| B. | PRICING SCHEDULE | 2 |
| B.1. | Brief Description of Services | 2 |
| B.2. | Contract Type | 2 |
| B.3. | Ceiling Value | 2 |
| B.4. | Overview of Pricing Schedules | 2 |
| B.4.1. | Contract Line Item Numbers (CLINs) Summary | 2 |
| B.4.2. | Pricing Schedule Attachments | 7 |
| B.4.3. | Pricing Terms | 7 |
| 693KA8-22-00004 | Part I – The Schedule |
| Amendment 3 | Section B – Pricing Schedule |
B-9
PRICING SCHEDULE
Brief Description of Services This contract provides for the design, development, test, implementation, and maintenance of Air-to-Ground Protocol Converters (APC) Systems, including services for program management, systems engineering, testing, and logistics. Specific tasks are set forth in Section C.
Contract Type This is an Indefinite Delivery/Indefinite Quantity (IDIQ) hybrid contract with firm-fixed price (FFP) and time and materials (T&M) Contract Line Item Numbers (CLINs).
Ceiling Value The ceiling value for this contract is $ [insert at time of award].
Overview of Pricing Schedules Contract Line Item Numbers (CLINs) Summary The maximum duration for this contract is twenty (20) years, if all options are exercised. The contract CLINs by contract period are as follows:
| CLIN |
| CLIN Description |
| Not-to-Exceed (NTE) Value |
Base Period Requirements
| 0001a |
| Program Management |
| $ [insert at time of award] |
| 0002a – 0002m |
| Engineering |
| $ [insert at time of award] |
| 0003a – 0003aj |
| Support Systems |
| $ [insert at time of award] |
| 0004a – 0004k |
| Test and Evaluation |
| $ [insert at time of award] |
| 0005a |
| Quality Control |
| $ [insert at time of award] |
| 0006a – 0006t |
| Integrated Logistics Support |
| $ [insert at time of award] |
| 0007a – 0007j |
| Deployment & Implementation |
| $ [insert at time of award] |
| 0008a – 0008(tbd) |
| Production Systems Hardware |
| $ [insert at time of award] |
| 0009a – 0009(tbd) |
| Production Spares Hardware |
| $ [insert at time of award] |
| 0010a – 0010dg |
| Labor Categories |
| Not Separately Priced (NSP) |
| 0011a |
| Contractor Depot Logistics Support (CDLS) |
| $ [insert at time of award] |
| 0012a |
| OCONUS Travel/Shipping |
| $ [insert at time of award] |
| Base Period Total NTE Value |
| $ [insert at time of award] |
| CLIN |
| CLIN Description |
| Not-to-Exceed (NTE) Value |
Option Period 1 Requirements
| 0101a |
| Program Management |
| $ [insert at time of award] |
| 0102a – 0102m |
| Engineering |
| $ [insert at time of award] |
| 0103a – 0103aj |
| Support Systems |
| $ [insert at time of award] |
| 0104a – 0104k |
| Test and Evaluation |
| $ [insert at time of award] |
| 0105a |
| Quality Control |
| $ [insert at time of award] |
| 0106a – 0106t |
| Integrated Logistics Support |
| $ [insert at time of award] |
| 0107a – 0107j |
| Deployment & Implementation |
| $ [insert at time of award] |
| 0108a – 0108(tbd) |
| Production Systems Hardware |
| $ [insert at time of award] |
| 0109a – 0109(tbd) |
| Production Spares Hardware |
| $ [insert at time of award] |
| 0110a – 0110dg |
| Labor Categories |
| NSP |
| 0111a |
| Contractor Depot Logistics Support (CDLS) |
| $ [insert at time of award] |
| 0112a |
| OCONUS Travel/Shipping |
| $ [insert at time of award] |
| Option Period 1 Total NTE Value |
| $ [insert at time of award] |
| CLIN |
| CLIN Description |
| Not-to-Exceed (NTE) Value |
Option Period 2 Requirements
| 0201a |
| Program Management |
| $ [insert at time of award] |
| 0202a – 0202m |
| Engineering |
| $ [insert at time of award] |
| 0203a – 0203aj |
| Support Systems |
| $ [insert at time of award] |
| 0204a – 0204k |
| Test and Evaluation |
| $ [insert at time of award] |
| 0205a |
| Quality Control |
| $ [insert at time of award] |
| 0206a – 0206t |
| Integrated Logistics Support |
| $ [insert at time of award] |
| 0207a – 0207j |
| Deployment & Implementation |
| $ [insert at time of award] |
| 0208a – 0208(tbd) |
| Production Systems Hardware |
| $ [insert at time of award] |
| 0209a – 0209(tbd) |
| Production Spares Hardware |
| $ [insert at time of award] |
| 0210a – 0210dg |
| Labor Categories |
| NSP |
| 0211a |
| Contractor Depot Logistics Support (CDLS) |
| $ [insert at time of award] |
| 0212a |
| OCONUS Travel/Shipping |
| $ [insert at time of award] |
| Option Period 2 Total NTE Value |
| $ [insert at time of award] |
| CLIN |
| CLIN Description |
| Not-to-Exceed (NTE) Value |
Option Period 3 Requirements
| 0301a |
| Program Management |
| $ [insert at time of award] |
| 0302a – 0302m |
| Engineering |
| $ [insert at time of award] |
| 0303a – 0303aj |
| Support Systems |
| $ [insert at time of award] |
| 0304a – 0304k |
| Test and Evaluation |
| $ [insert at time of award] |
| 0305a |
| Quality Control |
| $ [insert at time of award] |
| 0306a – 0306t |
| Integrated Logistics Support |
| $ [insert at time of award] |
| 0307a – 0307j |
| Deployment & Implementation |
| $ [insert at time of award] |
| 0308a – 0308(tbd) |
| Production Systems Hardware |
| $ [insert at time of award] |
| 0309a – 0309(tbd) |
| Production Spares Hardware |
| $ [insert at time of award] |
| 0310a – 0310dg |
| Labor Categories |
| NSP |
| 0311a |
| Contractor Depot Logistics Support (CDLS) |
| $ [insert at time of award] |
| 0312a |
| OCONUS Travel/Shipping |
| $ [insert at time of award] |
| Option Period 3 Total NTE Value |
| $ [insert at time of award] |
| CLIN |
| CLIN Description |
| Not-to-Exceed (NTE) Value |
Option Period 4 Requirements
| 0401a |
| Program Management |
| $ [insert at time of award] |
| 0402a – 0402m |
| Engineering |
| $ [insert at time of award] |
| 0403a – 0403aj |
| Support Systems |
| $ [insert at time of award] |
| 0404a – 0404k |
| Test and Evaluation |
| $ [insert at time of award] |
| 0405a |
| Quality Control |
| $ [insert at time of award] |
| 0406a – 0406t |
| Integrated Logistics Support |
| $ [insert at time of award] |
| 0407a – 0407j |
| Deployment & Implementation |
| $ [insert at time of award] |
| 0408a – 0408(tbd) |
| Production Systems Hardware |
| $ [insert at time of award] |
| 0409a – 0409(tbd) |
| Production Spares Hardware |
| $ [insert at time of award] |
| 0410a – 0410dg |
| Labor Categories |
| NSP |
| 0411a |
| Contractor Depot Logistics Support (CDLS) |
| $ [insert at time of award] |
| 0412a |
| OCONUS Travel/Shipping |
| $ [insert at time of award] |
| Option Period 4 Total NTE Value |
| $ [insert at time of award] |
| CLIN |
| CLIN Description |
| Not-to-Exceed (NTE) Value |
Option Period 5 Requirements
| 0501a |
| Program Management |
| $ [insert at time of award] |
| 0502a – 0502m |
| Engineering |
| $ [insert at time of award] |
| 0503a – 0503aj |
| Support Systems |
| $ [insert at time of award] |
| 0504a – 0504k |
| Test and Evaluation |
| $ [insert at time of award] |
| 0505a |
| Quality Control |
| $ [insert at time of award] |
| 0506a – 0506t |
| Integrated Logistics Support |
| $ [insert at time of award] |
| 0507a – 0507j |
| Deployment & Implementation |
| $ [insert at time of award] |
| 0508a – 0508(tbd) |
| Production Systems Hardware |
| $ [insert at time of award] |
| 0509a – 0509(tbd) |
| Production Spares Hardware |
| $ [insert at time of award] |
| 0510a – 0510dg |
| Labor Categories |
| NSP |
| 0511a |
| Contractor Depot Logistics Support (CDLS) |
| $ [insert at time of award] |
| 0512a |
| OCONUS Travel/Shipping |
| $ [insert at time of award] |
| Option Period 5 Total NTE Value |
| $ [insert at time of award] |
| CLIN |
| CLIN Description |
| Not-to-Exceed (NTE) Value |
Option Period 6 Requirements
| 0601a |
| Program Management |
| $ [insert at time of award] |
| 0602a – 0602m |
| Engineering |
| $ [insert at time of award] |
| 0603a – 0603aj |
| Support Systems |
| $ [insert at time of award] |
| 0604a – 0604k |
| Test and Evaluation |
| $ [insert at time of award] |
| 0605a |
| Quality Control |
| $ [insert at time of award] |
| 0606a – 0606t |
| Integrated Logistics Support |
| $ [insert at time of award] |
| 0607a – 0607j |
| Deployment & Implementation |
| $ [insert at time of award] |
| 0608a – 0608(tbd) |
| Production Systems Hardware |
| $ [insert at time of award] |
| 0609a – 0609(tbd) |
| Production Spares Hardware |
| $ [insert at time of award] |
| 0610a – 0610dg |
| Labor Categories |
| NSP |
| 0611a |
| Contractor Depot Logistics Support (CDLS) |
| $ [insert at time of award] |
| 0612a |
| OCONUS Travel/Shipping |
| $ [insert at time of award] |
| Option Period 6 Total NTE Value |
| $ [insert at time of award] |
| CLIN |
| CLIN Description |
| Not-to-Exceed (NTE) Value |
Option Period 7 Requirements
| 0701a |
| Program Management |
| $ [insert at time of award] |
| 0702a – 0702m |
| Engineering |
| $ [insert at time of award] |
| 0703a – 0703aj |
| Support Systems |
| $ [insert at time of award] |
| 0704a – 0704k |
| Test and Evaluation |
| $ [insert at time of award] |
| 0705a |
| Quality Control |
| $ [insert at time of award] |
| 0706a – 0706t |
| Integrated Logistics Support |
| $ [insert at time of award] |
| 0707a – 0707j |
| Deployment & Implementation |
| $ [insert at time of award] |
| 0708a – 0708(tbd) |
| Production Systems Hardware |
| $ [insert at time of award] |
| 0709a – 0709(tbd) |
| Production Spares Hardware |
| $ [insert at time of award] |
| 0710a – 0710dg |
| Labor Categories |
| NSP |
| 0711a |
| Contractor Depot Logistics Support (CDLS) |
| $ [insert at time of award] |
| 0712a |
| OCONUS Travel/Shipping |
| $ [insert at time of award] |
| Option Period 7 Total NTE Value |
| $ [insert at time of award] |
| CLIN |
| CLIN Description |
| Not-to-Exceed (NTE) Value |
Option Period 8 Requirements
| 0801a |
| Program Management |
| $ [insert at time of award] |
| 0802a – 0802m |
| Engineering |
| $ [insert at time of award] |
| 0803a – 0803aj |
| Support Systems |
| $ [insert at time of award] |
| 0804a – 0804k |
| Test and Evaluation |
| $ [insert at time of award] |
| 0805a |
| Quality Control |
| $ [insert at time of award] |
| 0806a – 0806t |
| Integrated Logistics Support |
| $ [insert at time of award] |
| 0807a – 0807j |
| Deployment & Implementation |
| $ [insert at time of award] |
| 0808a – 0808(tbd) |
| Production Systems Hardware |
| $ [insert at time of award] |
| 0809a – 0809(tbd) |
| Production Spares Hardware |
| $ [insert at time of award] |
| 0810a – 0810dg |
| Labor Categories |
| $ [insert at time of award] |
| 0811a |
| Contractor Depot Logistics Support (CDLS) |
| $ [insert at time of award] |
| 0812a |
| OCONUS Travel/Shipping |
| $ [insert at time of award] |
| Option Period 8 Total NTE Value |
| $ [insert at time of award] |
| CLIN |
| CLIN Description |
| Not-to-Exceed (NTE) Value |
Option Period 9 Requirements
| 0901a |
| Program Management |
| $ [insert at time of award] |
| 0902a – 0902m |
| Engineering |
| $ [insert at time of award] |
| 0903a – 0903aj |
| Support Systems |
| $ [insert at time of award] |
| 0904a – 0904k |
| Test and Evaluation |
| $ [insert at time of award] |
| 0905a |
| Quality Control |
| $ [insert at time of award] |
| 0906a – 0906t |
| Integrated Logistics Support |
| $ [insert at time of award] |
| 0907a – 0907j |
| Deployment & Implementation |
| $ [insert at time of award] |
| 0908a – 0908(tbd) |
| Production Systems Hardware |
| $ [insert at time of award] |
| 0909a – 0909(tbd) |
| Production Spares Hardware |
| $ [insert at time of award] |
| 0910a – 0910dg |
| Labor Categories |
| NSP |
| 0911a |
| Contractor Depot Logistics Support (CDLS) |
| $ [insert at time of award] |
| 0912a |
| OCONUS Travel/Shipping |
| $ [insert at time of award] |
| Option Period 9 Total NTE Value |
| $ [insert at time of award] |
| CLIN |
| CLIN Description |
| Not-to-Exceed (NTE) Value |
Option Period 10 Requirements
| 1001a |
| Program Management |
| $ [insert at time of award] |
| 1002a – 1002m |
| Engineering |
| $ [insert at time of award] |
| 1003a – 1003aj |
| Support Systems |
| $ [insert at time of award] |
| 1004a – 1004k |
| Test and Evaluation |
| $ [insert at time of award] |
| 1005a |
| Quality Control |
| $ [insert at time of award] |
| 1006a – 1006t |
| Integrated Logistics Support |
| $ [insert at time of award] |
| 1007a – 1007j |
| Deployment & Implementation |
| $ [insert at time of award] |
| 1008a – 1008(tbd) |
| Production Systems Hardware |
| $ [insert at time of award] |
| 1009a – 1009(tbd) |
| Production Spares Hardware |
| $ [insert at time of award] |
| 1010a – 1010dg |
| Labor Categories |
| NSP |
| 1011a |
| Contractor Depot Logistics Support (CDLS) |
| $ [insert at time of award] |
| 1012a |
| OCONUS Travel/Shipping |
| $ [insert at time of award] |
| Option Period 10 Total NTE Value |
| $ [insert at time of award] |
| CLIN |
| CLIN Description |
| Not-to-Exceed (NTE) Value |
Option Period 11 Requirements
| 1101a |
| Program Management |
| $ [insert at time of award] |
| 1102a – 1102m |
| Engineering |
| $ [insert at time of award] |
| 1103a – 1103aj |
| Support Systems |
| $ [insert at time of award] |
| 1104a – 1104k |
| Test and Evaluation |
| $ [insert at time of award] |
| 1105a |
| Quality Control |
| $ [insert at time of award] |
| 1106a – 1106t |
| Integrated Logistics Support |
| $ [insert at time of award] |
| 1107a – 1107j |
| Deployment & Implementation |
| $ [insert at time of award] |
| 1108a – 1108(tbd) |
| Production Systems Hardware |
| $ [insert at time of award] |
| 1109a – 1109(tbd) |
| Production Spares Hardware |
| $ [insert at time of award] |
| 1110a – 1110dg |
| Labor Categories |
| NSP |
| 1111a |
| Contractor Depot Logistics Support (CDLS) |
| $ [insert at time of award] |
| 1112a |
| OCONUS Travel/Shipping |
| $ [insert at time of award] |
| Option Period 11 Total NTE Value |
| $ [insert at time of award] |
| CLIN |
| CLIN Description |
| Not-to-Exceed (NTE) Value |
Option Period 12 Requirements
| 1201a |
| Program Management |
| $ [insert at time of award] |
| 1202a – 1202m |
| Engineering |
| $ [insert at time of award] |
| 1203a – 1203aj |
| Support Systems |
| $ [insert at time of award] |
| 1204a – 1204k |
| Test and Evaluation |
| $ [insert at time of award] |
| 1205a |
| Quality Control |
| $ [insert at time of award] |
| 1206a – 1206t |
| Integrated Logistics Support |
| $ [insert at time of award] |
| 1207a – 1207j |
| Deployment & Implementation |
| $ [insert at time of award] |
| 1208a – 1208(tbd) |
| Production Systems Hardware |
| $ [insert at time of award] |
| 1209a – 1209(tbd) |
| Production Spares Hardware |
| $ [insert at time of award] |
| 1210a – 1210dg |
| Labor Categories |
| NSP |
| 1211a |
| Contractor Depot Logistics Support (CDLS) |
| $ [insert at time of award] |
| 1212a |
| OCONUS Travel/Shipping |
| $ [insert at time of award] |
| Option Period 12 Total NTE Value |
| $ [insert at time of award] |
| CLIN |
| CLIN Description |
| Not-to-Exceed (NTE) Value |
Option Period 13 Requirements
| 1301a |
| Program Management |
| $ [insert at time of award] |
| 1302a – 1302m |
| Engineering |
| $ [insert at time of award] |
| 1303a – 1303aj |
| Support Systems |
| $ [insert at time of award] |
| 1304a – 1304k |
| Test and Evaluation |
| $ [insert at time of award] |
| 1305a |
| Quality Control |
| $ [insert at time of award] |
| 1306a – 1306t |
| Integrated Logistics Support |
| $ [insert at time of award] |
| 1307a – 1307j |
| Deployment & Implementation |
| $ [insert at time of award] |
| 1308a – 1308(tbd) |
| Production Systems Hardware |
| $ [insert at time of award] |
| 1309a – 1309(tbd) |
| Production Spares Hardware |
| $ [insert at time of award] |
| 1310a – 1310dg |
| Labor Categories |
| NSP |
| 1311a |
| Contractor Depot Logistics Support (CDLS) |
| $ [insert at time of award] |
| 1312a |
| OCONUS Travel/Shipping |
| $ [insert at time of award] |
| Option Period 13 Total NTE Value |
| $ [insert at time of award] |
| Base & All Option Periods Total NTE Value |
| $ [insert at time of award] |
Pricing Schedule Attachments Section B includes three attachments: Attachment A – Pricing Tables, Attachment B – Hardware Information, and Attachment C – Support Services Basis of Estimate (BOE)
1. Attachment A – Pricing Tables contains the CLIN pricing schedule for each contract period, including SOW and FAA WBS references, CLIN Type, Quantities, Units, Unit Price, and Total/Ceiling Value. For any CLINs with an unspecified quantity in the Pricing Tables, the associated minimum and maximum quantities to be ordered on the contract are provided in Sections B.4.3.1 and B.4.3.2.
2. Attachment B – Hardware Information contains the hardware ordering rules and basis of estimate information for CLINs XX08 Production System Hardware and XX09 Production Spares Hardware. The hardware ordering rules describe the criteria for determining how many of each component is required to assemble and configure a system as well as identify any CLIN interdependencies, IAW the Contractor’s system architecture. The FAA reserves the right to order any combination of production system hardware CLINs to accommodate any one of its facilities so long as it is IAW the established hardware ordering rules incorporated at contract award.
3. Attachment C - Support Services BOE contains supporting details to substantiate the Contractor’s CLIN pricing for all CLINs except XX08 and XX09. This includes but is not limited to direct labor, travel, shipping, materials, other direct costs (ODCs), overall ground rules & assumptions and estimating methodologies.
Pricing Terms Support Services CLINs
1. Support Services CLINs refers to all CLINs with the exception of XX08 Production System Hardware and XX09 Production Spares Hardware.
1. The pricing for a FFP Support Services CLIN must encompass the full scope of the Contractor’s efforts to perform the required functions described under the corresponding paragraph(s) of the SOW. This includes but is not limited to direct labor, shipping, travel, and other direct costs (ODCs). The only exception to this is noted below in Section B.4.3.4.
1. Certain Support Services CLINs will be ordered on IDIQ basis. The associated minimum and maximum quantities to be ordered on the contract are as follows:
| CLIN |
| Category Description |
| Minimum Quantity |
| Maximum Quantity |
| XX03e |
| Validation Test System (VTS) – Extended Warranty |
| [insert at time of award] |
| [insert at time of award] |
| XX03f |
| Validation Test System (VTS) ATLG – Extended Warranty |
| [insert at time of award] |
| [insert at time of award] |
| XX03j |
| iFAT/FAT System and ATLG - Extended Warranty |
| [insert at time of award] |
| [insert at time of award] |
| XX03n |
| Contractor Engineering Development System (CEDS) - Extended Warranty |
| [insert at time of award] |
| [insert at time of award] |
| XX03r |
| Manual and Training Development System (MTDS) - Extended Warranty |
| [insert at time of award] |
| [insert at time of award] |
| XX03w |
| System Test System (STS)/OT&E System - Extended Warranty |
| [insert at time of award] |
| [insert at time of award] |
| XX03x |
| System Test System (STS)/OT&E System ATLG – Extended Warranty |
| [insert at time of award] |
| [insert at time of award] |
| XX03ac |
| Environmental Test System (ETS) – Extended Warranty |
| [insert at time of award] |
| [insert at time of award] |
| XX03ag |
| Preemption Test System (PTS) – Extended Warranty |
| [insert at time of award] |
| [insert at time of award] |
| XX03ai |
| Faulted Modules – HW |
| 1 |
| 50 |
| XX03aj |
| Faulted Modules – Extended Warranty |
| [insert at time of award] |
| [insert at time of award] |
| XX04i |
| Conduct, and Develop and Deliver Independent Stability and Reliability Demonstration |
| 1 |
| 5 |
| XX06f |
| APC System Extended Warranty – Key Site |
| 0 |
| 36 |
| XX06i |
| APC System Familiarization Training - Conduct |
| 0 |
| 180 |
| XX06k |
| ATLG Familiarization Training – Conduct |
| 0 |
| 140 |
| XX06n |
| Operations and Maintenance Course - Conduct |
| 0 |
| [insert at time of award] |
| XX06p |
| Technical Operations – Second Level Engineering Course - Conduct |
| 0 |
| 140 |
| XX07c – XX07h |
| Site Installation |
| 1 |
| 298 |
Hardware CLINs
1. The pricing for all hardware CLINs must include all related and ancillary items (e.g., power cords, connectors, software license, and configuration settings) for the hardware to be fully functional and operate in accordance with the APC System contract requirements.
1. Certain Hardware CLINs will be ordered on an IDIQ basis. The associated minimum and maximum quantities to be ordered on this contract are as follows:
| CLIN |
| Category Description |
| Minimum Quantity |
| Maximum Quantity |
| XX08 |
| Production System Hardware |
| [insert at time of award] |
| [insert at time of award] |
| XX09 |
| Production Spares Hardware |
| [insert at time of award] |
| [insert at time of award] |
1. The FAA will not be obligated to place any orders of the Production System Hardware CLINs or Production Spares Hardware CLINs unless System Test is successfully completed. Minimum quantities reflect the minimum amount of hardware needed to support contract activities through the completion of System Test and are based on the ordering rules, ground rules and assumptions contained within Section B Attachment B – Hardware Information.
1. All hardware must be IPv4 and IPv6 compatible. The XX02d CLIN pricing reflects the Preplanned Engineering Change for implementation of IPv6.
Labor CLINs
1. Labor category rates provided within Section B Attachment A are fully burdened hourly rates that include wages, fringe benefits, overhead, general and administrative costs and profit.
1. Labor rates apply to all direct labor hours regardless of whether the Contractor or one of its subcontractors or partners performs the labor.
1. Labor rates provided in Section B Attachment A represent non-FAA site rates, unless otherwise indicated.
OCONUS Travel and Shipping CLIN Travel and shipping costs related to FAA OCONUS sites are to be recovered in their entirety using CLIN XX12a. Travel and shipping costs associated with any other contract requirements under any FFP CLINs must be included in that respective CLIN price.
[End of Document]