A7-1e BP1_DWG2026-0528_16_ICT_IHS-Whiteriver-Hospital_BID-ADD-E.pdf
PDF 11 MB Posted
- Attached to
- Whiteriver Hospital Construction
- Solicitation number
- 75H70126R00016
About this file
This document is an Infrastructure and Communications Technology (ICT) and Security systems drawing set for the IHS Whiteriver Hospital project located at 200 W Hospital Drive, Whiteriver, Arizona 85941. The project is associated with IHS Project #131445 and IHS Contract #75H70123R00008, with an award date of February 2, 2024. The drawings were prepared by SmithGroup based on a Program of Requirements dated March 26, 2022, amended February 3, 2025, and schematic drawings approved November 19, 2024.
The ICT drawings establish minimum infrastructure requirements for telecommunications, audiovisual, and data systems throughout the new hospital facility and existing connectivity. Key ICT requirements include: all telecommunications cabling shall be Category 6A and environment-rated; conduit installations must include pull strings with sequential footage marking and threaded insulation bushings; fiber backbone cabling connecting multiple Distribution Frames (MDFs/IDFs) must utilize redundant and diverse pathways that do not share routes; site conduits and pathways must be concrete-encased ductbank with appropriate manholes and handholes per telecommunications best practices; firestopping must be provided at all fire-rated penetrations; all junction boxes on opposite sides of walls must be separated by minimum 6 inches with acoustical putty pads to avoid sound transmission; floor boxes, junction boxes, and pull boxes require coordination-approved covers; flexible conduit is prohibited; and conduit fill requirements must adhere to code specifications. The contractor must field-verify all utility data requirements, coordinate final device locations with architectural and other trades, and maintain connectivity to the existing hospital throughout construction. Security systems drawings establish similar infrastructure requirements for security device installation, including flush mounting to recessed back boxes, conduit routing to accessible ceilings, and compliance with firestopping and electrical power requirements.
View the file
Other files
Show 40 more
Latest 50 of 107 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
A.
B.
C.
D.
E.
F.
G.
H.
THE ICT DRAWINGS ARE A SUBSET OF THE CONSTRUCTION PACKAGE. REFER TO THE COMPLETE DRAWING PACKAGE AND SPECIFICATIONS TO DETERMINE THE COMPLETE PROJECT SCOPE, GENERAL REQUIREMENTS, PRODUCT SPECIFICATIONS, AND
INSTALLATION REQUIREMENTS.
THE DRAWINGS REPRESENT THE ICT DESIGN INTENT AND ARE SCHEMATIC AND DIAGRAMMATICAL. THE SPECIFICATIONS ESTABLISH MINIMUM PERFORMANCE AND PRODUCT INSTALLATION REQUIREMENTS. PROVIDE NECESSARY EQUIPMENT AND ACCESSORIES FOR FULLY FUNCTIONAL SYSTEMS MEETING DESIGN INTENT AND OWNER REQUIREMENTS WHETHER EXPRESSLY SPECIFIED OR NOT. INSTALLATION METHODS MUST BE CONSISTENT WITH THE DESIGN INTENT, MANUFACTURER.
RECOMMENDATIONS, AND ALL LOCAL CODES AND REGULATIONS NECESSARY FOR COMPLETE AND OPERATIONAL ICT SYSTEMS.
THE ARCHITECTURAL DRAWINGS ESTABLISH AND GOVERN THE FINAL FINISHED APPEARANCES AND LOCATION OF THE EXPOSED WORK OF ALL TRADES. REFER TO ARCHITECTURAL DRAWINGS FOR ALL DEVICE MOUNTING REQUIREMENTS AND RULES, UON.
COORDINATE ALL DEVICE LOCATIONS AND MOUNTING HEIGHTS WITH ARCHITECTURAL DRAWINGS PRIOR TO ROUGH-IN.
COORDINATE THE INSTALLATION OF ICT SYSTEMS WITH ALL OTHER TRADES TO AVOID INTERFERENCES WITH PIPING, DUCTWORK, MECHANICAL EQUIPMENT, STRUCTURAL MEMBERS, FURNITURE, AND ALL OTHER GENERAL BUILDING CONSTRUCTION.
REFER TO ELECTRICAL DRAWINGS FOR POWER CIRCUIT REQUIREMENTS SERVING THE ICT SYSTEMS.
PROVIDE FIRESTOPPING AT ALL PENETRATIONS OF FIRE-RATED FLOOR AND WALL ASSEMBLIES, IN ACCORDANCE WITH REQUIREMENTS OF PROJECT FIRESTOPPING SPECIFICATION. ALL BACK BOXES MOUNTED WITHIN FIRE RATED PARTITIONS SHALL
MEET THE FIRE RATING OF THE PARTITION, AS REQUIRED BY CODE.
CONTRACTOR TO FIELD VERIFY ALL UTILITY DATA REQUIREMENTS AND TERMINATION LOCATIONS PER FINAL EQUIPMENT SELECTIONS. SEE PLANS FOR LOCATIONS AND QUANTITIES COORDINATION DURING DESIGN. THIS INCLUDES BUT IS NOT LIMITED TO MECHANICAL, ELECTRICAL, PLUMBING, MEDICAL EQUIPMENT, PNEUMATIC TUBE, FIRE ALARM/FIRE PROTECTION, ETC.
DEVICE ELEVATIONS SHOWN ARE FOR REFERENCE ONLY. CONTRACTOR TO REFER TO ARCHITECTURAL ELEVATIONS A0.3 AND OTHERS AS REQUIRED. CONTRACTOR TO COORDINATE FINAL DEVICE ROUGH-IN WITH ARCHITECTURAL AND OTHER TRADES AS
REQUIRED.
ICT GENERAL NOTES
SECTION NUMBER
KEY NOTETXXX
DETAIL NUMBER
DRAWING NUMBER WHERE DRAWN
DRAWING NUMBER WHERE DRAWN
T0.1
DEMO KEY NOTETDXX
A.
B.
C.
D.
E.
F.
G.
H.
I.
J.
K.
L.
M.
N.
O.
P.
Q.
R.
THE MAKE AND MODEL OF INFRASTRUCTURE DEVICES IN THE TECHNOLOGY LEGENDS HAVE BEEN LISTED TO ESTABLISH THE DESIRED LEVEL OF QUALITY AND PERFORMANCE FOR EACH DEVICE. THE INSTALLING CONTRACTOR MAY PROPOSE SUBSTITUTION OF THESE DEVICES WITH EQUIVALENT PRODUCT BY OTHER MANUFACTURERS PER SPECIFICATIONS, UON.
FURNITURE LAYOUTS ARE FOR REFERENCE ONLY. COORDINATE THE FINAL LOCATION OF DEVICES AND OUTLETS WITH ARCHITECT, OWNER AND FINAL APPROVED FURNITURE PLANS PRIOR TO INSTALLATION. PROVIDE ALL INTERCONNECTING WIRING, FITTINGS, AND HARDWARE REQUIRED FOR A COMPLETE INSTALLATION, EVEN IF NOT EXPLICITLY SHOWN ON PLANS.
TO AVOID SOUND TRANSMISSION THROUGH WALLS, RECESSED JUNCTION BOXES ON OPPOSITE SIDES OF ANY WALL SHALL NOT BE MOUNTED BACK-TO-BACK. PROVIDE A MINIMUM OF 6 INCHES OF SEPARATION BETWEEN BOXES AND PROVIDE ACOUSTICAL PUTTY
PADS AROUND THE BOX.
INFRASTRUCTURE SPECIFIED WITH MOUNTING ELEVATIONS ARE TO CENTERLINE OF BOX, UON. WHERE BOXES WITH DIFFERENT MOUNTING HEIGHTS ARE LOCATED IN THE SAME AREA ALIGN BOXES VERTICALLY AND HORIZONTALLY THROUGH THEIR CENTERLINES, UON. BOXES WHICH ARE NOT ALIGNED PROPERLY SHALL BE RELOCATED AS REQUIRED TO MEET ALIGNMENT REQUIREMENTS AT NO COST TO THE OWNER. THIS INCLUDES DEVICES INSTALLED BY OTHER TRADES.
MOUNT DEVICES FLUSH TO RECESSED BACK BOX WITH CONCEALED CONDUIT, UON ON THE DRAWINGS.
PROVIDE COVERS FOR ALL FLOOR BOXES, JUNCTION BOXES, AND PULL BOXES, AND COORDINATE THE COVER COLOR AND FINISH WITH THE ARCHITECT. INSTALL RAISED COVER WITH DEPTH THAT MATCHES THE WALL THICKNESS.
FURNISH ALL FLOOR BOXES, JUNCTION BOXES, AND PULL BOXES WITH KNOCKOUTS FOR REQUIRED CONDUIT. WHEN MOUNTING JUNCTION BOXES AND PULL BOXES AT OR ABOVE THE FINISHED CEILING LEVEL, ORIENT THE BOXES WITH THEIR OPEN SIDE
FACING DOWNWARD.
THE CONDUIT PATHS SHOWN IN THE DRAWINGS ARE FOR ILLUSTRATIVE PURPOSES ONLY. ACTUAL CONDUIT ROUTES SHOULD ADHERE TO THE SHORTEST FEASIBLE ROUTE WHILE ADHERING TO INDUSTRY STANDARDS AND BEST PRACTICES.
STUB ALL CONDUITS FOR AUDIOVISUAL SYSTEMS TO NEAREST ACCESSIBLE CEILING WITHIN THE SAME ROOM, UON.
ROUTE ALL WORK AREA OUTLET TELECOMMUNICATIONS CONDUITS TO THE NEAREST CABLE TRAY.
ENSURE THAT ALL CONDUIT INSTALLATIONS INCLUDE A PULL STRING WITH SEQUENTIAL FOOTAGE MARKING.
REAM AND FIT THREADED INSULATION BUSHING ON ALL CONDUIT ENDS.
BOND TO GROUND ONE OR BOTH ENDS OF ALL CONDUITS IN ACCORDANCE WITH NATIONAL AND LOCAL REGULATIONS.
FLEXIBLE CONDUIT IS NOT ALLOWED, UON.
WHEN PULLING CABLES INTO CONDUITS AND/OR SLEEVES, FULLY UTILIZE ONE CONDUIT BEFORE MOVING TO THE NEXT TO INCREASE UTILIZATION EFFICIENCY AND FUTURE FLEXIBILITY OF SPARE CONDUITS/SLEEVES. ADHERE TO FILL REQUIREMENTS
PER INSTANCE.
ALL TELECOMMUNICATIONS CABLING SHALL BE CATEGORY 6A AND RATED FOR THE ENVIRONMENT IN WHICH IT IS INSTALLED UON.
SEE DIVISION 27 SPECIFICATIONS FOR ADDITIONAL INFORMATION.
ANY INFRASTRUCTURE BACKBOX OR DEVICE THAT IS LOCATED IN AN OPEN CEILING ENVIRONMENT, CONTRACTOR TO INSTALL CONDUIT AS SPECIFIED FROM THE BACKBOX TO CABLE TRAY OR NEAREST ACCESSIBLE CEILING TO ALLOW CABLING TO BE CONCEALED IN THE CONDUIT IN AN OPEN CEILING ENVIRONMENT AND HOMERUN TO THE SERVING TELECOMMUNICATIONS ROOM.
PROVIDE PASS-THROUGH SLEEVES THROUGH WALLS EXTENDING TO THE DECK WHERE REQUIRED. SLEEVES SHALL BE APPROPRIATELY SIZED TO ACCOMMODATE TELECOM CABLING AS REQUIRED. ENSURE SLEEVES INCLUDE BUSHINGS ON BOTH
ENDS AND COMPLY WITH FIRESTOPPING REQUIREMENTS FOR RATED ASSEMBLIES.
ICT INFRASTRUCTURE NOTES
REFERENCE DESIGN BINDER 4 IHS WHITERIVER TECHNOLOGY SCOPE RESPONSIBILITY
MATRIX.
ICT CONTRACTOR RESPONSIBILITY MATRIX
WALL MOUNT TELECOMMUNICATION OUTLET -
SLASH INDICATES MOUNTING ABOVE FINISH
COUNTER
CABLE QTY
WALL MOUNT TELECOMMUNICATION OUTLETXX-#
TYPICAL WALL MOUNT TELECOMMUNICATIONS OUTLET
SPECIAL WALL MOUNT TELECOMMUNICATIONS OUTLET
CABLE QTY
SYMBOL TYPE
CEILING MOUNT TELECOMMUNICATIONS OUTLET
A - MOUNT ABOVE FINISHED CEILING
F - MOUNT FLUSH TO FINISHED CEILING
S - MOUNT TO STRUCTURE/DECK
SPECIAL CEILING MOUNT TELECOMMUNICATIONS OUTLET
XX-X-#
CABLE QTY
SYMBOL TYPE
CEILING TYPE
ICT SYMBOLS
XX
ICT MULTISERVICE FLOOR MOUNT DEVICE
FLOOR MOUNT MULTISERVICE OUTLET
#CABLE QTY
SYMBOL TYPE
XX
ICT MULTISERVICE WALL MOUNT DEVICE
WALL MOUNT MULTISERVICE OUTLET
#CABLE QTY
SYMBOL TYPE
XX
ICT MULTISERVICE CEILING MOUNT DEVICE
CEILING MOUNT MULTISERVICE OUTLET
#CABLE QTY
SYMBOL TYPE
XX
ICT FLOOR MOUNT DEVICE
FLOOR MOUNT DEVICE
SYMBOL TYPE
XX
ICT WALL MOUNT DEVICE
WALL MOUNT DEVICE
SYMBOL TYPE
XX
ICT CEILING MOUNT DEVICE
SYMBOL TYPE
CEILING MOUNT DEVICE
A - MOUNT ABOVE FINISHED CEILING
F - MOUNT FLUSH TO FINISHED CEILING
S - MOUNT TO STRUCTURE/DECK
CEILING TYPE
X
XX
ICT AV CEILING MOUNT EQUIPMENT
CEILING MOUNT AV EQUIPMENT TO BE PROVIDED AND INSTALLED BY AVC
C - CAMERA
M - MICROPHONE
S - LOUDSPEAKER
P - PENDANT LOUDSPEAKER
PA - PAGING LOUDSPEAKER
SM - SOUND MASKING LOUDSPEAKER
SYMBOL TYPE
A.
B.
C.
D.
THE PURPOSE OF THIS SHEET IS TO ILLUSTRATE AND DEFINE TYPICAL GRAPHIC SYMBOLS WHICH MAY TYPICALLY OCCUR ON THE ICT
DRAWINGS.
THIS SHEET MAY ILLUSTRATE ABBREVIATIONS, SYMBOLS AND LEGENDS WHICH DO NOT OCCUR AS PART OF THIS PROJECT. REFER TO
THE DRAWINGS TO DETERMINE WHICH ITEMS APPLY TO THE WORK OF THIS PROJECT.
ADDITIONAL SYMBOLS NOT SHOWN OR DEFINED ON THIS SHEET MAY BE USED ON THE ICT DRAWINGS AND ARE TYPICALLY DEFINED ON
OTHER SHEETS.
SYMBOLS ARE NOT DRAWN TO SCALE. TO DETERMINE THE ACTUAL SIZES OF ELEMENTS REPRESENTED BY SYMBOLS, REFER TO THE
SPECIFICATIONS AND OTHER SHEETS, AS MAY APPLY.
SHEET NUMBER
PROJECT NUMBER
SEALS AND SIGNATURES
ISSUED FOR DATE
Pl ot
Da te:
IHS Whiteriver Hospital 200 W Hospital Drive Whiteriver, Arizona, 85941
IHS Project #: 131445 IHS Contract #: 75H70123R00008 IHS Award Date: 02/02/2024
455 NORTH THIRD STREET
SUITE 250
PHOENIX, AZ 85004
602.265.2200 smithgroup.com
Drawn By: Checked By:
BASED ON PROGRAM OF REQUIREMENTS DATED [ 03/26/22],
POR AMENDMENT DATED [ 02/03/25], AND ON SCHEMATIC
DRAWINGS APPROVED [11/19/24].
5/2 8/2
6 1
1:0 8:5
8 A M
ICT ABBREVIATIONS AND
SYMBOLS
T0.1CD
Vo llm er
14904 Vollmer Foster
ICT ABBREVIATIONS ICT DEVICE SCHEDULES
REFERENCE SYMBOLS
ALL ABBREVIATIONS, SYMBOLS AND LEGENDS SHOWN ON THIS DRAWING ARE NOT NECESSARILY USED.
# NUMBER
+ #" MOUNTING HEIGHTS ARE TO CENTERLINE
OF DEVICE ABOVE FINISHED FLOOR OR
FINISHED GRADE
(A)
AC ALTERNATING CURRENT
ADA AMERICAN WITH DISABILITIES ACT
ADJ ADJACENT
AFC ABOVE FINISHED COUNTER
AFF ABOVE FINISHED FLOOR
AFG ABOVE FINISHED GRADE
AFS ABOVE FINISHED SLAB
AHJ AUTHORITY HAVING JURISDICTION
ALT ALTERNATE
ARCH ARCHITECT
AUX AUXILIARY
AV AUDIOVISUAL
AVC AUDIOVISUAL CONTRACTOR
AWG AMERICAN WIRE GAUGE
A AMPERES
(B)
BLDG BUILDING
B BURIED
BET BUILDING ENTRANCE TERMINAL
BD BLACK DROP
(C)
CA CABLE
CAB CABINET
CH CASE HEIGHT
CW CASE WIDTH
CD CASE DEPTH
CAT CATALOG
CATV CABLE TELEVISION
CCTV CLOSED CIRCUIT TELEVISION
CL CENTERLINE
CLG CEILING
COAX COAXIAL CABLING
COMM COMMUNICATIONS
C CONDUIT
(D)
D DEPTH
DC DIRECT CURRENT
DIST DISTRIBUTION
DIV DIVISION
DN DOWN
DWG(S) DRAWING(S)
DWGS DRAWINGS
(E)
EMT ELECTRICAL METALLIC TUBING
ENCL ENCLOSURE
EC ELECTRICAL CONTRACTOR
EF ENTRANCE FACILITY
EST ESTIMATE
EQ EQUIPMENT
(E), E, EX, EXIST EXISTING
ESS ELECTRONIC SECURITY SYSTEMS
(F)
FACP FIRE ALARM CONTROL PANEL
FC FOOT CANDLE
FLR FLOOR
FPD FLAT PANEL DISPLAY
FT FOOT/FEET (')
FURN FURNITURE
(G)
GC GENERAL CONTRACTOR
GND GROUND
GRC GALVANIZED RIGID CONDUIT
(H)
HH HANDHOLE
HT HEIGHT
(I)
ICT INFORMATION AND COMMUNICATIONS
TECHNOLOGY
IN INCH/INCHES (")
IW IMAGE WIDTH
IH IMAGE HEIGHT
IHAF IMAGE HEIGHT ABOVE FINISHED FLOOR
(J)
JB JUNCTION BOX
(K)
KO KNOCK OUT
(L)
L LENGTH, LONG
LAN LOCAL AREA NETWORK
LV LOW VOLTAGE (BELOW 50 VOLTS)
(M)
MH MANHOLE
MIC MICROPHONE
MTR MOTOR
MAX MAXIMUM
MFR MANUFACTURER
MIN MINIMUM
MISC MISCELLANEOUS
MTD MOUNTED
MTG MOUNTING
MTR MAIN TELECOMMUNICATIONS ROOM
(N)
NA NOT APPLICABLE
NEC NATIONAL ELECTRICAL CODE
NEMA NATIONAL ELECTRICAL MANUFACTURERS
ASSOCIATION
NIC NOT IN CONTRACT
NO., NUM. # NUMBER
NTS NOT TO SCALE
NC NURSE CALL
(O)
OC ON CENTER
OFCI OWNER FURNISHED, CONTRACTOR
INSTALLED
OFOI OWNER FURNISHED, OWNER INSTALLED
OPS OUTSIDE PLANT
(P)
PA PUBLIC ADDRESS
PB PULL BOX
PS POWER SUPPLY
PRJ PROJECTOR
PRS PROJECTION SCREEN
PWR POWER
(Q)
QTY QUANTITY
(R)
REQ'D REQUIRED
RF RADIO FREQUENCY
RFID RADIO FREQUENCY IDENTIFICATION
RSC RIGID STEEL CONDUIT
RE, (R) RELOCATE AS SHOWN
(S)
SC SECURITY CONTRACTOR
SCH, SCHED SCHEDULE
SF SQUARE FOOT
STP SHIELDED TWISTED PAIR
SPEC(S) SPECIFICATION(S)
STD STANDARD
(T)
TCC TELECOMMUNICATIONS CABLE
CONTRACTOR
TBD TO BE DETERMINED
TELECOM TELECOMMUNICATIONS
TYP TYPICAL
TR TELECOMMUNICATIONS ROOM
(U)
UG UNDERGROUND
UON UNLESS OTHERWISE NOTED
UPS UNINTERRUPTIBLE POWER SUPPLY
UTP UNSHIELDED TWISTED PAIR
(V)
V VOLTS
(W)
W/ WITH
W/O WITHOUT
WP WEATHERPROOF
WT WEIGHT
ICT DEVICE SCHEDULE
SYMBOL TYPE DESCRIPTION BACKBOX MOUNTING AV CONDUIT AV CONDUIT NOTES
AT-A ANTENNA DOUBLE-GANG 4-11/16" SQUARE BOX
BLANK COVER
ABOVE ACCESSIBLE CEILING N/A
AV1 AV IO PANEL DOUBLE-GANG 4-11/16" SQUARE BOX, RAISED ONE-DEVICE COVER PROJECT STANDARD OUTLET HEIGHT, REFER TO ARCH. DRAWINGS (UON) (1) 1 1/4" STUB TO NEAREST ACCESSIBLE CEILING (UON ON RISER DIAGRAM) AV2 AV IO PANEL DOUBLE-GANG 4-11/16" SQUARE BOX, RAISED TWO-DEVICE COVER PROJECT STANDARD OUTLET HEIGHT, REFER TO ARCH. DRAWINGS (UON) (1) 1 1/4" STUB TO NEAREST ACCESSIBLE CEILING (UON ON RISER DIAGRAM) AV3 AV IO PANEL TRIPLE-GANG BOX, RAISED THREE-DEVICE COVER PROJECT STANDARD OUTLET HEIGHT, REFER TO ARCH. DRAWINGS (UON) (2) 1 1/4" STUB TO NEAREST ACCESSIBLE CEILING (UON ON RISER DIAGRAM) C CAMERA DOUBLE-GANG 4-11/16" SQUARE BOX, RAISED TWO-DEVICE COVER 96" AFF - FLUSH (UON) (1) 1" STUB TO NEAREST ACCESSIBLE CEILING (UON ON RISER DIAGRAM) CP1 CONTROL PANEL DOUBLE-GANG 4-11/16" SQUARE BOX, RAISED ONE-DEVICE COVER PROJECT STANDARD SWITCH HEIGHT, REFER TO ARCH. DRAWINGS (UON) (1) 1" STUB TO NEAREST ACCESSIBLE CEILING (UON ON RISER DIAGRAM) CP2 CONTROL PANEL DOUBLE-GANG 4-11/16" SQUARE BOX, RAISED TWO-DEVICE COVER PROJECT STANDARD SWITCH HEIGHT, REFER TO ARCH. DRAWINGS (UON) (1) 1" STUB TO NEAREST ACCESSIBLE CEILING (UON ON RISER DIAGRAM) CP3 CONTROL PANEL TRIPLE-GANG BOX, RAISED THREE-DEVICE COVER PROJECT STANDARD SWITCH HEIGHT, REFER TO ARCH. DRAWINGS (UON) (1) 1" STUB TO NEAREST ACCESSIBLE CEILING (UON ON RISER DIAGRAM) ETC ELAPSE TIMER CONTROL PANEL DOUBLE-GANG 4-11/16" SQUARE BOX, RAISED ONE-DEVICE COVER 48" - FLUSH (UON) (1) 1" STUB TO NEAREST ACCESSIBLE CEILING (UON ON RISER DIAGRAM) RAT TRIBAL RADIO SYSTEM ANTENNA DOUBLE-GANG 4-11/16" SQUARE BOX, RAISED ONE-DEVICE COVER 90" AFF - FLUSH (UON) (1) 1 1/4" STUB TO NEAREST ACCESSIBLE CEILING (UON ON RISER DIAGRAM) RS ROOM SCHEDULING PANEL PROVIDED BY AV CONTRACTOR PROJECT STANDARD SWITCH HEIGHT, REFER TO ARCH. DRAWINGS (UON) (1) 1" CONDUIT TO START AT PROJECT STANDARD SWITCH HEIGHT AND STUB INTO NEAREST
ACCESSIBLE CEILING (UON ON RISER DIAGRAM)
SP-A LOUDSPEAKER PULL BOX DOUBLE-GANG 4-11/16" SQUARE BOX
BLANK COVER
18" ABOVE ACCESSIBLE CEILING (1) 1" STUB TO NEAREST ACCESSIBLE CEILING (UON ON RISER DIAGRAM)
SP-S LOUDSPEAKER PULL BOX DOUBLE-GANG 4-11/16" SQUARE BOX
BLANK COVER
SURFACE MOUNT TO DECK (1) 1"
VPA VISUAL PAGING LOUDSPEAKER N/A - FOR LOCATION PURPOSES ONLY 108" AFF - FLUSH (UON) N/A N/A
ICT TELECOM DEVICE SCHEDULE
SYMBOL TYPE DESCRIPTION BACKBOX MOUNTING TELECOM CONDUIT TELECOM CONDUIT NOTES
# (DATA AFC) DATA OUTLET(S) DOUBLE-GANG 4-11/16" SQUARE BOX, RAISED ONE-DEVICE COVER (UON) WALL / 44" AFF (UON) (1) 1 1/4" STUB TO NEAREST ACCESSIBLE CEILING, J-HOOK TO CABLE TRAY # (DATA) DATA OUTLET(S) DOUBLE-GANG 4-11/16" SQUARE BOX, RAISED ONE-DEVICE COVER PROJECT STANDARD OUTLET HEIGHT, REFER TO ARCH. DRAWINGS (UON) (1) 1 1/4" STUB TO NEAREST ACCESSIBLE CEILING, J-HOOK TO CABLE TRAY A-# CEILING DATA OUTLET(S) DOUBLE-GANG 4-11/16" SQUARE BOX, BLANK COVER ABOVE ACCESSIBLE CEILING J-HOOK TO CABLE TRAY
AE-# EXTERIOR WIRELESS ACCESS POINT
ENCLOSURE
HUBBELL ATS-04384C OR EQUAL WALL / 120" AFF (UON) (1) 1" STUB TO NEAREST ACCESSIBLE CEILING, J-HOOK TO CABLE TRAY
AP-A-# CEILING ACCESS POINT DATA OUTLET(S) CHATSWORTH PRODUCTS OBERON WI-TILE 1047 OR EQUAL ENCLOSURE INSTALLED IN ACCESSIBLE CEILING GRID, FLUSH WITH CEILING J-HOOK TO CABLE TRAY AP-F-# CEILING ACCESS POINT DATA OUTLET(S) CHATSWORTH PRODUCTS OBERON WI-TILE 1045 OR EQUAL ENCLOSURE INSTALLED FLUSH WITH CEILING (1) 1" STUB TO NEAREST ACCESSIBLE CEILING, J-HOOK TO CABLE TRAY AP-S-# CEILING ACCESS POINT DATA OUTLET(S) DOUBLE-GANG 4-11/16" SQUARE BOX, RAISED ONE-DEVICE COVER SURFACE MOUNT TO DECK (1) 1" STUB TO NEAREST CABLE TRAY
CE-# ED HEADWALL COMPUTER STATION DATA
OUTLET(S)
DOUBLE-GANG 4-11/16" SQUARE BOX, RAISED ONE-DEVICE COVER (UON) 48" - FLUSH (UON), COORDINATE W/ HEADWALL (1) 1-1/4" STUB TO NEAREST ACCESSIBLE CEILING, J-HOOK TO CABLE TRAY
CL-AN-# SYNCRONIZE CLOCK - ANALOG DOUBLE-GANG 4-11/16" SQUARE BOX, RAISED ONE-DEVICE COVER PROJECT STANDARD CLOCK HEIGHT, REFER TO ARCH. DRAWINGS (UON) (1) 1" STUB TO NEAREST ACCESSIBLE CEILING, J-HOOK TO CABLE TRAY CL-DI-# SYNCRONIZE CLOCK - DIGITAL DOUBLE-GANG 4-11/16" SQUARE BOX, RAISED ONE-DEVICE COVER PROJECT STANDARD CLOCK HEIGHT, REFER TO ARCH. DRAWINGS (UON) (1) 1" STUB TO NEAREST ACCESSIBLE CEILING, J-HOOK TO CABLE TRAY CL-EL-# SYNCRONIZE ELAPSE TIMER - DIGITAL DOUBLE-GANG 4-11/16" SQUARE BOX, RAISED ONE-DEVICE COVER PROJECT STANDARD CLOCK HEIGHT, REFER TO ARCH. DRAWINGS (UON) (1) 1" STUB TO NEAREST ACCESSIBLE CEILING, J-HOOK TO CABLE TRAY
CP-# PATIENT ROOM HEADWALL COMPUTER
STATION DATA OUTLET(S)
DOUBLE-GANG 4-11/16" SQUARE BOX, RAISED ONE-DEVICE COVER (UON) 42" AFF - FLUSH (UON), COORDINATE W/ HEADWALL (1) 1-1/4" STUB TO NEAREST ACCESSIBLE CEILING, J-HOOK TO CABLE TRAY
CS-# SURGERY PREP/PACU HEADWALL
COMPUTER STATION DATA OUTLET(S)
DOUBLE-GANG 4-11/16" SQUARE BOX, RAISED ONE-DEVICE COVER 48" AFF - FLUSH (UON) - COORDINATE W/ HEADWALL (1) 1 1/4" STUB TO NEAREST ACCESSIBLE CEILING, J-HOOK TO CABLE TRAY
CSP-# CEILING SERVICE PANEL DATA OUTLET(S) LOCATED IN CEILING SERVICE PANEL FLUSH MOUNT WITH CEILING SERVICE PANEL OR OVERHEAD CARRIER PATHWAY PROVIDED
WITHIN EQUIPMENT
ROUTE CABLES IN OVERHEAD UTILITY PATHWAY TO FACILITATE TRANSITION TO CABLETRAY
CST - # EMERGENCY CALL STATION STANCHION
DATA OUTLET(S)
DOUBLE-GANG 4-11/16" SQUARE BOX, RAISED ONE-DEVICE COVER, COORDINATE WITH
CST
COORDINATE WITH CST INSTALLATION REQUIREMENTS (1) 2" CONDUIT TO ENTER BUILDING, STUB TO NEAREST ACCESSIBLE CEILING, J-HOOK TO CABLE
TRAY
E-# VISUAL ACUITY TESTER DOUBLE-GANG 4-11/16" SQUARE BOX, RAISED ONE-DEVICE COVER WALL / 56" AFF (UON) (1) 1" STUB TO NEAREST ACCESSIBLE CEILING, J-HOOK TO CABLE TRAY FF-# FURNITURE FEED TELECOM PULLBOX DOUBLE-GANG 4-11/16" SQUARE BOX, RAISED ONE-DEVICE COVER (UON) WALL / 18" AFF (UON) (1) 1 1/4" STUB TO NEAREST ACCESSIBLE CEILING, J-HOOK TO CABLE TRAY FM-# IN-FLOOR CONDUIT STUB DATA OUTLET(S) IN-FLOOR CONDUIT FLOOR (1) 1 1/2" STUB TO DEDICATED CHASE WITHIN CABINET/EQUIPMENT FO-# IN-FURNITURE DATA OUTLET(S) COORDINATE WITH FURNITURE IN FURNITURE PATHWAY PROVIDED
WITHIN FURNITURE
PATHWAY WITHIN FURNITURE TO FURNITURE FEED PULL BOX
FO-# (AFC) IN-FURNITURE DATA OUTLET(S) COORDINATE WITH FURNITURE IN FURNITURE PATHWAY PROVIDED
WITHIN FURNITURE
PATHWAY WITHIN FURNITURE TO FURNITURE FEED PULL BOX
FS-# IN-SLAB CONDUIT STUB DATA OUTLET(S) IN-SLAB CONDUIT FLOOR / GRADE (1) 1 1/2" STUB TO 3" ABOVE FINISHED FLOOR FS-# IN-SLAB CONDUIT STUB DATA OUTLET(S) IN-SLAB CONDUIT FLOOR / GRADE (1) 1 1/2" STUB TO 3" ABOVE FINISHED FLOOR
HD-# DENTAL RECOVERY HEADWALL DATA
OUTLET(S)
DOUBLE-GANG 4-11/16" SQUARE BOX, RAISED ONE-DEVICE COVER (UON) 30" - FLUSH (UON), COORDINATE W/ HEADWALL (1) 1-1/4" STUB TO NEAREST ACCESSIBLE CEILING, J-HOOK TO CABLE TRAY
HE-# ED HEADWALL DATA OUTLET(S) DOUBLE-GANG 4-11/16" SQUARE BOX, RAISED ONE-DEVICE COVER (UON) 36" - FLUSH (UON), COORDINATE W/ HEADWALL (1) 1-1/4" STUB TO NEAREST ACCESSIBLE CEILING, J-HOOK TO CABLE TRAY HI-# L&D INFANT HEADWALL DATA OUTLET(S) DOUBLE-GANG 4-11/16" SQUARE BOX, RAISED ONE-DEVICE COVER 24" AFF - FLUSH (UON) - COORDINATE W/ HEADWALL (1) 1 1/4" STUB TO NEAREST ACCESSIBLE CEILING, J-HOOK TO CABLE TRAY HL-# LDRP HEADWALL DATA OUTLET(S) DOUBLE-GANG 4-11/16" SQUARE BOX, RAISED ONE-DEVICE COVER (UON) 30" AFF - FLUSH (UON), COORDINATE W/ HEADWALL (1) 1-1/4" STUB TO NEAREST ACCESSIBLE CEILING, J-HOOK TO CABLE TRAY HN-# L&D NURSERY HEADWALL DATA OUTLET(S) DOUBLE-GANG 4-11/16" SQUARE BOX, RAISED ONE-DEVICE COVER (UON) 36" AFF - FLUSH (UON), COORDINATE W/ HEADWALL (1) 1-1/4" STUB TO NEAREST ACCESSIBLE CEILING, J-HOOK TO CABLE TRAY
HP-# PATIENT AND TREATMENT ROOM HEADWALL
DATA OUTLET(S)
DOUBLE-GANG 4-11/16" SQUARE BOX, RAISED ONE-DEVICE COVER (UON) 30" - FLUSH (UON), COORDINATE W/ HEADWALL (1) 1-1/4" STUB TO NEAREST ACCESSIBLE CEILING, J-HOOK TO CABLE TRAY
HS-# SURGERY PREP/PACU HEADWALL DATA
OUTLET(S)
DOUBLE-GANG 4-11/16" SQUARE BOX, RAISED ONE-DEVICE COVER 24" AFF - FLUSH (UON) - COORDINATE W/ HEADWALL (1) 1 1/4" STUB TO NEAREST ACCESSIBLE CEILING, J-HOOK TO CABLE TRAY
LB-# LAB BENCH DATA OUTLET(S) INTERGRATED IN LAB BENCH IN LAB BENCH, REFER TO Q-SERIES EQUIPMENT SHEETS PATHWAY PROVIDED
WITHIN FURNITURE
ROUTE CABLES TO CEILING SERVICE PANEL / OVERHEAD CARRIER
MS-# MONUMENT SIGN DATA OUTLET(S) DOUBLE-GANG 4-11/16" SQUARE BOX, RAISED ONE-DEVICE COVER (UON) COORDINATE WITH MONUMENT SIGN (1) 2" CONDUIT TO ENTER BUILDING, STUB TO NEAREST ACCESSIBLE CEILING, J-HOOK TO CABLE
TRAY
P-# DATA OUTLET - WALL TELEPHONE DOUBLE-GANG 4-11/16" SQUARE BOX, RAISED ONE-DEVICE COVER (UON) 44" - FLUSH (UON) REFER TO ARCHITECTURAL ELEVATIONS A0.3 (1) 1" STUB TO NEAREST ACCESSIBLE CEILING, J-HOOK TO CABLE TRAY PC-# PATIENT CARE AREA DATA OUTLET(S) DOUBLE-GANG 4-11/16" SQUARE BOX, RAISED ONE-DEVICE COVER 24" AFF - FLUSH (UON) (1) 1 1/4" STUB TO NEAREST ACCESSIBLE CEILING, J-HOOK TO CABLE TRAY
PN-# PNEUMATIC TUBE WORK STATION DATA
OUTLET(S)
DOUBLE-GANG 4-11/16" SQUARE BOX, RAISED ONE-DEVICE COVER (UON) 44" - FLUSH (UON) (1) 1-1/4" STUB TO NEAREST ACCESSIBLE CEILING, J-HOOK TO CABLE TRAY
PT-S-# PNEUMATIC TUBE EQUIPMENT DATA
OUTLET(S)
DOUBLE-GANG 4-11/16" SQUARE BOX, RAISED ONE-DEVICE COVER SURFACE MOUNT TO DECK (1) 1" STUB TO NEAREST CABLE TRAY
RC-# RACEWAY FEED TELECOM PULLBOX DOUBLE-GANG 4-11/16" SQUARE BOX 44" AFF - FLUSH (UON), COORDINATE W/ ELECTRICAL RACEWAY (1) 1 1/4" STUB TO NEAREST ACCESSIBLE CEILING, J-HOOK TO CABLE TRAY RD-A-# CEILING RTLS DOOR DATA OUTLET(S) DOUBLE-GANG 4-11/16" SQUARE BOX, RAISED ONE-DEVICE COVER ABOVE ACCESSIBLE CEILING N/A J-HOOK TO CABLE TRAY RE-A-# CEILING RTLS RANGE EXTENDER OUTLET(S) DOUBLE-GANG 4-11/16" SQUARE BOX, RAISED ONE-DEVICE COVER ABOVE ACCESSIBLE CEILING N/A J-HOOK TO CABLE TRAY RL-A-# CEILING RTLS ELEVATOR DATA OUTLET(S) DOUBLE-GANG 4-11/16" SQUARE BOX, RAISED ONE-DEVICE COVER ABOVE ACCESSIBLE CEILING N/A J-HOOK TO CABLE TRAY RO-# IN-RACEWAY DATA OUTLET(S) COORDINATE WITH ELECTRICAL RACEWAY INSTALLED IN LOW VOLTAGE CHANNEL OF DUAL CHANNEL ELECTRICAL
RACEWAY
PATHWAY PROVIDED
WITHIN RACEWAY
PATHWAY WITHIN RACEWAY TO RACEWAY FEED PULL BOX
RS-A-# ROOM SCHEDULING PANEL DATA OUTLET(S) DOUBLE-GANG 4-11/16" SQUARE BOX, RAISED ONE-DEVICE COVER ABOVE ACCESSIBLE CEILING J-HOOK TO CABLE TRAY RT-A-# CEILING RTLS TRANSCEIVER DATA OUTLET(S) DOUBLE-GANG 4-11/16" SQUARE BOX, RAISED ONE-DEVICE COVER ABOVE ACCESSIBLE CEILING N/A J-HOOK TO CABLE TRAY RT-F-# CEILING RTLS MONITOR DATA OUTLET(S) DOUBLE-GANG 4-11/16" SQUARE BOX, RAISED ONE-DEVICE COVER FLUSH WITH CEILING (1) 1" STUB TO NEAREST ACCESSIBLE CEILING, J-HOOK TO CABLE TRAY SC-# SECURITY CAMERA DATA OUTLET(S) DOUBLE-GANG 4-11/16" SQUARE BOX, RAISED ONE-DEVICE COVER (UON) WALL / 120" AFF (UON) (1) 1" STUB TO NEAREST ACCESSIBLE CEILING, J-HOOK TO CABLE TRAY SC-A-# CEILING SECURITY CAMERA DATA OUTLET(S) DOUBLE-GANG 4-11/16" SQUARE BOX, RAISED ONE-DEVICE COVER ABOVE ACCESSIBLE CEILING J-HOOK TO CABLE TRAY SC-E-# CEILING SECURITY CAMERA DATA OUTLET(S) DOUBLE-GANG 4-11/16" SQUARE BOX, RAISED ONE-DEVICE COVER MOUNTED IN ELEVATOR CAB CEILING PROVIDE TRAVEL CABLE FOR NETWORK CONNECTION SC-F-# CEILING SECURITY CAMERA DATA OUTLET(S) DOUBLE-GANG 4-11/16" SQUARE BOX, RAISED ONE-DEVICE COVER FLUSH WITH CEILING (1) 1" STUB TO NEAREST ACCESSIBLE CEILING, J-HOOK TO CABLE TRAY SC-S-# CEILING SECURITY CAMERA DATA OUTLET(S) DOUBLE-GANG 4-11/16" SQUARE BOX, RAISED ONE-DEVICE COVER SURFACE MOUNT TO DECK (1) 1" STUB TO NEAREST CABLE TRAY
SCP - # SECURITY DEVICE POLE MOUNTED DATA
OUTLET(S)
DOUBLE-GANG 4-11/16" SQUARE BOX, RAISED ONE-DEVICE COVER, COORDINATE WITH
POLE INSTALLATION REQUIREMENTS
COORDINATE WITH POLE MOUNTED SECURITY SYSTEM DEVICE
INSTALLATION REQUIREMENTS
(1) 2" CONDUIT TO ENTER BUILDING, STUB TO NEAREST ACCESSIBLE CEILING, J-HOOK TO CABLE
TRAY
SP-A-# CEILING LOUDSPEAKER DATA OUTLET(S) DOUBLE-GANG 4-11/16" SQUARE BOX, BLANK COVER ABOVE ACCESSIBLE CEILING J-HOOK TO CABLE TRAY UP-# UTLITY POLE CEILING DATA OUTLET(S) DOUBLE-GANG 4-11/16" SQUARE BOX, BLANK COVER ABOVE ACCESSIBLE CEILING J-HOOK TO CABLE TRAY
VD-# DENTAL RECOVERY VITALS MONITOR DATA
OUTLET(S)
DOUBLE-GANG 4-11/16" SQUARE BOX, RAISED ONE-DEVICE COVER 72" AFF - FLUSH (UON) - COORDINATE WITH HEADWALL. (1) 1 1/4" STUB TO NEAREST ACCESSIBLE CEILING, J-HOOK TO CABLE TRAY
VE-# ED HEADWALL VITALS MONITOR DATA
OUTLET(S)
DOUBLE-GANG 4-11/16" SQUARE BOX, RAISED ONE-DEVICE COVER 66" AFF - FLUSH (UON) - COORDINATE WITH HEADWALL. (1) 1 1/4" STUB TO NEAREST ACCESSIBLE CEILING, J-HOOK TO CABLE TRAY
VI-# VIDEO INTERCOM DEVICE DATA OUTLET(S) DOUBLE-GANG 4-11/16" SQUARE BOX, RAISED ONE-DEVICE COVER (UON) WALL / 44" AFF (UON) (1) 1" STUB TO NEAREST ACCESSIBLE CEILING, J-HOOK TO CABLE TRAY VL-# LDRP VITALS MONITOR DATA OUTLET(S) DOUBLE-GANG 4-11/16" SQUARE BOX, RAISED ONE-DEVICE COVER 66" AFF - FLUSH (UON) - COORDINATE W/ HEADWALL. (1) 1 1/4" STUB TO NEAREST ACCESSIBLE CEILING, J-HOOK TO CABLE TRAY
VP-# PATIENT ROOM VITALS MONITOR DATA
OUTLET(S)
DOUBLE-GANG 4-11/16" SQUARE BOX, RAISED ONE-DEVICE COVER 66" AFF - FLUSH (UON) - COORDINATE WITH HEADWALL. (1) 1 1/4" STUB TO NEAREST ACCESSIBLE CEILING, J-HOOK TO CABLE TRAY
VPA-# DATA OUTLET - VISUAL PAGING
LOUDSPEAKER (WALL)
DOUBLE-GANG 4-11/16" SQUARE BOX, RAISED ONE-DEVICE COVER (UON) 108" AFF CENTERED ABOVE DIGITAL SIGNAGE DISPLAY, (UON) (1) 1" STUB TO NEAREST ACCESSIBLE CEILING, J-HOOK TO CABLE TRAY
VS-# SURGERY PREP/PACU HEADWALL VITALS
MONITOR DATA OUTLET(S)
DOUBLE-GANG 4-11/16" SQUARE BOX, RAISED ONE-DEVICE COVER 60" AFF - FLUSH (UON) - COORDINATE W/ HEADWALL. (1) 1 1/4" STUB TO NEAREST ACCESSIBLE CEILING, J-HOOK TO CABLE TRAY
ICT MULTISERVICE DEVICE SCHEDULE
SYMBOL TYPE DESCRIPTION BACKBOX MOUNTING AV CONDUIT AV CONDUIT NOTES
TELECOM
CONDUIT TELECOM CONDUIT NOTES
ELECTRICAL POWER NOTES (REFER TO ELECTRICAL
DRAWINGS FOR ADDITIONAL INFORMATION)
DB4 DISPLAY BOX W/ AV TELECOM AND POWER WIREMOLD EFSB2 FLUSH (UON) - REFER TO PLANS AND
ELEVATIONS FOR MOUNTING HEIGHT
INFORMATION
(1) 1 1/4" STUB TO NEAREST ACCESSIBLE CEILING (UON
ON RISER DIAGRAM)
N/A N/A DUPLEX -20A/120V
DB5 DISPLAY BOX W/ AV TELECOM AND POWER WIREMOLD EFSB4 FLUSH (UON) - REFER TO PLANS AND
ELEVATIONS FOR MOUNTING HEIGHT
INFORMATION
(1) 1 1/4" STUB TO NEAREST ACCESSIBLE CEILING (UON
ON RISER DIAGRAM)
(1) 1" STUB TO NEAREST ACCESSIBLE CEILING (UON) DUPLEX -20A/120V
DB8 FIRE-RATED DISPLAY BOX W/ AV TELECOM
AND POWER
FSR PWB-FR-450 FLUSH (UON) - REFER TO PLANS AND
ELEVATIONS FOR MOUNTING HEIGHT
INFORMATION
(1) 1 1/4" STUB TO NEAREST ACCESSIBLE CEILING (UON
ON RISER DIAGRAM)
(1) 1" STUB TO NEAREST ACCESSIBLE CEILING (UON) DUPLEX -20A/120V
DC6 DISPLAY BOX W/ AV TELECOM AND POWER NIGEL B. NB-PEBPM ABOVE ACCESSIBLE CEILING - REFER TO
DETAIL FOR MOUNTING INFORMATION
N/A N/A N/A J-HOOK TO CABLE TRAY BUILT-IN AC POWER OUTLETS - 20A/120V
FB10 FLOOR BOX W/ AV TELECOM AND POWER WIREMOLD EFB6S FLUSH WITH FINISHED FLOOR (2) 1 1/4" STUB TO NEAREST ACCESSIBLE CEILING (UON
ON RISER DIAGRAM)
(1) 1 1/4" STUB TO NEAREST ACCESSIBLE CEILING (UON) DOUBLE DUPLEX - 20A/120V
FB30 FLOOR BOX W/ TELECOM AND POWER WIREMOLD EFBFF FLUSH WITH FINISHED FLOOR N/A N/A (1) 1 1/4" STUB TO NEAREST ACCESSIBLE CEILING (UON) PASS-THRU / HARD WIRED TO FURNITURE SYSTEMS.
SEE ELECTRICAL PLANS FOR INFORMATION.
FB31 FLOOR BOX W/ TELECOM AND POWER WIREMOLD RFBA2R30 FLUSH WITH FINISHED FLOOR N/A N/A (1) 1 1/4" STUB TO NEAREST ACCESSIBLE CEILING (UON) DUPLEX - 20A/120V FB34 FLOOR BOX W/ TELECOM AND POWER WIREMOLD EFB6S FLUSH WITH FINISHED FLOOR N/A N/A (3) 1 1/4" STUB TO NEAREST ACCESSIBLE CEILING (UON) TRIPLE DUPLEX - 20A/120V
PT10 FLOOR RECESS POKE-THRU W/ AV TELECOM
AND POWER
WIREMOLD 6AT FLUSH WITH FINISHED FLOOR (1) 1 1/4" STUB TO NEAREST ACCESSIBLE CEILING (UON
ON RISER DIAGRAM)
(1) 1 1/4" STUB TO NEAREST ACCESSIBLE CEILING (UON) DUPLEX - 20A/120V
PT33 FLOOR RECESS FURNITURE FEED
POKE-THRU W/ TELECOM AND POWER
WIREMOLD 4FFATC15 FLUSH WITH FINISHED FLOOR N/A N/A (1) 1 1/2" STUB TO NEAREST ACCESSIBLE CEILING (UON) PASS-THRU / HARD WIRED TO FURNITURE SYSTEMS.
SEE ELECTRICAL PLANS FOR INFORMATION.
RK1 EQUIPMENT RACK PULL BOX W/ AV TELECOM
AND POWER
FSR WB-X2-GNG PROJECT STANDARD OUTLET HEIGHT - FLUSH
(UON) - REFER TO ARCH. DRAWINGS
(2) 1 1/4" STUB TO NEAREST ACCESSIBLE CEILING (UON
ON RISER DIAGRAM)
(1) 1 1/4" STUB TO NEAREST ACCESSIBLE CEILING (UON) DUPLEX - 20A/120V DEDICATED CIRCUIT
RK2 EQUIPMENT RACK PULL BOX W/ AV TELECOM
AND POWER
FSR WB-X3-GNG PROJECT STANDARD OUTLET HEIGHT - FLUSH
(UON) - REFER TO ARCH. DRAWINGS
(3) 1 1/4" STUB TO NEAREST ACCESSIBLE CEILING (UON
ON RISER DIAGRAM)
(1) 1 1/4" STUB TO NEAREST ACCESSIBLE CEILING (UON) DOUBLE DUPLEX - 20A/120V DUAL DEDICATED
CIRCUITS
RP PATIENT ROOM SIGNAGE DOUBLE-GANG 4-11/16" SQUARE BOX 48" - FLUSH (UON) (1) 1 1/4" STUB TO NEAREST ACCESSIBLE CEILING, J-HOOK
TO CABLE TRAY
(1) 1 1/4" STUB TO NEAREST ACCESSIBLE CEILING, J-HOOK TO CABLE
TRAY
N/A
SYMBOL SHEET NOTES
FINAL CONSTRUCTION DOCUMENTS 23JAN26
BID ADDENDUM-E 28MAY26
E
MISC
WATER
A,1 N 1049396.97 E 762103.57
A,5N 104960X.XXE 76214X.XX
C,5N 104959X.XXE 7622XX.XX
CST-4
CST-4
CST-4
CST-4
CST-4
CST-4
CST-4
CST-4
CST-4
CST-4
CST-4
SC-2
A.
B.
C.
D.
E.
F.
G.
H.
REFER TO CIVIL AND ELECTRICAL SITE UTILITY DRAWINGS FOR
PATHWAYS SERVING OUTSIDE PLANT COMMUNICATIONS
CABLING AND OTHER SITE RELATED EXTERIOR ICT DEVICES
SUCH AS DUCT BANKS, MANHOLES, AND HANDHOLES.
CONTRACTOR TO FIELD VERIFY PATHWAYS AND SITE
CONDITIONS.
CONTRACTOR TO CONFIRM NEW CONNECTIVITY FROM SSB TO
EXISTING HOSPITAL IS TESTED AND OPERATIONAL PRIOR TO
DEMOLITION AND NEW SITE WORK ASSOCIATED WITH NEW
HOSPITAL.
CONDUIT ROUTING, MANHOLES AND HANDHOLES ARE SHOWN
FOR COORDINATION PURPOSES ONLY. CONTRACTOR TO FIELD
VERIFY EXACT LOCATIONS AND COORDINATE WITH OTHER
UTILITIES AS REQUIRED AND PROVIDE ADDITIONAL MANHOLES
AND/OR HANDHOLES AS REQUIRED PER THE PROJECT
STANDARDS AND TELECOMMUNICATIONS BEST PRACTICES FOR
PROVIDING EVERY (2) 90 DEGREES OF BEND OR EVERY 150'.
ALL SITE CONDUITS AND PATHWAYS SHALL BE IN CONCRETE
ENCASED DUCTBANK.
CONTRACTOR IS RESPONSIBLE FOR MAINTAINING
CONNECTIVITY TO EXISTING HOSPITAL THROUGHOUT
CONSTRUCTION.
CONTRACTOR TO COORDINATE WITH IHS AS REQUIRED FOR
DISCONNECTION OF SERVICES AT EXISTING FACILITY UPON
COMPLETION OF NEW FACILITY. CONTRACTOR TO DEMO AND
REMOVE DUCT BANKS AND CABLING NOT REQUIRED FOR THE
NEW FACILITY.
MANHOLE / MAINTENANCE HOLE NUMBERING SCHEMES ON THE
PLANS ARE FOR COORDINATION PURPOSES ONLY. CONTRACTOR
TO PROVIDE FINAL LABELING SCHEME WITH ALL HANDHOLES,
MANHOLES, AND ACCESS POINTS. CONTRACTOR TO
COORDINATE WITH IHS AS REQUIRED FOR LABELING SCHEME.
GENERAL SHEET NOTES
MHNEW MANHOLE
MH-001
(8) 4" C
MATCH LINE
SHEET T1.1.2
MATCH LINE
SHEET T1.1.2
MH
MHNEW MANHOLE
MH-003
EXISTING MANHOLE MH-008
COORDINATE PATHWAYS AND
CONNECTIVITY. PROTECT
EXISTING UTILITIES AS REQUIRED.
EXISTING
PATHWAY
T111
SSB BUILDING
EXISTING
DIALYSIS BUILDING
EXISTING
PRIMARY SITE ENTRY
(VISITOR ENTRY)
3/4 ACCESS
SECONDARY SITE ENTRY
(EMERGENCY ENTRY)
FULL ACCESS
PRIMARY SITE ENTRY
(TRAFFIC SIGNAL)
FULL ACCESS
GARRETT BUILDING
EXISTING
HOSPITAL
EXISTING
AZ-73
402 OLD SAW MILL ROAD
402 OLD SAW MILL ROAD
W 36TH DRIVE
N
PO
W
ER
LIN
E
RO
AD
COMMANCHE DRIVE
CHOCTAW DRIVE
AP
AC
HE
C
IR
CL
E
KIOWA DRIVE
APACHE CIRCLE
AP
AC
HE
C
IR
CL
E KUPER DRIVE
APACHE CIRCLE
HOPI DRIVE
NAVAJO DRIVE
VISITOR PARKING - EAST
69 SPACES
NORTH LOOP ROAD
6 SPACES
FACILITIES
7 SPACES
EMS BUILDING
(2 STORY)
EMS PARKING
5 SPACES
VISITOR PARKING - ED
77 SPACES
EXISTING - SBS + ADMIN
136 SPACES
VISITOR PARKING - SOUTH
285 SPACES
APPROXIMATE LOCATION
EXISTING HOSPITAL TIE-IN
*PROPOSED
PEDESTRIAN
CONNECTION TO
STAFF HOUSE
T115
(4) 4" C
(4) 4" C
MH
MH
T120
T119
(4) 4" C
(4) 4" C
T111
(4) 4" C
REFERENCE BP4 DOCUMENTATION
FOR DEVICE LOCATIONS AND
INFORMATION.
MHNEW MANHOLE
MH-004
FOR FUTURE STAFF
QUARTERS CONNECTIVITY
(2) 4" C
SC-2
NEW HOSPITAL
PHASE 1
CENTRAL
PLANT
(1 STORY)
T126
T126
PUMP HOUSE
(TYP)
T128
(TYP)
T130
NEW MANHOLE
MH-006
ADMIN
BUILDING
EXISTING
NEW MANHOLE
MH-005
(2) 4" C
E
SHEET NUMBER
PROJECT NUMBER
SEALS AND SIGNATURES
ISSUED FOR DATE
Pl ot
Da te:
IHS Whiteriver Hospital 200 W Hospital Drive Whiteriver, Arizona, 85941
IHS Project #: 131445 IHS Contract #: 75H70123R00008 IHS Award Date: 02/02/2024
455 NORTH THIRD STREET
SUITE 250
PHOENIX, AZ 85004
602.265.2200 smithgroup.com
Drawn By: Checked By:
BASED ON PROGRAM OF REQUIREMENTS DATED [ 03/26/22],
POR AMENDMENT DATED [ 02/03/25], AND ON SCHEMATIC
DRAWINGS APPROVED [11/19/24].
5/2 7/2
6 4
:26 :30
P M
ICT SITE PLAN - PHASE 1 -
AREA 1
T1.1.1CD
Vo llm er
14904 Vollmer Foster
0 100' 200' 300'
GRAPHIC SCALE: 1" = 100' - 0"
SHEET KEYNOTES
T111 PRIOR TO DEMOLITION AND SITE WORK ASSOCIATED WITH
NEW HOSPITAL, CONTRACTOR TO PROVIDE AND INSTALL
CONDUITS TO ESTABLISH CONNECTIVITY BETWEEN SPECIAL
SERVICES BUILDING (SSB), AND EXISTING HOSPITAL.
CONTRACTOR TO PROVIDE, INSTALL AND TERMINATE
48-STRANDS OF SMFO AND 100-PAIR COPPER FROM
EXISTING HOSPITAL TO SSB AND TERMINATE IN EXISTING
HOSPITAL MDF. FROM ROUTE 73, PRIOR TO THE DEMOLITION
AND SITE WORK ASSOCIATED WITH THE NEW HOSPITAL,
INSTALL NEW DUCT BANK AND MANHOLE INFRASTRUCTURE
TO MAINTAIN EXISTING SERVICES TO EXISTING HOSPITAL
VIA SSB CAMPUS MPOE/DATA CENTER. TIE INTO EXISTING
MANHOLES AND PROVIDE NEW AS INDICATED. PROVIDE,
TERMINATE, AND TEST NEW CONNECTIVITY TO EXISTING
HOSPITAL VIA NEW PATHWAY FROM SSB.
T115 COORDINATE WITH SERVICE PROVIDER AS REQUIRED TO
MAINTAIN CONNECTIVITY TO EXISTING BUILDING.
COORDINATE TERMINATION LOCATIONS WITH SERVICE
PROVIDER AND EXISTING AERIAL FIBER CABLING. EXTEND
AND RELOCATE EXISTING SERVICES FROM ROUTE 73 VIA
NEW DUCTBANK TO SSB.
T119 CONSOLIDATE DATA FOR STAFF AND PATIENT PARKING
AREA INTO MANHOLE MH-006.
T120 ALL CABLING DATA TO BE INSTALLED VIA SPLICE CASE IN
MANHOLE TO FACILITATE TRANSITION OF CONNECTIVITY TO
NEW HOSPITAL PRIOR TO DEMOLITION OF EXISTING
HOSPITAL.
T126 COORDINATE LOCATION WITH OWNER AND SECURITY
PLANS PRIOR TO FINAL INSTALLATION. TERMINATE IN SSB
TELECOM ROOM.
T128 TERMINATE CONDUITS AT MANHOLE MH-006. ROUGH-IN
CABLING TO PUMP HOUSE IDF.
T130 DATA FOR STANCHION MOUNTED EMERGENCY BLUE PHONE
WITH MOUNTING ARM FOR 360 CAMERA AND INTEGRATED
PTZ CAMERA. CONTRACTOR TO PROVIDE AND INSTALL
COMPOSITE CABLE AS PART OF A POE EXTENDER SYSTEM
PER DIVISION 27 SPECIFICATIONS SECTION 271500 2.7 - 2.10.
PROVIDE (1) 2" CONDUIT AS REQUIRED FROM CST STUBBED
DIRECTLY INTO NEAREST TELECOM ROOM IN NEW
HOSPITAL. PROVIDE HANDHOLE FOR CABLE ACCESS EVERY
300' OR EVERY 180 DEGREE OF BEND.
PROJECT NORTH
SCALE: 1" = 100'-0"
ICT SITE PLAN - PHASE 1 - AREA 1
FINAL CONSTRUCTION DOCUMENTS 23JAN26
BID ADDENDUM-D 20MAY26
D
WATER
A,1 N 1049396.97 E 762103.57
A,5N 104960X.XXE 76214X.XX
C,5N 104959X.XXE 7622XX.XX
SU
RG
ER
Y
VIS
ITO
R
SU
RG
ER
Y
VIS
ITO
R
SU
RG
ER
Y
VIS
ITO
R
CST-4
CST-4
CST-4
CST-4
CST-4
CST-4
CST-4
CST-4
CST-4
CST-4
CST-4
CST-4
CST-4
CST-4
CST-4
CST-4
CST-4
CST-4
CST-4
CST-4
CST-4
CST-4
CST-4
CST-4
CST-4
CST-4
CST-4
CST-4
CST-4
CST-4
SC-2
CST-4
MH
EXISTING MANHOLE MH-008
COORDINATE PATHWAYS AND
CONNECTIVITY. PROTECT
EXISTING UTILITIES AS REQUIRED.
(8) 4" C
NEW MANHOLE
MH-007
(8) 4" C
(4) 4" C
MATCH LINE
SHEET T1.2.2
MATCH LINE
SHEET T1.2.2
EXISTING
PATHWAY
MH
T115 T117
T116
402 OLD SAW MILL ROAD
AP
AC
HE
C
IR
CL
E
PRIMARY SITE ENTRY
(VISITOR ENTRY)
3/4 ACCESS
SECONDARY SITE ENTRY
(EMERGENCY ENTRY)
FULL ACCESS
PRIMARY SITE ENTRY
(TRAFFIC SIGNAL)
FULL ACCESS
ADMIN
BUILDING
EXISTING
SSB BUILDING
EXISTING
DIALYSIS BUILDING
EXISTING
AZ-73
402 OLD SAW MILL ROAD
W 36TH DRIVE
N
PO
W
ER
LIN
E
RO
AD
COMMANCHE DRIVE
CHOCTAW DRIVE
AP
AC
HE
C
IR
CL
E
KIOWA DRIVE
APACHE CIRCLE
AP
AC
HE
C
IR
CL
E KUPER DRIVE
APACHE CIRCLE
HOPI DRIVE
NAVAJO DRIVE
VISITOR PARKING - EAST
69 SPACES
*PROPOSED
PEDESTRIAN
CONNECTION TO
STAFF HOUSE
NORTH LOOP ROAD
6 SPACES
FACILITIES
7 SPACES
EMS PARKING
5 SPACES
VISITOR PARKING - ED
77 SPACES
STAFF - NW
EXTENSION
88 SPACES
EXISTING - SBS + ADMIN
136 SPACES
T113
T114
VISITOR PARKING - SOUTH
285 SPACES
T115
(4) 4" C
MHNEW MANHOLE
MH-001
MHNEW MANHOLE
MH-003
(4) 4" C
MH
MH
(4) 4" C
T116
(8) 4" C
T118
402 OLD SAW MILL ROAD
(4) 4" C
MHNEW MANHOLE
MH-004
FOR FUTURE STAFF
QUARTERS CONNECTIVITY
(2) 4" C
SC-2
T121
T121
T121
SCP-4
SCP-4
SCP-4
SC-S-1
SC-S-1
SC-S-1
GOVERNMENT
LOT
72 SPACES
SC-S-1
SC-S-1
SC-S-1
SC-S-1
SC-S-1
SC-S-1
SC-S-1
SC-S-1
SC-S-1
STAFF - MAINLOT
551 SPACES
T122 T122
T122
ALT6
ALT6
ALT6
NEW HOSPITAL
PHASE 2
CENTRAL
PLANT
(1 STORY)
FS-2
FS-2
FS-2
T125
T125
FS-2
FS-2
T125
T125
T125
FS-4
T124
FS-2
T123
MH
NEW MANHOLE
MH-009
T122ALT6
REFERENCE BP4 DOCUMENTATION
FOR DEVICE LOCATIONS AND
INFORMATION.
PUMP HOUSE
CST-4
CST-4
CST-4
CST-4
MS-6
T122ALT6
T122ALT6
T122ALT6
SCP-1
NEW MANHOLE
MH-006
(TYP)
T131
T129
(TYP)
T130
NEW MANHOLE
MH-005
(2) 4" C
E
A.
B.
C.
D.
E.
F.
REFER TO CIVIL AND ELECTRICAL SITE UTILITY DRAWINGS FOR
PATHWAYS SERVING OUTSIDE PLANT COMMUNICATIONS
CABLING AND OTHER SITE RELATED EXTERIOR ICT DEVICES.
CONTRACTOR TO FIELD VERIFY PATHWAYS AND SITE
CONDITIONS.
CONTACTOR TO CONFIRM NEW CONNECTIVY FROM SSB TO
EXISTING HOSPITAL IS TESTED AND OPERATIONAL PRIOR TO
DEMOLITION AND NEW SITE WORK ASSOCIATED WITH NEW
HOSPITAL.
CONDUIT ROUTING, MANHOLES AND HANDHOLES ARE SHOWN
FOR COORDINATION PURPOSES ONLY. CONTRACTOR TO FIELD
VERIFY EXACT LOCATIONS AND COORDINATE WITH OTHER
UTILITIES AS REQUIRED AND PROVIDE ADDITIONAL MANHOLES
AND/OR HANDHOLES AS REQUIRED PER THE PROJECT
STANDARDS AND TELECOMMUNCATIONS BEST PRACTICES.
ALL SITE CONDUITS AND PATHWAYS SHALL BE IN CONCRETE
ENCASED DUCTBANK.
CONTRACTROR IS RESPONSIBLE FOR MAINTAINING
CONNECTIVITY TO EXISTING HOSPITAL THROUGHOUT
CONSTRUCTION.
GENERAL SHEET NOTES
SHEET NUMBER
PROJECT NUMBER
SEALS AND SIGNATURES
ISSUED FOR DATE
Pl ot
Da te:
IHS Whiteriver Hospital 200 W Hospital Drive Whiteriver, Arizona, 85941
IHS Project #: 131445 IHS Contract #: 75H70123R00008 IHS Award Date: 02/02/2024
455 NORTH THIRD STREET
SUITE 250
PHOENIX, AZ 85004
602.265.2200 smithgroup.com
Drawn By: Checked By:
BASED ON PROGRAM OF REQUIREMENTS DATED [ 03/26/22],
POR AMENDMENT DATED [ 02/03/25], AND ON SCHEMATIC
DRAWINGS APPROVED [11/19/24].
5/2 7/2
6 4
:26 :49
P M
ICT SITE PLAN - PHASE 2 -
AREA 1
T1.2.1CD
Vo llm er
14904 Vollmer Foster
SHEET KEYNOTES
ALT6 ADD OPTION 06: PV SYSTEM
T113 PROVIDE AND INSTALL 12-STRANDS SMFO AND 25-PAIR
COPPER FROM NEW HOSPITAL TO PUMP HOUSE.
T114 PROVIDE AND INSTALL 12-STRANDS SMFO AND 25-PAIR
COPPER FROM NEW HOSPITAL, COIL AND PROTECT FOR
FUTURE SPLICING TO SUPPORT FUTURE MOB.
T115 COORDINATE WITH SERVICE PROVIDER AS REQUIRED TO
MAINTAIN CONNECTIVITY TO EXISTING BUILDING.
COORDINATE TERMINATION LOCATIONS WITH SERVICE
PROVIDER AND EXISTING AERIAL FIBER CABLING. EXTEND
AND RELOCATE EXISTING SERVICES FROM ROUTE 73 VIA
NEW DUCTBANK TO SSB.
T116 GC TO COORDINATE WITH OWNER AND SERVICE PROVIDER
FOR SITE CONNECTIVITY.
T117 DATA FOR LED MONUMENT SIGN, CONTRACTOR TO PROVIDE
AND INSTALL COMPOSITE CABLE AS PART OF A POE
EXTENDER SYSTEM PER DIVISION 27 SPECIFICATIONS
SECTION 271500 2.7 - 2.10. TERMINATE IN NEAREST MDF.
REFER TO SIGNAGE DRAWINGS FOR ADDITIONAL
INFORMATION.
T118 PROVIDE AND INSTALL 12-STRANDS SMFO AND 25-PAIR
COPPER FROM NEW HOSPITAL TO LIFT STATION.
T121 FUTURE EV CHARGING LOCATION. PROVIDE (1) DATA CABLE
AT EACH LOCATION. PROVIDE 1-1/2" CONDUIT WITH
PULL-STRING. CONDUIT TO STUB-UP INTO CHARGING
BOLLARD / PEDESTAL. REFER TO ELECTRICAL SITE PLAN
E1.1 FOR EV CHARGING LOCATIONS.
T122 PER ADD OPTION 06, CONTRACTOR TO PROVIDE AND
INSTALL VIDEO SURVEILLANCE CAMERAS AS INDICATED ON
THE PLANS IF ALTERNATE IS ACCEPTED. IF ALTERNATE IS
NOT ACCEPTED, CONTRACTOR SHALL PROVIDE AND
INSTALL EMERGENCY HELP POINTS IN THE CURRENTLY
DESIGNED CAMERA LOCATIONS. EMERGENCY HELP POINTS
IN THESE LOCATIONS WILL BE IDENTICAL TO THE OTHERS
ON THE SITE.
T123 LOCATION FOR WIRELESS NETWORK BOLLARD COORDINATE
WITH EQUIPMENT PROVIDER. REFER TO SPECIFICATION
271500 SECTION 2.4 FOR BOLLARD INFORMATION.
T124 CONDUIT STUB UP TO NEMA RATED ENCLOSURE,
TERMINATE 4-PORT FACEPLATE INSIDE.
T125 DATA RESERVED FOR FOUNTAIN SYSTEM VAULT.
COORDINATE FINAL LOCATION AND REQUIREMENTS WITH
FOUNTAIN CONTROL SYSTEM.
T129 DATA FOR LICENSE PLATE RECOGNITION CAMERA AND
VIDEO INTERCOM, CONTRACTOR TO PROVIDE AND INSTALL
COMPOSITE CABLE AS PART OF A POE EXTENDER SYSTEM
PER DIVISION 27 SPECIFICATIONS SECTION 271500 2.7 - 2.10.
PROVIDE (1) 2" CONDUIT AS REQUIRED FROM DEVICE
DIRECTLY INTO NEAREST TELECOM ROOM. PROVIDE
HANDHOLE FOR CABLE ACCESS EVERY 300' OR EVERY 180
DEGREE OF BEND. CARD READER CABLING MAY SHARE
PATHWAYS AS REQUIRED. REFERENCE DIVISION 28 FOR
CABLING SPECIFICATIONS.
T130 DATA FOR STANCHION MOUNTED EMERGENCY BLUE PHONE
WITH MOUNTING ARM FOR 360 CAMERA AND INTEGRATED
PTZ CAMERA. CONTRACTOR TO PROVIDE AND INSTALL
COMPOSITE CABLE AS PART OF A POE EXTENDER SYSTEM
PER DIVISION 27 SPECIFICATIONS SECTION 271500 2.7 - 2.10.
PROVIDE (1) 2" CONDUIT AS REQUIRED FROM CST STUBBED
DIRECTLY INTO NEAREST TELECOM ROOM IN NEW
HOSPITAL. PROVIDE HANDHOLE FOR CABLE ACCESS EVERY
300' OR EVERY 180 DEGREE OF BEND.
T131 DATA FOR LICENSE PLATE RECOGNITION CAMERA AND
SECURITY CAMERA MOUNTED TO 12' POLE. CONTRACTOR
TO PROVIDE AND INSTALL COMPOSITE CABLE AS PART OF A
POE EXTENDER SYSTEM PER DIVISION 27 SPECIFICATIONS
SECTION 271500 2.7 - 2.10. PROVIDE (1) 2" CONDUIT AS
REQUIRED FROM LPR STUBBED DIRECTLY INTO NEAREST
TELECOM ROOM IN NEW HOSPITAL. PROVIDE HANDHOLE
FOR CABLE ACCESS EVERY 300' OR EVERY 180 DEGREE OF
BEND. REFER TO TY SERIES DRAWING FOR ADDITIONAL
INFORMATION.
0 100' 200' 300'
GRAPHIC SCALE: 1" = 100' - 0"
PROJECT NORTH
SCALE: 1" = 100'-0"
ICT SITE PLAN - PHASE 2 - AREA 1
FINAL CONSTRUCTION DOCUMENTS 23JAN26
BID ADDENDUM-D 20MAY26
BID ADDENDUM-E 28MAY26
C.
D.
E.
F.
REFER TO ICT SITE PLAN AND CIVIL SITE PLAN FOR OUTSIDE
PLANT PATHWAY INFORMATION AND ROUTING.
BUILDING RISERS ARE FOR DIAGRAMMATIC PURPOSES.
CONTRACTOR TO VERIFY PATHWAYS AND ROUTE IN FIELD.
PER RISER DIAGRAM CONTRACTOR SHALL RUN FIBER
BACKBONE CABLING CONNECTING MDF TO MDF ROOMS IN A
REDUNDANT AND DIVERSE PATHWAY SYSTEM. THIS CABLING
SHALL NOT SHARE PATHWAYS.
PER RISER DIAGRAM CONTRACTOR SHALL RUN COPPER
BACKBONE CABLING CONNECTING MDF TO MDF ROOMS IN A
REDUNDANT AND DIVERSE PATHWAY SYSTEM. THIS CABLING
SHALL NOT SHARE PATHWAYS.
SYSTEMS RISER DIAGRAMS ARE DIAGRAMMATICAL AND
REPRESENTATIVE OF THE INTERCONNECTIVITY OF DEVICES
WITHIN EACH SYSTEM. FOR INTEGRATION WITH OTHER
SYSTEMS, REFERENCE SYSTEMS INTEGRATION MATRIX AND
INDIVIDUAL SPECIFICATIONS IN DIVISIONS 27 AND 28 FOR MORE
INFORMATION.
REFER TO CIVIL AND ELECTRICAL DRAWINGS FOR MANHOLE
DETAILS.
GENERAL SHEET NOTES
MDF-2075
04 LEVEL
03 LEVEL
02 LEVEL
01 LEVEL
ROOF
04 LEVEL
03 LEVEL
02 LEVEL
01 LEVEL
ROOF
IDF-1054
IDF-2057
IDF-3058
IDF-4058 IDF-4038
IDF-3038
IDF-2045
IDF-1019
IDF-4008
IDF-3016
IDF-2013
MDF-1013
(12) 4" CONDUITS FOR INCOMING SERVICE
(12) 4" CONDUITS FOR INCOMING SERVICE
SERV ENT ELC-1015
(8) 4" EZ-PATH SLEEVES
(8) 4" EZ-PATH SLEEVES
(8) 4" EZ-PATH SLEEVES
(4) 4" CONDUITS TO ROOF
FOR SATELITE AND ANTENNA COMMUNICATIONS
(4) 4" EZ-PATH SLEEVES (8) 4" EZ-PATH SLEEVES
(4) 4" EZ-PATH SLEEVES
(4) 4" EZ-PATH SLEEVES(4) 4" EZ-PATH SLEEVES
(8) 4" EZ-PATH SLEEVES
SERV ENT ELC-2079
(4) 4" CONDUITS TO ROOF
FOR SATELITE AND ANTENNA COMMUNICATIONS
(4) 4" CONDUITS TO ROOF
FOR SATELITE AND ANTENNA COMMUNICATIONS
IDF IPC-1330MDF IPC- 1329
(4) 4" CONDUITS
(2) 4" CONDUIT (1) 4" CONDUIT
CONNECTING TUNNEL
T501
T501
EQUIPMENT STORAGE OEH-2405 EMS BUILDING
IHS WHITERIVER HOSPITAL (NEW CONSTRUCTION)
(2) 4" CONDUITS(2) 4" CONDUITS
IDF-1381
SERV ENT ELC-2079
SERV ENT ELC-1015 PUMP HOUSE
(4) 4" CONDUITS
NEW MANHOLE
MH-007
CONNECTION TO SERVICE PROVIDER
MANHOLE
MH-009
MANHOLE
MH-001
(4) 4" CONDUITS
FOR INCOMING
SERVICE (4) 4" CONDUITS FOR
INCOMING SERVICE
MONUMENT SIGN
SEE SITE PLAN
FOR LOCATION
AND QUANTITY
(1) 2" CONDUIT
T501
T501
(4) 4" CONDUITS
(4) 4" CONDUITS
(4) 4" CONDUITS
(4) 4" CONDUITS
(8) 4" CONDUITS
MANHOLE
MH-008
SPECIALTY SERVICES BUILDINGEXISTING CONDUITS
MANHOLE
MH-003
MANHOLE
MH-004
(4) 4" CONDUITS
LIFT STATION
(1) 2" CONDUIT
NEW MANHOLE
MH-005
(4) 4" CONDUITS (2) 4" CONDUITS
NEW MANHOLE
MH-006
IHS WHITERIVER HOSPITAL (EXISTING) SPECIALITY SERVICES BUILDING
(SSB)
(4) 4" CONDUITS
EXISTING MANHOLE SERVICE PROVIDER CONNECTION
T501
ICT SYMBOLS
ICT BUILDING RISER COMPONENTS
TELECOM GROUNDING BUS BAR, WALL MOUNTTGB
LIGHTING - PROTECTION BLOCK, WALL MOUNTCABLE
PROTECTION
COPPER PATCH PANEL, RACK MOUNTCOPPER
OPTICAL FIBER PATCH PANEL, RACK MOUNTOPTICAL
FIBER
ALL ABBREVIATIONS, SYMBOLS AND LEGENDS SHOWN ON THIS
DRAWING ARE NOT NECESSARILY USED
CABLE PATHWAY
(SEE DRAWINGS FOR INFORMATION ON
PATHWAY TYPE)
TELECOM MAIN GROUNDING BUS BAR, WALL MOUNTTMGB
66/110 - STYLE PUNCHDOWN BLOCK, WALL MOUNT#
CATV HEAD END EQUIPMENTCATV
CATV TAPCATV TAP
SHEET NUMBER
PROJECT NUMBER
SEALS AND SIGNATURES
ISSUED FOR DATE
Pl ot
Da te:
IHS Whiteriver Hospital 200 W Hospital Drive Whiteriver, Arizona, 85941
IHS Project #: 131445 IHS Contract #: 75H70123R00008 IHS Award Date: 02/02/2024
455 NORTH THIRD STREET
SUITE 250
PHOENIX, AZ 85004
602.265.2200 smithgroup.com
Drawn By: Checked By:
BASED ON PROGRAM OF REQUIREMENTS DATED [ 03/26/22],
POR AMENDMENT DATED [ 02/03/25], AND ON SCHEMATIC
DRAWINGS APPROVED [11/19/24].
5/2 7/2
6 4
:58 :20
P M
ICT BUILDING RISER
T5.0CD
Vo llm er
14904 Vollmer Foster
SHEET KEYNOTES
T501 REFER TO SPECIFICATION 270528 SECTION 2.12 FOR
INNERDUCT INFORMATION, TYP.
SCALE: NOT TO SCALE1 ICT BUILDING RISER - HOSPITAL INTERIOR PATHWAYS
SCALE: NOT TO SCALE2 ICT BUILDING RISER - SITE PATHWAYS
SCALE: NOT TO SCALE3 ICT BUILDING RISER - SITE PATHWAYS OF EXISTING HOSPITAL
FINAL CONSTRUCTION DOCUMENTS 05MAR26
OPTICAL
FIBER
OPTICAL
FIBER
OPTICAL
FIBER
OPTICAL
FIBER
OPTICAL
FIBER
OPTICAL
FIBER
A.
B.
C.
D.
E.
F.
REFER TO ICT SITE PLAN AND CIVIL SITE PLAN FOR OUTSIDE
PLANT PATHWAY INFORMATION AND ROUTING.
BUILDING RISERS ARE FOR DIAGRAMMATIC PURPOSES.
CONTRACTOR TO VERIFY PATHWAYS AND ROUTE IN FIELD.
PER RISER DIAGRAM CONTRACTOR SHALL RUN FIBER
BACKBONE CABLING CONNECTING MDF TO MDF ROOMS IN A
REDUNDANT AND DIVERSE PATHWAY SYSTEM. THIS CABLING
SHALL NOT SHARE PATHWAYS.
PER RISER DIAGRAM CONTRACTOR SHALL RUN COPPER
BACKBONE CABLING CONNECTING MDF TO MDF ROOMS IN A
REDUNDANT AND DIVERSE PATHWAY SYSTEM. THIS CABLING
SHALL NOT SHARE PATHWAYS.
SYSTEMS RISER DIAGRAMS ARE DIAGRAMMATICAL AND
REPRESENTATIVE OF THE INTERCONNECTIVITY OF DEVICES
WITHIN EACH SYSTEM. FOR INTEGRATION WITH OTHER
SYSTEMS, REFERENCE SYSTEMS INTEGRATION MATRIX AND
INDIVIDUAL SPECIFICATIONS IN DIVISIONS 27 AND 28 FOR MORE
INFORMATION.
REFER TO CIVIL AND ELECTRICAL DRAWINGS FOR MANHOLE
DETAILS.
GENERAL SHEET NOTES
ICT SYMBOLS
ICT BUILDING RISER COMPONENTS
TELECOM GROUNDING BUS BAR, WALL MOUNTTGB
LIGHTING - PROTECTION BLOCK, WALL MOUNTCABLE
PROTECTION
COPPER PATCH PANEL, RACK MOUNTCOPPER
OPTICAL FIBER PATCH PANEL, RACK MOUNTOPTICAL
FIBER
ALL ABBREVIATIONS, SYMBOLS AND LEGENDS SHOWN ON THIS
DRAWING ARE NOT NECESSARILY USED
CABLE PATHWAY
(SEE DRAWINGS FOR INFORMATION ON
PATHWAY TYPE)
TELECOM MAIN GROUNDING BUS BAR, WALL MOUNTTMGB
66/110 - STYLE PUNCHDOWN BLOCK, WALL MOUNT#
CATV HEAD END EQUIPMENTCATV
CATV TAPCATV TAP
ELECTRICAL ELC-2083 EMS BUILDING
IHS WHITERIVER HOSPITAL
(NEW CONSTRUCTION)
IDF-1381
SERV ENT ELC-2079
SERV ENT ELC-1015 PUMP HOUSEWATER TREATMENT
FACILITY /
WATER TOWER
NEW MANHOLE
MH-007
CONNECTION TO
SERVICE PROVIDER
EXISTING
MANHOLE
MH-009
NEW MANHOLE
MH-001
CONNECTION TO SERVICE PROVIDER
INCOMING SERVICE INCOMING SERVICE
(1) 24-STRAND SM (1) 24-STRAND SM (1) 24-STRAND SM
EXISTING
MANHOLE
MH-008
ANTENNA
T503 OUTDOOR EQUIPMENT STORAGE
ANTENNA
NEW MANHOLE
MH-006
ROUTE TEMPORARY
PARKING LOT CABLING
THROUGH NEW MH-006
AND NEW MH-005
12-STRANDS SMFO
NEW MANHOLE
MH-005
12-STRANDS SMFO
SHEET NUMBER
PROJECT NUMBER
SEALS AND SIGNATURES
ISSUED FOR DATE
Pl ot
Da te:
IHS Whiteriver Hospital 200 W Hospital Drive Whiteriver, Arizona, 85941
IHS Project #: 131445 IHS Contract #: 75H70123R00008 IHS Award Date: 02/02/2024
455 NORTH THIRD STREET
SUITE 250
PHOENIX, AZ 85004
602.265.2200 smithgroup.com
Drawn By: Checked By:
BASED ON PROGRAM OF REQUIREMENTS DATED [ 03/26/22],
POR AMENDMENT DATED [ 02/03/25], AND ON SCHEMATIC
DRAWINGS APPROVED [11/19/24].
5/2 7/2
6 4
:58 :22
P M
ICT BUILDING RISER
T5.2CD
Vo llm er
14904 Vollmer Foster
SHEET KEYNOTES
T503 WASTE WATER TREATMENT PLANT TO BE CONNECTED TO
HOSPITAL CAMPUS VIA 60 GHZ MMWAVE RADIO.
SCALE: NOT TO SCALE1 ICT BUILDING RISER - FIBER SITE
FINAL CONSTRUCTION DOCUMENTS 05MAR26
COPPER COPPER
COPPER
COPPER
COPPER
COPPER
PROTECTION
BLOCK
COPPER
PROTECTION
BLOCK
COPPER
PROTECTION
BLOCK
COPPER
PROTECTION
BLOCK
COPPER
PROTECTION
BLOCK
A.
B.
C.
D.
E.
F.
REFER TO ICT SITE PLAN AND CIVIL SITE PLAN FOR OUTSIDE
PLANT PATHWAY INFORMATION AND ROUTING.
BUILDING RISERS ARE FOR DIAGRAMMATIC PURPOSES.
CONTRACTOR TO VERIFY PATHWAYS AND ROUTE IN FIELD.
PER RISER DIAGRAM CONTRACTOR SHALL RUN FIBER
BACKBONE CABLING CONNECTING MDF TO MDF ROOMS IN A
REDUNDANT AND DIVERSE PATHWAY SYSTEM. THIS CABLING
SHALL NOT SHARE PATHWAYS.
PER RISER DIAGRAM CONTRACTOR SHALL RUN COPPER
BACKBONE CABLING CONNECTING MDF TO MDF ROOMS IN A
REDUNDANT AND DIVERSE PATHWAY SYSTEM. THIS CABLING
SHALL NOT SHARE PATHWAYS.
SYSTEMS RISER DIAGRAMS ARE DIAGRAMMATICAL AND
REPRESENTATIVE OF THE INTERCONNECTIVITY OF DEVICES
WITHIN EACH SYSTEM. FOR INTEGRATION WITH OTHER
SYSTEMS, REFERENCE SYSTEMS INTEGRATION MATRIX AND
INDIVIDUAL SPECIFICATIONS IN DIVISIONS 27 AND 28 FOR MORE
INFORMATION.
REFER TO CIVIL AND ELECTRICAL DRAWINGS FOR MANHOLE
DETAILS.
GENERAL SHEET NOTES
ICT SYMBOLS
ICT BUILDING RISER COMPONENTS
TELECOM GROUNDING BUS BAR, WALL MOUNTTGB
LIGHTING - PROTECTION BLOCK, WALL MOUNTCABLE
PROTECTION
COPPER PATCH PANEL, RACK MOUNTCOPPER
OPTICAL FIBER PATCH PANEL, RACK MOUNTOPTICAL
FIBER
ALL ABBREVIATIONS, SYMBOLS AND LEGENDS SHOWN ON THIS
DRAWING ARE NOT NECESSARILY USED
CABLE PATHWAY
(SEE DRAWINGS FOR INFORMATION ON
PATHWAY TYPE)
TELECOM MAIN GROUNDING BUS BAR, WALL MOUNTTMGB
66/110 - STYLE PUNCHDOWN BLOCK, WALL MOUNT#
CATV HEAD END EQUIPMENTCATV
CATV TAPCATV TAP
EQUIPMENT STORAGE OEH-2405 EMS BUILDING
IHS WHITERIVER HOSPITAL (NEW CONSTRUCTION)
IDF IDF-1381
SERV ENT ELC-2079
SERV ENT ELC-1015
PUMP HOUSE
25-PAIR CAT5e 25-PAIR CAT5e
EXISTING
MANHOLE
MH-009
NEW MANHOLE
MH-001
CONNECTION TO SERVICE PROVIDER
INCOMING SERVICE
EXISTING
MANHOLE
MH-008
NEW MANHOLE
MH-007
CONNECTION TO
SERVICE PROVIDER
INCOMING SERVICE
NEW MANHOLE
MH-006
ROUTE TEMPORARY
PARKING LOT CABLING
THROUGH NEW MH-006
AND NEW MH-005
NEW MANHOLE
MH-005
25-PAIR CAT5e
25-PAIR CAT5e
SHEET NUMBER
PROJECT NUMBER
SEALS AND SIGNATURES
ISSUED FOR DATE
Pl ot
Da te:
IHS Whiteriver Hospital 200 W Hospital Drive Whiteriver, Arizona, 85941
IHS Project #: 131445 IHS Contract #: 75H70123R00008 IHS Award Date: 02/02/2024
455 NORTH THIRD STREET
SUITE 250
PHOENIX, AZ 85004
602.265.2200 smithgroup.com
Drawn By: Checked By:
BASED ON PROGRAM OF REQUIREMENTS DATED [ 03/26/22],
POR AMENDMENT DATED [ 02/03/25], AND ON SCHEMATIC
DRAWINGS APPROVED [11/19/24].
5/2 7/2
6 4
:58 :24
P M
ICT BUILDING RISER
T5.4CD
Vo llm er
14904 Vollmer Foster
SHEET KEYNOTES
SCALE: NOT TO SCALE1 ICT BUILDING RISER - COPPER SITE
FINAL CONSTRUCTION DOCUMENTS 05MAR26
C.
D.
E.
F.
THE SECURITY DRAWINGS ARE A SUBSET OF THE
CONSTRUCTION PACKAGE. REFER TO THE COMPLETE
DRAWING PACKAGE AND SPECIFICATIONS TO DETERMINE THE
COMPLETE PROJECT SCOPE, GENERAL REQUIREMENTS,
PRODUCT SPECIFICATIONS, AND INSTALLATION
REQUIREMENTS.
THE DRAWINGS REPRESENT THE SECURITY DESIGN INTENT
AND ARE SCHEMATIC AND DIAGRAMMATICAL. THE
SPECIFICATIONS ESTABLISH MINIMUM PERFORMANCE AND
PRODUCT INSTALLATION REQUIREMENTS. PROVIDE
NECESSARY EQUIPMENT AND ACCESSORIES FOR FULLY
FUNCTIONAL SYSTEMS MEETING DESIGN INTENT AND OWNER
REQUIREMENTS WHETHER EXPRESSLY SPECIFIED OR NOT.
INSTALLATION METHODS MUST BE CONSISTENT WITH THE
DESIGN INTENT, MANUFACTURER RECOMMENDATIONS, AND
ALL LOCAL CODES AND REGULATIONS NECESSARY FOR
COMPLETE AND OPERATIONAL SECURITY SYSTEMS.
THE ARCHITECTURAL DRAWINGS ESTABLISH AND GOVERN THE
FINAL FINISHED APPEARANCES AND LOCATION OF THE
EXPOSED WORK OF ALL TRADES. REFER TO ARCHITECTURAL
DRAWINGS FOR ALL DEVICE MOUNTING REQUIREMENTS AND
RULES, UON. COORDINATE ALL DEVICE LOCATIONS AND
MOUNTING HEIGHTS WITH ARCHITECTURAL DRAWINGS PRIOR
TO ROUGH-IN.
COORDINATE THE INSTALLATION OF SECURITY SYSTEMS WITH
ALL OTHER TRADES TO AVOID INTERFERENCES WITH PIPING,
DUCTWORK, MECHANICAL EQUIPMENT, STRUCTURAL
MEMBERS, FURNITURE, AND ALL OTHER GENERAL BUILDING
CONSTRUCTION.
REFER TO ELECTRICAL DRAWINGS FOR POWER CIRCUIT
REQUIREMENTS SERVING THE SECURITY SYSTEMS.
PROVIDE FIRESTOPPING AT ALL…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .