This file is a Performance Requirements Summary (J.1(a) Attachment 3) for the NASA Ames Research Center Facilities Support Services II (AFSS II) contract. The document details comprehensive performance indicators across three primary domains: Business Management, Safety & Environmental, and Technical Operations. Performance standards are extremely precise, with most metrics allowing zero to very few contractor-culpable incidents per contract year, and requiring near-perfect uptime (99-100%) for critical systems including electrical substations, power distribution, utility systems, industrial control systems, fire suppression, HVAC, and communication networks.

The technical performance requirements are particularly stringent, mandating immediate response times (30 minutes on-duty, 2 hours off-duty) for system deficiencies, critical alarms, and failures across multiple infrastructure categories. Evaluation will be based on various data sources including Industrial Control Systems reports, Government Subject Matter Expert surveillance, CMMS Maximo Reports, and contractor-submitted documentation. Performance will be measured through precise calculations of incidents, response times, system availability, and task completion rates, with most technical systems requiring zero contractor-culpable disruptions and maintenance/repair within specified timeframes ranging from 2 weeks to 180 days depending on the system's criticality.

View the file

Other files

File Type Posted
80ARC025R0001 Amendment 00008.pdf PDF
1. Final Request for Proposal (RFP) Cover Letter.pdf PDF
80ARC025R0001 Amendment 00007 Rev. 1.pdf PDF
1. Final Request for Proposal (RFP) Cover Letter.pdf PDF
80ARC025R0001 Amendment 00006.pdf PDF
1. Final Request for Proposal (RFP) Cover Letter.pdf PDF
1. Final Request for Proposal (RFP) Cover Letter.pdf PDF
80ARC025R0001 Amendment 00005.pdf PDF
1. Final Request for Proposal (RFP) Cover Letter.pdf PDF
80ARC025R0001 Amendment 00004_Final.pdf PDF
80ARC025R0001 Amendment 00003_final.pdf PDF
J.1(a) Attachment 7 AFSS IAMAW Local 1414 Mechanical CBA.pdf PDF
J.1(b) Attachment 2 Standard Labor Category Descriptions.xlsx XLSX spreadsheet
1. Final Request for Proposal (RFP) Cover Letter.pdf PDF
J.1(a) Attachment 2 Contract Data Requirements List (CDRLs).pdf PDF
J.1(b) Attachment 1 AFSS II Cost_Price Template Workbook.xlsx XLSX spreadsheet
J.1(a) Attachment 6 AFSS IAMAW Local 1414 Clerical CBA.pdf PDF
Questions and Answers Submittal 930.pdf PDF
Question and Answer Submittal 924.pdf PDF
Amendment 0002 Excel Attachments.zip ZIP file
J.1(b) Attachments 6 Facilities Capital Cost of Money Factors Computation (FORM CASB-CMF).pdf PDF
J.1(b) Attachment 7 Contract Facilities Capital Cost of Money (DD Form 1861).pdf PDF
J.1(b) Attachment 4 Past Performance Relevancy Matrix.xlsx XLSX spreadsheet
80ARC025R0001 Amendment 00002_Final.pdf PDF
J.1(a) Attachment 5 Service Contract Act WD 2015-5641 Rev 28.pdf PDF
J.1(a) Attachment 6 AFSS IAMAW Local 1414 Clerical CBA_Redacted.pdf PDF
J.1(a) Attachment 7 AFSS IAMAW Local 1414 Mechanical CBA_Redacted.pdf PDF
Amendment 00001.pdf PDF
Question and Answer Submittal 918.pdf PDF
J.1(b) Attachment 4 Past Performance Relevancy Matrix.xlsx XLSX spreadsheet
1. Final Request for Proposal (RFP) Cover Letter.pdf PDF
SF33_80ARC025R0001.pdf PDF
J.1(a) Attachment 1 Ames Facilities Support Services II PWS_Final.pdf PDF
J.1(b) Attachment 2 Standard Labor Category Descriptions.xlsx XLSX spreadsheet
J.1(b) Attachment 3 Past Performance Questionnaire.pdf PDF
RFP 80ARC0256R0001 Question Template.xlsx XLSX spreadsheet
J.1(a) Attachment 4 Award Fee Evaluation Plan.pdf PDF
J.1(b) Attachment 1 AFSS II Cost_Price Template Workbook.xlsx XLSX spreadsheet
Section 5 Attachments.zip ZIP file
Section 10 and 11 Attachments.zip ZIP file
J.1(a) Attachment 2 Contract Data Requirements List (CDRLs).pdf PDF
J.1(a) Attachment 3 Performance Requirements Summary.xlsx XLSX spreadsheet
J.1(b) Attachment 4 Past Performance Relevancy Matrix.xlsx XLSX spreadsheet
Section 2 Attachments.zip ZIP file
Section 6 Attachments.zip ZIP file
Section 8 Attachments.zip ZIP file
2. 80ARC025R0001_Ames Facilities Support Services II_RFP.pdf PDF
J.1(b) Attachment 5 Quality Assurance Survillence Plan.pdf PDF
Section 7 Attachments.zip ZIP file
Section 9 Attachments.zip ZIP file
Show all 50

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sheet1

AMES II Performance Requirements Summary
Performance Indicator (From Requirements Document)Requirements Document/Attachments ReferenceCalculationSource of Evaluation DataMinimum Performance StandardData Submitted
BUSINESS MANAGEMENT
Timely delivery of selected contract deliverables as described in J.1(a) Performance Work Statement. Selected deliverables will be identified after awardJ.1(a) Attachment 2 Contract Data Requirements ListAmong Selected Deliverables (ID'd by government prior to period): (Number of deliverables which are late)/(total number of selected deliverables)Government SME and SM ReportsLess than than 5%Contractor submitted Business Status Reports, RCM Report, Safety Report
Accuracy of Monthly IDIQ Invoiced Work - IDIQ invoices match IDIQ quotesJ.1(a) Attachment 1 PWS Section 10.02.f(Number of monthly IDIQ vouchers/invoices with inaccuracies)/(total number of monthly IDIQ vouchers/invoices)Contractor invoices and SAP ReportLess than than 5%Contractor invoices and SAP data
Invoicing in accordance with agreed upon terms and conditions of the contract after awardJ.1(a) Attachment 1 PWS Section 10.02.fEach occurrence of failure to: provide certified payrolls, provide certified subcontract listing or paid amounts to each subcontractor.Task pay requests, written communications to the contractor from the CO/COR, or CPAR'sZeroContractor invoices and SAP data
SAFETY & ENVIRONMENTAL
Non-compliances
Incident not reported within NMIS & to COR within 24 hours.PWS Section 2.04.dEach occurrence of the performance indicator within the contract performance yearCOR/ACOR/Government SME/Safety Representative/Safety Report1 or fewer occurrences per contract yearGovernment Safety Report
Performing work outside the scope of, or without, an approved ESH Plan. This ESH Plan should be submitted to the government for review & shall be readily available at the jobsite.PWS Section 5.08.h / PWS Section 10.02.aEach occurrence of the performance indicator within the contract performance yearCOR/ACOR/Government SME/Safety Representative/Safety Report1 or fewer occurrences per contract yearGovernment Safety Report
Failure to provide fall protection where required. Have applicable and valid training and certificates readily available at jobsite.PWS Section 5.08.h.ii (fall protection) / PWS Section 9.01.a.ii.003 (training) / DRD 020 (training certs)Each occurrence of the performance indicator within the contract performance yearCOR/ACOR/Government SME/Safety Representative/Safety Report1 or fewer occurrences per contract yearGovernment Safety Report
Failure to complete LOTO where required, and complete necessary documentation for LOTO. (LOTO required per APR 8715.1 Chapter 31)PWS Section 2.04.a.iEach occurrence of the performance indicator within the contract performance yearCOR/ACOR/Government SME/Safety Representative/Safety Report1 or fewer occurrences per contract yearGovernment Safety Report
Failure to resolve or abate an identified non-compliance within the specified time period. (i.e.., SHETRac, IFO, QAAR, AS9100, Regulatory)PWS Section 5.03.aEach occurrence of the performance indicator within the contract performance yearCOR/ACOR/Government SME/Safety Representative/Safety Report1 or fewer occurrences per contract yearGovernment Safety Report
Operating systems without a valid safety/environmental permit (i.e. steam, chilled water, and natural gas)PWS Section 5.01.eEach occurrence of the performance indicator within the contract performance yearCOR/ACOR/Government SME/Safety Representative/Safety Report1 or fewer occurrences per contract yearGovernment Safety Report
Failure to comply with an Fed OSHA, Cal OSHA, EPA, NFPA, NASA and Ames Procedural RequirementsPWS Section 2.04.a & PWS Section 2.04.a.iEach occurrence of the performance indicator within the contract performance yearCOR/ACOR/Government SME/Safety Representative/Safety Report1 or fewer occurrences per contract yearGovernment Safety Report
TECHNICAL
Operations
N225B, N225,M10, M104, M590 Substations provides power to NASA Campus, NRP, CANG. N225B should be maintained to provide power and be available 100% of the time. Upon investigation only contractor culpable insidents will be counted against the 100% requirement. A Substation deficiency, criticle alarm, failure response is expected 2 hours after incident off duty hours and 30 minutes on duty hours to start an investigation. Investigation shall be continuously worked to a budgetary cost of repair.C7-513/AFSS II Equipment ListEach Occurance of Work Disruption or Environmental IncidentIndustrial Control Systems (ICS) report/ Government SME SurveillanceZero Contractor culpable occurancesContractor submitted report
N225, N225B, M10, M590, M104 Substation Battery Systems provide critical protective systems power. Battery banks shall be maintained for 100% uptime. Upon investigation only contractor culpable insidents will be counted against the 100% requirement. deficiency, critical alarm response is expected 2 hours after incident off duty hours and 30 minutes on duty hours to start an investigation.C7-513/AFSS II Equipment ListEach Occurance of Work Disruption or Environmental IncidentIndustrial Control Systems (ICS) report/ Government SME SurveillanceZero Contractor culpable occurancesContractor submitted report
NASA Building Systems C (T138) and D T195 and cable loop and sectionalizing switch infrastructure. One system shall always be available 100% of the time along with associated cable loop and sectionalizing switch infrastructure.Upon investigation only contractor culpable insidents will be counted against the 100% requirement. A System deficiency, critical alarm, failure response is expected 2 hours after incident off duty hours and 30 minutes on duty hours to start an investigation. Investigation shall be continuously worked to a budgetary cost of repair.C7- 507-521 /AFSS II Equipment ListEach Occurance of Work Disruption or Environmental IncidentIndustrial Control Systems (ICS) report/ Government SME SurveillanceZero Contractor culpable occurancesContractor submitted report
NASA Building Systems A (T49) and B T90 and cable loop and sectionalizing switch infrastructure. One system shall always be available 100% of the time along with associated cable loop and sectionalizing switch infrastructure.Upon investigation only contractor culpable insidents will be counted against the 100% requirement. A System deficiency, critical alarm, failure response is expected 2 hours after incident off duty hours and 30 minutes on duty hours to start an investigation.C7- 507-521 /AFSS II Equipment ListEach Occurance of Work Disruption or Environmental IncidentIndustrial Control Systems (ICS) report/ Government SME SurveillanceZero Contractor culpable occurancesContractor submitted report
N225B T206, T221 sources One system shall always be available 100% of the time along with associated cable and infrastructure.Upon investigation only contractor culpable insidents will be counted against the 100% requirement. A System deficiency, critical alarm, failure response is expected 2 hours after incident off duty hours and 30 minutes on duty hours to start an investigation.C7- 507-521 /AFSS II Equipment ListEach Occurance of Work Disruption or Environmental IncidentIndustrial Control Systems (ICS) report/ Government SME SurveillanceZero Contractor culpable occurancesContractor submitted report
Moffett NRP and CANG power system M10. M10 substation and feeder systems, sectionalizing switches and infrastructure. A System deficiency, critical alarm, failure response is expected 2 hours after incident off duty hours and 30 minutes on duty hours to start an investigation. Investigation shall be continuously worked to a budgetary cost of repair.C7- 507-521 /AFSS II Equipment ListEach Occurance of Work Disruption or Environmental IncidentIndustrial Control Systems (ICS) report/ Government SME SurveillanceZero Contractor culpable occurancesContractor submitted report
Building Substations, Switchgears and transformers are expected should be maintained to be available at a 100% up time. Upon investigation only contractor culpable insidents will be counted against the 100% requirement. System failure, deficiency response is expected 2 hours after incident off duty hours and 30 minutes on duty hours to start an investigation. Investigation shall be continuously worked to a budgetary cost of repair.C7- 507-521 /AFSS II Equipment ListEach Occurance of Work Disruption or Environmental IncidentIndustrial Control Systems (ICS) report/ Government SME SurveillanceZero Contractor culpable occurancesContractor submitted report
Total loss of availability of a Low voltage electrical system for occupied spaces. Upon investigation only contractor culpable insidents will be counted against the requirement.PWS Attachment J02.11.03Each occurance per monthIndustrial Control Systems (ICS) report/ Government SME SurveillanceOne or less per monthContractor submitted report
Partial loss of availability of a Low voltage electrical system for occupied spaces. Upon investigation only contractor culpable insidents will be counted against the requirement.PWS Attachment J02.11.03Each occurance per monthIndustrial Control Systems (ICS) report/ Government SME SurveillanceThree or less per monthContractor submitted report
Total loss of availability of a Low voltage electrical system for non-occupied spaces. Upon investigation only contractor culpable insidents will be counted against the requirement.PWS Attachment J02.11.03Each occurance per monthIndustrial Control Systems (ICS) report/ Government SME SurveillanceOne or less per monthContractor submitted report
Partial loss of availability of a Low voltage electrical system for non-occupied spaces. Upon investigation only contractor culpable insidents will be counted against the requirement.PWS Attachment J02.11.03Each occurance per monthIndustrial Control Systems (ICS) report/ Government SME SurveillanceThree or less per monthContractor submitted report
Total loss of availability of Street/Perimeter/Parking Lot Lighting. Upon investigation only contractor culpable insidents will be counted against the requirement.PWS Attachment J02.11.03Each occurance per monthIndustrial Control Systems (ICS) report/ Government SME SurveillanceOne or less per monthContractor submitted report
Partial loss of availability of Street/Perimeter/Parking Lot Lighting. Upon investigation only contractor culpable insidents will be counted against the requirement.PWS Attachment J02.11.03Each occurance per monthIndustrial Control Systems (ICS) report/ Government SME SurveillanceFive or less per monthContractor submitted report
Total loss of availability of Emergency Generation Systems (Including RUPS). Upon investigation only contractor culpable insidents will be counted against the requirement.PWS Attachment J02.11.03Each occurance per monthIndustrial Control Systems (ICS) report/ Government SME SurveillanceOne or less per monthContractor submitted report
Partial loss of availability of Emergency Generation Systems (Including RUPS). Upon investigation only contractor culpable insidents will be counted against the requirement.PWS Attachment J02.11.03Each occurance per monthIndustrial Control Systems (ICS) report/ Government SME SurveillanceOne or less per monthContractor submitted report
Traffic lights and controlers shall be maintained to a level of 100% availability.Upon investigation only contractor culpable insidents will be counted against the 100% requirement. Troubleshootingof deficiencies should be immediately performed to diagnose and cost the repair.C7-521/AFSS II Equipment ListEach Occurance of Work Disruption or Environmental IncidentIndustrial Control Systems (ICS) report/ Government SME SurveillanceZero Contractor culpable occurancesContractor submitted report
Emergency lights, Exit signs and Egress UPS systems shall be maintained to provide 100% up time for life safety.Upon investigation only contractor culpable insidents will be counted against the 100% requirement. Repairs for commercially available on the shelf components shall be repaired in 2 weeks.C7- 507-521 /AFSS II Equipment ListEach Occurance of Work Disruption or Environmental IncidentIndustrial Control Systems (ICS) report/ Government SME SurveillanceZero Contractor culpable occurancesContractor submitted report
Natural Gas Distribution System shall have 100% uptime.Upon investigation only contractor culpable insidents will be counted against the 100% requirement. If a leak or line break takes place, a repair shall be completed within 90 days (MF1005GAS DISTRIBUTION SYSTEM &
NA283GAS DISTRIBUTION SYSTEM)C7-584/AFSS II Equipment ListEach Occurance of Work Disruption or Environmental IncidentIndustrial Control Systems (ICS) report/ Government SME SurveillanceZero Contractor culpable occurancesContractor submitted report
Sanitary Sewer Distribution System shall have 100% uptime. Upon investigation only contractor culpable insidents will be counted against the 100% requirement.If a leak or line break takes place, a repair shall be completed within 90 days (MF1024 SANITARY SEWER DISTRIBUTION SYSTEM & NA284 SEWAGE DISTRIBUTION SYSTEM)C7-578,580,581,582,583,593/AFSS II Equipment ListEach Occurance of Work Disruption or Environmental IncidentIndustrial Control Systems (ICS) report/ Government SME SurveillanceZero Contractor culpable occurancesContractor submitted report
Water Distribution System shall have 100% uptime. Upon investigation only contractor culpable insidents will be counted against the 100% requirement.If a leak or line break takes place, a repair shall be completed within 120 days (MF1025WATER DISTRIBUTION SYSTEM &
NA281WATER DISTRIBUTION SYSTEM)C7-578,586,588,589,590,592/AFSS II Equipment ListEach Occurance of Work Disruption or Environmental IncidentIndustrial Control Systems (ICS) report/ Government SME SurveillanceZero Contractor culpable occurancesContractor submitted report
M191 Storm Lift Sation shall have 100% uptime.Upon investigation only contractor culpable insidents will be counted against the 100% requirement. If one pump is down, Pump shall be repaired or replaced withing 180 days of issuing a task order. (4320577570237PUMP, SUMP #1 & 4320577670084PUMP, SUMP #2 )C7-581/AFSS II Equipment ListEach Occurance of Work Disruption or Environmental IncidentIndustrial Control Systems (ICS) report/ Government SME SurveillanceZero Contractor culpable occurancesContractor submitted report
M056 Sunnyvale Sewer Lift Sation Emergency Power Generator shall have 100% uptime. Upon investigation only contractor culpable incidents will be counted against the 100% requirement.Power Generator shall be repaired or replaced withing 30 days of issuing a task order. (6115572100057GENERATOR, EMER. DIESEL - 60 KW - 130 GALLONS)C7-508/AFSS II Equipment ListEach Occurance of Work Disruption or Environmental IncidentIndustrial Control Systems (ICS) report/ Government SME SurveillanceZero Contractor culpable occurancesContractor submitted report
Industrial Control Systems (ICS) & CPSDC network and hardware fully operational capacity 99% of the time (down time should not exceed 8 hours per month). Upon investigation only contractor culpable insidents will be counted against the requirement.J2.06.501 FMCS Field Inventory / PWS Section 6.09.a / Attachment J2.06.703Each 8 hours of accumulative down-time within one month constitutes an occurrenceIndustrial Control Systems (ICS) report/ Government SME SurveillanceZero Contractor culpable occurancesContractor submitted report
FMCS total loss of availability of Customer Alarm functionality. Upon investigation only contractor culpable incidents will be counted against this requirement.PWS Attachment J2.06.703Each occurance per monthIndustrial Control Systems (ICS) report/ Government SME Surveillance/ CMMS Maximo ReportOne or less per monthContractor submitted report
FMCS total loss of availability of Maintenance Alarm functionality. Upon investigation only contractor culpable incidents will be counted against this requirement.PWS Attachment J2.06.703Each occurance per monthIndustrial Control Systems (ICS) report/ Government SME Surveillance/ CMMS Maximo ReportOne or less per monthContractor submitted report
FMCS partial loss of availability of Customer Alarm functionality. Upon investigation only contractor culpable incidents will be counted against this requirement.PWS Attachment J2.06.703Each occurance per monthIndustrial Control Systems (ICS) report/ Government SME Surveillance/ CMMS Maximo ReportOne or less per monthContractor submitted report
FMCS partial loss of availability of Maintenance Alarm functionality. Upon investigation only contractor culpable incidents will be counted against this requirement.PWS Attachment J2.06.703Each occurance per monthIndustrial Control Systems (ICS) report/ Government SME Surveillance/ CMMS Maximo ReportThree or less per monthContractor submitted report
ALS3 Suppression Systems; Fully operational capacity 99% of the time (down time should not exceed 8 hours per month).Upon investigation only contractor culpable insidents will be counted against the requirement.C7-526,527,528 / PWS Section 7.08.cEach 8 hours of accumulative down-time within one month constitutes an occurrenceIndustrial Control Systems (ICS) report/ Government SME SurveillanceZero Contractor culpable occurancesContractor submitted report
Total loss of Fire Alarm Systems or Gas Detection Systems. Upon investigation only contractor culpable insidents will be counted against the requirement.PWS Section 7.08.c, PWS Attachment J2.11.05Each occurrence per monthIndustrial Control Systems (ICS) report/ Government SME SurveillanceZero per monthContractor submitted report
Partial loss of Fire Alarm Systems. Upon investigation only contractor culpable insidents will be counted against the requirement.PWS Section 7.08.c, PWS Attachment J2.11.05Each occurrence per monthIndustrial Control Systems (ICS) report/ Government SME SurveillanceOne or less per monthContractor submitted report
Partial loss of Gas Detection System. Upon investigation only contractor culpable insidents will be counted against the requirement.PWS Section 7.08.c, PWS Attachment J2.11.05Each occurrence per monthIndustrial Control Systems (ICS) report/ Government SME SurveillanceTwo or less per monthContractor submitted report
Total loss of availability for HVAC/R Critical Systems. Upon investigation only contractor culpable insidents will be counted against the requirement.PWS Attachments J2.11.06, J2.11.07, J2.11.08Each occurrence per monthIndustrial Control Systems (ICS) report/ Government SME SurveillanceZero per monthContractor submitted report
Partial loss of availability for HVAC/R Critical Systems. Upon investigation only contractor culpable insidents will be counted against the requirement.PWS Attachments J2.11.06, J2.11.07, J2.11.08Each occurrence per monthIndustrial Control Systems (ICS) report/ Government SME SurveillanceOne or less per monthContractor submitted report
Total loss of availability for HVAC/R Non-Critical A Systems. Upon investigation only contractor culpable insidents will be counted against the requirement.PWS Attachments J2.11.06, J2.11.07, J2.11.08Each occurrence per monthIndustrial Control Systems (ICS) report/ Government SME SurveillanceOne or less per monthContractor submitted report
Partial loss of availability for HVAC/R Non-Critical A Systems. Upon investigation only contractor culpable insidents will be counted against the requirement.PWS Attachments J2.11.06, J2.11.07, J2.11.08Each occurrence per monthIndustrial Control Systems (ICS) report/ Government SME SurveillanceThree or less per monthContractor submitted report
Total loss of availability for HVAC/R Non-Critical B Systems. Upon investigation only contractor culpable insidents will be counted against the requirement.PWS Attachments J2.11.06, J2.11.07, J2.11.08Each occurrence per monthIndustrial Control Systems (ICS) report/ Government SME SurveillanceTwo or less per monthContractor submitted report
Partial loss of availability for HVAC/R Non-Critical B Systems. Upon investigation only contractor culpable insidents will be counted against the requirement.PWS Attachments J2.11.06, J2.11.07, J2.11.08Each occurrence per monthIndustrial Control Systems (ICS) report/ Government SME SurveillanceSix or less per monthContractor submitted report
Trouble Calls (Deferred Trouble Calls are not factored into these calculations)
Emergency: Failure to respond per time requirementsPWS Section 8.01.c.iEach occurrenceCMMS report/ Government SME SurveillanceLess than 4 failures to respond on time per contract year. This metric resets every contract year.Government CMMS Report
Emergency: Failure to complete per time requirementsPWS Section 8.01.c.i(Monthly number of Emergency TCs completed on-time) divided by (Total Monthly number of Emergency TCs)CMMS report/ Government SME SurveillanceGreater than 90%Government CMMS Report
Urgent: Failure to complete per time requirementsPWS Section 8.01.c.ii(Monthly number of Urgent TCs completed on-time) divided by (Total Monthly number of Urgent TCs)CMMS report/ Government SME SurveillanceGreater than 85%Government CMMS Report
Routine: Successfully completing Trouble Calls per time requirementsPWS Section 8.01.c.iii(Monthly number of Routine TCs completed on-time) divided by (Total Monthly number of Routine TCs)CMMS report/ Government SME SurveillanceGreater than 85%Government CMMS Report
PM, PGM, and PT&I
Unexcused Late PM’s, PGM and PT&IsPWS Section 7.03.a.vi(Monthly number of PMs, PGMs and PT&I tasks completed on-time) divided by (Total monthly number of scheduled tasks) per Maximo Work Group (See PWS Section 7.03.a.vi)CMMS report / Government SME SurveillanceGreater than 85% per Maximo Work GroupGovernment CMMS Report
Incomplete PM/PGM/PT&I Documentation in CMMSPWS Section 7.03.a.vi(Monthly number of PMs, PGMs and PT&I tasks completed on-time) divided by (Total monthly number of scheduled tasks) per Maximo Work Group (See PWS Section 7.03.a.vi)CMMS report / Government SME SurveillanceGreater than 85% per Maximo Work GroupGovernment CMMS Report
Indefinite Delivery, Idefinite Quantity (IDIQ) Work
Timely return of IDIQ quotes per PWSPWS Section 10.02.d.i & 10.02.d.ii(Monthly number of on-time IDIQ quotes) divided by (Total number of Monthly IDIQ tasks issued) This calculation is based on the IDIQ Estimates Prioritization list.CMMS Report/COR/Government SME SurveillanceGreater than 92%Government CMMS Report
Quote not approved before work beginsPWS Section 10.02.f(Monthly number of tasks started w/o funding approval) divided by (Monthly number of tasks issued)CMMS Report/COR/Government SME SurveillanceLess than 2%Government CMMS Report
Adherence to scheduled finish date IDIQ tasks. Missed scheduled finish dates that are unauthorized by the Government SME/COR.PWS Section 10.02.b(Monthly number of tasks completed within schedule) divided by (Monthly number of tasks scheduled to be completed) This calculation is based on the Funded IDIQ Prioritized Status List.CMMS Report/COR/Government SME SurveillanceGreater than 92%Government CMMS Report
Incomplete IDIQ Documentation in CMMSPWS Section 10.02.f(Monthly number of properly documented tasks) divided by (Total number of Monthly tasks documented)CMMS report / Government SME SurveillanceGreater than 90%Government CMMS Report
PVS Certification
Timely scheduling of certification/recertification servicesPWS Section 7.08F/11.07.C.iii(Monthly number of on time estimates) divided by (Total number of submitted estimates)CMMS report / Government SME SurveillanceGreater than 95%Contractor Submitted Reports and Monthly Priority Meetings
Missing completion date of certification/recertification work or otherwise allowing pressure system certifications to expirePWS Section 7.08F/11.07.C.iii(Number of tasks with missed completion date based on estimated provided) divided by (Total number of completed certification tasks)CMMS report / Government SME SurveillanceLess than 5%Contractor Submitted Reports and Monthly Priority Meetings