This is an Addendum (Addendum D) to the IHS Whiteriver Hospital project contract documents, issued by SmithGroup on May 20, 2026. The addendum serves to clarify, revise, and supersede information contained in the Project Manual, Drawings, and previously issued addenda, and must be acknowledged by bidders on the Bid Form to be incorporated into the contract.
Addendum D addresses clarifications and revisions stemming from seven Bidder Request for Information (RFI) responses: BID RFI 083 regarding liquefied-petroleum gas piping cathodic protection requirements, BID RFI 084 regarding site ICT infrastructure conflicts, BID RFI 075 regarding exterior wall assembly keynotes, BID RFI 077 regarding terrazzo base specifications, and BID RFI 087 regarding fence gauge wire specifications. The addendum includes one revised specification section (Section 231126 - Facility Liquefied-Petroleum Gas Piping) and eight revised drawing sheets: ADOT_RD7.1 traffic signal plans and equipment schedules, BP1 site details, two exterior wall assembly drawings, a Level 1 finish floor plan, and two ICT site plans for Phases 1 and 2. All revisions are incorporated into the contract through enumeration of this addendum in the Owner/Contractor Agreement.
View the file
Other files
Show 40 more
Latest 50 of 107 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ADDENDUM
www.smithgroup.com
PROJECT IHS Whiteriver Hospital
NUMBER
D
PROJECT NO. 14904.000 DATE 5/20/2026
PROJECT
LOCATION
Whiteriver, AZ
OWNER Indian Health Service
PREPARED BY
SmithGroup
NAME COMPANY
Owner Indian Health Service Contractor or Bidder Attn: Bidders Team Team
This Addendum is issued pursuant to the Instructions to Bidders and/or Conditions of the Contract. This Addendum serves to clarify, revise, and supersede information in the Project Manual, Drawings, and previously issued Addenda. Portions of the Addendum affecting the Contract Documents will be incorporated into the Contract by enumeration of the Addendum in the Owner/Contractor Agreement. The Bidder shall acknowledge receipt of this Addendum in the appropriate space on the Bid Form.
ADDENDUM-D TO ADDRESS: ADOT Plans Clarifications, Revised Spec 231126 per BID RFI 083 Response, Clarifications for BID RFI 084 Site ICT Infrastructure Conflicts, Clarifications for BID RFI 075 Exterior Wall Assembly Keynote, Clarifications for BID RFI 077 Terrazzo Base, Clarifications for BID RFI 087 Gauge Wire
DOCUMENTS ISSUED WITH THIS DOCUMENT
PART 1 - REVISED DOCUMENTS ISSUED WITH THIS DOCUMENT
1.1 REVISED PROJECT MANUAL DOCUMENTS AND SPECIFICATIONS
A. List documents and specifications revised and (provide brief description of change)
1. SECTION 231126 - FACILITY LIQUEFIED-PETROLEUM GAS PIPING
(Clarifications in Response to BID RFI 083 regarding Cathodic Protection not req.)
1.2 REVISED DRAWING SHEETS
A. List drawings sheets revised and (provide brief description of changes)
1. ADOT_RD7.1 – TRAFFIC SIGNAL PLAN (Clarification to Traffic Signal Plan)
2. ADOT_RD7.1 - TRAFFIC SIGNAL EQUIPMENT SCHEDULE (Clarification to
Equipment Schedule and Pull Box Schedule)
3. BP1_SITE DETAILS (Clarifications for BID RFI 087 Fence Guage Wire)
4. BP1_A5.0.10 - EXTERIOR WALL ASSEMBLIES (Clarifications for BID RFI 075
Exterior Wall Assembly Keynote) www.smithgroup.com
5. BP1_A5.0.11 - EXTERIOR WALL ASSEMBLIES (Clarifications for BID RFI 075 Exterior Wall Assembly Keynote)
6. BP1_AI2.1.1A - LEVEL 1 (LOWER GROUND) - FINISH FLOOR PLAN - AREA
A (Clarifications for BID RFI 077 Terrazzo Base)
7. BP1_T1.1.1 - ICT SITE PLAN - PHASE 1 - AREA 1 (Clarifications for BID RFI 084 Site ICT Infrastructure Conflicts)
8. BP1_T1.2.1 - ICT SITE PLAN - PHASE 2 - AREA 1 (Clarifications for BID RFI 084 Site ICT Infrastructure Conflicts)
END OF DOCUMENT