This document is an Amendment to a previous Solicitation for a Design/Bid/Build Construction Project to Correct Shoreline Erosion at the U.S. Coast Guard Station Siuslaw River in Florence, Oregon.

The amendment revises various drawing notes and details related to the upper retaining wall, providing options for either including or excluding the upper retaining wall. The Price Proposal Form has been updated to reflect these options, with the Base Item covering the shore erosion wall and base site civil improvements, excluding the upper retaining wall area. Option 1 covers the Upper Retaining Wall, and Option 2 covers No Upper Retaining Wall. Additional options are included for Exterior Floating Dock Guide Pile Replacement and Supplemental Bridge Piles.

This opportunity is only available to the successful NMACC III Pool 1 Offerors. The Solicitation Number is 70Z05024R43000003, issued by the Department of Homeland Security U.S. Coast Guard.

View the file

Other files

File Type Posted
Price Proposal Form Rev 6.pdf PDF
SF 30 Station Siuslaw Amendment 0010.pdf PDF
Suislaw EA_w all signatures (June 2024).pdf PDF
Draft MMPA IHA_USCG Station Siuslaw_41624.pdf PDF
SF 30 Station Siuslaw Amendment 0009 and continuation sheet.pdf PDF
Amendment 0008 with Price Proposal Rev 5 - 19JUL2024.pdf PDF
Amendment 0007 03JUL2024.pdf PDF
Amendment 0006 02JUL2024.pdf PDF
Permit 2. BA_USCG Station Siuslaw.pdf PDF
STA Siuslaw Amendment 0005 with Site Visit Log.pdf PDF
STA Siuslaw Amendment 0005 Attachment PPI 073 Fiber Box Picture.pdf PDF
Permit 5. DEQ 401 WQC USCG Station Siuslaw River Covered Moorage and Shoreline 2023-651- signed.pdf PDF
STA Siuslaw Amendment 0005 Attachment PPI 076 Fuel Picture.pdf PDF
Permit 6. Section 408 No Alteration - USCG Covered Moorage and Shoreline.pdf PDF
Permit 3. CZMA Federal Consistency Determination_USCG Station Siuslaw.pdf PDF
STA Siuslaw Amendment 0005 STA Siuslaw Additional Specifications Update 06-27-2024 (PPI 075).pdf PDF
STA Siuslaw Amendment 0005 Attachment Geotechnical Report 1-26-2024.pdf PDF
Permit 1. Final JPA_USCG Station Siuslaw_revised.pdf PDF
Permit 4. Suislaw EA_w all signatures (June 2024).pdf PDF
STA Siuslaw Amendment 0004.pdf PDF
STA Siuslaw Amendment 0004 USCG SIUSLAW GEOTECHNICAL REPORT (version 12-07-2023).pdf PDF
STA Siuslaw Amendment 0003.pdf PDF
STA Siuslaw Amendment 0002.pdf PDF
Task Order Announcement Station Siuslaw Correct Shore Erosion.pdf PDF
USCG Siuslaw FINAL Dwgs 2024.04.16.pdf PDF
USCG Siuslaw Drawings 100 percent Wall Plan.pdf PDF
USCG Siuslaw RFP Specs_Final 2024.04.16.pdf PDF
Show all 27

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT CONTROL NUMBER :

SUMMARY OF CHANGES :

PROJECT NO. 13-5067032

SOLICITATION NO. _N/A_

DATE: MAY 28, 2024

PROJECT NO 13-5067032 IS AMENDED AS FOLLOWS:

DESIGN DRAWINGS

REMOVE:

CE-100 KEY Note #9 – “PROVIDE UPPER RETAINING WALL" BID ALTERNATE

SHOWN. SEE CG100 FOR INFORMATION ON "NO UPPER RETAINING WALL" BID

ALTERNATE”

REPLACE:

CE-100 KEY Note #9 – “PROVIDE UPPER RETAINING WALL" GOVERNMENT BID

SHEET SHOWN. SEE CG100 FOR INFORMATION ON "NO UPPER RETAINING WALL"

BID OPTIONS”

CS-100 KEY Note #4 – “TOP OF SLOPE RETAINING WALL, SEE CG100 & S-100.

“PROVIDE UPPER RETAINING WALL” BID ALTERNATE SHOWN. SEE CG100 FOR

INFORMATION ON “NO UPPER RETAINING WALL” BID ALTERNATE”

REPLACE:

CS-100 KEY Note #4 – “TOP OF SLOPE RETAINING WALL, SEE CG100 & S-100.

“PROVIDE UPPER RETAINING WALL” BID OPTION SHOWN. SEE CG100 FOR

INFORMATION ON “NO UPPER RETAINING WALL” BID OPTIONS”

CG-100 KEY Note #10 – “PROVIDE UPPER RETAINING WALL” BID ALTERNATE

SHOWN.

REPLACE:

CG100 FOR INFORMATION ON “NO UPPER RETAINING WALL” BID OPTIONS”

L-101 LOWER RIGHT VIEW – “NO UPPER RETAINING WALL” BID ALTERNATIVE

L-101 LOWER RIGHT VIEW – “NO UPPER RETAINING WALL” BID OPTION SHOWN.

L-102 LOWER RIGHT VIEW – “NO UPPER RETAINING WALL” BID ALTERNATIVE

L-102 LOWER RIGHT VIEW – “NO UPPER RETAINING WALL” BID OPTION SHOWN.

PROJECT NO. 13-5067032

SOLICITATION NO. _N/A_

DATE: MAY 28, 2024

REMOVE:

S-100 KEY Note #2 – “RETAINING WALL AT TOP OF SLOPE. PROVIDE UPPER

RETAINING WALL” BID ALTERNATE SHOWN ON STRUCTURAL SHEET. FOR

INFORMATION ON “NO UPPER RETAINING WALL” BID ALTERNATE, REFER TO

SHEET CG-100.

REPLACE:

S-100 KEY Note #2 – “RETAINING WALL AT TOP OF SLOPE. PROVIDE UPPER

RETAINING WALL” GOVERNMENT BID SHEET SHOWN ON STRUCTURAL SHEET.

FOR INFORMATION ON “NO UPPER RETAINING WALL” BID OPTIONS, REFER TO

SHEET CG-100.

S-103 KEY GENERAL NOTE #1 – ON THIS SHEET, “PROVIDE UPPER RETAINING

WALL" BID ALTERNATE SHOWN. SEE CG100 FOR INFORMATION ON “NO UPPER

RETAINING WALL” BID ALTERNATE, WHICH INCLUES NO STRUCTURAL WALL

SCOPE IN THIS UPPER AREA.

REPLACE:

S-103 KEY GENERAL NOTE #1 – ON THIS SHEET, “PROVIDE UPPER RETAINING

WALL" BID OPTION SHOWN. SEE CG100 FOR INFORMATION ON “NO UPPER

RETAINING WALL” BID OPTION, WHICH INCLUES NO STRUCTURAL WALL SCOPE

IN THIS UPPER AREA.

PRICE PROPOSAL FORM

Provide prices per the following structure. Project scope is divided into Base Item, and

Options, as indicated. Items not noted otherwise in the drawings are contained in the

Base Item. See drawings and specifications for more detail. Option 1, or Option 2 will be awarded with the Base Item for a complete and usable requirement.

BASE ITEM:

Provide shore erosion wall and base site civil improvements, excluding site grading and upper retaining wall area described in Option 1 and Option 2. Temporarily remove and re-install eastern span of bridge, to allow installation of shore erosion wall. See documents for more detail.

TOTAL BASE ITEM

OPTION 1: UPPER RETAINING WALL

Provide upper retaining wall as shown and described as “UPPER RETAINNG WALL”.

OPTION 2: NO UPPER RETAINING WALL

Provide site grading and no upper retaining wall as shown on plans and described as

“NO UPPER RETAINING WALL”.

OPTION 3: EXTERIOR FLOATING DOCK GUIDE PILE REPLACEMENT”

Demolish exterior floating dock guide piles and provide new exterior floating dock guide piles.

OPTION 4: SUPPLEMENTAL BRIDGE PILES

Provide new supplementary piles at existing-to-remain bridge.