This document is a Standard Form 30 Amendment of Solicitation/Modification of Contract for a Multiple Award Task Order Contract (MATOC) issued by the Indian Health Service (IHS). Amendment 10 updates the Statement of Work (SOW) and provides responses to vendor questions regarding a solicitation with the number 75H70125R00033.

Key details include clarifications on Tribal Employment Rights Office (TERO) compliance across different tribal jurisdictions, background investigation requirements, and site-specific security orientations. The amendment confirms that contractors will be responsible for the Oglala Sioux Tribe's 1% Environmental Protection Program tax, must comply with each tribe's specific TERO policies, and need to complete facility-specific background checks. Each task order will outline relevant TERO provisions, and an approved site superintendent must be physically present whenever work is being performed, including by subcontractors. The amendment is dated October 24, 2025, and provides links to the Oglala Sioux Tribe's TERO ordinance and compliance plan.

View the file

Other files for this federal contract opportunity

Other files attached to IHS Nationwide Multiple Award Task Order Contract, newest first.
File Type Posted
B05 75H70125R00033 Amendment 13.pdf PDF
B01 Section J Attachment 5.6 Seed Project Wage Determination dated 11-21-2025.pdf PDF
B05 75H70125R00033 Amendment 12.pdf PDF
B01 Section J Attachment 5.13 Kyle EOC Modernization All Doors - Combined.pdf PDF
B01 Section J Attachment 5.7 Updated Kyle Door Schedule Amendment 11.xlsx XLSX spreadsheet
B01 Section J Attachment 5.5 Updated Construction Drawings Amendment 11.pdf PDF
B01 Section J Attachment 5.3 Updated Seed Project SOW Amendment 11.pdf PDF
B01 Section J Attachment 5.2 Updated Seed Project Price Schedule Amendment 11.xlsx XLSX spreadsheet
B05 75H70125R00033 Amendment 11.pdf PDF
B01 Section J Attachment 5.3 Updated Seed Project SOW Amendment 10.pdf PDF
B05 75H70125R00033 Amendment 09.pdf PDF
B05 Section J Attachment 5.5 Updated Construction Drawings Amendment 09.pdf PDF
B01 Section J Attachment 5.3 Updated Seed Project SOW Amendment 09.pdf PDF
B03 Site Visit Sign in Sheet.pdf PDF
B01 Section J Attachment 5.11 Pre-Construction Risk Assessment.docx DOCX document
B01 Section J Attachment 5.7 Updated Kyle Door Schedule Amendment 08.xlsx XLSX spreadsheet
B05 75H70125R00033 Amendment 08.pdf PDF
B01 Section J Attachment 5.9 Flooring Finish.pdf PDF
B01 Section J Attachment 5.12 Turf Area - Current Conditions.jpg JPG image
B01 Section J Attachment 5.10 Kyle Floor Plan with Room Numbers.pdf PDF
B01 Section J Attachment 5.3 Updated Seed Project SOW Amendment 08.pdf PDF
B01 Section J Attachment 5.2 Updated Seed Project Price Schedule Amendment 08.xlsx XLSX spreadsheet
B01 Section J Attachment 5.8 Infection Control Risk Assessment.docx DOCX document
B01 Section J Attachment 5.5 Updated Construction Drawings Amendment 08.pdf PDF
B05 75H70125R00033 Amendment 07.pdf PDF
B01 Section J Attachment 5.2 - Updated Seed Project Price Schedule - Amendment 06.xlsx XLSX spreadsheet
B05 75H70125R00033 Amendment 06.pdf PDF
B05 75H70125R00033 Amendment 05.pdf PDF
Attachment 5.7 - Kyle Door Schedule.pdf PDF
B01 Section J Attachment 5.3 Updated Seed Project SOW.pdf PDF
B05 75H70125R00033 Amendment 04.pdf PDF
B01 Section J Attachment 5.2 - Updated Seed Project Price Schedule.xlsx XLSX spreadsheet
B05 75H70125R00033 Amendment 03.pdf PDF
B05 75H70125R00033 Amendment 02.pdf PDF
B05 75H70125R00033 Amendment 01.pdf PDF
B01 Section J Attachment 5.6 Seed Project Wage Decision SD20250017.pdf PDF
B01 Section J Attachment 5.2 - Seed Project Price Schedule.xlsx XLSX spreadsheet
B01 Section J Attachment 1 - PPQ.docx DOCX document
B01 75H70125R00033.pdf PDF
B01 Section J Attachment 5.4 - Kyle ICRA Map.pdf PDF
B01 Section J Attachment 6 IHS IEE Representation Form.pdf PDF
B01 Section J Attachment 5.5 Construction Drawings.pdf PDF
B01 Section J Attachment 5.3 Seed Project SOW.pdf PDF
B01 Section J Attachment 5.1 - Self Performance Calculation Sheet - Seed Project.docx DOCX document
B01 Section J Attachment 4 - Financial Institution Reference Sheet.pdf PDF
B01 Section J Attachment 3 - Experience Form.docx DOCX document
B01 Section J Attachment 2 - Contractor Surety Information.docx DOCX document
Show all 47

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

(a) By completing items 8 and 15, and returning or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

E. IMPORTANT: Contractor is not is required to sign this document and return copies to the issuing office.

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE

2. AMENDMENT/MODIFICATION NUMBER 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQUISITION NUMBER 5. PROJECT NUMBER (If applicable)

7. ADMINISTERED BY (If other than Item 6) CODE

STANDARD FORM 30 (REV. 11/2016)

Prescribed by GSA FAR (48 CFR) 53.243

FACILITY CODE

9A. AMENDMENT OF SOLICITATION NUMBER

9B. DATED (SEE ITEM 11)

10A. MODIFICATION OF CONTRACT/ORDER NUMBER

10B. DATED (SEE ITEM 13)

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended. is not extended.

12. ACCOUNTING AND APPROPRIATION DATA (If required) copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NUMBER AS DESCRIBED IN ITEM 14.

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER

NUMBER IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15C. DATE SIGNED

15A. NAME AND TITLE OF SIGNER (Type or print)

16C. DATE SIGNED

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

PAGE OF PAGES

6. ISSUED BY CODE

8. NAME AND ADDRESS OF CONTRACTOR (Number, street, county, State and ZIP Code) (X)

CODE

15B. CONTRACTOR/OFFEROR

(Signature of person authorized to sign)

16B. UNITED STATES OF AMERICA

(Signature of Contracting Officer)

Previous edition unusable

A000010

The reason for this amendment is to update Attachment 5.3 - SOW and to provide responses to vendor questions.

See Attached Summary of Changes

Division of Eng. Services Seattle 701 Fifth Avenue, Suite 1600 Seattle WA 98104

See block 6

75H70125R00033

1 3

10/24/2025

09/16/2025

SUMMARY OF CHANGES

75H70125R00033 Amendment 10

A. Section 2.D of the SOW has been modified. Replace Attachment 5.3 Updated SOW Amendment 09 with Attachment 5.3 Updated SOW Amendment 10, dated October 24, 2025.

B. Answers to the following questions are as follows:

1. Please confirm whether the Contractor will be responsible for payment of the Oglala Sioux Tribe’s 1% Environmental Protection Program (EPP) tax.

Response: Yes

2. For projects performed on the Pine Ridge Reservation, the solicitation indicates full compliance with the Oglala Sioux Tribe’s TERO requirements, including use and preference of TERO‐certified contractors, hiring of tribal employees, and payment of applicable fees. Can you include the TERO ordinance?

Response: The Oglala Sioux Tribe’s TERO ordinance is located at https://www.narf.org/nill/codes/oglala_sioux/chapter18‐tero.html. The Oglala Sioux TERO Compliance Plan is located here: https://dot.sd.gov/media/155fe2ad/OSTcomplianceplan.pdf

3. Since this MATOC will cover multiple tribal jurisdictions nationwide, can the Government clarify how TERO (Tribal Employment Rights Office) compliance will be managed for task orders on different reservations? Each tribe enforces its own employment ordinances, fees, and certification requirements (e.g., permit fees, local hiring percentages, and use of TERO‐certified subcontractors), and these can vary significantly between locations. Will IHS issue uniform guidance for TERO coordination and compliance under this contract, or will each task order require separate TERO approval and payment of tribal fees based on the applicable tribal regulations?

Response: MATOC contractors are responsible for complying with all TERO policies, ordinances, and regulations of the respective tribe where work is performed. Because TERO requirements differ by tribe, the Government will not issue uniform guidance for this MATOC. Instead, each task order solicitation will outline the relevant TERO provisions and provide the necessary contact information to support contractor compliance.

4. Section H.44 of the solicitation requires background investigations and security clearances for contractor personnel, including the superintendent. Since this MATOC covers multiple IHS facilities and tribal jurisdictions, can the Government clarify whether a previously completed IHS background investigation (for example, from another IHS project or facility) can be accepted for future task orders, or if a new investigation must be completed for each facility? Additionally, what is the typical timeframe for completion of an IHS background check, and must a cleared superintendent or key person be physically onsite at all times when subcontractors or other employees are performing work?

Response: Security requirements vary by facility. MATOC contractors are responsible for ensuring compliance with each facility’s specific background investigation and clearance procedures.

Previously completed IHS background checks may not be automatically accepted; contractors must confirm requirements with the facility’s security personnel for each task order.

Background investigation processing times differ by location and can range from approximately 72 hours to 7 days or longer, depending on local procedures and documentation completeness.

An approved site superintendent is required to be physically present whenever work is being performed, including by subcontractors. Subcontractors will not be allowed to work on site without superintendence as prescribed in FAR 52.236‐6 — Superintendence by the Contractor. No other

SUMMARY OF CHANGES

75H70125R00033 Amendment 10 personnel may serve in this role unless specifically approved by the Contracting Officer. Failure to adhere to this requirement may result in the issuance of a Cure Notice and a future Termination for Default.

5. Please clarify whether each IHS facility will require its own site‐specific badging and security orientation for contractor personnel, and if so, whether these must be renewed for every task order.

Response: Each facility will have its own site‐specific security orientation for contractor personnel.

Each facility will make the determination if repeat orientations are required for the same personnel.