This document is a Standard Form 30 Amendment of Solicitation/Modification of Contract for a federal procurement opportunity (Solicitation Number 75H70125R00033) for the Kyle Health Center Modernization project. The amendment extends the proposal due date from October 31, 2025, to November 7, 2025, at 2 PM Pacific Time, and is designated as a 100% Small Business set-aside. The project involves modernization work at a health center, with specific requirements including 20-gauge metal studs, 4,000 psi concrete, Select White Maple Alpine AL18 wood doors, black aluminum windows, and various interior and exterior modifications.
Key details include updating construction drawings, Statement of Work, and addressing 31 vendor questions covering topics such as ISBEE set-aside pool considerations, telecom infrastructure, fire extinguishers, door hardware, signage (approximately 125 rooms and 5 exterior signs), and specific material specifications. The government confirmed that the ongoing government shutdown will not affect the MATOC (Multiple Award Task Order Contract) award, and future task order requests will be competed among contractors within designated area pools. Contractors are required to provide attic stock, perform concrete testing, and follow specific guidelines for various construction elements like cabinetry, roofing, and exterior treatments.
View the file
Other files for this federal contract opportunity
Show all 47
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
(a) By completing items 8 and 15, and returning or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
E. IMPORTANT: Contractor is not is required to sign this document and return copies to the issuing office.
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE
2. AMENDMENT/MODIFICATION NUMBER 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQUISITION NUMBER 5. PROJECT NUMBER (If applicable)
7. ADMINISTERED BY (If other than Item 6) CODE
STANDARD FORM 30 (REV. 11/2016)
Prescribed by GSA FAR (48 CFR) 53.243
FACILITY CODE
9A. AMENDMENT OF SOLICITATION NUMBER
9B. DATED (SEE ITEM 11)
10A. MODIFICATION OF CONTRACT/ORDER NUMBER
10B. DATED (SEE ITEM 13)
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended. is not extended.
12. ACCOUNTING AND APPROPRIATION DATA (If required) copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NUMBER AS DESCRIBED IN ITEM 14.
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER
NUMBER IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15C. DATE SIGNED
15A. NAME AND TITLE OF SIGNER (Type or print)
16C. DATE SIGNED
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
PAGE OF PAGES
6. ISSUED BY CODE
8. NAME AND ADDRESS OF CONTRACTOR (Number, street, county, State and ZIP Code) (X)
CODE
15B. CONTRACTOR/OFFEROR
(Signature of person authorized to sign)
16B. UNITED STATES OF AMERICA
(Signature of Contracting Officer)
Previous edition unusable
A000009
The reason for this amendment is to extend the due date for the proposals, update attachments in Section J, and to provide responses to vendor questions.
See Attached Summary of Changes
Division of Eng. Services Seattle 701 Fifth Avenue, Suite 1600 Seattle WA 98104
See block 6
75H70125R00033
1 5
10/21/2025
09/16/2025
SUMMARY OF CHANGES
75H70125R00033 Amendment 09
A. Replace Attachment 5.5 – Updated Construction Drawings Amendment 08 with Attachment 5.5 Updated Construction Drawings Amendment 09.
B. Replace Attachment 5.3 Updated SOW Amendment 08 with Attachment 5.3 Updated SOW Amendment
09, dated October 21, 2025.
C. Extend the due date for proposals from 31 October 2025 to 7 November 2025. The due time remains unchanged at 2 PM Pacific Time.
D. Answers to the following questions are as follows:
1. Section L states that the seed project is a 100% Small Business set‐aside. If, following evaluation, the Government designates the Great Plains Area as an ISBEE set‐aside pool, will the seed project be awarded only to an ISBEE firm? If so, please clarify whether non‐ISBEE Small Businesses that submit proposals and are evaluated as providing the best value would remain eligible for award of the seed project.
Response: If the Great Plains Area is designated as an ISBEE set‐aside pool after technical evaluations, the seed project will also be awarded only to a qualified ISBEE firm that received a MATOC for the Great Plains area. If the Contracting Officer determines that a fair and reasonable price cannot be achieved within the designated ISBEE pool, the Government reserves the right to award the seed project to a qualified non‐ISBEE Small Business in accordance with the Buy Indian Act (25 U.S.C. § 47) and HHSAR 326.603‐1. Any such qualified non‐ISBEE firm must be willing to accept the project for the Great Plains area.
If the Great Plains Area is not designated as an ISBEE set‐aside, the seed project will be awarded to the qualified Small Business offeror that provides the best value to the Government, consistent with the evaluation criteria stated in the solicitation.
The Government notes that the seed project represents a unique, one‐time evaluation and award requirement used to establish the MATOC contracts. Following MATOC award, all future Task Order Requests for Proposal (TORFPs) will be issued and competed solely among the contractors within each designated Area pool in accordance with its final ISBEE or Small Business designation.
2. Per the Bidding Documents, it is hard to tell if there is any work regarding the following trade package: Is “Telecom Infrastructure” need to be included as part of the Seed Project scope of work, or will that be handled separately?"?
Response: No. The nurse stations will be the only locations that require data and electrical connections.
3. Per the Bidding Documents, it is hard to tell or not stated if there is any work regarding the following trade package: Do any of the existing fire extinguishers/cabinets need to be removed and replaced? If some do need replacing, do we just use the existing ones or purchase new ones? If they are to be replaced, please provide information on the size and styles wanted.
Response: No
4. Per Amendment 0006, the Attachment 5.2 Price Schedule was updated, but we have a question regarding two CLIN’s on this form, 8 and CLIN #15. Both of these are unclear as to what is indicated on the plan sheets they are referenced to, and what should be put in these two bid items. Please clarify what Doors‐Frames‐Hardware as listed below should go into which bid item?
Amendment 09
a. CLIN #15 has “8” JOB, should this be “1”?
b. CLIN # 8 has “46 ea.” listed below, but plan sheets A103 & A121 add up to?
c. Plan sheet A103 has a count of 23 ea. ‐Doors‐Frames‐Hardware as per “08‐01 Install Doors per the Door Schedule and SOW.
d. Plan sheet A121 has a count 33 ea.‐Doors‐Frames‐Hardware as per “08‐01 Install Doors per the Door Schedule and SOW.
Response: See updated Price Schedule Amendment 08
5. With the ongoing government shutdown, what is the possibility of this MATOC being delayed or defunded?
Response: The government shutdown will not affect the award of this MATOC.
6. What is the steel gauge of the metal studs required for the framing?
Response: 20‐guage
7. Can you provide more detail on concrete requirements (PSI, reinforcement requirements, etc)?
Response: 4,000 psi at 28 days. Same thickness as existing. Concrete joints. ABA/ADA ramp with detachable warning. Curb and Gutter detail will be provided later. Broom finish. No reinforcement unless existing.
8. What is the requirements for the bedding/media/fill material for the turf?
Response: Manufacturers' recommendations to be followed.
9. Does the underlayment/decking need to be replaced with the roofing?
Response: Unknown at this time. If not structurally sound, replace as needed.
10. Is there onsite storage for equipment/desks/etc that need storage during work, or will that be contractor provided?
Response: No. Would like to see a storage container to be able to secure materials.
11. Are the door frames grouted?
Response: Unknown if not stated on as‐builts
12. What make/model for cabinetry was used for the design?
Response: Midmark. Refer to section 2.G in the SOW.
13. For the Tipi roof, do the existing end pieces need to be wrapped/replaced with new metal?
Response: Yes. Regal Blue color.
14. Is there a preference for the bathroom accessories (toilet paper, bars, etc)?
15. Since there is no identified or decided on signage, can you provide a budget number for the bid to provide equality amongst bidders?
Response: Approximately 125 rooms and 5 exterior signs.
16. Will cutovers and shut offs for any utilities or services be required after hours?
Amendment 09
Response: Preferably but will depend on the ICRA and PCRA documents and which areas will be affected.
17. Is any attic stock required after ACT installation?
Response: 5 boxes
18. All exterior doors are to have automation products, But they don’t list it out, will all that be by others?
Response: See updated Construction Drawings Amendment 09
19. Reference spec’s for the wood doors and it says see updated door schedule, it looks like it is still White Maple?
Response: Select White Maple Alpine AL18 or equivalent
20. Replaced windows, are they all aluminum?
Response: Yes, black in color
21. For the hardware groups we are just going by what is called out on the door schedule in the hardware column?
Response: Yes, those are the Make of what was installed on the Pharmacy project, and the other doors will need to match.
22. Please clarify where to find opening I1, 301 & 302B? they were added to the door schedule but the floor plan they included in the addendum doesn’t show rooms I1 or 301, and room 302 only shows the one door, not a second one.
Response: Updated drawings. A121.
23. There are several drawings referenced in the revised Statement of Work for the Kyle Health Center Modernization that were not included in the Amendment 08 updated construction drawings, Please advise.
•Item 2F ‐ Dwg M‐5 •Item 2I & 2J– Dwg A‐7 and A‐15 •Item 2N – Dwg A‐1 •Item 2N – Page 19 of the Electrical Plan sheets for the LPS •Item 2O – Dwg M‐2 •Item 2O – Dwg PL101 •Item 2P – Dwg A‐22 Response: Provided updated drawings. Separated by trade.
24. There are some documents that are referenced in the revised Statement of Work for the Kyle Health Center Modernization that were not included in the Amendment 08. Please Advise.
Item 2N – Signage Example Will the preferred exterior signage be monument type, post and panel, or mounted to building?
Will this signage be lighted?
Response: Signage example provided. Only an example and will be used as a basis of design.
Exterior signage will not be mounted to the building. Could be a monument type with post and panel, both lit. Dependent on design.
Amendment 09
25. The SOW does not reference removing and replacing the countertop and sinks in the main bathroom. Should these tasks be priced into the bid?
Response: SOW updated. Yes, bid on these. CLIN 022.
26. Are contractors expected to replace the light fixtures in the solid‐surface ceiling areas? The SOW only specifies new fixtures in the suspended ceilings.
27. The plans call for the removal of the existing ceramic tile on the walls to be removed but do not specify a replacement. What is desired by the Government here?
Response: See updated SOW
28. The plans provide call for corner and wall protectant. What is the height of the corner protectant?
What material is desired stainless steel or plastic?
Response: Same height as wall protection. Same material as wall protection.
29. Are there any third‐party inspections required, e.g., for rebar/epoxy, etc.?
Response: No, the government will provide inspection.
30. Is testing required for concrete cylinders and/or soils and compaction?
Response: Yes for both
31. The SOW calls for a new flag pole, Will this need new lightning ground rod protection?