This is a construction drawing sheet for the Hon-Dah Utility Campus project. Sheet C9.01 contains details for Building Package 3 (BP3) and was issued as part of the Final Construction Documents dated March 5, 2026, with a Bid Addendum-A issued on April 16, 2026. The drawing was prepared by Dibble Corporation and checked by Smith Group, with offices located in Phoenix and Goodyear, Arizona.
The site plan depicts the utility campus layout with a central circular building and associated infrastructure. Key design elements include roof access steps with IPC and OSHA requirements, mechanical level specifications, a reclaimed water tank, roof-mounted small package doors, and various utility connections. The drawing includes callouts for specific construction details such as electrical and structural requirements scattered throughout the plan. A note at the bottom of the sheet specifies that OSHA manufacturer small package doors must be provided where indicated and directs contractors to refer to other sheets for specific requirements. The document is part of the IHS Whiteriver Hospital project (Project A, TOAD number) and serves as a construction bid package for contractors.
View the file
Other files
Show 40 more
Latest 50 of 107 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PHASE
PROJECT NUMBER
SHEET TITLE
SEALS AND SIGNATURES
ISSUED FOR DATE
4/1 5/2
6 4
:06 P
M Pl ot Da te:
G:
\20
\10
4_
IH
S_
W
HI
TE
RI
VE
R\
CA
D
HO
N-
DA
H\
C9 .01
D
ET
AI
LS
.D W
G
455 NORTH THIRD STREET
SUITE 250
PHOENIX, AZ 85004
602.265.2200 smithgroup.com
1626 NORTH LITCHFIELD RD
SUITE 150
GOODYEAR, AZ 85395
623.935.2258 dibblecorp.com
SHEET NUMBER
BP3
DRAWN BY: DIBBLE CHECKED BY: SM
FINAL CONSTRUCTION DOCUMENTS 05MAR26
BUILDING PACKAGE 3 (BP3)
HON-DAH UTILITY CAMPUS
BID ADDENDUM-A 16APR26
DETAILS
C9.01
| Sheets and Views |
| C9.01 |
File details come from the government source that posted it. Updated .