A2-1g BP2_DWG2026-0416_05_CIVIL_IHS-Whiteriver-UC_BID-ADD-A.pdf
PDF 1 MB Posted
- Attached to
- Whiteriver Hospital Construction
- Solicitation number
- 75H70126R00016
About this file
This document is a set of Final Construction Documents (Bid Addendum-A) containing Storm Drain Plans and Details for the IHS Whiteriver Utility Campus project located in Whiteriver, Arizona. The plans are dated May 5, 2026 (Final Construction Documents) with Bid Addendum-A issued April 16, 2026.
The documents include storm drain planning and design details prepared by SmihtGroup (455 North Third Street, Suite 250, Phoenix, AZ 85004) and Dibble Corporation (1626 North Litchfield Road, Suite 150, Goodyear, AZ 85395). Sheet C3.03 and C3.04 present Storm Drain Plans showing the layout of drainage infrastructure, including storm drain lines, catch basins, and connections to floodplain limits for a new building and associated utility campus features. Sheet C8.01 provides detailed cross-sectional and plan views of reclaimed water tanks and domestic water tanks, including specifications for tank access covers, drain configurations, utility connections, and structural support requirements. The construction notes reference the Program of Requirements dated March 26, 2022, a POR Amendment dated February 3, 2025, and Schematic Drawings approved November 19, 2024. The document includes a standard notice requiring contactors to call 811 or visit Arizona811.com at least two full working days before beginning excavation work.
View the file
Other files
Show 40 more
Latest 50 of 107 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PHASE
PROJECT NUMBER
SHEET TITLE
SEALS AND SIGNATURES
ISSUED FOR DATE
4/1 5/2
6 3
:54 P
M Pl ot Da te:
G:
\20
\10
4_
IH
S_
W
HI
TE
RI
VE
R\
CA
D\
UT
ILI
TY
C
AM
PU
S\
4- C3
.X -S
TR
M
455 NORTH THIRD STREET
SUITE 250
PHOENIX, AZ 85004
602.265.2200 smithgroup.com
1626 NORTH LITCHFIELD RD
SUITE 150
GOODYEAR, AZ 85395
623.935.2258 dibblecorp.com
SHEET NUMBER
BP2
DRAWN BY: DIBBLE CHECKED BY: SM
BASED ON PROGRAM OF REQUIREMENTS DATED [03/26/22],
POR AMENDMENT DATED [02/03/25], AND ON SCHEMATIC
DRAWINGS APPROVED [11/19/24].
UTILITY CAMPUS
FINAL CONSTRUCTION DOCUMENTS 05MAR26
BID ADDENDUM-A 16APR26
Call 811 or click Arizona811.com
Contact Arizona 811 at least two full working days before you begin excavation
STORM DRAIN PLAN
C3.03
CONSTRUCTION NOTES
REFERENCE NOTES
SHEET TITLE
SEALS AND SIGNATURES
ISSUED FOR DATE
4/1 5/2
6 3
:54 P
M Pl ot Da te:
G:
\20
\10
4_
IH
S_
W
HI
TE
RI
VE
R\
CA
D\
UT
ILI
TY
C
AM
PU
S\
4- C3
.X -S
TR
M
455 NORTH THIRD STREET
SUITE 250
PHOENIX, AZ 85004
602.265.2200 smithgroup.com
1626 NORTH LITCHFIELD RD
SUITE 150
GOODYEAR, AZ 85395
623.935.2258 dibblecorp.com
SHEET NUMBER
BP2
DRAWN BY: DIBBLE CHECKED BY: SM
BASED ON PROGRAM OF REQUIREMENTS DATED [03/26/22],
POR AMENDMENT DATED [02/03/25], AND ON SCHEMATIC
DRAWINGS APPROVED [11/19/24].
UTILITY CAMPUS
FINAL CONSTRUCTION DOCUMENTS 05MAR26
BID ADDENDUM-A 16APR26
Call 811 or click Arizona811.com
Contact Arizona 811 at least two full working days before you begin excavation
STORM DRAIN PLAN
C3.04
CONSTRUCTION NOTES
REFERENCE NOTES
SHEET TITLE
SEALS AND SIGNATURES
ISSUED FOR DATE
4/1 5/2
6 3
:54 P
M Pl ot Da te:
G:
\20
\10
4_
IH
S_
W
HI
TE
RI
VE
R\
CA
D\
UT
ILI
TY
C
AM
PU
S\
4- C8
.0X -D
ET
L
455 NORTH THIRD STREET
SUITE 250
PHOENIX, AZ 85004
602.265.2200 smithgroup.com
1626 NORTH LITCHFIELD RD
SUITE 150
GOODYEAR, AZ 85395
623.935.2258 dibblecorp.com
SHEET NUMBER
BP2
DRAWN BY: DIBBLE CHECKED BY: SM
BASED ON PROGRAM OF REQUIREMENTS DATED [03/26/22],
POR AMENDMENT DATED [02/03/25], AND ON SCHEMATIC
DRAWINGS APPROVED [11/19/24].
UTILITY CAMPUS
FINAL CONSTRUCTION DOCUMENTS 05MAR26
BID ADDENDUM-A 16APR26
DETAILS
C8.01
| Sheets and Views |
| C3.03 STORM DRAIN PLAN |
| C3.04 STORM DRAIN PLAN |
| C8.01 DETAILS |
File details come from the government source that posted it. Updated .