This document is a comprehensive set of electrical construction drawings and specifications for the IHS Whiteriver Hospital expansion project located in Whiteriver, Arizona. The project is identified as IHS Project #131445 under IHS Contract #75H70123R00008, with an award date of February 2, 2024. The drawings are prepared by SmithGroup and based on a Program of Requirements dated March 26, 2022, with amendments dated February 3, 2025, and schematic drawings approved November 19, 2024.
The electrical design encompasses multiple building systems including power distribution, lighting, receptacles, photovoltaic solar systems, generator backup systems, fire pump connections, UPS systems, and control wiring throughout the multi-level hospital facility. Key electrical infrastructure includes transformers ranging from 45 kVA to 112.5 kVA, automatic transfer switches with 4-pole configurations and bypass isolation, panelboards rated at 225A to 400A with surge protective devices, motor starters with variable frequency drives for HVAC equipment, and lighting control systems with occupancy sensors and dimmers. The photovoltaic system (Additive Option No. 6) specifies parking shade canopy-mounted panels totaling approximately 830 modules distributed across three carports with 62.5 kW inverters connected at 480/277V. The design maintains voltage drop limitations of 2% for feeders and 3% for branch circuits, provides dedicated neutral conductors for each branch circuit, and incorporates ground fault protection in required areas per NEC standards. All work must comply with the National Electrical Code, local building codes, fire codes, and includes comprehensive coordination requirements with mechanical systems, architectural elements, and equipment manufacturers throughout the construction process.
View the file
Other files
Show 40 more
Latest 50 of 107 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
GAP
RP-XXXX SYMBOL INDICATES TO WHICH PANELBOARD INDICATED CIRCUITS IN THE ROOM
ARE TO BE CONNECTED.
GENERATOR ANNUNCIATOR (DERANGEMENT) PANEL
GENERATORG
LCP
RPX
EMU
UPS
PANELBOARD - (FLUSH/SURFACE)
DISTRIBUTION PANELBOARD
LIGHTING CONTROL PANEL, SURFACE MTD. UON.
LOW VOLTAGE LIGHTING RELAY PANEL, SURFACE MTD. UON
(X IS A VARIABLE LETTER BASED ON LEVEL AND AREA)
UNINTERRUPTIBLE POWER SUPPLY
ELECTRONIC METERING UNITM
SPD SURGE PROTECTIVE DEVICE
sEMU ELECTRONIC SUB METERING UNITsM
GROUND
ATS
FUSE
BUS DUCT PLUG-IN UNIT
AUTOMATIC TRANSFER SWITCH
LIGHTNING ARRESTOR
PLUG-IN CIRCUIT BREAKER, IP20 RATED, TOUCH SAFE BARRIER
E
K
T
FUSED SWITCH
DELTA CONNECTION
CPT
ELECTRIC INTERLOCK SYSTEM
CONTROL POWER TRANSFORMER
CURRENT TRANSFORMER
POTENTIAL TRANSFORMER
KEY INTERLOCKING SYSTEM
WYE CONNECTION - SOLID GROUND
SWITCH - SINGLE THROW
DRAWOUT TYPE, CIRCUIT BREAKER
STATIONARY CIRCUIT BREAKER
TRANSFORMER - TYPE AND RATING AS INDICATED
CB
VFD
PC
C CONTACTOR
HAND-OFF-AUTO SELECTOR SWITCH WITH PILOT LIGHT
VARIABLE FREQUENCY DRIVE/VARIABLE FREQUENCY MOTOR CONTROLLER
PACKAGE CONTROL UNIT (PROVIDED BY EQUIPMENT SUPPLIER)
MANUAL MOTOR STARTER WITH PILOT LIGHT AS INDICATED.
PUSHBUTTON STATION
DISCONNECT SWITCH, FUSED.
PROVIDE SWITCH AND FUSE AMPACITY EQUAL TO OR GREATER THAN FEEDER AMPACITY, UON
DISCONNECT SWITCH, NON-FUSED
PROVIDE SWITCH AMPACITY EQUAL TO OR GREATER THAN FEEDER AMPACITY, UON
COMBINATION MOTOR STARTER WITH DISCONNECT SWITCH.
PROVIDE SWITCH AND FUSE AMPACITY EQUAL TO OR GREATER THAN FEEDER AMPACITY, UON
CIRCUIT BREAKER IN NEMA 1 ENCLOSURE (FLUSH/SURFACE)
MOTOR AND CONNECTION
EMERGENCY POWER OFF
M
GROUNDING BUS BAR
DT
D2
PIPI
D2
DT
PH
TS
EM
MED
L
DT
XX LIGHTING FIXTURE TYPE DESIGNATION - "XX" INDICATES SPECIFIC TYPE
REFER TO LIGHT FIXTURE SCHEDULE
EXIT LIGHT - WALL/CEILING MOUNTED - DIRECTIONAL
ARROWS AS INDICATED SHADING INDICATES ILLUMINATED
FACE
LIGHTING TRACK - "X" DENOTES TYPE
LIGHTING FIXTURE - TYPE AS INDICATED
WALL MOUNTED LIGHTING FIXTURE- TYPE AS INDICATED
SITE LIGHTING FIXTURE TYPE AS INDICATED
LIGHTING FIXTURE - TYPE AS INDICATED (SUBSCRIPT INDICATES SWITCH CONTROL)
NICOLAUDIE ARCHITECTURAL STICK-DE3 TOUCH SCREEN CONTROL KEYPAD
FOR USE WITH DMX FIXTURES
SINGLE OR DOUBLE, REMOTE EMERGENCY LIGHTING FIXTURE
DUAL LEVEL SWITCHING. PROVIDE BALLASTS/DRIVERS REQUIRED TO
PROVIDE DUAL LEVEL SWITCHING.
PASSIVE INFRARED OCCUPANCY SENSOR (WALL/CEILING)
THREE-WAY SWITCH (S3P-THREE-WAY SWITCH WITH PILOT LIGHT)
SENSORSWITCH NIGHTINGALE 4 BUTTON DIMMER FOR PATIENT ROOMS
REMOTE TEST SWITCH FOR LIGHT FIXTURES EQUIPPED WITH INTEGRAL BATTERIES
FOUR - WAY SWITCH
PASSIVE INFRARED/ULTRASONIC OCCUPANCY SENSOR (WALL/CEILING)
PHOTO CELL
PASSIVE INFRARED/ULTRASONIC OCCUPANCY SENSOR, 2 POLE (WALL/CEILING)
HALF SHADING INDICATES FIXTURE CONNECTED TO CRITICAL BRANCH
SUBSCRIPT EM INDICATES INTEGRAL BATTERY UNIT
SHADING INDICATES FIXTURE CONNECTED TO LIFE SAFETY BRANCH
SUBSCRIPT EM INDICATES INTEGRAL BATTERY UNIT
SUBSCRIPT NL INDICATES FIXTURE TO OPERATE AS UNSWITCHED NIGHT LIGHT
EM
LOW VOLTAGE SWITCH
WALLWASH LIGHT FIXTURE
PASSIVE INFRARED/ULTRASONIC OCCUPANCY SENSOR
ELTD EMERGENCY LIGHTING TRANSFER DEVICE
CS COMBINATION PHOTOCELL/OCCUPANCY SENSOR
L1 SINGLE ZONE LOW VOLTAGE ON/OFF SWITCH
L1D SINGLE ZONE LOW VOLTAGE DIMMER SWITCH
L2 2 ZONE LOW VOLTAGE ON/OFF SWITCH
L2D 2 ZONE LOW VOLTAGE DIMMER SWITCH
L4 4 ZONE LOW VOLTAGE ON/OFF SWITCH
L4D 4 ZONE LOW VOLTAGE DIMMER SWITCH
NL
EM
NL
a
DTD PASSIVE INFRARED/ULTRASONIC OCCUPANCY SENSOR DIMMER
C CRITICAL
E EQUIPMENT
L LIFE SAFETY
S OPTIONAL STANDBY
U UNINTERRUPTIBLE
POWER SUPPLY
DISTRIBUTION BRANCH
D DISTRIBUTION BOARD / PANEL
P BRANCH CIRCUIT PANEL BOARD
KP KITCHEN POWER PANEL BOARD
A AUTOMATIC TRANSFER SWITCH
T TRANSFORMER
B BUSWAY
S SWITCHBOARD
G GENERATOR
EQUIPMENT TYPE
1 FIRST LEVEL
2 SECOND LEVEL
3 THIRD LEVEL
4 FOURTH LEVEL
R ROOF LEVEL
BUILDING LEVEL
X X X X X X X
SES SOURCE
EQUIPMENT TYPE
BUILDING LEVEL
VOLTAGE
A SES-A
B SES-B
C SES-C
D SES-D
E SES-E
SOURCE
C CENTRAL UTILITY PLANT
M MAIN ELECTRICAL ROOM
E SUB ELECTRICAL ROOM, EAST
W SUB ELECTRICAL ROOM, WEST
T COMMUNICATIONS ROOM
X EMS BUILDING
F FACILITIES
Y CENTRAL PLANT YARD
LOCATION
H 480/277V L 208/120V
VOLTAGE
LOCATION
DISTRIBUTION BRANCH
LETTER ID
A-1
TMH
EMH
EHH
FB
UG
GB
G
PB
CT
TELEPHONE MANHOLE
ELECTRIC MANHOLE
GROUND ROD
ELECTRIC HANDHOLE
GROUND BUS
GROUND CABLE, SIZE AS INDICATED
PLUG-IN BUSWAY
FEEDER BUSWAY
UNDERGROUND CONDUIT/DUCTBANK
CABLE TRAY
CONDUIT TURNED DOWN
CONDUIT TURNED UP
CONDUIT CAST IN CONCRETE OR BELOW SLAB
CONDUIT RUN CONCEALED IN FINISHED AREAS, EXPOSED IN UNFINISHED
AREAS OR BELOW ACCESS FLOORS
HOMERUN TO PANEL WITH CIRCUIT NUMBER(S) AS INDICATED
DEMOLITION WORK
J JJ
AFX
FBX
6-30R
ACCESS FLOOR BOX ("X" DENOTES TYPE AS SPECIFIED)
FLOOR BOX ("X" DENOTES TYPE AS SPECIFIED)
JUNCTION BOX (CEILING, FLOOR OR WALL MOUNTED) INDICATED IN POWER, LIGHTING &
FIRE ALARM SYSTEMS PLANS.
DIRECT CONNECTION TO EQUIPMENT
CEILING MOUNTED DUPLEX RECEPTACLE, NEMA 5-20R
("CR" SUBSCRIPT INDICATES CORD REEL)
SPECIAL PURPOSE RECEPTACLE. TYPE AS INDICATED ON DRAWINGS.
COORDINATE RECEPTACLE TYPE WITH ACTUAL EQUIPMENT PRIOR TO INSTALLATION.
HALF SWITCHED DUPLEX RECEPTACLE, NEMA 5-20R
EMERGENCY DUPLEX RECEPTACLE, NEMA 5-20R
(SHADING INDICATING EMERGENCY RECEPTACLE TYPICAL FOR ALL OTHER
RECEPTACLE TYPES)
QUADRUPLEX RECEPTACLE, (2) NEMA 5-20R, FLOOR MTD SERVICE FITTING, FLUSH TYPE UON
("S" DENOTES SURFACE TYPE)
CEILING MOUNTED QUADRUPLEX ISOLATED GROUND RECEPTACLE, (2)NEMA 5-20R,
DUPLEX ISOLATED GROUND RECEPTACLES WITH A COMMON FACEPLATE.
SINGLE RECEPTACLE, NEMA 5-20R, FLOOR MTD SERVICE FITTING, FLUSH TYPE UON
("S" DENOTES SURFACE TYPE)
CEILING MOUNTED DUPLEX ISOLATED GROUND RECEPTACLE, NEMA 5-20R
CEILING MOUNTED SINGLE ISOLATED GROUND RECEPTACLE, NEMA 5-20R
CEILING MOUNTED SINGLE RECEPTACLE, NEMA 5-20R
SINGLE RECEPTACLE, NEMA 5-20R, MOUNTED AT 24" AFF IN CLINICAL AREAS
QUADRUPLEX, (2)NEMA 5-20R, DUPLEX RECEPTACLES WITH A COMMON
FACEPLATE, MOUNTED AT 24" AFF IN CLINICAL AREAS
DUPLEX RECEPTACLE, NEMA 5-20R, MOUNTED AT 24" AFF IN CLINICAL AREAS
DUPLEX RECEPTACLE, NEMA 5-20R (SLASH INDICATES MOUNTING ABOVE FINISH COUNTER)
SINGLE RECEPTACLE, NEMA 5-20R (SLASH INDICATES MOUNTING ABOVE FINISH COUNTER)
RECEPTACLES MOUNTED ABOVE THE CEILING.
QUADRUPLEX RECEPTACLE, (2) NEMA 5-20R, DUPLEX RECEPTACLES WITH A
COMMON FACEPLATE. (SLASH INDICATES MOUNTING ABOVE FINISH COUNTER)
CEILING MOUNTED QUADRUPLEX RECEPTACLE, (2) NEMA 5-20R, DUPLEX RECEPTACLES WITH
A COMMON FACEPLATE.
GFCI, DUPLEX RECEPTACLE, NEMA 5-20R (SLASH INDICATES MOUNTING ABOVE FINISH COUNTER).
THE GFCI MUST BE INSTALLED IN A READILY ACCESSIBLE LOCATION PER NEC 210.8.
SURFACE RACEWAY (FILLED SPACES DENOTE RECEPTACLE LOCATIONS)
HC ADA DOOR ACTUATOR
P P
PD PD
POWER SERVICE FITTING (CEILING, FLOOR OR WALL MOUNTED) FOR CONNECTION TO
FURNITURE SYSTEM AS SPECIFIED.
COMBINATION POWER AND TELECOMMUNICATIONS BOX (CEILING, FLOOR OR WALL MOUNTED)
FOR POWER AND DATA CONNECTION INDICATED IN POWER & SPECIAL SYSTEMS PLANS.
PTX POKE-THROUGH ASSEMBLY ("X" DENOTES TYPE AS SPECIFIED)
SINGLE IG RECEPTACLE, NEMA 5-20R, FLOOR MTD SERVICE FITTING, FLUSH TYPE UON
("S" DENOTES SURFACE TYPE)
WHERE INDICATED IN AN EXISTING FLOOR, PROVIDE CORE DRILL PACKAGE
TO MAINTAIN FIRE RATING OF FLOOR. EXTEND CONDUIT AND WIRING IN
CEILING SPACE OF FLOOR BELOW TO ELECTRICAL CLOSET OR PANELBOARD.
DUPLEX RECEPTACLE, NEMA 5-20R, FLOOR MTD SERVICE FITTING, FLUSH TYPE UON
("S" DENOTES SURFACE TYPE)
DUPLEX IG RECEPTACLE, NEMA 5-20R, FLOOR MTD SERVICE FITTING, FLUSH TYPE UON
("S" DENOTES SURFACE TYPE)
QUADRUPLEX IG RECEPTACLE, (2) NEMA 5-20R, FLOOR MTD SERVICE FITTING, FLUSH TYPE UON
("S" DENOTES SURFACE TYPE)
COMBINATION USB DUPLEX RECEPTACLE, NEMA 5-20R, WITH (2) 5VDC, 2.1A USB CHARGING
PORTS
FULLY CONTROLLED DUPLEX/QUADRUPLEX RECEPTACLE, NEMA 5-20R. PROVIDE
ALL WIRING, EQUIPMENT, POWER PACKS, AND OCCUPANCY SENSOR INTEGRATION
REQUIRED TO TURN OFF RECEPTACLE(S) WHEN SPACE IS UNOCCUPIED.
HALF CONTROLLED DUPLEX/QUADRUPLEX RECEPTACLE, NEMA 5-20R. PROVIDE ALL
WIRING, EQUIPMENT, POWER PACKS, AND OCCUPANCY SENSOR INTEGRATION
REQUIRED TO TURN OFF HALF OF RECEPTACLE(S) WHEN SPACE IS UNOCCUPIED.
P
PD
REFER TO FLOOR BOX / POKE-THROUGH SCHEDULE FOR TYPES.
REFER TO CORRESPONDING ARCHITECTURAL HEADWALL ELEVATION FOR REQUIRED
ELECTRICAL DEVICE PLACEMENT, A8 SERIES PLANS.
BLANK FACE GFCI MODULE WITH VISUAL AND AUDIBLE ALARM, EATON #SGFDA20W, OR EQUIVALENT.
MOUNTED AT 44" AFF. INSTALL IN A READILY ACCESSIBLE LOCATION AND CONNECT TO A RECEPTACLE
REQUIRING GFCI PROTECTION THAT IS NOT IN A READILY ACCESSIBLE LOCATION.
FG
H-##
A B C A B C
A.
B.
C.
D.
E.
F.
G.
H.
I.
J.
K.
L.
M.
N.
O.
P.
Q.
R.
PROVIDE 1#12 + 1#12N + 1#12G FOR 20A BRANCH CIRCUITING,
UON; MAXIMUM OF THREE CIRCUITS PER CONDUIT; MINIMUM
CONDUIT SIZE OF 3/4" C, UON.
PROVIDE A DEDICATED NEUTRAL WIRE FOR EACH BRANCH
CIRCUIT.
COORDINATE DEVICE LOCATIONS AND MOUNTING HEIGHTS
WITH ARCHITECTURAL DRAWINGS PRIOR TO ROUGH-IN.
PROVIDE FIRE STOPPING FOR CONDUITS AND ELECTRICAL
EQUIPMENT FOR FLOOR SLABS, WALLS AND CEILINGS TO
MAINTAIN FIRE RATING.
INSTALL ELECTRICAL WORK IN ACCORDANCE WITH THE
NATIONAL ELECTRICAL CODE AND LOCAL BUILDING AND FIRE
CODES, IN A NEAT AND WORKMANLIKE MANNER.
LIMIT VOLTAGE DROP TO 2% FOR FEEDERS AND 3% FOR
BRANCH CIRCUITS. INCLUDE DERATING FACTOR FOR ROOF-
MOUNTED CONDUITS.
REFER TO ARCH. REFLECTED CEILING PLANS FOR EXACT
LOCATION OF CEILING MOUNTED DEVICES AND LIGHT
FIXTURES, UNLESS OTHERWISE INDICATED.
WHERE MULTIPLE SWITCHES, RECEPTACLES, AND OTHER
OUTLETS (EXCEPT WALL PHONES) ARE INDICATED PROVIDE
MULTI-GANG BACK BOXES WITH GANG BARRIERS AND A
COMMON FACEPLATE.
WHERE DIFFERENT RECESSED ELECTRICAL DEVICES WITH THE
SAME MOUNTING HEIGHTS ARE INDICATED SIDE-BY-SIDE,
MOUNT THE DEVICES SO THAT THERE IS FOUR INCHES
BETWEEN ADJACENT VERTICAL EDGES OF THE FACEPLATES,
UON.
WHERE ELECTRICAL DEVICES WITH DIFFERENT MOUNTING
HEIGHTS ARE LOCATED IN THE SAME AREA ALIGN DEVICES
VERTICALLY THROUGH THEIR CENTERLINES, UON.
WHERE EXIT SIGNS ARE INDICATED ABOVE DOOR MOUNT AS
FOLLOWS, CENTER THE EXIT SIGN BETWEEN TOP OF DOOR
FRAME AND CEILING IF DISTANCE BETWEEN TOP OF DOOR
FRAME AND CEILING IS 24 INCHES OR LESS; OTHERWISE
MOUNT BOTTOM OF EXIT SIGN 6 INCHES FROM TOP OF DOOR
FRAME, MOUNT OTHER WALL MOUNTED EXIT SIGNS IN THE
SAME AREA AT THE SAME HEIGHT. COORDINATE WITH
ARCHITECTURAL DETAILS.
EXIT SIGNS ARE TO BE TYPE "X1", UON.
PROVIDE SEPARATE NEUTRALS FOR DIMMING CIRCUITS.
PROVIDE FEEDERS AND BRANCH CIRCUITS WHICH HAVE AN
AMPACITY EQUAL TO OR GREATER THAN THE CIRCUIT
OVERCURRENT PROTECTIVE DEVICE RATING, U.O.N.
FURNITURE LAYOUTS ARE FOR REFERENCE ONLY.
COORDINATE THE FINAL LOCATION OF ELECTRICAL DEVICES
AND OUTLETS WITH ARCHITECT, OWNER AND FINAL FURNITURE
PLANS PRIOR TO INSTALLATION.
MOUNT DEVICES FLUSH WITH CONCEALED CONDUIT, EXCEPT
AS NOTED ON THE DRAWINGS AND IN MECHANICAL AND
ELECTRICAL EQUIPMENT ROOMS.
THE DRAWINGS REPRESENT ELECTRICAL DESIGN INTENT. THEY
ARE DIAGRAMMATIC. PROVIDE ALL COMPONENTS NECESSARY
FOR COMPLETE OPERATING ELECTRICAL SYSTEMS.
WHEN MORE THAN ONE 20A., 1P., 120 VOLT CIRCUIT FEEDS A
SURFACE RACEWAY CONNECT RECEPTACLES TO ALTERNATE
CIRCUITS AS FOLLOWS - U.O.N.
SECTION NUMBER
KEY NOTEEXXX
DETAIL NUMBER
DRAWING NUMBER WHERE DRAWN
DRAWING NUMBER WHERE DRAWN
A101
SIM
E0.1
THE FOLLOWING DEVICE TYPES ARE SPECIFIED ON ICT 'T' SERIES PLANS AND ARE ALSO REFLECTED ON 'E' SERIES ELECTRICAL PLANS TO SPECIFY LINE VOLTAGE POWER REQUIREMENTS. REFER TO 'T' SERIES PLANS FOR ELECTRICAL DEVICE REQUIREMENTS.
XX FLOOR MOUNT MULTISERVICE DEVICE
XX WALL MOUNT MULTISERVICE DEVICE
XX CEILING MOUNT MULTISERVICE DEVICE
DB4 DISPLAY BOX WITH TELECOM AND POWER
DB5 DISPLAY BOX WITH TELECOM AND POWER
DP PATIENT ROOM DISPLAY BOX WITH TELECOM AND POWER
FB10 FLOOR BOX WITH AV TELECOM AND POWER
FB34 FLOOR BOX WITH TELECOM AND POWER
PT10 POKE-THRU WITH AV, TELECOM AND POWER
PT11 POLE-THRU WITH TELECOM AND POWER
PT33 FLOOR FURNITURE FEED WITH TELECOM AND POWER
RK1 EQUIPMENT RACK PULL BOX WITH TELECOM AND POWER
RK2 EQUIPMENT RACK PULL BOX WITH TELECOM AND POWER
SYMBOLTAG
THE FOLLOWING SINGLE SERVICE DEVICE TYPES ARE SPECIFIED ON 'E' SERIES PLANS
XX SINGLE SERVICE FLOOR DEVICE
FB1 LEGRAND RFBA 2 GANG, OR EQUIVALENT
(1) 5-20R RECEPTACLE
FB2 LEGRAND RFBA 2 GANG, OR EQUIVALENT
(2) 5-20R RECEPTACLE
FBF LEGRAND RFBA 4 GANG, OR EQUIVALENT
CONFIGURED FOR SYSTEMS FURNITURE FEED
PT1 LEGRAND 6AT, OR EQUIVALENT
(1) 5-20R RECEPTACLE
PT2 LEGRAND 6AT, OR EQUIVALENT
(2) 5-20R RECEPTACLE
PTF LEGRAND 6AT, OR EQUIVALENT
CONFIGURED FOR SYSTEMS FURNITURE FEED
SYMBOLTAG
SHEET NUMBER
PROJECT NUMBER
SEALS AND SIGNATURES
ISSUED FOR DATE
Pl ot
Da te:
IHS Whiteriver Hospital 200 W Hospital Drive Whiteriver, Arizona, 85941
IHS Project #: 131445 IHS Contract #: 75H70123R00008 IHS Award Date: 02/02/2024
455 NORTH THIRD STREET
SUITE 250
PHOENIX, AZ 85004
602.265.2200 smithgroup.com
Drawn By: Checked By:
BASED ON PROGRAM OF REQUIREMENTS DATED [ 03/26/22],
POR AMENDMENT DATED [ 02/03/25], AND ON SCHEMATIC
DRAWINGS APPROVED [11/19/24].
6/1 2/2
6 1
:12 :16
P M
ELECTRICAL
ABBREVIATIONS AND
SYMBOLS
E0.1CD
W hit tin gto n
14904.000 Whittington Baca
ACCESS CONTROL DEVICES 3'-6" AFF
CLOCK OUTLETS 7'-0" AFF
DIMMERS 4'-0" AFF
DISCONNECT SWITCHES 5'-6" AFF
INDIVIDUAL CIRCUIT BREAKERS 5'-6" AFF
INTERCOM 3'-6" AFF
MOTOR STARTERS 5'-6" AFF
PANELBOARDS & CABINETS 6'-0" AFF TO TOP
PUSHBUTTONS 3'-6" AFF
RECEPTACLES 1'-6" AFF
RECEPTACLES ABOVE FINISHED
COUNTER
8" AFC
VANITY LIGHT IN TOILET 6" ABOVE THE MIRROR, UON
VOLUME CONTROLS 3'-6" AFF
WALL SWITCHES 4'-0" AFF
TELECOMMUNICATIONS OUTLETS 1'-6" AFF
TELECOMMUNICATIONS OUTLETS -
WALL PHONE
3'-6" AFF
TV OUTLETS 5'-0" AFF
NURSE CALL DOME LIGHTS 7'-6" AFF
NURSE CALL STATIONS 3'-6" AFF
FIRE ALARM - PULL STATIONS 3'-6" AFF
FIREMAN'S PHONE 3'-6" AFF
FIRE ALARM DEVICES HORN / SPEAKERS
/ STROBES (MOUNTING HEIGHT AT THE
TOP OF THE FIRE ALARM DEVICE OR 6"
BELOW CEILING WHICH IS LOWER)
7'-2" AFF TO TOP
ELECTRICAL ABBREVIATIONS ELECTRICAL LIGHTING SYMBOLS
DISTRIBUTION AND DIAGRAM SYMBOLS
ELECTRICAL WIRING SYMBOLS
ELECTRICAL EQUIPMENT SYMBOLS
ELECTRICAL POWER SYMBOLS GENERAL NOTES
MOUNTING HEIGHTS
REFERENCE SYMBOLS
1.
2.
3.
4.
MOUNTING HEIGHT NOTES:
ALL ELEVATIONS ARE TO CENTER LINE OF DEVICE, UNLESS
OTHERWISE NOTED.
REFER TO EQUIPMENT ELEVATION DRAWINGS FOR
COORDINATION WITH CASEWORK.
MOUNT MANUAL MOTOR STARTER ADJACENT TO OR ON UNIT.
REFER TO ARCHITECTURAL A0 SERIES FOR ADDITIONAL
ELECTRICAL DEVICE MOUNTING HEIGHTS AND DEVICE
ALIGNMENT RULES.
ALL ABBREVIATIONS, SYMBOLS AND LEGENDS SHOWN ON THIS DRAWING ARE NOT NECESSARILY USED.
A A AMPERES
AC ALTERNATING CURRENT
AF AMPERE FRAME (BREAKER RATING)
AFC ABOVE FINISHED COUNTER
AFF ABOVE FINISHED FLOOR
AFG ABOVE FINISHED GRADE
AHU AIR HANDLING UNIT
AIC AMPERE INTERRUPTING CAPACITY
ALT ALTERNATE
ARCH ARCHITECT
AT AMPERES TRIP
ATS AUTOMATIC TRANSFER SWITCH
AUTO AUTOMATIC
AUX AUXILIARY
AWG AMERICAN WIRE GAUGE
B BLDG BUILDING
BRKR, BKR BREAKER
C C CONDUIT
CATV CABLE TELEVISION
CB CIRCUIT BREAKER
CCTV CLOSED CIRCUIT TELEVISION
CE CONTROLLED EMERGENCY
CKT CIRCUIT
CLG CEILING
COM, COMM COMMUNICATIONS
COPY COPIER
CP CONTROL PANEL
CPT CONTROL POWER TRANSFORMER
CT CURRENT TRANSFORMER
CU COPPER
D DC DIRECT CURRENT
DISC DISCONNECT
DIST DISTRIBUTION
DIV DIVISION
DN DOWN
DP DISTRIBUTION PANEL
DPDT DOUBLE POLE DOUBLE THROW
DPST DOUBLE POLE SINGLE THROW
DW DISHWASHER
DWG DRAWING
E E, EX, EXIST EXISTING
EG EQUIPMENT GROUND
ELEC ELECTRIC, ELECTRICAL
ELEV ELEVATOR
EM. EMEG EMERGENCY
EMT ELECTRIC METALLIC CONDUIT
ENCL ENCLOSURE
EO ELECTRICALLY OPERATED
EQ, EQIP EQUIPMENT
EWC ELECTRIC WATER COOLER
EWH ELECTRIC WATER HEATER
F F FUSE
FA FIRE ALARM
FAAP FIRE ALARM ANNUNCIATOR PANEL
FACP FIRE ALARM CONTROL PANEL
FAEP FIRE ALARM EXTENDER PANEL
FC FOOT CANDLE
FDR FEEDER
FESS FLYWHEEL ENERGY STORAGE SYSTEM
FL, FLR FLOOR
FLA FULL LOAD AMPS
FLEX FLEXIBLE
FLUOR FLUORESCENT
FS FLUSH SENSOR
FT FOOT / FEET (')
FTL FEED THROUGH LUGS
G G, GND, GRD GROUND
GEN GENERATOR
GFCI GROUND FAULT CIRCUIT INTERRUPTER
GFI GROUND FAULT INTERRUPTER
H H HORIZONTAL MOUNTING
HH HAND HOLE
HOA HAND-OFF-AUTOMATIC
HP HORSEPOWER
HPS HIGH PRESSURE SODIUM
HR HOUR
HT HEIGHT
HTR HEATER
HVAC HEATING VENTILATION AND AIR
CONDITIONING
HZ HERTZ
I IG ISOLATED GROUND
IN INCH / INCHES (")
INCAND INCANDESCENT
J JB, JBOX JUNCTION BOX
K K KEY INTERLOCK
Kcmil 1000 CIRCULAR mils
KV KILOVOLTS (THOUSAND VOLTS)
KVA KILOVOLTS-AMPERES (THOUSAND
VOLT-AMPS)
kW KILOWATTS (THOUSAND WATTS)
KWH KILOWATT-HOURS
L-G LINE TO GROUND
L-L LINE TO LINE
L-N LINE TO NEUTRAL
L LA LIGHTNING ARRESTOR
LAN LOCAL AREA NETWORK
LC, LCP LIGHTING CONTROL PANEL
LP LIGHTING PANEL
LS LAVATORY SENSOR
LSI LONG-TIME, SHORT-TIME,
INSTANTANEOUS
LSIA LONG-TIME, SHORT-TIME,
INSTANTANEOUS,GROUND-FAULT ALARM
ONLY
LSIG LONG-TIME, SHORT-TIME,
INSTANTANEOUS,GROUND-FAULT
LTG LIGHTING
LV LOW VOLTAGE (BELOW 50 VOLTS)
M MCA MINIMUM CIRCUIT AMPACITY
MCB MAIN CIRCUIT BREAKER
MCC MOTOR CONTROL CENTER
MECH MECHANICAL
MFR MANUFACTURER
MH MANHOLE
MIN MINIMUM
MISC MISCELLANEOUS
MLO MAIN LUGS ONLY
MOCP MAXIMUM OVERCURRENT PROTECTION
MTD MOUNTED
MTG MOUNTING
MTS MANUAL TRANSFER SWITCH
MV MEDIUM VOLTAGE (OVER 600V LESS THAN
35KV)
N N NEUTRAL
NC NORMALLY CLOSED
NEC NATIONAL ELECTRICAL CODE
NEMA NATIONAL ELECTRICAL MANUFACTURERS
ASSOCIATION
NIC NOT IN CONTRACT
NL NIGHTLIGHT
NO NORMALLY OPEN
NO., NUM. # NUMBER
NTS NOT TO SCALE
O OC ON CENTER
OCPD OVERCURRENT PROTECTION DEVICE
OFCI OWNER FURNISHED, CONTRACTOR
INSTALLED
OFOI OWNER FURNISHED, OWNER INSTALLED
OH OVERHEAD
OHD OVERHEAD DOOR
OHE/T OVERHEAD ELECTRIC/TELEPHONE
OPP OPPOSITE
P P POLE
PA PUBLIC ADDRESS
PB PULL BOX
PDP POWER DISTRIBUTION PANEL
PE PHOTO ELECTRIC
PF POWER FACTOR
PH, Ø PHASE
PNL PANEL
PRI PRIMARY
PT POTENTIAL TRANSFORMER
PV PHOTOVOLTAIC
PVC POLYVINYL CHLORIDE
PWR POWER
Q QTY QUANTITY
R R, RE RELOCATE AS SHOWN
RCLP REMOTE CONTROL LIGHTING PANEL
RCPT RECEPTACLE
REF REFRIGERATOR
RF RADIO FREQUENCY
RGB RED, GREEN, BLUE (COLOR CHANGING)
RLA RATED (RUNNING) LOAD AMPS
RM ROOM
RP RECEPTACLE PANELBOARD
RSC RIGID STEEL CONDUIT
S SCH, SCHED SCHEDULE
SEC SECONDARY
SES SERVICE ENTRANCE SECTION
SF SQUARE FOOT
SPD SURGE PROTECTIVE DEVICE
SPDT SINGLE POLE DOUBLE THROW
SPEC(S) SPECIFICATION(S)
SPKR SPEAKER
SPST SINGLE POLE SINGLE THROW
STD STANDARD
SW SWITCH
SWBD SWITCHBOARD
SWGR SWITCHGEAR
SYM SYMMETRICAL
T T TAMPER RESISTANT
TB TERMINAL BLOCK
TBB TELEPHONE BACKBOARD
TC TIME CLOCK
TEL, TELE TELEPHONE
TELECOM TELECOMMUNICATIONS
TP TAMPERPROOF
TV TELEVISION
TYP TYPICAL
U UG UNDERGROUND
UGP UNDERGROUND PRIMARY
UGS UNDERGROUND SECONDARY
UGT UNDERGROUND TELEPHONE
UL UNDERWRITER'S LABORATORY
UON UNLESS OTHERWISE NOTED
UPS UNINTERRUPTIBLE POWER SUPPLY
V V VOLTS
VA VOLT-AMPERES
VFD VARIABLE FREQUENCY DRIVE/ VARIABLE
FREQUENCY MOTOR CONTROLLER
W W WIRE
W/ WITH
W/O WITHOUT
WHM WATT HOUR METER
WP WEATHERPROOF
WR WEATHER RESISTANT RATED
RECEPTACLE & WEATHER PROOF METAL
IN-USE COVER
X X REMOVE DEVICE
XFMR TRANSFORMER
Z %Z PERCENT IMPEDANCE
ELECTRICAL EQUIPMENT NAMING CONVENTION KEY
ALL ABBREVIATIONS, SYMBOLS AND LEGENDS SHOWN ON THIS DRAWING ARE NOT NECESSARILY USED.
ICT MULTISERVICE DEVICE SYMBOLSSINGLE SERVICE FLOOR DEVICE SYMBOLS
FINAL CONSTRUCTION DOCUMENTS 05MAR26
BID ADDENDUM-G 12JUN26
G
06-12-26
6-30-28
DN
DN
T TT T T
A,1 N 1049396.97E 762103.57
A,5N 1049607.57E 762146.84
C,5N 1049594.09E 762212.47
O
HE
O
HE
O
HE
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G G
G
G
G
G
6"W (A
C)
4"W
(PVC)
2"W (P
VC)
4"W
(PVC
6"W (A
C)
4" W
(P
VC
8"W (P
VC)
8" W
(P
VC
6"
W (A
C)
3"W (PVC)
3"W (PVC)
36"SD
"X30
"SD
12"SD
"S
D
36"SD
24"SD
42"SD
42"SD
TS
TS
E
SS
S
S
S
SS
SD SD
SD
S
S
S
S
S
SD
S S
S
S
SD
SD
SD
SD
SD
SD
SD
S
S
S
S
ARV
ARV
ARV
ARV
ARV
SD
SD
SD
SD
SD
S
S
S S
S
S
CLEAR ZONE
360'
Thru Lane Begins
10.0000
20.0000
88.0000
10.0000
20.0000
88.0000
20.0000
88.0000
7' x1
5' x8
0C F
6"S(FM)
6"S(FM)
12"W
"W
6"
8" W
"W
8" W
"W
8" W
12"W
"W
"W
"W
"W
"W
"W
8" W
"W
"W
8" W
"W
"W
8" W
8"F
1.5"W
8"W
8"W
6"
24"SD
24"SD
72"SD
"S
D
12"SD
12"SD
"S
D
"S
D
"S
D
"S
D
6"S(FM)
6"S(FM
6"S(FM)
6" S(
FM
6" S(
FM
6" S(
FM
6" S(
FM
6"S(FM)
6"S(FM)
6" S(
FM
6" S(
FM
6" S(
FM
6" S(
FM
6" S(
FM
6" S(
FM
S S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
SD
536870914 5610.87
BASE SET-AT
MISC
MISC
5407.19
SET-AT
5397.92
SET-AT
5371.38
SET-AT
5393.98
SET-AT
5532.80
SET-AT
5407.15
SET-AT
5400.37
SET-AT
5604.95
SET-AT
536870913 5398.06
BASE
WATER
T
T
CARPORT#2
EXISTING BUILDING
TO REMAIN
EXISTING BUILDING
TO REMAIN
EXISTING BUILDING
TO REMAIN
TYP
E103
E118
E119
ACC-2 A.
B.
C.
D.
ADDITIVE OPTION NO. 6, BASE BID PROVIDE ALL
UNDERGROUND CONDUITS ASSOCIATED WITH PHOTOVOLTAIC
SYSTEM INCLUDING BUT NOT LIMITED TO, HANDHOLES,
CONDUIT STUB-UPS BETWEEN MAIN ELECTRICAL ROOM,
PHOTOVOLTAIC DISTRIBUTION PANEL AND AC COMBINER
BOXES. CAP, PROTECT AND MARK CONDUIT LOCATIONS WITH
DETECTABLE UNDERGROUND TAPE FOR IMPLEMENTATION OF
FULLY FUNCTIONING PHOTOVOLTAIC SYSTEM IN THE FUTURE.
A PLAN INDICATING UNDERGROUND CONDUIT
SIZE/QUANTITY/ROUTING FOR FUTURE PHOTOVOLTAIC WILL BE
REQUIRED FOR REVIEW PRIOR TO BACKFILL. ALL
UNDERGROUND CONDUITS WILL BE REQUIRED TO BE SHOWN
IN AS-BUILT DOCUMENTATION.
ADDITIVE OPTION NO. 6, OPTION PROVIDE PARKING SHADE
CANOPY MOUNTED PHOTOVOLTAIC PANELS, DC CONDUCTORS,
INVERTERS, AC COMBINER BOXES, PHOTOVOLTAIC
DISTRIBUTION PANELBOARDS, AND ALL OTHER REQUIRED
PHOTOVOLTAIC HARDWARE AND ACCESSORIES FOR THE
CONSTRUCTION OF A COMPLETE AND FUNCTIONING
PHOTOVOLTAIC SYSTEM AS NOTED IN CONSTRUCTION
DRAWINGS AND SPECIFICATIONS. NOTE, PARKING SHADE
CANOPIES ARE NOT PART OF PHOTOVOLTAIC SYSTEM OPTION
AND ARE PROVIDED BY OTHERS.
COORDINATE WITH LOCAL UTILITY FOR ALL SITE SERVICE
REQUIREMENTS.
CONTACT LOCAL UTILITY TO IDENTIFY ALL EXISTING
UNDERGROUND UTILITIES.
GENERAL SHEET NOTES
SHEET NUMBER
PROJECT NUMBER
SEALS AND SIGNATURES
ISSUED FOR DATE
Pl ot
Da te:
IHS Whiteriver Hospital 200 W Hospital Drive Whiteriver, Arizona, 85941
IHS Project #: 131445 IHS Contract #: 75H70123R00008 IHS Award Date: 02/02/2024
455 NORTH THIRD STREET
SUITE 250
PHOENIX, AZ 85004
602.265.2200 smithgroup.com
Drawn By: Checked By:
BASED ON PROGRAM OF REQUIREMENTS DATED [ 03/26/22],
POR AMENDMENT DATED [ 02/03/25], AND ON SCHEMATIC
DRAWINGS APPROVED [11/19/24].
6/1 2/2
6 1
:12 :23
P M
ELECTRICAL SITE
PHOTOVOLTAIC SYSTEM
PLAN PHASE 1
E1.2.P1CD
W hit tin gto n
14904.000 Whittington Baca
E103 590W Q CELL PANELS OR APPROVED SIMILAR ARE THE
BASIS OF DESIGN FOR THE SOLAR ARRAY. ANY PROPOSED
DEVIATION FROM THIS SPECIFICATION MUST BE
COORDINATED WITH THE ENGINEER BEFORE
IMPLEMENTATION.
E118 PROVIDE (4) 3" CONDUITS FROM ACC-2, ROUTED
UNDERGROUND AND STUBBED UP INTO ELECTRICAL
ELC-2056. CONDUITS SHALL THEN BE ROUTED VERTICALLY
TO 2ND LEVEL CEILING SPACE AND EXTENDED OVERHEAD
TO PV-DPB LOCATED IN MAIN NORMAL ELECTRICAL
CUP-2374. PROVIDE PULL BOX(ES) AS REQUIRED.
UNDERGROUND ELBOWS SHALL BE PVC COATED GRMC.
EXPOSED EXTERIOR CONDUIT SHALL BE GRMC. PULL BOX
LOCATIONS SHALL BE COORDINATED WITH EOR PRIOR TO
COMMENCING WORK. REFER TO PV DIAGRAMS FOR
ADDITIONAL INFORMATION.
E119 PROVIDE (2) 3" CONDUITS FROM PV-DPA, (4) 3" CONDUITS
FROM PV-DPC, AND (4) 3" CONDUITS FROM PV-DPD, ROUTED
UNDERGROUND AND STUBBED TO AREA SHOWN. PV
DISTRIBUTION PANELS LOCATED IN MAIN NORMAL
ELECTRICAL ROOM CUP-2374. REFER TO SHEET E6.2.1 FOR
ADDITIONAL INFORMATION.
0 60' 120' 180'
GRAPHIC SCALE: 1" = 60' - 0"
PROJECT NORTH
SHEET KEYNOTES
SCALE: 1" = 80'-0"1 ELECTRICAL SITE PHOTOVOLTAIC SYSTEM PLAN PHASE 1
FINAL CONSTRUCTION DOCUMENTS 23JAN26
BID ADDENDUM-G 12JUN26
G
5407.15
SET-AT
5407.19
SET-AT
5397.92
SET-AT
5371.38
SET-AT
5393.98
SET-AT
5400.37
SET-AT
5532.80
SET-AT
5604.95
SET-AT
MISC
MISC
536870913 5398.06
BASE
WATER
536870914 5610.87
BASE SET-AT
O
HE
O
HE
O
HE
S
6" S(
VC
P)
6"S(VCP)6"S(VCP)
8"S
8"S
8"S
8" S
8"S
8" S
8"S 8"S
S 8"S(VCP)
8"S(VCP)
8" S
8" S
8" S
CLEAR ZONE
CLEAR ZONE
CLEAR ZONE
360'
Thru Lane Begins
10.0000
20.0000
88.0000
10.0000
20.0000
88.0000
20.0000
88.0000
SU
RG
ER
Y
VIS
ITO
R
SU
RG
ER
Y
VIS
ITO
R
SU
RG
ER
Y
VIS
ITO
R
A,1 N 1049396.97E 762103.57
A,5N 1049607.57E 762146.84
C,5N 1049594.09E 762212.47
DN
DN
T TT T T
T
J
J
J
J J J
J J J
A.
B.
C.
D.
ADDITIVE OPTION NO. 6, BASE BID PROVIDE ALL
UNDERGROUND CONDUITS ASSOCIATED WITH PHOTOVOLTAIC
SYSTEM INCLUDING BUT NOT LIMITED TO, HANDHOLES,
CONDUIT STUB-UPS BETWEEN MAIN ELECTRICAL ROOM,
PHOTOVOLTAIC DISTRIBUTION PANEL AND AC COMBINER
BOXES. CAP, PROTECT AND MARK CONDUIT LOCATIONS WITH
DETECTABLE UNDERGROUND TAPE FOR IMPLEMENTATION OF
FULLY FUNCTIONING PHOTOVOLTAIC SYSTEM IN THE FUTURE.
A PLAN INDICATING UNDERGROUND CONDUIT
SIZE/QUANTITY/ROUTING FOR FUTURE PHOTOVOLTAIC WILL BE
REQUIRED FOR REVIEW PRIOR TO BACKFILL. ALL
UNDERGROUND CONDUITS WILL BE REQUIRED TO BE SHOWN
IN AS-BUILT DOCUMENTATION.
ADDITIVE OPTION NO. 6, OPTION PROVIDE PARKING SHADE
CANOPY MOUNTED PHOTOVOLTAIC PANELS, DC CONDUCTORS,
INVERTERS, AC COMBINER BOXES, PHOTOVOLTAIC
DISTRIBUTION PANELBOARDS, AND ALL OTHER REQUIRED
PHOTOVOLTAIC HARDWARE AND ACCESSORIES FOR THE
CONSTRUCTION OF A COMPLETE AND FUNCTIONING
PHOTOVOLTAIC SYSTEM AS NOTED IN CONSTRUCTION
DRAWINGS AND SPECIFICATIONS. NOTE, PARKING SHADE
CANOPIES ARE NOT PART OF PHOTOVOLTAIC SYSTEM OPTION
AND ARE PROVIDED BY OTHERS.
COORDINATE WITH LOCAL UTILITY FOR ALL SITE SERVICE
REQUIREMENTS.
CONTACT LOCAL UTILITY TO IDENTIFY ALL EXISTING
UNDERGROUND UTILITIES.
GENERAL SHEET NOTES
CARPORT#1
CARPORT#4
EXISTING BUILDING
TO REMAIN
EXISTING BUILDING
TO REMAIN
EXISTING BUILDING
TO REMAIN
ACC-2
ACC-6
ACC-4
ACC-1
CARPORT#3
CARPORT#2
E120
TYP
E121
E122
CARPORT#5
CARPORT#6
ACC-3
ACC-4
SHEET NUMBER
PROJECT NUMBER
SEALS AND SIGNATURES
ISSUED FOR DATE
Pl ot
Da te:
IHS Whiteriver Hospital 200 W Hospital Drive Whiteriver, Arizona, 85941
IHS Project #: 131445 IHS Contract #: 75H70123R00008 IHS Award Date: 02/02/2024
455 NORTH THIRD STREET
SUITE 250
PHOENIX, AZ 85004
602.265.2200 smithgroup.com
Drawn By: Checked By:
BASED ON PROGRAM OF REQUIREMENTS DATED [ 03/26/22],
POR AMENDMENT DATED [ 02/03/25], AND ON SCHEMATIC
DRAWINGS APPROVED [11/19/24].
6/1 2/2
6 1
:12 :35
P M
ELECTRICAL SITE
PHOTOVOLTAIC SYSTEM
PLAN PHASE 2
E1.2.P2CD
W hit tin gto n
14904.000 Whittington Baca
E120 EXTEND FROM STUBBED LOCATION, UNDERGROUND
CONDUITS ORIGINATING FROM PV-DBD TO ACC. PROVIDE
PULL BOX(ES) AS REQUIRED. UNDERGROUND ELBOWS
SHALL BE PVC COATED GRMC. EXPOSED EXTERIOR
CONDUIT SHALL BE GRMC. PULL BOX LOCATIONS SHALL BE
COORDINATED WITH EOR PRIOR TO COMMENCING WORK.
REFER TO PV DIAGRAMS FOR ADDITIONAL INFORMATION
INCLUDING CONDUIT SIZES.
E121 EXTEND FROM STUBBED LOCATION, UNDERGROUND
CONDUITS ORIGINATING FROM PV-DBC TO ACC. PROVIDE
PULL BOX(ES) AS REQUIRED. UNDERGROUND ELBOWS
SHALL BE PVC COATED GRMC. EXPOSED EXTERIOR
CONDUIT SHALL BE GRMC. PULL BOX LOCATIONS SHALL BE
COORDINATED WITH EOR PRIOR TO COMMENCING WORK.
REFER TO PV DIAGRAMS FOR ADDITIONAL INFORMATION
INCLUDING CONDUIT SIZES.
E122 EXTEND FROM STUBBED LOCATION, UNDERGROUND
CONDUITS ORIGINATING FROM PV-DBA TO ACC. PROVIDE
PULL BOX(ES) AS REQUIRED. UNDERGROUND ELBOWS
SHALL BE PVC COATED GRMC. EXPOSED EXTERIOR
CONDUIT SHALL BE GRMC. PULL BOX LOCATIONS SHALL BE
COORDINATED WITH EOR PRIOR TO COMMENCING WORK.
REFER TO PV DIAGRAMS FOR ADDITIONAL INFORMATION
INCLUDING CONDUIT SIZES.
0 60' 120' 180'
GRAPHIC SCALE: 1" = 60' - 0"
PROJECT NORTH
SHEET KEYNOTES
SCALE: 1" = 80'-0"1 ELECTRICAL SITE PHOTOVOLTAIC SYSTEM PLAN PHASE 2
FINAL CONSTRUCTION DOCUMENTS 23JAN26
BID ADDENDUM-G 12JUN26
G
LSIG
2500/3
LS
IG
/3
EN
L
AB
LS
IG
0/
EN
L
AA
APW2LHA
225A
MLO
SPD
APW2LLA
150A
MCB
SPD
APW3LHA
80A
MLO
SPD
APW3LLA
60A
MLO
SPD
APW4LHA
80A
MLO
SPD
APW4LLA
60A
MLO
SPD
APW2SHD
225A
FTL
SPD
LS
I
5/
APW2SHE
225A
MLO
SPD
APW2SHA
300A
FTL
APW2SLA
400A
MCB/FTL
LS
I
0/
APW2SLB
400A
MLO
APW2SHB
300A
FTL
APW2SLC
400A
MCB/FTL
LS
I
0/
APW2SLD
400A
MLO
APW2SHC
300A
FTL
APW2SLE
400A
MCB/FTL
LS
I
0/
APW2SLF
400A
MLO
APW1LHA
80A
MLO
SPD
APW1LLA
60A
MLO
SPD
APW1SHD
125A
MLO
SPD
APW1SHE
125A
MLO
SPD
APW1SLA
225A
FTL
APW1SHA
300A
MLO
APW1SLB
225A
MLO
APW1SLC
225A
FTL
APW1SHB
300A
MLO
APW1SLD
225A
MLO
APW1SLE
225A
FTL
APW1SHC
300A
MLO
APW1SLF
225A
MLO
LS
IG
/3
EN
L
AC
APW2CHA
150A
MLO
LS
I
0/
APW1CHA
150A
MLO
LS
I
0/
LS
I
0/
APW1SLH
400A
MCB
APW1SLJ
225A
MLO
5/
M M M M
MM M
M
M
M M60 /3
APA2LHA
100A
MLO
SPD
APA2LLA
60A
MCB
SPD
APA2SHA
200A
MCB
LS
I
0/
M
APA2SLA
150A
MCB/FTL
APA1SLA
150A
MLO
AP2LLA
60A
MCB
SPD
/3
SPD
A.
B.
C.
D.
E.
F.
G.
H.
I.
J.
K.
L.
ADDITIVE OPTION NO. 6, BASE BID PROVIDE ALL
UNDERGROUND CONDUITS ASSOCIATED WITH PHOTOVOLTAIC
SYSTEM INCLUDING BUT NOT LIMITED TO, HANDHOLES,
CONDUIT STUB-UPS BETWEEN MAIN ELECTRICAL ROOM,
PHOTOVOLTAIC DISTRIBUTION PANEL AND AC COMBINER
BOXES. CAP, PROTECT AND MARK CONDUIT LOCATIONS WITH
DETECTABLE UNDERGROUND TAPE FOR IMPLEMENTATION OF
FULLY FUNCTIONING PHOTOVOLTAIC SYSTEM IN THE FUTURE.
A PLAN INDICATING UNDERGROUND CONDUIT
SIZE/QUANTITY/ROUTING FOR FUTURE PHOTOVOLTAIC WILL BE
REQUIRED FOR REVIEW PRIOR TO BACKFILL. ALL
UNDERGROUND CONDUITS WILL BE REQUIRED TO BE SHOWN
IN AS-BUILT DOCUMENTATION.
ADDITIVE OPTION NO. 6, OPTION PROVIDE PARKING SHADE
CANOPY MOUNTED PHOTOVOLTAIC PANELS, DC CONDUCTORS,
INVERTERS, AC COMBINER BOXES, PHOTOVOLTAIC
DISTRIBUTION PANELBOARDS, AND ALL OTHER REQUIRED
PHOTOVOLTAIC HARDWARE AND ACCESSORIES FOR THE
CONSTRUCTION OF A COMPLETE AND FUNCTIONING
PHOTOVOLTAIC SYSTEM AS NOTED IN CONSTRUCTION
DRAWINGS AND SPECIFICATIONS. NOTE, PARKING SHADE
CANOPIES ARE NOT PART OF PHOTOVOLTAIC SYSTEM OPTION
AND ARE PROVIDED BY OTHERS.
SEE DRAWING E0.1 FOR ABBREVIATIONS, SYMBOLS, GENERAL
NOTES.
THE CONTRACTOR SHALL COORDINATE EXACT LOCATION OF
EQUIPMENT POWER CONNECTIONS WITH EQUIPMENT
INSTALLER PRIOR TO ROUGH-IN.
COORDINATE FINAL LOCATION OF MECHANICAL EQUIPMENT
AND ASSOCIATED DISCONNECT SWITCHES, STARTERS, VFDS,
CONTROL POWER AND OTHER POWER REQUIREMENTS WITH
DIV 23 AND MECHANICAL DRAWINGS.
SEE MECHANICAL EQUIPMENT SCHEDULE FOR ASSOCIATED
OVERCURRENT DEVICES, DISCONNECT SWITCHES, STARTERS
AND WIRES.
VOLTAGE DROP SHALL BE LIMITED TO LESS THAN 3% FOR ALL
BRANCH CIRCUITS AND 2% FOR ALL FEEDERS.
CONTRACTOR SHALL COORDINATE AND FIELD VERIFY
REQUIREMENT OF NEUTRAL CONDUCTOR FOR ALL EQUIPMENT
AND PROVIDE NEUTRAL CONDUCTOR AS NECESSARY.
ALL LIFE SAFETY AND LIGHTING PANELBOARDS SHALL BE
EQUIPPED WITH TYPE 2 SPD.
ALL AUTOMATIC TRANSFER SWITCHES SHALL BE 4 POLE AND
EQUIPPED WITH BYPASS ISOLATION.
ALL UTILITY TRANSFORMERS DESCRIBED AS NAVOPACHE
TRANSFORMER TO BE COORDINATED WITH UTILITY AND
PROVIDED BY UTILITY. COORDINATE ALL FINAL REQUIREMENTS
AND AVAILABLE FAULT CURRENT CONTRIBUTIONS BASED ON
SUPPLIED EQUIPMENT. BASIS OF DESIGN 2500KVA, AND 5%Z.
BASIS OF DESIGN ELECTRICAL EQUIPMENT MANUFACTURERS
ARE SIEMENS, ASCO, AND CATERPILLAR. EQUIVALENT
EQUIPMENT FROM APPROVED MANUFACTURERS IS
ACCEPTABLE, PER DIV 26 SPECIFICATIONS.
GENERAL SHEET NOTES
OPTIONAL
STANDBYE503
E502
M
NAVOPACHE
TRANSFORMER
ADM2SH
1000A
480-277V
3PH/4W
LIFE
SAFETY
ATS-ALA
400A
4P
LEVEL 1
LEVEL 2
LEVEL 2
LEVEL 3
TAPW2LLA
45kVA
LEVEL 3
LEVEL 4
ATS-ASA
1000A
4P
LTG
TAPW2SLA/B
112.5kVA
PWR
TAPW2SLC/D
112.5kVA
TAPW2SLE/F
112.5kVA
PWR PWR
CRITICAL
ADM2CH
1000A
480-277V
3PH/4W
ATS-ACA
1000A
4P
PWR
PWR
LEVEL 4
ROOF
A1000
A400 A1000
T112T112T112T45
A300
A400
A300 A225
A225
A300
A300 A225
A225
A400
A300
A300 A225
A225
A400
A225
A125 A125
A225
A150
A1000
A1000
A150
E501
TAPW1SLH/J
112.5kVA
A225
LAB PWR
ADM2LH
400A 480-277V
3PH/4W
A225
MAIN
SA1
SA2 SA3 SA4
DA1 DA2 DA3 DA4 DA7
DA5 DA8
A400
TAPA2LLA
15kVA
60V1
T15
EMS PWR
A200V1
EMS BLDG
TAPA2SLA
45kVA
T45
A150
DA6
MATCHLINE
MATCHLINE
TAP2LLA
15kVA T15
T112
SES-A
3200A BUS
PER NEC 705.12(B)
480-277V/3PH/4W (3)
E521
SEL-751
(3)(3)
G
G G
G
G G G
G
G
G
G
E531
G
E532 E532
G
E532
G
G
G
SHEET NUMBER
PROJECT NUMBER
SEALS AND SIGNATURES
ISSUED FOR DATE
Pl ot
Da te:
IHS Whiteriver Hospital 200 W Hospital Drive Whiteriver, Arizona, 85941
IHS Project #: 131445 IHS Contract #: 75H70123R00008 IHS Award Date: 02/02/2024
455 NORTH THIRD STREET
SUITE 250
PHOENIX, AZ 85004
602.265.2200 smithgroup.com
Drawn By: Checked By:
BASED ON PROGRAM OF REQUIREMENTS DATED [ 03/26/22],
POR AMENDMENT DATED [ 02/03/25], AND ON SCHEMATIC
DRAWINGS APPROVED [11/19/24].
6/1 2/2
6 1
:12 :40
P M
ELECTRICAL ONE LINE
DIAGRAM - SES-A, 1 OF 2
E5.1.1CD
W hit tin gto n
14904.000 Whittington Baca
X FEEDER SCHEDULE
SHEET KEYNOTES
E501 NAVOPACHE UTILITY METER. METER SHALL BE EQUIPPED
WITH CAPABILITY TO INTERFACE WITH BMS. ELECTRICAL
CONTRACTOR SHALL PROVIDE REQUIRED CONDUIT AND
COMMUNICATION WIRING FROM METER TO POINT OF
INTERFACE WITH BMS.
E502 COMPLIANCE WITH "NEC 240.87 ARC ENERGY REDUCTION"
REQUIRED. REDUCTION METHOD SHALL ALLOW FOR
REQUIRED SELECTIVE DEVICE COORDINATION AND ARC
FLASH REQUIREMENTS. REFER TO ELECTRICAL
SPECIFICATIONS FOR ADDITIONAL INFORMATION.
E503 PROVIDE PERMANENT IDENTIFICATION PLAQUE INDICATING
THE FOLLOWING: ELECTRICAL SERVICE #1 OF 5.
GENERATORS LOCATED IN ELECTRICAL EQUIPMENT YARD,
GENERATOR DISCONNECTS LOCATED IN ADJACENT
ELECTRICAL ROOM IN GMDB. PV DISCONNECT LOCATED AT
END OF THIS ELECTRICAL EQUIPMENT LINEUP.
E521 PROVIDE RELAY PROTECTION ELEMENTS REQUIRED BY
UTILITY AND MULTIPLE GENERATOR AND PV MONITORING
AND CONTROL SYSTEM MANUFACTURER. INTEGRATE SEL
RELAY AND PROGRAMMING INTO MULTIPLE GENERATOR
AND PV MONITORING SYSTEM AND CIRCUIT BREAKER.
PROVIDE AND PROGRAM PROTECTION ELEMENT SET POINTS
AND LOGIC WITHIN THE RELAY. REFER TO SEL-751 DETAIL
FOR ADDITIONAL INFORMATION.
E531 ELECTRICAL EQUIPMENT CONSTRUCTION =
UL891 REAR CONNECTED SWITCHBOARD
DRAW-OUT LOW VOLTAGE POWER CIRCUIT BREAKERS
E532 ELECTRICAL EQUIPMENT CONSTRUCTION =
UL67 PANELBOARD
IP20, TOUCH-SAFE, PLUG-IN MOLDED CASE CIRCUIT
BREAKERS, ELECTRONIC TRIP UNIT
SCALE: NOT TO SCALE1 ONE LINE DIAGRAM - SES-A, 1 OF 2
60 4#4 + 1#10 G, 1 1/4" C 60V1 4#1 + 1#6 G, 1 1/2" C 80 4#3 + 1#8 G, 1 1/4" C A125 4#2/0 + 1#6 G, 2" C A150 4#3/0 + 1#4 G, 2" C
A200V1 4#400KCMIL + 1#1 G, 2 1/2" C
A225 4#300KCMIL + 1#2 G, 2 1/2" C
A300 4#500KCMIL + 1#2 G, 3" C
A400 2 SETS OF 4#250KCMIL + 1#1 G, (2) 2 1/2" C
A1000 3 SETS OF 4#600KCMIL + 1#4/0 G, (3) 3 1/2" C
T15 15KVA TRANSFORMER, 480-208Y/120V, 3PH
PRIMARY FEEDER: 3#10 + 1#10 G, 3/4" C
SECONDARY FEEDER: 4#4 + 1#8 G, 1 1/4" C
BONDING JUMPERS & GROUNDING ELECTRODE
CONDUCTOR: #8
T45 45KVA TRANSFORMER, 480-208Y/120V, 3PH
PRIMARY FEEDER: 3#3 + 1#8 G, 1 1/4" C
SECONDARY FEEDER: 4#1/0 + 1#6 G, 2" C
BONDING JUMPERS & GROUNDING ELECTRODE
CONDUCTOR: #6
T112 112.5KVA TRANSFORMER, 480-208Y/120V, 3PH
PRIMARY FEEDER: 3#3/0 + 1#6 G, 2" C
SECONDARY FEEDER: 2 SETS OF 4#3/0 + 1#2 G, (2)
2" C
BONDING JUMPERS & GROUNDING ELECTRODE
CONDUCTOR: #2
"A" DENOTES ALUMINUM CONDUCTORS, ALL OTHER CONDUCTORS SHALL BE COPPER
FINAL CONSTRUCTION DOCUMENTS 05MAR26
BID ADDENDUM-A 16APR26
BID ADDENDUM-E 28MAY26
BID ADDENDUM-G 12JUN26
G
G
G
APW2CHD
225A
MLO/FTL
SPD
LS
I
5/
APW2CHE
225A
MLO
SPD
APW2CLA
125A
MCB
APW2CLB
125A
MCB
APW2CHB
150A
MLO
APW2CLC
125A
MCB
LS
I
0/
APW2CLD
125A
MCB
APW2CHC
150A
MLO
APW2CLE
125A
MCB
LS
I
0/
APW2CLF
125A
MCB
APW1CHD
125A
MLO
SPD
APW1CHE
125A
MLO
SPD
APW1CLA
125A
MCB
APW1CHA
150A
MLO
APW1CLB
125A
MCB
APW1CLD
125A
MCB
APW1CHB
150A
MLO
APW1CLC
125A
MCB
APW1CLF
125A
MCB
APW1CHC
150A
MLO
APW1CLE
125A
MCB
LS
IG
/3
EN
L
AD
LS
I
0/
LS
I
5/
LS
I
5/
LS
I
0/
LS
I
5/
LS
I
5/
LS
I
5/
LS
I
0/
LS
I
5/
LS
I
/3
VFD
LS
I
0/
VFD
LS
I
/3
VFD
LS
I
0/
VFD
LS
IG
0/
PVW
LS
I
0/
LS
IG
0/
EN
L
AE
0/
0/
APW2EHA
300A
MLO
APW1EHA
150A
MLO
APW2EHB
250A
MLO
APW1EHB
150A
MLO
APW1ELA
150A
MCB
APW1ELB
150A
MCB
LS
I
/3
M M
M M M M M M M M M M M M M M
M M M M M M
M
APA1CLA
60A
MCB
APW2ELA
150A
MCB
APW2ELB
150A
MCB
A.
B.
C.
D.
E.
F.
G.
H.
I.
J.
K.
L.
ADDITIVE OPTION NO. 6, BASE BID PROVIDE ALL
UNDERGROUND CONDUITS ASSOCIATED WITH PHOTOVOLTAIC
SYSTEM INCLUDING BUT NOT LIMITED TO, HANDHOLES,
CONDUIT STUB-UPS BETWEEN MAIN ELECTRICAL ROOM,
PHOTOVOLTAIC DISTRIBUTION PANEL AND AC COMBINER
BOXES. CAP, PROTECT AND MARK CONDUIT LOCATIONS WITH
DETECTABLE UNDERGROUND TAPE FOR IMPLEMENTATION OF
FULLY FUNCTIONING PHOTOVOLTAIC SYSTEM IN THE FUTURE.
A PLAN INDICATING UNDERGROUND CONDUIT
SIZE/QUANTITY/ROUTING FOR FUTURE PHOTOVOLTAIC WILL BE
REQUIRED FOR REVIEW PRIOR TO BACKFILL. ALL
UNDERGROUND CONDUITS WILL BE REQUIRED TO BE SHOWN
IN AS-BUILT DOCUMENTATION.
ADDITIVE OPTION NO. 6, OPTION PROVIDE PARKING SHADE
CANOPY MOUNTED PHOTOVOLTAIC PANELS, DC CONDUCTORS,
INVERTERS, AC COMBINER BOXES, PHOTOVOLTAIC
DISTRIBUTION PANELBOARDS, AND ALL OTHER REQUIRED
PHOTOVOLTAIC HARDWARE AND ACCESSORIES FOR THE
CONSTRUCTION OF A COMPLETE AND FUNCTIONING
PHOTOVOLTAIC SYSTEM AS NOTED IN CONSTRUCTION
DRAWINGS AND SPECIFICATIONS. NOTE, PARKING SHADE
CANOPIES ARE NOT PART OF PHOTOVOLTAIC SYSTEM OPTION
AND ARE PROVIDED BY OTHERS.
SEE DRAWING E0.1 FOR ABBREVIATIONS, SYMBOLS, GENERAL
NOTES.
THE CONTRACTOR SHALL COORDINATE EXACT LOCATION OF
EQUIPMENT POWER CONNECTIONS WITH EQUIPMENT
INSTALLER PRIOR TO ROUGH-IN.
COORDINATE FINAL LOCATION OF MECHANICAL EQUIPMENT
AND ASSOCIATED DISCONNECT SWITCHES, STARTERS, VFDS,
CONTROL POWER AND OTHER POWER REQUIREMENTS WITH
DIV 23 AND MECHANICAL DRAWINGS.
SEE MECHANICAL EQUIPMENT SCHEDULE FOR ASSOCIATED
OVERCURRENT DEVICES, DISCONNECT SWITCHES, STARTERS
AND WIRES.
VOLTAGE DROP SHALL BE LIMITED TO LESS THAN 3% FOR ALL
BRANCH CIRCUITS AND 2% FOR ALL FEEDERS.
CONTRACTOR SHALL COORDINATE AND FIELD VERIFY
REQUIREMENT OF NEUTRAL CONDUCTOR FOR ALL EQUIPMENT
AND PROVIDE NEUTRAL CONDUCTOR AS NECESSARY.
ALL LIFE SAFETY AND LIGHTING PANELBOARDS SHALL BE
EQUIPPED WITH TYPE 2 SPD.
ALL AUTOMATIC TRANSFER SWITCHES SHALL BE 4 POLE AND
EQUIPPED WITH BYPASS ISOLATION.
ALL UTILITY TRANSFORMERS DESCRIBED AS NAVOPACHE
TRANSFORMER TO BE COORDINATED WITH UTILITY AND
PROVIDED BY UTILITY. COORDINATE ALL FINAL REQUIREMENTS
AND AVAILABLE FAULT CURRENT CONTRIBUTIONS BASED ON
SUPPLIED EQUIPMENT. BASIS OF DESIGN 2500KVA, AND 5%Z.
BASIS OF DESIGN ELECTRICAL EQUIPMENT MANUFACTURERS
ARE SIEMENS, ASCO, AND CATERPILLAR. EQUIVALENT
EQUIPMENT FROM APPROVED MANUFACTURERS IS
ACCEPTABLE, PER DIV 26 SPECIFICATIONS.
GENERAL SHEET NOTES
LTG
TAPW2CLA/B
75kVA
PWR PWR
EQUIPMENT
ADM2EHA
1600A
480-277V
3PH/4W
ATS-AEA
1600A
4P
LEVEL 1
LEVEL 2
LEVEL 2
LEVEL 3
LEVEL 3
LEVEL 4
PWR PWR
TAPW1CLA/B
75kVA
PWR
PWR
TAPW2CLC/D
75kVA
PWR
PWR
TAPW1CLC/D
75kVA
TAPW2CLE/F
75kVA
PWR
PWR PWR
TAPW1CLE/F
75kVA
LEVEL 4
ROOF
T75D T75D
T75DT75DT75D A150 A150 A225
A225
A150 A150 A150 A125 A125
A1600
A1600
1000-3
ACCH-1
CHWP-1
100-3
HHWP-1
30-3
CBWP-1
100-3
PV A
EH-1
EQUIPMENT
ADM2EHB
600A
480-277V
3PH/4W
ATS-AEB
600A
4P
A600
A600
A250A300
A150 T75D
300-3
TAPW1ELA
45kVA
T45
TAPW1ELB
45kVA
T45
, E O
1000-3
B-1
NON-COINCIDENT
LOAD
SA5 SA6
DA9 DA11 DA13 DA15 DA17 DA19 DA20 DA21 DA22 DA23 DA24 DA25 DA26 DA29
DA8 DA10 DA12 DA14 DA16 DA18
E519
60V1
EMS BLDG
SA7
MATCHLINE
TAPW2ELA
45kVA
T45
TAPW2ELB
45kVA
T45
A150
MATCHLINE
NON-COINCIDENT
LOAD
E530 G
G
G
G
G
G
G
G
G
G
G
G
G G G G G
G
G
E533 E532
SHEET NUMBER
PROJECT NUMBER
SEALS AND SIGNATURES
ISSUED FOR DATE
Pl ot
Da te:
IHS Whiteriver Hospital 200 W Hospital Drive Whiteriver, Arizona, 85941
IHS Project #: 131445 IHS Contract #: 75H70123R00008 IHS Award Date: 02/02/2024
455 NORTH THIRD STREET
SUITE 250
PHOENIX, AZ 85004
602.265.2200 smithgroup.com
Drawn By: Checked By:
BASED ON PROGRAM OF REQUIREMENTS DATED [ 03/26/22],
POR AMENDMENT DATED [ 02/03/25], AND ON SCHEMATIC
DRAWINGS APPROVED [11/19/24].
6/1 2/2
6 1
:12 :45
P M
ELECTRICAL ONE LINE
DIAGRAM - SES-A, 2 OF 2
E5.1.2CD
W hit tin gto n
14904.000 Whittington Baca
X FEEDER SCHEDULE
SHEET KEYNOTES
E519 PV CIRCUIT BREAKER SHALL BE LOCATED AT LAST BUSSED
SPACE. PROVIDE PERMANENT IDENTIFICATION PLAQUE
INDICATING THE FOLLOWING: PV POWER SOURCE - DO NOT
RELOCATE THIS CIRCUIT BREAKER
E530 PROVIDE SHUNT TRIP CIRCUIT BREAKER FOR INTERFACE
WITH BOILER EMERGENCY SHUTDOWN EPO SWITCHES.
REFER TO EMP2.2.G FOR ADDITIONAL INFORMATION.
E532 ELECTRICAL EQUIPMENT CONSTRUCTION =
UL67 PANELBOARD
IP20, TOUCH-SAFE, PLUG-IN MOLDED CASE CIRCUIT
BREAKERS, ELECTRONIC TRIP UNIT
E533 ELECTRICAL EQUIPMENT CONSTRUCTION =
UL891 SWITCHBOARD
</= 600A IP20, TOUCH-SAFE, PLUG-IN MOLDED CASE CIRCUIT
BREAKERS, ELECTRONIC TRIP UNIT
> 600A FIXED MOUNT MOLDED CASE CIRCUIT BREAKERS,
ELECTRONIC TRIP UNIT
SCALE: NOT TO SCALE1 ONE LINE DIAGRAM - SES-A, 2 OF 2
30-3 3#10 + 1#10 G, 3/4" C 60V1 4#1 + 1#6 G, 1 1/2" C 100-3 3#1 + 1#8 G, 1 1/2" C
300-3 3#350KCMIL + 1#4 G, 3" C
1000-3 3 SETS OF 3#400KCMIL + 1#2/0 G, (3) 3" C
A125 4#2/0 + 1#6 G, 2" C A150 4#3/0 + 1#4 G, 2" C
A225 4#300KCMIL + 1#2 G, 2 1/2" C
A250 4#350KCMIL + 1#2 G, 2 1/2" C
A300 4#500KCMIL + 1#2 G, 3" C
A600 2 SETS OF 4#500KCMIL + 1#2/0 G, (2) 3" C
A1600 5 SETS OF 4#600KCMIL + 1#350KCMIL G, (5) 3 1/2" C
T45 45KVA TRANSFORMER, 480-208Y/120V, 3PH
PRIMARY FEEDER: 3#3 + 1#8 G, 1 1/4" C
SECONDARY FEEDER: 4#1/0 + 1#6 G, 2" C
BONDING JUMPERS & GROUNDING ELECTRODE
CONDUCTOR: #6
T75D 75KVA TRANSFORMER, 480-208Y/120V, 3PH
PRIMARY FEEDER: 3#1/0 + 1#6 G, 1 1/2" C
SECONDARY FEEDERS: 4#1/0 + 1#2 G, 2" C TO EACH PANEL
BONDING JUMPERS & GROUNDING ELECTRODE
CONDUCTOR: #2
"A" DENOTES ALUMINUM CONDUCTORS, ALL OTHER CONDUCTORS SHALL BE COPPER
FINAL CONSTRUCTION DOCUMENTS 05MAR26
BID ADDENDUM-A 16APR26
BID ADDENDUM-E 28MAY26
BID ADDENDUM-G 12JUN26
G
G
G
LS
IG
/3
EN
L
BB
LS
IG
0/
EN
L
BA
BPE2SHD
225A
FTL
SPD
LS
I
5/
BPE2SHE
225A
MLO
SPD
BPE2SHA
300A
FTL
BPE2SLA
400A
MCB/FTL
LS
I
0/
BPE2SLB
400A
MLO
BPE2SHB
300A
FTL
BPE2SLC
225A
MCB/FTL
LS
I
0/
BPE2SLD
225A
MLO
BPE1SHD
125A
MLO
SPD
BPE1SHE
125A
MLO
SPD
BPE1SLA
225A
FTL
BPE1SHA
300A
MLO
BPE1SLB
225A
MLO
BPE1SLC
225A
FTL
BPE1SHB
300A
MLO
BPE1SLD
225A
MLO
/3
/3
/3
/3
/3
LS
IG
/3
LS
I
/3
BPT2SLA
150A
MCB
BPT2SLB
225A
MCB
LS
I
5/
BPT1SLA
80A
MLO
BPT3SLA
80A
MLO
BPT4SLA
80A
MLO
BPT2SLC
225A
MCB
LS
I
5/
BPT1SLB
80A
MLO
BPT3SLB
80A
MLO
BPT4SLB
80A
MLO
BPF2SHA
250A
MLO
BPF2SLA
225A
MCB
LS
I
0/
M
M M
M M M M M M M
SPD
A.
B.
C.
D.
E.
F.
G.
H.
I.
J.
K.
L.
ADDITIVE OPTION NO. 6, BASE BID PROVIDE ALL
UNDERGROUND CONDUITS ASSOCIATED WITH PHOTOVOLTAIC
SYSTEM INCLUDING BUT NOT LIMITED TO, HANDHOLES,
CONDUIT STUB-UPS BETWEEN MAIN ELECTRICAL ROOM,
PHOTOVOLTAIC DISTRIBUTION PANEL AND AC COMBINER
BOXES. CAP, PROTECT AND MARK CONDUIT LOCATIONS WITH
DETECTABLE UNDERGROUND TAPE FOR IMPLEMENTATION OF
FULLY FUNCTIONING PHOTOVOLTAIC SYSTEM IN THE FUTURE.
A PLAN INDICATING UNDERGROUND CONDUIT
SIZE/QUANTITY/ROUTING FOR FUTURE PHOTOVOLTAIC WILL BE
REQUIRED FOR REVIEW PRIOR TO BACKFILL. ALL
UNDERGROUND CONDUITS WILL BE REQUIRED TO BE SHOWN
IN AS-BUILT DOCUMENTATION.
ADDITIVE OPTION NO. 6, OPTION PROVIDE PARKING SHADE
CANOPY MOUNTED PHOTOVOLTAIC PANELS, DC CONDUCTORS,
INVERTERS, AC COMBINER BOXES, PHOTOVOLTAIC
DISTRIBUTION PANELBOARDS, AND ALL OTHER REQUIRED
PHOTOVOLTAIC HARDWARE AND ACCESSORIES FOR THE
CONSTRUCTION OF A COMPLETE AND FUNCTIONING
PHOTOVOLTAIC SYSTEM AS NOTED IN CONSTRUCTION
DRAWINGS AND SPECIFICATIONS. NOTE, PARKING SHADE
CANOPIES ARE NOT PART OF PHOTOVOLTAIC SYSTEM OPTION
AND ARE PROVIDED BY OTHERS.
SEE DRAWING E0.1 FOR ABBREVIATIONS, SYMBOLS, GENERAL
NOTES.
THE CONTRACTOR SHALL COORDINATE EXACT LOCATION OF
EQUIPMENT POWER CONNECTIONS WITH EQUIPMENT
INSTALLER PRIOR TO ROUGH-IN.
COORDINATE FINAL LOCATION OF MECHANICAL EQUIPMENT
AND ASSOCIATED DISCONNECT SWITCHES, STARTERS, VFDS,
CONTROL POWER AND OTHER POWER REQUIREMENTS WITH
DIV 23 AND MECHANICAL DRAWINGS.
SEE MECHANICAL EQUIPMENT SCHEDULE FOR ASSOCIATED
OVERCURRENT DEVICES, DISCONNECT SWITCHES, STARTERS
AND WIRES.
VOLTAGE DROP SHALL BE LIMITED TO LESS THAN 3% FOR ALL
BRANCH CIRCUITS AND 2% FOR ALL FEEDERS.
CONTRACTOR SHALL COORDINATE AND FIELD VERIFY
REQUIREMENT OF NEUTRAL CONDUCTOR FOR ALL EQUIPMENT
AND PROVIDE NEUTRAL CONDUCTOR AS NECESSARY.
ALL LIFE SAFETY AND LIGHTING PANELBOARDS SHALL BE
EQUIPPED WITH TYPE 2 SPD.
ALL AUTOMATIC TRANSFER SWITCHES SHALL BE 4 POLE AND
EQUIPPED WITH BYPASS ISOLATION.
ALL UTILITY TRANSFORMERS DESCRIBED AS NAVOPACHE
TRANSFORMER TO BE COORDINATED WITH UTILITY AND
PROVIDED BY UTILITY. COORDINATE ALL FINAL REQUIREMENTS
AND AVAILABLE FAULT CURRENT CONTRIBUTIONS BASED ON
SUPPLIED EQUIPMENT. BASIS OF DESIGN 2500KVA, AND 5%Z.
BASIS OF DESIGN ELECTRICAL EQUIPMENT MANUFACTURERS
ARE SIEMENS, ASCO, AND CATERPILLAR. EQUIVALENT
EQUIPMENT FROM APPROVED MANUFACTURERS IS
ACCEPTABLE, PER DIV 26 SPECIFICATIONS.
GENERAL SHEET NOTES
E504
E502
M
NAVOPACHE
TRANSFORMER
LEVEL 1
LEVEL 2
LEVEL 2
LEVEL 3
LEVEL 3
LEVEL 4
LEVEL 4
ROOF
OPTIONAL
STANDBY
BDM2SH
1000A
480-277V
3PH/4W
EQUIPMENT
(ELEVATORS)
ATS-BEA
400A
4P
ATS-BSA
1000A
4P
LTG
TBPE2SLA/B
112.5kVA
TBPE2SLC/D
75kVA
CNTRL
PNL
STAFF/PATIENT
ELEV 1B
CNTRL
PNL
STAFF/PATIENT
ELEV 1A
CNTRL
PNL
FREIGHT ELEV 5
CNTRL
PNL
PUBLIC ELEV 4B
CNTRL
PNL
PUBLIC ELEV 4A
BDW4EH
400A 480-277V
3PH/4W
ATS-BCA
1000A
4P
PWR PWR
A400
A400
A1000
A1000
A300 A300V1 A225
T112 T75
A300 A225
A225
A400
A300
A225
A225
A125 A125
A225V1
TBPT2SLA
45kVA K13
TBPT2SLB
75kVA K13
TBPT2SLC
75kVA K13
T45N T75N T75N
80 80
80 80
80 80
MDF IDF IDF
E501
50-3 50-3 80-3 50-3V1 50-3V1
FAC BLDG
TBPF2SLA
75kVA
MAIN
SB1
SB2 SB3
DB1 DB2 DB3 DB4 DB5 DB6 DB7
MATCHLINE
MATCHLINE
T75
A250
A250
TBPT2SLA
200A/150AF
BPF2SHA
400A/250AF
TBPE1SLC/D
75kVA
T75
TBPT2SLB
400A/225AF
TBPT2SLC
400A/225AF
#2
SES-B
3200A BUS
PER NEC 705.12(B)
480-277V/3PH/4W (3)
E521
SEL-751
(3)(3)
G G G G G
GGGGGG
G
E531
G
E532
E532
G
E532
SHEET NUMBER
PROJECT NUMBER
SEALS AND SIGNATURES
ISSUED FOR DATE
Pl ot
Da te:
IHS Whiteriver Hospital 200 W Hospital Drive Whiteriver, Arizona, 85941
IHS Project #: 131445 IHS Contract #: 75H70123R00008 IHS Award Date: 02/02/2024
455 NORTH THIRD STREET
SUITE 250
PHOENIX, AZ 85004
602.265.2200 smithgroup.com
Drawn By: Checked By:
BASED ON PROGRAM OF REQUIREMENTS DATED [ 03/26/22],
POR AMENDMENT DATED [ 02/03/25], AND ON SCHEMATIC
DRAWINGS APPROVED [11/19/24].
6/1 2/2
6 1
:12 :49
P M
ELECTRICAL ONE LINE
DIAGRAM - SES-B, 1 OF 2
E5.2.1CD
W hit tin gto n
14904.000 Whittington Baca
X FEEDER SCHEDULE
SHEET KEYNOTES
E501 NAVOPACHE UTILITY METER. METER SHALL BE EQUIPPED
WITH CAPABILITY TO INTERFACE WITH BMS. ELECTRICAL
CONTRACTOR SHALL PROVIDE REQUIRED CONDUIT AND
COMMUNICATION WIRING FROM METER TO POINT OF
INTERFACE WITH BMS.
E502 COMPLIANCE WITH "NEC 240.87 ARC ENERGY REDUCTION"
REQUIRED. REDUCTION METHOD SHALL ALLOW FOR
REQUIRED SELECTIVE DEVICE COORDINATION AND ARC
FLASH REQUIREMENTS. REFER TO ELECTRICAL
SPECIFICATIONS FOR ADDITIONAL INFORMATION.
E504 PROVIDE PERMANENT IDENTIFICATION PLAQUE INDICATING
THE FOLLOWING: ELECTRICAL SERVICE #2 OF 5.
GENERATORS LOCATED IN ELECTRICAL EQUIPMENT YARD,
GENERATOR DISCONNECTS LOCATED IN ADJACENT
ELECTRICAL ROOM IN GMDB. PV DISCONNECT LOCATED AT
END OF THIS ELECTRICAL EQUIPMENT LINEUP.
E521 PROVIDE RELAY PROTECTION ELEMENTS REQUIRED BY
UTILITY AND MULTIPLE GENERATOR AND PV MONITORING
AND CONTROL SYSTEM MANUFACTURER. INTEGRATE SEL
RELAY AND PROGRAMMING INTO MULTIPLE GENERATOR
AND PV MONITORING SYSTEM AND CIRCUIT BREAKER.
PROVIDE AND PROGRAM PROTECTION ELEMENT SET POINTS
AND LOGIC WITHIN THE RELAY. REFER TO SEL-751 DETAIL
FOR ADDITIONAL INFORMATION.
E531 ELECTRICAL EQUIPMENT CONSTRUCTION =
UL891 REAR CONNECTED SWITCHBOARD
DRAW-OUT LOW VOLTAGE POWER CIRCUIT BREAKERS
E532 ELECTRICAL EQUIPMENT CONSTRUCTION =
UL67 PANELBOARD
IP20, TOUCH-SAFE, PLUG-IN MOLDED CASE CIRCUIT
BREAKERS, ELECTRONIC TRIP UNIT
SCALE: NOT TO SCALE1 ONE LINE DIAGRAM - SES-B, 1 OF 2
50-3 3#6 + 1#10 G, 3/4" C 50-3V1 3#2 + 1#4 G, 1 1/4" C 80 4#3 + 1#8 G, 1 1/4" C 80-3 3#3 + 1#8 G, 1 1/4" C A125 4#2/0 + 1#6 G, 2" C
A225 4#300KCMIL + 1#2 G, 2 1/2" C
A225V1 4#400KCMIL + 1#1/0 G, 2 1/2" C
A250 4#350KCMIL + 1#2 G, 2 1/2" C
A300 4#500KCMIL + 1#2 G, 3" C
A300V1 4#600KCMIL + 1#1 G, 3" C
A400 2 SETS OF 4#250KCMIL + 1#1 G, (2) 2 1/2" C
A1000 3 SETS OF 4#600KCMIL + 1#4/0 G, (3) 3 1/2" C
T45N 45KVA TRANSFORMER, 480-208Y/120V, 3PH
PRIMARY FEEDER: 3#3 + 1#8 G, 1 1/4" C
SECONDARY FEEDER: 3#1/0, 1#4/0 N + 1#6 G, 2" C
BONDING JUMPERS & GROUNDING ELECTRODE
CONDUCTOR: #6
T75 75KVA TRANSFORMER, 480-208Y/120V, 3PH
PRIMARY FEEDER: 3#1/0 + 1#6 G, 1 1/2" C
SECONDARY FEEDER: 4#4/0 + 1#2 G, 2 1/2" C
BONDING JUMPERS & GROUNDING ELECTRODE
CONDUCTOR: #2
T75N 75KVA TRANSFORMER, 480-208Y/120V, 3PH
PRIMARY FEEDER: 3#1/0 + 1#6 G, 1 1/2" C
SECONDARY FEEDER: 3#4/0, 1#500KCMIL N + 1#2
G, 2 1/2" C
BONDING JUMPERS & GROUNDING ELECTRODE
CONDUCTOR: #2
T112 112.5KVA TRANSFORMER, 480-208Y/120V, 3PH
PRIMARY FEEDER: 3#3/0 + 1#6 G, 2" C
SECONDARY FEEDER: 2 SETS OF 4#3/0 + 1#2 G, (2)
2" C
BONDING JUMPERS & GROUNDING ELECTRODE
CONDUCTOR: #2
"A" DENOTES ALUMINUM CONDUCTORS, ALL OTHER CONDUCTORS SHALL BE COPPER
FINAL CONSTRUCTION DOCUMENTS 05MAR26
BID ADDENDUM-A 16APR26
BID ADDENDUM-E 28MAY26
BID ADDENDUM-G 12JUN26
G
G
G
LS
IG
/3
EN
L
BC
BPE2CHD
225A
FTL
SPD
LS
I
5/
BPE2CHE
225A
MLO
SPD
BPE2CHA
150A
MLO
BPE2CLA
125A
MCB
LS
I
0/
BPE2CLB
125A
MCB
BPE2CHB
150A
MLO
BPE2CLC
125A
MCB
LS
I
0/
BPE2CLD
125A
MCB
BPE1CHD
125A
MLO
SPD
BPE1CHE
125A
MLO
SPD
BPE1CLA
125A
MCB
BPE1CHA
150A
MLO
BPE1CLB
125A
MCB
BPE1CLD
125A
MCB
BPE1CHB
150A
MLO
BPE1CLC
125A
MCB
LS
IG
/3
EN
L
BD
LS
I
0/
LS
I
5/
LS
I
5/
LS
I
0/
LS
I
5/
LS
I
5/
BPE2CLE
125A
MCB
BPE2CLF
125A
MCB
LS
I
5/
LS
I
/3
VFD
LS
I
0/
VFD
LS
I
/3
VFD
LS
I
0/
VFD
LS
I
0/
LS
IG
0/
PVX
LS
IG
0/
EN
L
BE
LS
I
0/
LS
I
0/
BPE2EHA
400A
MLO
BPE1EHA
225A
MLO
BPE2EHB
400A
MLO
BPE1EHB
225A
MLO
BPE1ELA
150A
MCB
BPE1ELB
150A
MCB
LS
I
0/
LS
I
0/
LS
I
0/
UA1 BP1 UB1
LS
I
/3
M M M M
M
M
M M M M M
M M M M M
M M M M M M M M
A.
B.
C.
D.
E.
F.
G.
H.
I.
J.
K.
L.
ADDITIVE OPTION NO. 6, BASE BID PROVIDE ALL
UNDERGROUND CONDUITS ASSOCIATED WITH PHOTOVOLTAIC
SYSTEM INCLUDING BUT NOT LIMITED TO, HANDHOLES,
CONDUIT STUB-UPS BETWEEN MAIN ELECTRICAL ROOM,
PHOTOVOLTAIC DISTRIBUTION PANEL AND AC COMBINER
BOXES. CAP, PROTECT AND MARK CONDUIT LOCATIONS WITH
DETECTABLE UNDERGROUND TAPE FOR IMPLEMENTATION OF
FULLY FUNCTIONING PHOTOVOLTAIC SYSTEM IN THE FUTURE.
A PLAN INDICATING UNDERGROUND CONDUIT
SIZE/QUANTITY/ROUTING FOR FUTURE PHOTOVOLTAIC WILL BE
REQUIRED FOR REVIEW PRIOR TO BACKFILL. ALL
UNDERGROUND CONDUITS WILL BE REQUIRED TO BE SHOWN
IN AS-BUILT DOCUMENTATION.
ADDITIVE OPTION NO. 6, OPTION PROVIDE PARKING SHADE
CANOPY MOUNTED PHOTOVOLTAIC PANELS, DC CONDUCTORS,
INVERTERS, AC COMBINER BOXES, PHOTOVOLTAIC
DISTRIBUTION PANELBOARDS, AND ALL OTHER REQUIRED
PHOTOVOLTAIC HARDWARE AND ACCESSORIES FOR THE
CONSTRUCTION OF A COMPLETE AND FUNCTIONING
PHOTOVOLTAIC SYSTEM AS NOTED IN CONSTRUCTION
DRAWINGS AND SPECIFICATIONS. NOTE, PARKING SHADE
CANOPIES ARE NOT PART OF PHOTOVOLTAIC SYSTEM OPTION
AND ARE PROVIDED BY OTHERS.
SEE DRAWING E0.1 FOR ABBREVIATIONS, SYMBOLS, GENERAL
NOTES.
THE CONTRACTOR SHALL COORDINATE EXACT LOCATION OF
EQUIPMENT POWER CONNECTIONS WITH EQUIPMENT
INSTALLER PRIOR TO ROUGH-IN.
COORDINATE FINAL LOCATION OF MECHANICAL EQUIPMENT
AND ASSOCIATED DISCONNECT SWITCHES, STARTERS, VFDS,
CONTROL POWER AND OTHER POWER REQUIREMENTS WITH
DIV 23 AND MECHANICAL DRAWINGS.
SEE MECHANICAL EQUIPMENT SCHEDULE FOR ASSOCIATED
OVERCURRENT DEVICES, DISCONNECT SWITCHES, STARTERS
AND WIRES.
VOLTAGE DROP SHALL BE LIMITED TO LESS THAN 3% FOR ALL
BRANCH CIRCUITS AND 2% FOR ALL FEEDERS.
CONTRACTOR SHALL COORDINATE AND FIELD VERIFY
REQUIREMENT OF NEUTRAL CONDUCTOR FOR ALL EQUIPMENT
AND PROVIDE NEUTRAL CONDUCTOR AS NECESSARY.
ALL LIFE SAFETY AND LIGHTING PANELBOARDS SHALL BE
EQUIPPED WITH TYPE 2 SPD.
ALL AUTOMATIC TRANSFER SWITCHES SHALL BE 4 POLE AND
EQUIPPED WITH BYPASS ISOLATION.
ALL UTILITY TRANSFORMERS DESCRIBED AS NAVOPACHE
TRANSFORMER TO BE COORDINATED WITH UTILITY AND
PROVIDED BY UTILITY. COORDINATE ALL FINAL REQUIREMENTS
AND AVAILABLE FAULT CURRENT CONTRIBUTIONS BASED ON
SUPPLIED EQUIPMENT. BASIS OF DESIGN 2500KVA, AND 5%Z.
BASIS OF DESIGN ELECTRICAL EQUIPMENT MANUFACTURERS
ARE SIEMENS, ASCO, AND CATERPILLAR. EQUIVALENT
EQUIPMENT FROM APPROVED MANUFACTURERS IS
ACCEPTABLE, PER DIV 26 SPECIFICATIONS.
GENERAL SHEET NOTES
LEVEL 1
LEVEL 2
LEVEL 2
LEVEL 3
LEVEL 3
LEVEL 4
LEVEL 4
ROOF
CRITICAL
BDM2CH
1000A
480-277V
3PH/4W
ATS-BCA
1000A
4P
LTG
TBPE2CLA/B
75kVA
PWR PWR
EQUIPMENT
BDM2EHA
1600A
480-277V
3PH/4W
ATS-BEB
1600A
4P
PWR PWR
TBPE1CLA/B
75kVA
PWR
PWR
TBPE2CLC/D
75kVA
PWR
PWR
TBPE1CLC/D
75kVA
TBPE2CLE/F
75kVA
PWR
A1000
A1000
A150
T75D
A150V1
T75DV1 T75D
A225
T75D T75DV1
A150 A150V1 A125 A125
A225V1
A1600
A1600
1000-3
ACCH-2
CHWP-2
100-3
HHWP-2
30-3
CBWP-2
100-3
EH-2
PV BEQUIPMENT
BDM2EHB
600A
480-277V
3PH/4W
ATS-BEC
600A
4P
A600
A600
A400V1A400
A225
TBPE1ELA
45kVA
T45
TBPE1ELB
45kVA
T45
, E O
400 400 400
UPS A1
INPUT
UPS B1
INPUT
UPS A1/B1
BYPASS
1000-3
NON-COINCIDENT
LOAD
B-2
E519
SB4 SB5 SB6
DB8
DB9
DB10 DB12 DB14 DB19
DB11 DB13 DB15 DB17 DB18
DB16
DB20 DB21 DB22 DB23 DB24 DB25 DB26 DB27
SB7
MATCHLINE
MATCHLINE
300-3
A225
E530
G
G G G G G
GGGGG
G
G G G G G
G
G
E532 E532E533
SHEET NUMBER
PROJECT NUMBER
SEALS AND SIGNATURES
ISSUED FOR DATE
Pl ot
Da te:
IHS Whiteriver Hospital 200 W Hospital Drive Whiteriver, Arizona, 85941
IHS Project #: 131445 IHS Contract #: 75H70123R00008 IHS Award Date: 02/02/2024
455 NORTH THIRD STREET
SUITE 250
PHOENIX, AZ 85004
602.265.2200 smithgroup.com
Drawn By: Checked By:
BASED ON PROGRAM OF REQUIREMENTS DATED [ 03/26/22],
POR AMENDMENT DATED [ 02/03/25], AND ON SCHEMATIC
DRAWINGS APPROVED [11/19/24].
6/1 2/2
6 1
:12 :54
P M
ELECTRICAL ONE LINE
DIAGRAM - SES-B, 2 OF 2
E5.2.2CD
W hit tin gto n
14904.000 Whittington Baca
X FEEDER SCHEDULE
SHEET KEYNOTES
E519 PV CIRCUIT BREAKER SHALL BE LOCATED AT LAST BUSSED
SPACE. PROVIDE PERMANENT IDENTIFICATION PLAQUE
INDICATING THE…