B05 75H70125R00033 Amendment 03.pdf

PDF 326 KB Posted

Attached to
IHS Nationwide Multiple Award Task Order Contract Federal contract opportunity
Solicitation number
75H70125R00033
Issued by
Department of Health and Human Services Indian Health Service

About this file

This document is an Amendment of Solicitation/Modification of Contract with Questions and Answers for Solicitation Number 75H70125R00033, issued by the Division of Engineering Services in Seattle. The amendment provides clarifications for a seed project, which is not a design-build project, and addresses various contractor requirements. Key points include: contractors can have one individual fill multiple roles (superintendent, safety officer, quality manager), designers must be employees of the offeror, and past performance can be utilized by team members in a teaming arrangement. The document allows a small business to submit two proposals (one as a small business and another as a team member) and confirms that no design submission or specification book is required for this project. Wage determination and staffing details are addressed, with contractors advised to assign employees to the most appropriate labor category and submit additional classification requests if needed.

View the file

Other files for this federal contract opportunity

Other files attached to IHS Nationwide Multiple Award Task Order Contract, newest first.
File Type Posted
B05 75H70125R00033 Amendment 13.pdf PDF
B01 Section J Attachment 5.6 Seed Project Wage Determination dated 11-21-2025.pdf PDF
B05 75H70125R00033 Amendment 12.pdf PDF
B01 Section J Attachment 5.5 Updated Construction Drawings Amendment 11.pdf PDF
B01 Section J Attachment 5.3 Updated Seed Project SOW Amendment 11.pdf PDF
B01 Section J Attachment 5.13 Kyle EOC Modernization All Doors - Combined.pdf PDF
B01 Section J Attachment 5.7 Updated Kyle Door Schedule Amendment 11.xlsx XLSX spreadsheet
B01 Section J Attachment 5.2 Updated Seed Project Price Schedule Amendment 11.xlsx XLSX spreadsheet
B05 75H70125R00033 Amendment 11.pdf PDF
B01 Section J Attachment 5.3 Updated Seed Project SOW Amendment 10.pdf PDF
B05 75H70125R00033 Amendment 10.pdf PDF
B05 Section J Attachment 5.5 Updated Construction Drawings Amendment 09.pdf PDF
B05 75H70125R00033 Amendment 09.pdf PDF
B01 Section J Attachment 5.3 Updated Seed Project SOW Amendment 09.pdf PDF
B03 Site Visit Sign in Sheet.pdf PDF
B01 Section J Attachment 5.9 Flooring Finish.pdf PDF
B01 Section J Attachment 5.11 Pre-Construction Risk Assessment.docx DOCX document
B01 Section J Attachment 5.7 Updated Kyle Door Schedule Amendment 08.xlsx XLSX spreadsheet
B05 75H70125R00033 Amendment 08.pdf PDF
B01 Section J Attachment 5.8 Infection Control Risk Assessment.docx DOCX document
B01 Section J Attachment 5.5 Updated Construction Drawings Amendment 08.pdf PDF
B01 Section J Attachment 5.12 Turf Area - Current Conditions.jpg JPG image
B01 Section J Attachment 5.10 Kyle Floor Plan with Room Numbers.pdf PDF
B01 Section J Attachment 5.3 Updated Seed Project SOW Amendment 08.pdf PDF
B01 Section J Attachment 5.2 Updated Seed Project Price Schedule Amendment 08.xlsx XLSX spreadsheet
B05 75H70125R00033 Amendment 07.pdf PDF
B01 Section J Attachment 5.2 - Updated Seed Project Price Schedule - Amendment 06.xlsx XLSX spreadsheet
B05 75H70125R00033 Amendment 06.pdf PDF
Attachment 5.7 - Kyle Door Schedule.pdf PDF
B05 75H70125R00033 Amendment 05.pdf PDF
B01 Section J Attachment 5.3 Updated Seed Project SOW.pdf PDF
B05 75H70125R00033 Amendment 04.pdf PDF
B01 Section J Attachment 5.2 - Updated Seed Project Price Schedule.xlsx XLSX spreadsheet
B05 75H70125R00033 Amendment 02.pdf PDF
B05 75H70125R00033 Amendment 01.pdf PDF
B01 Section J Attachment 1 - PPQ.docx DOCX document
B01 Section J Attachment 5.6 Seed Project Wage Decision SD20250017.pdf PDF
B01 Section J Attachment 5.2 - Seed Project Price Schedule.xlsx XLSX spreadsheet
B01 Section J Attachment 6 IHS IEE Representation Form.pdf PDF
B01 Section J Attachment 5.5 Construction Drawings.pdf PDF
B01 Section J Attachment 5.3 Seed Project SOW.pdf PDF
B01 Section J Attachment 5.1 - Self Performance Calculation Sheet - Seed Project.docx DOCX document
B01 Section J Attachment 4 - Financial Institution Reference Sheet.pdf PDF
B01 Section J Attachment 3 - Experience Form.docx DOCX document
B01 Section J Attachment 2 - Contractor Surety Information.docx DOCX document
B01 75H70125R00033.pdf PDF
B01 Section J Attachment 5.4 - Kyle ICRA Map.pdf PDF
Show all 47

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

(a) By completing items 8 and 15, and returning or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

E. IMPORTANT: Contractor is not is required to sign this document and return copies to the issuing office.

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE

2. AMENDMENT/MODIFICATION NUMBER 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQUISITION NUMBER 5. PROJECT NUMBER (If applicable)

7. ADMINISTERED BY (If other than Item 6) CODE

STANDARD FORM 30 (REV. 11/2016)

Prescribed by GSA FAR (48 CFR) 53.243

FACILITY CODE

9A. AMENDMENT OF SOLICITATION NUMBER

9B. DATED (SEE ITEM 11)

10A. MODIFICATION OF CONTRACT/ORDER NUMBER

10B. DATED (SEE ITEM 13)

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended. is not extended.

12. ACCOUNTING AND APPROPRIATION DATA (If required) copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NUMBER AS DESCRIBED IN ITEM 14.

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER

NUMBER IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15C. DATE SIGNED

15A. NAME AND TITLE OF SIGNER (Type or print)

16C. DATE SIGNED

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

PAGE OF PAGES

6. ISSUED BY CODE

8. NAME AND ADDRESS OF CONTRACTOR (Number, street, county, State and ZIP Code) (X)

CODE

15B. CONTRACTOR/OFFEROR

(Signature of person authorized to sign)

16B. UNITED STATES OF AMERICA

(Signature of Contracting Officer)

Previous edition unusable

A000003

The reason for this amendment is to provide answers to questions.

See Summary of Changes

Division of Eng. Services Seattle 701 Fifth Avenue, Suite 1600 Seattle WA 98104

See block 6

75H70125R00033

1 4

09/25/2025

09/16/2025

QUESTIONS AND ANSWERS

75H70125R00033

Answers to the following questions are as follows:

1. Solicitation section H.18 COORDINATION OF TRADES states "The contractor shall have a competent and registered engineer to coordinate all fieldwork and shop drawings of the various trades prior to installation and for submission of coordinated shop drawings for approval" Question: Is the Government requiring a "registered engineer" to coordinate filed work and shop drawings or can this work be performed by the project superintendent?

Response: A registered engineer is only required if specified in the task order’s Statement of Work;

otherwise, the project superintendent may perform the coordination.

2. Please confirm for the seed project that one contractor individual can fill the position of the superintendent, safety officer, and quality manager.

Response: For the purposes of this seed project, a site superintendent may also fill in the positions of safety officer and quality assurance. Individual task orders will specify how key personnel positions should be filled.

3. Please confirm if the seed project is a design build project. The SOW doesn’t indicate anything about design requirements. If design‐build what are the design submission requirements?

Response: The Seed project is not a design‐build project. No design is required for this project.

4. If proposing as a teaming arrangement the solicitation indicates “teaming proposals shall clearly identify the roles and level of participation of each firm in the proposed work and shall include the Small Business Administration approval of Small Business status of the offering business entity.” The SBA doesn’t approve teaming agreements. Please advise.

Response: This is correct. The SBA does not approve teaming agreement. However, the solicitation is not requiring SBA approval of the teaming agreement; rather, it requires the offering entity to submit proof of its SBA‐approved small business status.

5. Can past performance be utilized by both team members if contemplating a teaming agreement?

Response: Yes

6. Can a business that is considered a small business provide two proposals? One as a small business and another proposal as a team member of an ISBEE teaming partner.

Response: This is allowable. Each submission will be evaluated independently, but offerors should be mindful of potential Organizational Conflict of Interest concerns.

7. Solicitation indicates “Relevant and recent experience with design‐build projects for healthcare or related facilities where the Offeror performed all Mechanical/Electrical/Plumbing (MEP) design activities in‐house.” To be considered in‐house does this mean that the designers are employees of the offeror or can outside consultants/design firms be considered in‐house if design services were subcontracted by the offeror?

Response: The designers must be employees of the offeror.

8. Should design team members be identified in the offeror’s proposal.

Response: Offerors may either identify design team members or explain how subconsultant design services will be obtained in their technical proposal; this information must be included under Factor 3(a)(5) to achieve a “Satisfactory” rating. Offerors may also identify their design team in Factor 1 when design‐ build projects were performed entirely in‐house for MEP design.

9. In the RFP – Section K – it goes from K.1, K.2 then skips to K.6. Please clarify if K.3, K.4 and K.5 was meant to be omitted.

Response: Section K.6 is renumbered to K.3.

10. And there is no listing for Reps and Certs to be inserted into the Price Proposal. If you do want them included, can I just place them in the back of the price proposal?

Response: Reps and Certs are not a required submittal for this solicitation. However, firms should ensure that their Reps and Certs are current and active in SAM.gov.

11. See attached Attachment 2 – Contractors Surety Information. Reference the below line item, copied and pasted from Section B, noted in italics.

“What is the contractors rating?_____________________”

Are you asking for the contractor’s bonding rates? Or are you asking for the surety’s rating (i.e., A.M.

Best rating of A)? Please review and clarify.

Response: Some surety companies have provided us with an overall assessment of the firm using their own rating system. Usually it’s based on the contractor’s financial strength, credit history and/or track record on bonded projects. We do not need the surety’s AM Best Rating.

12. Are project specifications (specification book) for the seed project intended to be included as part of this solicitation? None were provided.

Response: A specification book is not included; the seed project is defined by a Statement of Work and drawings, which provide the necessary information for proposal preparation and reflect the type of documentation to be expected under the MATOC.

13. Wage Determination does not include wage rates for the following required by RFP: Flooring installation, window installation, ceiling installation. Is laborer, carpenter or painter to be used in place of these trades?

Response: Contractors should assign employees to the most appropriate listed labor category based on the work performed; if no existing category is suitable, you may submit an additional classification request (conformance) through the contracting officer for Department of Labor (DOL) approval.

14. Contractors Staff requires superintendent onsite at all times, please provide staffing requirement for

QCM/SSHO.

Response: See response to question #2 in this amendment.

Additional responses to seed project technical questions will be forthcoming in an upcoming amendment.