CR_16052_ATTA_SSP_54353_54354_Baseline.docx
DOCX document 6 MB Posted
- Attached to
- Human Space Flight Technical Integration Contract (HSFTIC) Federal contract opportunity
- Solicitation number
- 80JSC019R0023
About this file
This document summarizes a forthcoming solicitation for the Human Space Flight Technical Integration Contract (HSFTIC). NASA/JSC plans to issue a Request for Proposal for technical integration services to support human space flight programs. The total small business set-aside solicitation will use NAICS code 541715 with a size standard of 1,250 employees. The anticipated RFP release date is November 1, 2019 with a proposal due date of December 11, 2019. The solicitation and any amendments will be available at the NASA procurement website and FBO.gov. Offerors must monitor for the RFP release and are responsible for downloading documents. All technical questions must be submitted in writing.
CR 16052 ATTA SSP 54353 54354 Baseline
View the file
Other files for this federal contract opportunity
Show all 50
Human Space Flight Technical Integration Contract (HSFTIC) has more files on GovTribe.
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Post Increment Evaluation Report Increments 53 and 54 Review Copy
International Space Station Program
Baseline (Draft – February 2019) March 2019
EAR 99. This document may be used only in the International Space Station (ISS) program to fulfill responsibilities of a Cooperating Agency of an ISS Partner in furtherance of the ISS Intergovernmental Agreement. Re-transfer or disclosure to, or use by, any persons other than citizens of ISS Program International Partner countries, or use for any other purpose, requires prior Governments authorization of all ISS Program Partners who approve this document.
National Aeronautics and Space Administration International Space Station Program Johnson Space Center Houston, Texas Contract Number: NNJ12GA46C
SSP 54353_54354
Baseline (Draft – February 2019)
REVISION AND HISTORY PAGE
| REV. |
| DESCRIPTION |
| PUB. DATE |
| - |
| Initial Release (Reference per SSCD 16052, EFF. XX-XX-XX) |
| XX-XX-XX |
Baseline (Draft – February 2019)
PREFACE
Post Increment Evaluation Report Increments 53 and 54 This document is the Post Increment Evaluation Report Increments 53 and 54. Official delivery of this document is under the control of the Space Station Control Board (SSCB). Any changes or revisions will be jointly agreed to and signed by the National Aeronautics and Space Administration (NASA) and the affected International Partners (IPs).
i
SSCB APPROVAL NOTICE
INTERNATIONAL SPACE STATION PROGRAM
post Increment evaluation report Increments 53 and 54 march 2019Review Copy
Kirk A. Shireman Manager, International Space Station National Aeronautics and Space Administration
Alexey Strelnikov Director, Department of Human Space Programs, State Space Corporation Roscosmos
Date
Date
Ken Podwalski Program Manager Canadian Space Station Program
Fumiya Tsutsui ISS Program Manager Japan Aerospace Exploration Agency
Date
Date
Bernardo Patti Program Manager European Space Agency
Date
INTERNATIONAL SPACE STATION PROGRAM
post Increment evaluation report Increments 53 and 54 CONCURRENCEReview Copy march 2019
| Prepared by: |
| Courtney Hoffman |
OP
book coordinator/ Document Quality Assurance (DQA) Representative org signature
DATE
| Prepared by: |
| Jarrett Quasny |
OP
Increments 53 and 54 increment Engineer org signature
DATE
| Concurred by: |
| Ryan Lien |
OC
Increments 53 and 54 increment manager
ORG
SIGNATURE
DATE
| Concurred by: |
| Bradley Files |
OC
Increment Integration and Operations Manager
ORG
SIGNATURE
DATE
| Concurred by: |
| Ryan L. Prouty |
OC
mission integration and operations office manager
ORG
SIGNATURE
DATE
Post Increment evaluation report Increments 53 and 54
CONCURRENCE
march 2019Review Copy
| Developer Concurrence: |
| Aleksey Bideev |
RSC-E
Russian Modules Manager
ORG
SIGNATURE
DATE
| Developer Concurrence: |
| Mikhail Shutikov |
RSC-E
International Programs integration org
SIGNATURE
DATE
| Developer Concurrence: |
| Konstantin Grigoriev |
RSC-E
Russian segment integration org
SIGNATURE
DATE
| Developer Concurrence: |
| Marina Sycheva |
RSC-E
PLANNING AND MANIFEST MANAGER
org
SIGNATURE
DATE
Developer Concurrence:
Vitali Chernov
RSC-E
program analysis and assessment org signature
DATE
Increments 53 and 54
CONCURRENCE
march 2019Review Copy
| Developer Concurrence: |
| Igor Pustovoy |
RSC-E
International Programs Integration org
SIGNATURE
DATE
Developer Concurrence:
Irina Manaeva
RSC-E
program analysis and assessment, specialist
ORG
SIGNATURE
DATE
Developer Concurrence:
Elena Timokhina
RSC-E
TECHNICAL SPECIALIST
ORG
SIGNATURE
DATE
Developer Concurrence:
Nadezha Gorbova
RSC-E
MANIFEST AND CREW PROVISIONING SPECIALIST
ORG
SIGNATURE
DATE
Developer Concurrence:
Natalia Uspenskaya
RSC-E
cargo stowage manager
ORG
SIGNATURE
DATE
Increments 53 and 54
CONCURRENCE
march 2019Review Copy
Developer Concurrence:
Sergei Yaroshenko
RSC-E
vehicle integrated performance and resources org signature
DATE
| Developer Concurrence: |
| Ekaterina Makhneva |
RSC-E
СОЖ manager org signature
DATE
| Developer Concurrence: |
| Svetlana Novikova |
RSC-E
PAYLOAD INTEGRATION AND OPERATION
org signature
DATE
| Developer Concurrence: |
| Elena Demina |
RSC-E
Payload Integration
ORG
SIGNATURE
DATE
| Developer Concurrence: |
| Svetlana Smirnova |
RSC-E
operations MANAGEMENT
ORG
SIGNATURE
DATE
Increments 53 and 54
CONCURRENCE
march 2019Review Copy
| Developer Concurrence: |
| Elena Zapryagaylo |
RSC-E
water specialist
ORG
SIGNATURE
DATE
iii
TABLE OF CONTENTS
| PARAGRAPH | PAGE | |
| 1.0 | Introduction | 1-1 |
| 1.1 | Purpose | 1-1 |
| 1.2 | SCOPE | 1-1 |
| 1.3 | PRECEDENCE | 1-1 |
| 1.4 | DELEGATION OF AUTHORITY | 1-1 |
| 2.0 | documents | 2-1 |
| 2.1 | applicable documents | 2-1 |
| 2.2 | reference documents | 2-1 |
| 3.0 | Increments 53 and 54 summary | 3-1 |
| 4.0 | ON-ORBIT RESOURCE Assumptions and allocations | 4-1 |
| 4.1 | power transfer to the russian segment assessment | 4-1 |
| 4.2 | Increments 53 and 54 crew time | 4-10 |
| 4.3 | Stowage | 4-14 |
| 4.4 | Cargo, Water and Propellant Transfer | 4-15 |
| 5.0 | <Reserved> | 5-1 |
| 6.0 | extravehicular activity | 6-1 |
| 7.0 | IDRD PERIOD AND TASK REQUIREMENTS SUMMARY | 7-1 |
| 7.1 | IDRD Period Summary | 7-1 |
| 7.2 | Increment 53 Requirements | 7-15 |
| 7.2.1 | <Reserved> | 7-15 |
| 7.2.2 | Increment 53 tasks (IN DESCENDING prioritized ORDER) | 7-15 |
| 7.3 | Increment 54 Requirements | 7-29 |
| 7.3.1 | <Reserved> | 7-29 |
| 7.3.2 | Increment 54 tasks (IN DESCENDING prioritized ORDER) | 7-29 |
APPENDIX
| a | Acronyms and abbreviations | a-1 | |
| b | glossary of terms | b-1 | |
| c | open work | c-1 | |
| d | Increments 53 and 54 Violations, waivers and deviations | d-1 | |
| e | Increments 53 and 54 final crew time graphs for maintenance, | ||
| medical operations and utilization | e-1 |
TABLE
| 3.0-1 | INCREMENTS 53 and 54 SUMMARY | 3-1 |
| 3.0-2 | INCREMENTS 53 and 54 FLIGHT SUMMARY | 3-2 |
| 3.0-2 | INCREMENTS 53 and 54 FLIGHT SUMMARY | 3-3 |
| 4.1-1 | BALANCE of contributions (electrical Power) accounting | 4-2 |
| 4.1-2 | USOS TO RUSSIAN POWER TRANSFERS | 4-4 |
| 4.1-3 | U.S. to FGB POWER transfers | 4-6 |
| 4.1-4 | RUSSIAN HARDWARE OPERATIONAL EFFECTS ON RUSSIAN POWER TRANSFERS | 4-8 |
| 4.2-1 | increments 53 and 54 Operations (4 Pages) | 4-10 |
| 4.2-2 | increments 53 and 54 CROSS-STATION Crew Time (CSCT) | 4-14 |
| 4.2-3 | increments 53 and 54 Joint research | 4-14 |
| 4.3-1 | HARDWARE Stowed on iss during IncrementS 53 and 54 | 4-14 |
| 4.4-1 | MASS USOS VEHICLES DELIVERED TO ISS | 4-15 |
| 4.4-1A | MASS USOS VEHICLES DELIVERED TO ISS (NASA/CSA/ESA/JAXA Dry Cargo Only) | 4-16 |
| 4.4-2 | mass USOS VEHICLES RETURNED FROM ISS | 4-17 |
| 4.4-2A | MASS USOS VEHICLES RETURNED FROM ISS (NASA/CSA/ESA/JAXA dry cargo only) | 4-18 |
| 4.4-3 | mass ROSCOSMOS vEHICLES DELIVERED TO ISS | 4-19 |
| 4.4-3A | MASS ROSCOSMOS VEHICLES DELIVERED TO ISS (NASA/CSA/ESA/JAXA) (dry cargo only) | 4-20 |
| 4.4-4 | mass ROSCOSMOS VEHICLES RETURNED FROM ISS | 4-21 |
| 4.4-4A | MASS ROSCOSMOS VEHICLES RETURNED FROM ISS (NASA/CSA/ESA/JAXA dry cargo only) | 4-22 |
| 4.4-5 | mass From Common Spare Pool Hardware by nasa/csa/esa/jaxa | 4-23 |
| 4.4-6 | Water deliveries, consumption and surplus consumption | 4-24 |
| 4.4-7 | Cold Stowage Transportation Usage | 4-25 |
| 4.4-8 | JEMAL Cycles in Increments 53 and 54 (Russian Review not Required) | 4-25 |
| 4.4-9 | Propellant Consumption and Availability | 4-25 |
| 6.0-1 | EXTRAVEHICULAR ACTIVITY SUMMARY (2 PAGES) | 6-1 |
| J-1 | Increments 53 and 54 Robotics Tasks (3 Pages) | 7-51 |
| C-1 | to be determined items | c-1 |
| C-2 | TO BE RESOLVED ISSUES | c-1 |
| D-1 | Violations, Waivers and Deviations (18 Pages) | d-1 |
FIGURE
| 4.1-1 | PROFILE of RS (IDRD Allocation) power transfers for Increments 53_54 | 4-5 | ||
| 4.1-2 | PROFILE OF FGB POWER TRANSFERS FOR Increments 53_54 | 4-7 | ||
| 4.1-3 | ISS As Flown Altitude Profile | 4-9 | ||
| 7.1-1 | Investigations by Science Discipline | 7-14 | ||
| E-1 | Increments 53 and 54 usos utilization crew time totals (Russian review not required) | e-2 | ||
| E-2 | Increments 53 and 54 maintenance crew time totals | (Russian review not required) | e-3 | |
| e-4 | Increments 53 and 54 USOS preventative maintenance Crew time totals | (Russian review not required) | e-4 | |
| e-5 | Increments 53 and 54 USOS corrective maintenance Crew time totals | (Russian review not required) | e-5 | |
| e-6 | Increments 53 and 54 USOS system maintenance Crew time totals | (Russian review not required) | e-6 | |
| e-7 | Increments 53 and 54 USOS med ops Crew time totals | |||
| (Russian review not required) | e-7 |
Introduction Purpose SSP 54353_54354, Post Increment Evaluation Report (PIER) for Increments 53 and 54, documents the Increment Definition and Requirements Document (IDRD) Period executed requirements and resource usage. This report includes a summary of actual launch dates with major milestones that occurred within the IDRD Period and summaries of the resource and accommodations, including transfer of power, cargo, and propellant for the International Space Station (ISS). Section 7.0, IDRD Period and Task Requirements Summary, and Appendix D, Increments 53 and 54 Violations, Waivers and Deviations are provided for reference only and are not part of the Program’s obligations accounting data.
SCOPE
This report covers Increments 53 and 54, and includes both joint ISS/mated vehicle operations and ISS-only continuous operational phases (i.e., stages) of the Increments. Increment 53 began in September 2017 with the undocking of Soyuz Flight 50. Increment 53 ended and Increment 54 began with the undocking of Soyuz Flight 51 in December of 2017. Increment 54 ended in February 2018 with the undocking of Soyuz Flight 52.
PRECEDENCE
Information contained in this document shall be consistent with ISS Program documentation, including the Memorandum of Understandings (MOU), Balance of Contributions (BoC), and other higher-level agreements. In case of conflicts between this document (excluding Section 7.0 and Appendix D) and SSP 50826, ISS 6-Crew Strategic Planning Document: ISS Crew Augmentation Strategic Plan for 2009-2011; SSP 50261-01, Generic Groundrules, Requirements, and Constraints, Part 1: Strategic and Tactical Planning; SSP 54100, Multi-Increment Planning Document; and SSP 54053_54054, Increment Definition and Requirements Document for Increments 53 and 54, this document shall take precedence.
DELEGATION OF AUTHORITY
The Space Station Control Board (SSCB) has formal control and approval of this document. All changes to this document will be processed in accordance with the procedures as specified in SSP 50123, Configuration Management Handbook.
3-3 documents applicable documents The following documents include specifications, models, standards, guidelines, handbooks, and other special publications. The documents listed in this paragraph are applicable to the extent specified herein. Inclusion of applicable documents herein does not in any way supersede the order of precedence identified in Paragraph 1.2 of this document.
| DOCUMENT |
| TITLE |
| TYPE |
| SSP 50123 |
| Configuration Management Handbook |
| Multilateral |
| SSP 50261-01 |
| Generic Groundrules, Requirements, and Constraints, Part 1: Strategic and Tactical Planning |
| Multilateral |
| SSP 50826 |
| International Space Station 6-Crew Strategic Planning Document: ISS Crew Augmentation Strategic Plan for 2009-2011 |
| Multilateral |
| SSP 54053_54054 |
| Increment Definition and Requirements Document for Increments 53 and 54 |
| Multilateral |
| SSP 54053_54054-ANX2 |
| Increment Definition and Requirements Document for Increments 53 and 54, Annex 2: On-Orbit Maintenance Plan |
| Multilateral |
| SSP 54053_54054-ANX4 |
| Increment Definition and Requirements Document for Increments 53 and 54, Annex 4: Medical Operations and Environmental Monitoring |
| Multilateral |
| SSP 54053 _54054-ANX5 |
| Increment Definition and Requirements Document for Increment 53 and 54, Annex 5: Payload Tactical Plan [List here if called out by title in Section 7 (ex. per SSP 540XX _540YY-ANX5 )] |
| Multilateral |
| SSP 54100 |
| Multi-Increment Planning Document |
| Multilateral |
reference documents The following documents contain supplemental information to guide the user in the application of this document. These reference documents may or may not be specifically cited within the text of this document.
| DOCUMENT |
| TITLE |
| TYPE |
| SSP 54052-51S |
| Increment Definition and Requirements Document for Increment 52, Annex 1: Station Manifest, Flight 51 Soyuz |
| Multilateral |
| SSP 54052-67P |
| Increment Definition and Requirements Document for Increment 52, Annex 1: Station Manifest, Flight 67 Progress |
| Multilateral |
| SSP 54052-SpX-12 |
| Increment Definition and Requirements Document for Increment 52, Annex 1: Station Manifest, Flight SpX-12 |
| Multilateral |
| SSP 54053-52S |
| Increment Definition and Requirements Document for Increment 53, Annex 1: Station Manifest, Flight 52 Soyuz |
| Multilateral |
| SSP 54053-68P |
| Increment Definition and Requirements Document for Increment 53, Annex 1: Station Manifest, Flight 68 Progress |
| Multilateral |
| SSP 54053-OA-8 |
| Increment Definition and Requirements Document for Increment 53, Annex 1: Station Manifest, Flight OA-8 |
| Multilateral |
| SSP 54054-53S |
| Increment Definition and Requirements Document for Increment 54, Annex 1: Station Manifest, Flight 53 Soyuz |
| Multilateral |
| SSP 54054-69P |
| Increment Definition and Requirements Document for Increment 54, Annex 1: Station Manifest, Flight 69 Progress |
| Multilateral |
| SSP 54054-SpX-13 |
| Increment Definition and Requirements Document for Increment 54, Annex 1: Station Manifest, Flight SpX-13 |
| Multilateral |
| NAS15-10110 |
| Contract NAS15-10110 between the National Aeronautics and Space Administration of the United States of America and the Russian Space Agency of the Russian Federation for Supplies and Services Relating to MIR-1 and the International Space Station: Phase One and Selected Phase Two Activities |
| Bilateral |
Increments 53 and 54 summary Increment 53 began with the undocking of 50 Soyuz, which reduced the Expedition crew to 3. Expedition 53 crewmembers increased to 6 with the docking of 52 Soyuz. When 51 Soyuz undocked, Expedition crew size was reduced to 3, Increment 53 ended and Increment 54 began. Expedition 54 crewmembers increased to 6 with the docking of 53 Soyuz. When 52 Soyuz undocked, Increment 54 ended and Increment 55 began.
Table 3.0-1, Increments 53 and 54 Summary, includes crew rotation plans, the Multilateral Crew Operations Panel (MCOP) defined crew assignments and respective agencies.
TABLE 3.0-1 INCREMENTS 53 and 54 SUMMARY
| Increment 53 Start |
| Undocking of 50 Soyuz (02 September 2017) |
| Increment 53 End |
| Undocking of 51 Soyuz (14 December 2017) |
| Increment Duration (days) |
| 103 |
| Increment 54 Start |
| Undocking of 51 Soyuz (14 December 2017) |
| Increment 54 End |
| Undocking of 52 Soyuz ( 27 February 2018) |
| Increment Duration (days) |
| 75 |
| Crew Plan |
| Expedition 53 Crew |
| E53 CDR (R. Bresnik) |
| 51S (launch/return) |
| E53 FE-4 (S. Ryazanskiy) |
| 51S (launch/return) |
| E53 FE-6 (P. Nespoli) |
| 51S (launch/return) |
| E53 FE-1 (A. Misurksin) |
| 52S (launch/return) |
| E53 FE-2 (M. Vande Hei) |
| 52S (launch/return) |
| E53 FE-3 (J. Acaba) |
| 52S (launch/return) |
Expedition 54 Crew
| E54 CDR (A. Misurksin) |
| 52S (launch/return) |
| E54 FE-2 (M. Vande Hei) |
| 52S (launch/return) |
| E53 FE-3 (J. Acaba) |
| 52S (launch/return) |
| E54 FE-4 (A. Shkaplerov) |
| 53S (launch/return) |
| E54 FE-5 (S. Tingle) |
| 53S (launch/return) |
| E54 FE-6 (N. Kanai) |
| 53S (launch/return) |
Table 3.0-2, Increments 53 and 54 Flight Summary, identifies the actual dates and mission data for all flights that visited the ISS during this Increment.
TABLE 3.0-2 INCREMENTS 53 and 54 FLIGHT SUMMARY
Increment 53 Definition
| Start Event |
| End Event |
| Duration |
| 50S Undock |
| 51S Undock |
| 103 days |
| Flight |
| Event |
| Date (GMT) dd/mmm/yy |
| Location |
| Mission Duration (days) |
| Docked Duration (days) |
| Crew Size |
Vehicle/ISS External Cargo
| 52S |
| Launch |
| 12 Sep 17 |
| Baikonur |
| 168 |
| - |
| 3 |
| 3 |
52S launches just prior to midnight GMT on 12 Sep 17 and docks just after midnight GMT on 13 Sep 17
| 52S |
| Dock |
| 13 Sep 17 |
| MRM2 |
| - |
| 168 |
| 0 |
| 6 |
52S launches just prior to midnight GMT on 12 Sep 17 and docks just after midnight GMT on 13 Sep 17
| SpX-12 |
| Unberth |
| 17 Sep 17 |
| N2-Nadir |
| 34 |
| 32 |
| - |
| 6 |
| 68P |
| Launch |
| 14 Oct 17 |
| Baikonur |
| 165 |
| - |
| - |
| 6 |
| 68P |
| Dock |
| 16 Oct 17 |
| DC1 |
| - |
| 163 |
| - |
| 6 |
| OA-8 |
| Launch |
| 12 Nov 17 |
| Wallops |
| 24 |
| - |
| - |
| 6 |
| OA-8 |
| Berth |
| 14 Nov 17 |
| N1-Nadir |
| - |
| 22 |
| - |
| 6 |
| OA-8 |
| Unberth |
| 06 Dec 17 |
| N1-Nadir |
| 24 |
| 22 |
| - |
| 6 |
| 51S |
| Undock |
| 14 Dec 17 |
| MRM1 |
| 139 |
| 139 |
| 3 |
| 3 |
TABLE 3.0-2 INCREMENTS 53 and 54 FLIGHT SUMMARY
Increment 54 Definition
| Start Event |
| End Event |
| Duration |
| 51S Undock |
| 52S Undock |
| 75 days |
| Flight |
| Event |
| Date (GMT) dd/mmm/yy |
| Location |
| Mission Duration (days) |
| Docked Duration (days) |
| Crew Size |
Vehicle/ISS
| External Cargo |
| Notes/TBR Summary |
| SpX-13 |
| Launch |
| 15 Dec 17 |
| KSC |
| 29 |
| - |
| - |
| 3 |
| SDS, TSIS, 1 x Empty FRAM |
| SpX-13 |
| Berth |
| 17 Dec 17 |
| N2-Nadir |
| - |
| 27 |
| - |
| 3 |
| 53S |
| Launch |
| 17 Dec 17 |
| Baikonur |
| 168 |
| - |
| 3 |
| 3 |
| 53S |
| Dock |
| 19 Dec 17 |
| MRM1 |
| - |
| 166 |
| 0 |
| 6 |
| 67P |
| Undock |
| 28 Dec 17 |
| SM-Aft |
| 197 |
| 195 |
| - |
| 6 |
| SpX-13 |
| Unberth |
| 13 Jan 18 |
| N2-Nadir |
| 29 |
| 27 |
| - |
| 6 |
| Rapid Scat (2 FRAMs), 1 x Empty FRAM |
| 69P |
| Launch |
| 13 Feb 18 |
| Baikonur |
| 191 |
| - |
| - |
| 6 |
| 69P |
| Dock |
| 15 Feb 18 |
| SM-Aft |
| - |
| 189 |
| - |
| 6 |
| 52S |
| Undock |
| 27 Feb 18 |
| MRM2 |
| 168 |
| 168 |
| 3 |
| 3 |
ON-ORBIT RESOURCE Assumptions and allocations This section defines the allocation of the on-orbit ISS capabilities between systems and utilization across the increments. Allocations are limited to power, crew time, and on-orbit accommodation. Sub-allocations of utilization allocations are provided in the SSP 54053_54054-ANX5. Any non-standard requirements of resources are also provided in Paragraph 4.4. The allocation guidelines are baselined in the SSP 5026101. All data contained in this section represent operational requirements.
power transfer to the russian segment assessment The amount of electrical power transferred from the U.S. segment to the Service Module (SM) during Increment 53_54 (177 days) equals 16064.4 kWh (according to measurements at the output of the USOS electrical power system). In accordance with Addendum 2 of the protocol on the balance of contributions and ISS partner rights, the amount of electrical power transferred to the Russian segment is calculated according to values at the input to the SM voltage and current stabilizer [СНТ]. Since the loss in cables during the transfer from the USOS to the SM CHT input is approximately 3%, the amount of electrical power transferred to the SM, calculated as stipulated by the balance of contributions, is 15582.5 kWh.
The “expansion to 6 crew” also increased the number of docked Soyuz Transportation Modified Anthropometric (TMA), usually at MRM2 and one at MRM1. By having provided electrical power to one of the Soyuz vehicles continuously docked to Functional Cargo Block (FGB) during Increments 53 and 54, NASA fulfilled for this period in Increments 53 and 54, its obligation to provide electrical power for 1 equivalent Soyuz continuously docked to ISS as stipulated in the NASA-Roscosmos Program Managers’ understanding of February 10, 2010. Therefore the relevant amount of power is not accounted against Roscosmos’ original 615,000 kWh allocation.
The amount of electrical power transferred from the USOS to the FGB and consumed by the MRM1 during Increment 53_54 (177 days) equals 2209 kWh (based on the IDRD allocation, MRM1 plus Multipurpose Laboratory Module (MLM) equipment, of 520w average load). Given the loss of capacity in the FGB voltage converter [ARCU] of 13%, the amount of electrical power, calculated as transferred from the USOS to FGB ARCU input in support of the MRM1 plus MLM equipment at the FGB nadir port, is 2539 kWh (output ÷87%).
The total amount of electrical power, calculated as stipulated by the balance of contributions as transferred from the U.S. segment, during Increment 53_54 (177 days) equals 18125.8 kWh.
Per the July 1st, 2006 2nd Addendum Balance of Contributions section D (Electrical Power) an accounting of power transfer/usage will begin on the first day of 2006 and should show progressive deficits from an initial 615,000 kWh. Table 4.1-1 shows the incremental accounting. At the conclusion of Increment 53_54 the remaining balance of power transfer is 268972 kWh.
Table 4.1-1 BALANCE of contributions (electrical Power) accounting
Table 4.1-2, USOS to Russian Power Transfers, and Figure 4.1-1 compare IDRD power transfer allocation to the Russian Segment (RS) from the USOS versus actual power transfer levels as reported by telemetry. Telemetry values were averaged over a 6-hour period. The comparison shows that, in general, IDRD power transfer allocations overestimated actual power transfer levels during Increments 53 and 54 and previous increments. Various factors contributed to these conservative differences, including Russian hardware operational constraints and actual versus predicted Russian systems operations and assumptions.
Russian hardware operational constraints are a result of the power regulation hierarchy in the Russian Electrical Power System (EPS) power architecture, which causes ARCU to saturate during eclipse periods. Saturated ARCUs transfer power at their maximum capability, above the needed power transfer deficit. The power transfer allocation in the IDRD has been set to the minimum number of ARCUs needed to support the Russian power deficits.
The power transfer allocation also assumes all RS systems loads are operating nominally. Therefore, any RS hardware failures or power-downs may contribute to differences in power transferred to the RS. Some of these instances are capture in table 4.1-4. There were times that Elektron and/or Vozdukh were off during these increments that most likely reduced the estimated planned power transfer. Elektron and Vozdukh operational modes were determined from telemetry and documented in D684-12237-53_54 spreadsheet, RS Averages workbook.
Another factor for over allocating power transfers is due to the power allocation in the IDRD having only three solar beta ranges, which takes the more conservative value for each range.
Table 4.1-3, USOS to FGB Power Transfers, and Figure 4.1-2 compare IDRD power transfer allocation to the FGB Segment from the USOS versus actual power transfer levels as reported by telemetry. The comparison shows the IDRD power transfer allocations overestimate actual power transfer levels during Increments 53 and 54. For most of the time during Increments 53 and 54 power transfer is approximately 1.5 kW average (2.4kW peak), which is below IDRD power transfer allocation of 3.0 kW. An explanation of the difference is that the FGB allocation assumed the FGB arrays are retracted and generating minimal power. However, the FGB arrays generate moderate power and batteries support during eclipse periods. It is important to note that the 3.0 kW allocation was selected to mitigate a catastrophic hazard condition. This condition is for a one string channel failure in the USOS.
In summary, the IDRD power transfer allocations significantly overestimate actual power transfer levels. Accounting for the factors discussed above, the gap between IDRD allocations versus actuals can be explained. However, due to FGB safety concerns and to increase the time to respond to failures, it is acceptable to plan for conservatism within the IDRD. For the USOS to RS Power Transfer, based on telemetry during Increments 53 and 54, recommend no change in the IDRD allocation.
TABLE 4.1-2 USOS TO RUSSIAN POWER TRANSFERS
Power Transfer
| Telemetry Start Date |
| Telemetry End Date |
| As Flown Flight Attitude |
| Solar Beta Range |
[1] Telemetry Average (kW) [2]
| IDRD Allocation (kW)[3][4] |
| IDRD Flight/Stage |
| Increments 53_54 |
Events
| 9/02/17 |
| 9/12/17 |
| XVV |
| Low |
| 2.4 |
| 5.9 |
| {5} 53-3[7] |
| 50S undock (9/02/17). Increment 53 starts |
| 9/13/17 |
| 9/14/17 |
| XVV |
| Low |
| 3.7 |
| 5.9 |
| {10} 53-6[14] |
| 52S Docking (9/13/17) |
| 9/15/17 |
| 9/15/17 |
| XVV |
| Mid |
| 3.8 |
| 5.9 |
| {10} 53-6[14] |
| SpaceX-12 Departure (9/16/17) |
| 9/16/17 |
| 9/28/17 |
| XVV |
| Mid |
| 4.3 |
| 5.9 |
| {6} 53-6[8] |
| 9/28/17 |
| 10/14/17 |
| XVV |
| Low |
| 3.2 |
| 5.9 |
| {6} 53-6[8] |
| U.S. EVA LEE A R&R (10/5), U.S. EVA CP9 R&R (10/10) |
| 10/14/17 |
| 10/15/17 |
| XVV |
| Mid |
| 4.0 |
| 5.9 |
| {6} 53-6[8] |
| 10/16/17 |
| 10/17/17 |
| XVV |
| Mid |
| 4.6 |
| 5.9 |
| {8} 53-6[11] |
| 68P Docking (10/16/17) |
| 10/18/17 |
| 10/28/17 |
| XVV |
| High |
| 5.0 |
| 7.8 |
| {8} 53-6[11] |
| U.S. EVA 46 (10/20/17) |
| 10/28/17 |
| 10/31/17 |
| XVV |
| Mid |
| 4.2 |
| 5.9 |
| {8} 53-6[11] |
| 10/31/17 |
| 11/14/17 |
| XVV |
| Low |
| 3.5 |
| 5.9 |
| {8} 53-6[11] |
| 11/14/17 |
| 12/5/17 |
| XVV |
| Low |
| 3.5 |
| 5.9 |
| {7} 53-6[9] |
| Cygnus-8 Capture (11/14/18) |
| 12/5/17 |
| 12/11/17 |
| XVV |
| Low |
| 3.5 |
| 5.9 |
| {8} 53-6[11] |
| Cygnus-8 Departure (12/05/18) |
| 12/11/17 |
| 12/14/17 |
| XVV |
| Mid |
| 3.9 |
| 5.9 |
| {8} 53-6[11] |
| 12/14/17 |
| 12/14/17 |
| XVV |
| Mid |
| 3.8 |
| 5.9 |
| {9} 54-3[12] |
| 51S Undocking (12/14/17). Increment 54 starts |
| 12/14/17 |
| 12/17/17 |
| XVV |
| High |
| 3.7 |
| 7.8 |
| {9} 54-3[12] |
| 12/17/17 |
| 12/19/17 |
| XVV |
| High |
| 4.9 |
| 7.8 |
| {9} 54-3[12] |
| SpaceX-13 Capture (12/17/17) |
| 12/19/17 |
| 12/27/17 |
| XVV |
| High |
| 5.2 |
| 7.8 |
| {7} 54-6[9] |
| 53S Docking (12/19/17) |
| 12/27/17 |
| 12/28/17 |
| XVV |
| High |
| 4.5 |
| 7.8 |
| {10} 54-6[14] |
| 67P Undocking (12/27/17) |
| 12/28/17 |
| 12/31/17 |
| XVV |
| Mid |
| 4.0 |
| 5.9 |
| {10} 54-6[14] |
| 12/31/17 |
| 01/12/18 |
| XVV |
| Low |
| 3.3 |
| 5.9 |
| {10} 54-6[14] |
| 01/12/18 |
| 02/09/18 |
| XVV |
| Low |
| 3.2 |
| 5.9 |
| {6} 54-6[8] |
| SpaceX-13 Departure (1/12/18). LEE B R&R U.S. EVA (1/23). RS EVA 44 (2/2). |
| 02/10/18 |
| 02/13/18 |
| XVV |
| Mid |
| 4.0 |
| 5.9 |
| {6} 54-6[8] |
| 02/13/18 |
| 02/15/18 |
| XVV |
| High |
| 5.0 |
| 7.8 |
| {8} 54-6[11] |
| 02/15/18 |
| 02/23/18 |
| XVV |
| High |
| 5.0 |
| 7.8 |
| {8} 54-6[11] |
| 69P Docking (2/15/18) |
| 02/23/18 |
| 02/27/18 |
| XVV |
| Mid |
| 4.4 |
| 5.9 |
| {8} 54-6[11] |
| 52S Undocking (02/27/18) |
Notes:
[1] IDRD (SSP 54053_54054) Solar beta definitions are defined as follows: Low < 37º, Mid between 37º and 52º, High >52º.
[2] All values from the input side of the ARCU/CHT.
[3] IDRD RS allocation. Excludes power transfer to the FGB segment.
[4] Per IDRD, RS Allocation assumes SM solar array in sun tracking mode.
{5} [IDRD note 7] 1 Progress attached to SM and 1 Soyuz attached to FGB/MRM1 and 1 CRS vehicle attached to USOS.
{6} [IDRD note 8] 1 Progress and 1 Soyuz attached to SM and 1 Soyuz attached to FGB/MRM1.
{7} [IDRD note 9] 2 Progress and 1 Soyuz attached to SM and 1 Soyuz attached to FGB/MRM1 and 1 CRS vehicle attached to USOS.
{8} [IDRD note 11] 2 Progress and 1 Soyuz attached to SM and 1 Soyuz attached to FGB/MRM1 and 2 CRS vehicles attached to USOS.
{9} [IDRD note 12] 2 Progress and 1 Soyuz attached to SM.
{10} [IDRD note 14] 1 Progress and 1 Soyuz attached to SM and 1 Soyuz attached to FGB/MRM1 and 1 Soyuz attached to FGB/MRM1.
Example figure 4.1-1 PROFILE of RS (IDRD Allocation) power transfers for Increments 53_54 table 4.1-3 U.S. to FGB POWER transfers
Power Transfer
| Telemetry Start Date |
| Telemetry End Date |
| As Flown Flight Attitude |
| Solar Beta Range |
[1] Telemetry Average (kW) [2]
| IDRD Allocation (kW)[3][4] [5] |
| IDRD Flight/Stage |
| Increments 53_54 |
Events
| 9/02/17 |
| 9/12/17 |
| XVV |
| Low |
| 1.1 |
| 3.0 |
| 53-3[6] |
| 50S undock (9/02/17). Increment 53 starts |
| 9/13/17 |
| 9/14/17 |
| XVV |
| Low |
| 1.2 |
| 3.0 |
| 53-6[6] |
| 52S Docking (9/13/17) |
| 9/15/17 |
| 9/15/17 |
| XVV |
| Mid |
| 1.1 |
| 3.0 |
| 53-6[6] |
| SpaceX-12 Departure (9/16/17) |
| 9/16/17 |
| 9/28/17 |
| XVV |
| Mid |
| 1.0 |
| 3.0 |
| 53-6[6] |
| 9/28/17 |
| 10/14/17 |
| XVV |
| Low |
| 1.2 |
| 3.0 |
| 53-6[6] |
| U.S. EVA LEE A R&R (10/5), U.S. EVA CP9 R&R (10/10) |
| 10/14/17 |
| 10/15/17 |
| XVV |
| Mid |
| 1.2 |
| 3.0 |
| 53-6[6] |
| 10/16/17 |
| 10/17/17 |
| XVV |
| Mid |
| 1.3 |
| 3.0 |
| 53-6[6] |
| 68P Docking (10/16/17) |
| 10/18/17 |
| 10/28/17 |
| XVV |
| High |
| 1.5 |
| 3.0 |
| 53-6[6] |
| U.S. EVA 46 (10/20/17) |
| 10/28/17 |
| 10/31/17 |
| XVV |
| Mid |
| 1.3 |
| 3.0 |
| 53-6[6] |
| 10/31/17 |
| 11/14/17 |
| XVV |
| Low |
| 1.4 |
| 3.0 |
| 53-6[6] |
| 11/14/17 |
| 12/5/17 |
| XVV |
| Low |
| 1.3 |
| 3.0 |
| 53-6[6] |
| Cygnus-8 Capture (11/14/18) |
| 12/5/17 |
| 12/11/17 |
| XVV |
| Low |
| 1.4 |
| 3.0 |
| 53-6[6] |
| Cygnus-8 Departure (12/05/18) |
| 12/11/17 |
| 12/14/17 |
| XVV |
| Mid |
| 1.2 |
| 3.0 |
| 53-6[6] |
| 12/14/17 |
| 12/14/17 |
| XVV |
| Mid |
| 1.0 |
| 3.0 |
| 54-3[7] |
| 51S Undocking (12/14/17). Increment 54 starts |
| 12/14/17 |
| 12/17/17 |
| XVV |
| High |
| 1.0 |
| 3.0 |
| 54-3[7] |
| 12/17/17 |
| 12/19/17 |
| XVV |
| High |
| 1.4 |
| 3.0 |
| 54-3[7] |
| SpaceX-13 Capture (12/17/17) |
| 12/19/17 |
| 12/27/17 |
| XVV |
| High |
| 1.4 |
| 3.0 |
| 54-6[6] |
| 53S Docking (12/19/17) |
| 12/27/17 |
| 12/28/17 |
| XVV |
| High |
| 1.1 |
| 3.0 |
| 54-6[6] |
| 67P Undocking (12/27/17) |
| 12/28/17 |
| 12/31/17 |
| XVV |
| Mid |
| 1.0 |
| 3.0 |
| 54-6[6] |
| 12/31/17 |
| 01/12/18 |
| XVV |
| Low |
| 1.2 |
| 3.0 |
| 54-6[6] |
| 01/12/18 |
| 02/09/18 |
| XVV |
| Low |
| 1.2 |
| 3.0 |
| 54-6[6] |
| SpaceX-13 Departure (1/12/18). LEE B R&R U.S. EVA (1/23). RS EVA 44 (2/2). |
| 02/10/18 |
| 02/13/18 |
| XVV |
| Mid |
| 1.3 |
| 3.0 |
| 54-6[6] |
| 02/13/18 |
| 02/15/18 |
| XVV |
| High |
| 1.5 |
| 3.0 |
| 54-6[6] |
| 02/15/18 |
| 02/23/18 |
| XVV |
| High |
| 1.5 |
| 3.0 |
| 54-6[6] |
| 69P Docking (2/15/18) |
| 02/23/18 |
| 02/27/18 |
| XVV |
| Mid |
| 1.3 |
| 3.0 |
| 54-6[6] |
| 52S Undocking (02/27/18) |
Notes:
Generic:
[1] IDRD (SSP 54053_54054) Solar beta definitions are defined as follows; Low < 37º, Mid between 37º and 52º, High >52º.
[2] All values from the input side of the ARCU.
[3] IDRD FGB allocation.
[4] Per IDRD, FGB Allocation assumes FGB solar arrays are retracted, do not generate power, and FGB batteries are off-line.
[5] Per IDRD, FGB loads and Power Generation values provided by Khrunichev and include the Soyuz transport vehicle docked to FGB.
Flight/Stage Specific:
[6] 1 Soyuz on FGB/MRM1.
[7] No vehicle on FGB/MRM1.
Example figure 4.1-2 PROFILE OF FGB POWER TRANSFERS FOR Increments 53_54
TABLE 4.1-4 RUSSIAN HARDWARE OPERATIONAL EFFECTS ON RUSSIAN POWER TRANSFERS
Date/GMT
| Russian Hardware Operational Status from RS On-Orbit Telemetry |
| Increment/ Solar Beta Range |
| Notes |
Russian transfers indicated are daily averages for the specified day(s) unless noted otherwise.
| 9/3-9/12 |
| Elektron off, Vozdukh on. |
| S53/Low |
| Russian transfer (~2.5 kW) within allocation (5.9 kW). |
| 9/13-9/14 |
| Elektron on (23 amps), Vozdukh on. |
| S53/Low |
| Russian transfer (~3.7 kW) within allocation (5.9 kW). |
| 9/16-9/28 |
| Elektron on (23 amps), Vozdukh on. |
| S53/Mid |
| Russian transfer (~4.3 kW) within allocation (5.9 kW). |
| 9/28-10/14 |
| Elektron on (23 amps), Vozdukh on. |
| S53/Low |
| Russian transfer (~2.6 kW) within allocation (5.9 kW). |
| 10/18-10/28 |
| Elektron on (23 amps), Vozdukh on. |
| S53/High |
| Russian transfer (~5.0 kW) within allocation (7.8 kW). |
| 10/28-10/31 |
| Elektron on (23 amps), Vozdukh on. |
| S53/Mid |
| Russian transfer (~4.3 kW) within allocation (5.9 kW). |
| 10/31-12/11 |
| Elektron on (23 amps), Vozdukh on. |
| S53/Low |
| Russian transfer (~3.5 kW) within allocation (5.9 kW). |
| 12/15-12/19 |
| Elektron off, Vozdukh on. |
| S54/High |
| Russian transfer (~4.3 kW) within allocation (7.8 kW). |
| 12/19-12/27 |
| Elektron off, Vozdukh on. |
| S54/High |
| Russian transfer (~5.2 kW) within allocation (7.8 kW). |
| 12/28-12/31 |
| Elektron on (23 amps), Vozdukh on. |
| S54/Mid |
| Russian transfer (~4.0 kW) within allocation (5.9 kW). |
| 12/31-01/30 |
| Elektron on (23 amps), Vozdukh on. |
| S54/Low |
| Russian transfer (~3.2 kW) within allocation (5.9 kW). |
| 02/04-02/09 |
| Elektron on (23 amps), Vozdukh on. |
| S54/Low |
| Russian transfer (~3.4 kW) within allocation (5.9 kW). |
| 02/10-02/13 |
| Elektron on (23 amps), Vozdukh on. |
| S54/Mid |
| Russian transfer (~4.0 kW) within allocation (5.9 kW). |
| 02/13-02/15 |
| Elektron on (23 amps), Vozdukh on. |
| S54/High |
| Russian transfer (~5.0 kW) within allocation (7.8 kW). |
| 02/15-02/23 |
| Elektron on (23 amps), Vozdukh on. |
| S54/High |
| Russian transfer (~5.0 kW) within allocation (7.8 kW). |
| 02/23-02/27 |
| Elektron on (23 amps), Vozdukh on. |
| S54/Mid |
| Russian transfer (~4.4 kW) within allocation (5.9 kW). |
Figure 4.1-3, ISS As Flown Altitude Profile, is a graphical representation of the ISS altitude showing where specific height adjustments were made during Increment 53 and 54. The figure is derived from data recorded in real time on an irregular frequency, and as a result several days may pass between data points. It is understood that reboost events occurred on a single day as noted on the figure.
Baseline (Draft – October 2018) Figure 4.1-3 ISS As Flown Altitude Profile
4-25
Increments 53 and 54 crew time Paragraph 4.2, Increments 53_54 Crew Time, is the summary of the pre-Increment planned and actual Increment crew time spent on various mission categories define in the Generic Groundrules, Requirements and Constraints (GGR&C).
The actual Increment 53_54 duration of 178 days was 1 days longer than the palnned preflight duration number of days in the Increment.
The total number of work weeks in Increments 53_54 was 24.2.
Table 4.2-1 reflects the summary of operations performed on ISS. This data reflects RS crewmember or USOS crewmember-specific data as planned and performed on ISS.
Table 4.2-1 increments 53 and 54 Operations (4 Pages)
| Category/Task |
| USOS Crew Time Hours |
| RS Crew Time Hours |
| Table numbers correlate to GGR&C Table E.8-1B, Crew Time Activities for IDRD Period: Segment - Specific Operations |
| Planned Incs. 53_54 Crew Hours [1] |
| Actual |
Incs.
53_54 Scheduled Crew Hours [2]
| Actual Incs. 53_54 Task List Crew Hours[2] |
| Total Completed Incs. |
53_54 Crew Hours[2]
| Planned Incs. 53_54 Crew Hours[1] |
| Actual |
Incs.
53_54 Scheduled Crew Hours[2]
| Actual Incs. 53_54 Task List Crew Hours[2] |
| Total Completed Incs. |
53_54 Crew Hours[2]
8.0 Utilization Operations
8.1 USOS Utilization Totals
USOS Voluntary Science
| 1644.00 |
| 1231.67 |
| 82.90 |
| 1314.58 |
8.1 NASA Utilization [3]
NASA Voluntary Science
| 954.83 |
| 64.88 |
| 1019.71 |
8.1 ESA Utilization [4]
ESA Voluntary Science
| 115.33 |
| 12.33 |
| 127.67 [3] |
8.1 JAXA Utilization [5]
JAXA Voluntary Science
| 126.17 |
| 5.50 |
| 131.67 |
8.1 CSA Utilization [6]
CSA Voluntary Science
| 33.72 |
| 0.17 |
| 33.88 [4] |
8.3 RS Utilization Totals
| 508.44 |
| 489.09 |
| 0.00 |
| 489.09 |
8.3 RS Utilization
| 508.44 |
| 489.09 |
| 0.00 |
| 489.09 |
| 1.0 Soyuz Vehicle Traffic Totals |
| 21.34 |
| 26.17 |
| 0.50 |
| 26.67 |
| 71.34 |
| 73.41 |
| 0.00 |
| 73.41 |
| 1.1.1 Soyuz Docking (including Safety briefing) |
| 11.00 |
| 10.50 |
| 0.00 |
| 10.50 |
| 25.34 |
| 32.00 |
| 0.00 |
| 32.00 |
1.1.1.1 Prepack of cargo to return on Soyuz (RS cargo and transfer)
| 20.00 |
| 17.58 |
| 0.00 |
| 32.00 |
| 1.2.2 Soyuz Undocking |
| 10.34 |
| 15.67 |
| 0.50 |
| 16.17 |
| 26.00 |
| 23.83 |
| 0.00 |
| 23.83 |
| Crew Rotation Totals |
| 97.67 |
| 82.42 |
| 21.33 |
| 103.75 |
| 74.34 |
| 64.08 |
| 0.0 |
| 64.08 |
| 1.1.4.1 Handover |
| 60.00 |
| 55.83 |
| 7.33 |
| 63.17 |
| 40.00 |
| 12.33 |
| 0.00 |
| 12.33 |
| 1.1.4.2 Roles and Responsibilities Review (Arrival and Departure) |
| 12.00 |
| 12.00 |
| 0.00 |
| 12.00 |
| 6.00 |
| 6.00 |
| 0.00 |
| 6.00 |
1.1.4.3 Transfer Cargo Items delivered on Soyuz
| 7.00 |
| 7.75 |
| 0.00 |
| 7.75 |
| 1.1.4.4 Soyuz USOS cargo unpack and final stow |
| 14.00 |
| 1.67 |
| 4.50 |
| 6.17 |
1.1.4.5 Soyuz Cargo Loading
| 20.00 |
| 36.67 |
| 0.00 |
| 36.67 |
| 1.1.4.6 Soyuz prepack USOS cargo |
| 8.00 |
| 8.25 |
| 8.5 |
| 16.75 |
| 1.1.4.8 Change of Command |
| 2.66 |
| 2.67 |
| 0.00 |
| 2.67 |
| 1.34 |
| 1.33 |
| 0.00 |
| 1.33 |
| 1.1.4.9 USOS Post-Departure SSC System Prep for Arriving Crew |
| 1.00 |
| 2.00 |
| 1.00 |
| 3.00 |
| 1.1.5 ISS New Crew Familiarization |
| 35.00 |
| 29.42 |
| 0.00 |
| 29.42 |
| 20.00 |
| 18.58 |
| 0.00 |
| 18.58 |
| 1.1.5.2 ISS Crew Preparation for Return |
| 30.00 |
| 31.92 |
| 4.00 |
| 35.92 |
| 20.00 |
| 16.67 |
| 0.00 |
| 16.67 |
| Vehicle Traffic Totals |
| 306.16 |
| 251.76 |
| 49.16 |
| 300.92 |
| 135.00 |
| 61.42 |
| 0.00 |
| 61.42 |
1.2.1.1 Progress Unloading
| 44.00 |
| 20.33 |
| 0.00 |
| 20.33 |
| 1.2.1.2 Progress USOS Cargo unpack and final stow |
| 4.000 |
| 0.00 |
| 1.00 |
| 1.00 |
1.2.1.3 Progress Loading
| 48.00 |
| 2.00 |
| 0.00 |
| 2.00 |
| 1.2.1.4 Progress USOS Cargo Trash Gather |
| 0.00 |
| 0.00 |
| 0.00 |
| 0.00 |
1.2.2 Progress Docking
| 29.16 |
| 31.92 |
| 0.00 |
| 31.92 |
1.2.3 Progress Undocking
| 13.84 |
| 3.17 |
| 0.00 |
| 3.17 |
| USOS Cargo Pregather |
| 13.00 |
| 13.75 |
| 1.00 |
| 14.75 |
| 1.5.2 Orbital ATK Berthing |
| 21.33 |
| 15.00 |
| 5.83 |
| 20.83 |
| 1.5.1.1 Orbital ATK Cargo Operations (including cargo tag ups) |
| 50.50 |
| 72.42 |
| 15.00 |
| 87.42 |
| 0.00 |
| 0.17 |
| 0.00 |
| 0.17 |
| 1.5.3 Orbital ATK Unberth |
| 14.83 |
| 12.67 |
| 1.00 |
| 13.67 |
| 1.6.2 SpaceX Berthing |
| 38.34 |
| 14.92 |
| 0.00 |
| 14.92 |
| 0.00 |
| 2.50 |
| 0.00 |
| 2.50 |
| 1.6.1.1 SpaceX Cargo Operations (including cargo tag ups) |
| 133.00 |
| 97.42 |
| 25.00 |
| 122.42 |
| 0.00 |
| 1.33 |
| 0.00 |
| 1.33 |
| 1.6.3 SpaceX Unberth |
| 31.16 |
| 25.58 |
| 0.33 |
| 25.92 |
| 2.0 USOS Medical Operations |
| 197.00 |
| 186.92 |
| 7.42 |
| 194.33 |
2.0 RS Medical Operations [7]
| 80.71 |
| 86.67 |
| 0.00 |
| 86.67 |
| 3.0 ISS Operations Emergency and Medical OBT |
| 52.83 |
| 52.08 |
| 0.75 |
| 52.83 |
| 25.87 |
| 25.83 |
| 0.00 |
| 25.83 |
| 3.2 USOS Vehicle/Module OBT |
| 91.00 |
| 65.83 |
| 0.00 |
| 65.83 |
| 3.2 RS Vehicle/Module OBT |
| 14.0 |
| 15.00 |
| 0.00 |
| 15.00 |
| 30.00 |
| 24.50 |
| 0.00 |
| 24.50 |
| Routine Operations Totals |
| 110.25 |
| 111.75 |
| 28.94 |
| 140.69 |
| 103.11 |
| 135.60 |
| 0.00 |
| 135.60 |
| 4.2 Station Support Computer Refresh New Crew |
| 2.25 |
| 2.50 |
| 0.25 |
| 2.75 |
| 1.50 |
| 0.17 |
| 0.00 |
| 0.17 |
| 4.4 Operational (Exp to Exp Crew) Tag-Ups |
| 4.00 |
| 1.00 |
| 0.00 |
| 1.00 |
| 3.00 |
| 0.50 |
| 0.00 |
| 0.50 |
| 4.5 U.S. Emergency VHF Comm Testing |
| 0.50 |
| 0.83 |
| 0.00 |
| 0.83 |
| 0.33 |
| 0.25 |
| 0.00 |
| 0.25 |
| 4.10 ODF Updates |
| 0.75 |
| 1.25 |
| 0.25 |
| 1.50 |
| 0.75 |
| 0.00 |
| 0.00 |
| 0.00 |
Segment Specific Routine Operations
| 4.1 RS PAO |
| 0.00 |
| 2.67 |
| 0.00 |
| 2.67 |
| 30.53 |
| 55.75 |
| 0.00 |
| 55.75 |
| 4.1 USOS PAO |
| 89.30 |
| 90.00 |
| 19.60 |
| 109.60 |
| 0.00 |
| 0.50 |
| 0.00 |
| 0.50 |
4.6.1 IMS Daily File Preparation
| 36.00 |
| 18.67 |
| 0.00 |
| 18.67 |
4.6.2 IMS Tag-ups
| 6.00 |
| 8.75 |
| 0.00 |
| 8.75 |
| 4.6.3 ISS USOS Weekly Stowage Conf |
| 5.95 |
| 5.42 |
| 0.00 |
| 5.42 |
| 4.7 Audits |
| 3.00 |
| 5.75 |
| 3.50 |
| 9.25 |
| 25.00 |
| 22.42 |
| 0.00 |
| 22.42 |
| 4.8 ISS Crew Downlinked Messages for ISS Program |
| 0.00 |
| 0.00 |
| 3.00 |
| 3.00 |
4.9 RS laptop Virus Scan
| 8.67 |
| 0.00 |
| 8.67 |
| 4.11 ISS Safety Video Survey |
| 4.50 |
| 1.08 |
| 0.92 |
| 2.00 |
| 4.12 USOS Misc Ops |
| 0.00 |
| 1.25 |
| 1.42 |
| 2.67 |
4.13 RSOC Misc Ops
| 0.00 |
| 19.92 |
| 0.00 |
| 19.92 |
| Logistics and Maintenance Totals |
| 305.00 |
| 382.22 |
| 31.83 |
| 414.05 |
| 412.00 |
| 447.34 |
| 0.00 |
| 447.34 |
5.1 NASA Preventative Maintenance
| 107.67 |
| 11.58 |
| 119.25 |
5.1 NASA Corrective
| 142.03 |
| 19.08 |
| 161.12 |
| 0.00 |
| 2.42 |
| 0.00 |
| 2.42 |
5.1 NASA Contingency
| 0.00 |
| 0.00 |
| 0.00 |
5.1 ESA Preventative Maintenance
| 1.25 |
| 0.00 |
| 1.25 |
5.1 ESA Corrective Maintenance
| 8.17 |
| 0.50 |
| 8.67 |
5.1 JAXA Preventative Maintenance
| 8.50 |
| 0.00 |
| 8.50 |
5.1 JAXA Corrective Maintenance
| 3.00 |
| 0.67 |
| 3.67 |
5.1 CSA Maintenance
| 57.10 |
| 0.00 |
| 57.10 |
5.1 USOS Sys Ops
| 54.50 |
| 0.00 |
| 54.50 |
5.2 RS Maintenance and Systems
| 412.00 |
| 444.92 |
| 0.00 |
| 444.92 |
5.2 RS FGB Technical Maintenance
| Resupply and Outfitting Totals |
| 220.16 |
| 183.01 |
| 36.50 |
| 219.50 |
| 40.00 |
| 9.67 |
| 0.00 |
| 9.67 |
| 6.1 NASA Resupply/Outfitting |
| 200.25 |
| 161.92 |
| 32.75 |
| 194.67 |
| 6.1 ESA Resupply /Outfitting |
| 9.66 |
| 4.17 |
| 3.42 |
| 7.58 |
| 6.1 JAXA Resupply /Outfitting |
| 10.25 |
| 16.92 |
| 0.33 |
| 17.25 |
6.2 RS Resupply /Outfitting
| 40.00 |
| 9.67 |
| 0.00 |
| 9.67 |
| 7.1 EMU EVA |
| 225.58 |
| 527.02 |
| 60.08 |
| 587.10 |
| 1.66 |
| 2.67 |
| 0.00 |
| 2.67 |
| 7.2 Orlan EVA |
| 0.00 |
| 13.33 |
| 1.25 |
| 14.58 |
| 0.00 |
| 163.42 |
| 0.00 |
| 163.42 |
NOTES:
| [1] | The numbers in this column represent pre-flight baseline planning numners are used for Stage crew time allocations. |
| [2] | The numbers in this column of the table reflect actual totals. |
| [3] | 29.33 hours of ESA utilization was performed as Reserve Hot List and will not count against the COUP percentages. |
| [4] | 12.17 hours of CSA utilization was performed as Reserve Hot List and will not count against the COUP percentages. |
Table 4.2-2, Increments 53 and 54 Cross Station Crew Time (CSCT), is the summary of executed cross-station crew time for both USOS crewmembers and RS crewmembers. USOS Total is the total time spent by USOS crewmembers performing Russian tasks and RS Total is the total time spent by RS crewmembers performing USOS tasks.
Table 4.2-2 increments 53 and 54 CROSS-STATION Crew Time (CSCT)
| CSCT Tasks |
| USOS Total (hours) [2] |
| RS Total (hours) |
| Total Difference [1] |
| CSCT Tasks for Incs. 53_54 |
| 17.25 |
| 11.91 |
| -5.34 |
| Notes: | |
| [1] | The total difference reflects the delta between the amount of hours that the RS crew spent performing USOS tasks from the amount of time that the USOS crew spent doing RS tasks. |
| [2] | The USOS Total sum includes 2.93 hours completed by the USOS crew for RS EVA isolation. Currently, there is no agreement between NASA and Roscosmos to account for the crew time spent for crewmember isolation during EVA as a service provided. |
Table 4.2-3, Increments 53_54 Joint Research, is the summary of joint participation by both USOS and RS crewmembers in payload activities. The Joint Research totals for USOS and RS are included in the total utilization numbers respectively in Table 4.2-1 Increments 53 and 54 Operations.
Table 4.2-3 increments 53 and 54 Joint research
| Tasks |
| USOS Total (hours) |
| RS Total (hours) |
| MARES Sarcolab |
| 39.17 |
| 51.50 |
| Cool Flames |
| 1.33 |
| 0.00 |
| ACME |
| 14.17 |
| 0.83 |
| EarthKAM |
| 1.83 |
| 5.17 |
| EML |
| 0.08 |
| 1.50 |
| Spheres-ZR |
| 16.08 |
| 16.17 |
Stowage Table 4.3-1, Hardware Stowed on ISS during Increments 53 and 54, lists the volumes/duration of NASA hardware stowed in the RS and Russian hardware stowed in the USOS, including the FGB.
Table 4.3-1 HARDWARE Stowed on iss during IncrementS 53 and 54
| Increments 53 and 54 |
| CTBE |
| m3 |
| Total U.S. hardware stowed on ISS RS during Increments 53 and 54 |
| 0.128 |
| 0.007 |
| Total RS hardware stowed on ISS USOS during Increments 53 and 54 |
| 237.794 |
| 12.603 |
Baseline (Draft – October 2018)
Cargo, Water and Propellant Transfer Table 4.4-1, Mass USOS Vehicles Delivered to ISS, is the summary of the items NASA vehicles have provided to the ISS each flight in this IDRD Period, including delivery of Russian cargo and delivery of water to ISS. Table 4.4-1A, Mass USOS Vehicles Delivered to ISS (NASA/CSA/ESA/JAXA Dry Cargo Only), reflects the NASA/CSA/ESA/JAXA Dry Cargo only. Mass data included in these tables are approved per the Post Flight Manifest Change Directive (CD).
Table 4.4-1 MASS USOS VEHICLES DELIVERED TO ISS (All weights in kilograms)
| NASA/CSA/ESA/JAXAA |
| RUSSIAN |
| Pro-pellant (Kg) |
| Gases for Repress (Kg) |
| Launch Flight |
| Cargo |
| Pay-loads |
| Water (Liters) |
| Gases for USOS A/L (Kg) |
| Cargo |
| Pay-loads |
| Other |
| U.S. provided Food for RSO |
| U.S. provided Crew Prov for RSO |
| Charge-able |
| Non-Charge-able |
| OA-8 CR#15861 |
| 2359.10 |
| 799.06 |
| 73.00 |
| 0.00 |
| 0.00 |
| 0.00 |
| 13.20 |
| 0.00 |
| 0.00 |
| 0.00 |
| 93.80 |
| SpX-13 CR#15876 |
| 958.45 |
| 1330.85 |
| 0.00 |
| 0.00 |
| 0.00 |
| 0.00 |
| 0.00 |
| 0.00 |
| 0.00 |
| 0.00 |
| 0.00 |
| SpX-14 CR#15982 |
| 1005.99 |
| 1570.49 |
| 0.00 |
| 0.00 |
| 0.00 |
| 0.00 |
| 13.62 |
| 0.00 |
| 0.00 |
| 0.00 |
| 0.00 |
| Increment 53-54 Total Mass |
| 4323.54 |
| 3700.40 |
| 73.00 |
| 0.00 |
| 0.00 |
| 0.00 |
| 26.82 |
| 0.00 |
| 0.00 |
| 0.00 |
| 93.80 |
A - See USOS mass breakout in Table 4.4-1A:
O - This documents the mass of NASA food and crew provisions provided to the RS crew under the "Protocol between NASA and ROSCOSMOS, USOS/RS Food and Crew Provisions" dated 7, April 2014 agreement.
Traceability Note concerning Table 4.4-1A:
Table 4.4-1 Cargo = Table 4.4-1A[(NASA(Other + USOS Consumables + Packing)) + ((CSA+ESA+JAXA) Cargo) + ((CSA+ESA+JAXA) Packing) ]
Table 4.4-1 Payloads = Table 4.4-1A[(NASA+CSA+ESA+JAXA) Payloads] tABLE 4.4-1A MASS USOS VEHICLES DELIVERED TO ISS (NASA/CSA/ESA/JAXA Dry Cargo Only) (All weights shown in kilograms)
NASA / CSA / ESA / JAXA
| Launch Flight |
| NASA |
| CSA |
| ESA |
| JAXA |
| Cargo |
| Pay-loads+ |
| Pack-ing* |
| Cargo |
| Pay-loads |
| Pack-ing* |
| Cargo |
| Pay-loads+ |
| Pack-ing* |
| Cargo |
| Pay-loads |
| Pack-ing* |
| Other** |
| USOS Consumables |
| OA-8 CR#15861 |
| 571.57 |
| 1530.37 |
| 724.89 |
| 213.79 |
| 7.44 |
| 0.00 |
| 0.56 |
| 4.38 |
| 6.77 |
| 0.84 |
| 28.94 |
| 67.40 |
| 1.21 |
| SpX-13 CR#15876 |
| 209.71 |
| 643.50 |
| 1201.49 |
| 82.86 |
| 0.00 |
| 2.07 |
| 0.14 |
| 0.00 |
| 80.07 |
| 4.30 |
| 15.02 |
| 47.22 |
| 2.92 |
| SpX-14 CR#15982 |
| 492.67 |
| 381.04 |
| 1377.93 |
| 106.80 |
| 0.12 |
| 2.88 |
| 0.25 |
| 10.95 |
| 74.72 |
| 7.12 |
| 0.00 |
| 114.96 |
| 7.04 |
| Increment 53-54 Total Mass |
| 1273.95 |
| 2554.91 |
| 3304.31 |
| 403.45 |
| 7.56 |
| 4.95 |
| 0.95 |
| 15.33 |
| 161.56 |
| 12.26 |
| 43.96 |
| 229.58 |
| 11.17 |
* Stowage provisions not manifested.
** U.S. Cargo Other does not include CWC water + OA-8: CEF ref. - DBC 08FEB18 2.48 kg of MSL mass transferred from ESA to NASA per NASA ESA Technical Understanding on Operation of Facility - July 2013.
+ SpX-14: The Payload ASIM PFM is a bartered item that NASA launched on ESA's behalf (311.30 kg).
Table 4.4-2, Mass USOS Vehicles Returned from ISS, is the summary of the items NASA vehicles have returned to the ground from the ISS for each flight in this IDRD Period, including return of Russian cargo, payloads, and disposal of trash. Table 4.4-2A, Mass USOS Vehicles Returned from ISS (NASA/CSA/ESA/JAXA Dry Cargo Only), reflects the NASA/CSA/ESA/JAXA Dry Cargo Only. Mass data included in these tables are approved per the Post Flight Manifest CD.
Table 4.4-2 mass USOS VEHICLES RETURNED FROM ISS (All weights in kilograms)
| NASA / CSA / ESA / JAXA A |
| RUSSIAN |
| Total Disposed |
| Return Flight |
| NASA |
| USOS Disposed |
| Cargo |
| Pay-loads |
| Disposed |
| Cargo |
| Pay-loads |
| USOS Waste |
| Daily Trash |
| FGB Waste |
| Charge-able |
| Non-Chargeable |
| RS Waste |
| Daily Trash |
| OA-8 CR#15861 |
| 0.00 |
| 0.00 |
| 1753.74 |
| 907.10 |
| 0.00 |
| 0.00 |
| 0.00 |
| 0.00 |
| 93.00 |
| 0.00 |
| 2753.84 |
| SpX-12 CR#15820 |
| 410.20 |
| 1202.30 |
| 58.12 |
| 0.00 |
| 0.00 |
| 0.00 |
| 0.00 |
| 0.00 |
| 0.00 |
| 58.12 |
| SpX-13 CR#15876 |
| 980.54 |
| 812.93 |
| 547.63 |
| 0.00 |
| 0.00 |
| 0.00 |
| 0.00 |
| 0.00 |
| 0.00 |
| 0.00 |
| 547.63 |
| Increment 53-54 Total Mass |
| 1390.74 |
| 2015.23 |
| 2359.49 |
| 907.10 |
| 0.00 |
| 0.00 |
| 0.00 |
| 0.00 |
| 93.00 |
| 0.00 |
| 3359.59 |
A - See USOS mass breakout in Table 4.4-2A.
Traceability Note concerning Table 4.4-2A below:
Table 4.4-2 Cargo = Table 4.4-2A[(NASA(Cargo Other + USOS Consumables)) + ((CSA+ESA+JAXA) Cargo)]
Table 4.4-2 NonChargeable = This mass is defined as part of Balance of Contributions and is not part of CSOC agreement. See Annex 1 Manifest for N Noted items.
Table 4.4-2 Payloads = Table 4.4-2A[(NASA+CSA+ESA+JAXA) Payloads]
TABLE 4.4-2A MASS USOS VEHICLES RETURNED FROM ISS (NASA/CSA/ESA/JAXA dry cargo only) (All weights in kilograms)
| Return Flight |
| NASA |
| CSA |
| ESA |
| JAXA |
| Cargo |
| Pay-loads |
| Packing* |
| Cargo |
| Pay-loads |
| Packing* |
| Cargo |
| Pay-loads |
| Packing* |
| Cargo |
| Pay-loads |
| Packing* |
| Other |
| USOS Consumables |
| OA-8 CR#15861 |
| -- |
| -- |
| -- |
| -- |
| -- |
| -- |
| -- |
| -- |
| -- |
| -- |
| -- |
| -- |
| -- |
| SpX-12 CR#15820 |
| 119.00 |
| 183.62 |
| 1148.44 |
| 101.79 |
| 0.00 |
| 1.87 |
| 0.12 |
| 1.75 |
| 13.26 |
| 1.12 |
| 0.00 |
| 38.74 |
| 2.85 |
| SpX-13 CR#15876 |
| 473.44 |
| 363.31 |
| 785.68 |
| 109.55 |
| 28.02 |
| 3.55 |
| 2.27 |
| 2.67 |
| 15.62 |
| 1.01 |
| 0.00 |
| 8.09 |
| 0.25 |
| Increment 53-54 Total Mass |
| 592.44 |
| 546.93 |
| 1934.12 |
| 211.34 |
| 28.02 |
| 5.42 |
| 2.39 |
| 4.42 |
| 28.88 |
| 2.13 |
| 0.00 |
| 46.83 |
| 3.10 |
* Stowage provisions not manifested.
Table 4.4-3, Mass Roscosmos Vehicles Delivered to ISS, is the summary of the items Roscosmos vehicles have provided to the ISS each flight in this IDRD Period, including delivery of NASA cargo, payloads, water, propellant and gases to ISS. Table 4.4-3A, Mass ROSCOSMOS Vehicles Delivered to ISS (NASA/CSA/ESA/JAXA), reflects the NASA/CSA/ESA/JAXA breakdown. Mass data included in these tables are approved per the Post Flight Manifest CD.
TABLE 4.4-3 mass ROSCOSMOS vEHICLES DELIVERED TO ISS (All weights in kilograms)
| Flight |
| NASA / CSA / ESA / JAXA A |
| RUSSIAN |
| Cargo |
| Pay-load |
| Volume |
(Liters)
| Cargo |
| Pay-load |
| Water (Liters) |
| Pro-pellant (Kg) |
| Gases Repress (Kg) |
| FGB |
| Other |
| RS ProvidedO |
| Charge-able |
| Non-Chargeable |
| Charge-able |
| Non-Chargeable |
| Food |
| Crew Provisions |
| 52S CR#15903 |
| 0.00 |
| 0.00 |
| 57.66 |
| 0.00 |
| 0.00 |
| 5.06 |
| 9.09 |
| 452.86 |
| 107.92 |
| 9.55 |
| 0.00 |
| 0.00 |
| 0.00 |
| 68P CR#15910 |
| 84.43 |
| 0.00 |
| 4.59 |
| 0.00 |
| 24.32 |
| 7.42 |
| 0.00 |
| 119.80 |
| 1001.55 |
| 40.30 |
| 640.00 |
| 747.00 |
| 47.00 |
| 53S CR#15873 |
| 0.00 |
| 0.00 |
| 46.82 |
| 0.00 |
| 0.00 |
| 0.00 |
| 1.05 |
| 573.18 |
| 115.29 |
| 8.25 |
| 0.00 |
| 0.00 |
| 0.00 |
| 69P CR#15862 F |
| 17.85 |
| 23.46 |
| 9.60 |
| 0.00 |
| 18.11 |
| 0.00 |
| 5.32 |
| 105.22 |
| 976.24 |
| 315.25 |
| 442.00 |
| 759.00 |
| 46.00 |
| Increment 53-54 Total Mass |
| 102.28 |
| 23.46 |
| 118.67 |
| 0.00 |
| 42.43 |
| 12.48 |
| 15.46 |
| -- |
| 2201.00 |
| 373.35 |
| 1082.00 |
| 1506.00 |
| 93.00 |
Notes:
A - See USOS mass breakout in Table 4.4-3A:
O-This documents the mass of Russian food and crew provisions launched by RSA for the USOS crew under the 'Protocol between NASA and ROSCOSMOS USOS/RS Food and Crew Provisions' dated 7, April 2014 agreement.
F - 69P: FGB hardware flown under obligations to deliver 188 kg of FGB cargo per FGB Sustaining Engineering Protocol between NASA and State Corporation Roscosmos from January 2017.
Traceability Note concerning Table 4.4-3:
Table 4.4-3 Other = Table 4.4-3A [(NASA (Other + USOS Consumables + Packing)) + ((CSA+ESA+JAXA) Cargo) + ((CSA+ESA+JAXA) Packing)] Table 4.4-3 NonChargeable = This mass is defined as part of Balance of Contributions and is not part of CSOC agreement.
Table 4.4-3 Payloads = Table 4.4-3A [(NASA+CSA+ESA+JAXA) Payloads]
TABLE 4.4-3A MASS ROSCOSMOS VEHICLES DELIVERED TO ISS (NASA/CSA/ESA/JAXA) (dry cargo only)
NASA / CSA / ESA / JAXA
| Flight |
| NASA |
| CSA |
| ESA |
| JAXA |
| Cargo |
| Pay-loadsB |
| Pack-ing* |
| Cargo |
| Pay-loads |
| Pack-ing* |
| Cargo |
| Pay-loadsB |
| Pack-ing* |
| Cargo |
| Pay-loads |
| Pack-ing* |
| Other |
| CSOC |
| 52S CR#15903 |
| 9.66 |
| 53.06 |
| 9.06 |
| -- |
| 0.00 |
| 0.00 |
| -- |
| 0.00 |
| 0.03 |
| -- |
| 0.00 |
| 0.00 |
| -- |
| 68P CR#15910 |
| 84.43 |
| 36.33 |
| 0.00 |
| -- |
| 0.00 |
| 0.00 |
| -- |
| 0.00 |
| 0.00 |
| -- |
| 0.00 |
| 0.00 |
| -- |
| 53S CR#15873 |
| 2.04 |
| 44.76 |
| 0.77 |
| -- |
| 0.00 |
| 0.00 |
| -- |
| 0.00 |
| 0.06 |
| -- |
| 0.01 |
| 0.22 |
| -- |
| 69P CR#15862 |
| 44.34 |
| 24.68 |
| 5.32 |
| -- |
| 0.00 |
| 0.00 |
| -- |
| 0.00 |
| 0.00 |
| -- |
| 0.00 |
| 0.00 |
| -- |
| Increment 53-54 Total Mass |
| 140.47 |
| 158.83 |
| 15.15 |
| 0.00 |
| 0.00 |
| 0.00 |
| 0.00 |
| 0.00 |
| 0.09 |
| 0.00 |
| 0.01 |
| 0.22 |
| 0.00 |
Notes:
B - 53S: Pursuant to the July 21, 2015 NASA-ESA Protocol 44S Upmass and 42S Downmass Planning, NASA launched 0.77 kg and returned 0.77 kg of cargo on ESA’s behalf.
* Packing indicates “Stowage provisions not manifested”
Table 4.4-4, Mass Roscosmos Vehicles Returned from ISS, is the summary of the items Roscosmos vehicles have returned to the ground or disposed of from the ISS for each flight in this IDRD Period, including return of NASA cargo, payloads, and disposal of trash. Table 4.4-4A, Mass Roscosmos Vehicles Returned from ISS (NASA/CSA/ESA/JAXA Dry Cargo Only), reflects the NASA/CSA/ESA/JAXA Dry Cargo Only. Mass data included in these tables are approved per the Post Flight Manifest Change Directive (CD).
TABLE 4.4-4 mass ROSCOSMOS VEHICLES RETURNED FROM ISS (All weights in kilograms)
| Flight |
| NASA / CSA / ESA / JAXA A |
| RUSSIAN |
| Total Disposed |
| USOS Returned |
| USOS Disposed |
| Returned |
| Disposed |
| FGB |
| Cargo |
| Pay-loads |
| Return Volume (Liters) |
| USOS Disposed |
| Daily Disposed |
| FGB Disposed |
| Volume (Liters) |
| Cargo |
| Payloads |
| RS Disposed |
| Daily Disposed |
| Chargeable |
| Non-ChargeableF |
| Chargeable |
| Non-Chargeable |
| 51S CR#15859 |
| 0.00 |
| 0.14 |
| 16.44 |
| 0.00 |
| 1.90 |
| 48.51 |
| 0.00 |
| 0.00 |
| 0.00 |
| 0.00 |
| 9.62 |
| 22.91 |
| 100.60 |
| 0.00 |
| 100.60 |
| 52S CR#15903 |
| 0.00 |
| 0.00 |
| 19.23 |
| 0.28 |
| 0.96 |
| 49.69 |
| 0.00 |
| 0.00 |
| 0.00 |
| 0.00 |
| 12.99 |
| 14.43 |
| 97.14 |
| 0.00 |
| 97.14 |
| 67P CR#15855 |
| 0.00 |
| 0.00 |
| 0.00 |
| 0.00 |
| 0.00 |
| 0.00 |
| 270.50 |
| 0.00 |
| 15.01 |
| 285.68 |
| 0.00 |
| 0.00 |
| 1163.68 |
| 0.00 |
| 1449.19 |
| Increment 53-54 Total Mass |
| 0.00 |
| 0.14 |
| 35.67 |
| 0.28 |
| 2.86 |
| -- |
| 270.50 |
| 0.00 |
| 15.01 |
| -- |
| 22.62 |
| 37.34 |
| 1361.42 |
| 0.00 |
| 1646.93 |
Notes:
A - See USOS mass breakout in Table 4.4-4A.
F -51S: FGB hardware flown under agreement defined in June 2017 Program Management Review Protocol Item 14.0.
Traceability Note concerning Table 4.4-4 below:
Table 4.4-4 Cargo = Table 4.4-4A[(NASA(Cargo Other + USOS Consumables)) + ((CSA+ESA+JAXA) Cargo)] Table 4.4-4 NonChargeable = This mass is defined as part of Balance of Contributions and is not part of CSOC agreement. See Annex 1 Manifest for N Noted items.
Table 4.4-4 Payloads = Table 4.4-4A[(NASA+CSA+ESA+JAXA) Payloads]
TABLE 4.4-4A MASS ROSCOSMOS VEHICLES RETURNED FROM ISS (NASA/CSA/ESA/JAXA dry cargo only)
| Flight |
| NASA / CSA / ESA / JAXA |
| NASA |
| CSA |
| ESA |
| JAXA |
| Cargo |
| Pay-loads |
| Cargo |
| Pay-loads |
| Cargo |
| Pay-loads |
| Cargo |
| Pay-loads |
| Other |
| CSOC |
| 51S CR#15859 |
| 0.50 |
| 15.84 |
| 1.14 |
| 0.00 |
| 0.00 |
| 0.10 |
| 0.76 |
| 0.00 |
| 0.00 |
| 52S CR#15903 |
| 0.93 |
| 18.58 |
| 0.96 |
| 0.00 |
| 0.00 |
| 0.00 |
| 0.00 |
| 0.00 |
| 0.00 |
| 67P CR#15855 |
| -- |
| -- |
| -- |
| -- |
| -- |
| -- |
| -- |
| -- |
| -- |
| Increment 53-54 Total Mass |
| 1.43 |
| 34.42 |
| 2.10 |
| 0.00 |
| 0.00 |
| 0.10 |
| 0.76 |
| 0.00 |
| 0.00 |
Table 4.4-5, Mass from Common Spare Pool Hardware By NASA/CSA/ESA/JAXA, is the summary of the hardware provided by NASA to NASA/CSA/ESA/JAXA on-orbit and or return from orbit under the Common Spares Pool Agreements in which the up-mass and down mass is NASA/CSA/ESA/JAXA responsibility.
Increment 53 exchanges;
1 each OPA Canister Part Number: 683-99752-1, SN: N/A Transferred from NASA to JAXA. 2.8848 KG Increment 54 exchanges;
CSP-2018-138 Makita Batteries, Charger and Drill, NASA to JAXA on February 20, 2018.
Part Name: Makita 3.0 AH Battery Assemblies (4 each), P/N: SEG33111376-302, S/Ns: 1062, 1063, 1066, 1067 Part Name: IVA Tool Battery Charger, P.N: SEG33110643-303, S/N: 1005 Part Name: IVA Power Tool charger Adapter Cable, P/N: SEG33110639-302, S/N: 1001 Part Name: Makita Driver Drill, P/N: 6213D, B/C 007954J ORU Condition: Good No compensation is expected for this transfer of ownership.
TABLE 4.4-5 mass From Common Spare Pool Hardware by nasa/csa/esa/jaxa
| ESA (Kg) |
| JAXA (Kg) |
| Chargeable |
| Non-Chargeable |
| Chargeable |
| Non-Chargeable |
| Launch |
| 0 |
| 0 |
| 2.8848 |
| 0 |
| Return |
| 0 |
| 0 |
| 0 |
| 0 |
Increments 53_54 Total Mass
| 0 |
| 0 |
| 2.8848 |
| 0 |
Table 4.4-6, Water Deliveries, Consumption and Surplus Consumption, is the summary of water delivered to and consumed by each segment during this IDRD period. Deliveries include water provided by visiting vehicles and reclaimed by processing urine. Consumption is calculated assuming each crewmember consumes water and oxygen at the same rate per person. Consumption is calculated using a crew days ratio, which is each segment’s crewmembers’ portion of the total crew days spent on ISS during the IDRD period. The resulting segment’s surplus consumption (or deficit consumption) is considered to have been transferred to (or from) the other segment.
TABLE 4.4-6 Water deliveries, consumption and surplus consumption
| Increments 53-54 |
| USOS(L) |
| RS (L) |
| Identifier and Formulas |
| Initial Segment Inventory |
| 2313.2 |
| 868.3 |
| A |
| Deliveries - Vehicles and EVA |
| 16.3 |
| 1139.1 |
| B |
| Deliveries - Urine Processing and Sabatier |
| 1518.8 |
| 0.0 |
| C |
| Final Segment Inventory |
| 2325.1 |
| 11230.3 |
| D |
| Non-Crew Consumption |
| 0 |
| 0 |
| E |
| Crew-Days ratio [1] |
| 0.6667 |
| 0.333 |
| F |
| Expected Total Crew Support Consumption [2] |
| 2300.3 |
| G= |
A+B+C-D-E
| Allocated Consumption (per crew-days ratio) [7] |
| 1533.5 |
| 766.8 |
| H=G*F |
| Actual Segment Consumption |
| 1523.2 |
| 777.1 |
| I= |
A+B+C-D-E
| Condensate Owed to Segment [3] |
| 62.4 |
| -62.4 |
| AA |
| Surplus Water Provided for Oxygen Production [3] |
| -74.1 |
| 74.1 |
| BB |
| Direct Water Transfers [3] [4] |
| 78.2 |
| -78.2 |
| CC |
| Cross-Segment Consumption [3] [5] [7] |
| -76.9 |
| 79.6 |
| DD |
| Increment(s) Surplus (Deficit) Consumption [7] |
| -10.3 |
| 10.3 |
| [6] |
[1] ratio of segment crew’s days on ISS to total crew days in ISS [2] expected crew support consumption based on total crew days on ISS [3] this data is for informational purposes only to document condensate balance and transfers between segments and not utilized in the surplus calculation [4] this data includes only the directly transferred water via CWCs and EDVs for RS consumption, it does not include cross-segment consumption [5] A positive value here indicates additional consumption from this segment by the crew of the other segment, a negative value indicates the segments crew consumed from the other segment [6] Surplus = I – H = AA + BB + CC + DD [7] Swingbed was not utilized.
Table 4.4-7, Cold Stowage Transportation Usage, reflects the Partners’ use of cold stowage transportation resources for the flights occurring in Increments 53 and 54. The data in this table represent the distribution of the cold stowage asset tare weights across the partners that utilized the asset. The cold stowage assets considered are the NASA-provided freezers and coldbags. If a partner provides their own cold stowage capability, it is not considered a shared resource and is not included in these tables.
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .