2.4.1(g) Attachment G-CLIN Pricing Excel Sheet.xlsx
XLSX spreadsheet 12 KB Posted
- Solicitation number
- 70FBR226R00000016
- Issued by
-
Federal Emergency Management Agency
About this file
This is a pricing proposal attachment template for a FEMA Region 2 comprehensive facility upgrades solicitation at Naval Weapons Station Earle Building C-54 in New Jersey. The Excel sheet provides the cost line item structure (CLINs) for the base period, organized into six primary work categories plus bonding costs. The primary work packages include: CLIN 0001 for roof repair and waterproofing; CLIN 0002 for external door replacement (4 units); CLIN 0003 for internal door replacement (9 units); CLIN 0004 for Regional Response Coordination Center (RRCC) refresh; CLIN 0005 for exterior cement repairs, sidewalk expansion, and patio renovation; and CLIN 0006 for training room wall reinforcement and finish restoration. Each primary CLIN is subdivided into material costs (sub-CLIN A) and labor costs (sub-CLIN B), with quantities specified as either LOT or EA (each). CLIN 0007 addresses bonding at 3 percent of total project cost.
The template currently shows placeholder pricing with minimal unit prices filled in (only CLIN 0001A contains $1.00), indicating vendors must complete all pricing fields during proposal submission. All costs are associated with Naval Weapons Station Earle (NWSE) facility work performed in accordance with the referenced Statement of Work (SOW) sections 3.1 through 3.5. This attachment is part of solicitation 70FBR226R00000016 and serves as the structured format for vendors to submit their comprehensive pricing for all labor, equipment, tools, materials, parts, and supplies required to complete the facility infrastructure upgrades at Building C-54.
View the file
Other files
Show all 47
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Pricing Proposal
| Attachment G: CLIN Pricing Proposal Excel Sheet | ||||||
| Line Item(s) Base Period | ||||||
| CLIN | Buyer Description | Quantity | Unit | Vendor | Unit Price | Total Price |
| 0001 | Naval Weapons Station Earle (NWSE) Building |
C-54 Roof Repair and Waterproofing in accordance with the Statement of Work (SOW).
| Refer to Section 3.2 of the SOW. | $ - 0 | ||||||
| 0001A | NWSE Building C-54 Roof Repair and Waterproofing Material Costs | 1 | LOT | $ 1.00 | $ 1.00 | ||
| 0001B | NWSE Building C-54 Roof Repair and Waterproofing Labor Costs | 1 | LOT | $ - 0 | |||
| 0002 | Naval Weapons Station Earle (NWSE) Building C-54 Door Replacement (Front and Side - External) in accordance with the Statement of Work (SOW). Refer to Section 3.1 of the SOW. | $ - 0 | |||||
| 0002A | NWSE Building C-54 Door Replacement (Front and Side - External) Material Costs | 4 | EA | $ - 0 | |||
| 0002B | NWSE Building C-54 Door Replacement (Front andSide - External) Labor Costs | 4 | EA | $ - 0 | |||
| 0003 | Naval Weapons Station Earle (NWSE) Building C-54 Door Replacement (Internal doors) in accordance with the Statement of Work (SOW). Refer to Section 3.1 of the SOW. | $ - 0 | |||||
| 0003A | NWSE Building C-54 Door Replacement (Internal doors) Material Costs | 9 | EA | $ - 0 | |||
| 0003B | NWSE Building C-54 Door Replacement (Internal doors) Labor Costs | 9 | EA | $ - 0 | |||
| 0004 | Naval Weapons Station Earle (NWSE) Building C-54 RRCC Refresh in accordance with the Statement of Work (SOW). Refer to Section 3.3 of the SOW. | $ - 0 | |||||
| 0004A | NWSE Building C-54 RRCC Refresh Material Costs | 1 | LOT | $ - 0 | |||
| 0004B | NWSE Building C-54 RRCC Refresh Labor Costs | 1 | LOT | $ - 0 | |||
| 0005 | Naval Weapons Station Earle (NWSE) Building C-54 Exterior Cement Repairs, Sidewalk Expansion, and Patio Renovation in accordance with the Statement of Work (SOW). Refer to Section 3.4 of the SOW. | $ - 0 | |||||
| 0005A | NWSE Building C-54 Exterior Cement Repairs, Sidewalk Expansion, and Patio Renovation Material Costs | 1 | LOT | $ - 0 | |||
| 0005B | NWSE Building C-54 Exterior Cement Repairs, Sidewalk Expansion, and Patio Renovation Labor Costs | 1 | LOT | $ - 0 | |||
| 0006 | Naval Weapons Station Earle (NWSE) Building C-54 Training Room Wall Reinforcement and Finish Restoration in accordance with the Statement of Work (SOW). Refer to Section 3.5 of the SOW. | $ - 0 | |||||
| 0006A | NWSE Building C-54 Training Room Wall Reinforcement and Finish Restoration Material Costs | 1 | LOT | $ - 0 | |||
| 0006B | NWSE Building C-54 Training Room Wall Reinforcement and Finish Restoration Labor Costs | 1 | LOT | $ - 0 | |||
| 0007 | Bonding - 3% of total cost of the project | 1 | LOT | $ - 0 | |||
| Total Cost | $ - 0 |