This document is a Request for Proposal (RFP) for NASA Ames Research Center's Facilities Support Services II (AFSS II) contract. NASA will conduct this as an 8(a) set-aside competitive acquisition for small businesses, with a NAICS code of 561210 and a small business size standard of $47 million. The hybrid contract will have a total potential performance period of 5 years, including a 12-month base period and four 12-month option periods, with an additional 6-month extension option. The contract will provide comprehensive facilities support services for the Moffett Field site, covering approximately 1,960 acres and 5 million square feet of floor space, including clean rooms, laboratories, computing facilities, offices, and utility systems.
The contract will be structured as a Cost-Plus Award Fee (CPAF) hybrid with Indefinite Delivery/Indefinite Quantity (IDIQ) task order capabilities, allowing for both CPAF and Firm Fixed Price (FFP) task orders. Key contract components include Operations & Maintenance, Reactive Maintenance, and Specialty Support Services across base and option periods. The solicitation requires detailed proposals addressing past performance, cost/price factors, and specific technical requirements. Proposals are due by October 14th, 2025, with an anticipated contract start date of February 12, 2026. The total maximum ordering quantity for IDIQ CLINs is $100 million, with a minimum ordering quantity of $5,000.
View the file
Other files
Show all 50
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
80ARC025R0001
PART I – THE SCHEDULE
SECTION B - SUPPLIES OR SERVICES AND PRICES/COSTS
B-1
B.1 SUPPLIES AND/OR SERVICES TO BE PROVIDED
(a) This is a single award hybrid contract with Firm-Fixed-Price (FFP) Contract Line Item Numbers (CLIN) for Phase-In; Cost-Plus-Award-Fee (CPAF) CLINs for Core Technical Services and Indefinite Delivery/Indefinite Quantity (IDIQ) CLINs under which FFP or CPAF task orders may be executed.
This contract is for facilities support services at Ames Research Center (ARC). The Contractor shall provide all resources (except as may be expressly stated in the contract as furnished by the Government) necessary to perform and/or deliver the requirements and items in accordance with the Specifications/Performance Work Statement (PWS) in Section C.
CLIN No.
Description
Contract Type
PWS Section
QTY
Unit
0001 Phase-in Activities FFP Section 4 1 Job
Operations & Maintenance of Ames Research Center Facilities (Contract Base)
CPAF
Sections 6 and 7
Job
0003 Reactive Maintenance (Contract Base) CPAF Section 8 1 Job 0004 Specialty Support Services (Contract Base) CPAF Section 9 1 Job
0005 IDIQ CLIN CPAF
Section 10
As stated in task orders
0006 IDIQ CLIN FFP Section 10 1 As stated in task orders
Center Facilities (Option)
1003 Reactive Maintenance (Option) CPAF Section 8 1 Job 1004 Specialty Support Services (Option) CPAF Section 9 1 Job
2003 Reactive Maintenance (Option) CPAF Section 8 1 Job 2004 Specialty Support Services (Option) CPAF Section 9 1 Job
3003 Reactive Maintenance (Option) CPAF Section 8 1 Job 3004 Specialty Support Services (Option) CPAF Section 9 1 Job
4003 Reactive Maintenance (Option) CPAF Section 8 1 Job 4004 Specialty Support Services (Option) CPAF Section 9 1 Job
(b) Options - If Options are exercised pursuant to Clause 52.217-9, “Option to Extend the Term of the Contract,” the Contractor shall provide all resources (except as may be expressly stated in the contract as furnished by the Government) necessary to furnish the items below in accordance with the Description/Specifications/Performance Work Statement in Section C and as identified
B-2 under individual Core CLINs and the IDIQ task orders.
(c) The minimum ordering quantity/value under IDIQ CLIN 0005 and CLIN 0006 combined is $5,000. There will be no further obligation on the part of the Government to issue any task orders beyond the minimum ordering quantity/value. At the sole discretion of the Government, the minimum ordering quantity/value of the IDIQ portion of the contract may be met through obligations under CLINs 0001, 0002, 0003, 0004 and/or issuance of task orders under CLINs 0005 and 0006. The total maximum ordering quantity/value of IDIQ CLINs 0005 and 0006 is $100,000,000.
(d) CLIN 0005 is an Indefinite Delivery/Indefinite Quantity (IDIQ) where CPAF Task Orders may be issued in accordance with Clause NFS 1852.216-80, Task Ordering Procedure, by the Contracting Officer. The CPAF labor rates proposed will be incorporated into the contract as Attachment 13 Section J.1(a) and are the maximum labor rates the Offeror may propose on any future CPAF task orders.
(e) CLIN 0006 is an Indefinite Delivery/Indefinite Quantity (IDIQ) where FFP Task Orders may be issued in accordance with Clause NFS 1852.216-80, Task Ordering Procedure, by the Contracting Officer. The fully burdened FFP rates proposed will be incorporated into the contract as Attachment 13 Section J.1(a) and are the maximum labor rates the Offeror may propose on any future FFP task orders.
(End of clause)
1852.216-78 FIRM FIXED PRICE (DEC 1988)
The total firm fixed price of this contract is $ (To Be Proposed [TBP]).
B-3
1852.216-85 ESTIMATED COST AND AWARD FEE. (SEP 1993)
The estimated cost of this contract is $TBD. The maximum available award fee, excluding base fee, if any, is $TBD. The base fee is $0.00. Total estimated cost, base fee, and maximum award fee are $TBD.
Summary of Contract Funding
CLIN Description Total Estimated Cost Maximum Available Award Fee
Base Period 0002 - Operations & Maintenance of Ames Research Center Facilities (Base) TBP TBP
0003 - Reactive Maintenance (Base) TBP TBP 0004 - Specialty Support Services (Base) TBP TBP
0005 – CPAF IDIQ TBD TBD
0006 – FFP IDIQ TBD TBD
Option Period One 1002 - Operations & Maintenance of Ames Research Center Facilities (OP) TBP TBP
1003 - Reactive Maintenance (OP) TBP TBP 1004 - Specialty Support Services (OP) TBP TBP
0005 – CPAF IDIQ TBD TBD
0006 – FFP IDIQ TBD TBD
Option Period Two 2002 - Operations & Maintenance of Ames Research Center Facilities (OP) TBP TBP
2003 - Reactive Maintenance (OP) TBP TBP 2004 - Specialty Support Services (OP) TBP TBP
0005 – CPAF IDIQ TBD TBD
0006 – FFP IDIQ TBD TBD
Option Period Three 3002 - Operations & Maintenance of Ames Research Center Facilities (OP) TBP TBP
3003 - Reactive Maintenance (OP) TBP TBP 3004 - Specialty Support Services (OP) TBP TBP
0005 – CPAF IDIQ TBD TBD
0006 – FFP IDIQ TBD TBD
Option Period Four 4002 - Operations & Maintenance of Ames Research Center Facilities (OP) TBP TBP
4003 - Reactive Maintenance (OP) TBP TBP 4004 - Specialty Support Services (OP) TBP TBP
0005 – CPAF IDIQ TBD TBD
0006 – FFP IDIQ TBD TBD
B-4
The award fee percentage for all CPAF CLINs, including all options, is “TBD”.
Percent CY1 CY2 CY3 CY4 CY5 Award Fee Percentage TBP TBP TBP TBP TBP TBP
SECTION C – DESCRIPTION/SPECIFICATIONS
C-1
C.1 DESCRIPTION/SPECIFICATIONS/STATEMENT OF WORK
The Contractor shall perform and complete all requirements stated in the AFSS II Performance Work Statement (PWS), entitled “Ames Facilities Support Services II (AFSS II) Performance Work Statement” which is incorporated as Attachment 1 in Section J.(a). The Contractor shall furnish all personnel, services, equipment, materials, and facilities necessary for, or incidental to, performance of the requirements set forth in the AFSS II PWS, and all contractual requirements shall be accomplished in accordance with the AFSS II PWS.
(End of text) (End of Section)
SECTION D – PACKAGING AND MARKING
D-2
Clauses incorporated by reference:
NASA FAR SUPPLEMENT (48 CFR CHAPTER 18) CLAUSES:
1852.211-70 PACKAGING, HANDLING, AND TRANSPORTATION. (SEP 2005)
(End of by reference clauses)
1852.245-74 IDENTIFICATION AND MARKING OF GOVERNMENT EQUIPMENT.
(JAN 2011)
(a) The Contractor shall identify all equipment to be delivered to the Government using NASA Technical Handbook (NASA-HDBK) 6003, Application of Data Matrix Identification Symbols to Aerospace Parts Using Direct Part Marking Methods/Techniques, and NASA Standard (NASA-STD) 6002, Applying Data Matrix Identification Symbols on Aerospace Parts or through the use of commercial marking techniques that: (1) are sufficiently durable to remain intact through the typical lifespan of the property: and, (2) contain the data and data format required by the standards. This requirement includes deliverable equipment listed in the schedule and other equipment when no longer required for contract performance and NASA directs physical transfer to NASA or a third party. The Contractor shall identify property in both machine and human readable form unless the use of a machine readable-only format is approved by the NASA Industrial Property Officer.
(b) Equipment shall be marked in a location that will be human readable, without disassembly or movement of the equipment, when the items are placed in service unless such placement would have a deleterious effect on safety or on the item's operation.
(c) Concurrent with equipment delivery or transfer, the Contractor shall provide the following data in an electronic spreadsheet format:
(1) Item Description.
(2) Unique Identification Number (License Tag).
(3) Unit Price.
(4) An explanation of the data used to make the unique identification number.
(d) For equipment no longer needed for contract performance and physically transferred under paragraph (a) of this clause, the following additional data is required:
(1) Date originally placed in service.
(2) Item condition.
(e) The data required in paragraphs (c) and (d) of this clause shall be delivered to the NASA center receiving activity listed below:
NASA Ames Research Center Building N255 Moffett Field, CA 94035-0001
SECTION D – PACKAGING AND MARKING
D-2
(f) The contractor shall include the substance of this clause, including this paragraph (f), in all subcontracts that require delivery of equipment.
SECTION F - DELIVERIES OR PERFORMANCE
F-
FEDERAL ACQUISITION REGULATION (48 CFR CHAPTER 1):
52.242-15 STOP-WORK ORDER. (AUG 1989) ALTERNATE I (APR 1984)
52.247-34 F.O.B. DESTINATION. (JAN 1991)
52.247-35 F.O.B. DESTINATION, WITHIN CONSIGNEE'S PREMISES. (APR 1984)
F.1 PERIOD OF PERFORMANCE
The performance for this contract is set forth below.
CLIN
No.
Description
Period of Performance
Phase-in Activities
The period of performance is Sixty (60) days from the effective date of the contract.
0002 Operations & Maintenance (Base) 12 Months after the completion of CLIN 0001 0003 Reactive Maintenance (Base) 12 Months after the completion of CLIN 0001 0004 Specialty Support Services (Base) 12 Months after the completion of CLIN 0001 1002 Operations & Maintenance (Option) 12 Months after the completion of CLIN 0002 1003 Reactive Maintenance (Option) 12 Months after the completion of CLIN 0003 1004 Specialty Support Services (Option) 12 Months after the completion of CLIN 0004 2002 Operations & Maintenance (Option) 12 Months after the completion of CLIN 1002 2003 Reactive Maintenance (Option) 12 Months after the completion of CLIN 1003 2004 Specialty Support Services (Option) 12 Months after the completion of CLIN 1004 3002 Operations & Maintenance (Option) 12 Months after the completion of CLIN 2002 3003 Reactive Maintenance (Option) 12 Months after the completion of CLIN 2003 3004 Specialty Support Services (Option) 12 Months after the completion of CLIN 2004 4002 Operations & Maintenance (Option) 12 Months after the completion of CLIN 3002 4003 Reactive Maintenance (Option) 12 Months after the completion of CLIN 3003 4004 Specialty Support Services (Option) 12 Months after the completion of CLIN 3004
IDIQ CLIN
Will be initiated at award and performance will commence based on task order awards. The ordering period for the IDIQ component of the contract will be five (5) years from the completion of phase-in. Each Individual task order will include its own period of performance.
0006 IDIQ CLIN Will be initiated at award and performance will commence based on task order awards. The ordering period for the IDIQ component of the contract will be five (5) years from the completion of phase-in. Each Individual task order will include its own period of performance.
SECTION F - DELIVERIES OR PERFORMANCE
F-
(End of Text)
F.2 DELIVERY SCHEDULE
(a) The Contractor shall deliver the supplies and services as required by this contract and individual task orders.
(b) Unless specified otherwise, all items shall be delivered to:
NASA Ames Research Center Contract “Number provided at award” Moffett Field, CA 94035-1000 Attn: COR <<Name provided at award>> Mail Stop <<Provided at Award>>
F.3 DELIVERY OF REPORTS
Unless otherwise specified, all reports shall be addressed to the recipients listed in Attachment 2 in Section J.1(a) “Contract Data Requirements List (CDRL)". Reports specific to task orders will be specified in the individual task order.
F.4 PLACE OF PERFORMANCE - SERVICES
The Contractor shall perform the work under this contract at NASA Ames Research Center, Moffett Field, CA 94035-0001 or at other locations as directed in writing by the Contracting Officer.
(End of Text)
SECTION G - CONTRACT ADMINISTRATION DATA
G-1
52.216-32 TASK-ORDER AND DELIVERY-ORDER OMBUDSMAN. (SEP 2019)
https://www.hq.nasa.gov/office/procurement/regs/Procurement-Ombuds- Comp-Advocate- Listing.pdf
1852.242-73 NASA CONTRACTOR FINANCIAL MANAGEMENT REPORTING. (NOV
2004)
1852.245-70 CONTRACTOR REQUESTS FOR GOVERNMENT-FURNISHED
PROPERTY. (AUG 2015) with ALTERNATE I (AUG 2015)
1852.245-75 PROPERTY MANAGEMENT CHANGES. (JAN 2011)
1852.245-78 PHYSICAL INVENTORY OF CAPITAL PERSONAL PROPERTY. (AUG
2015)
1852.245-79 RECORDS AND DISPOSITION REPORTS FOR GOVERNMENT
PROPERTY WITH POTENTIAL HISTORIC OR SIGNIFICANT REAL VALUE. (JAN
2011)
1852.216-76 AWARD FEE FOR SERVICE CONTRACTS. (JUN 2018)
(a) The contractor can earn award fee from a minimum of zero dollars to the maximum stated in NASA FAR Supplement clause 1852.216-85, “Estimated Cost and Award Fee” in this contract.
(b) Beginning six (6) months after the effective date of this contract, the Government shall evaluate the Contractor's performance every six (6) months to determine the amount of award fee earned by the contractor during the period. The Contractor may submit a self-evaluation of performance for each evaluation period under consideration. These self-evaluations will be considered by the Government in its evaluation. The Government's Fee Determination Official (FDO) will determine the award fee amounts based on the Contractor's performance in accordance with the Attachment 4, Section J.1(a) Award Fee Evaluation Plan. The plan may be revised unilaterally by the Government prior to the beginning of any rating period to redirect emphasis.
G-2
(c) The Government will advise the Contractor in writing of the evaluation results. The ARC Payment Office will make payment based on See Award Fee Plan (J.1(a) Attachment 4).
(d) The Contracting Officer may direct the withholding of earned award fee payments until a reserve is set aside in an amount that the Contracting Officer considers necessary to protect the Government's interest relative to an orderly and timely closeout of the contract. This reserve shall not exceed 15 percent of the contract's total potential award fee or $100,000.00, whichever is less.
(e) The amount of award fee which can be awarded in each evaluation period is limited to the amounts set forth at See Award Fee Plan (J.1(a) Attachment 4). Award fee which is not earned in an evaluation period cannot be reallocated to future evaluation periods.
(f)(1) Provisional award fee payments will not be made under this contract pending the determination of the amount of fee earned for an evaluation period. If applicable, provisional award fee payments will be made to the Contractor on a basis as determined by the CO. The total amount of award fee available in an evaluation period that will be provisionally paid is the lesser of $0.00 or the prior period's evaluation score.
(2) Provisional award fee payments will be superseded by the final award fee evaluation for that period. If provisional payments exceed the final evaluation score, the Contractor will either credit the next payment voucher for the amount of such overpayment or refund the difference to the Government, as directed by the Contracting Officer.
(3) If the Contracting Officer determines that the Contractor will not achieve a level of performance commensurate with the provisional rate, payment of provisional award fee will be discontinued or reduced in such amounts as the Contracting Officer deems appropriate. The Contracting Officer will notify the Contractor in writing if it is determined that such discontinuance or reduction is appropriate.
(4) Provisional award fee payments will not be made prior to the first award fee determination by the Government.
(g) Award fee determinations are unilateral decisions made solely at the discretion of the Government.
1852.232-80 SUBMISSION OF VOUCHERS FOR PAYMENT. (APR 2018)
(a) The designated payment office is the NASA Shared Services Center (NSSC) located at FMD Accounts Payable, Bldg. 1111, Jerry Hass Road, Stennis Space Center, MS 39529.
G-3
(b) Except for classified vouchers, the Contractor shall submit all vouchers and invoices using the steps described at NSSC's Vendor Payment information Web site at:
https://www.nssc.nasa.gov/vendorpayment. Please contact the NSSC Customer Contact Center at 1-877-NSSC123 (1-877-677-2123) with any additional questions or comments.
(c) Payment requests.
(1) The payment periods are stipulated in the payment clause(s) contained in this contract.
(2) Vouchers submitted under cost type contracts and invoices submitted under fixed-price contracts shall include the items delineated in FAR 32.905(b) supported by relevant back-up documentation. Back-up documentation shall include at a minimum, the following information:
(i) Vouchers.
(A) Breakdown of billed labor costs and associated contractor generated supporting documentation for billed direct labor costs to include rates used and number of hours incurred.
(B) Breakdown of billed other direct costs (ODCs) and associated contractor generated supporting documentation for billed ODCs.
(C) Indirect rate(s) used to calculate the amount of billed indirect expenses.
(D) Progress reports, as required.
(ii) Invoices.
(A) Description of goods and services delivered as part of the contract's terms and conditions, including the dates of delivery/performance.
(B) Progress reports, as required.
(C) Date goods and services were performed.
(iii) Fee vouchers.
(A) Listing of all provisionally-billed fee by period or date earned since contract award.
(B) A reconciliation of all billed and earned fee.
(C) A clear explanation of the fee calculations.
(d) Non-electronic payment requests. The Contractor may submit a non-electronic voucher/invoice using the steps for non-electronic payment requests described at https://www.nssc.nasa.gov/vendorpayment, when any of the following conditions are met:
(1) The Contracting Officer administering the contract for payment has determined, in writing, that electronic submission would be unduly burdensome to the Contractor.
(2) The contract includes provisions allowing the contractor to submit vouchers or invoices using the steps for non-electronic payment. In such instances the Contractor agrees to submit non-electronic payment requests using the method or methods specified in Section G of the contract.
G-4
(e) Improper vouchers/invoices. The NSSC Payment Office will notify the contractor of any apparent error, defect, or impropriety in a voucher/invoice within seven calendar days of receipt by the NSSC Payment Office. Inquiries regarding requests for payment should be directed to the NSSC as specified in paragraph (b) of this section.
(f) Other payment clauses. In addition to the requirements of this clause, the Contractor shall meet the requirements of the appropriate payment clauses in this contract when submitting payment requests.
(g) In the event that amounts are withheld from payment in accordance with provisions of this contract, a separate payment request for the amount withheld will be required before payment for that amount may be made.
1852.245-71 INSTALLATION-ACCOUNTABLE GOVERNMENT PROPERTY. (JUN
2018)
(a) The Government property described in paragraph (c) of this clause may be made available to the Contractor on a no-charge basis for use in performance of this contract. This property shall be utilized only within the physical confines of the NASA installation that provided the property unless authorized by the Contracting Officer under (b)(1)(iv). Under this clause, the Government retains accountability for, and title to, the property, and the Contractor shall comply with the following:
NASA Procedural Requirements (NPR) 4100.1, NASA Materials Inventory Management Manual;
NASA Procedural Requirements (NPR) 4200.1, NASA Equipment Management Procedural Requirements;
NASA Procedural Requirement (NPR) 4300.1, NASA Personal Property Disposal Procedural Requirements;
Property not recorded in NASA property systems must be managed in accordance with the requirements of the clause at FAR 52.245-1, as incorporated in this contract.
The Contractor shall establish and adhere to a system of written procedures to assure continued, effective management control and compliance with these user responsibilities. In accordance with FAR 52.245-1(h)(1) the contractor shall be liable for property lost, damaged, destroyed or stolen by the contractor or their employees when determined responsible by a NASA Property Survey Board, in accordance with the NASA guidance in this clause.
G-5
(b)(1) The official accountable recordkeeping, financial control, and reporting of the property subject to this clause shall be retained by the Government and accomplished within NASA management information systems prescribed by the installation Supply and Equipment Management Officer (SEMO) and Financial Management Officer. If this contract provides for the Contractor to acquire property, title to which will vest in the Government, the following additional procedures apply:
(i) The Contractor's purchase order shall require the vendor to deliver the property to the installation central receiving area.
(ii) The Contractor shall furnish a copy of each purchase order, prior to delivery by the vendor, to the installation central receiving area.
(iii) The Contractor shall establish a record for Government titled property as required by FAR 52.245-1, as incorporated in this contract, and shall maintain that record until accountability is accepted by the Government.
(iv) Contractor use of Government property at an off-site location and off-site subcontractor use requires advance approval of the Contracting Officer and notification of the Industrial Property Officer. The property shall be considered Government furnished and the Contractor shall assume accountability and financial reporting responsibility. The Contractor shall establish records and property control procedures and maintain the property in accordance with the requirements of FAR 52.245-1, Government Property (as incorporated in this contract), until its return to the installation. NASA Procedural Requirements related to property loans shall not apply to offsite use of property by contractors.
(2) After transfer of accountability to the Government, the Contractor shall continue to maintain such internal records as are necessary to execute the user responsibilities identified in paragraph (a) of this clause and document the acquisition, billing, and disposition of the property. These records and supporting documentation shall be made available, upon request, to the SEMO and any other authorized representatives of the Contracting Officer.
(c) The following property and services are provided if checked:
☒ (1) Office space, work area space, and utilities. Government telephones are available for official purposes only.
☒ (2) Office furniture.
☒ (3) Property listed in PWS Section 14, “PWS Attachments”.
(i) If the Contractor acquires property, title to which vests in the Government pursuant to other provisions of this contract, this property also shall become accountable to the Government upon its entry into Government records.
(ii) The Contractor shall not bring to the installation for use under this contract any property owned or leased by the Contractor, or other property that the
G-6
Contractor is accountable for under any other Government contract, without the Contracting Officer's prior written approval.
☐ (4) Supplies from stores stock.
☒ (5) Publications and blank forms stocked by the installation.
☐(6) Safety and fire protection for Contractor personnel and facilities.
☒ (7) Installation service facilities: TBD ☒ (8) Medical treatment of a first-aid nature for Contractor personnel injuries or illnesses sustained during on-site duty.
☒ (9) Cafeteria privileges for Contractor employees during normal operating hours.
☒ (10) Building maintenance for facilities occupied by Contractor personnel.☐ (11)Moving and hauling for office moves, movement of large equipment, and delivery of supplies. Moving services may be provided on-site, as approved by the Contracting Officer.
1852.245-71 INSTALLATION-ACCOUNTABLE GOVERNMENT PROPERTY. (JUN
2018) ALTERNATE I (JAN 2011)
Alternate I (JAN 2011) As prescribed in 1845.107-70(b)(4), substitute the following for paragraph (b)(1)(i) of the basic clause:
(i) The Contractor shall not utilize the installation's central receiving facility for receipt of contractor-acquired property. However, the Contractor shall provide listings suitable for establishing accountable records of all such property received, on a monthly basis, to the SEMO.
1852.245-73 FINANCIAL REPORTING OF NASA PROPERTY IN THE CUSTODY OF
CONTRACTORS. (JAN 2017)
(a) The Contractor shall submit annually a NASA Form (NF) 1018, NASA Property in the Custody of Contractors, in accordance with this clause, the instructions on the form and NFS subpart 1845.71, and any supplemental instructions for the current reporting period issued by
NASA.
(b)(1) Subcontractor use of NF 1018 is not required by this clause; however, the Contractor shall include data on property in the possession of subcontractors in the annual NF 1018.
(2) The Contractor shall mail the original signed NF 1018 directly to the cognizant NASA Center Industrial Property Officer and a copy to the cognizant NASA Center Deputy Chief Financial Officer, Finance, unless the Contractor uses the NF 1018 Electronic Submission System (NESS) for report preparation and submission.
G-7
(3) One copy shall be submitted (through the Department of Defense (DOD) Property Administrator if contract administration has been delegated to DOD) to the following address: TBD, unless the Contractor uses the NF 1018 Electronic Submission System (NESS) for report preparation and submission.
(c)(1) The annual reporting period shall be from October 1 of each year through September 30 of the following year. The report shall be submitted in time to be received by October 31st. The information contained in these reports is entered into the NASA accounting system to reflect current asset values for agency financial statement purposes. Therefore, it is essential that required reports be received no later than October 31st.
(2) Some activity may be estimated for the month in which the report is submitted, if necessary, to ensure the NF 1018 is received when due. However, contractors' procedures must document the process for developing these estimates based on planned activity such as planned purchases or NASA Form 533 (NF 533) Contractor Financial Management Report cost estimates. It should be supported and documented by historical experience or other corroborating evidence, and be retained in accordance with FAR Subpart 4.7, Contractor Records Retention. Contractors shall validate the reasonableness of the estimates and associated methodology by comparing them to the actual activity once that data is available, and adjust them accordingly. In addition, differences between the estimated cost and actual cost must be adjusted during the next reporting period.
Contractors shall have formal policies and procedures, which address the validation of NF 1018 data, including data from subcontractors, and the identification and timely reporting of errors. The objective of this validation is to ensure that information reported is accurate and in compliance with the NASA FAR Supplement. If errors are discovered on NF 1018 after submission, the contractor shall contact the cognizant NASA Center Industrial Property Officer (IPO) within 30 days after discovery of the error to discuss corrective action.
(3) In addition to an annual report, if at any time during performance of the contract, NASA-owned property in the custody of the contractor has a value of $10 million or more, the contractor shall also submit a report no later than the 21st of each month in accordance with the requirements of paragraph (c)(2) of this clause.
(4) The Contracting Officer may, in NASA's interest, withhold payment until a reserve not exceeding $25,000 or 5 percent of the amount of the contract, whichever is less, has been set aside, if the Contractor fails to submit annual NF 1018 reports in accordance with NFS subpart 1845.71, any monthly report in accordance with (c)(3) of this clause, and any supplemental instructions for the current reporting period issued by NASA. Such reserve shall be withheld until the Contracting Officer has determined that NASA has received the required reports. The withholding of any amount or the subsequent payment thereof shall not be construed as a waiver of any Government right.
G-8
(d) A final report shall be submitted within 30 days after disposition of all property subject to reporting when the contract performance period is complete in accordance with paragraph (b)(1) through (3) of this clause.
1852.245-76 LIST OF GOVERNMENT PROPERTY FURNISHED PURSUANT TO FAR
52.245–1. (JAN 2011)
For performance of work under this contract, the Government will make available Government property identified in the Section 14 of the PWS “PWS Attachments” of this contract on a no charge-for-use basis pursuant to the clause at FAR 52.245–1, Government Property, as incorporated in this contract. The Contractor shall use this property in the performance of this contract at NASA Ames Research Center and at other location(s) as may be approved by the Contracting officer. Under FAR 52.245–1, the Contractor is accountable for the identified property.
1852.245-77 LIST OF GOVERNMENT PROPERTY FURNISHED PURSUANT TO FAR
52.245–2. (JAN 2011)
For performance of work under this contract, the Government will make available Government property identified in Section 14 of the PWS “PWS Attachments” of this contract on a no charge-for-use basis pursuant to FAR 52.245–2, Government Property Installation Operation Services, as incorporated in this contract. The Contractor shall use this property in the performance of this contract at NASA Ames Research Center and at other location(s) as may be approved by the
1852.245-82 OCCUPANCY MANAGEMENT REQUIREMENTS. (SEP 2017)
(a) In addition to the requirements of the clause at FAR 52.245-1, Government Property, as included in this contract, the Contractor shall comply with the following in performance of work in and around Government real property:
(1) NPD 8800.14, Policy for Real Estate Management.
(2) NPD 8831.2, Facilities Maintenance and Operations Management.
(b) The Contractor shall obtain the written approval of the Contracting Officer before installing or removing Contractor-owned property onto or into any Government real property or when movement of Contractor-owned property may damage or destroy Government-owned property.
G-9
The Contractor shall restore damaged property to its original condition at the Contractor's expense.
(c) The Contractor shall not acquire, construct or install any fixed improvement or structural alterations in Government buildings or other real property without the advance, written approval of the Contracting Officer. Fixed improvement or structural alterations, as used herein, means any alteration or improvement in the nature of the building or other real property that, after completion, cannot be removed without substantial loss of value or damage to the premises. Title to such property shall vest in the Government.
(d) The Contractor shall report any real property or any portion thereof when it is no longer required for performance under the contract, as directed by the Contracting Officer.
1852.245-83 REAL PROPERTY MANAGEMENT REQUIREMENTS. (JAN 2011)
(a) In addition to the requirements of the FAR Government Property Clause incorporated in this contract (FAR 52.245-1), the Contractor shall comply with the following in performance of any maintenance, construction, modification, demolition, or management activities of any Government real property:
(1) NPD 8800.14, Policy for Real Property Management.
(2) NPR 8831.2, Facility Maintenance Management.
(b) Within 30 calendar days following award, the Contractor shall provide a plan for maintenance of Government real property provided for use under this contract. The Contractor's maintenance program shall enable the identification, disclosure, and performance of normal and routine preventative maintenance and repair. The Contractor shall disclose and report to the Contracting Officer the need for replacement and/or capital rehabilitation. Upon acceptance by the Contracting Officer, the program shall become a requirement under this contract.
(c) Title to parts replaced by the Contractor in carrying out its normal maintenance obligations shall pass to and vest in the Government upon completion of their installation in the facilities.
The Contractor shall keep the property free and clear of all liens and encumbrances.
(d) The Contractor shall keep records of all work done to real property, including plans, drawings, charts, warranties, and manuals. Records shall be complete and current. Record of all transactions shall be auditable. The Government shall have access to these records at all reasonable times, for the purposes of reviewing, inspecting, and evaluating the Contractor's real property management effectiveness. When real property is disposed of under this contract, the Contractor shall deliver the related records to the Government.
G-10
(e) The Contracting Officer may direct the Contractor in writing to reduce the work required by the maintenance program authorized in paragraph (b) of this clause at any time.
SECTION H - SPECIAL CONTRACT REQUIREMENTS
H-
1852.223-70 SAFETY AND HEALTH MEASURES AND MISHAP REPORTING. (DEC
2015)
1852.223-72 SAFETY AND HEALTH (SHORT FORM). (JUL 2015)
1852.223-75 MAJOR BREACH OF SAFETY OR SECURITY. (FEB 2002)
1852.242-72 DENIED ACCESS TO NASA FACILITIES. (OCT 2015)
1852.225-70 EXPORT LICENSES. (FEB 2000)
(a) The Contractor shall comply with all U.S. export control laws and regulations, including the International Traffic in Arms Regulations (ITAR), 22 CFR parts 120-130, and the Export Administration Regulations (EAR), 15 CFR parts 730-799, in the performance of this contract.
In the absence of available license exemptions/exceptions, the Contractor shall be responsible for obtaining the appropriate licenses or other approvals, if required, for exports of hardware, technical data, and software, or for the provision of technical assistance.
(b) The Contractor shall be responsible for obtaining export licenses, if required, before utilizing foreign persons in the performance of this contract, including instances where the work is to be performed on-site at Ames Research Center, where the foreign person will have access to export-controlled technical data or software.
(c) The Contractor shall be responsible for all regulatory record keeping requirements associated with the use of licenses and license exemptions/exceptions.
(d) The Contractor shall be responsible for ensuring that the provisions of this clause apply to its subcontractors.
ARC 52.230-90 CONTRACTOR PURCHASING (MAY 2020)
The contract (or task order) describes the work to be performed. The contractor may determine a need to procure supplies and services from outside vendors which are incidental to performing the contractual requirements. These purchasing activities should promote competition to the maximum extent possible and promote best value purchases; however, these purchasing functions are limited to necessary and incidental items tied directly to contract performance. As such, the contractor is prohibited from purchasing items for direct use by the government as these items should be procured by the Government. The contractor shall not perform purchasing functions or act in any other way as an agent for the Government.
Examples of prohibited purchases that are typical for most support service contracts include the purchase, for Government use only, of the following: office supplies, hardware, personal computers and other peripheral devices and related supplies, licenses, subscriptions, vehicles, and personal or convenience items. Other examples of prohibited purchases include: pass-through purchases unrelated to the overall scope of the contract (i.e., non-contract related ODCs).
The Contracting Officer at the time of negotiation will make a determination as to the appropriateness of the ODCs being proposed by the contractor. The contractor is required to notify the Contracting Officer of any requests by Government personnel to direct a specific procurement action to a specific source without appropriate justification and approval (see NFS 1806.303-170).
Alternate I (MAY 2020)
The contractor shall not be entitled to payment or reimbursement for any purchase that is not incidental to the direct performance of the specific work it has agreed to perform under the Contract. Furthermore, the contractor shall not be entitled to payment or reimbursement for any tasks or services performed, nor for any incidental or administrative expenses whatsoever not incurred in or incidental to direct performance of the contract PWS.
ARC 52.231-90 SEVERANCE PAY (MAY 2020)
In conjunction with FAR 31.205-6(g), the severance pay cost shall not exceed 40 hours pay for each year of employment per eligible employee on the current contract, up to a maximum of 80 hours per eligible employee. In no event shall the Government reimburse the Contractor for severance cost for employees who voluntarily accept employment with a succeeding contractor within ninety (90) days after completion of the current contract.
ARC 52.237-99 NON-PERSONAL SERVICES (MAY 2020)
(a) In accordance with FAR 37.104(b), no personal services shall be performed under this contract. No Contractor employee will be directly supervised by the Government. All individual Contractor work assignments and daily work direction shall be given by an employee of the Contractor. If the Contractor believes any Government action or communication has been given that would create a personal services relationship between the Government and any Contractor employee, the Contractor shall promptly notify the Contracting Officer of this communication or action.
(b) The Contractor shall not perform any inherently governmental actions under this contract. No
Contractor employee shall hold him or herself out to be a Government employee, agent, or representative. No Contractor employee shall state orally or in writing at any time that he or she is acting on behalf of the Government. In all communications with third parties in connection with this contract, Contractor employees shall identify themselves as Contractor employees and specify the name of the company for which they work. In all communications with other Government contractors in connection with this contract, the Contractor employee shall state that they have no authority to in any way change the contract and that if the other contractor believes this communication to be a direction to change their contract, they should notify the Contracting Officer for that contract and not carry out the direction until a clarification has been issued by the
(c) The Contractor shall ensure that all of its employees working on this contract are informed of the substance of this clause. Nothing in this clause shall limit the Government's rights in any way under any other provision of the contract, including those related to the Government's right to inspect and accept the services to be performed under this contract. The substance of this clause shall be included in all subcontracts at any tier.
H.1 OPTION TO TRANSITION FROM AWARD-FEE TO FIXED-FEE
The Government may choose to transition all unexercised Cost-Plus Award Fee (CPAF) option Contract Line Item Numbers (CLINs) and the CPAF IDIQ CLIN to a Cost Plus Fixed Fee (CPFF) contract type under this contract. The Contracting Officer may exercise this option by issuance of a unilateral contract modification; provided that the Government, in its sole discretion determines to be in its best interest and it provides the Contractor a preliminary written notice no later than 45 calendar days into an award fee evaluation period. At no time during contract performance will the Contractor be eligible for both the award-fee and fixed fee amounts identified in Attachment 4, Section J.1(a), Award Fee Evaluation Plan, this clause, and/or Section B of this contract. Any previously awarded award fee as determined by the Fee Determining Official (FDO) and issued via contract modification will not be retroactively converted to fixed fee.
Should this option be exercised, the listed fixed-fee provisions will be in effect for the applicable CLINs:
FAR 52.216-8, Fixed Fee NFS 1852.216-75, Payment of Fixed Fee
The following are the fixed-fee percentages to be used in all CLINs, converted from CPAF to CPFF. Proposed fixed fee percentages/rates cannot exceed 10% per FAR 15.404-4(c)4(i)(c):
Note: “CY” in the table below denotes Contract Year Percent CY1, CY2, CY3, CY4, CY5
Percent CY1 CY2 CY3 CY4 CY5 NTE Fixed-Fee Rate TBP TBP TBP TBP TBP TBP
(a) All other terms and conditions (excluding the award-fee provisions) of the contract as it exists immediately prior to the exercise of the option remain the same.
(End of Clause)
PART II – CONTRACT CLAUSES
SECTION I - CONTRACT CLAUSES
I-1
52.202-1 DEFINITIONS. (JUN 2020)
52.203-3 GRATUITIES. (APR 1984)
52.203-5 COVENANT AGAINST CONTINGENT FEES. (MAY 2014)
52.203-6 RESTRICTIONS ON SUBCONTRACTOR SALES TO THE GOVERNMENT.
(JUN 2020)
52.203-7 ANTI-KICKBACK PROCEDURES. (JUN 2020)
52.203-8 CANCELLATION, RESCISSION, AND RECOVERY OF FUNDS FOR
ILLEGAL OR IMPROPER ACTIVITY. (MAY 2014)
52.203-10 PRICE OR FEE ADJUSTMENT FOR ILLEGAL OR IMPROPER ACTIVITY.
(MAY 2014)
52.203-12 LIMITATION ON PAYMENTS TO INFLUENCE CERTAIN FEDERAL
TRANSACTIONS. (JUN 2020)
52.203-13 CONTRACTOR CODE OF BUSINESS ETHICS AND CONDUCT. (NOV 2021)
52.203-14 DISPLAY OF HOTLINE POSTER(S). (NOV 2021)
52.203-19 PROHIBITION ON REQUIRING CERTAIN INTERNAL
CONFIDENTIALITY AGREEMENTS OR STATEMENTS. (JAN 2017)
52.204-9 PERSONAL IDENTITY VERIFICATION OF CONTRACTOR PERSONNEL.
(JAN 2011)
52.204-10 REPORTING EXECUTIVE COMPENSATION AND FIRST-TIER
SUBCONTRACT AWARDS. (JUN 2020)
52.204-13 SYSTEM FOR AWARD MANAGEMENT MAINTENANCE. (OCT 2018)
52.204-14 SERVICE CONTRACT REPORTING REQUIREMENTS. (OCT 2016)
52.204-15 SERVICE CONTRACT REPORTING REQUIREMENTS FOR INDEFINITE-
DELIVERY CONTRACTS. (OCT 2016)
52.204-18 COMMERCIAL AND GOVERNMENT ENTITY CODE MAINTENANCE
(AUG 2020)
I-2
52.204-19 INCORPORATION BY REFERENCE OF REPRESENTATIONS AND
CERTIFICATIONS. (DEC 2014)
52.204-23 PROHIBITION ON CONTRACTING FOR HARDWARE, SOFTWARE, AND
SERVICES DEVELOPED OR PROVIDED BY KASPERSKY LAB COVERED
ENTITIES. (DEC 2023)
52.204-25 PROHIBITION ON CONTRACTING FOR CERTAIN
TELECOMMUNICATIONS AND VIDEO SURVEILLANCE SERVICES OR
EQUIPMENT. (NOV 2021)
52.204-27 PROHIBITION ON A BYTEDANCE COVERED APPLICATION. (JUN 2023)
52.204-30 FEDERAL ACQUISITION SUPPLY CHAIN SECURITY ACT ORDERS –
PROHIBITION (DEC 2023)
52.207-3 RIGHT OF FIRST REFUSAL OF EMPLOYMENT. (MAY 2006)
52.208-9 CONTRACTOR USE OF MANDATORY SOURCES OF SUPPLY OR
SERVICES. (MAY 2014)
52.209-6 PROTECTING THE GOVERNMENT'S INTEREST WHEN
SUBCONTRACTING WITH CONTRACTORS DEBARRED, SUSPENDED, PROPOSED
FOR DEBARMENT, OR VOLUNTARILY EXCLUDED. (JAN 2025)
52.209-9 UPDATES OF PUBLICLY AVAILABLE INFORMATION REGARDING
RESPONSIBILITY MATTERS. (OCT 2018)
52.209-10 PROHIBITION ON CONTRACTING WITH INVERTED DOMESTIC
CORPORATIONS. (NOV 2015)
52.215-2 AUDIT AND RECORDS - NEGOTIATION. (JUN 2020) ALTERNATE I (MAR
2009)
52.215-8 ORDER OF PRECEDENCE - UNIFORM CONTRACT FORMAT. (OCT 1997)
52.215-10 PRICE REDUCTION FOR DEFECTIVE CERTIFIED COST OR PRICING
DATA. (AUG 2011)
52.215-12 SUBCONTRACTOR CERTIFIED COST OR PRICING DATA. (JUN 2020)
52.215-15 PENSION ADJUSTMENTS AND ASSET REVERSIONS. (OCT 2010)
52.215-18 REVERSION OR ADJUSTMENT OF PLANS FOR POSTRETIREMENT
BENEFITS (PRB) OTHER THAN PENSIONS. (JUL 2005)
I-3
52.215-19 NOTIFICATION OF OWNERSHIP CHANGES. (OCT 1997)
52.215-21 REQUIREMENTS FOR CERTIFIED COST OR PRICING DATA AND DATA
OTHER THAN CERTIFIED COST OR PRICING DATA - MODIFICATIONS. (NOV
2021) ALTERNATE III (OCT 1997)
(c) Submit the cost portion of the proposal via the following electronic media: Excel
52.215-23 LIMITATIONS ON PASS-THROUGH CHARGES. (JUN 2020)
52.216-7 ALLOWABLE COST AND PAYMENT. (AUG 2018)
52.217-8 OPTION TO EXTEND SERVICES. (NOV 1999)
52.219-6 NOTICE OF TOTAL SMALL BUSINESS SET-ASIDE. (NOV 2020)
52.219-8 UTILIZATION OF SMALL BUSINESS CONCERNS. (JAN 2025)
52.219-11 SPECIAL 8(A) CONTRACT CONDITIONS. (JAN 2017)
52.219-14 LIMITATIONS ON SUBCONTRACTING. (OCT 2022)
52.219-28 POSTAWARD SMALL BUSINESS PROGRAM REREPRESENTATION. (JAN
2025) ALTERNATE I (MAR 2020)
52.222-3 CONVICT LABOR. (JUN 2003)
52.222-4 CONTRACT WORK HOURS AND SAFETY STANDARDS - OVERTIME
COMPENSATION. (MAY 2018)
52.222-35 EQUAL OPPORTUNITY FOR VETERANS. (JUN 2020)
52.222-36 EQUAL OPPORTUNITY FOR WORKERS WITH DISABILITIES. (JUN 2020)
52.222-37 EMPLOYMENT REPORTS ON VETERANS. (JUN 2020)
52.222-40 NOTIFICATION OF EMPLOYEE RIGHTS UNDER THE NATIONAL LABOR
RELATIONS ACT. (DEC 2010)
52.222-41 SERVICE CONTRACT LABOR STANDARDS. (AUG 2018)
52.222-42 STATEMENT OF EQUIVALENT RATES FOR FEDERAL HIRES. (MAY 2014)
52.222-50 COMBATING TRAFFICKING IN PERSONS. (NOV 2021)
52.222-54 EMPLOYMENT ELIGIBILITY VERIFICATION. (JAN 2025)
I-4
52.222-55 MINIMUM WAGES FOR CONTRACTOR WORKERS UNDER EXECUTIVE
ORDER 14026. (JAN 2022)
52.222-62 PAID SICK LEAVE UNDER EXECUTIVE ORDER 13706. (JAN 2022)
52.223-3 HAZARDOUS MATERIAL IDENTIFICATION AND MATERIAL SAFETY
DATA. (FEB 2021) ALTERNATE I (JUL 1995)
52.223-5 POLLUTION PREVENTION AND RIGHT-TO-KNOW INFORMATION. (MAY
2024)
52.223-12 MAINTENANCE, SERVICE, REPAIR, OR DISPOSAL OF REFRIGERATION
EQUIPMENT AND AIR CONDITIONERS. (MAY 2024)
52.223-20 AEROSOLS. (MAY 2024)
52.223-21 FOAMS. (MAY 2024)
52.224-3 PRIVACY TRAINING. (JAN 2017) ALTERNATE I (JAN 2017)
52.225-1 BUY AMERICAN - SUPPLIES. (OCT 2022)
52.225-13 RESTRICTIONS ON CERTAIN FOREIGN PURCHASES. (FEB 2021)
52.226-7 DRUG-FREE WORKPLACE. (MAY 2024)
52.226-8 ENCOURAGING CONTRACTOR POLICIES TO BAN TEXT MESSAGING
WHILE DRIVING. (MAY 2024)
52.227-1 AUTHORIZATION AND CONSENT. (JUN 2020)
52.227-2 NOTICE AND ASSISTANCE REGARDING PATENT AND COPYRIGHT
INFRINGEMENT (JUN 2020)
52.227-17 RIGHTS IN DATA - SPECIAL WORKS. (DEC 2007)
52.227-23 RIGHTS TO PROPOSAL DATA (TECHNICAL). (JUN 1987)
52.228-7 INSURANCE - LIABILITY TO THIRD PERSONS. (MAR 1996)
52.232-9 LIMITATION ON WITHHOLDING OF PAYMENTS. (APR 1984)
52.232-16 PROGRESS PAYMENTS. (NOV 2021) ALTERNATE I (MAR 2000)
52.232-17 INTEREST. (MAY 2014)
I-5
52.232-18 AVAILABILITY OF FUNDS. (APR 1984)
52.232-22 LIMITATION OF FUNDS. (APR 1984)
52.232-23 ASSIGNMENT OF CLAIMS. (MAY 2014) ALTERNATE I (APR 1984)
52.232-25 PROMPT PAYMENT. (JAN 2017) ALTERNATE I (FEB 2002)
52.232-33 PAYMENT BY ELECTRONIC FUNDS TRANSFER - SYSTEM FOR AWARD
MANAGEMENT. (OCT 2018)
52.232-39 UNENFORCEABILITY OF UNAUTHORIZED OBLIGATIONS. (JUN 2013)
52.232-40 PROVIDING ACCELERATED PAYMENTS TO SMALL BUSINESS
SUBCONTRACTORS. (MAR 2023)
52.233-1 DISPUTES. (MAY 2014) ALTERNATE I (DEC 1991)
52.233-3 PROTEST AFTER AWARD. (AUG 1996) ALTERNATE I (JUN 1985)
52.233-4 APPLICABLE LAW FOR BREACH OF CONTRACT CLAIM. (OCT 2004)
52.237-2 PROTECTION OF GOVERNMENT BUILDINGS, EQUIPMENT, AND
VEGETATION. (APR 1984)
52.237-3 CONTINUITY OF SERVICES. (JAN 1991)
52.240-1 PROHIBITION ON UNMANNED AIRCRAFT SYSTEMS MANUFACTURED
OR ASSEMBLED BY AMERICAN SECURITY DRONE ACT—COVERED FOREIGN
ENTITIES. (NOV 2024)
52.242-1 NOTICE OF INTENT TO DISALLOW COSTS. (APR 1984)
52.242-3 PENALTIES FOR UNALLOWABLE COSTS. (DEC 2022)
52.242-4 CERTIFICATION OF FINAL INDIRECT COSTS. (JAN 1997)
52.242-13 BANKRUPTCY. (JUL 1995)
52.244-2 SUBCONTRACTS. (JUN 2020) ALTERNATE I (JUN 2020)
52.244-5 COMPETITION IN SUBCONTRACTING. (AUG 2024)
52.245-1 GOVERNMENT PROPERTY. (SEP 2021)
52.245-9 USE AND CHARGES. (APR 2012)
I-6
52.246-23 LIMITATION OF LIABILITY. (FEB 1997)
52.246-25 LIMITATION OF LIABILITY - SERVICES. (FEB 1997)
52.248-1 VALUE ENGINEERING. (JUN 2020)
52.249-6 TERMINATION (COST-REIMBURSEMENT). (MAY 2004)
52.249-14 EXCUSABLE DELAYS. (APR 1984)
52.251-2 INTERAGENCY FLEET MANAGEMENT SYSTEM VEHICLES AND
RELATED SERVICES. (JAN 1991)
52.253-1 COMPUTER GENERATED FORMS. (JAN 1991)
1852.203-71 REQUIREMENT TO INFORM EMPLOYEES OF WHISTLEBLOWER
RIGHTS. (JUL 2023)
1852.215-84 OMBUDSMAN. (NOV 2023)
1852.216-89 ASSIGNMENT AND RELEASE FORMS. (AUG 2016)
1852.223-74 DRUG- AND ALCOHOL-FREE WORKFORCE (OCT 2023).
1852.227-88 GOVERNMENT-FURNISHED COMPUTER SOFTWARE AND RELATED
TECHNICAL DATA. (APR 2015)
1852.237-70 EMERGENCY EVACUATION PROCEDURES. (DEC 1988)
1852.237-71 PENSION PORTABILITY (JAN 1997)
1852.237-72 ACCESS TO SENSITIVE INFORMATION. (JUN 2005)
1852.237-73 RELEASE OF SENSITIVE INFORMATION. (JUN 2005)
I-7
52.204-21 BASIC SAFEGUARDING OF COVERED CONTRACTOR INFORMATION
SYSTEMS. (NOV 2021)
(a) Definitions. As used in this clause - Covered contractor information system means an information system that is owned or operated by a contractor that processes, stores, or transmits Federal contract information.
Federal contract information means information, not intended for public release, that is provided by or generated for the Government under a contract to develop or deliver a product or service to the Government, but not including information provided by the Government to the public (such as on public Web sites) or simple transactional information, such as necessary to process payments.
Information means any communication or representation of knowledge such as facts, data, or opinions, in any medium or form, including textual, numerical, graphic, cartographic, narrative, or audiovisual (Committee on National Security Systems Instruction (CNSSI) 4009).
Information system means a discrete set of information resources organized for the collection, processing, maintenance, use, sharing, dissemination, or disposition of information (44 U.S.C.
3502).
Safeguarding means measures or controls that are prescribed to protect information systems.
(b) Safeguarding requirements and procedures.
(1) The Contractor shall apply the following basic safeguarding requirements and procedures to protect covered contractor information systems. Requirements and procedures for basic safeguarding of covered contractor information systems shall include, at a minimum, the following security controls:
(i) Limit information system access to authorized users, processes acting on behalf of authorized users, or devices (including other information systems).
(ii) Limit information system access to the types of transactions and functions that authorized users are permitted to execute.
(iii) Verify and control/limit connections to and use of external…