STA Siuslaw Amendment 0001.pdf
PDF 1009 KB Posted
- Attached to
- DBB for Correct Shoreline Erosion at USCG Station Siuslaw in Florence, OR (NMACC III Pool 1)
- Solicitation number
- 70Z05024R43000003
About this file
This document is an Amendment to a previous Solicitation for a Design/Bid/Build Construction Project to Correct Shoreline Erosion at the U.S. Coast Guard Station Siuslaw River in Florence, Oregon.
The amendment revises various drawing notes and details related to the upper retaining wall, providing options for either including or excluding the upper retaining wall. The Price Proposal Form has been updated to reflect these options, with the Base Item covering the shore erosion wall and base site civil improvements, excluding the upper retaining wall area. Option 1 covers the Upper Retaining Wall, and Option 2 covers No Upper Retaining Wall. Additional options are included for Exterior Floating Dock Guide Pile Replacement and Supplemental Bridge Piles.
This opportunity is only available to the successful NMACC III Pool 1 Offerors. The Solicitation Number is 70Z05024R43000003, issued by the Department of Homeland Security U.S. Coast Guard.
View the file
Other files
Show all 27
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT CONTROL NUMBER :
SUMMARY OF CHANGES :
PROJECT NO. 13-5067032
SOLICITATION NO. _N/A_
DATE: MAY 28, 2024
PROJECT NO 13-5067032 IS AMENDED AS FOLLOWS:
DESIGN DRAWINGS
REMOVE:
CE-100 KEY Note #9 – “PROVIDE UPPER RETAINING WALL" BID ALTERNATE
SHOWN. SEE CG100 FOR INFORMATION ON "NO UPPER RETAINING WALL" BID
ALTERNATE”
REPLACE:
CE-100 KEY Note #9 – “PROVIDE UPPER RETAINING WALL" GOVERNMENT BID
SHEET SHOWN. SEE CG100 FOR INFORMATION ON "NO UPPER RETAINING WALL"
BID OPTIONS”
CS-100 KEY Note #4 – “TOP OF SLOPE RETAINING WALL, SEE CG100 & S-100.
“PROVIDE UPPER RETAINING WALL” BID ALTERNATE SHOWN. SEE CG100 FOR
INFORMATION ON “NO UPPER RETAINING WALL” BID ALTERNATE”
REPLACE:
CS-100 KEY Note #4 – “TOP OF SLOPE RETAINING WALL, SEE CG100 & S-100.
“PROVIDE UPPER RETAINING WALL” BID OPTION SHOWN. SEE CG100 FOR
INFORMATION ON “NO UPPER RETAINING WALL” BID OPTIONS”
CG-100 KEY Note #10 – “PROVIDE UPPER RETAINING WALL” BID ALTERNATE
SHOWN.
REPLACE:
CG100 FOR INFORMATION ON “NO UPPER RETAINING WALL” BID OPTIONS”
L-101 LOWER RIGHT VIEW – “NO UPPER RETAINING WALL” BID ALTERNATIVE
L-101 LOWER RIGHT VIEW – “NO UPPER RETAINING WALL” BID OPTION SHOWN.
L-102 LOWER RIGHT VIEW – “NO UPPER RETAINING WALL” BID ALTERNATIVE
L-102 LOWER RIGHT VIEW – “NO UPPER RETAINING WALL” BID OPTION SHOWN.
PROJECT NO. 13-5067032
SOLICITATION NO. _N/A_
DATE: MAY 28, 2024
REMOVE:
S-100 KEY Note #2 – “RETAINING WALL AT TOP OF SLOPE. PROVIDE UPPER
RETAINING WALL” BID ALTERNATE SHOWN ON STRUCTURAL SHEET. FOR
INFORMATION ON “NO UPPER RETAINING WALL” BID ALTERNATE, REFER TO
SHEET CG-100.
REPLACE:
S-100 KEY Note #2 – “RETAINING WALL AT TOP OF SLOPE. PROVIDE UPPER
RETAINING WALL” GOVERNMENT BID SHEET SHOWN ON STRUCTURAL SHEET.
FOR INFORMATION ON “NO UPPER RETAINING WALL” BID OPTIONS, REFER TO
SHEET CG-100.
S-103 KEY GENERAL NOTE #1 – ON THIS SHEET, “PROVIDE UPPER RETAINING
WALL" BID ALTERNATE SHOWN. SEE CG100 FOR INFORMATION ON “NO UPPER
RETAINING WALL” BID ALTERNATE, WHICH INCLUES NO STRUCTURAL WALL
SCOPE IN THIS UPPER AREA.
REPLACE:
S-103 KEY GENERAL NOTE #1 – ON THIS SHEET, “PROVIDE UPPER RETAINING
WALL" BID OPTION SHOWN. SEE CG100 FOR INFORMATION ON “NO UPPER
RETAINING WALL” BID OPTION, WHICH INCLUES NO STRUCTURAL WALL SCOPE
IN THIS UPPER AREA.
PRICE PROPOSAL FORM
Provide prices per the following structure. Project scope is divided into Base Item, and
Options, as indicated. Items not noted otherwise in the drawings are contained in the
Base Item. See drawings and specifications for more detail. Option 1, or Option 2 will be awarded with the Base Item for a complete and usable requirement.
BASE ITEM:
Provide shore erosion wall and base site civil improvements, excluding site grading and upper retaining wall area described in Option 1 and Option 2. Temporarily remove and re-install eastern span of bridge, to allow installation of shore erosion wall. See documents for more detail.
TOTAL BASE ITEM
OPTION 1: UPPER RETAINING WALL
Provide upper retaining wall as shown and described as “UPPER RETAINNG WALL”.
OPTION 2: NO UPPER RETAINING WALL
Provide site grading and no upper retaining wall as shown on plans and described as
“NO UPPER RETAINING WALL”.
OPTION 3: EXTERIOR FLOATING DOCK GUIDE PILE REPLACEMENT”
Demolish exterior floating dock guide piles and provide new exterior floating dock guide piles.
OPTION 4: SUPPLEMENTAL BRIDGE PILES
Provide new supplementary piles at existing-to-remain bridge.
| STA Siuslaw Amendment 1 |
| Amendment 1 STA Siuslaw Control Shoreline Erosion |
| PRICE PROPOSAL FORM Rev2 |