Amendment 0008 with Price Proposal Rev 5 - 19JUL2024.pdf
PDF 512 KB Posted
- Attached to
- DBB for Correct Shoreline Erosion at USCG Station Siuslaw in Florence, OR (NMACC III Pool 1)
- Solicitation number
- 70Z05024R43000003
About this file
This document is Amendment 0008 to the solicitation for the Design/Bid/Build Construction Project to Correct Shoreline Erosion at the U.S. Coast Guard Station Siuslaw River in Florence, Oregon. The amendment updates the Price Proposal Sheet, Rev 5, which includes a base item for the shore erosion wall and site civil improvements, and four optional items: upper retaining wall, no upper retaining wall, exterior floating dock guide pile replacement, and supplemental bridge piles. Offerors must provide prices for the base item and can choose to include pricing for the optional items. The total price, which includes the base item and any selected options, will be the basis for award. This opportunity is available only to the successful NMACC III Pool 1 Offerors. The Federal Agency involved is the Department of Homeland Security U.S. Coast Guard.
View the file
Other files
Show all 27
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE
3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQ. NO. 5. PROJECT NO. (If applicable)
7. ADMINISTERED BY (If other than Item 6) CODE
STANDARD FORM 30 (REV. 10-83)
Prescribed by GSA FAR (48 CFR) 53.243
FACILITY CODE
10A. MODIFICATION OF CONTRACT/ORDER NO.
10B. DATED (SEE ITEM 13)
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended, is not extended.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
(a) By completing items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or
(c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment your desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO.
IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15C. DATE SIGNED
15A. NAME AND TITLE OF SIGNER (Type or print)
16C. DATE SIGNED
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
PAGE OF PAGES
6. ISSUED BY CODE
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code) (X)
CODE
15B. CONTRACTOR/OFFEROR
(Signature of person authorized to sign)
16B. UNITED STATES OF AMERICA
(Signature of Contracting Officer)
NSN 7540-01-152-8070
Previous edition unusable
2. AMENDMENT/MODIFICATION NO.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
CORRECT SHORELINE EROSION AT USCG STATION SIUSLAW, FLORENCE, OR; Task Order Announcement 70Z05024R43000003; Amendment 0008: Updated Price Proposal Sheet Rev 5 on pages 2 and 3.
USCG FDCC DET SEATTLE
915 SECOND AVE, RM 2664
SEATTLE, WASHINGTON 98174-1011
9A. AMENDMENT OF SOLICITATION
NO.
70Z05024R43000003
1 3
07/19/2024
9B. DATED (SEE ITEM 11)
05/29/2024
X
X
Melvin Tiglao, Contracting Officer
PRICE PROPOSAL FORM
Provide prices per the following structure. Project scope is divided into Base Item, and Options, as indicated. Items not noted otherwise in the drawings are contained in the Base Item. See drawings and specifications for more detail. Option 1, or Option 2 will be awarded with the Base Item for a complete and usable requirement. The Government may award Options 3 and 4 in any combination or not awarded at all.
BASE ITEM:
Provide shore erosion wall and base site civil improvements, excluding site grading and upper retaining wall area described in Option 1 and Option 2. Temporarily remove and re-install eastern span of bridge, to allow installation of shore erosion wall. See documents for more detail.
Total: $_________________
OPTION 1: UPPER RETAINING WALL
Provide upper retaining wall as shown and described as “UPPER RETAINNG WALL”.
Total: $___________________
OPTION 2: NO UPPER RETAINING WALL
Provide site grading and no upper retaining wall as shown on plans and described as “NO
UPPER RETAINING WALL”.
Total: $___________________
OPTION 3: EXTERIOR FLOATING DOCK GUIDE PILE REPLACEMENT”
Demolish exterior floating dock guide piles and provide new exterior floating dock guide piles.
Mobilization/demobilization costs are not included.
Construction: $___________________
Mobilization / Demobilization: $___________________
Total: $___________________
OPTION 4: SUPPLEMENTAL BRIDGE PILES
Provide new supplementary piles at existing-to-remain bridge. Mobilization/demobilization costs are not included.
Construction: $___________________
Mobilization / Demobilization: $___________________
Total: $___________________
COMBINED MOBILIZATION/DEMOBILIZATION FOR OPTION 3 AND OPTION 4
Provide mobilization/demobilization costs for Option 3 and Option 4.
Combined Options 3 and 4 Construction: $___________________
Combined Options 3 and 4 Mobilization / Demobilization: $___________________
Combined Options 3 and 4 Total: $___________________
OFFERORS THAT INCLUDE LANGUAGE IN THEIR PROPOSALS CONTAINING
CONDITIONS MAY BE REJECTED.
TOTAL PRICE: The Total Price shall be deemed to include all costs required for all the specified work to be completed in accordance with the plans and specifications.
TOTAL PRICE (Base Item 1, Option 1, Option 2, Option 3, and Option 4) Options if any, will be exercised at time of award.
| SF 30 Station Siuslaw Amendment 0008 |
| Price Proposal Form Rev 5 |
| 2024-07-19T15:37:33-0700 | |
| TIGLAO.MELVIN.J A.1172808472 |