2.4.1(c) Attachment C-Specs for Doors for Earle_07.28.26_OR.pdf

PDF 891 KB Posted

Attached to
FEMA Region 2 Naval Weapons Station Earle Building C-54 Comprehensive Facility Upgrades
Solicitation number
70FBR226R00000016
Issued by

About this file

This is a Specifications document for Exterior Door Replacement dated July 28, 2026, issued by the U.S. Department of Homeland Security/FEMA Region II.

The requirement is to provide and install double-acting automated access doors at the front and side of Building C-54 at Naval Weapons Station Earle, located at 201 New Jersey Route 34, Colts Neck, NJ 07722. The front door dimensions are 9'11" X 7'11" and the side door dimensions are 6'3" X 7'11". All doors must feature aluminum frames with an anodized bronze satin finish and dark desiccant strips. Bidders must submit estimates including all labor, materials, and equipment rental costs in proposals not exceeding ten pages, along with drawings. A mandatory site visit to NWS Earle is required; contractors must bring valid identification and are subject to vehicle inspection and background checks, as all personnel entering the Naval Base must be U.S. citizens. Bidders must submit product data and finish samples for approval prior to purchase or application. The Wage Determination Davis Bacon No. NJ20260037 Mod 1 dated 05/18/2026 for Monmouth County, NJ applies to this contract.

The specification details comprehensive requirements for aluminum-framed entrances including performance standards for wind load resistance, thermal movement, windborne debris impact resistance, condensation resistance, water resistance, and air infiltration resistance. Materials must comply with ASTM standards for aluminum extrusions and sheet metal. Doors must include extruded aluminum stiles and rails with thermal breaks, integral fixed stops, snap-on removable stops, removable weather stripping, and welded or interlocked dovetail joints. A pre-installation meeting is required minimum 30 days before work begins with the Contracting Officer's Representative, contractor, and installer. The contractor must provide a 20-year manufacturer's warranty against material and manufacturing defects and comply with FAR Clause 52.246-21 for construction warranty.

View the file

Other files

File Type Posted
2.4.1(b) Attachment B-NWSE Building C-54 A100 Floor Plan.pdf PDF
2.4.1(i) Attachment I-RRCC Wall and Doors Picture 5.pdf PDF
2.4.1(n) Attachment N-Technical Evaluation Factors-Consolidation Requirement_08.03.2026.pdf PDF
2.8.1 Consolidation Project NWSE Questions 09.09.26_v3.pdf PDF
2.4.1(e) Attachment E-RRCC Wall and Doors Picture 1.pdf PDF
2.4.1(d) Attachment D-RRCC Scale Diagram.pdf PDF
2.4.1(k) Attachment K-RRCC Wall and Doors Picture 7.pdf PDF
2.4.1(p) Attachment P-CLIN Pricing Excel Sheet.xlsx XLSX spreadsheet
2.4.1(o) Attachment O-Wage Determination Davis Bacon No. NJ20260037 Mod 1 05.18.26.pdf PDF
2.4.1(l) Attachment L-Training Room Planar_VideoWall 8x4 DLP 1.2 2K Nit.pdf PDF
2.4.1(m) Attachment M-Notice to Offerors-Statement of Contractor Assurance.pdf PDF
2.4.1(h) Attachment H-RRCC Wall and Doors Picture 4.pdf PDF
2.4.1(a) Attachment A-SOW_CONSOLIDATED-Doors_RRCC_Wall_Concrete_ v8_09.09.2026 Security Edits.pdf PDF
2.4.1 Solicitation 70FBR226R00000016_001.pdf PDF
2.8.1(a) Consolidation Q&A-Question 16 Reference.pdf PDF
2.4.1(c) Attachment C-Specs for Doors for Earle_07.28.26_OR.pdf PDF
2.4.1(f) Attachment F-RRCC Wall and Doors picture 2.pdf PDF
2.4.1(j) Attachment J-RRCC Wall and Doors Picture 6.pdf PDF
2.4.1(g) Attachment G-RRCC Wall and Doors Picture 3.pdf PDF
2.4.1(p) Attachment P-CLIN Pricing Excel Sheet.pdf PDF
2.4.1 Solicitation 70FBR226R00000016_001.pdf PDF
2.4.1(g) Attachment G-CLIN Pricing Excel Sheet.pdf PDF
2.4.1(e) Attachment E-Technical Evaluation Factors-Consolidation Requirement_08.03.2026.pdf PDF
2.4.1(c) Attachment C-Specs for Doors for Earle_07.28.26_OR.pdf PDF
2.4.1(f) Attachment F-Wage Determination Davis Bacon No. NJ20260037 Mod 1 05.18.26.pdf PDF
2.4.1(b) Attachment B-NWSE Building C-54 A100 Floor Plan.pdf PDF
2.4.1(a) Attachment A-SOW_CONSOLIDATED-Roof Doors RRCC_Concrete_ v6_08.21.2026 Security Edits.pdf PDF
2.4.1 Solicitation 70FBR226R00000016_001.pdf PDF
2.4.1(g) Attachment G-CLIN Pricing Excel Sheet.xlsx XLSX spreadsheet
2.4.1(d) Attachment D-Notice to Offerors-Statement of Contractor Assurance.pdf PDF
2.4.1(e) Attachment E-Technical Evaluation Factors-Consolidation Requirement_08.03.2026.pdf PDF
2.4.1(g) Attachment G-CLIN Pricing Excel Sheet.xlsx XLSX spreadsheet
2.4.1(a) Attachment A-SOW_CONSOLIDATED-Roof Doors RRCC_Concrete_ v6_08.21.2026 Security Edits.pdf PDF
2.4.1(b) Attachment B-NWSE Building C-54 A100 Floor Plan.pdf PDF
2.4.1(d) Attachment D-Notice to Offerors-Statement of Contractor Assurance.pdf PDF
2.4.1(f) Attachment F-Wage Determination Davis Bacon No. NJ20260037 Mod 1 05.18.26.pdf PDF
2.4.1(g) Attachment G-CLIN Pricing Excel Sheet.pdf PDF
2.4.1 Solicitation 70FBR226R00000016_001.pdf PDF
2.2.1(d) Attachment D-Notice to Offerors-Statement of Contractor Assurance.pdf PDF
2.2.1(g) Attachment G-CLIN Pricing Excel Sheet.pdf PDF
2.2.1(a) Attachment A-SOW_CONSOLIDATED-Roof Doors RRCC_Concrete_ v4_08.04.2026 Security Edits.pdf PDF
2.2.1 Solicitation 70FBR226R00000016.pdf PDF
2.2.1(f) Attachment F-Wage Determination Davis Bacon No. NJ20260037 Mod 1 05.18.26.pdf PDF
2.2.1(c) Attachment C-Specs for Doors for Earle_07.28.26_OR.pdf PDF
2.2.1(g) Attachment G-CLIN Pricing Excel Sheet.xlsx XLSX spreadsheet
2.2.1(e) Attachment E-Technical Evaluation Factors-Consolidation Requirement_08.03.2026.pdf PDF
2.2.1(b) Attachment B-NWSE Building C-54 A100 Floor Plan.pdf PDF
Show all 47

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

U.S. Department of Homeland Security/ FEMA Region II

1 World Trade Center, 52nd Floor New York, New York 10007.

Specifications for Exterior Door Replacement

Dated: July 28, 2026

1. Introduction

This requirement is to provide and install double acting automated access doors at both the front and side of the building to accommodate and maintain a safe FEMA workspace environment for staff to Building C-54 at Naval Weapons Station EARLE, in Colts Neck, NJ.

2. Instructions to bidders

A. Bidders are requested to submit an estimate for work as described in the “Statement of

Work” (SOW). The estimate shall include the cost of all labor, materials, equipment rentals, etc.

B. A mandatory site visit will be conducted. Contractors will provide a list of attendees, prior to site visit. Contractors are required to bring Identification to the site visit and are subject to vehicle inspection prior to being granted access to the base.

C. Before submitting a proposal, maximum of ten (10 pages), and drawings, the bidders shall carefully examine and visit the site at NWS Earle Colts Neck, NJ and check existing conditions during the site visit. The bidders will utilize the Earle Floor Plan (PDF document supplied by FEMA) as a tool in locating entrances in question. The Earle

Floor Plan identifies the approximate location of all spaces. Should the bidders find discrepancies in / or omissions from the scope of work listed below, bidder shall notify the Contracting Officer, who will send written instruction to all bidders regarding this discrepancy or omission.

D. The contractor is to submit product data and finish samples for approval prior to application or purchase.

E. Location

The work is located at: Naval Weapons Station Earle

201 New Jersey Route 34, Bldg. C-54, Colts Neck, NJ 07722

70FBR226R00000016_0001 Page 55 of 81

Please Note: Security Information for NWS Earle:

Naval Weapons Station Earle’s security performs a background check on all personnel entering the Naval Base. Driver’s must be U.S. citizens and are required to present a valid driver’s license, vehicle registration, and proof of insurance. All vehicles, exterior and interior, will be thoroughly inspected by base security.

F. All bidders shall use the Wage Determination Davis Bacon No. NJ20260037 Mod 1 dated 05/18/2026 for Monmouth County, NJ. The McNamara-O’Hara Service Contract Act requires contractors and subcontractors performing services on prime contracts in excess of $2,500 to pay service employees in various classes no less than the wage rates and fringe benefits found prevailing in the locality, or the rates (including prospective increases) contained in a predecessor contractor's collective bargaining agreement. The Department of

Labor issues wage determinations on a contract-by-contract basis in response to specific requests from contracting agencies. These determinations are incorporated into the contract.

3. Related Specifications

A. Aluminum framed entrances

B. Door Dimensions

a. Front Door (photo A.) – 9’11” X 7’11”

b. Side Door (photo B.) – 6’3” X 7’11”

Photo A. Photo B.

70FBR226R00000016_0001 Page 56 of 81

4. Related Requirements

A. Door Finish and Color: Section 09 06 00, Anodized Bronze Satin Finnish with dark desiccant strips.

B. Glass and Glazing: Section 08 80 00, GLAZING

C. Hardware: Section 08 71 00, DOOR HARDWARE.

D. Automatic Door Actuators: Section 08 71 13, AUTOMATIC DOOR OPERATORS.

E. Aluminum Finish and Color: Section 09 06 00, SCHEDULE FOR FINISHES.

5. Pre-installation Meetings

A. Conduct pre-installation meeting at project site, minimum 30 days before beginning

Work of this section.

a. Required Participants:

i. Contracting Officer's Representative (COR)

ii. Contractor

iii. Installer

b. Meeting Agenda: Distribute agenda to participants minimum 3 days before meeting.

i. Installation schedule

ii. Installation sequence

iii. Preparatory work

iv. Protection before, during, and after installation

v. Installation

vi. Terminations

vii. Transitions and connections to other work

viii. Other items affecting successful completion.

c. Document and distribute meeting minutes to participants to record decisions affecting installation

6. Submittals

A. Submittal Drawings: Minimum of 1 to 2 (half size) scale

a. Show size, configuration, fabrication and installation

b. Show anchorage and reinforcement

c. Show interface and relationship to adjacent work, including thermal, air and water barrier continuity

B. Manufacturer’s Literature and Data

a. Description of each product

b. Door, each type

c. Entrance and Storefront Construction

d. Installation instructions

70FBR226R00000016_0001 Page 57 of 81

e. Warranty

C. Samples

a. Door Corner Section: Minimum 450mm X 450mm (18” x 18”) for each specified door type showing head rail and hinge stile Aluminum Anodized

b. Finish with sample extrusions minimum of 150mm (6”) long for each specified color in sets of three showing maximum color range.

7. Quality Assurance

A. Manufacturer Qualifications

a. Regularly manufactures specified products

B. Installer Qualifications

a. Regularly installs specified products

b. Installed specified products with satisfactory service on a minimum of five (5) similar installations over the course of the last five (5) years.

c. Project experience list – Provide contact names and addresses for completed projects

C. Welders and Welding Procedures Qualifications: AWS D1.2/D1.2M

8. Delivery, Storage and Handling

A. Deliver Products in manufacturer’s original sealed packaging

B. Mark packaging, legibly. Indicate manufacturer's name or brand, type, color, production run number, and manufacture date.

C. Before installation, return or dispose of products within distorted, damaged, or opened packaging.

D. Store products indoors in dry, weather tight facility

E. Protect products from damage during handling and construction operations

9. Warranty

A. Construction warranty, FAR Clause 52.246-21 – Warranty of construction

B. Manufacturer's Warranty: Warrant painted finish against material and manufacturing defects

a. Warranty period: 20 years

10. Products

A. System performance

a. Delegated design: Prepare submittal documents including design calculations and drawings signed and sealed by registered design professional, licensed in New

Jersey.

i. Minor deviations to details shown on drawings to accommodate manufacturer’s standard products may be accepted by Contracting

70FBR226R00000016_0001 Page 58 of 81

Officer's Representative when deviations do not affect design concept and specified performance.

b. Design aluminum framed entrances and storefronts complying with specified performance:

i. Wind Load Resistance: ASCE/SEI 7; Design criteria as indicated on

Drawings when tested according to ASTM E330/E330M.

1. Maximum Deflection: 1/175 of span, maximum with minimum 1.65 safety factor.

ii. Thermal Movement: Accommodate ambient temperature range of 67 degrees C (120 degrees F).

iii. Windborne Debris Impact Resistance: Pass ASTM E1886.

1. Openings within 9144 mm (30 feet) of Grade: ASTM E1996 large missile test.

2. Other Openings: ASTM 1996 small missile test.

iv. Condensation Resistance: NFRC 500.

1. Fixed Framing: 45 CRF, minimum.

v. Water Resistance: ASTM E331; No uncontrolled penetration at380 Pa (8 psf), minimum, pressure differential.

vi. Fixed Framing Air Infiltration Resistance: ASTM E283; 0.30 L/s/sq. m

(0.06 cfm/sf), maximum at 300 Pa (6.24 psf), minimum, pressure differential.

vii. Entrance Doors Air Infiltration Resistance: ASTM E283; maximum allowable at 75 Pa (1.57 psf), minimum, pressure differential.

1. Single Doors: 2.5 L/s/sq. m (0.5 cfm/sf).

2. Paired Doors: 6 L/s/sq. m (1.2 cfm/sf).

B. Materials

a. Aluminum:

i. Sheet Metal: ASTM B209M (ASTM B209), minimum 1.6 mm (0.063 inch) thick.

ii. Extrusions: ASTM B221M (ASTM B221).

1. Framing: Minimum 3 mm (0.125 inch) wall thickness.

2. Glazing Beads, Moldings, and Trim: Minimum 1.25 mm (0.050 inch) thick.

70FBR226R00000016_0001 Page 59 of 81

iii. Color Anodized Aluminum: Provide aluminum alloy required to produce specified color.

b. Stainless Steel: ASTM A240/A240M; Type 302 or Type 304.

c. Thermal Break: Manufacturer standard low conductive material retarding heat flow in the framework, where insulating glass is scheduled.

C. Products – General

a. Provide aluminum framed entrances from one manufacturer.

b. Provide aluminum entrances, systems from same manufacturer.

D. Frames

a. Framing Members: Extruded aluminum, thermally broken.

b. Stops: Provide integral fixed stops and glass rebates and snap-on removable stops.

c. Provide concealed screws, bolts and other fasteners.

d. Secure cover boxes to frames behind lock strike cutouts.

E. Stile and Rail Doors

a. Stiles and Rails: Extruded aluminum, thermally broken.

i. Thickness: 45 mm (1 3/4 inch).

ii. Stiles and Head Rails: 101.6 mm (3 1/2 inches) wide.

iii. Bottom Rails: 152.4 mm (10 inches) wide.

b. Single-Acting Doors:

i. Bevel: 3 mm (1/8 inch) at lock, hinge, and meeting stile edges.

ii. Clearances: 2 mm (1/16 inch) at hinge stiles, 3 mm (1/8 inch) at lock stiles and top rails, and 5 mm (3/16 inch) at floors and thresholds.

c. Glass Rebates: Integral with stiles and rails.

d. Glazing Beads: Extruded aluminum, 1.3 mm (0.050 inch) thick. Integral with stiles and rails or applied type, snap fit secured.

e. Stile and Rail Joints: Welded or interlocked dovetail joints between stiles and rails.

i. Clamp door together through top and bottom rails with 9 mm (3/8 inch) primed steel tie rod extending into stiles and having self-locking nut and washer at both ends.

ii. Reinforce stiles and rails to prevent door distortion when tie rods are tightened.

iii. Provide compensating spring type washer under each nut for stress relief.

iv. Construct joints to remain rigid and tight when door is operated.

f. Weather stripping: Removable, woven pile type (silicone treated) weather stripping

70FBR226R00000016_0001 Page 60 of 81 attached to aluminum or vinyl holder.

i. Make slots for applying weather stripping integral with doors and door frame stops.

ii. Apply continuous weather stripping to heads, jambs, bottom, and meeting stiles of doors and frames so doors swing freely and close positively.

F. Fabrication

a. Form metal parts and fit and assemble joints, except joints designed to accommodate movement. Seal joints to resist air infiltration and water penetration.

b. Factory assemble doors.

G. Finishes

a. Aluminum Anodized Finish: NAAMM AMP 500.

i. Color Anodized Finish: AA C22A42 or AA C22A44; Class I Architectural,

0.018 mm (0.7 mil) thick.

b. Aluminum Paint finish:

i. Baked Enamel or Powder Coat: AAMA 2603; polyester resin, minimum 0.4 mm (1.5 mil) film thickness.

H. Accessories

a. Barrier Coating: ASTM D1187/D1187M.

b. Fasteners:

i. Aluminum: ASTM F468, Alloy 2024.

ii. Stainless Steel: ASTM F593, Alloy Groups 1, 2 and 3.

c. Anchors: Aluminum or stainless steel; type to suit application.

d. Galvanizing Repair Paint: MPI No. 18.

e. Touch Up Paint: Match shop finish.

11. Execution

A. Preparation

a. Examine and verify substrate suitability for product installation.

i. Coordinate floor closer installation recessed into concrete slabs.

ii. Coordinate anchor installation built into masonry and concrete.

70FBR226R00000016_0001 Page 61 of 81

b. Protect existing construction and completed work from damage.

c. Clean substrates. Remove contaminants capable of affecting subsequently installed product's performance.

d. Apply barrier coating to aluminum surfaces in contact with dissimilar metals.

B. Installation – General

a. Install products according to manufacturer's instructions

i. When manufacturer's instructions deviate from specifications, submit proposed resolution for Contracting Officer's Representative consideration.

b. Install aluminum framed entrances and storefronts plumb and true, in alignment and to lines shown on drawings.

c. Anchor frames to adjoining construction at heads, jambs and sills.

d. Provide concealed aluminum clips to connect adjoining frame sections.

e. Install door hardware and hang doors.

f. Adjust doors and hardware uniform clearances and proper operation.

g. Touch up damaged factory finishes.

i. Repair galvanized surfaces with galvanized repair paint.

ii. Repair painted surfaces with touch up primer.

h. Tolerances:

i. Variation from Plumb, Level, Warp, and Bow: Maximum 3 mm in 3 m (1/8 inch in 10 feet).

ii. Variation from Plane: Maximum3 mm in 3.65 m (1/8 inch in 12 feet); 6 mm

(1/4 inch) over total length.

iii. Variation from Alignment: Maximum 1.5 mm (1/16 inch) in line offset and maximum 3 mm (1/8 inch) corner offset.

iv. Variation from Square: Maximum 3 mm (1/8 inch) diagonal measurement differential.

C. Protection, Cleaning and repairing

a. Clean exposed aluminum and glass surfaces. Remove contaminants and stains.

b. Protect aluminum framed entrances and storefronts from construction operations.

c. Remove protective materials immediately before acceptance.

d. Repair damage

70FBR226R00000016_0001 Page 62 of 81

Federal Emergency Management Agency
Comprehensive Facility Upgrades for Building C-54, Naval Weapons Station, Earle
1. Purpose
2. Background
3. Scope of Work (Summary)
Please also refer to Attachment A Specs for doors and Attachment B A100 Floor plan for details.
3.1 Door Replacement and Upgrades
3.2 Roof Repair and Waterproofing
3.3 RRCC Facility Upgrade
3.4 Exterior Cement Repairs, Sidewalk Expansion, and Patio Renovation
b. Sidewalk Expansion (Warehouse Dock to Building Side Door):
c. Patio Area Renovation (Adjacent to Side Double Doors and Expanded Sidewalk):
Safety Process for 3.4
4. Performance Requirements
5. Performance Criteria
6. Contractor Deliverables
7. Period of Performance
8. Operating Constraints
9. Security and Access
10. Applicable Documents or References
11. Privacy Clauses
HSAR 3052.240-71 CONTRACTOR EMPLOYEE ACCESS (HSAR DEVIATION 25-12) (Effective November 3, 2025)
HSAR 3052.240-71 CONTRACTOR EMPLOYEE ACCESS ALT II (HSAR DEVIATION 25-12) (Effective
SECURITY LANGUAGE
Background Investigations:
Low Risk without Information System Access:
Low Risk with Information System Access:
Moderate Risk:
High Risk:
Background Investigation Process:
Continued Eligibility and Reinvestigation:
Exclusion by Contracting Officer:
OPSEC Training:
Insider Threat Training:
Facility Access:
Separation of Contract:
12. Points of Contact
Appendices:
Change Management
2.4.1(b) Attachment B-NWSE Building C-54 A100 Floor Plan.pdf
2.2.1(d) Attachment D-Notice to Offerors-Statement of Contractor Assurance.pdf
U.S. Department of Homeland Security
500 C Street, SW
Washington DC 20472
2.2.1(g) Attachment G-CLIN Pricing Excel Sheet.pdf
Pricing Proposal
1.1.3 SOW_CONSOLIDATED - Roof Doors RRCC and Concrete_ v5_08.19.2026 Security Edits.pdf
STATEMENT OF WORK FOR:
Comprehensive Facility Upgrades for Building C-54, Naval Weapons Station, Earle
Statement of Work (SOW) for Comprehensive Facility
Upgrades for Building C-54, Naval Weapon Station Earle
1. Purpose
The purpose of this project is to provide comprehensive facility upgrades to Building C-54 at Naval Weapons Station Earle (NWSE). The scope includes:
1) Installation and upgrade of automated, ADA-compliant access doors at exterior entry points (please see attachment A for more details), as well as installation of nine (9) wood doors with glazed windows for conference rooms and offices within the fa...
2) Repair, restoration, and waterproofing of the office building roof.
3) Renovation and modernization of the Regional Response Coordination Center (RRCC), including flooring, walls, electrical and communication infrastructure.
4) Repair, patching, and expansion of exterior cement surfaces, including the loading dock, sidewalks, and patio area, to improve safety, accessibility, and support future facility enhancements.
These upgrades will enhance safety, accessibility, operational reliability, and compliance with all applicable standards to support FEMA’s mission requirements.
2. Background
3. Scope of Work (Summary)
Please also refer to Attachment A Specs for doors and Attachment B A100 Floor plan for details.
Background Investigations:
Low Risk without Information System Access:
Low Risk with Information System Access:
Moderate Risk:
High Risk:
Background Investigation Process:
Continued Eligibility and Reinvestigation:
Exclusion by Contracting Officer:
OPSEC Training:
Insider Threat Training:
2.2.1 Solicitation 70FBR226R00000016.pdf
Solicitation/Contract/Order for commercial products and commercial services
Requisition number
Contract number
Award/Effective date
Order number
Solicitation number
Solicitation issue date
For solicitation information call:
Name
Telephone number
Offer due date/local time
Issued by
Code
This acquisition is
NAICS
Size standard
Delivery for free on board (FOB) destination unless block is marked
Discount terms
This contract is a rated order under the defense priorities and allocations system - DPAS
Rating
Method of solicitation
Deliver to
Code
Administered by
Code
Contractor/Offeror
Code
Facility code
Telephone number
Check if remittance is different and put such address in offer
Payment will be made by
Code
Submit invoices to address shown in block 18a unless block below is checked
Accounting and appropriation data
Total award amount
Solicitation incorporates by reference
Addenda
Contract/purchase order incorporates by reference
Addenda
Contractor is required to sign this doc. and return:
Award of contract: reference
Signature of offeror/contractor
Name and title of signer
Signer date signed
Signature of contracting officer
Name of contracting officer
Contracting officer date signed
Authorized for local reproduction. Previous edition is not usable
Standard Form 1449 (Rev. 11/2021)
Quantity in column 21 has been
Signature of authorized government representative
Date
Printed name and title of authorized government representative
Mailing address authorized government representative
Telephone number of authorized government representative
Email number of authorized government representative
Ship number
Voucher number
Amount verified correct for
Payment
Check number
Stock record (S/R)
S/R account number
S/R voucher number
Paid by
I certify this account is correct and proper for payment
Signature and title of certifying officer
Date
Received by
Received at
Date received
Total containers
Standard Form 1449 (rev. 11/2021) Back
2.2.1(c) Attachment C-Specs for Doors for Earle_07.28.26_OR.pdf
2.2.1(d) Attachment D-Notice to Offerors-Statement of Contractor Assurance.pdf
U.S. Department of Homeland Security
500 C Street, SW
Washington DC 20472
2.2.1(g) Attachment G-CLIN Pricing Excel Sheet.pdf
Pricing Proposal
1.1.3 SOW_CONSOLIDATED - Roof Doors RRCC and Concrete_ v5_08.19.2026 Security Edits.pdf
STATEMENT OF WORK FOR:
Comprehensive Facility Upgrades for Building C-54, Naval Weapons Station, Earle
Statement of Work (SOW) for Comprehensive Facility
Upgrades for Building C-54, Naval Weapon Station Earle
1. Purpose
The purpose of this project is to provide comprehensive facility upgrades to Building C-54 at Naval Weapons Station Earle (NWSE). The scope includes:
1) Installation and upgrade of automated, ADA-compliant access doors at exterior entry points (please see attachment A for more details), as well as installation of nine (9) wood doors with glazed windows for conference rooms and offices within the fa...
2) Repair, restoration, and waterproofing of the office building roof.
3) Renovation and modernization of the Regional Response Coordination Center (RRCC), including flooring, walls, electrical and communication infrastructure.
4) Repair, patching, and expansion of exterior cement surfaces, including the loading dock, sidewalks, and patio area, to improve safety, accessibility, and support future facility enhancements.
These upgrades will enhance safety, accessibility, operational reliability, and compliance with all applicable standards to support FEMA’s mission requirements.
2. Background
3. Scope of Work (Summary)
Please also refer to Attachment A Specs for doors and Attachment B A100 Floor plan for details.
Background Investigations:
Low Risk without Information System Access:
Low Risk with Information System Access:
Moderate Risk:
High Risk:
Background Investigation Process:
Continued Eligibility and Reinvestigation:
Exclusion by Contracting Officer:
OPSEC Training:
Insider Threat Training:
2.2.1 Solicitation 70FBR226R00000016.pdf
Solicitation/Contract/Order for commercial products and commercial services
Requisition number
Contract number
Award/Effective date
Order number
Solicitation number
Solicitation issue date
For solicitation information call:
Name
Telephone number
Offer due date/local time
Issued by
Code
This acquisition is
NAICS
Size standard
Delivery for free on board (FOB) destination unless block is marked
Discount terms
This contract is a rated order under the defense priorities and allocations system - DPAS
Rating
Method of solicitation
Deliver to
Code
Administered by
Code
Contractor/Offeror
Code
Facility code
Telephone number
Check if remittance is different and put such address in offer
Payment will be made by
Code
Submit invoices to address shown in block 18a unless block below is checked
Accounting and appropriation data
Total award amount
Solicitation incorporates by reference
Addenda
Contract/purchase order incorporates by reference
Addenda
Contractor is required to sign this doc. and return:
Award of contract: reference
Signature of offeror/contractor
Name and title of signer
Signer date signed
Signature of contracting officer
Name of contracting officer
Contracting officer date signed
Authorized for local reproduction. Previous edition is not usable
Standard Form 1449 (Rev. 11/2021)
Quantity in column 21 has been
Signature of authorized government representative
Date
Printed name and title of authorized government representative
Mailing address authorized government representative
Telephone number of authorized government representative
Email number of authorized government representative
Ship number
Voucher number
Amount verified correct for
Payment
Check number
Stock record (S/R)
S/R account number
S/R voucher number
Paid by
I certify this account is correct and proper for payment
Signature and title of certifying officer
Date
Received by
Received at
Date received
Total containers
Standard Form 1449 (rev. 11/2021) Back
2.2.1(d) Attachment D-Notice to Offerors-Statement of Contractor Assurance.pdf
2.2.1(d) Attachment D-Notice to Offerors-Statement of Contractor Assurance.pdf
U.S. Department of Homeland Security
500 C Street, SW
Washington DC 20472
2.2.1(g) Attachment G-CLIN Pricing Excel Sheet.pdf
Pricing Proposal
1.1.3 SOW_CONSOLIDATED - Roof Doors RRCC and Concrete_ v5_08.19.2026 Security Edits.pdf
STATEMENT OF WORK FOR:
Comprehensive Facility Upgrades for Building C-54, Naval Weapons Station, Earle
Statement of Work (SOW) for Comprehensive Facility
Upgrades for Building C-54, Naval Weapon Station Earle
1. Purpose
The purpose of this project is to provide comprehensive facility upgrades to Building C-54 at Naval Weapons Station Earle (NWSE). The scope includes:
1) Installation and upgrade of automated, ADA-compliant access doors at exterior entry points (please see attachment A for more details), as well as installation of nine (9) wood doors with glazed windows for conference rooms and offices within the fa...
2) Repair, restoration, and waterproofing of the office building roof.
3) Renovation and modernization of the Regional Response Coordination Center (RRCC), including flooring, walls, electrical and communication infrastructure.
4) Repair, patching, and expansion of exterior cement surfaces, including the loading dock, sidewalks, and patio area, to improve safety, accessibility, and support future facility enhancements.
These upgrades will enhance safety, accessibility, operational reliability, and compliance with all applicable standards to support FEMA’s mission requirements.
2. Background
3. Scope of Work (Summary)
Please also refer to Attachment A Specs for doors and Attachment B A100 Floor plan for details.
Background Investigations:
Low Risk without Information System Access:
Low Risk with Information System Access:
Moderate Risk:
High Risk:
Background Investigation Process:
Continued Eligibility and Reinvestigation:
Exclusion by Contracting Officer:
OPSEC Training:
Insider Threat Training:
2.2.1 Solicitation 70FBR226R00000016.pdf
Solicitation/Contract/Order for commercial products and commercial services
Requisition number
Contract number
Award/Effective date
Order number
Solicitation number
Solicitation issue date
For solicitation information call:
Name
Telephone number
Offer due date/local time
Issued by
Code
This acquisition is
NAICS
Size standard
Delivery for free on board (FOB) destination unless block is marked
Discount terms
This contract is a rated order under the defense priorities and allocations system - DPAS
Rating
Method of solicitation
Deliver to
Code
Administered by
Code
Contractor/Offeror
Code
Facility code
Telephone number
Check if remittance is different and put such address in offer
Payment will be made by
Code
Submit invoices to address shown in block 18a unless block below is checked
Accounting and appropriation data
Total award amount
Solicitation incorporates by reference
Addenda
Contract/purchase order incorporates by reference
Addenda
Contractor is required to sign this doc. and return:
Award of contract: reference
Signature of offeror/contractor
Name and title of signer
Signer date signed
Signature of contracting officer
Name of contracting officer
Contracting officer date signed
Authorized for local reproduction. Previous edition is not usable
Standard Form 1449 (Rev. 11/2021)
Quantity in column 21 has been
Signature of authorized government representative
Date
Printed name and title of authorized government representative
Mailing address authorized government representative
Telephone number of authorized government representative
Email number of authorized government representative
Ship number
Voucher number
Amount verified correct for
Payment
Check number
Stock record (S/R)
S/R account number
S/R voucher number
Paid by
I certify this account is correct and proper for payment
Signature and title of certifying officer
Date
Received by
Received at
Date received
Total containers
Standard Form 1449 (rev. 11/2021) Back
2.4.1(e) Attachment E-Technical Evaluation Factors-Consolidation Requirement_08.03.2026.pdf
2.2.1(d) Attachment D-Notice to Offerors-Statement of Contractor Assurance.pdf
U.S. Department of Homeland Security
500 C Street, SW
Washington DC 20472
2.2.1(g) Attachment G-CLIN Pricing Excel Sheet.pdf
Pricing Proposal
1.1.3 SOW_CONSOLIDATED - Roof Doors RRCC and Concrete_ v5_08.19.2026 Security Edits.pdf
STATEMENT OF WORK FOR:
Comprehensive Facility Upgrades for Building C-54, Naval Weapons Station, Earle
Statement of Work (SOW) for Comprehensive Facility
Upgrades for Building C-54, Naval Weapon Station Earle
1. Purpose
The purpose of this project is to provide comprehensive facility upgrades to Building C-54 at Naval Weapons Station Earle (NWSE). The scope includes:
1) Installation and upgrade of automated, ADA-compliant access doors at exterior entry points (please see attachment A for more details), as well as installation of nine (9) wood doors with glazed windows for conference rooms and offices within the fa...
2) Repair, restoration, and waterproofing of the office building roof.
3) Renovation and modernization of the Regional Response Coordination Center (RRCC), including flooring, walls, electrical and communication infrastructure.
4) Repair, patching, and expansion of exterior cement surfaces, including the loading dock, sidewalks, and patio area, to improve safety, accessibility, and support future facility enhancements.
These upgrades will enhance safety, accessibility, operational reliability, and compliance with all applicable standards to support FEMA’s mission requirements.
2. Background
3. Scope of Work (Summary)
Please also refer to Attachment A Specs for doors and Attachment B A100 Floor plan for details.
Background Investigations:
Low Risk without Information System Access:
Low Risk with Information System Access:
Moderate Risk:
High Risk:
Background Investigation Process:
Continued Eligibility and Reinvestigation:
Exclusion by Contracting Officer:
OPSEC Training:
Insider Threat Training:
2.2.1 Solicitation 70FBR226R00000016.pdf
Solicitation/Contract/Order for commercial products and commercial services
Requisition number
Contract number
Award/Effective date
Order number
Solicitation number
Solicitation issue date
For solicitation information call:
Name
Telephone number
Offer due date/local time
Issued by
Code
This acquisition is
NAICS
Size standard
Delivery for free on board (FOB) destination unless block is marked
Discount terms
This contract is a rated order under the defense priorities and allocations system - DPAS
Rating
Method of solicitation
Deliver to
Code
Administered by
Code
Contractor/Offeror
Code
Facility code
Telephone number
Check if remittance is different and put such address in offer
Payment will be made by
Code
Submit invoices to address shown in block 18a unless block below is checked
Accounting and appropriation data
Total award amount
Solicitation incorporates by reference
Addenda
Contract/purchase order incorporates by reference
Addenda
Contractor is required to sign this doc. and return:
Award of contract: reference
Signature of offeror/contractor
Name and title of signer
Signer date signed
Signature of contracting officer
Name of contracting officer
Contracting officer date signed
Authorized for local reproduction. Previous edition is not usable
Standard Form 1449 (Rev. 11/2021)
Quantity in column 21 has been
Signature of authorized government representative
Date
Printed name and title of authorized government representative
Mailing address authorized government representative
Telephone number of authorized government representative
Email number of authorized government representative
Ship number
Voucher number
Amount verified correct for
Payment
Check number
Stock record (S/R)
S/R account number
S/R voucher number
Paid by
I certify this account is correct and proper for payment
Signature and title of certifying officer
Date
Received by
Received at
Date received
Total containers
Standard Form 1449 (rev. 11/2021) Back
2.4.1(f) Attachment F-Wage Determination Davis Bacon No. NJ20260037 Mod 1 05.18.26.pdf
2.2.1(d) Attachment D-Notice to Offerors-Statement of Contractor Assurance.pdf
U.S. Department of Homeland Security
500 C Street, SW
Washington DC 20472
2.2.1(g) Attachment G-CLIN Pricing Excel Sheet.pdf
Pricing Proposal
1.1.3 SOW_CONSOLIDATED - Roof Doors RRCC and Concrete_ v5_08.19.2026 Security Edits.pdf
STATEMENT OF WORK FOR:
Comprehensive Facility Upgrades for Building C-54, Naval Weapons Station, Earle
Statement of Work (SOW) for Comprehensive Facility
Upgrades for Building C-54, Naval Weapon Station Earle
1. Purpose
The purpose of this project is to provide comprehensive facility upgrades to Building C-54 at Naval Weapons Station Earle (NWSE). The scope includes:
1) Installation and upgrade of automated, ADA-compliant access doors at exterior entry points (please see attachment A for more details), as well as installation of nine (9) wood doors with glazed windows for conference rooms and offices within the fa...
2) Repair, restoration, and waterproofing of the office building roof.
3) Renovation and modernization of the Regional Response Coordination Center (RRCC), including flooring, walls, electrical and communication infrastructure.
4) Repair, patching, and expansion of exterior cement surfaces, including the loading dock, sidewalks, and patio area, to improve safety, accessibility, and support future facility enhancements.
These upgrades will enhance safety, accessibility, operational reliability, and compliance with all applicable standards to support FEMA’s mission requirements.
2. Background
3. Scope of Work (Summary)
Please also refer to Attachment A Specs for doors and Attachment B A100 Floor plan for details.
Background Investigations:
Low Risk without Information System Access:
Low Risk with Information System Access:
Moderate Risk:
High Risk:
Background Investigation Process:
Continued Eligibility and Reinvestigation:
Exclusion by Contracting Officer:
OPSEC Training:
Insider Threat Training:
2.2.1 Solicitation 70FBR226R00000016.pdf
Solicitation/Contract/Order for commercial products and commercial services
Requisition number
Contract number
Award/Effective date
Order number
Solicitation number
Solicitation issue date
For solicitation information call:
Name
Telephone number
Offer due date/local time
Issued by
Code
This acquisition is
NAICS
Size standard
Delivery for free on board (FOB) destination unless block is marked
Discount terms
This contract is a rated order under the defense priorities and allocations system - DPAS
Rating
Method of solicitation
Deliver to
Code
Administered by
Code
Contractor/Offeror
Code
Facility code
Telephone number
Check if remittance is different and put such address in offer
Payment will be made by
Code
Submit invoices to address shown in block 18a unless block below is checked
Accounting and appropriation data
Total award amount
Solicitation incorporates by reference
Addenda
Contract/purchase order incorporates by reference
Addenda
Contractor is required to sign this doc. and return:
Award of contract: reference
Signature of offeror/contractor
Name and title of signer
Signer date signed
Signature of contracting officer
Name of contracting officer
Contracting officer date signed
Authorized for local reproduction. Previous edition is not usable
Standard Form 1449 (Rev. 11/2021)
Quantity in column 21 has been
Signature of authorized government representative
Date
Printed name and title of authorized government representative
Mailing address authorized government representative
Telephone number of authorized government representative
Email number of authorized government representative
Ship number
Voucher number
Amount verified correct for
Payment
Check number
Stock record (S/R)
S/R account number
S/R voucher number
Paid by
I certify this account is correct and proper for payment
Signature and title of certifying officer
Date
Received by
Received at
Date received
Total containers
Standard Form 1449 (rev. 11/2021) Back
2.4.1(g) Attachment G-CLIN Pricing Excel Sheet.pdf
2.2.1(d) Attachment D-Notice to Offerors-Statement of Contractor Assurance.pdf
U.S. Department of Homeland Security
500 C Street, SW
Washington DC 20472
2.2.1(g) Attachment G-CLIN Pricing Excel Sheet.pdf
Pricing Proposal
1.1.3 SOW_CONSOLIDATED - Roof Doors RRCC and Concrete_ v5_08.19.2026 Security Edits.pdf
STATEMENT OF WORK FOR:
Comprehensive Facility Upgrades for Building C-54, Naval Weapons Station, Earle
Statement of Work (SOW) for Comprehensive Facility
Upgrades for Building C-54, Naval Weapon Station Earle
1. Purpose
The purpose of this project is to provide comprehensive facility upgrades to Building C-54 at Naval Weapons Station Earle (NWSE). The scope includes:
1) Installation and upgrade of automated, ADA-compliant access doors at exterior entry points (please see attachment A for more details), as well as installation of nine (9) wood doors with glazed windows for conference rooms and offices within the fa...
2) Repair, restoration, and waterproofing of the office building roof.
3) Renovation and modernization of the Regional Response Coordination Center (RRCC), including flooring, walls, electrical and communication infrastructure.
4) Repair, patching, and expansion of exterior cement surfaces, including the loading dock, sidewalks, and patio area, to improve safety, accessibility, and support future facility enhancements.
These upgrades will enhance safety, accessibility, operational reliability, and compliance with all applicable standards to support FEMA’s mission requirements.
2. Background
3. Scope of Work (Summary)
Please also refer to Attachment A Specs for doors and Attachment B A100 Floor plan for details.
Background Investigations:
Low Risk without Information System Access:
Low Risk with Information System Access:
Moderate Risk:
High Risk:
Background Investigation Process:
Continued Eligibility and Reinvestigation:
Exclusion by Contracting Officer:
OPSEC Training:
Insider Threat Training:
2.2.1 Solicitation 70FBR226R00000016.pdf
Solicitation/Contract/Order for commercial products and commercial services
Requisition number
Contract number
Award/Effective date
Order number
Solicitation number
Solicitation issue date
For solicitation information call:
Name
Telephone number
Offer due date/local time
Issued by
Code
This acquisition is
NAICS
Size standard
Delivery for free on board (FOB) destination unless block is marked
Discount terms
This contract is a rated order under the defense priorities and allocations system - DPAS
Rating
Method of solicitation
Deliver to
Code
Administered by
Code
Contractor/Offeror
Code
Facility code
Telephone number
Check if remittance is different and put such address in offer
Payment will be made by
Code
Submit invoices to address shown in block 18a unless block below is checked
Accounting and appropriation data
Total award amount
Solicitation incorporates by reference
Addenda
Contract/purchase order incorporates by reference
Addenda
Contractor is required to sign this doc. and return:
Award of contract: reference
Signature of offeror/contractor
Name and title of signer
Signer date signed
Signature of contracting officer
Name of contracting officer
Contracting officer date signed
Authorized for local reproduction. Previous edition is not usable
Standard Form 1449 (Rev. 11/2021)
Quantity in column 21 has been
Signature of authorized government representative
Date
Printed name and title of authorized government representative
Mailing address authorized government representative
Telephone number of authorized government representative
Email number of authorized government representative
Ship number
Voucher number
Amount verified correct for
Payment
Check number
Stock record (S/R)
S/R account number
S/R voucher number
Paid by
I certify this account is correct and proper for payment
Signature and title of certifying officer
Date
Received by
Received at
Date received
Total containers
Standard Form 1449 (rev. 11/2021) Back