SF 30 Station Siuslaw Amendment 0009 and continuation sheet.pdf
PDF 268 KB Posted
- Attached to
- DBB for Correct Shoreline Erosion at USCG Station Siuslaw in Florence, OR (NMACC III Pool 1)
- Solicitation number
- 70Z05024R43000003
About this file
This document is an amendment to a solicitation for a design-bid-build construction project to correct shoreline erosion at the U.S. Coast Guard Station Siuslaw River in Florence, Oregon. The key details are:
The amendment extends the proposal due date to August 2, 2024 and provides additional information, including a draft Environmental Assessment, draft Incidental Harassment Authorization for marine mammals, and a revised price proposal. The solicitation is only open to successful offerors from the NMACC III Pool 1. The project requires construction of a sheet pile shoreline erosion wall, upper retaining wall, grading, utilities, temporary removal and reinstallation of a bridgeway, demolition and replacement of guide piles for an exterior floating dock, and other incidental work. The amendment directs contractors to include three 4-hour work stoppages in their base item pricing for waterfront work associated with endangered species. All other terms and conditions of the solicitation remain unchanged.
View the file
Other files
Show all 27
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
(a) By completing items 8 and 15, and returning or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment your desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE
3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQ. NO. 5. PROJECT NO. (If applicable)
7. ADMINISTERED BY (If other than Item 6) CODE
STANDARD FORM 30 (REV. 10-83)
Prescribed by GSA FAR (48 CFR) 53.243
FACILITY CODE
10A. MODIFICATION OF CONTRACT/ORDER NO.
10B. DATED (SEE ITEM 13)
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended, is not extended.
12. ACCOUNTING AND APPROPRIATION DATA (If required) copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO.
IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15C. DATE SIGNED
15A. NAME AND TITLE OF SIGNER (Type or print)
16C. DATE SIGNED
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
PAGE OF PAGES
6. ISSUED BY CODE
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code) (X)
CODE
15B. CONTRACTOR/OFFEROR
(Signature of person authorized to sign)
16B. UNITED STATES OF AMERICA
(Signature of Contracting Officer)
NSN 7540-01-152-8070
Previous edition unusable
2. AMENDMENT/MODIFICATION NO.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
CORRECT SHORELINE EROSION AT USCG STATION SIUSLAW, FLORENCE, OR; Task Order Announcement 70Z05024R43000003; Amendment 0009: See Continuation Page.
The Proposal Due date has been extended to August 2, 2024.
USCG FDCC DET SEATTLE
915 SECOND AVE, RM 2664
SEATTLE, WASHINGTON 98174-1011
9A. AMENDMENT OF SOLICITATION
NO.
70Z05024R43000003
1 2
07/25/2024
9B. DATED (SEE ITEM 11)
05/29/2024
X
X
SOLICITATION NO. 70Z05024R43000003
DATE: 25JUL2024
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
ENCLOSED DOCUMENTS:
EA - FINAL ENVIRONMENTAL ASSESSMENT, June 2024.
IHA - Draft Request for Marine Mammal Protection Act Incidental Harassment
Authorization, April 2024.
Price Proposal Rev 6
THE FOLLOWING QUESTIONS WERE RECEIVED IN RESPONSE TO THE
SOLICITATION:
Please provide further guidance on the project requirements related to potential impacts due to protected/endangered species within the work areas.
Amendment 0005, Summary of Changes, indicates that the IHA Application is still in process and was not provided to bidders. Requirements associated with the IHA Permit are currently not known. Unknown potential project delays resulting from protected/endangered species within the work areas is a project risk to the Contractor and the Government. Without clear direction from the Government, it is difficult to identify fixed costs, if any, related to these potential delays.
Please consider leveling the competing Contractor’s scope by establishing a basis that all Contractors should use to provide revised proposals.
In order to keep project cost to a minimum, we suggest the Government direct Contractors to assume no impact to the project resulting from protected/endangered species. Should this direction change during the performance of the contract the Government would address actual conditions with the Contractor at that time.
Answer: Draft IHA Application and Environmental Assessment are included in this amendment. The Contractor is responsible for meeting the requirements and recommendations for the draft IHA, Environmental Assessment, and other environmental documentation.
Include three (3) separate 4-hour work stoppages for waterfront work associated with endangered species in the Base Item on the Price Proposal Form. Assume in-water equipment is fully manned and mobilized during the three 4-hour work stoppages.
The Proposal Due Date has been extended. The due date for proposals is August 2, 2024.
All other terms and conditions remain unchanged. Offerors are reminded to acknowledge receipt of this amendment in response to the subject TOA.