B05 75H70125R00033 Amendment 02.pdf

PDF 241 KB Posted

Attached to
IHS Nationwide Multiple Award Task Order Contract Federal contract opportunity
Solicitation number
75H70125R00033
Issued by
Department of Health and Human Services Indian Health Service

About this file

This document is an Amendment of Solicitation with accompanying Questions and Answers for Solicitation Number 75H70125R00033, issued by the Division of Engineering Services in Seattle. The amendment provides clarifications about an Indefinite Delivery/Indefinite Quantity (IDIQ) contract, with a specific focus on a "seed project" located in Kyle, South Dakota (Great Plains Area). Key points include: contractors must submit seed project pricing for evaluation, even if they are not interested in performing in the Great Plains Area, and offerors who did not select the Great Plains as a performance location can decline the seed project without penalty. The past performance evaluation will consider projects between $100K and $5M, with projects over $5M evaluated on a case-by-case basis, and projects under $100K potentially rated less favorably. The solicitation allows small business contractors to select their areas of performance interest, with the best-value offeror potentially being awarded the seed project.

View the file

Other files for this federal contract opportunity

Other files attached to IHS Nationwide Multiple Award Task Order Contract, newest first.
File Type Posted
B05 75H70125R00033 Amendment 13.pdf PDF
B01 Section J Attachment 5.6 Seed Project Wage Determination dated 11-21-2025.pdf PDF
B05 75H70125R00033 Amendment 12.pdf PDF
B01 Section J Attachment 5.13 Kyle EOC Modernization All Doors - Combined.pdf PDF
B01 Section J Attachment 5.7 Updated Kyle Door Schedule Amendment 11.xlsx XLSX spreadsheet
B01 Section J Attachment 5.5 Updated Construction Drawings Amendment 11.pdf PDF
B01 Section J Attachment 5.3 Updated Seed Project SOW Amendment 11.pdf PDF
B01 Section J Attachment 5.2 Updated Seed Project Price Schedule Amendment 11.xlsx XLSX spreadsheet
B05 75H70125R00033 Amendment 11.pdf PDF
B01 Section J Attachment 5.3 Updated Seed Project SOW Amendment 10.pdf PDF
B05 75H70125R00033 Amendment 10.pdf PDF
B05 75H70125R00033 Amendment 09.pdf PDF
B05 Section J Attachment 5.5 Updated Construction Drawings Amendment 09.pdf PDF
B01 Section J Attachment 5.3 Updated Seed Project SOW Amendment 09.pdf PDF
B03 Site Visit Sign in Sheet.pdf PDF
B01 Section J Attachment 5.11 Pre-Construction Risk Assessment.docx DOCX document
B01 Section J Attachment 5.7 Updated Kyle Door Schedule Amendment 08.xlsx XLSX spreadsheet
B05 75H70125R00033 Amendment 08.pdf PDF
B01 Section J Attachment 5.9 Flooring Finish.pdf PDF
B01 Section J Attachment 5.8 Infection Control Risk Assessment.docx DOCX document
B01 Section J Attachment 5.5 Updated Construction Drawings Amendment 08.pdf PDF
B01 Section J Attachment 5.12 Turf Area - Current Conditions.jpg JPG image
B01 Section J Attachment 5.10 Kyle Floor Plan with Room Numbers.pdf PDF
B01 Section J Attachment 5.3 Updated Seed Project SOW Amendment 08.pdf PDF
B01 Section J Attachment 5.2 Updated Seed Project Price Schedule Amendment 08.xlsx XLSX spreadsheet
B05 75H70125R00033 Amendment 07.pdf PDF
B01 Section J Attachment 5.2 - Updated Seed Project Price Schedule - Amendment 06.xlsx XLSX spreadsheet
B05 75H70125R00033 Amendment 06.pdf PDF
B05 75H70125R00033 Amendment 05.pdf PDF
Attachment 5.7 - Kyle Door Schedule.pdf PDF
B01 Section J Attachment 5.3 Updated Seed Project SOW.pdf PDF
B05 75H70125R00033 Amendment 04.pdf PDF
B01 Section J Attachment 5.2 - Updated Seed Project Price Schedule.xlsx XLSX spreadsheet
B05 75H70125R00033 Amendment 03.pdf PDF
B05 75H70125R00033 Amendment 01.pdf PDF
B01 Section J Attachment 5.6 Seed Project Wage Decision SD20250017.pdf PDF
B01 Section J Attachment 5.2 - Seed Project Price Schedule.xlsx XLSX spreadsheet
B01 Section J Attachment 1 - PPQ.docx DOCX document
B01 Section J Attachment 6 IHS IEE Representation Form.pdf PDF
B01 Section J Attachment 5.5 Construction Drawings.pdf PDF
B01 Section J Attachment 5.3 Seed Project SOW.pdf PDF
B01 Section J Attachment 5.1 - Self Performance Calculation Sheet - Seed Project.docx DOCX document
B01 Section J Attachment 4 - Financial Institution Reference Sheet.pdf PDF
B01 Section J Attachment 3 - Experience Form.docx DOCX document
B01 Section J Attachment 2 - Contractor Surety Information.docx DOCX document
B01 75H70125R00033.pdf PDF
B01 Section J Attachment 5.4 - Kyle ICRA Map.pdf PDF
Show all 47

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

(a) By completing items 8 and 15, and returning or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

E. IMPORTANT: Contractor is not is required to sign this document and return copies to the issuing office.

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE

2. AMENDMENT/MODIFICATION NUMBER 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQUISITION NUMBER 5. PROJECT NUMBER (If applicable)

7. ADMINISTERED BY (If other than Item 6) CODE

STANDARD FORM 30 (REV. 11/2016)

Prescribed by GSA FAR (48 CFR) 53.243

FACILITY CODE

9A. AMENDMENT OF SOLICITATION NUMBER

9B. DATED (SEE ITEM 11)

10A. MODIFICATION OF CONTRACT/ORDER NUMBER

10B. DATED (SEE ITEM 13)

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended. is not extended.

12. ACCOUNTING AND APPROPRIATION DATA (If required) copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NUMBER AS DESCRIBED IN ITEM 14.

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER

NUMBER IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15C. DATE SIGNED

15A. NAME AND TITLE OF SIGNER (Type or print)

16C. DATE SIGNED

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

PAGE OF PAGES

6. ISSUED BY CODE

8. NAME AND ADDRESS OF CONTRACTOR (Number, street, county, State and ZIP Code) (X)

CODE

15B. CONTRACTOR/OFFEROR

(Signature of person authorized to sign)

16B. UNITED STATES OF AMERICA

(Signature of Contracting Officer)

Previous edition unusable

A000002

The reason for this amendment is to provide answers to questions.

See Summary of Changes

Division of Eng. Services Seattle 701 Fifth Avenue, Suite 1600 Seattle WA 98104

See block 6

75H70125R00033

1 3

09/19/2025

09/16/2025

QUESTIONS AND ANSWERS

75H70125R00033

Answers to the following questions are as follows:

1. Is the 75% performance completion requirement for IDIQ contracts, or is this requirement specific to individual task orders?

Response: Both would be acceptable.

2. Section B.4 of the RFP states, “the small business contractor whose proposal is considered the best value will be awarded the seed project.” IHS areas of performance in Section B.6.3, allows offers to select which areas they are interested in performing in. How will the seed project be awarded to the best value contractor, if this offeror did not select “Great Plains” as a performance location of interest?

Response: Reference Section M.4.1 paragraph c, “If the seed project is awarded to an offeror who did not wish to receive task orders in the Great Plains Area, the offeror may decline the task order, which will not be counted against the contractor when the Government is considering off‐ramping procedures. In this case, the award will be offered to the contractor who offered the next best value to the government until the task order is accepted.”

3. Will the Government consider making the Seed Project a “Sample Project” due to unfair competition for those contractors who are not selecting South Dakota (Great Plains) as a performance location of interest?

Response: The Seed project will remain as such at this time.

4. We would like to request clarification regarding the seed project in Kyle, SD. Specifically, if we submit pricing for the seed project, would that automatically make us eligible for award of that project: …..we do not believe we can be competitive in that location and would prefer not to be considered for the seed project.

Response: See Response to Question #2. However, please keep in mind that all offerors must submit seed project pricing so the Government can evaluate each offeror’s price for reasonableness under FAR 15.404‐1. Submission does not obligate an offeror to accept award if they did not elect the Great Plains Area; in that case, the offeror may decline without penalty and award will be made to the next best‐value offeror. The Government understands that firms unable to accept task orders in the Great Plains Area may not be competitive and that their pricing will reflect higher costs due to distance and other such factors. We are not seeking to award at an unreasonably higher price, but rather to confirm that pricing submitted is reasonable for the circumstances.

5. It states that the limit for past performance is 500K to 5,000,000.00 – One of our relevant experiences is over the 5 million by a small amount would it be considered?

Response: The government will evaluate projects over $5M on a case by case basis. We do not anticipate rating relevant projects over $5M less favorably. However, projects under $100K may be rated less favorably. It is noted that the range is the question is incorrect. The range is between $100K and $5M.

QUESTIONS AND ANSWERS

75H70125R00033

6. Please clarify that when PPQs or CPARs are included in the proposal, that they are outside the page count restrictions. And if so, shall they be added as attachments separately or is it okay to insert in the proposal?

Response: Correct, PPQs and CPARS do not have a page restriction. The only page restrictions in Factor 2:

Past Performance is the narratives addressing adverse past performance ratings (limit 2 pages per project). All documents should be included in your proposal.

7. Please clarify if you will accept previously completed PPQs that are on this same form?

• The PPQ (attachment 1) states on page 2 of 5 in the NOTE at the bottom of the page “AND MAY

DUPLICATE THIS QUESTIONNAIRE FOR FUTURE SUBMISSION ON IHS SOLICITATIONS”

• RFP Page 77 instructions for L.14.2.2 Factor 2: PP ‐ …. Offerors shall not include or reference PPQs previously submitted for other RFPs.

Response: PPQs must be submitted on the forms specifically identified for this solicitation. We will not accept PPQs submitted for other RFPs in this solicitation.

8. Are there any Liquidated Damages for the Seed Project? I do not see any listed.

Response: There are no Liquidated Damages for the Seed Project.