APCS SIR Sect J Att J.8.2 Amend 3.xlsx

XLSX spreadsheet 25 KB Posted

Attached to
National Airspace System (NAS) A/G Protocol Converter (APC) System Federal contract opportunity
Solicitation number
693KA8-22-R-00004
Issued by
Department of Transportation Federal Aviation Administration Headquarters

View the file

Other files for this federal contract opportunity

Other files attached to National Airspace System (NAS) A/G Protocol Converter (APC) System, newest first.
File Type Posted
APCS SIR Sect J Att J.1.4 Amend 6.docx DOCX document
APCS SIR Sect L Amend 6.docx DOCX document
APC SIR 693KA8-22-R-00004-Amendment_0006_20230206.pdf PDF
APCS SIR Sect L Att L.7 Amend 6.docx DOCX document
APC SIR 693KA8-22-R-00004_Amendment_0005_20230125.pdf PDF
APCS SIR Sect L Amend 5.docx DOCX document
APC-TES002 Test Procedures (CTP) Amend 5.docx DOCX document
APCS SIR Sect L Att L.4 Amend 5.xlsx XLSX spreadsheet
APCS SIR Sect M Amend 5.docx DOCX document
APC-TES004 Contractor Test Reports (CTR) Amend 5.docx DOCX document
APC SIR 693KA8-22-R-00004_Amendment 0004_20221130.pdf PDF
APCS SIR Sect M Amend 4.docx DOCX document
APCS SIR Sect B Att A Amend 3.xlsx XLSX spreadsheet
APCS SIR Sect J Att J.1.4 Amend 3.docx DOCX document
APCS SIR Sect L Amend 3.docx DOCX document
APCS SIR Sect L Att L.8 Amend 3.xlsx XLSX spreadsheet
693KA8-22-R-00004_Amendment 0003_20221122.pdf PDF
APCS SIR Sect B Amend 3.docx DOCX document
APCS SIR Sect E Amend 3.docx DOCX document
APCS SIR Sect F Amend 3.docx DOCX document
APCS SIR Sect J Att J.1.1 Amend 3.docx DOCX document
APCS SIR Sect M Amend 3.docx DOCX document
APCS SIR Sect C Amend 3.docx DOCX document
APCS SIR Sect L Att L.14 Amend 3.xlsx XLSX spreadsheet
693KA8-22-R-00004_Amendment 0002 20221021.pdf PDF
APCS SIR Sect J Att J.3.1 Amend 2.docx DOCX document
APCS SIR Sect M Amend 2.docx DOCX document
693KA8-22-R-00004_Amendment 0001 20220927.pdf PDF
APCS SIR Sect J Att J.1.1 Amend 1.docx DOCX document
APCS SIR Sect L Att L.6 Amend 1.docx DOCX document
APCS SIR Sect B Att A Amend 1.xlsx XLSX spreadsheet
APCS SIR Sect C Amend 1.docx DOCX document
APCS SIR Sect I Amend 1.docx DOCX document
APCS SIR Sect J Att J.1.4 Amend 1.docx DOCX document
APCS SIR Sect L Amend 1.docx DOCX document
APCS SIR Sect L Att L.8 Amend 1.xlsx XLSX spreadsheet
APCS SIR Sect H.docx DOCX document
APCS SIR Sect D.docx DOCX document
APCS SIR Sect E.docx DOCX document
APCS SIR Sect J.zip ZIP file
APCS SIR Sect L.zip ZIP file
APCS SIR Sect B.zip ZIP file
APCS SIR Sect F.docx DOCX document
APCS SIR Sect I.docx DOCX document
APCS SIR Sect K.docx DOCX document
APCS SIR Sect M.docx DOCX document
SF33_693KA8-22-R-00004.pdf PDF
APCS SIR Sect C.docx DOCX document
APCS SIR Sect G.docx DOCX document
FAA NAS VoICE Public Notices.docx DOCX document
Show all 50

National Airspace System (NAS) A/G Protocol Converter (APC) System has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

APC CWBS

693KA8-22-R-00004
Amendment 3Part III – List of Documents, Exhibits, and Other Attachments

Attachment J.8.2, Contract Work Breakdown Structure

CWBS #CWBS Element NameContract Line Item Number (CLIN)Statement of Work (SOW) Section Number(s) and Paragraph Letter(s)
3.0Air-to-Ground Protocol Converter (APC) System Solution Implementation
3.1Prime Mission Product
3.1.1Production Systems HardwareXX08 Production Systems Hardware (FFP)C.8.2.9, C.9.2
3.2System Engineering
3.2.1System Engineering SupportXX02a System Engineering Support (T&M)C.4 (a,b), C.4.1, C.4.2, C.4.3, C.4.4, C.4.5, C.4.6, C.4.7, C.4.8, C.4.11, C.6.8 (e-p)
3.2.1.1System Engineering ManagementC.4 (a,b), C.4.1, C.4.2 (a,f-g), C.6.8 (e-p)
3.2.1.2System Engineering DocumentsC.4.2 (b-e,h), C.4.2.1, C.4.2.2, C.4.2.3, C.4.2.7 (d,l-m)
3.2.1.3System Engineering Reviews
3.2.1.3.1initial System Requirements Review (iSRR)C.4.2.4
3.2.1.3.2Final Requirements Review (FRR)C.4.2.5
3.2.1.3.3APC System Preliminary Design Review (PDR)C.4.2.7 (a-b,e-f,h-k,n-r)
3.2.1.3.4ATLG Preliminary Design Review (PDR)C.4.2.7 (c,g,e,h-k,n-r)
3.2.1.3.5APC System Critical Design Review (CDR)C.4.2.8 (a-c,e-k)
3.2.1.3.6ATLG Critical Design Review (CDR)C.4.2.8 (a,d-k)
3.2.1.4System Engineering Development
3.2.1.4.1APC System Hardware DevelopmentC.4 (a)
3.2.1.4.2APC System Software DevelopmentC.4 (a)
3.2.1.4.3APC System Integration, Assembly, Test and CheckoutC.4 (a)
3.2.1.5System Engineering Assistance for Validation Test System UpdatesC.4.2.6
3.2.1.6Human Factors Engineering
3.2.1.6.1Human Factors Engineering ManagementC.4.3.1
3.2.1.6.2Human Factors DesignC.4.3.2
3.2.1.6.3Early User Involvement EventsC.4.3.3
3.2.1.7Environmental, Occupational Safety and Health (EOSH)C.4.4
3.2.1.8Safety Program
3.2.1.8.1Safety Program ImplementationC.4.5 (a-b), C.4.5.1
3.2.1.8.2System Hazard AssessmentsC.4.5.2
3.2.1.8.3System Safety AssessmentC.4.5.3
3.2.1.8.4Hazard Tracking and Safety Control Verification TrackingC.4.5.4
3.2.1.9Reliability, Maintainability, and Availability (RMA)
3.2.1.9.1RMA Analysis and PredictionC.4.6 (a-b), C.4.6.1
3.2.1.9.2Reliability Centered MaintenanceC.4.6.2
3.2.1.9.3Failure Reporting, Analysis and Corrective Action SystemC.4.6.3
3.2.1.10Internet Protocol (IP) AddressingC.4.7
3.2.1.11System Security Authorization SupportC.4.8
3.2.1.12Hardware and Software Baseline Support ActivityC.4.11
3.2.2Engineering Changes
3.2.2.1APC System Analog Transport Engineering ChangeXX02b Implement Analog Transport Engineering Change (FFP)C.4.12.1
3.2.2.2APC System Local Legacy Radio-APC (LLR-APC) Engineering ChangeXX02c Implement LLR-APC Engineering Change (FFP)C.4.12.2
3.2.2.3APC System IPv6 Engineering ChangeXX02d Implement IPv6 Engineering Change (FFP)C.4.12.3
3.2.2.4APC Management Subsystem (APCMS) Server Engineering Change for Migration to Government Furnished Property (GFP) Server PlatformXX02e Implement Migration to GFP Server Platform Engineering Change (FFP)C.4.12.4
3.2.2.5APCMS Workstation Engineering Change for Migration to GFP Workstation PlatformXX02f Implement Migration to GFP Workstation Platform Engineering Change (FFP)C.4.12.5
3.2.2.6APCMS Engineering Change for Migration to GFP Network PlatformXX02g Implement Migration to GFP Network Platform Engineering Change (FFP)C.4.12.6
3.2.2.7Additional Engineering ChangesXX02h Implement Additional Engineering Changes (T&M)Various
3.2.2.8Engineering Change Proposal (ECP) PackagesXX02i Generate ECP Packages (T&M)C.4.9.5.3
3.2.3Configuration Management
3.2.3.1Configuration ManagementXX02j Configuration Management (FFP)C.4.9 (a), C.4.9.1, C.4.9.2, C.4.9.3, C.4.9.5 (Except C.4.9.5.3)
3.2.3.2Configuration AuditsXX02k Configuration Audits (FFP)C.4.9.6
3.2.4Quality ControlXX05a Quality Control Program (FFP)C.7
3.2.5European Organisation for Civil Aviation Equipment (EUROCAE) Document (ED)-137 Volume 1 Interoperability Activity SupportXX02m ED-137 Volume 1 Interoperability Activity Support (T&M)C.4.10
3.2.6FM DevelopmentXX03ah Faulted Modules (FM) - Development (FFP)C.5.9 (a)
3.3Program ManagementXX01a Program Management (FFP)C.3
3.4Test and Evaluation (T&E)
3.4.1Development Test
3.4.1.1T&E ManagementXX04a Test and Evaluation Management (FFP)C.6 (a), C.6.1, C.6.2, C.6.3
3.4.1.2Initial Factory Acceptance Test (iFAT)XX04b Initial Factory Acceptance Test (iFAT) (FFP)C.6.4, C.6.5, C.6.7, C.6.9 (a thru d), C.6.9.1, C.6.9.2, C.6.9.3, C.6.9.7, C.6.8 (a,e-p), C.6.9.11
3.4.1.3Factory Acceptance Test (FAT)XX04c Factory Acceptance Test (FAT) (T&M)C.6.4, C.6.5, C.6.7, C.6.9 (a thru d), C.6.9.1, C.6.9.2, C.6.9.4, C.6.9.7, C.6.8 (a,e-p), C.6.9.11
3.4.1.4Integration and Checkout (INCO)XX04d Integration and Checkout (INCO) (T&M)C.6.4, C.6.5, C.6.7, C.6.9 (a thru d), C.6.9.2, C.6.9.5, C.6.8 (a,e-p)
3.4.1.5System TestXX04e System Test (T&M)C.6.4, C.6.5, C.6.7, C.6.9 (a thru d), C.6.9.1, C.6.9.2, C.6.9.6, C.6.9.7, C.6.8 (a,e-p), C.6.9.11
3.4.1.6FAA-Conducted Test SupportXX04h FAA-Conducted Test Support (T&M)C.6.9 (d), C.6.8 (a,e-p), C.6.9.12
3.4.1.7Independent Stability and Reliability Demonstration (IS&RD)XX04i Conduct, and Develop and Deliver Independent Stability and Reliability Demonstration (FFP)C.6.5, C.6.9 (a-d), C.6.9.7, C.6.8 (a,e-p)
3.4.1.8AccreditationXX04k Accreditation (T&M)C.6.4, C.6.5, C.6.7, C.6.8 (a,e-p), C.6.9 (a thru d), C.6.9.1, C.6.9.2, C.6.9.10, C.6.9.11, C.6.10.1 (a), C.6.10.2
3.4.1.9Production Acceptance Test (PAT) ProceduresXX04f Develop and Deliver Contractor Test Procedures - PAT (T&M)C.6.4
3.4.1.10System Acceptance Test (SAT) ProceduresXX04g Develop and Deliver Contractor Test Procedures - SAT (T&M)C.6.4
3.4.1.11IS&RD Test ProceduresXX04j Develop and Deliver Test Procedures for Independent Stability and Reliability Demonstration (FFP)C.6.4
3.5Integrated Logistics Support (ILS)
3.5.1Maintenance Planning
3.5.1.1ILS ProgramXX06a Integrated Logistics Support (ILS) Program (FFP)C.8.1, C.8.2 (Except C.8.2.6, C.8.2.8 (c,f-o), C.8.2.8.1, C.8.2.8.2, C.8.2.9, C.8.2.10, C.8.2.12), C.8.3.1 (a-f), C.8.3.1.1, C.8.3.1.2, C.8.3.1.4
3.5.1.2Diminishing Manufacturing Sources/Material Shortages (DMS/MS)XX06b Diminishing Manufacturing Sources/Material Shortages (DMS/MS) (T&M)C.8.2.12
3.5.1.3Software Transition PlanXX06q Software Transition Plan (FFP)C.8.3.2
3.5.1.4Software Programmers ManualXX06r Software Programmers Manual (FFP)C.8.3.1 (a-c,e,f), C.8.3.1.3
3.5.3Support Equipment
3.5.3.1Validation Test System (VTS) Hardware and InstallationXX03a Validation Test System (VTS) - HW and Installation (FFP)C.5.1.1, C.5.1.2, C.8.2.9
3.5.3.2VTS APC Traffic Load Generator (ATLG) Hardware and InstallationXX03b Validation Test System (VTS) ATLG - HW and Installation (FFP)C.5.6, C.8.2.9, C.6.10.1 (b-d)
3.5.3.3iFAT/FAT System & Commercial-Off-The-Shelf (COTS)/Previously Developed Product (PDP) Traffic Load Generator (TLG) Hardware and InstallationXX03g iFAT System and COTS/PDP TLG - HW and Installation. (FFP)C.5.2.1, C.5.2.2, C.5.6, C.8.2.9
3.5.3.4Contractor Engineering Development System (CEDS) Hardware and InstallationXX03k Contractor Engineering Development System (CEDS) - HW and Installation (FFP)C.5.3.1, C.5.3.2, C.8.2.9
3.5.3.5Manual and Training Development System (MTDS) Hardware and InstallationXX03o Manual and Training Development System (MTDS) - HW and Installation (FFP)C.5.4.1, C.5.4.2, C.8.2.9
3.5.3.6System Test System (STS)/Operational Test and Evaluation (OT&E) System Hardware and InstallationXX03s System Test System (STS)/OT&E System - HW and Installation (FFP)C.5.5.1 (a), C.5.5.2 (a,c,e,g,i,j,k), C.8.2.9
3.5.3.7STS/OT&E ATLG Hardware and InstallationXX03t System Test System (STS)/OT&E System ATLG- HW and Installation (FFP)C.5.5.1(b), C.5.5.2 (b,d,f,h,i,j,k), C.5.6, C.8.2.9, C.6.10.1 (b-d)
3.5.3.8APC Traffic Load Generator (ATLG) Hardware and InstallationXX03y APC Traffic Load Generator (ATLG) - HW and Installation (T&M)C.5.6, C.8.2.9, C.6.10.1 (b-d)
3.5.3.9Environmental Test System (ETS) Hardware and InstallationXX03z Environmental Test System (ETS) - HW and Installation (FFP)C.5.7.1, C.5.7.2, C.8.2.9
3.5.3.10Preemption Test System (PTS) Hardware and InstallationXX03ad Preemption Test System (PTS) - HW and Installation (FFP)C.5.8.1, C.5.8.2, C.8.2.9
3.5.3.11Faulted Modules (FM) HardwareXX03ai Faulted Modules (FM) - HW (FFP)C.5.9 (b), C.8.2.9
3.5.5Training, Training Support, and Personnel Skills
3.5.5.1Establish Training ProgramXX06g Establish Training Program (FFP)C.8.4 (a-d), C.8.4.1
3.5.5.2APC System Familiarization Training Course DevelopmentXX06h APC System Familiarization Training - Development (T&M)C.8.4 (b,c,d), C.8.4.2
3.5.5.3ATLG Familiarization Training Course DevelopmentXX06j ATLG Familiarization Training - Development (T&M)C.8.4 (b,c,d), C.8.4.4
3.5.5.4Operations and Maintenance (O&M) Instructor-Led Course DevelopmentXX06l Operations and Maintenance Course - Instructor Led Development (T&M)C.8.4 (a-d), C.8.4.6
3.5.5.5O&M Web-Based Course DevelopmentXX06m Operations and Maintenance Course - Web Based Development (T&M)C.8.4 (a-d), C.8.4.7
3.5.5.6Second Level Engineering Course DevelopmentXX06o Technical Operations - Second Level Engineering Course - Development (T&M)C.8.4 (a-d), C.8.4.9
3.5.5.7On-the-Job Training (OJT) Course DevelopmentXX06s On the Job Training (OJT) (T&M)C.8.4 (a-d), C.8.4.11
3.5.5.8Performance Examination (PE) DevelopmentXX06t Performance Examination (PE) (T&M)C.8.4 (a-d), C.8.4.12
3.5.5.9APC System Familiarization Training Course ConductXX06i APC System Familiarization Training - Conduct (FFP)C.8.4.3
3.5.5.10ATLG Familiarization Training Course ConductXX06k ATLG Familiarization Training - Conduct (FFP)C.8.4.5
3.5.5.11O&M Course ConductXX06n Operations and Maintenance Course - Conduct (FFP)C.8.4.8
3.5.5.12Second Level Engineering Course ConductXX06p Technical Operations - Second Level Engineering Course - Conduct (FFP)C.8.4.10
3.5.6Production Spares HardwareXX09 Production Spares Hardware (FFP)C.8.2.6, C.8.2.9, C.9.2
3.5.8Escrow Account Maintenance and DeliveryXX02l Maintenance and Delivery of Escrow Account (FFP)C.4.9.4
3.7Implementation and Deployment
3.7.1Implementation Planning, Management, and ControlXX07a APC System Production and Deployment - Implementation Management (FFP)C.9.1, C.10.1, C.10.2 (d-f)
3.7.10Site Installation and Activation
3.7.10.nSite n (Specify) Installation and Activation
3.7.10.n.3Site n (Specify) Engineering and Preparation
3.7.10.n.3.1Site n (Specify) Site Installation PlanningXX07b Site Survey (FFP)C.10.2.1
3.7.10.n.3.2Site n (Specify) Supplemental Implementation SupportXX07j Supplemental Implementation Support (T&M)C.10.3
3.7.10.n.4Site n (Specify) Solution Installation and Checkout - Size 1-7
3.7.10.n.4.1Site n (Specify) Solution Installation and Checkout - Size 1-7XX07c - XX07i Site Installation - APC # of Interfaces XXX-XXX (Size X) (FFP)C.10.2 (a-c), C.10.2.2
3.7.10.n.4.2Site n (Specify) OCONUS Travel/ShippingXX12a OCONUS Travel/Shipping (T&M)Various
4APC System In-Service Management
4.224/7 Site Maintenance SupportXX06c Site Maintenance, 24/7 Support (T&M)C.8.5.1
4.7Integrated Logistics Support (ILS)
4.7.3Support Equipment Maintenance
4.7.3.1Support Equipment Maintenance Support
4.7.3.1.1VTS MaintenanceXX03d Validation Test System (VTS) - Maintenance Support (T&M)C.5.1.4
4.7.3.1.2iFAT/FAT System & ATLG MaintenanceXX03i iFAT/FAT System and ATLG - System Maintenance (T&M)C.5.2.4
4.7.3.1.3CEDS MaintenanceXX03m Contractor Engineering Development System (CEDS) - System Maintenance (T&M)C.5.3.4
4.7.3.1.4MTDS MaintenanceXX03q Manual and Training Development System (MTDS) - System Maintenance (T&M)C.5.4.4
4.7.3.1.5STS/OT&E and ATLG MaintenanceXX03v System Test System (STS)/OT&E System and ATLG - System Maintenance (T&M)C.5.5.4
4.7.3.1.6ETS MaintenanceXX03ab Environmental Test System (ETS) - System Maintenance (T&M)C.5.7.4
4.7.3.1.7PTS MaintenanceXX03af Preemption Test System (PTS) - System Maintenance (T&M)C.5.8.4
4.7.3.2Support Equipment Maintenance Extended Warranty
4.7.3.2.1VTS Extended WarrantyXX03e Validation Test System (VTS) - Extended Warranty (FFP)C.8.2.10
4.7.3.2.2VTS ATLG Extended WarrantyXX03f Validation Test System (VTS) ATLG - Extended Warranty (FFP)C.8.2.10
4.7.3.2.3iFAT/FAT System & ATLG Extended WarrantyXX03j iFAT/FAT System and ATLG - Extended Warranty (FFP)C.8.2.10
4.7.3.2.4CEDS Extended WarrantyXX03n Contractor Engineering Development System (CEDS) - Extended Warranty (FFP)C.8.2.10
4.7.3.2.5MTDS Extended WarrantyXX03r Manual and Training Development System (MTDS) - Extended Warranty (FFP)C.8.2.10
4.7.3.2.6STS/OT&E Extended WarrantyXX03w System Test System (STS)/OT&E System - Extended Warranty (FFP)C.8.2.10
4.7.3.2.7STS/OT&E ATLG Extended WarrantyXX03x System Test System (STS)/OT&E System ATLG - Extended Warranty (FFP)C.8.2.10
4.7.3.2.8ETS Extended WarrantyXX03ac Environmental Test System (ETS) - Extended Warranty (FFP)C.8.2.10
4.7.3.2.9PTS Extended WarrantyXX03ag Preemption Test System (PTS) - Extended Warranty (FFP)C.8.2.10
4.7.3.2.10FM Extended WarrantyXX03aj Faulted Modules (FM) - Extended Warranty (FFP)C.8.2.10
4.7.6Supply Support
4.7.6.1Contractor Depot Logistics Support (CDLS)XX11a Contractor Depot Logistics Support (CDLS) (T&M)C.8.2.8 (except a,b,d,e)
4.7.6.2Keysite APC System Extended WarrantyXX06f APC System Extended Warranty - Keysite (FFP)C.8.2.10
4.8Second Level Engineering
4.8.2National Airspace System (NAS) Field Support and Restoration
4.8.2.1On-Site Support to FAA Second Level EngineeringXX06d On-Site Support to FAA Second Level Engineering (T&M)C.8.5.2 (b)
4.8.2.224/7 Telephone Support to FAA Second Level EngineeringXX06e 24/7 Telephone Support (T&M)C.8.5.2 (a)
4.14Sustain Operational Service
4.14.1VTS Updates/UpgradesXX03c Validation Test System (VTS) - Updates and Upgrades (T&M)C.5.1.3
4.14.2iFAT/FAT System & ATLG Updates/UpgradesXX03h iFAT/FAT System and ATLG - Updates and Upgrades (T&M)C.5.2.3
4.14.3CEDS Updates/UpgradesXX03l Contractor Engineering Development System (CEDS) - Updates and Upgrades (T&M)C.5.3.3
4.14.4MTDS Updates/UpgradesXX03p Manual and Training Development System (MTDS) - Updates and Upgrades (T&M)C.5.4.3
4.14.5STS/OT&E and ATLG Updates/UpgradesXX03u System Test System (STS)/OT&E System and ATLG - Updates and Upgrades (T&M)C.5.5.3
4.14.6ETS Updates/UpgradesXX03aa Environmental Test System (ETS) - Updates and Upgrades (T&M)C.5.7.3
4.14.7PTS Updates/UpgradesXX03ae Preemption Test System (PTS) - Updates and Upgrades (T&M)C.5.8.3

&"Times New Roman,Bold"&14 APC CWBS Index and Dictionary

&P

File details come from the government source that posted it. Updated .