This document is a specification for Metal Building Systems for the Whiteriver Hospital project, issued by SmithGroup as Final Construction Documents with Bid Addendum-H dated 18 June 2026.
The specification establishes requirements for a complete metal building system including structural-steel framing, standing-seam metal roof panels with vertical ribs, concealed-fastener flush-profile metal wall panels with flush-profile liner panels, thermal insulation (R-30 ci for roof, R-13 + R-14 ci for walls), personnel doors and frames, aluminum windows, door canopies, snow retention bars, and associated accessories. The basis of design is Butler Manufacturing Company (BlueScope Buildings North America, Inc.), though equivalent products from other manufacturers may be considered with minor deviations. The metal building system must be obtained from a single source and single manufacturer. Roof panels feature aluminum-zinc alloy-coated steel with three-coat fluoropolymer finish; wall panels match with concealed fasteners and factory-applied sealant. The specification includes 20-year warranties on metal panel finishes and standing-seam roof panel weathertightness. Performance requirements address structural loads per MBMA guidelines, seismic performance per ASCE/SEI 7, air infiltration limits (0.06 cfm/sq. ft. for both roof and wall panels), water penetration prevention, wind-uplift resistance rated UL 90, and energy performance with Solar Reflectance Index of at least 64. Shop drawings, product data, samples, delegated design submittals with professional engineer certification, and quality assurance documentation from an IAS AC472-accredited manufacturer are required. Installation must comply with manufacturer instructions with specified tolerances (1/4 inch in 20 feet for panels), proper flashing and sealing, concurrent thermal insulation installation, and field quality control inspections by a qualified special inspector.
View the file
Other files
Show 40 more
Latest 50 of 107 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SMITHGROUP 14904.000 INDIAN HEALTH SERVICE
WHITERIVER HOSPITAL
FINAL CONSTRUCTION DOCUMENTS
BID ADDENDUM-H
18 JUNE 2026
METAL BUILDING SYSTEMS 133419 - 1
SECTION 133419 - METAL BUILDING SYSTEMS
PART 1 - GENERAL
1.1 RELATED DOCUMENTS
A. Drawings and general provisions of the Contract, including General and
Supplementary Conditions and Division 01 Specification Sections, apply to this Section.
1.2 SUMMARY
A. Section Includes:
1. Structural-steel framing.
2. Metal roof panels.
3. Metal wall panels.
4. Thermal insulation.
5. Personnel doors and frames.
6. Door canopies.
7. Snow retention bars.
8. Windows.
9. Accessories.
B. Related Requirements:
1. Section 013573 "Delegated Design Requirements and Procedures".
2. Section 083323 "Overhead Coiling Doors" for coiling doors in metal building systems.
1.3 DEFINITIONS
A. Terminology Standard: See MBMA's "Metal Building Systems Manual" for definitions of terms for metal building system construction not otherwise defined in this Section or in standards referenced by this Section.
1.4 COORDINATION
A. Coordinate sizes and locations of concrete foundations and casting of anchor-rod inserts into foundation walls and footings. Anchor rod installation, concrete, reinforcement, and formwork requirements are specified in Division 3.
B. Coordinate metal panel assemblies with rain drainage work, flashing, trim, and construction of supports and other adjoining work to provide a leakproof, secure, and noncorrosive installation.
1.5 PREINSTALLATION MEETINGS
A. Preinstallation Conference: Conduct conference at Project site.
1. Review methods and procedures related to metal building systems including, but not limited to, the following:
a. Condition of foundations and other preparatory work performed by other trades.
b. Structural load limitations.
FINAL CONSTRUCTION DOCUMENTS
METAL BUILDING SYSTEMS 133419 - 2
c. Construction schedule. Verify availability of materials and erector's personnel, equipment, and facilities needed to make progress and avoid delays.
d. Required tests, inspections, and certifications.
e. Unfavorable weather and forecasted weather conditions and impact on construction schedule.
2. Review methods and procedures related to metal roof panel assemblies including, but not limited to, the following:
a. Compliance with requirements for purlin and rafter conditions, including flatness and attachment to structural members.
b. Structural limitations of purlins and rafters during and after roofing.
c. Flashings, special roof details, roof drainage, roof penetrations, equipment curbs, and condition of other construction that will affect metal roof panels.
d. Temporary protection requirements for metal roof panel assembly during and after installation.
e. Roof observation and repair after metal roof panel installation.
3. Review methods and procedures related to metal wall panel assemblies including, but not limited to, the following:
a. Compliance with requirements for support conditions, including alignment between and attachment to structural members.
b. Structural limitations of girts and columns during and after wall panel installation.
c. Flashings, special siding details, wall penetrations, openings, and condition of other construction that will affect metal wall panels.
d. Temporary protection requirements for metal wall panel assembly during and after installation.
e. Wall observation and repair after metal wall panel installation.
1.6 ACTION SUBMITTALS
A. Product Data: For each type of metal building system component.
1. Include construction details, material descriptions, dimensions of individual components and profiles, and finishes for the following:
a. Metal roof panels.
b. Metal wall panels.
c. Thermal insulation and vapor-retarder facings.
d. Personnel doors and frames.
e. Windows.
f. Louvers.
B. Shop Drawings: Indicate components by others. Include full building plan, elevations, sections, details and the following:
1. Anchor-Rod Plans: Submit anchor-rod plans and templates before foundation work begins. Include location, diameter, and minimum required projection of anchor rods required to attach metal building to foundation. Indicate column reactions at each location.
FINAL CONSTRUCTION DOCUMENTS
METAL BUILDING SYSTEMS 133419 - 3
2. Structural-Framing Drawings: Show complete fabrication of primary and secondary framing; include provisions for openings. Indicate welds and bolted connections, distinguishing between shop and field applications. Include transverse cross-sections.
a. Show provisions for attaching bridge crane components.
3. Metal Roof and Wall Panel Layout Drawings: Show layouts of panels including methods of support. Include details of edge conditions, joints, panel profiles, corners, anchorages, clip spacing, trim, flashings, closures, and special details.
Distinguish between factory- and field-assembled work; show locations of exposed fasteners.
a. Show roof-mounted items including roof hatches, equipment supports, pipe supports and penetrations, lighting fixtures, and items mounted on roof curbs.
b. Show wall-mounted items including personnel doors, vehicular doors, windows, louvers, and lighting fixtures.
c. Show translucent panels.
4. Accessory Drawings: Include details of the following items, at a scale of not less than 1-1/2 inches per 12 inches:
a. Door canopies.
b. Flashing and trim.
c. Gutters.
d. Downspouts.
C. Samples for Initial Selection: For units with factory-applied finishes.
D. Samples for Verification: For the following products:
1. Panels: Nominal 12 incheslong by actual panel width. Include fasteners, closures, and other exposed panel accessories.
2. Flashing and Trim: Nominal 12 incheslong. Include fasteners and other exposed accessories.
3. Vapor-Retarder Facings: Nominal 6-inch-square Samples.
4. Windows: Full-size, nominal 12-inch-long frame Samples showing typical profile.
5. Accessories: Nominal 12-inch-long Samples for each type of accessory.
E. Door Schedule: For doors and frames. Use same designations indicated on Drawings.
Include details of reinforcement.
1. Door Hardware Schedule: Include details of fabrication and assembly of door hardware. Organize schedule into door hardware sets indicating complete designations of every item required for each door or opening.
2. Keying Schedule: Detail Owner's final keying instructions for locks. Include schematic keying diagram and index each key set to unique door designations.
F. Delegated-Design Submittal: For metal building systems.
1. Refer to Section 013573 "Delegated Design Requirements and Procedures" for delegated design submittal procedures and requirements
2. Include analysis data indicating compliance with performance requirements and design data signed and sealed by the qualified professional engineer responsible for their preparation.
G. INFORMATIONAL SUBMITTALS
1. Qualification Data: For erector and manufacturer.
FINAL CONSTRUCTION DOCUMENTS
METAL BUILDING SYSTEMS 133419 - 4
2. Welding certificates.
3. Letter of Design Certification: Signed and sealed by a qualified professional engineer. Include the following:
a. Name and location of Project.
b. Order number.
c. Name of manufacturer.
d. Name of Contractor.
e. Building dimensions including width, length, height, and roof slope.
f. Indicate compliance with AISC standards for hot-rolled steel and AISI standards for cold-rolled steel, including edition dates of each standard.
g. Governing building code and year of edition.
h. Design Loads: Include dead load, roof live load, collateral loads, roof snow load, deflection, wind loads/speeds and exposure, seismic design category or effective peak velocity-related acceleration/peak acceleration, and auxiliary loads (cranes).
i. Load Combinations: Indicate that loads were applied acting simultaneously with concentrated loads, according to governing building code.
j. Building-Use Category: Indicate category of building use and its effect on load importance factors.
4. Erector Certificates: For qualified erector, from manufacturer.
5. Material Test Reports: For each of the following products:
a. Structural steel including chemical and physical properties.
b. Bolts, nuts, and washers including mechanical properties and chemical analysis.
c. Tension-control, high-strength, bolt-nut-washer assemblies.
d. Shop primers.
e. Nonshrink grout.
H. Field quality-control reports.
I. Surveys: Show final elevations and locations of major members. Indicate discrepancies between actual installation and the Contract Documents. Have surveyor who performed surveys certify their accuracy.
J. Sample Warranties: For special warranties.
1.7 CLOSEOUT SUBMITTALS
A. Maintenance Data: For metal panel finishes and door hardware to include in maintenance manuals.
1.8 QUALITY ASSURANCE
A. Manufacturer Qualifications: A qualified manufacturer.
1. Accreditation: Manufacturer's facility accredited according to the International Accreditation Service's AC472, "Accreditation Criteria for Inspection Programs for Manufacturers of Metal Building Systems."
2. Engineering Responsibility: Preparation of comprehensive engineering analysis and Shop Drawings by a professional engineer who is legally qualified to practice in jurisdiction where Project is located.
FINAL CONSTRUCTION DOCUMENTS
METAL BUILDING SYSTEMS 133419 - 5
B. Erector Qualifications: An experienced erector who specializes in erecting and installing work similar in material, design, and extent to that indicated for this Project and who is acceptable to manufacturer.
C. Welding Qualifications: Qualify procedures and personnel according to the following:
1. AWS D1.1/D1.1M, "Structural Welding Code - Steel."
2. AWS D1.3, "Structural Welding Code - Sheet Steel."
1.9 DELIVERY, STORAGE, AND HANDLING
A. Deliver components, sheets, panels, and other manufactured items so as not to be damaged or deformed. Package metal panels for protection during transportation and handling.
B. Unload, store, and erect metal panels in a manner to prevent bending, warping, twisting, and surface damage.
C. Stack metal panels horizontally on platforms or pallets, covered with suitable weathertight and ventilated covering. Store metal panels to ensure dryness, with positive slope for drainage of water. Do not store metal panels in contact with other materials that might cause staining, denting, or other surface damage.
1.10 FIELD CONDITIONS
A. Weather Limitations: Proceed with panel installation only when weather conditions permit metal panels to be installed according to manufacturers' written instructions and warranty requirements.
1.11 WARRANTY
A. Special Warranty on Metal Panel Finishes: Manufacturer agrees to repair finish or replace metal panels that show evidence of deterioration of factory-applied finishes within specified warranty period.
1. Exposed Panel Finish: Deterioration includes, but is not limited to, the following:
a. Color fading more than 5 Hunter units when tested according to
ASTM D 2244.
b. Chalking in excess of a No. 8 rating when tested according to
ASTM D 4214.
c. Cracking, checking, peeling, or failure of paint to adhere to bare metal.
2. Finish Warranty Period: 20 years from date of Substantial Completion.
B. Special Weathertightness Warranty for Standing-Seam Metal Roof Panels:
Manufacturer agrees to repair or replace standing-seam metal roof panel assemblies that leak or otherwise fail to remain weathertight within specified warranty period.
1. Warranty Period: 20 years from date of Substantial Completion.
FINAL CONSTRUCTION DOCUMENTS
METAL BUILDING SYSTEMS 133419 - 6
PART 2 - PRODUCTS
2.1 MANUFACTURERS
A. Basis of Design (Product Standard): Contract Documents are based on products and systems indicated to establish a standard of quality. Other manufacturers offering products having equivalent characteristics may be considered, provided deviations are minor and comply with requirements of Contract Documents as judged by the Architect.
1. Butler Manufacturing Company; a division of BlueScope Buildings North
America, Inc.
B. Source Limitations: Obtain metal building system components, including primary and secondary framing and metal panel assemblies, from single source from single manufacturer.
2.2 SYSTEM DESCRIPTION
A. Provide a complete, integrated set of mutually dependent components and assemblies that form a metal building system capable of withstanding structural and other loads, thermally induced movement, and exposure to weather without failure or infiltration of water into building interior.
B. Primary-Frame Type:
1. Rigid Clear Span: Solid-member, structural-framing system without interior columns.
C. End-Wall Framing: Manufacturer's standard, for buildings not required to be expandable, consisting of primary frame, capable of supporting one-half of a bay design load.
D. Secondary-Frame Type: Manufacturer's standard purlins and joists and exterior-framed (bypass) girts.
E. Eave Height: As indicated by nominal height on Drawings.
F. Bay Spacing: As indicated on Drawings.
G. Roof Slope: As indicated.
H. Roof System: Manufacturer's standard standing-seam, vertical-rib, metal roof panels.
1. Liner Panels: Tapered rib.
I. Exterior Wall System: Manufacturer's standard concealed-fastener, flush-profile, metal wall panels.
1. Liner Panels: Flush profile. (Add. H)
2.3 PERFORMANCE REQUIREMENTS
A. Delegated Design: Engage a registered design professional, as defined in Section
013573 "Delegated Design Requirements and Procedures" to design metal building system.
1. Material properties indicated in this Section shall be considered as minimum properties.
http://www.specagent.com/LookUp/?uid=123457048226&mf=04&src=wd
FINAL CONSTRUCTION DOCUMENTS
METAL BUILDING SYSTEMS 133419 - 7
B. Structural Performance: Metal building systems shall withstand the effects of gravity loads and the following loads and stresses within limits and under conditions indicated according to procedures in MBMA's "Metal Building Systems Manual."
1. Design Loads: As indicated.
2. Bridge Crane Loadings: As indicated.
3. Deflection and Drift Limits: Design metal building system assemblies to withstand serviceability design loads without exceeding deflections and drift limits recommended in AISC Steel Design Guide No. 3 "Serviceability Design Considerations for Steel Buildings."
C. Seismic Performance: Metal building system shall withstand the effects of earthquake motions determined according to ASCE/SEI 7.
D. Thermal Movements: Allow for thermal movements from ambient and surface temperature changes by preventing buckling, opening of joints, overstressing of components, failure of joint sealants, failure of connections, and other detrimental effects. Base calculations on surface temperatures of materials due to both solar heat gain and nighttime-sky heat loss.
1. Temperature Change: 120 deg F, ambient; 180 deg F, material surfaces.
E. Fire-Resistance Ratings: Where assemblies are indicated to have a fire-resistance rating, provide metal panel assemblies identical to those of assemblies tested for fire resistance per ASTM E 119 or ASTM E 108 by a qualified testing agency. Identify products with appropriate markings of applicable testing agency.
1. Indicate design designations from UL's "Fire Resistance Directory," FM Global's
"Approval Guide," or from the listings of another qualified testing agency.
F. Fire-Rated Door Assemblies: Assemblies complying with NFPA 80 that are listed and labeled by a qualified testing agency, for fire-protection ratings indicated, based on testing at positive pressure according to NFPA 252 or UL 10C.
1. Oversize Fire-Rated Door Assemblies: For units exceeding sizes of tested assemblies, provide certification by a qualified testing agency that doors comply with standard construction requirements for tested and labeled fire-rated door assemblies except for size.
G. Structural Performance for Metal Roof and Wall Panels: Provide metal panel systems capable of withstanding the effects of the following loads, based on testing according to
ASTM E 1592:
1. Wind Load Design Criteria: As indicated on the Drawings.
2. Snow and Ice Loads: As indicated on the Drawings.
3. Other Design Loads: As indicated on the Drawings.
H. Air Infiltration for Metal Roof Panels: Air leakage of not more than 0.06 cfm/sq. ft.when tested according to ASTM E 1680 at the following test-pressure difference:
1. Test-Pressure Difference: 6.24 lbf/sq. ft..
I. Air Infiltration for Metal Wall Panels: Air leakage of not more than 0.06 cfm/sq. ft.when tested according to ASTM E 283 at the following test-pressure difference:
1. Test-Pressure Difference: 6.24 lbf/sq. ft.
J. Water Penetration for Metal Roof Panels: No water penetration when tested according to ASTM E 1646 at the following test-pressure difference:
1. Test-Pressure Difference: 6.24 lbf/sq. ft.
FINAL CONSTRUCTION DOCUMENTS
METAL BUILDING SYSTEMS 133419 - 8
K. Water Penetration for Metal Wall Panels: No water penetration when tested according to ASTM E 331 at the following test-pressure difference:
1. Test-Pressure Difference: 6.24 lbf/sq. ft.
L. Wind-Uplift Resistance: Provide metal roof panel assemblies that comply with UL 580 for wind-uplift-resistance class indicated.
1. Uplift Rating: UL 90.
M. Energy Star Listing: Roof panels that are listed on the DOE's ENERGY STAR "Roof Products Qualified Product List" for low-slope roof products.
N. Energy Performance: Provide roof panels according to one of the following when tested according to CRRC-1:
1. Three-year, aged, Solar Reflectance Index of not less than 64 when calculated according to ASTM E 1980.
O. Thermal Performance for Opaque Elements: Provide the following maximum U-factors and minimum R-values when tested according to ASTM C 1363 or ASTM C 518:
1. Roof:
a. R-Value: R-30 ci.
2. Walls:
a. R-Value: R-13 + R-14 ci.
2.4 STRUCTURAL-STEEL FRAMING
A. Structural Steel: Comply with AISC 360, "Specification for Structural Steel Buildings."
B. Bolted Connections: Comply with RCSC's "Specification for Structural Joints Using High-Strength Bolts."
C. Cold-Formed Steel: Comply with AISI's "North American Specification for the Design of Cold-Formed Steel Structural Members" for design requirements and allowable stresses.
D. Primary Framing: Manufacturer's standard primary-framing system, designed to withstand required loads and specified requirements. Primary framing includes transverse rafters, corner columns, and canopy wall framing; and wind bracing.
1. General: Provide frames with attachment plates, bearing plates, and splice members. Factory drill for field-bolted assembly. Provide frame span and spacing indicated.
2. Rigid Clear-Span Frames: I-shaped frame sections fabricated from shop-welded, built-up steel plates or structural-steel shapes. Interior columns are not permitted.
E. Secondary Framing: Manufacturer's standard secondary framing, including purlins, girts, eave struts, flange bracing, base members, gable angles, clips, headers, jambs, and other miscellaneous structural members. Unless otherwise indicated, fabricate framing from either cold-formed, structural-steel sheet or roll-formed, metallic-coated steel sheet, prepainted with coil coating, to comply with the following:
1. Purlins: C- or Z-shaped sections; fabricated from built-up steel plates, steel sheet, or structural-steel shapes; minimum 2-1/2-inch- wide flanges.
a. Depth: needed to comply with system performance requirements.
FINAL CONSTRUCTION DOCUMENTS
METAL BUILDING SYSTEMS 133419 - 9
2. Girts: C- or Z-shaped sections; fabricated from built-up steel plates, steel sheet, or structural-steel shapes. Form ends of Z-sections with stiffening lips angled 40 to 50 degrees from flange, with minimum 2-1/2-inch- wide flanges.
a. Depth: As required to comply with system performance requirements.
3. Eave Struts: Unequal-flange, C-shaped sections; fabricated from built-up steel plates, steel sheet, or structural-steel shapes; to provide adequate backup for metal panels.
4. Flange Bracing: Minimum 2-by-2-by-1/8-inch structural-steel angles or 1-inch-diameter, cold-formed structural tubing to stiffen primary-frame flanges.
5. Sag Bracing: Minimum 1-by-1-by-1/8-inch structural-steel angles.
6. Purlin and Girt Clips: Manufacturer's standard clips fabricated from steel sheet.
Provide galvanized clips where clips are connected to galvanized framing members.
7. Framing for Openings: Channel shapes; fabricated from cold-formed, structural-steel sheet or structural-steel shapes. Frame head and jamb of door openings and head, jamb, and sill of other openings.
8. Miscellaneous Structural Members: Manufacturer's standard sections fabricated from cold-formed, structural-steel sheet; built-up steel plates; or zinc-coated (galvanized) steel sheet; designed to withstand required loads.
F. Canopy Framing: Manufacturer's standard structural-framing system, designed to withstand required loads; fabricated from shop-welded, built-up steel plates or structural-steel shapes. Provide frames with attachment plates and splice members, factory drilled for field-bolted assembly.
G. Bracing: Provide adjustable wind bracing using any method as follows:
1. Rods: ASTM A 36/A 36M; ASTM A 572/A 572M, Grade 50; or
ASTM A 529/A 529M, Grade 50; minimum 1/2-inch- diameter steel; threaded full length or threaded a minimum of 6 inches at each end.
2. Cable: ASTM A 475, minimum 1/4-inch- diameter, extra-high-strength grade, Class B, zinc-coated, seven-strand steel; with threaded end anchors.
3. Angles: Fabricated from structural-steel shapes to match primary framing, of size required to withstand design loads.
4. Rigid Portal Frames: Fabricated from shop-welded, built-up steel plates or structural-steel shapes to match primary framing; of size required to withstand design loads.
5. Fixed-Base Columns: Fabricated from shop-welded, built-up steel plates or structural-steel shapes to match primary framing; of size required to withstand design loads.
6. Diaphragm Action of Metal Panels: Design metal building to resist wind forces through diaphragm action of metal panels.
H. Anchor Rods: Headed anchor rods as indicated in Anchor Rod Plan for attachment of metal building to foundation.
I. Materials:
1. W-Shapes: ASTM A 992/A 992M
2. Channels, Angles, M-Shapes, and S-Shapes: ASTM A 36/A
3. Plate and Bar: ASTM A 36/A
4. Steel Pipe: ASTM A 53/A 53M, Type E or S, Grade B.
FINAL CONSTRUCTION DOCUMENTS
METAL BUILDING SYSTEMS 133419 - 10
5. Cold-Formed Hollow Structural Sections: ASTM A 500, Grade B or C, structural tubing.
6. Structural-Steel Sheet: Hot-rolled, ASTM A 1011/A 1011M
7. Metallic-Coated Steel Sheet: ASTM A 653/A 653M
8. Metallic-Coated Steel Sheet Prepainted with Coil Coating: Steel sheet, metallic coated by the hot-dip process and prepainted by the coil-coating process to comply with ASTM A 755/A 755M.
a. Aluminum-Zinc Alloy-Coated Steel Sheet: ASTM A 792/A 792M
9. Non-High-Strength Bolts, Nuts, and Washers: ASTM A 307, Grade A, carbon-steel, hex-head bolts; ASTM A 563 carbon-steel hex nuts; and ASTM F 844 plain (flat) steel washers.
a. Finish: Hot-dip zinc coating, ASTM F 2329, Class C.
10. Structural Bolts, Nuts, and Washers: ASTM A 325, Type 1, heavy-hex steel structural bolts; ASTM A 563 heavy-hex carbon-steel nuts; and ASTM F 436 hardened carbon-steel washers.
a. Finish: Hot-dip zinc coating, ASTM F 2329, Class C
11. Threaded Rods: ASTM A 193/A 193M
a. Nuts: ASTM A 563 heavy-hex carbon steel.
b. Washers: ASTM A 36/A 36M carbon steel.
c. Finish: Hot-dip zinc coating, ASTM F 2329, Class C
J. Finish: Factory primed. Apply specified primer immediately after cleaning and pretreating.
1. Clean and prepare in accordance with SSPC-SP2.
2. Coat with manufacturer's standard primer. Apply primer to primary and secondary framing to a minimum dry film thickness of 1 mil.
a. Prime secondary framing formed from uncoated steel sheet to a minimum dry film thickness of 0.5 mil on each side.
2.5 METAL ROOF PANELS
A. Standing-Seam, Vertical-Rib, Metal Roof Panels: Formed with vertical ribs at panel edges and intermediate stiffening ribs symmetrically spaced between ribs; designed for sequential installation by mechanically attaching panels to supports using concealed clips located under one side of panels and engaging opposite edge of adjacent panels.
1. Material: Aluminum-zinc alloy-coated steel sheet, 0.034-inch thickness. Prepainted by the coil-coating process to comply with ASTM A 755/A 755M.
a. Exterior Finish: Three-coat fluoropolymer.
b. Color: As selected by Architect.
2. Clips: Two-piece floating to accommodate thermal movement.
3. Joint Type: Mechanically seamed.
4. Basis of Design: Butler Manufacturing Company; a division of BlueScope
Buildings North America, Inc., "MR-24 Roof System".
B. Finishes:
1. Exposed Coil-Coated Finish:
a. Three-Coat Fluoropolymer: AAMA 621. Fluoropolymer finish containing not less than 70 percent PVDF resin by weight in both color coat and clear topcoat. Prepare, pretreat, and apply coating to exposed metal surfaces to comply with coating and resin manufacturers' written instructions.
FINAL CONSTRUCTION DOCUMENTS
METAL BUILDING SYSTEMS 133419 - 11
2. Concealed Finish: Apply pretreatment and manufacturer's standard white or light-colored acrylic or polyester backer finish, consisting of prime coat and wash coat with a minimum total dry film thickness of 0.5 mil.
2.6 SNOW RETENTION BARS
A. Basis of Design (Product Standard): Contract Documents are based on products and systems indicated to establish a standard of quality. Other manufacturers offering products having equivalent characteristics may be considered, provided deviations are minor and comply with requirements of Contract Documents as judged by the Architect.
1. PMC Industries, Inc. (www.aceclamp.com), "ColorSnap".
2. Components: Extruded aluminum rail, color strip, ice flags, clamps, top block, hex head bolt, connector link.
3. Extruded Materials (Rails and Ice Flag): 6000 Series tempered aluminum alloy complying with ASTM B221.
4. Stainless Steel Materials (Connector Link and Hex Head Bolts): 300 Series stainless steel complying with ASTM A582/12.
5. Roof Clamp Style: Compatible with geometry and dimensions of roof standing seam profile.
6. Color: As selected by Architect.
2.7 METAL WALL PANELS
A. Concealed-Fastener, Flush-Profile, Metal Wall Panels: Formed with vertical panel edges and a flush surface; with flush joint between panels; with 1-inch-wide flange for attaching interior finish; designed to be installed by lapping and interconnecting side edges of adjacent panels and mechanically attaching through panel to supports using concealed fasteners and factory-applied sealant in side joints.
1. Material: Aluminum-zinc alloy-coated steel sheet, 0.034-inchthickness. Prepainted by the coil-coating process to comply with ASTM A 755/A 755M.
a. Exterior Finish: Fluoropolymer.
b. Color: As selected by Architect.
2. Panel Coverage: 6 inches.
3. Panel Height: 3 inches.
B. Flush-Profile, Metal Liner Panels: Solid panels formed with vertical panel edges and intermediate stiffening ribs symmetrically spaced between panel edges; with flush joint between panels; designed for interior side of metal wall panel assemblies and installed by lapping and interconnecting side edges of adjacent panels and mechanically attaching through panel to supports using concealed fasteners and factory-applied sealant in side joints.
1. Material: Aluminum-zinc alloy-coated steel sheet, 0.030-inchthickness.
Prepainted by the coil-coating process to comply with ASTM A 755/A 755M.
a. Exterior Finish: Siliconized polyester.
b. Color: As selected by Architect.
2. Sound Absorption: NRC not less than 1.00 when tested according to
ASTM C 423.
3. Panel Coverage: 12 inches.
4. Panel Height: 1.5 inches. (Add. H)
FINAL CONSTRUCTION DOCUMENTS
METAL BUILDING SYSTEMS 133419 - 12
C. Finishes:
1. Exposed Coil-Coated Finish:
a. Three-Coat Fluoropolymer: AAMA 621. Fluoropolymer finish containing not less than 70 percent PVDF resin by weight in both color coat and clear topcoat. Prepare, pretreat, and apply coating to exposed metal surfaces to comply with coating and resin manufacturers' written instructions.
b. Siliconized Polyester: Epoxy primer and silicone-modified, polyester-enamel topcoat; with a minimum dry film thickness of 0.2 mil for primer and 0.8 mil for topcoat.
2. Concealed Finish: Apply pretreatment and manufacturer's standard white or light-colored acrylic or polyester backer finish, consisting of prime coat and wash coat with a minimum total dry film thickness of 0.5 mil.
2.8 DOOR CANOPIES
A. Fabricated from G-90 galvanized 10 gauge (0.138 inches) structural steel plate.
1. Gable configuration with 4:12 slope.
2. All welded construction, welds ground smooth.
3. Stiffeners, trim, and stainless steel fasteners as recommended by the manufacturer.
4. Powder coated finish is color as selected by the Architect.
B. Basis of Design (Product Standard): Contract Documents are based on products and systems indicated to establish a standard of quality. Other manufacturers offering products having equivalent characteristics may be considered, provided deviations are minor and comply with requirements of Contract Documents as judged by the Architect.
1. Metallic Products, "Ice Shield Canopy".
2.9 THERMAL INSULATION
A. Faced Metal Building Insulation: ASTM C 991, Type II, glass-fiber-blanket insulation;
0.5-lb/cu. ft.density; 2-inch-wide, continuous, vapor-tight edge tabs; with a flame-spread index of 25 or less.
B. Mineral-Fiber-Blanket Insulation: ASTM C 665, type indicated below; consisting of fibers manufactured from glass, slag wool, or rock wool.
1. Unfaced: Type I (blankets without membrane covering), passing ASTM E 136 for combustion characteristics.
C. Retainer Strips: For securing insulation between supports, 0.025-inchnominal-thickness, formed, metallic-coated steel or PVC retainer clips colored to match insulation facing.
D. Vapor-Retarder Tape: Pressure-sensitive tape of type recommended by vapor-retarder manufacturer for sealing joints and penetrations in vapor retarder.
2.10 PERSONNEL DOORS AND FRAMES
A. Swinging Personnel Doors and Frames: As specified in Section 081113 "Hollow Metal
Doors and Frames."
FINAL CONSTRUCTION DOCUMENTS
METAL BUILDING SYSTEMS 133419 - 13
2.11 WINDOWS
A. Aluminum Windows: Metal building system manufacturer's standard, with self-flashing mounting fins, and as follows:
1. Type, Performance Class, and Performance Grade: Comply with
AAMA/WDMA/CSA 101/I.S.2/A440 and as follows:
a. Horizontal-Sliding Units: HS-CW30.
b. Fixed Units: FW-CW30.
2. Aluminum Extrusions: ASTM B 221, alloy and temper recommended by manufacturer for strength, corrosion resistance, and application of required finish, but not less than 0.064-inch thickness at any location for main frame and sash members.
a. Thermally Improved Construction: Fabricate window units with an integral, concealed, low-conductance thermal barrier; located between exterior materials and window members exposed on interior side; in a manner that eliminates direct metal-to-metal contact.
3. Mullions: Between adjacent windows, fabricated of extruded aluminum matching finish of window units.
4. Fasteners, Anchors, and Clips: Nonmagnetic stainless steel, aluminum, or other noncorrosive material, compatible with aluminum window members, trim, hardware, anchors, and other components of window units. Fasteners shall not be exposed, except for attaching hardware.
a. Reinforcement: Where fasteners screw-anchor into aluminum less than
0.128 inch thick, reinforce interior with aluminum or nonmagnetic stainless steel to receive screw threads, or provide standard, noncorrosive, pressed-in, spline grommet nuts.
5. Hardware: Manufacturer's standard; of aluminum or stainless steel, including the following:
a. Cam-action sweep sash lock and keeper at meeting rails.
b. Spring-loaded, snap-type lock at jambs.
c. Lift handles for single-hung units.Nylon sash rollers for horizontal-sliding units.
6. Sliding-Type Weather Stripping: Woven-pile weather stripping of wool, polypropylene, or nylon pile and resin-impregnated backing fabric; complying with AAMA 701/702.
7. Insect Screens: Provide removable insect screen on each operable exterior sash, with screen frame finished to match window unit, and as follows:
a. Glass-Fiber Mesh Fabric: 18-by-14mesh of PVC-coated, glass-fiber threads, woven and fused to form a fabric mesh; complying with ASTM D 3656.
B. Glazing: Comply with requirements specified in Section 088000 "Glazing."
1. Heat-Strengthened Float Glass: ASTM C1048, Kind HS (heat strengthened), Type I, Condition A (uncoated) unless otherwise indicated, Type I, Class 1 (clear), Quality-Q3.
2. Insulating-Glass Units: Factory-assembled units consisting of sealed lites of 6-mm-thick clear float glass separated by a dehydrated interspace, qualified according to ASTM E2190.
3. Safety Glass where indicated or required by Code: Category II materials complying with testing requirements in 16 CFR 1201.
FINAL CONSTRUCTION DOCUMENTS
METAL BUILDING SYSTEMS 133419 - 14
a. Provide safety glazing labeling.
4. Glazing Stops: Screw-applied or snap-on glazing stops coordinated with Section
088000 "Glazing" and with glazing system indicated. Match material and finish of window frames.
5. Factory-Glazed Fabrication: Glaze window units in the factory to greatest extent possible and practical for applications indicated. Comply with requirements in Section 088000 "Glazing."
C. Finish:
1. Baked-Enamel Finish, Organic Coating: Thermosetting, modified-acrylic enamel primer/topcoat system complying with AAMA 2603 except with a minimum dry film thickness of 0.7 mil, medium gloss.
a. Color: As selected by Architect.
2.12 ACCESSORIES
A. General: Provide accessories as standard with metal building system manufacturer and as specified. Fabricate and finish accessories at the factory to greatest extent possible, by manufacturer's standard procedures and processes. Comply with indicated profiles and with dimensional and structural requirements.
1. Form exposed sheet metal accessories that are without excessive oil-canning, buckling, and tool marks and that are true to line and levels indicated, with exposed edges folded back to form hems.
B. Roof Panel Accessories: Provide components required for a complete metal roof panel assembly including copings, fasciae, corner units, ridge closures, clips, sealants, gaskets, fillers, closure strips, and similar items. Match material and finish of metal roof panels unless otherwise indicated.
1. Closures: Provide closures at eaves and ridges, fabricated of same material as metal roof panels.
2. Clips: Manufacturer's standard, formed from stainless-steel sheet, designed to withstand negative-load requirements.
3. Cleats: Manufacturer's standard, mechanically seamed cleats formed from stainless-steel sheet or nylon-coated aluminum sheet.
4. Backing Plates: Provide metal backing plates at panel end splices, fabricated from material recommended by manufacturer.
5. Closure Strips: Closed-cell, expanded, cellular, rubber or crosslinked, polyolefin-foam or closed-cell laminated polyethylene; minimum 1-inch-thick, flexible closure strips; cut or premolded to match metal roof panel profile. Provide closure strips where indicated or necessary to ensure weathertight construction.
6. Thermal Spacer Blocks: Where metal panels attach directly to purlins, provide thermal spacer blocks of thickness required to provide 1-inchstandoff; fabricated from extruded polystyrene.
C. Wall Panel Accessories: Provide components required for a complete metal wall panel assembly including copings, fasciae, mullions, sills, corner units, clips, sealants, gaskets, fillers, closure strips, and similar items. Match material and finish of metal wall panels unless otherwise indicated.
1. Closures: Provide closures at eaves and rakes, fabricated of same material as metal wall panels.
FINAL CONSTRUCTION DOCUMENTS
METAL BUILDING SYSTEMS 133419 - 15
2. Backing Plates: Provide metal backing plates at panel end splices, fabricated from material recommended by manufacturer.
3. Closure Strips: Closed-cell, expanded, cellular, rubber or crosslinked, polyolefin-foam or closed-cell laminated polyethylene; minimum 1-inch-thick, flexible closure strips; cut or premolded to match metal wall panel profile. Provide closure strips where indicated or necessary to ensure weathertight construction.
D. Flashing and Trim: Zinc-coated (galvanized) or aluminum-zinc alloy-coated steel sheet, 0.018-inchnominal uncoated steel thickness, prepainted with coil coating; finished to match adjacent metal panels.
1. Provide flashing and trim as required to seal against weather and to provide finished appearance. Locations include, but are not limited to, eaves, rakes, corners, bases, framed openings, ridges, fasciae, and fillers.
2. Opening Trim: Aluminum-zinc alloy-coated steel sheet, 0.030-inch nominal uncoated steel thickness, prepainted with coil coating. Trim head and jamb of door openings, and head, jamb, and sill of other openings.
E. Gutters: Zinc-coated (galvanized) or aluminum-zinc alloy-coated steel sheet, 0.018-inchnominal uncoated steel thickness, prepainted with coil coating; finished to match roof fascia and rake trim. Match profile of gable trim, complete with end pieces, outlet tubes, and other special pieces as required. Fabricate in minimum 96-inch-long sections, sized according to SMACNA's "Architectural Sheet Metal Manual."
1. Gutter Supports: Fabricated from same material and finish as gutters.
2. Strainers: Bronze, copper, or aluminum wire ball type at outlets.
F. Downspouts: Zinc-coated (galvanized) or aluminum-zinc alloy-coated steel sheet, 0.018-inch nominal uncoated steel thickness, prepainted with coil coating; finished to match metal wall panels. Fabricate in minimum 10-foot-long sections, complete with formed elbows and offsets.
1. Mounting Straps: Fabricated from same material and finish as gutters.
G. Pipe Flashing: Premolded, EPDM pipe collar with flexible aluminum ring bonded to base.
H. Materials:
1. Fasteners: Self-tapping screws, bolts, nuts, self-locking rivets and bolts, end-welded studs, and other suitable fasteners designed to withstand design loads. Provide fasteners with heads matching color of materials being fastened by means of plastic caps or factory-applied coating.
a. Fasteners for Metal Roof Panels: Self-drilling, Type 410 stainless steel or self-tapping, Type 304 stainless-steel, with EPDM washer under heads of fasteners bearing on weather side of metal panels.
b. Fasteners for Metal Wall Panels: Self-drilling, Type 410 stainless steel or self-tapping, Type 304 stainless-steel, with EPDM sealing washers bearing on weather side of metal panels.
c. Fasteners for Flashing and Trim: Blind fasteners or self-drilling screws with hex washer head.
d. Blind Fasteners: High-strength aluminum or stainless-steel rivets.
2. Corrosion-Resistant Coating: Cold-applied asphalt mastic, compounded for
15-mildry film thickness per coat. Provide inert-type noncorrosive compound free of asbestos fibers, sulfur components, and other deleterious impurities.
FINAL CONSTRUCTION DOCUMENTS
METAL BUILDING SYSTEMS 133419 - 16
3. Nonmetallic, Shrinkage-Resistant Grout: ASTM C 1107/C 1107M, factory-packaged, nonmetallic aggregate grout, noncorrosive, nonstaining, mixed with water to consistency suitable for application and a 30-minute working time.
4. Metal Panel Sealants:
a. Sealant Tape: Pressure-sensitive, 100 percent solids, gray polyisobutylene-compound sealant tape with release-paper backing.
Provide permanently elastic, nonsag, nontoxic, nonstaining tape of manufacturer's standard size.
b. Joint Sealant: ASTM C 920; one part elastomeric polyurethane or polysulfide; of type, grade, class, and use classifications required to seal joints in metal panels and remain weathertight; and as recommended by metal building system manufacturer.
2.13 FABRICATION
A. General: Design components and field connections required for erection to permit easy assembly.
1. Mark each piece and part of the assembly to correspond with previously prepared erection drawings, diagrams, and instruction manuals.
2. Fabricate structural framing to produce clean, smooth cuts and bends. Punch holes of proper size, shape, and location. Members shall be free of cracks, tears, and ruptures.
B. Tolerances: Comply with MBMA's "Metal Building Systems Manual" for fabrication and erection tolerances.
C. Primary Framing: Shop fabricate framing components to indicated size and section, with baseplates, bearing plates, stiffeners, and other items required for erection welded into place. Cut, form, punch, drill, and weld framing for bolted field assembly.
1. Make shop connections by welding or by using high-strength bolts.
2. Join flanges to webs of built-up members by a continuous, submerged arc-welding process.
3. Brace compression flange of primary framing with steel angles or cold-formed structural tubing between frame web and purlin web or girt web, so flange compressive strength is within allowable limits for any combination of loadings.
4. Weld clips to frames for attaching secondary framing if applicable, or punch for bolts.
5. Shop Priming: Prepare surfaces for shop priming according to SSPC-SP 2. Shop prime primary framing with specified primer after fabrication.
D. Secondary Framing: Shop fabricate framing components to indicated size and section by roll forming or break forming, with baseplates, bearing plates, stiffeners, and other plates required for erection welded into place. Cut, form, punch, drill, and weld secondary framing for bolted field connections to primary framing.
1. Make shop connections by welding or by using non-high-strength bolts.
2. Shop Priming: Prepare uncoated surfaces for shop priming according to
SSPC-SP 2. Shop prime uncoated secondary framing with specified primer after fabrication.
FINAL CONSTRUCTION DOCUMENTS
METAL BUILDING SYSTEMS 133419 - 17
E. Metal Panels: Fabricate and finish metal panels at the factory to greatest extent possible, by manufacturer's standard procedures and processes, as necessary to fulfill indicated performance requirements. Comply with indicated profiles and with dimensional and structural requirements.
1. Provide panel profile, including major ribs and intermediate stiffening ribs, if any, for full length of metal panel.
2.14 SOURCE QUALITY CONTROL
A. Special Inspection: Owner will engage a qualified special inspector to perform source quality control inspections and to submit reports.
1. Accredited Manufacturers: Special inspections will not be required if fabrication is performed by an IAS AC472-accredited manufacturer approved by authorities having jurisdiction to perform such Work without special inspection.
a. After fabrication, submit copy of certificate of compliance to authorities having jurisdiction, certifying that Work was performed according to Contract requirements.
PART 3 - EXECUTION
3.1 EXAMINATION
A. Examine substrates, areas, and conditions, with erector present, for compliance with requirements for installation tolerances and other conditions affecting performance of the Work.
B. Before erection proceeds, survey elevations and locations of concrete- and masonry-bearing surfaces and locations of anchor rods, bearing plates, and other embedments to receive structural framing, with erector present, for compliance with requirements and metal building system manufacturer's tolerances.
1. Engage land surveyor to perform surveying.
C. Proceed with erection only after unsatisfactory conditions have been corrected.
3.2 PREPARATION
A. Clean and prepare surfaces to be painted according to manufacturer's written instructions for each particular substrate condition.
B. Provide temporary shores, guys, braces, and other supports during erection to keep structural framing secure, plumb, and in alignment against temporary construction loads and loads equal in intensity to design loads. Remove temporary supports when permanent structural framing, connections, and bracing are in place unless otherwise indicated.
3.3 ERECTION OF STRUCTURAL FRAMING
A. Erect metal building system according to manufacturer's written instructions and drawings.
B. Do not field cut, drill, or alter structural members without written approval from metal building system manufacturer's professional engineer.
FINAL CONSTRUCTION DOCUMENTS
METAL BUILDING SYSTEMS 133419 - 18
C. Set structural framing accurately in locations and to elevations indicated, according to AISC specifications referenced in this Section. Maintain structural stability of frame during erection.
D. Base and Bearing Plates: Clean concrete- and masonry-bearing surfaces of bond-reducing materials, and roughen surfaces prior to setting plates. Clean bottom surface of plates.
1. Set plates for structural members on wedges, shims, or setting nuts as required.
2. Tighten anchor rods after supported members have been positioned and plumbed. Do not remove wedges or shims but, if protruding, cut off flush with edge of plate before packing with grout.
3. Promptly pack grout solidly between bearing surfaces and plates so no voids remain. Neatly finish exposed surfaces; protect grout and allow to cure. Comply with manufacturer's written installation instructions for shrinkage-resistant grouts.
E. Align and adjust structural framing before permanently fastening. Before assembly, clean bearing surfaces and other surfaces that will be in permanent contact with framing. Perform necessary adjustments to compensate for discrepancies in elevations and alignment.
1. Level and plumb individual members of structure.
2. Make allowances for difference between temperature at time of erection and mean temperature when structure will be completed and in service.
F. Primary Framing and End Walls: Erect framing level, plumb, rigid, secure, and true to line. Level baseplates to a true even plane with full bearing to supporting structures, set with double-nutted anchor bolts. Use grout to obtain uniform bearing and to maintain a level base-line elevation. Moist-cure grout for not less than seven days after placement.
1. Make field connections using high-strength bolts installed according to RCSC's
"Specification for Structural Joints Using High-Strength Bolts" for bolt type and joint type specified.
a. Joint Type: Snug tightened or pretensioned as required by manufacturer.
G. Secondary Framing: Erect framing level, plumb, rigid, secure, and true to line. Field bolt secondary framing to clips attached to primary framing.
1. Provide rake or gable purlins with tight-fitting closure channels and fasciae.
2. Locate and space wall girts to suit openings such as doors and windows.
3. Provide supplemental framing at entire perimeter of openings, including doors, windows, louvers, ventilators, and other penetrations of roof and walls.
H. Bracing: Install bracing in roof and sidewalls where indicated on erection drawings.
1. Tighten rod and cable bracing to avoid sag.
2. Locate interior end-bay bracing only where indicated.
I. Framing for Openings: Provide shapes of proper design and size to reinforce openings and to carry loads and vibrations imposed, including equipment furnished under mechanical and electrical work. Securely attach to structural framing.
J. Erection Tolerances: Maintain erection tolerances of structural framing within
AISC 303.
FINAL CONSTRUCTION DOCUMENTS
METAL BUILDING SYSTEMS 133419 - 19
3.4 METAL PANEL INSTALLATION, GENERAL
A. Fabricate and finish metal panels and accessories at the factory, by manufacturer's standard procedures and processes, as necessary to fulfill indicated performance requirements demonstrated by laboratory testing. Comply with indicated profiles and with dimensional and structural requirements.
B. Examination: Examine primary and secondary framing to verify that structural-panel support members and anchorages have been installed within alignment tolerances required by manufacturer.
1. Examine roughing-in for components and systems penetrating metal panels, to verify actual locations of penetrations relative to seams before metal panel installation.
C. General: Anchor metal panels and other components of the Work securely in place, with provisions for thermal and structural movement.
1. Field cut metal panels as required for doors, windows, and other openings. Cut openings as small as possible, neatly to size required, and without damage to adjacent metal panel finishes.
a. Field cutting of metal panels by torch is not permitted unless approved in writing by manufacturer.
2. Install metal panels perpendicular to structural supports unless otherwise indicated.
3. Flash and seal metal panels with weather closures at perimeter of openings and similar elements. Fasten with self-tapping screws.
4. Locate and space fastenings in uniform vertical and horizontal alignment.
5. Locate metal panel splices over structural supports with end laps in alignment.
6. Lap metal flashing over metal panels to allow moisture to run over and off the material.
D. Metal Protection: Where dissimilar metals contact each other or corrosive substrates, protect against galvanic action by painting contact surfaces with corrosion-resistant coating, by applying rubberized-asphalt underlayment to each contact surface, or by other permanent separation as recommended by metal roof panel manufacturer.
E. Joint Sealers: Install gaskets, joint fillers, and sealants where indicated and where required for weatherproof performance of metal panel assemblies. Provide types of gaskets, fillers, and sealants indicated; or, if not indicated, provide types recommended by metal panel manufacturer.
1. Seal metal panel end laps with double beads of tape or sealant the full width of panel. Seal side joints where recommended by metal panel manufacturer.
2. Prepare joints and apply sealants to comply with requirements in Section 079200
"Joint Sealants."
3.5 METAL ROOF PANEL INSTALLATION
A. General: Provide metal roof panels of full length from eave to ridge unless otherwise indicated or restricted by shipping limitations.
1. Install ridge caps as metal roof panel work proceeds.
2. Flash and seal metal roof panels with weather closures at eaves and rakes.
Fasten with self-tapping screws.
FINAL CONSTRUCTION DOCUMENTS
METAL BUILDING SYSTEMS 133419 - 20
B. Standing-Seam Metal Roof Panels: Fasten metal roof panels to supports with concealed clips at each standing-seam joint, at location and…