These are Final Construction Documents (issued 05MAR26) for the IHS Whiteriver Hospital traffic signal project, prepared by SmithGroup and Dibble Corporation. The documents consist of a Traffic Signal Plan (Sheet RD7.1) and Traffic Signal Equipment Schedule (Sheet RD7.2), based on a Program of Requirements dated 03/26/22, a POR Amendment dated 02/03/25, and Schematic Drawings approved 11/19/24. A Bid Addendum-D was issued 20MAY26.
The Traffic Signal Plan details the installation and configuration of traffic signal heads and overhead directional signage at the intersection of SR 73, Hospital Drive, and Potter Street. The plan specifies four green directional signs with white text and arrows (1.50" radius, 0.50" border, White on Green) positioned at various locations around the intersection, along with traffic signal conduits and pedestrian signal infrastructure. The Equipment Schedule identifies required equipment including a meter service pedestal, UPS (Uninterruptible Power Supply) system, traffic controller with PEC, poles, traffic signal heads, metro signs, and full box schedules. The schedule requires new foundation construction for equipment installation, with specific notation that all equipment stations/offsets are referenced to the SR 73 centerline and that the contractor must furnish and install equipment per ADOT specifications and APL, with shop drawing approval required prior to ordering materials and a 30-calendar-day timeline for sign and hardware removal after contract completion.
View the file
Other files
Show 40 more
Latest 50 of 107 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PHASE
PROJECT NUMBER
SHEET TITLE
SEALS AND SIGNATURES
ISSUED FOR DATE
5/1 8/2
6 1
1:2 6 A
M Pl ot Da te:
G:
\20
\10
4_
IH
S_
W
HI
TE
RI
VE
R\
CA
D\
4-
TS
455 NORTH THIRD STREET
SUITE 250
PHOENIX, AZ 85004
602.265.2200 smithgroup.com
1626 NORTH LITCHFIELD RD
SUITE 150
GOODYEAR, AZ 85395
623.935.2258 dibblecorp.com
SHEET NUMBER
CD
DRAWN BY: GIESELMAN CHECKED BY: MOWRY
BASED ON PROGRAM OF REQUIREMENTS DATED [03/26/22],
POR AMENDMENT DATED [02/03/25], AND ON SCHEMATIC
DRAWINGS APPROVED [11/19/24].
FINAL CONSTRUCTION DOCUMENTS 05MAR26
TRAFFIC SIGNAL
PLAN
RD7.1
Call 811 or click Arizona811.com
Contact Arizona 811 at least two full working days before you begin excavation
Hospital Dr
Potter St
Po tte rS t
Ho sp ita lDr
SR 73
SR732.
4.75
14.38 6 14.13 8.75
3.
D3-1(overhead);
1.50" Radius, 0.50" Border, White on Green;
"SR 73", C 50% spacing;
SR 73 36
D3-1(overhead);
2.
5.38 48.38
8.
7.13
4.
8.
4 9.75 5.38
3.
3.
5.
1.50" Radius, 0.50" Border, White on Green;
"Hospital", C 50% spacing; "Dr", C;
Arrow 6" Type D1 - 0°;
4.
8.
10.88 9.75
2.
4 38
8.
4 6.5 10.88
5.
3.
3.
1.50" Radius, 0.50" Border, White on Green;
Arrow 6" Type D1 - 180°;
"Potter", C 50% spacing; "St", C;
Potte r S t
Hosp i ta l D r
D3-1(overhead);
2.
10.88 38
8.
4 6.5
4.
8.
4 9.75 10.88
3.
3.
5.
1.50" Radius, 0.50" Border, White on Green;
"Potter", C 50% spacing; "St", C;
Arrow 6" Type D1 - 0°;
4.
8.
5.38 9.75
2.
4 48.38
8.
7.135.38
5.
3.
3.
1.50" Radius, 0.50" Border, White on Green;
Arrow 6" Type D1 - 180°;
"Hospital", C 50% spacing; "Dr", C;
Hosp i ta l D r
Potte r S t
BID ADDENDUM-D 20MAY26
Call 811 or click Arizona811.com
Contact Arizona 811 at least two full working days before you begin excavation
PHASE
PROJECT NUMBER
SHEET TITLE
SEALS AND SIGNATURES
ISSUED FOR DATE
5/1 8/2
6 1
1:2 7 A
M Pl ot Da te:
G:
\20
\10
4_
IH
S_
W
HI
TE
RI
VE
R\
CA
D\
4-
TS
455 NORTH THIRD STREET
SUITE 250
PHOENIX, AZ 85004
602.265.2200 smithgroup.com
1626 NORTH LITCHFIELD RD
SUITE 150
GOODYEAR, AZ 85395
623.935.2258 dibblecorp.com
SHEET NUMBER
CD
DRAWN BY: GIESELMAN CHECKED BY: MOWRY
BASED ON PROGRAM OF REQUIREMENTS DATED [03/26/22],
POR AMENDMENT DATED [02/03/25], AND ON SCHEMATIC
DRAWINGS APPROVED [11/19/24].
FINAL CONSTRUCTION DOCUMENTS 05MAR26
RD7.2
TRAFFIC SIGNAL
EQUIPMENT
SCHEDULE
BID ADDENDUM-D 20MAY26
| Sheets and Views |
| RD7.1 PLAN |
| RD7.2 EQUIPMENT SCHEDULE |
File details come from the government source that posted it. Updated .