These are Final Construction Documents (FCD) for the IHS Whiteriver Hospital roadway improvement project, issued May 14, 2026, prepared by SmithGroup and Dibble Corporation. The documents are based on a Program of Requirements dated March 26, 2022, with amendments dated February 3, 2025, and schematic drawings approved November 19, 2024. The project involves roadway construction on State Route 73 near the hospital in White River, Arizona, with work divided into two distinct phases. Phase 1 includes removal and replacement of existing pavement, installation of new west side driveways, culverts, and guardrails, with retention of new east side driveways. Phase 2 consists of installation of permanent pavement signage and markings. Earthwork quantities total 2,771 cubic yards of embankment and 615 cubic yards of white material removal. The project roadway has been designed utilizing construction standard drawings with reference to IA SUDAS specifications, and incorporates specific design data including asphalt flatline reference points, design speed of 40 miles per hour, and riprap gradation with D50 of 10.0 inches.
Construction sequencing requires the contractor to maintain at least one through lane on State Route 73 with shift operations as necessary, including hospital traffic accommodation during phases 1 and 2. Traffic control requirements mandate compliance with the 2023 Manual on Uniform Traffic Control Devices (MUTCD) and ADOT standards, with detailed schematics provided for advance signing, temporary traffic control devices, and work zone configurations. The contractor must submit traffic control plans for Engineer approval and maintain a minimum of seven feet clearance between signs and pavement. Temporary pavement markings shall be removed by water blasting, and traffic control devices must be tested per National Cooperative Highway Research Program Report 350. All work requires coordination with Arizona 811 for utility locate requests at least two full working days before excavation. Two bid addenda were issued (April 16 and May 14, 2026) that are incorporated into the contract documents.
View the file
Other files
Show 40 more
Latest 50 of 107 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PHASE
PROJECT NUMBER
SHEET TITLE
SEALS AND SIGNATURES
ISSUED FOR DATE
5/1 4/2
6 1
2:5 8 P
M Pl ot Da te:
G:
\20
\10
4_
IH
S_
W
HI
TE
RI
VE
R\
CA
D\
4-
RD
X.
X-
NO
TE
455 NORTH THIRD STREET
SUITE 250
PHOENIX, AZ 85004
602.265.2200 smithgroup.com
1626 NORTH LITCHFIELD RD
SUITE 150
GOODYEAR, AZ 85395
623.935.2258 dibblecorp.com
SHEET NUMBER
CD
DRAWN BY: GIESELMAN CHECKED BY: MOWRY
BASED ON PROGRAM OF REQUIREMENTS DATED [03/26/22],
POR AMENDMENT DATED [02/03/25], AND ON SCHEMATIC
DRAWINGS APPROVED [11/19/24].
FINAL CONSTRUCTION DOCUMENTS 05MAR26
GENERAL NOTES &
DESIGN DATA
RD2.2
A
A B
B
RIPRAP GRADATION, D50=10.0"
BID ADDENDUM-A 16APR26
BID ADDENDUM-C 14MAY26
SHEET TITLE
SEALS AND SIGNATURES
ISSUED FOR DATE
5/1 4/2
6 3
:07 P
M Pl ot Da te:
G:
\20
\10
4_
IH
S_
W
HI
TE
RI
VE
R\
CA
D\
4-
RD
X.
X-
SM
455 NORTH THIRD STREET
SUITE 250
PHOENIX, AZ 85004
602.265.2200 smithgroup.com
1626 NORTH LITCHFIELD RD
SUITE 150
GOODYEAR, AZ 85395
623.935.2258 dibblecorp.com
SHEET NUMBER
CD
DRAWN BY: GIESELMAN CHECKED BY: MOWRY
BASED ON PROGRAM OF REQUIREMENTS DATED [03/26/22],
POR AMENDMENT DATED [02/03/25], AND ON SCHEMATIC
DRAWINGS APPROVED [11/19/24].
FINAL CONSTRUCTION DOCUMENTS 05MAR26
RD6.2
Call 811 or click Arizona811.com
Contact Arizona 811 at least two full working days before you begin excavation
SIGN SUMMARY
SHEET TITLE
SEALS AND SIGNATURES
ISSUED FOR DATE
5/1 4/2
6 3
:02 P
M Pl ot Da te:
G:
\20
\10
4_
IH
S_
W
HI
TE
RI
VE
R\
CA
D\
4-
RD
X.
X-
SM
455 NORTH THIRD STREET
SUITE 250
PHOENIX, AZ 85004
602.265.2200 smithgroup.com
1626 NORTH LITCHFIELD RD
SUITE 150
GOODYEAR, AZ 85395
623.935.2258 dibblecorp.com
SHEET NUMBER
CD
DRAWN BY: GIESELMAN CHECKED BY: MOWRY
BASED ON PROGRAM OF REQUIREMENTS DATED [03/26/22],
POR AMENDMENT DATED [02/03/25], AND ON SCHEMATIC
DRAWINGS APPROVED [11/19/24].
FINAL CONSTRUCTION DOCUMENTS 05MAR26
RD6.4
SIGNING & MARKING
PLAN
N CHIEF AVE
W HOSPITAL DR
N CHIEF AVE
W HOSPITAL DR
AD
O
PT
A
H
IG
H W
AY
AD
O
PT
A
H
IG
H W
AY
AD
O
PT
A
H
IG
H W
AY
N P
O
TTE
R S
T
Call 811 or click Arizona811.com
Contact Arizona 811 at least two full working days before you begin excavation
SR 73
SR 73
SHEET TITLE
SEALS AND SIGNATURES
ISSUED FOR DATE
5/1 4/2
6 1
2:5 8 P
M Pl ot Da te:
G:
\20
\10
4_
IH
S_
W
HI
TE
RI
VE
R\
CA
D\
4-
RD
X.
X-
TC
455 NORTH THIRD STREET
SUITE 250
PHOENIX, AZ 85004
602.265.2200 smithgroup.com
1626 NORTH LITCHFIELD RD
SUITE 150
GOODYEAR, AZ 85395
623.935.2258 dibblecorp.com
SHEET NUMBER
CD
DRAWN BY: GIESELMAN CHECKED BY: MOWRY
BASED ON PROGRAM OF REQUIREMENTS DATED [03/26/22],
POR AMENDMENT DATED [02/03/25], AND ON SCHEMATIC
DRAWINGS APPROVED [11/19/24].
FINAL CONSTRUCTION DOCUMENTS 05MAR26
RD8.1
TRAFFIC CONTROL
NOTES
SHEET TITLE
SEALS AND SIGNATURES
ISSUED FOR DATE
5/1 4/2
6 1
2:5 8 P
M Pl ot Da te:
G:
\20
\10
4_
IH
S_
W
HI
TE
RI
VE
R\
CA
D\
4-
RD
X.
X-
TC
455 NORTH THIRD STREET
SUITE 250
PHOENIX, AZ 85004
602.265.2200 smithgroup.com
1626 NORTH LITCHFIELD RD
SUITE 150
GOODYEAR, AZ 85395
623.935.2258 dibblecorp.com
SHEET NUMBER
CD
DRAWN BY: GIESELMAN CHECKED BY: MOWRY
BASED ON PROGRAM OF REQUIREMENTS DATED [03/26/22],
POR AMENDMENT DATED [02/03/25], AND ON SCHEMATIC
DRAWINGS APPROVED [11/19/24].
FINAL CONSTRUCTION DOCUMENTS 05MAR26
RD8.2
TRAFFIC CONTROL
SCHEMATICS &
ADVANCE SIGNING
SHEET TITLE
SEALS AND SIGNATURES
ISSUED FOR DATE
5/1 4/2
6 1
2:5 8 P
M Pl ot Da te:
G:
\20
\10
4_
IH
S_
W
HI
TE
RI
VE
R\
CA
D\
4-
RD
X.
X-
TC
455 NORTH THIRD STREET
SUITE 250
PHOENIX, AZ 85004
602.265.2200 smithgroup.com
1626 NORTH LITCHFIELD RD
SUITE 150
GOODYEAR, AZ 85395
623.935.2258 dibblecorp.com
SHEET NUMBER
CD
DRAWN BY: GIESELMAN CHECKED BY: MOWRY
BASED ON PROGRAM OF REQUIREMENTS DATED [03/26/22],
POR AMENDMENT DATED [02/03/25], AND ON SCHEMATIC
DRAWINGS APPROVED [11/19/24].
FINAL CONSTRUCTION DOCUMENTS 05MAR26
PHASE 1
PHASE 2
RD8.3
CONSTRUCTION
SEQUENCING
| Sheets and Views |
| RD2.2 General Notes & Design Data |
| RD6.2 Sign Summary |
| RD6.4 Plan |
| RD8.1 TRAFFIC CONTROL NOTES |
| RD8.2 TRAFFIC CONTROL SCHEMATICS & ADVANCE SIGNING |
| RD8.3 CONSTRUCTION SEQUENCING |
File details come from the government source that posted it. Updated .