2.2.1(g) Attachment G-CLIN Pricing Excel Sheet.pdf

PDF 555 KB Posted

Attached to
FEMA Region 2 Naval Weapons Station Earle Building C-54 Comprehensive Facility Upgrades
Solicitation number
70FBR226R00000016
Issued by

About this file

This is a CLIN Pricing Proposal Excel Sheet for a federal construction contract at Naval Weapons Station Earle (NWSE) Building C-54. The contract encompasses five primary work scopes, each structured with separate material and labor cost line items, plus a bonding requirement.

The five main CLINs are: (0001) Roof Repair and Waterproofing; (0002) External Door Replacement (Front and Side); (0003) Internal Door Replacement; (0004) RRCC Refresh; and (0005) Exterior Cement Repairs, Sidewalk Expansion, and Patio Renovation. Each primary CLIN is subdivided into material costs (designated with "A" suffix) and labor costs (designated with "B" suffix), all priced on a lump-sum LOT basis. CLIN 0006 specifies bonding at 3 percent of the total project cost. The pricing template requires vendors to populate unit prices and total prices across all line items; currently, only CLIN 0001 contains a nominal $1.00 placeholder price, while all remaining CLINs show zero or blank pricing fields. Work scopes reference specific sections within the Statement of Work (SOW) for detailed specifications. The document indicates this is for the Base Period of contract 70FBR226R00000016.

View the file

Other files

File Type Posted
2.8.1 Consolidation Project NWSE Questions 09.09.26_v3.pdf PDF
2.4.1(e) Attachment E-RRCC Wall and Doors Picture 1.pdf PDF
2.4.1(d) Attachment D-RRCC Scale Diagram.pdf PDF
2.4.1(k) Attachment K-RRCC Wall and Doors Picture 7.pdf PDF
2.4.1(p) Attachment P-CLIN Pricing Excel Sheet.xlsx XLSX spreadsheet
2.4.1(b) Attachment B-NWSE Building C-54 A100 Floor Plan.pdf PDF
2.4.1(i) Attachment I-RRCC Wall and Doors Picture 5.pdf PDF
2.4.1(n) Attachment N-Technical Evaluation Factors-Consolidation Requirement_08.03.2026.pdf PDF
2.8.1(a) Consolidation Q&A-Question 16 Reference.pdf PDF
2.4.1(c) Attachment C-Specs for Doors for Earle_07.28.26_OR.pdf PDF
2.4.1(f) Attachment F-RRCC Wall and Doors picture 2.pdf PDF
2.4.1(j) Attachment J-RRCC Wall and Doors Picture 6.pdf PDF
2.4.1(g) Attachment G-RRCC Wall and Doors Picture 3.pdf PDF
2.4.1(p) Attachment P-CLIN Pricing Excel Sheet.pdf PDF
2.4.1(o) Attachment O-Wage Determination Davis Bacon No. NJ20260037 Mod 1 05.18.26.pdf PDF
2.4.1(l) Attachment L-Training Room Planar_VideoWall 8x4 DLP 1.2 2K Nit.pdf PDF
2.4.1(m) Attachment M-Notice to Offerors-Statement of Contractor Assurance.pdf PDF
2.4.1(h) Attachment H-RRCC Wall and Doors Picture 4.pdf PDF
2.4.1(a) Attachment A-SOW_CONSOLIDATED-Doors_RRCC_Wall_Concrete_ v8_09.09.2026 Security Edits.pdf PDF
2.4.1 Solicitation 70FBR226R00000016_001.pdf PDF
2.4.1 Solicitation 70FBR226R00000016_001.pdf PDF
2.4.1(g) Attachment G-CLIN Pricing Excel Sheet.pdf PDF
2.4.1(e) Attachment E-Technical Evaluation Factors-Consolidation Requirement_08.03.2026.pdf PDF
2.4.1(c) Attachment C-Specs for Doors for Earle_07.28.26_OR.pdf PDF
2.4.1(g) Attachment G-CLIN Pricing Excel Sheet.xlsx XLSX spreadsheet
2.4.1(d) Attachment D-Notice to Offerors-Statement of Contractor Assurance.pdf PDF
2.4.1(f) Attachment F-Wage Determination Davis Bacon No. NJ20260037 Mod 1 05.18.26.pdf PDF
2.4.1(b) Attachment B-NWSE Building C-54 A100 Floor Plan.pdf PDF
2.4.1(a) Attachment A-SOW_CONSOLIDATED-Roof Doors RRCC_Concrete_ v6_08.21.2026 Security Edits.pdf PDF
2.4.1 Solicitation 70FBR226R00000016_001.pdf PDF
2.4.1(c) Attachment C-Specs for Doors for Earle_07.28.26_OR.pdf PDF
2.4.1(e) Attachment E-Technical Evaluation Factors-Consolidation Requirement_08.03.2026.pdf PDF
2.4.1(g) Attachment G-CLIN Pricing Excel Sheet.xlsx XLSX spreadsheet
2.4.1(f) Attachment F-Wage Determination Davis Bacon No. NJ20260037 Mod 1 05.18.26.pdf PDF
2.4.1(g) Attachment G-CLIN Pricing Excel Sheet.pdf PDF
2.4.1 Solicitation 70FBR226R00000016_001.pdf PDF
2.4.1(a) Attachment A-SOW_CONSOLIDATED-Roof Doors RRCC_Concrete_ v6_08.21.2026 Security Edits.pdf PDF
2.4.1(b) Attachment B-NWSE Building C-54 A100 Floor Plan.pdf PDF
2.4.1(d) Attachment D-Notice to Offerors-Statement of Contractor Assurance.pdf PDF
2.2.1(a) Attachment A-SOW_CONSOLIDATED-Roof Doors RRCC_Concrete_ v4_08.04.2026 Security Edits.pdf PDF
2.2.1 Solicitation 70FBR226R00000016.pdf PDF
2.2.1(d) Attachment D-Notice to Offerors-Statement of Contractor Assurance.pdf PDF
2.2.1(g) Attachment G-CLIN Pricing Excel Sheet.xlsx XLSX spreadsheet
2.2.1(e) Attachment E-Technical Evaluation Factors-Consolidation Requirement_08.03.2026.pdf PDF
2.2.1(b) Attachment B-NWSE Building C-54 A100 Floor Plan.pdf PDF
2.2.1(f) Attachment F-Wage Determination Davis Bacon No. NJ20260037 Mod 1 05.18.26.pdf PDF
2.2.1(c) Attachment C-Specs for Doors for Earle_07.28.26_OR.pdf PDF
Show all 47

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Attachment G: CLIN Pricing Proposal Excel Sheet

CLIN Buyer Description Quantity Unit Vendor Unit Price Total Price

Naval Weapons Station Earle (NWSE) Building C-54 Roof Repair and Waterproofing in accordance with the Statement of Work (SOW).

Refer to Section 3.2 of the SOW.

1 LOT $ 1.00 $ 1.00

0001A NWSE Building C-54 Roof Repair and Waterproofing Material Costs

1 LOT $ -

0001B NWSE Building C-54 Roof Repair and Waterproofing Labor Costs

1 LOT $ -

Naval Weapons Station Earle (NWSE) Building C- 54 Door Replacement (Front and Side - External) in accordance with the Statement of Work (SOW). Refer to Section 3.1 of the SOW.

1 LOT $ -

0002A NWSE Building C-54 Door Replacement (Front and Side - External) Material Costs

1 LOT $ -

0002B NWSE Building C-54 Door Replacement (Front andSide - External) Labor Costs

1 LOT $ -

Naval Weapons Station Earle (NWSE) Building C- 54 Door Replacement (Internal doors) in accordance with the Statement of Work (SOW).

Refer to Section 3.1 of the SOW.

1 LOT $ -

0003A NWSE Building C-54 Door Replacement (Internal doors) Material Costs

1 LOT $ -

0003B NWSE Building C-54 Door Replacement (Internal doors) Labor Costs

1 LOT $ -

Naval Weapons Station Earle (NWSE) Building C- 54 RRCC Refresh in accordance with the Statement of Work (SOW). Refer to Section 3.3 of the SOW.

1 LOT $ -

0004A NWSE Building C-54 RRCC Refresh Material Costs 1 LOT $ - 0004B NWSE Building C-54 RRCC Refresh Labor Costs 1 LOT $ -

Naval Weapons Station Earle (NWSE) Building C- 54 Exterior Cement Repairs, Sidewalk Expansion, and Patio Renovation in accordance with the Statement of Work (SOW). Refer to Section 3.4 of the SOW.

1 LOT $ -

0005A NWSE Building C-54 Exterior Cement Repairs, Sidewalk Expansion, and Patio Renovation Material Costs

1 LOT $ -

0005B NWSE Building C-54 Exterior Cement Repairs, Sidewalk Expansion, and Patio Renovation Labor Costs

1 LOT $ -

0006 Bonding - 3% of total cost of the project 1 LOT $ -

Total Cost $ -

Line Item(s) Base Period

70FBR226R00000016 Page 77 of 77

2.2.1(d) Attachment D-Notice to Offerors-Statement of Contractor Assurance.pdf
U.S. Department of Homeland Security
500 C Street, SW
Washington DC 20472
2.2.1(g) Attachment G-CLIN Pricing Excel Sheet.pdf
Pricing Proposal
1.1.3 SOW_CONSOLIDATED - Roof Doors RRCC and Concrete_ v5_08.19.2026 Security Edits.pdf
STATEMENT OF WORK FOR:
Comprehensive Facility Upgrades for Building C-54, Naval Weapons Station, Earle
Statement of Work (SOW) for Comprehensive Facility
Upgrades for Building C-54, Naval Weapon Station Earle
1. Purpose
The purpose of this project is to provide comprehensive facility upgrades to Building C-54 at Naval Weapons Station Earle (NWSE). The scope includes:
1) Installation and upgrade of automated, ADA-compliant access doors at exterior entry points (please see attachment A for more details), as well as installation of nine (9) wood doors with glazed windows for conference rooms and offices within the fa...
2) Repair, restoration, and waterproofing of the office building roof.
3) Renovation and modernization of the Regional Response Coordination Center (RRCC), including flooring, walls, electrical and communication infrastructure.
4) Repair, patching, and expansion of exterior cement surfaces, including the loading dock, sidewalks, and patio area, to improve safety, accessibility, and support future facility enhancements.
These upgrades will enhance safety, accessibility, operational reliability, and compliance with all applicable standards to support FEMA’s mission requirements.
2. Background
3. Scope of Work (Summary)
Please also refer to Attachment A Specs for doors and Attachment B A100 Floor plan for details.
Background Investigations:
Low Risk without Information System Access:
Low Risk with Information System Access:
Moderate Risk:
High Risk:
Background Investigation Process:
Continued Eligibility and Reinvestigation:
Exclusion by Contracting Officer:
OPSEC Training:
Insider Threat Training:
2.2.1 Solicitation 70FBR226R00000016.pdf
Solicitation/Contract/Order for commercial products and commercial services
Requisition number
Contract number
Award/Effective date
Order number
Solicitation number
Solicitation issue date
For solicitation information call:
Name
Telephone number
Offer due date/local time
Issued by
Code
This acquisition is
NAICS
Size standard
Delivery for free on board (FOB) destination unless block is marked
Discount terms
This contract is a rated order under the defense priorities and allocations system - DPAS
Rating
Method of solicitation
Deliver to
Code
Administered by
Code
Contractor/Offeror
Code
Facility code
Telephone number
Check if remittance is different and put such address in offer
Payment will be made by
Code
Submit invoices to address shown in block 18a unless block below is checked
Accounting and appropriation data
Total award amount
Solicitation incorporates by reference
Addenda
Contract/purchase order incorporates by reference
Addenda
Contractor is required to sign this doc. and return:
Award of contract: reference
Signature of offeror/contractor
Name and title of signer
Signer date signed
Signature of contracting officer
Name of contracting officer
Contracting officer date signed
Authorized for local reproduction. Previous edition is not usable
Standard Form 1449 (Rev. 11/2021)
Quantity in column 21 has been
Signature of authorized government representative
Date
Printed name and title of authorized government representative
Mailing address authorized government representative
Telephone number of authorized government representative
Email number of authorized government representative
Ship number
Voucher number
Amount verified correct for
Payment
Check number
Stock record (S/R)
S/R account number
S/R voucher number
Paid by
I certify this account is correct and proper for payment
Signature and title of certifying officer
Date
Received by
Received at
Date received
Total containers
Standard Form 1449 (rev. 11/2021) Back

File details come from the government source that posted it. Updated .