This document is a Price Proposal Form for a federal Design/Bid/Build construction project to correct shoreline erosion at the U.S. Coast Guard Station Siuslaw River in Florence, Oregon. The project scope includes a base item for shore erosion wall and base site civil improvements, with four optional items: an upper retaining wall, no upper retaining wall, exterior floating dock guide pile replacement, and supplemental bridge piles. Offerors must provide fixed prices for the base item and each optional item. This opportunity is available only to the successful NMACC III Pool 1 offerors. The agency is the Department of Homeland Security U.S. Coast Guard. The solicitation number is 70Z05024R43000003.
View the file
Other files
Show all 27
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PRICE PROPOSAL FORM
Provide prices per the following structure. Project scope is divided into Base Item, and Options, as indicated. Items not noted otherwise in the drawings are contained in the Base Item. See drawings and specifications for more detail. Option 1, or Option 2 will be awarded with the Base Item for a complete and usable requirement. The Government may award Options 3 and 4 in any combination or not awarded at all.
BASE ITEM:
Provide shore erosion wall and base site civil improvements, excluding site grading and upper retaining wall area described in Option 1 and Option 2. Temporarily remove and re-install eastern span of bridge, to allow installation of shore erosion wall. See documents for more detail.
Total: $_________________
OPTION 1: UPPER RETAINING WALL
Provide upper retaining wall as shown and described as “UPPER RETAINNG WALL”.
Total: $___________________
OPTION 2: NO UPPER RETAINING WALL
Provide site grading and no upper retaining wall as shown on plans and described as “NO
UPPER RETAINING WALL”.
Total: $___________________
OPTION 3: EXTERIOR FLOATING DOCK GUIDE PILE REPLACEMENT”
Demolish exterior floating dock guide piles and provide new exterior floating dock guide piles.
Mobilization/demobilization costs are not included.
Construction: $___________________
Mobilization / Demobilization: $___________________
Total: $___________________
OPTION 4: SUPPLEMENTAL BRIDGE PILES
Provide new supplementary piles at existing-to-remain bridge. Mobilization/demobilization costs are not included.
Construction: $___________________
Mobilization / Demobilization: $___________________
Total: $___________________
COMBINED MOBILIZATION/DEMOBILIZATION FOR OPTION 3 AND OPTION 4
Provide mobilization/demobilization costs for Option 3 and Option 4.
Combined Options 3 and 4 Construction: $___________________
Combined Options 3 and 4 Mobilization / Demobilization: $___________________
Combined Options 3 and 4 Total: $___________________