Aging_Changes.pptx

PPTX presentation 67 KB Posted

Attached to
Human Space Flight Technical Integration Contract (HSFTIC)
Solicitation number
80JSC019R0023
Issued by

About this file

This document contains information on two upcoming federal contracting opportunities. The first is a presentation summarizing aging change requests for the International Space Station over 365 and 180 days. It lists several open-work items and their statuses but does not provide details on required products or services.

The second opportunity is a solicitation for the Human Space Flight Technical Integration Contract to be issued by NASA's Johnson Space Center. Services sought include technical integration for human space flight. The anticipated release date for the request for proposals is November 1, 2019, with a proposal due date of December 11, 2019. This is a total small business set-aside with a NAICS code of 541715 and size standard of 1,250. All responsible sources may submit offers which will be considered.

Aging Changes

View the file

Other files

File Type Posted
SF30 - RFP - Amendment 3.pdf PDF
HSFTIC J-17 placeholder (FRFP).docx DOCX document
FRFP Industry Questions and Responses 120419.pdf PDF
Attachment L-7 Cost Estimating Wookbook Amendment 4 12-2-19 - FRFP-3.xlsx XLSX spreadsheet
Attachment L-6 EPM Workbook - Amendment 4 12-2-19 - FRFP-3.xlsx XLSX spreadsheet
Attachment L-7 Cost Estimating Wookbook 11.21.19 FRFP-2.xlsx XLSX spreadsheet
Attachment L-6 EPM Workbook 11.21.19 FRFP-2.xlsx XLSX spreadsheet
HSFTIC L Instructions 11.22.19 FRFP-2.docx DOCX document
SF30 - RFP - Amendment 2.pdf PDF
80JSC019R0023 - SF33 FRFP-2.pdf PDF
Modification FRFP-1 Change Log.docx DOCX document
Attachment L-7 Cost Estimating Wookbook MOD FRFP-1.xlsx XLSX spreadsheet
FRFP Industry Questions and Responses 111919.docx DOCX document
Attachment L-6 EPM Workbook MOD FRFP-1.xlsx XLSX spreadsheet
80JSC019R0023 HSFTIC RFP with MOD FRFP-1.docx DOCX document
HSFTIC Pre-Proposal Conference - Posting.pdf PDF
HSFTIC Interested Parties List - Rev. 1.pdf PDF
HSFTIC_J-4_Applicable_and_Reference_Document_List.xlsx XLSX spreadsheet
80JSC019R0023_Request_for_Proposal.pdf PDF
Attachment_L-7_Cost_Estimating_Workbook.xlsx XLSX spreadsheet
Attachment_L-6_EPM_Template_Workbook.xlsx XLSX spreadsheet
80JSC019R0023_-_SF33.pdf PDF
HSFTIC_J-13_List_of_Government_Furnished_Data.xlsx XLSX spreadsheet
HSFTIC_Pre-Proposal_Conference_Information.docx DOCX document
80JSC019R0023_-_Cover_Letter.pdf PDF
SSP_50949-RevA.docx DOCX document
SSP_41150-RevL.pdf PDF
IRT_Processes_RevC_FINAL_Jan_2017.docx DOCX document
42124_P1_RC.pdf PDF
SSP_50098_Part_2_Rev_A.pdf PDF
PPD_521_RB_FINAL.pdf PDF
SSP_50137-RevA.docx DOCX document
GRA_for_Gateway.xlsx XLSX spreadsheet
SSP_30234-RevH.docx DOCX document
SSP41148_IRN.pdf PDF
SSP_50128-C3.doc DOC document
SSP-57003_Rev_L.docx DOCX document
SSP_50310-RevB.docx DOCX document
SSP_50309_Part_2.pdf PDF
JSC_Form_288.doc DOC document
SSP_57000_Revision_S.docx DOCX document
SSP_50200-08-RevB-DCN008-Collated_Master.docx DOCX document
SSP-41172_Rev_AD.docx DOCX document
SSP_41151-Appendix_D-RevH.docx DOCX document
SSP_50420-HTV1-Baseline.docx DOCX document
41004P1_H-1.pdf PDF
CR_16052_ATTA_SSP_54353_54354_Baseline.docx DOCX document
SSP_50333-RevH.docx DOCX document
APA_Style_Website_Ref.pptx PPTX presentation
SSP_50627-RevA.docx DOCX document
Show 40 more

Latest 50 of 212 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Aging Change Requests Over 365 Days July 12, 2019 Pre-Decisional, For Internal Use Only

SSCNTitleBoard/ PanelNASA CE*Age (Days)
Open Work
15539Baseline SSP 51066, ISS Deorbit Strategy and Contingency Action Plan
Status: 07/12/19 – Memo requesting Russian signature was provided to RSC-E on 05/05/19; ECD for Russian signature status is 07/31/19.MSEICBCharles Gray436

*Age represents the days since CR Forwarding Authorization Date

William Cleek 281-483-4386

Pre-decisional, For Internal Use Only

Aging Change Requests Over 180 Days July 12, 2019 Pre-Decisional, For Internal Use Only

SSCNTitleBoard/ PanelNASA CE*Age (Days)
Open Work
15983Baseline SSP 51078, Joint Implementation Plan for ISS Microbial Sampling, Sharing, and Dissemination Results

Status: 07/12/19 – NASA CE provided updated document to the IPs on 07/01/19 for technical signatures; JAXA and ASI technical signatures received on 07/09/19.

MVCBJanejit Gensler311
15546 Rev ARevise SSP 50038, Computer-Based Control System Safety Requirements to Revision C

Status: 07/12/19 – JAXA has requested additional meetings with the Safety Team to discuss the unresolved topics; the Safety Team is working with JAXA to resolve the remaining issues.

S&MACBAndrew Lindsay304
16009Update SSP 50005, ISS Flight Crew Integration Standard (NASA-STD-3000/T) Labeling Requirements

Status: 07/12/19 – CD submittal is pending resolution of the Hazard Response Level (HRL) container labeling issue; additional clarification of the requirements was requested by OB and additional O-code stakeholders and an agreement was reached amongst the teams regarding the requirements updates; management approvals are in work.

MVCBOlga Vassiliev255
15980Retirement of Flight Operations Directorate ISS Program Documents Due to Process Change and Life Cycle End
Status: 07/12/19 – Pending NASA CE concurrence on CD.GSCBBharatkumar Patel (Contractor CE)207
16037Design, Build, Test and Deliver Four Cell Stack Assemblies for Installation into ISS Oxygen Generation Assembly (OGA) Hydrogen Dome Orbital Replacement Unit (H2 Dome ORU), Provide Cell Stack Test Hardware, and Qualify New Supplier
Status: 07/12/19 – Evaluations are being worked; change will require a UCA; Gate 2 completed on 02/01/19, and Pink Team held on 02/14/19; RFP (to supplier) sent on 05/20/19; Supplier proposal is now due on 07/12/19.VCBLuis Valesquez182

*Age represents the days since CR Forwarding Authorization Date

William Cleek 281-483-4386

Pre-decisional, For Internal Use Only image1.png

File details come from the government source that posted it. Updated .