This is a Final Construction Document details sheet (C8.01) for the Utility Campus project at IHS Whiteriver Hospital, located in Whiteriver, Arizona. The document is sheet BP2 from a comprehensive construction document set prepared by SmithGroup and Dibble Corporation. The drawings are based on the Program of Requirements dated March 26, 2022, with a POR Amendment dated February 3, 2025, and schematic drawings approved November 19, 2024. The document was issued for final construction on March 5, 2026, with subsequent Bid Addendum-A issued April 16, 2026, and Bid Addendum-H issued June 18, 2026.
The sheet contains detailed technical drawings and specifications for utility infrastructure, including cross-sectional and plan view details of water tank systems (both reclaimed water tanks and domestic water tanks), roof-mounted mechanical systems, and associated utility connections. The drawings specify component materials, dimensions, access requirements, and connection details for the utility campus infrastructure. This document serves as the construction basis for contractors bidding on or executing the hospital utility campus work, with all revisions and addenda incorporated through the June 18, 2026 issuance date.
View the file
Other files
Show 40 more
Latest 50 of 107 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PHASE
PROJECT NUMBER
SHEET TITLE
SEALS AND SIGNATURES
ISSUED FOR DATE
6/1 8/2
6 2
:19 P
M Pl ot Da te:
G:
\20
\10
4_
IH
S_
W
HI
TE
RI
VE
R\
CA
D\
UT
ILI
TY
C
AM
PU
S\
4- C8
.0X -D
ET
L
455 NORTH THIRD STREET
SUITE 250
PHOENIX, AZ 85004
602.265.2200 smithgroup.com
1626 NORTH LITCHFIELD RD
SUITE 150
GOODYEAR, AZ 85395
623.935.2258 dibblecorp.com
SHEET NUMBER
BP2
DRAWN BY: DIBBLE CHECKED BY: SM
BASED ON PROGRAM OF REQUIREMENTS DATED [03/26/22],
POR AMENDMENT DATED [02/03/25], AND ON SCHEMATIC
DRAWINGS APPROVED [11/19/24].
UTILITY CAMPUS
FINAL CONSTRUCTION DOCUMENTS 05MAR26
BID ADDENDUM-A 16APR26
BID ADDENDUM-H 18JUN26
DETAILS
C8.01
[1] C8.01 - DETAILS