/Low
Russian transfer (~2.6 kW) within allocation (5.9 kW).
10/18-10/28
Elektron on (23 amps), Vozdukh on.
S53/High
Russian transfer (~5.0 kW) within allocation (7.8 kW).
10/28-10/31
Elektron on (23 amps), Vozdukh on.
S53/Mid
Russian transfer (~4.3 kW) within allocation (5.9 kW).
10/31-12/11
Elektron on (23 amps), Vozdukh on.
S53/Low
Russian transfer (~3.5 kW) within allocation (5.9 kW).
12/15-12/19
Elektron off, Vozdukh on.
S54/High
Russian transfer (~4.3 kW) within allocation (7.8 kW).
12/19-12/27
Elektron off, Vozdukh on.
S54/High
Russian transfer (~5.2 kW) within allocation (7.8 kW).
12/28-12/31
Elektron on (23 amps), Vozdukh on.
S54/Mid
Russian transfer (~4.0 kW) within allocation (5.9 kW).
12/31-01/30
Elektron on (23 amps), Vozdukh on.
S54/Low
Russian transfer (~3.2 kW) within allocation (5.9 kW).
02/04-02/09
Elektron on (23 amps), Vozdukh on.
S54/Low
Russian transfer (~3.4 kW) within allocation (5.9 kW).
02/10-02/13
Elektron on (23 amps), Vozdukh on.
S54/Mid
Russian transfer (~4.0 kW) within allocation (5.9 kW).
02/13-02/15
Elektron on (23 amps), Vozdukh on.
S54/High
Russian transfer (~5.0 kW) within allocation (7.8 kW).
02/15-02/23
Elektron on (23 amps), Vozdukh on.
S54/High
Russian transfer (~5.0 kW) within allocation (7.8 kW).
02/23-02/27
Elektron on (23 amps), Vozdukh on.
S54/Mid
Russian transfer (~4.4 kW) within allocation (5.9 kW).

Figure 4.1-3, ISS As Flown Altitude Profile, is a graphical representation of the ISS altitude showing where specific height adjustments were made during Increment 53 and 54. The figure is derived from data recorded in real time on an irregular frequency, and as a result several days may pass between data points. It is understood that reboost events occurred on a single day as noted on the figure.

Baseline (Draft – October 2018) Figure 4.1-3 ISS As Flown Altitude Profile

4-25

Increments 53 and 54 crew time Paragraph 4.2, Increments 53_54 Crew Time, is the summary of the pre-Increment planned and actual Increment crew time spent on various mission categories define in the Generic Groundrules, Requirements and Constraints (GGR&C).

The actual Increment 53_54 duration of 178 days was 1 days longer than the palnned preflight duration number of days in the Increment.

The total number of work weeks in Increments 53_54 was 24.2.

Table 4.2-1 reflects the summary of operations performed on ISS. This data reflects RS crewmember or USOS crewmember-specific data as planned and performed on ISS.

Table 4.2-1 increments 53 and 54 Operations (4 Pages)

Category/Task
USOS Crew Time Hours
RS Crew Time Hours
Table numbers correlate to GGR&C Table E.8-1B, Crew Time Activities for IDRD Period: Segment - Specific Operations
Planned Incs. 53_54 Crew Hours [1]
Actual

Incs.

53_54 Scheduled Crew Hours [2]

Actual Incs. 53_54 Task List Crew Hours[2]
Total Completed Incs.

53_54 Crew Hours[2]

Planned Incs. 53_54 Crew Hours[1]
Actual

Incs.

53_54 Scheduled Crew Hours[2]

Actual Incs. 53_54 Task List Crew Hours[2]
Total Completed Incs.

53_54 Crew Hours[2]

8.0 Utilization Operations

8.1 USOS Utilization Totals

USOS Voluntary Science

1644.00
1231.67
82.90
1314.58

8.1 NASA Utilization [3]

NASA Voluntary Science

954.83
64.88
1019.71

8.1 ESA Utilization [4]

ESA Voluntary Science

115.33
12.33
127.67 [3]

8.1 JAXA Utilization [5]

JAXA Voluntary Science

126.17
5.50
131.67

8.1 CSA Utilization [6]

CSA Voluntary Science

33.72
0.17
33.88 [4]

8.3 RS Utilization Totals

508.44
489.09
0.00
489.09

8.3 RS Utilization

508.44
489.09
0.00
489.09
1.0 Soyuz Vehicle Traffic Totals
21.34
26.17
0.50
26.67
71.34
73.41
0.00
73.41
1.1.1 Soyuz Docking (including Safety briefing)
11.00
10.50
0.00
10.50
25.34
32.00
0.00
32.00

1.1.1.1 Prepack of cargo to return on Soyuz (RS cargo and transfer)

20.00
17.58
0.00
32.00
1.2.2 Soyuz Undocking
10.34
15.67
0.50
16.17
26.00
23.83
0.00
23.83
Crew Rotation Totals
97.67
82.42
21.33
103.75
74.34
64.08
0.0
64.08
1.1.4.1 Handover
60.00
55.83
7.33
63.17
40.00
12.33
0.00
12.33
1.1.4.2 Roles and Responsibilities Review (Arrival and Departure)
12.00
12.00
0.00
12.00
6.00
6.00
0.00
6.00

1.1.4.3 Transfer Cargo Items delivered on Soyuz

7.00
7.75
0.00
7.75
1.1.4.4 Soyuz USOS cargo unpack and final stow
14.00
1.67
4.50
6.17

1.1.4.5 Soyuz Cargo Loading

20.00
36.67
0.00
36.67
1.1.4.6 Soyuz prepack USOS cargo
8.00
8.25
8.5
16.75
1.1.4.8 Change of Command
2.66
2.67
0.00
2.67
1.34
1.33
0.00
1.33
1.1.4.9 USOS Post-Departure SSC System Prep for Arriving Crew
1.00
2.00
1.00
3.00
1.1.5 ISS New Crew Familiarization
35.00
29.42
0.00
29.42
20.00
18.58
0.00
18.58
1.1.5.2 ISS Crew Preparation for Return
30.00
31.92
4.00
35.92
20.00
16.67
0.00
16.67
Vehicle Traffic Totals
306.16
251.76
49.16
300.92
135.00
61.42
0.00
61.42

1.2.1.1 Progress Unloading

44.00
20.33
0.00
20.33
1.2.1.2 Progress USOS Cargo unpack and final stow
4.000
0.00
1.00
1.00

1.2.1.3 Progress Loading

48.00
2.00
0.00
2.00
1.2.1.4 Progress USOS Cargo Trash Gather
0.00
0.00
0.00
0.00

1.2.2 Progress Docking

29.16
31.92
0.00
31.92

1.2.3 Progress Undocking

13.84
3.17
0.00
3.17
USOS Cargo Pregather
13.00
13.75
1.00
14.75
1.5.2 Orbital ATK Berthing
21.33
15.00
5.83
20.83
1.5.1.1 Orbital ATK Cargo Operations (including cargo tag ups)
50.50
72.42
15.00
87.42
0.00
0.17
0.00
0.17
1.5.3 Orbital ATK Unberth
14.83
12.67
1.00
13.67
1.6.2 SpaceX Berthing
38.34
14.92
0.00
14.92
0.00
2.50
0.00
2.50
1.6.1.1 SpaceX Cargo Operations (including cargo tag ups)
133.00
97.42
25.00
122.42
0.00
1.33
0.00
1.33
1.6.3 SpaceX Unberth
31.16
25.58
0.33
25.92
2.0 USOS Medical Operations
197.00
186.92
7.42
194.33

2.0 RS Medical Operations [7]

80.71
86.67
0.00
86.67
3.0 ISS Operations Emergency and Medical OBT
52.83
52.08
0.75
52.83
25.87
25.83
0.00
25.83
3.2 USOS Vehicle/Module OBT
91.00
65.83
0.00
65.83
3.2 RS Vehicle/Module OBT
14.0
15.00
0.00
15.00
30.00
24.50
0.00
24.50
Routine Operations Totals
110.25
111.75
28.94
140.69
103.11
135.60
0.00
135.60
4.2 Station Support Computer Refresh New Crew
2.25
2.50
0.25
2.75
1.50
0.17
0.00
0.17
4.4 Operational (Exp to Exp Crew) Tag-Ups
4.00
1.00
0.00
1.00
3.00
0.50
0.00
0.50
4.5 U.S. Emergency VHF Comm Testing
0.50
0.83
0.00
0.83
0.33
0.25
0.00
0.25
4.10 ODF Updates
0.75
1.25
0.25
1.50
0.75
0.00
0.00
0.00

Segment Specific Routine Operations

4.1 RS PAO
0.00
2.67
0.00
2.67
30.53
55.75
0.00
55.75
4.1 USOS PAO
89.30
90.00
19.60
109.60
0.00
0.50
0.00
0.50

4.6.1 IMS Daily File Preparation

36.00
18.67
0.00
18.67

4.6.2 IMS Tag-ups

6.00
8.75
0.00
8.75
4.6.3 ISS USOS Weekly Stowage Conf
5.95
5.42
0.00
5.42
4.7 Audits
3.00
5.75
3.50
9.25
25.00
22.42
0.00
22.42
4.8 ISS Crew Downlinked Messages for ISS Program
0.00
0.00
3.00
3.00

4.9 RS laptop Virus Scan

8.67
0.00
8.67
4.11 ISS Safety Video Survey
4.50
1.08
0.92
2.00
4.12 USOS Misc Ops
0.00
1.25
1.42
2.67

4.13 RSOC Misc Ops

0.00
19.92
0.00
19.92
Logistics and Maintenance Totals
305.00
382.22
31.83
414.05
412.00
447.34
0.00
447.34

5.1 NASA Preventative Maintenance

107.67
11.58
119.25

5.1 NASA Corrective

142.03
19.08
161.12
0.00
2.42
0.00
2.42

5.1 NASA Contingency

0.00
0.00
0.00

5.1 ESA Preventative Maintenance

1.25
0.00
1.25

5.1 ESA Corrective Maintenance

8.17
0.50
8.67

5.1 JAXA Preventative Maintenance

8.50
0.00
8.50

5.1 JAXA Corrective Maintenance

3.00
0.67
3.67

5.1 CSA Maintenance

57.10
0.00
57.10

5.1 USOS Sys Ops

54.50
0.00
54.50

5.2 RS Maintenance and Systems

412.00
444.92
0.00
444.92

5.2 RS FGB Technical Maintenance

Resupply and Outfitting Totals
220.16
183.01
36.50
219.50
40.00
9.67
0.00
9.67
6.1 NASA Resupply/Outfitting
200.25
161.92
32.75
194.67
6.1 ESA Resupply /Outfitting
9.66
4.17
3.42
7.58
6.1 JAXA Resupply /Outfitting
10.25
16.92
0.33
17.25

6.2 RS Resupply /Outfitting

40.00
9.67
0.00
9.67
7.1 EMU EVA
225.58
527.02
60.08
587.10
1.66
2.67
0.00
2.67
7.2 Orlan EVA
0.00
13.33
1.25
14.58
0.00
163.42
0.00
163.42

NOTES:

[1]The numbers in this column represent pre-flight baseline planning numners are used for Stage crew time allocations.
[2]The numbers in this column of the table reflect actual totals.
[3]29.33 hours of ESA utilization was performed as Reserve Hot List and will not count against the COUP percentages.
[4]12.17 hours of CSA utilization was performed as Reserve Hot List and will not count against the COUP percentages.

Table 4.2-2, Increments 53 and 54 Cross Station Crew Time (CSCT), is the summary of executed cross-station crew time for both USOS crewmembers and RS crewmembers. USOS Total is the total time spent by USOS crewmembers performing Russian tasks and RS Total is the total time spent by RS crewmembers performing USOS tasks.

Table 4.2-2 increments 53 and 54 CROSS-STATION Crew Time (CSCT)

CSCT Tasks
USOS Total (hours) [2]
RS Total (hours)
Total Difference [1]
CSCT Tasks for Incs. 53_54
17.25
11.91
-5.34
Notes:
[1]The total difference reflects the delta between the amount of hours that the RS crew spent performing USOS tasks from the amount of time that the USOS crew spent doing RS tasks.
[2]The USOS Total sum includes 2.93 hours completed by the USOS crew for RS EVA isolation. Currently, there is no agreement between NASA and Roscosmos to account for the crew time spent for crewmember isolation during EVA as a service provided.

Table 4.2-3, Increments 53_54 Joint Research, is the summary of joint participation by both USOS and RS crewmembers in payload activities. The Joint Research totals for USOS and RS are included in the total utilization numbers respectively in Table 4.2-1 Increments 53 and 54 Operations.

Table 4.2-3 increments 53 and 54 Joint research

Tasks
USOS Total (hours)
RS Total (hours)
MARES Sarcolab
39.17
51.50
Cool Flames
1.33
0.00
ACME
14.17
0.83
EarthKAM
1.83
5.17
EML
0.08
1.50
Spheres-ZR
16.08
16.17

Stowage Table 4.3-1, Hardware Stowed on ISS during Increments 53 and 54, lists the volumes/duration of NASA hardware stowed in the RS and Russian hardware stowed in the USOS, including the FGB.

Table 4.3-1 HARDWARE Stowed on iss during IncrementS 53 and 54

Increments 53 and 54
CTBE
m3
Total U.S. hardware stowed on ISS RS during Increments 53 and 54
0.128
0.007
Total RS hardware stowed on ISS USOS during Increments 53 and 54
237.794
12.603

Baseline (Draft – October 2018)

Cargo, Water and Propellant Transfer Table 4.4-1, Mass USOS Vehicles Delivered to ISS, is the summary of the items NASA vehicles have provided to the ISS each flight in this IDRD Period, including delivery of Russian cargo and delivery of water to ISS. Table 4.4-1A, Mass USOS Vehicles Delivered to ISS (NASA/CSA/ESA/JAXA Dry Cargo Only), reflects the NASA/CSA/ESA/JAXA Dry Cargo only. Mass data included in these tables are approved per the Post Flight Manifest Change Directive (CD).

Table 4.4-1 MASS USOS VEHICLES DELIVERED TO ISS (All weights in kilograms)

NASA/CSA/ESA/JAXAA
RUSSIAN
Pro-pellant (Kg)
Gases for Repress (Kg)
Launch Flight
Cargo
Pay-loads
Water (Liters)
Gases for USOS A/L (Kg)
Cargo
Pay-loads
Other
U.S. provided Food for RSO
U.S. provided Crew Prov for RSO
Charge-able
Non-Charge-able
OA-8 CR#15861
2359.10
799.06
73.00
0.00
0.00
0.00
13.20
0.00
0.00
0.00
93.80
SpX-13 CR#15876
958.45
1330.85
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
SpX-14 CR#15982
1005.99
1570.49
0.00
0.00
0.00
0.00
13.62
0.00
0.00
0.00
0.00
Increment 53-54 Total Mass
4323.54
3700.40
73.00
0.00
0.00
0.00
26.82
0.00
0.00
0.00
93.80

A - See USOS mass breakout in Table 4.4-1A:

O - This documents the mass of NASA food and crew provisions provided to the RS crew under the "Protocol between NASA and ROSCOSMOS, USOS/RS Food and Crew Provisions" dated 7, April 2014 agreement.

Traceability Note concerning Table 4.4-1A:

Table 4.4-1 Cargo = Table 4.4-1A[(NASA(Other + USOS Consumables + Packing)) + ((CSA+ESA+JAXA) Cargo) + ((CSA+ESA+JAXA) Packing) ]

Table 4.4-1 Payloads = Table 4.4-1A[(NASA+CSA+ESA+JAXA) Payloads] tABLE 4.4-1A MASS USOS VEHICLES DELIVERED TO ISS (NASA/CSA/ESA/JAXA Dry Cargo Only) (All weights shown in kilograms)

NASA / CSA / ESA / JAXA

Launch Flight
NASA
CSA
ESA
JAXA
Cargo
Pay-loads+
Pack-ing*
Cargo
Pay-loads
Pack-ing*
Cargo
Pay-loads+
Pack-ing*
Cargo
Pay-loads
Pack-ing*
Other**
USOS Consumables
OA-8 CR#15861
571.57
1530.37
724.89
213.79
7.44
0.00
0.56
4.38
6.77
0.84
28.94
67.40
1.21
SpX-13 CR#15876
209.71
643.50
1201.49
82.86
0.00
2.07
0.14
0.00
80.07
4.30
15.02
47.22
2.92
SpX-14 CR#15982
492.67
381.04
1377.93
106.80
0.12
2.88
0.25
10.95
74.72
7.12
0.00
114.96
7.04
Increment 53-54 Total Mass
1273.95
2554.91
3304.31
403.45
7.56
4.95
0.95
15.33
161.56
12.26
43.96
229.58
11.17

* Stowage provisions not manifested.

** U.S. Cargo Other does not include CWC water + OA-8: CEF ref. - DBC 08FEB18 2.48 kg of MSL mass transferred from ESA to NASA per NASA ESA Technical Understanding on Operation of Facility - July 2013.

+ SpX-14: The Payload ASIM PFM is a bartered item that NASA launched on ESA's behalf (311.30 kg).

Table 4.4-2, Mass USOS Vehicles Returned from ISS, is the summary of the items NASA vehicles have returned to the ground from the ISS for each flight in this IDRD Period, including return of Russian cargo, payloads, and disposal of trash. Table 4.4-2A, Mass USOS Vehicles Returned from ISS (NASA/CSA/ESA/JAXA Dry Cargo Only), reflects the NASA/CSA/ESA/JAXA Dry Cargo Only. Mass data included in these tables are approved per the Post Flight Manifest CD.

Table 4.4-2 mass USOS VEHICLES RETURNED FROM ISS (All weights in kilograms)

NASA / CSA / ESA / JAXA A
RUSSIAN
Total Disposed
Return Flight
NASA
USOS Disposed
Cargo
Pay-loads
Disposed
Cargo
Pay-loads
USOS Waste
Daily Trash
FGB Waste
Charge-able
Non-Chargeable
RS Waste
Daily Trash
OA-8 CR#15861
0.00
0.00
1753.74
907.10
0.00
0.00
0.00
0.00
93.00
0.00
2753.84
SpX-12 CR#15820
410.20
1202.30
58.12
0.00
0.00
0.00
0.00
0.00
0.00
58.12
SpX-13 CR#15876
980.54
812.93
547.63
0.00
0.00
0.00
0.00
0.00
0.00
0.00
547.63
Increment 53-54 Total Mass
1390.74
2015.23
2359.49
907.10
0.00
0.00
0.00
0.00
93.00
0.00
3359.59

A - See USOS mass breakout in Table 4.4-2A.

Traceability Note concerning Table 4.4-2A below:

Table 4.4-2 Cargo = Table 4.4-2A[(NASA(Cargo Other + USOS Consumables)) + ((CSA+ESA+JAXA) Cargo)]

Table 4.4-2 NonChargeable = This mass is defined as part of Balance of Contributions and is not part of CSOC agreement. See Annex 1 Manifest for N Noted items.

Table 4.4-2 Payloads = Table 4.4-2A[(NASA+CSA+ESA+JAXA) Payloads]

TABLE 4.4-2A MASS USOS VEHICLES RETURNED FROM ISS (NASA/CSA/ESA/JAXA dry cargo only) (All weights in kilograms)

Return Flight
NASA
CSA
ESA
JAXA
Cargo
Pay-loads
Packing*
Cargo
Pay-loads
Packing*
Cargo
Pay-loads
Packing*
Cargo
Pay-loads
Packing*
Other
USOS Consumables
OA-8 CR#15861
--
--
--
--
--
--
--
--
--
--
--
--
--
SpX-12 CR#15820
119.00
183.62
1148.44
101.79
0.00
1.87
0.12
1.75
13.26
1.12
0.00
38.74
2.85
SpX-13 CR#15876
473.44
363.31
785.68
109.55
28.02
3.55
2.27
2.67
15.62
1.01
0.00
8.09
0.25
Increment 53-54 Total Mass
592.44
546.93
1934.12
211.34
28.02
5.42
2.39
4.42
28.88
2.13
0.00
46.83
3.10

* Stowage provisions not manifested.

Table 4.4-3, Mass Roscosmos Vehicles Delivered to ISS, is the summary of the items Roscosmos vehicles have provided to the ISS each flight in this IDRD Period, including delivery of NASA cargo, payloads, water, propellant and gases to ISS. Table 4.4-3A, Mass ROSCOSMOS Vehicles Delivered to ISS (NASA/CSA/ESA/JAXA), reflects the NASA/CSA/ESA/JAXA breakdown. Mass data included in these tables are approved per the Post Flight Manifest CD.

TABLE 4.4-3 mass ROSCOSMOS vEHICLES DELIVERED TO ISS (All weights in kilograms)

Flight
NASA / CSA / ESA / JAXA A
RUSSIAN
Cargo
Pay-load
Volume

(Liters)

Cargo
Pay-load
Water (Liters)
Pro-pellant (Kg)
Gases Repress (Kg)
FGB
Other
RS ProvidedO
Charge-able
Non-Chargeable
Charge-able
Non-Chargeable
Food
Crew Provisions
52S CR#15903
0.00
0.00
57.66
0.00
0.00
5.06
9.09
452.86
107.92
9.55
0.00
0.00
0.00
68P CR#15910
84.43
0.00
4.59
0.00
24.32
7.42
0.00
119.80
1001.55
40.30
640.00
747.00
47.00
53S CR#15873
0.00
0.00
46.82
0.00
0.00
0.00
1.05
573.18
115.29
8.25
0.00
0.00
0.00
69P CR#15862 F
17.85
23.46
9.60
0.00
18.11
0.00
5.32
105.22
976.24
315.25
442.00
759.00
46.00
Increment 53-54 Total Mass
102.28
23.46
118.67
0.00
42.43
12.48
15.46
--
2201.00
373.35
1082.00
1506.00
93.00

Notes:

A - See USOS mass breakout in Table 4.4-3A:

O-This documents the mass of Russian food and crew provisions launched by RSA for the USOS crew under the 'Protocol between NASA and ROSCOSMOS USOS/RS Food and Crew Provisions' dated 7, April 2014 agreement.

F - 69P: FGB hardware flown under obligations to deliver 188 kg of FGB cargo per FGB Sustaining Engineering Protocol between NASA and State Corporation Roscosmos from January 2017.

Traceability Note concerning Table 4.4-3:

Table 4.4-3 Other = Table 4.4-3A [(NASA (Other + USOS Consumables + Packing)) + ((CSA+ESA+JAXA) Cargo) + ((CSA+ESA+JAXA) Packing)] Table 4.4-3 NonChargeable = This mass is defined as part of Balance of Contributions and is not part of CSOC agreement.

Table 4.4-3 Payloads = Table 4.4-3A [(NASA+CSA+ESA+JAXA) Payloads]

TABLE 4.4-3A MASS ROSCOSMOS VEHICLES DELIVERED TO ISS (NASA/CSA/ESA/JAXA) (dry cargo only)

NASA / CSA / ESA / JAXA

Flight
NASA
CSA
ESA
JAXA
Cargo
Pay-loadsB
Pack-ing*
Cargo
Pay-loads
Pack-ing*
Cargo
Pay-loadsB
Pack-ing*
Cargo
Pay-loads
Pack-ing*
Other
CSOC
52S CR#15903
9.66
53.06
9.06
--
0.00
0.00
--
0.00
0.03
--
0.00
0.00
--
68P CR#15910
84.43
36.33
0.00
--
0.00
0.00
--
0.00
0.00
--
0.00
0.00
--
53S CR#15873
2.04
44.76
0.77
--
0.00
0.00
--
0.00
0.06
--
0.01
0.22
--
69P CR#15862
44.34
24.68
5.32
--
0.00
0.00
--
0.00
0.00
--
0.00
0.00
--
Increment 53-54 Total Mass
140.47
158.83
15.15
0.00
0.00
0.00
0.00
0.00
0.09
0.00
0.01
0.22
0.00

Notes:

B - 53S: Pursuant to the July 21, 2015 NASA-ESA Protocol 44S Upmass and 42S Downmass Planning, NASA launched 0.77 kg and returned 0.77 kg of cargo on ESA’s behalf.

* Packing indicates “Stowage provisions not manifested”

Table 4.4-4, Mass Roscosmos Vehicles Returned from ISS, is the summary of the items Roscosmos vehicles have returned to the ground or disposed of from the ISS for each flight in this IDRD Period, including return of NASA cargo, payloads, and disposal of trash. Table 4.4-4A, Mass Roscosmos Vehicles Returned from ISS (NASA/CSA/ESA/JAXA Dry Cargo Only), reflects the NASA/CSA/ESA/JAXA Dry Cargo Only. Mass data included in these tables are approved per the Post Flight Manifest Change Directive (CD).

TABLE 4.4-4 mass ROSCOSMOS VEHICLES RETURNED FROM ISS (All weights in kilograms)

Flight
NASA / CSA / ESA / JAXA A
RUSSIAN
Total Disposed
USOS Returned
USOS Disposed
Returned
Disposed
FGB
Cargo
Pay-loads
Return Volume (Liters)
USOS Disposed
Daily Disposed
FGB Disposed
Volume (Liters)
Cargo
Payloads
RS Disposed
Daily Disposed
Chargeable
Non-ChargeableF
Chargeable
Non-Chargeable
51S CR#15859
0.00
0.14
16.44
0.00
1.90
48.51
0.00
0.00
0.00
0.00
9.62
22.91
100.60
0.00
100.60
52S CR#15903
0.00
0.00
19.23
0.28
0.96
49.69
0.00
0.00
0.00
0.00
12.99
14.43
97.14
0.00
97.14
67P CR#15855
0.00
0.00
0.00
0.00
0.00
0.00
270.50
0.00
15.01
285.68
0.00
0.00
1163.68
0.00
1449.19
Increment 53-54 Total Mass
0.00
0.14
35.67
0.28
2.86
--
270.50
0.00
15.01
--
22.62
37.34
1361.42
0.00
1646.93

Notes:

A - See USOS mass breakout in Table 4.4-4A.

F -51S: FGB hardware flown under agreement defined in June 2017 Program Management Review Protocol Item 14.0.

Traceability Note concerning Table 4.4-4 below:

Table 4.4-4 Cargo = Table 4.4-4A[(NASA(Cargo Other + USOS Consumables)) + ((CSA+ESA+JAXA) Cargo)] Table 4.4-4 NonChargeable = This mass is defined as part of Balance of Contributions and is not part of CSOC agreement. See Annex 1 Manifest for N Noted items.

Table 4.4-4 Payloads = Table 4.4-4A[(NASA+CSA+ESA+JAXA) Payloads]

TABLE 4.4-4A MASS ROSCOSMOS VEHICLES RETURNED FROM ISS (NASA/CSA/ESA/JAXA dry cargo only)

Flight
NASA / CSA / ESA / JAXA
NASA
CSA
ESA
JAXA
Cargo
Pay-loads
Cargo
Pay-loads
Cargo
Pay-loads
Cargo
Pay-loads
Other
CSOC
51S CR#15859
0.50
15.84
1.14
0.00
0.00
0.10
0.76
0.00
0.00
52S CR#15903
0.93
18.58
0.96
0.00
0.00
0.00
0.00
0.00
0.00
67P CR#15855
--
--
--
--
--
--
--
--
--
Increment 53-54 Total Mass
1.43
34.42
2.10
0.00
0.00
0.10
0.76
0.00
0.00

Table 4.4-5, Mass from Common Spare Pool Hardware By NASA/CSA/ESA/JAXA, is the summary of the hardware provided by NASA to NASA/CSA/ESA/JAXA on-orbit and or return from orbit under the Common Spares Pool Agreements in which the up-mass and down mass is NASA/CSA/ESA/JAXA responsibility.

Increment 53 exchanges;

1 each OPA Canister Part Number: 683-99752-1, SN: N/A Transferred from NASA to JAXA. 2.8848 KG Increment 54 exchanges;

CSP-2018-138 Makita Batteries, Charger and Drill, NASA to JAXA on February 20, 2018.

Part Name: Makita 3.0 AH Battery Assemblies (4 each), P/N: SEG33111376-302, S/Ns: 1062, 1063, 1066, 1067 Part Name: IVA Tool Battery Charger, P.N: SEG33110643-303, S/N: 1005 Part Name: IVA Power Tool charger Adapter Cable, P/N: SEG33110639-302, S/N: 1001 Part Name: Makita Driver Drill, P/N: 6213D, B/C 007954J ORU Condition: Good No compensation is expected for this transfer of ownership.

TABLE 4.4-5 mass From Common Spare Pool Hardware by nasa/csa/esa/jaxa

ESA (Kg)
JAXA (Kg)
Chargeable
Non-Chargeable
Chargeable
Non-Chargeable
Launch
0
0
2.8848
0
Return
0
0
0
0

Increments 53_54 Total Mass

0
0
2.8848
0

Table 4.4-6, Water Deliveries, Consumption and Surplus Consumption, is the summary of water delivered to and consumed by each segment during this IDRD period. Deliveries include water provided by visiting vehicles and reclaimed by processing urine. Consumption is calculated assuming each crewmember consumes water and oxygen at the same rate per person. Consumption is calculated using a crew days ratio, which is each segment’s crewmembers’ portion of the total crew days spent on ISS during the IDRD period. The resulting segment’s surplus consumption (or deficit consumption) is considered to have been transferred to (or from) the other segment.

TABLE 4.4-6 Water deliveries, consumption and surplus consumption

Increments 53-54
USOS(L)
RS (L)
Identifier and Formulas
Initial Segment Inventory
2313.2
868.3
A
Deliveries - Vehicles and EVA
16.3
1139.1
B
Deliveries - Urine Processing and Sabatier
1518.8
0.0
C
Final Segment Inventory
2325.1
11230.3
D
Non-Crew Consumption
0
0
E
Crew-Days ratio [1]
0.6667
0.333
F
Expected Total Crew Support Consumption [2]
2300.3
G=

A+B+C-D-E

Allocated Consumption (per crew-days ratio) [7]
1533.5
766.8
H=G*F
Actual Segment Consumption
1523.2
777.1
I=

A+B+C-D-E

Condensate Owed to Segment [3]
62.4
-62.4
AA
Surplus Water Provided for Oxygen Production [3]
-74.1
74.1
BB
Direct Water Transfers [3] [4]
78.2
-78.2
CC
Cross-Segment Consumption [3] [5] [7]
-76.9
79.6
DD
Increment(s) Surplus (Deficit) Consumption [7]
-10.3
10.3
[6]

[1] ratio of segment crew’s days on ISS to total crew days in ISS [2] expected crew support consumption based on total crew days on ISS [3] this data is for informational purposes only to document condensate balance and transfers between segments and not utilized in the surplus calculation [4] this data includes only the directly transferred water via CWCs and EDVs for RS consumption, it does not include cross-segment consumption [5] A positive value here indicates additional consumption from this segment by the crew of the other segment, a negative value indicates the segments crew consumed from the other segment [6] Surplus = I – H = AA + BB + CC + DD [7] Swingbed was not utilized.

Table 4.4-7, Cold Stowage Transportation Usage, reflects the Partners’ use of cold stowage transportation resources for the flights occurring in Increments 53 and 54. The data in this table represent the distribution of the cold stowage asset tare weights across the partners that utilized the asset. The cold stowage assets considered are the NASA-provided freezers and coldbags. If a partner provides their own cold stowage capability, it is not considered a shared resource and is not included in these tables.