This document is a set of ICT (Information and Communications Technology) site planning drawings for the IHS Whiteriver Hospital construction project located at 200 W Hospital Drive, Whiteriver, Arizona 85941. The project is associated with IHS Project #131445 and IHS Contract #75H70123R00008, with an award date of February 2, 2024. The drawings are based on a Program of Requirements dated March 26, 2022, a POR Amendment dated February 3, 2025, and Schematic Drawings approved on November 19, 2024.
The contractor is responsible for installing concrete-encased ductbank conduit systems, manholes (MH-005 and MH-006 are specified as new installations with 4-inch conduits), and handholes to support outside plant communications cabling and exterior ICT devices throughout the hospital site. Key contractor obligations include field verification of pathways and site conditions; coordination with other utilities; confirmation that new connectivity from the Service Support Building (SSB) to the existing hospital is tested and operational prior to demolition work; and maintenance of connectivity to the existing hospital throughout construction. Additional responsibilities include providing manholes and handholes per project standards and telecommunications best practices (every 90 degrees of bend or every 150 feet), coordinating with IHS on service disconnection procedures and facility demolition, and developing a final labeling scheme for all access points. The contractor must also reference BP4 documentation for device locations and coordinate with civil and electrical site utility drawings for complete pathway information.
View the file
Other files
Show 40 more
Latest 50 of 107 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
MISC
WATER
A,1 N 1049396.97 E 762103.57
A,5N 104960X.XXE 76214X.XX
C,5N 104959X.XXE 7622XX.XX
CST-4
CST-4
CST-4
CST-4
CST-4
CST-4
CST-4
CST-4
CST-4
CST-4
CST-4
SC-2
A.
B.
C.
D.
E.
F.
G.
H.
REFER TO CIVIL AND ELECTRICAL SITE UTILITY DRAWINGS FOR
PATHWAYS SERVING OUTSIDE PLANT COMMUNICATIONS
CABLING AND OTHER SITE RELATED EXTERIOR ICT DEVICES
SUCH AS DUCT BANKS, MANHOLES, AND HANDHOLES.
CONTRACTOR TO FIELD VERIFY PATHWAYS AND SITE
CONDITIONS.
CONTRACTOR TO CONFIRM NEW CONNECTIVITY FROM SSB TO
EXISTING HOSPITAL IS TESTED AND OPERATIONAL PRIOR TO
DEMOLITION AND NEW SITE WORK ASSOCIATED WITH NEW
HOSPITAL.
CONDUIT ROUTING, MANHOLES AND HANDHOLES ARE SHOWN
FOR COORDINATION PURPOSES ONLY. CONTRACTOR TO FIELD
VERIFY EXACT LOCATIONS AND COORDINATE WITH OTHER
UTILITIES AS REQUIRED AND PROVIDE ADDITIONAL MANHOLES
AND/OR HANDHOLES AS REQUIRED PER THE PROJECT
STANDARDS AND TELECOMMUNICATIONS BEST PRACTICES FOR
PROVIDING EVERY (2) 90 DEGREES OF BEND OR EVERY 150'.
ALL SITE CONDUITS AND PATHWAYS SHALL BE IN CONCRETE
ENCASED DUCTBANK.
CONTRACTOR IS RESPONSIBLE FOR MAINTAINING
CONNECTIVITY TO EXISTING HOSPITAL THROUGHOUT
CONSTRUCTION.
CONTRACTOR TO COORDINATE WITH IHS AS REQUIRED FOR
DISCONNECTION OF SERVICES AT EXISTING FACILITY UPON
COMPLETION OF NEW FACILITY. CONTRACTOR TO DEMO AND
REMOVE DUCT BANKS AND CABLING NOT REQUIRED FOR THE
NEW FACILITY.
MANHOLE / MAINTENANCE HOLE NUMBERING SCHEMES ON THE
PLANS ARE FOR COORDINATION PURPOSES ONLY. CONTRACTOR
TO PROVIDE FINAL LABELING SCHEME WITH ALL HANDHOLES,
MANHOLES, AND ACCESS POINTS. CONTRACTOR TO
COORDINATE WITH IHS AS REQUIRED FOR LABELING SCHEME.
GENERAL SHEET NOTES
MHNEW MANHOLE
MH-001
(8) 4" C
MATCH LINE
SHEET T1.1.2
MATCH LINE
SHEET T1.1.2
MH
MHNEW MANHOLE
MH-003
EXISTING MANHOLE MH-008
COORDINATE PATHWAYS AND
CONNECTIVITY. PROTECT
EXISTING UTILITIES AS REQUIRED.
EXISTING
PATHWAY
T111
SSB BUILDING
EXISTING
DIALYSIS BUILDING
EXISTING
PRIMARY SITE ENTRY
(VISITOR ENTRY)
3/4 ACCESS
SECONDARY SITE ENTRY
(EMERGENCY ENTRY)
FULL ACCESS
PRIMARY SITE ENTRY
(TRAFFIC SIGNAL)
FULL ACCESS
GARRETT BUILDING
EXISTING
HOSPITAL
EXISTING
AZ-73
402 OLD SAW MILL ROAD
402 OLD SAW MILL ROAD
W 36TH DRIVE
N
PO
W
ER
LIN
E
RO
AD
COMMANCHE DRIVE
CHOCTAW DRIVE
AP
AC
HE
C
IR
CL
E
KIOWA DRIVE
APACHE CIRCLE
AP
AC
HE
C
IR
CL
E KUPER DRIVE
APACHE CIRCLE
HOPI DRIVE
NAVAJO DRIVE
VISITOR PARKING - EAST
69 SPACES
NORTH LOOP ROAD
6 SPACES
FACILITIES
7 SPACES
EMS BUILDING
(2 STORY)
EMS PARKING
5 SPACES
VISITOR PARKING - ED
77 SPACES
EXISTING - SBS + ADMIN
136 SPACES
VISITOR PARKING - SOUTH
285 SPACES
APPROXIMATE LOCATION
EXISTING HOSPITAL TIE-IN
*PROPOSED
PEDESTRIAN
CONNECTION TO
STAFF HOUSE
T115
(4) 4" C
(4) 4" C
MH
MH
T120
T119
(4) 4" C
(4) 4" C
T111
NEW MANHOLE
MH-005 (4) 4" C
REFERENCE BP4 DOCUMENTATION
FOR DEVICE LOCATIONS AND
INFORMATION.
MHNEW MANHOLE
MH-004
FOR FUTURE STAFF
QUARTERS CONNECTIVITY
(2) 4" C
SC-2
NEW HOSPITAL
PHASE 1
CENTRAL
PLANT
(1 STORY)
T126
T126
PUMP HOUSE
(TYP)
T128
(TYP)
T130
NEW MANHOLE
MH-006
ADMIN
BUILDING
EXISTING
SHEET NUMBER
PROJECT NUMBER
SEALS AND SIGNATURES
ISSUED FOR DATE
Pl ot
Da te:
IHS Whiteriver Hospital 200 W Hospital Drive Whiteriver, Arizona, 85941
IHS Project #: 131445 IHS Contract #: 75H70123R00008 IHS Award Date: 02/02/2024
455 NORTH THIRD STREET
SUITE 250
PHOENIX, AZ 85004
602.265.2200 smithgroup.com
Drawn By: Checked By:
BASED ON PROGRAM OF REQUIREMENTS DATED [ 03/26/22],
POR AMENDMENT DATED [ 02/03/25], AND ON SCHEMATIC
DRAWINGS APPROVED [11/19/24].
5/1 8/2
6 1
1:4 9:3
3 A M
ICT SITE PLAN - PHASE 1 -
AREA 1
T1.1.1CD
Vo llm er
14904 Vollmer Foster
0 100' 200' 300'
GRAPHIC SCALE: 1" = 100' - 0"
SHEET KEYNOTES
T111 PRIOR TO DEMOLITION AND SITE WORK ASSOCIATED WITH
NEW HOSPITAL, CONTRACTOR TO PROVIDE AND INSTALL
CONDUITS TO ESTABLISH CONNECTIVITY BETWEEN SPECIAL
SERVICES BUILDING (SSB), AND EXISTING HOSPITAL.
CONTRACTOR TO PROVIDE, INSTALL AND TERMINATE
48-STRANDS OF SMFO AND 100-PAIR COPPER FROM
EXISTING HOSPITAL TO SSB AND TERMINATE IN EXISTING
HOSPITAL MDF. FROM ROUTE 73, PRIOR TO THE DEMOLITION
AND SITE WORK ASSOCIATED WITH THE NEW HOSPITAL,
INSTALL NEW DUCT BANK AND MANHOLE INFRASTRUCTURE
TO MAINTAIN EXISTING SERVICES TO EXISTING HOSPITAL
VIA SSB CAMPUS MPOE/DATA CENTER. TIE INTO EXISTING
MANHOLES AND PROVIDE NEW AS INDICATED. PROVIDE,
TERMINATE, AND TEST NEW CONNECTIVITY TO EXISTING
HOSPITAL VIA NEW PATHWAY FROM SSB.
T115 COORDINATE WITH SERVICE PROVIDER AS REQUIRED TO
MAINTAIN CONNECTIVITY TO EXISTING BUILDING.
COORDINATE TERMINATION LOCATIONS WITH SERVICE
PROVIDER AND EXISTING AERIAL FIBER CABLING. EXTEND
AND RELOCATE EXISTING SERVICES FROM ROUTE 73 VIA
NEW DUCTBANK TO SSB.
T119 CONSOLIDATE DATA FOR STAFF AND PATIENT PARKING
AREA INTO MANHOLE MH-006.
T120 ALL CABLING DATA TO BE INSTALLED VIA SPLICE CASE IN
MANHOLE TO FACILITATE TRANSITION OF CONNECTIVITY TO
NEW HOSPITAL PRIOR TO DEMOLITION OF EXISTING
HOSPITAL.
T126 COORDINATE LOCATION WITH OWNER AND SECURITY
PLANS PRIOR TO FINAL INSTALLATION. TERMINATE IN SSB
TELECOM ROOM.
T128 TERMINATE CONDUITS AT MANHOLE MH-006. ROUGH-IN
CABLING TO PUMP HOUSE IDF.
T130 DATA FOR STANCHION MOUNTED EMERGENCY BLUE PHONE
WITH MOUNTING ARM FOR 360 CAMERA AND INTEGRATED
PTZ CAMERA. CONTRACTOR TO PROVIDE AND INSTALL
COMPOSITE CABLE AS PART OF A POE EXTENDER SYSTEM
PER DIVISION 27 SPECIFICATIONS SECTION 271500 2.7 - 2.10.
PROVIDE (1) 2" CONDUIT AS REQUIRED FROM CST STUBBED
DIRECTLY INTO NEAREST TELECOM ROOM IN NEW
HOSPITAL. PROVIDE HANDHOLE FOR CABLE ACCESS EVERY
300' OR EVERY 180 DEGREE OF BEND.
PROJECT NORTH
SCALE: 1" = 100'-0"
ICT SITE PLAN - PHASE 1 - AREA 1
FINAL CONSTRUCTION DOCUMENTS 23JAN26
BID ADDENDUM-D 20MAY26
D
WATER
A,1 N 1049396.97 E 762103.57
A,5N 104960X.XXE 76214X.XX
C,5N 104959X.XXE 7622XX.XX
SU
RG
ER
Y
VIS
ITO
R
SU
RG
ER
Y
VIS
ITO
R
SU
RG
ER
Y
VIS
ITO
R
CST-4
CST-4
CST-4
CST-4
CST-4
CST-4
CST-4
CST-4
CST-4
CST-4
CST-4
CST-4
CST-4
CST-4
CST-4
CST-4
CST-4
CST-4
CST-4
CST-4
CST-4
CST-4
CST-4
CST-4
CST-4
CST-4
CST-4
CST-4
CST-4
CST-4
SC-2
CST-4
MH
EXISTING MANHOLE MH-008
COORDINATE PATHWAYS AND
CONNECTIVITY. PROTECT
EXISTING UTILITIES AS REQUIRED.
(8) 4" C
NEW MANHOLE
MH-007
(8) 4" C
(4) 4" C
MATCH LINE
SHEET T1.2.2
MATCH LINE
SHEET T1.2.2
EXISTING
PATHWAY
MH
T115 T117
T116
402 OLD SAW MILL ROAD
AP
AC
HE
C
IR
CL
E
PRIMARY SITE ENTRY
(VISITOR ENTRY)
3/4 ACCESS
SECONDARY SITE ENTRY
(EMERGENCY ENTRY)
FULL ACCESS
PRIMARY SITE ENTRY
(TRAFFIC SIGNAL)
FULL ACCESS
ADMIN
BUILDING
EXISTING
SSB BUILDING
EXISTING
DIALYSIS BUILDING
EXISTING
AZ-73
402 OLD SAW MILL ROAD
W 36TH DRIVE
N
PO
W
ER
LIN
E
RO
AD
COMMANCHE DRIVE
CHOCTAW DRIVE
AP
AC
HE
C
IR
CL
E
KIOWA DRIVE
APACHE CIRCLE
AP
AC
HE
C
IR
CL
E KUPER DRIVE
APACHE CIRCLE
HOPI DRIVE
NAVAJO DRIVE
VISITOR PARKING - EAST
69 SPACES
*PROPOSED
PEDESTRIAN
CONNECTION TO
STAFF HOUSE
NORTH LOOP ROAD
6 SPACES
FACILITIES
7 SPACES
EMS PARKING
5 SPACES
VISITOR PARKING - ED
77 SPACES
STAFF - NW
EXTENSION
88 SPACES
EXISTING - SBS + ADMIN
136 SPACES
T113
T114
VISITOR PARKING - SOUTH
285 SPACES
T115
(4) 4" C
MHNEW MANHOLE
MH-001
MHNEW MANHOLE
MH-003
(4) 4" C
MH
MH
(4) 4" C
T116
(8) 4" C
T118
NEW MANHOLE
MH-005
402 OLD SAW MILL ROAD
(4) 4" C
MHNEW MANHOLE
MH-004
FOR FUTURE STAFF
QUARTERS CONNECTIVITY
(2) 4" C
SC-2
T121
T121
T121
SCP-4
SCP-4
SCP-4
SC-S-1
SC-S-1
SC-S-1
GOVERNMENT
LOT
72 SPACES
SC-S-1
SC-S-1
SC-S-1
SC-S-1
SC-S-1
SC-S-1
SC-S-1
SC-S-1
SC-S-1
STAFF - MAINLOT
551 SPACES
T122 T122
T122
ALT6
ALT6
ALT6
NEW HOSPITAL
PHASE 2
CENTRAL
PLANT
(1 STORY)
FS-2
FS-2
FS-2
T125
T125
FS-2
FS-2
T125
T125
T125
FS-4
T124
FS-2
T123
MH
NEW MANHOLE
MH-009
T122ALT6
REFERENCE BP4 DOCUMENTATION
FOR DEVICE LOCATIONS AND
INFORMATION.
PUMP HOUSE
CST-4
CST-4
CST-4
CST-4
MS-6
T122ALT6
T122ALT6
T122ALT6
SCP-1
NEW MANHOLE
MH-006
(TYP)
T131
T129
(TYP)
T130
A.
B.
C.
D.
E.
F.
REFER TO CIVIL AND ELECTRICAL SITE UTILITY DRAWINGS FOR
PATHWAYS SERVING OUTSIDE PLANT COMMUNICATIONS
CABLING AND OTHER SITE RELATED EXTERIOR ICT DEVICES.
CONTRACTOR TO FIELD VERIFY PATHWAYS AND SITE
CONDITIONS.
CONTACTOR TO CONFIRM NEW CONNECTIVY FROM SSB TO
EXISTING HOSPITAL IS TESTED AND OPERATIONAL PRIOR TO
DEMOLITION AND NEW SITE WORK ASSOCIATED WITH NEW
HOSPITAL.
CONDUIT ROUTING, MANHOLES AND HANDHOLES ARE SHOWN
FOR COORDINATION PURPOSES ONLY. CONTRACTOR TO FIELD
VERIFY EXACT LOCATIONS AND COORDINATE WITH OTHER
UTILITIES AS REQUIRED AND PROVIDE ADDITIONAL MANHOLES
AND/OR HANDHOLES AS REQUIRED PER THE PROJECT
STANDARDS AND TELECOMMUNCATIONS BEST PRACTICES.
ALL SITE CONDUITS AND PATHWAYS SHALL BE IN CONCRETE
ENCASED DUCTBANK.
CONTRACTROR IS RESPONSIBLE FOR MAINTAINING
CONNECTIVITY TO EXISTING HOSPITAL THROUGHOUT
CONSTRUCTION.
GENERAL SHEET NOTES
SHEET NUMBER
PROJECT NUMBER
SEALS AND SIGNATURES
ISSUED FOR DATE
Pl ot
Da te:
IHS Whiteriver Hospital 200 W Hospital Drive Whiteriver, Arizona, 85941
IHS Project #: 131445 IHS Contract #: 75H70123R00008 IHS Award Date: 02/02/2024
455 NORTH THIRD STREET
SUITE 250
PHOENIX, AZ 85004
602.265.2200 smithgroup.com
Drawn By: Checked By:
BASED ON PROGRAM OF REQUIREMENTS DATED [ 03/26/22],
POR AMENDMENT DATED [ 02/03/25], AND ON SCHEMATIC
DRAWINGS APPROVED [11/19/24].
5/1 8/2
6 1
1:4 9:4
9 A M
ICT SITE PLAN - PHASE 2 -
AREA 1
T1.2.1CD
Vo llm er
14904 Vollmer Foster
SHEET KEYNOTES
ALT6 ADD OPTION 06: PV SYSTEM
T113 PROVIDE AND INSTALL 12-STRANDS SMFO AND 25-PAIR
COPPER FROM NEW HOSPITAL TO PUMP HOUSE.
T114 PROVIDE AND INSTALL 12-STRANDS SMFO AND 25-PAIR
COPPER FROM NEW HOSPITAL, COIL AND PROTECT FOR
FUTURE SPLICING TO SUPPORT FUTURE MOB.
T115 COORDINATE WITH SERVICE PROVIDER AS REQUIRED TO
MAINTAIN CONNECTIVITY TO EXISTING BUILDING.
COORDINATE TERMINATION LOCATIONS WITH SERVICE
PROVIDER AND EXISTING AERIAL FIBER CABLING. EXTEND
AND RELOCATE EXISTING SERVICES FROM ROUTE 73 VIA
NEW DUCTBANK TO SSB.
T116 GC TO COORDINATE WITH OWNER AND SERVICE PROVIDER
FOR SITE CONNECTIVITY.
T117 DATA FOR LED MONUMENT SIGN, CONTRACTOR TO PROVIDE
AND INSTALL COMPOSITE CABLE AS PART OF A POE
EXTENDER SYSTEM PER DIVISION 27 SPECIFICATIONS
SECTION 271500 2.7 - 2.10. TERMINATE IN NEAREST MDF.
REFER TO SIGNAGE DRAWINGS FOR ADDITIONAL
INFORMATION.
T118 PROVIDE AND INSTALL 12-STRANDS SMFO AND 25-PAIR
COPPER FROM NEW HOSPITAL TO LIFT STATION.
T121 FUTURE EV CHARGING LOCATION. PROVIDE (1) DATA CABLE
AT EACH LOCATION. PROVIDE 1-1/2" CONDUIT WITH
PULL-STRING. CONDUIT TO STUB-UP INTO CHARGING
BOLLARD / PEDESTAL. REFER TO ELECTRICAL SITE PLAN
E1.1 FOR EV CHARGING LOCATIONS.
T122 PER ADD OPTION 06, CONTRACTOR TO PROVIDE AND
INSTALL VIDEO SURVEILLANCE CAMERAS AS INDICATED ON
THE PLANS IF ALTERNATE IS ACCEPTED. IF ALTERNATE IS
NOT ACCEPTED, CONTRACTOR SHALL PROVIDE AND
INSTALL EMERGENCY HELP POINTS IN THE CURRENTLY
DESIGNED CAMERA LOCATIONS. EMERGENCY HELP POINTS
IN THESE LOCATIONS WILL BE IDENTICAL TO THE OTHERS
ON THE SITE.
T123 LOCATION FOR WIRELESS NETWORK BOLLARD COORDINATE
WITH EQUIPMENT PROVIDER. REFER TO SPECIFICATION
271500 SECTION 2.4 FOR BOLLARD INFORMATION.
T124 CONDUIT STUB UP TO NEMA RATED ENCLOSURE,
TERMINATE 4-PORT FACEPLATE INSIDE.
T125 DATA RESERVED FOR FOUNTAIN SYSTEM VAULT.
COORDINATE FINAL LOCATION AND REQUIREMENTS WITH
FOUNTAIN CONTROL SYSTEM.
T129 DATA FOR LICENSE PLATE RECOGNITION CAMERA AND
VIDEO INTERCOM, CONTRACTOR TO PROVIDE AND INSTALL
COMPOSITE CABLE AS PART OF A POE EXTENDER SYSTEM
PER DIVISION 27 SPECIFICATIONS SECTION 271500 2.7 - 2.10.
PROVIDE (1) 2" CONDUIT AS REQUIRED FROM DEVICE
DIRECTLY INTO NEAREST TELECOM ROOM. PROVIDE
HANDHOLE FOR CABLE ACCESS EVERY 300' OR EVERY 180
DEGREE OF BEND. CARD READER CABLING MAY SHARE
PATHWAYS AS REQUIRED. REFERENCE DIVISION 28 FOR
CABLING SPECIFICATIONS.
T130 DATA FOR STANCHION MOUNTED EMERGENCY BLUE PHONE
WITH MOUNTING ARM FOR 360 CAMERA AND INTEGRATED
PTZ CAMERA. CONTRACTOR TO PROVIDE AND INSTALL
COMPOSITE CABLE AS PART OF A POE EXTENDER SYSTEM
PER DIVISION 27 SPECIFICATIONS SECTION 271500 2.7 - 2.10.
PROVIDE (1) 2" CONDUIT AS REQUIRED FROM CST STUBBED
DIRECTLY INTO NEAREST TELECOM ROOM IN NEW
HOSPITAL. PROVIDE HANDHOLE FOR CABLE ACCESS EVERY
300' OR EVERY 180 DEGREE OF BEND.
T131 DATA FOR LICENSE PLATE RECOGNITION CAMERA AND
SECURITY CAMERA MOUNTED TO 12' POLE. CONTRACTOR
TO PROVIDE AND INSTALL COMPOSITE CABLE AS PART OF A
POE EXTENDER SYSTEM PER DIVISION 27 SPECIFICATIONS
SECTION 271500 2.7 - 2.10. PROVIDE (1) 2" CONDUIT AS
REQUIRED FROM LPR STUBBED DIRECTLY INTO NEAREST
TELECOM ROOM IN NEW HOSPITAL. PROVIDE HANDHOLE
FOR CABLE ACCESS EVERY 300' OR EVERY 180 DEGREE OF
BEND. REFER TO TY SERIES DRAWING FOR ADDITIONAL
INFORMATION.
0 100' 200' 300'
GRAPHIC SCALE: 1" = 100' - 0"
PROJECT NORTH
SCALE: 1" = 100'-0"
ICT SITE PLAN - PHASE 2 - AREA 1
FINAL CONSTRUCTION DOCUMENTS 23JAN26
BID ADDENDUM-D 20MAY26