APC-TES002 Test Procedures (CTP) Amend 5.docx

DOCX document 34 KB Posted

Attached to
National Airspace System (NAS) A/G Protocol Converter (APC) System Federal contract opportunity
Solicitation number
693KA8-22-R-00004
Issued by
Department of Transportation Federal Aviation Administration Headquarters

View the file

Other files for this federal contract opportunity

Other files attached to National Airspace System (NAS) A/G Protocol Converter (APC) System, newest first.
File Type Posted
APC-CMP001 Configuration Management Plan (CMP) Amend 6.docx DOCX document
APC-SW007 Software Configuration Management Plan (SCMP) Amend 6.docx DOCX document
APCS SIR Sect J Att J.1.4 Amend 6.docx DOCX document
APCS SIR Sect L Amend 6.docx DOCX document
APCS SIR Sect L Att L.4 Amend 5.xlsx XLSX spreadsheet
APCS SIR Sect M Amend 5.docx DOCX document
APC-TES004 Contractor Test Reports (CTR) Amend 5.docx DOCX document
APC SIR 693KA8-22-R-00004_Amendment_0005_20230125.pdf PDF
APCS SIR Sect L Amend 5.docx DOCX document
APCS SIR Sect M Amend 4.docx DOCX document
APC SIR 693KA8-22-R-00004_Amendment 0004_20221130.pdf PDF
APCS SIR Sect C Amend 3.docx DOCX document
APCS SIR Sect L Att L.14 Amend 3.xlsx XLSX spreadsheet
APCS SIR Sect B Att A Amend 3.xlsx XLSX spreadsheet
APCS SIR Sect J Att J.1.4 Amend 3.docx DOCX document
APCS SIR Sect J Att J.8.2 Amend 3.xlsx XLSX spreadsheet
APCS SIR Sect L Amend 3.docx DOCX document
APCS SIR Sect L Att L.8 Amend 3.xlsx XLSX spreadsheet
693KA8-22-R-00004_Amendment 0003_20221122.pdf PDF
APCS SIR Sect B Amend 3.docx DOCX document
APCS SIR Sect E Amend 3.docx DOCX document
APCS SIR Sect F Amend 3.docx DOCX document
APCS SIR Sect J Att J.1.1 Amend 3.docx DOCX document
APCS SIR Sect M Amend 3.docx DOCX document
693KA8-22-R-00004_Amendment 0002 20221021.pdf PDF
APCS SIR Sect J Att J.3.1 Amend 2.docx DOCX document
APCS SIR Sect M Amend 2.docx DOCX document
APCS SIR Sect C Amend 1.docx DOCX document
APCS SIR Sect I Amend 1.docx DOCX document
APCS SIR Sect J Att J.1.4 Amend 1.docx DOCX document
APCS SIR Sect L Amend 1.docx DOCX document
APCS SIR Sect L Att L.8 Amend 1.xlsx XLSX spreadsheet
693KA8-22-R-00004_Amendment 0001 20220927.pdf PDF
APCS SIR Sect J Att J.1.1 Amend 1.docx DOCX document
APCS SIR Sect L Att L.6 Amend 1.docx DOCX document
APCS SIR Sect B Att A Amend 1.xlsx XLSX spreadsheet
SF33_693KA8-22-R-00004.pdf PDF
APCS SIR Sect C.docx DOCX document
APCS SIR Sect G.docx DOCX document
APCS SIR Sect H.docx DOCX document
APCS SIR Sect D.docx DOCX document
APCS SIR Sect E.docx DOCX document
APCS SIR Sect J.zip ZIP file
APCS SIR Sect L.zip ZIP file
APCS SIR Sect B.zip ZIP file
APCS SIR Sect F.docx DOCX document
APCS SIR Sect I.docx DOCX document
APCS SIR Sect K.docx DOCX document
APCS SIR Sect M.docx DOCX document
FAA NAS VoICE Public Notices.docx DOCX document
Show all 50

National Airspace System (NAS) A/G Protocol Converter (APC) System has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

693KA8-22-R-00004Part III – List of Documents, Exhibits, and Other Attachments
Amendment 5Section J.4, VoICE APC System CDRLS and DIDs

SIR 693KA8-21-RFI-XXXX

Section J4 – CDRLs and DIDs

CONTRACT DATA REQUIREMENTS LIST (CDRL)

1. CDRL #

APC-TES002

2. Title

Contractor Test Procedure(s) – iFAT, FAT, PAT, SAT, System Test, Accreditation Test(s)

6. Requiring Office

FAA

10. Frequency

ASREQ

12. First Submission

Block 16

14. Distribution

COR

CO

0/1

LT

4. DID #

TES002

5. Contract Reference

J.1.8 VoICE APC System Test and Evaluation Requirements - 2.2 Contractor Test Procedures (CTP) 7.

8. Approval Code

A
9.
11.
13. Subsequent Submission

Block 16

16. REMARKS:

Block 12: First Submission

· The Contractor must deliver iFAT test procedures within 15 business days after initial SRR (iSRR), unless otherwise specified by the FAA.

· The Contractor must deliver FAT test procedures within 20 business days after CMTP approval, unless otherwise specified by the FAA.

· The Contractor must deliver System test procedures within 20 business days after FAT test procedure(s) approval, unless otherwise specified by the FAA.

· The Contractor must deliver PAT test procedures within 20 business days after System test procedure(s) approval, unless otherwise specified by the FAA.

· The Contractor must deliver SAT test procedures within 20 business days after PAT test procedure(s) approval, unless otherwise specified by the FAA.

Block 13: Subsequent Submission

· Subsequent submissions are done until approval is received.

· CTPs are updated as necessary for regression testing.

Block 14, 15: CO Letter of Transmittal only

15. TOTAL 0/1

693KA8-22-R-00004Part III – List of Documents, Exhibits, and Other Attachments
Amendment 5Section J.4, VoICE APC System CDRLS and DIDs

DATA ITEM DESCRIPTION

1. CDRL TITLE

Contractor Test Procedure(s) – iFAT, FAT, PAT, SAT, System Test, Accreditation Test(s)

2. CDRL NUMBER

TES-002

3. DESCRIPTION/PURPOSE

This document provides the criteria by which each Contractor Test Procedure must be prepared. These criteria apply to the test procedures developed for Initial Factory Acceptance Test (iFAT), Factory Acceptance Test (FAT), Production Acceptance Test (PAT), Site Acceptance Test (SAT), System Test, and Accreditation Test(s) unless otherwise specified.

NOTE: The Contractor may deliver Initial FAT (iFAT) procedures in the original Contractor format.

4. DATA REQUIREMENTS

Reference:

J.1.8 VoICE APC System Test and Evaluation Requirements - 2.2 Contractor Test Procedures (CTP)

General:

All Contractor Test Procedure(s) must contain step-by-step instructions and the background information needed to conduct a specific test run or set of test runs. The procedures must contain test steps, which provide instructions for specific operator actions with associated expected results for each action. Data and information applicable to all test procedures must be documented as Front Matter to the Contractor Test Procedure(s).

The Contractor must deliver iFAT test procedures within 15 business days after initial SRR (iSRR), unless otherwise specified by the FAA.

The Contractor must deliver FAT test procedures within 20 business days after CMTP approval, unless otherwise specified by the FAA.

The Contractor must deliver System test procedures within 20 business days after FAT test procedure(s) approval, unless otherwise specified by the FAA.

The Contractor must deliver PAT test procedures within 20 business days after System test procedure(s) approval, unless otherwise specified by the FAA.

The Contractor must deliver SAT test procedures within 20 business days after PAT test procedure(s) approval, unless otherwise specified by the FAA.

Production Acceptance Test (PAT) Procedures must also include the detailed in-plant procedures that the Contractor will use to demonstrate that each system coming off the production line is operational, and functions in accordance with the Specification.

Site Acceptance Test (SAT) Procedures must also include the detailed procedures and background information required for the conduct of the site acceptance test at each site. The SAT Procedures must demonstrate that the system is operational, functions in accordance with the Specification, and is installed in accordance with the SIP.

Content:

Each set of Contractor Test Procedures must include overall introductory/general information prepared in accordance with the Front Matter Template TES-002-ATT2 included as Attachment 2.

For each set of Contractor Test Procedures, individual test procedures must be prepared in accordance with the CTP Template TES-002-ATT1 included as Attachment 1.

Format:

The Contractor must deliver Contractor Test Procedures in a Government approved electronic format (e.g., Microsoft Windows/Office Suite of products, etc.). The Contractor Test Procedures must be delivered without restrictive legends and software that would limit the Government’s ability to copy/reproduce and edit/modify the Contractor Test Procedures using the electronic version.

The Contractor Test Procedure(s) must identify the applicable test phase that the document is being prepared for (e.g., Contractor Test Procedure – FAT, Contractor Test Procedure – SAT, Contractor Test Procedure – PAT, Contractor Test Procedure – System Test, Contractor Test Procedure – Accreditation Test, etc.).

Revisions to the Contractor Test Procedure(s) must be delivered in a Government approved electronic format with changes clearly displayed (e.g., Microsoft Word with Changes Tracked).