A10-1j BP3_DWG2026-0618_05_CIVIL_IHS-Hon-Dah-UC_BID-ADD-H.pdf
PDF 497 KB Posted
- Attached to
- Whiteriver Hospital Construction
- Solicitation number
- 75H70126R00016
About this file
This is a construction detail drawing for the Hon-Dah Utility Campus, Building Package 3 (BP3), prepared by SmithGroup and Dibble Corporation. The document consists of two detailed technical sheets (C9.01 and C9.02) that provide specifications and construction details for utility infrastructure components at the IHS Whiteriver Hospital project located in Whiteriver, Arizona.
Sheet C9.01 presents a plan view of a reclaimed water tank system with detailed annotations regarding roof access steps, mechanical level connections, overflow provisions, and drain valve locations. Sheet C9.02 contains multiple sectional details illustrating tank penetration specifications, piping connections, overflow weir and piping configurations, tank drain outlet piping details, and tank floor drain valve installations. The drawings include specific construction notes regarding tank shell specifications, piping materials (steel and PVC), valve requirements, and thermal insulation enclosure requirements. The document was issued as Final Construction Documents dated March 5, 2026, with subsequent bid addenda issued on April 16, 2026 (Addendum-A) and June 18, 2026 (Addendum-H). The drawings are technical construction specifications suitable for bidding and construction purposes on this federal Indian Health Service project.
View the file
Other files
Show 40 more
Latest 50 of 107 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PHASE
PROJECT NUMBER
SHEET TITLE
SEALS AND SIGNATURES
ISSUED FOR DATE
6/1 8/2
6 2
:20 P
M Pl ot Da te:
G:
\20
\10
4_
IH
S_
W
HI
TE
RI
VE
R\
CA
D
HO
N-
DA
H\
C9 .01
D
ET
AI
LS
.D W
G
455 NORTH THIRD STREET
SUITE 250
PHOENIX, AZ 85004
602.265.2200 smithgroup.com
1626 NORTH LITCHFIELD RD
SUITE 150
GOODYEAR, AZ 85395
623.935.2258 dibblecorp.com
SHEET NUMBER
BP3
DRAWN BY: DIBBLE CHECKED BY: SM
FINAL CONSTRUCTION DOCUMENTS 05MAR26
BUILDING PACKAGE 3 (BP3)
HON-DAH UTILITY CAMPUS
BID ADDENDUM-A 16APR26
BID ADDENDUM-H 18JUN26
DETAILS
C9.01
PHASE
PROJECT NUMBER
SHEET TITLE
SEALS AND SIGNATURES
ISSUED FOR DATE
6/1 8/2
6 2
:21 P
M Pl ot Da te:
G:
\20
\10
4_
IH
S_
W
HI
TE
RI
VE
R\
CA
D
HO
N-
DA
H\
C9 .01
D
ET
AI
LS
.D W
G
455 NORTH THIRD STREET
SUITE 250
PHOENIX, AZ 85004
602.265.2200 smithgroup.com
1626 NORTH LITCHFIELD RD
SUITE 150
GOODYEAR, AZ 85395
623.935.2258 dibblecorp.com
SHEET NUMBER
BP3
DRAWN BY: DIBBLE CHECKED BY: SM
FINAL CONSTRUCTION DOCUMENTS 05MAR26
BUILDING PACKAGE 3 (BP3)
HON-DAH UTILITY CAMPUS
BID ADDENDUM-A 16APR26
BID ADDENDUM-H 18JUN26
DETAILS
C9.02
B B
AA
| Sheets and Views |
| C9.01 DETAILS |
| C9.02 DETAILS |
File details come from the government source that posted it. Updated .