693KA8-24-R-00012 - Section J Attachment J.02 CDRLs.pdf

PDF 729 KB Posted

Attached to
Engine Generator Systems - Second Additional Answer to Question
Solicitation number
693KA8-24-R-00012
Issued by

About this file

This document is a Contract Data Requirements List (CDRL) that identifies the data items required under the Engine Generator Systems solicitation 693KA8-24-R-00012. The key details include:

The contractor must provide various data products related to the engine generator systems, including monitoring software/firmware, equipment data sheets, dimension drawings, electrical/wiring diagrams, a recommended spare parts list, site spare parts list, support equipment candidates list, spare parts peculiar list, logistics management information, commercial support documentation, a program plan, program management reports, and training materials and evaluations. Submission timelines range from 14 calendar days to 90 calendar days, depending on the specific data item. The data is required to be provided to the Contracting Officer, Power Services Group, Logistics Team, and other specified addressees. The overall contract period of performance is 10 years, consisting of a 2-year base period and four 2-year option periods.

View the file

Other files

File Type Posted
693KA8-24-R-00012 - Section B - Attachment B.1 - Amendment 0002.xlsx XLSX spreadsheet
693KA8-24-R-00012 Amendment 0002 cover sheet.pdf PDF
693KA8-24-R-00012 - Section F - Amendment 0001.pdf PDF
693KA8-24-R-00012 - Section B - Attachment B.1 - Amendment 0001.xlsx XLSX spreadsheet
693KA8-24-R-00012 - Section L - Amendment 0001.pdf PDF
693KA8-24-R-00012 - Section J - Attachment J.01 - Amendment 0001.pdf PDF
693KA8-24-R-00012 - Section C - Amendment 0001.pdf PDF
693KA8-24-R-00012 - Industry Questions_FAA Responses 07022024.pdf PDF
693KA8-24-R-00012 - Amendment 0001 coversheet.pdf PDF
693KA8-24-R-00012 - Section B Attachment B.1.xlsx XLSX spreadsheet
693KA8-24-R-00012 - Section D.pdf PDF
693KA8-24-R-00012 - Section F.pdf PDF
693KA8-24-R-00012 - Section G.pdf PDF
693KA8-24-R-00012 - Section J Attachment J.03 DID L006 - Attachment LMI Requirements Template.xls XLS spreadsheet
693KA8-24-R-00012 - Section J Attachment J.04 Labor Categories.pdf PDF
693KA8-24-R-00012 - Section J Attachment J.06 CDLS Vendor Users Guide.pdf PDF
693KA8-24-R-00012 - Section J Attachment J.09 Equipment Characteristics.xlsx XLSX spreadsheet
693KA8-24-R-00012 - Section J Attachment J.10 Past Performance Questionnaire.pdf PDF
693KA8-24-R-00012 - Section E.pdf PDF
693KA8-24-R-00012 - Section J Attachment J.01 FAA-E_2204E Specification.pdf PDF
693KA8-24-R-00012 - Section J Attachment J.03 DID L006 - Attachment LMI LITE Data Definitions.pdf PDF
693KA8-24-R-00012 - Section J Attachment J.05 FAA-STD-028C.pdf PDF
693KA8-24-R-00012 - Section K.pdf PDF
693KA8-24-R-00012 - Section L Attachment L.1.xlsx XLSX spreadsheet
693KA8-24-R-00012 - Section I.pdf PDF
693KA8-24-R-00012 - Section J Attachment J.0 Index.pdf PDF
693KA8-24-R-00012 - Section J Attachment J.07 Site Acceptance Test (SAT).pdf PDF
693KA8-24-R-00012 - Section L.pdf PDF
693KA8-24-R-00012 - Section M.pdf PDF
693KA8-24-R-00012 - Section A.pdf PDF
693KA8-24-R-00012 - Section B.pdf PDF
693KA8-24-R-00012 - Section C.pdf PDF
693KA8-24-R-00012 - Section H.pdf PDF
693KA8-24-R-00012 - Section J Attachment J.03 DIDs.pdf PDF
693KA8-24-R-00012 - Section J Attachment J.08 Performance Specification.xlsx XLSX spreadsheet
Show all 35

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DD Form 1423-1, Jun 90

CONTRACT DATA REQUIREMENTS LIST

(1 DATA ITEM)

FORM APPROVED OMB

NO. 0704-0188

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY

TDP TM EQUIPMENT DOCUMENTATION & DATA

D. SYSTEM / ITEM E. CONTRACT / PR NO. F. CONTRACTOR

ENGINE GENERATOR SYSTEMS

1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE OF DATA ITEM

E001 MONITORING SOFTWARE/FIRMWARE REMOTE MONITORING

4. AUTHORITY (DATA ACQUISITION

DOCUMENT NO.)

5. CONTRACT REFERENCE 6. REQUIRING OFFICE

DI-FAA-E001 SOW C.3.3.2.1 NAS POWER SERVICES GROUP

POWER INTEGRATION TEAM

7. DD 250 REQUIRED 8. APP CODE 9. DIST STATEMENT REQUIRED 10. FREQUENCY

N/A NONE AS CHANGES OCCUR

11. AS OF DATE 12. DATE OF FIRST SUBMISSION 13. DATE OF SUBSEQUENT SUBMISSION

SEE BLOCK 16 SEE BLOCK 16

14. D I S T R I B U T I O N

B. COPIES B. COPIES

A. ADDRESSEE FINAL A. ADDRESSEE FINAL

DRAFT REG ELECTRONIC DRAFT REG REPRO

CONTRACTING

OFFICER

0 0 1

POWER

SERVICES

GROUP

0 0 1

0 0 0

(A) TOTAL 0 0 2 (B) TOTAL

15. TOTAL OF A & B 2

16. REMARKS: TO ENABLE REMOTE SOFTWARE/FIRMWARE MONITORING, THE CONTRACT MUST SUBMIT ANY SOFTWARE CHANGES FOR

ANY EQUIPMENT PURCHASED FROM THE CONTRACTOR AND OWNED BY THE GOVERNMENT.

BLOCK 10 – ONE TIME SUBMISSION UNLESS EGS OR ATS PROCESSOR/CONTROL AND MONITORING SOFTWARE IS CHANGED.

BLOCK 12 – THE CONTRACTOR MUST PROVIDE SOFTWARE INTERFACE DOCUMENTS WITHIN, 14 CALENDAR DAYS FOLLOWING RECEIPT

OF THE DELIVERY ORDER.

BLOCK 13 – IF AN EGS OR ATS PROCESSOR/CONTROL AND MONITORING SOFTWARE IS CHANGED OR RECONFIGURED THE

CONTRACTOR SHALL UPDATE AND SUBMIT THE REVISED SOFTWARE INTERFACE DOCUMENT.

17. PRICE GROUP: 18. ESTIMATED TOTAL PRICE:

G. PREPARED BY H. DATE I. APPROVED BY J. DATE

EG EQUIPMENT TEAM, AJW-222 AUGUST 15, 2023 MICHAEL ISAAC AJW-221 AUGUST 31, 2023

(1 DATA ITEM)

FORM APPROVED OMB

NO. 0704-0188

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY

TDP TM EQUIPMENT DOCUMENTATION & DATA

D. SYSTEM / ITEM E. CONTRACT / PR NO. F. CONTRACTOR

ENGINE GENERATOR SYSTEMS

1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE OF DATA ITEM

E002 SOFTWARE/FIRMWARE INTERFACE DOCUMENTATION

4. AUTHORITY (DATA ACQUISITION DOCUMENT

NO.)

5. CONTRACT REFERENCE 6. REQUIRING OFFICE

DI-FAA-E002 SOW C.3.3.2.2 NAS POWER SERVICES GROUP POWER

INTEGRATION TEAM

7. DD 250 REQUIRED 8. APP CODE 9. DIST STATEMENT REQUIRED 10. FREQUENCY

N/A NONE AS CHANGES OCCUR

11. AS OF DATE 12. DATE OF FIRST SUBMISSION 13. DATE OF SUBSEQUENT SUBMISSION

SEE BLOCK 16 SEE BLOCK 16

14. D I S T R I B U T I O N

B. COPIES B. COPIES

A. ADDRESSEE FINAL A. ADDRESSEE FINAL

DRAFT REG ELECTRONIC DRAFT REG REPRO

CONTRACTING

OFFICER

0 0 1

POWER

SERVICES

GROUP

0 0 1

(A) TOTAL 0 0 2 (B) TOTAL

15. TOTAL OF A & B 2

16. REMARKS:

THE CONTRACTOR MUST ENSURE CONFIGURATION MANAGEMENT. THE CONTRACT MUST SUBMIT ANY SOFTWARE CHANGES FOR ANY EGS EQUIPMENT SOFTWARE PURCHASED FROM THE CONTRACTOR AND OWNED BY THE GOVERNMENT.

BLOCK 10 – ONE TIME SUBMISSION UNLESS EGS OR ATS PROCESSOR/CONTROL AND MONITORING SOFTWARE IS CHANGED.

BLOCK 12 – THE CONTRACTOR MUST PROVIDE SOFTWARE/FIRMWARE INTERFACE DOCUMENTS WITHIN 14 CALENDAR DAYS FOLLOWING

RECEIPT OF THE DELIVERY ORDER.

BLOCK 13 – IF AN EGS OR ATS PROCESSOR/CONTROL AND MONITORING SOFTWARE IS CHANGED OR RECONFIGURED THE CONTRACTOR

S 14 C D P 17. PRICE GROUP: 18. ESTIMATED TOTAL PRICE:

(1 DATA ITEM)

FORM APPROVED OMB

NO. 0704-0188

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY

X101-X121, X140, X141, X143, X-148-

TDP TM EQUIPMENT DOCUMENTATION & DATA

D. SYSTEM / ITEM E. CONTRACT / PR NO. F. CONTRACTOR

ENGINE GENERATOR SYSTEMS

1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE OF DATA ITEM

E003 EQUIPMENT DATA SHEETS DOCUMENTATION

4. AUTHORITY (DATA ACQUISITION DOCUMENT NO.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE

DI-FAA-E003 THROUGH E009 SOW C.3.3.3 NAS POWER SERVICES GROUP

POWER INTEGRATION TEAM

7. DD 250 REQUIRED 8. APP CODE 9. DIST STATEMENT REQUIRED 10. FREQUENCY

N/A NONE SEE BLOCK 16

11. AS OF DATE 12. DATE OF FIRST SUBMISSION 13. DATE OF SUBSEQUENT SUBMISSION

N/A SEE BLOCK 16 SEE BLOCK 16

14. D I S T R I B U T I O N

B. COPIES B. COPIES

A. ADDRESSEE FINAL A. ADDRESSEE FINAL

DRAFT REG ELECTRONIC DRAFT REG REPRO

CONTRACTING

OFFICER

0 0 1

POWER SERVICES

GROUP

0 0 1

LOGISTICS TEAM 0 0 1

(A) TOTAL 0 0 3 (B) TOTAL

15. TOTAL OF A & B 2

16. REMARKS:

THE CONTRACTOR MUST SUBMIT EQUIPMENT DATA SHEETS FOR CLINS AS IDENTIFIED IN DI-FAA-E003-E006.

BLOCK 10 – WITHIN 30 CALENDAR DAYS FOLLOWING FAA APPROVAL TO PURCHASE NEW EQUIPMENT CONFIGURATIONS.

BLOCK 12 – WITHIN 30 CALENDAR DAYS AFTER CONTRACT AWARD.

BLOCK 13 – WITHIN 30 CALENDAR DAYS FOLLOWING FAA APPROVAL TO PURCHASE NEW EQUIPMENT CONFIGURATIONS.

17. PRICE GROUP: 18. ESTIMATED TOTAL PRICE:

(1 DATA ITEM)

FORM APPROVED OMB

NO. 0704-0188

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY

X101-X121, X138, X140, X141, X143, X148-150

TDP TM EQUIPMENT DOCUMENTATION & DATA

D. SYSTEM / ITEM E. CONTRACT / PR NO. F. CONTRACTOR

ENGINE GENERATOR SYSTEMS

1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE OF DATA ITEM

E004 EQUIPMENT DIMENSION DRAWINGS DOCUMENTATION

4. AUTHORITY (DATA ACQUISITION DOCUMENT NO.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE

DI-FAA-E004 SOW C.3.3.4 NAS POWER SERVICES GROUP

POWER INTEGRATION TEAM

7. DD 250 REQUIRED 8. APP CODE 9. DIST STATEMENT

REQUIRED

10. FREQUENCY

N/A NONE SEE BLOCK 16

11. AS OF DATE 12. DATE OF FIRST SUBMISSION 13. DATE OF SUBSEQUENT SUBMISSION

SEE BLOCK 16 SEE BLOCK 16

14. D I S T R I B U T I O N

B. COPIES B. COPIES

A. ADDRESSEE FINAL A. ADDRESSEE FINAL

DRAFT REG ELECTRONIC DRAFT REG REPRO

CONTRACTING

OFFICER

0 0 1

POWER

SERVICES

GROUP

0 0 1

LOGISTICS TEAM 0 0 1

(A) TOTAL 0 0 3 (B) TOTAL

15. TOTAL OF A & B 2

16. REMARKS:

THE CONTRACTOR MUST SUBMIT EQUIPMENT DIMENSION DRAWINGS FOR CLINS AS IDENTIFIED IN DI-FAA-E003-E006.

BLOCK 10 - WITHIN 30 CALENDAR DAYS FOLLOWING FAA APPROVAL TO PURCHASE NEW EQUIPMENT CONFIGURATIONS.

BLOCK 12 – WITHIN 30 CALENDAR DAYS AFTER CONTRACT AWARD.

BLOCK 13 – WITHIN 30 CALENDAR DAYS FOLLOWING FAA APPROVAL TO PURCHASE NEW EQUIPMENT CONFIGURATIONS.

17. PRICE GROUP: 18. ESTIMATED TOTAL

PRICE:

FORM APPROVED OMB

NO. 0704-0188

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY

X101-X119, X138, X140, X141, X148-150

TDP TM EQUIPMENT DOCUMENTATION & DATA

ENGINE GENERATOR SYSTEMS

1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE OF DATA ITEM

E005 EQUIPMENT BILL OF MATERIALS DOCUMENTATION

4. AUTHORITY (DATA ACQUISITION DOCUMENT NO.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE

DI-FAA-E005 SOW C.3.3.5 NAS POWER SERVICES GROUP

POWER INTEGRATION TEAM

7. DD 250 REQUIRED 8. APP CODE 9. DIST STATEMENT REQUIRED 10. FREQUENCY

N/A NONE SEE BLOCK 16

11. AS OF DATE 12. DATE OF FIRST SUBMISSION 13. DATE OF SUBSEQUENT

SUBMISSION

SEE BLOCK 16 SEE BLOCK 16

14. D I S T R I B U T I O N

B. COPIES B. COPIES

A. ADDRESSEE FINAL A. ADDRESSEE FINAL

DRAFT REG ELECTRONIC DRAFT REG REPRO

CONTRACTING

OFFICER

0 0 1

POWER

SERVICES

GROUP

16. REMARKS:

TO CONTACTOR MUST SUBMIT A BILL OF MATERIALS (BOM)S FOR CLINS IDENTIFIED IN DI-FAA-E003-E006.

BLOCK 10 – WITHIN 30 CALENDAR DAYS FOLLOWING FAA APPROVAL TO PURCHASE NEW EQUIPMENT CONFIGURATIONS.

BLOCK 12 – WITHIN 30 CALENDAR DAYS AFTER CONTRACT AWARD.

BLOCK 13 – WITHIN 30 CALENDAR DAYS FOLLOWING FAA APPROVAL TO PURCHASE NEW EQUIPMENT CONFIGURATIONS.

17. PRICE GROUP: 18. ESTIMATED TOTAL PRICE:

FORM APPROVED OMB

NO. 0704-0188

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY

X101-X120, X138 X140, X141, X143, X148-150

TDP TM EQUIPMENT DOCUMENTATION & DATA

D. SYSTEM / ITEM E. CONTRACT / PR NO. F. CONTRACTOR

ENGINE GENERATOR SYSTEMS

1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE OF DATA ITEM

E006 EQUIPMENT ELECTRICAL/WIRING DIAGRAMS

4. AUTHORITY (DATA ACQUISITION DOCUMENT NO.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE

DI-FAA-E006 SOW C.3.3.6 NAS POWER SERVICES GROUP

POWER INTEGRATION TEAM

7. DD 250 REQUIRED 8. APP CODE 9. DIST STATEMENT

REQUIRED

10. FREQUENCY

N/A NONE SEE BLOCK 16

11. AS OF DATE 12. DATE OF FIRST SUBMISSION 13. DATE OF SUBSEQUENT SUBMISSION

SEE BLOCK 16 SEE BLOCK 16

14. D I S T R I B U T I O N

B. COPIES B. COPIES

A. ADDRESSEE FINAL A. ADDRESSEE FINAL

DRAFT REG ELECTRONIC DRAFT REG REPRO

CONTRACTING

OFFICER

0 0 1

POWER

SERVICES

GROUP

16. REMARKS:

THE CONTRACTOR MUST SUBMIT EQUIPMENT ELECTRICAL/WIRING DIAGRAMS FOR CLINS IDENTIFIED IN DI-FAA-E003-E006.

BLOCK 10 – WITHIN 30 CALENDAR DAYS FOLLOWING FAA APPROVAL TO PURCHASE NEW EQUIPMENT CONFIGURATIONS.

BLOCK 12 – WITHIN 30 CALENDAR DAYS AFTER CONTRACT AWARD.

BLOCK 13 – WITHIN 30 CALENDAR DAYS FOLLOWING FAA APPROVAL TO PURCHASE NEW EQUIPMENT CONFIGURATIONS.

FORM APPROVED OMB

NO. 0704-0188

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY

X130, X132 TDP TM INTEGRATED LOGISTICS SUPPORT

D. SYSTEM / ITEM E. CONTRACT / PR NO. F. CONTRACTOR

Engine Generator Systems

1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE OF DATA ITEM

L001 INTEGRATED SUPPORT PLAN (ISP)

4. AUTHORITY (DATA ACQUISITION DOCUMENT NO.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE

DI-FAA-L001 SOW C.3.4.1.1 NAS POWER SERVICES GROUP

POWER INTEGRATION TEAM

7. DD 250 REQUIRED 8. APP CODE 9. DIST STATEMENT REQUIRED 10. FREQUENCY

N/A N/A NONE ONE/REVISIONS

11. AS OF DATE 12. DATE OF FIRST SUBMISSION 13. DATE OF SUBSEQUENT SUBMISSION

SEE BLOCK 16 SEE BLOCK 16

14. D I S T R I B U T I O N

B. COPIES B. COPIES

A. ADDRESSEE FINAL A. ADDRESSEE FINAL

DRAFT REG ELECTRONIC DRAFT REG REPRO

CONTRACTING

OFFICER

0 0 1

POWER

SERVICES

GROUP

16. REMARKS: THE CONTRACTOR MUST ESTABLISH AND MANAGE AND INTEGRATED SUPPORT PROGRAM (ISP) THAT

PROVIDES INTEGRATED LOGISTICS SUPPORT (ILS) FOR THE EGS PROGRAM

BLOCK 12 – THE CONTRACTOR MUST SUBMIT THE ISP OR THE APPLICABLE PORTIONS OF THEIR ISO 9000 SERIES DOCUMENTATION OR A COPY OF INTERNAL DOCUMENTATION THAT SUPPORTS BOTH THE SCOPE AND INTENT OF THE ISP NLT 14 CALENDAR DAYS AFTER RECEIVING THE DELIVERY ORDER. THE GOVERNMENT WILL REVIEW AND COMMENT OR APPROVE THE ISP, ISO 9000 SERIES DOCUMENTATION, OR INTERNAL CORPORATE

DOCUMENTATION WITHIN 30 CALENDAR DAYS AFTER RECEIPT FROM CONTRACTOR.

BLOCK 13 – THE CONTRACTOR MUST UPDATE AND RESUBMIT THE ISP OR SUBSTITUTED CORPORATE DOCUMENTATION, AS REVISIONS OCCUR OR 14 CALENDAR DAYS FOLLOWING RECEIPT OF GOVERNMENT COMMENTS.

17. PRICE GROUP: 18. ESTIMATED TOTAL PRICE:

FORM APPROVED OMB

NO. 0704-0188

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY

X130, X132, X152 TDP TM INTEGRATED LOGISTICS SUPPORT

D. SYSTEM / ITEM E. CONTRACT / PR NO. F. CONTRACTOR

Engine Generator Systems

1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE OF DATA ITEM

L002 RECOMMENDED SPARE PARTS LIST (RSPL)

4. AUTHORITY (DATA ACQUISITION DOCUMENT NO.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE

DI-FAA-L002 SOW C.3.4.2.1.1 NAS POWER SERVICES GROUP

POWER INTEGRATION TEAM

7. DD 250 REQUIRED 8. APP CODE 9. DIST STATEMENT REQUIRED 10. FREQUENCY

N/A N/A N/A ONE/REVISIONS

11. AS OF DATE 12. DATE OF FIRST SUBMISSION 13. DATE OF SUBSEQUENT SUBMISSION

SEE BLOCK 16 SEE BLOCK 16

14. D I S T R I B U T I O N

B. COPIES B. COPIES

A. ADDRESSEE FINAL A. ADDRESSEE FINAL

DRAFT REG ELECTRONIC DRAFT REG REPRO

CONTRACTING

OFFICER

0 0 1

POWER

SERVICES

GROUP

15. TOTAL OF A & B 3

16. REMARKS: THE CONTRACTOR MUST PROVIDE A RECOMMENDED SPARE PARTS LIST FOR ALL EGS ORDERED UNDER THIS CONTRACT.

BLOCK 10 - ONCE / REVISIONS

Block 12 - THE FIRST RECOMMENDED SPARE PARTS LIST SUBMITTAL IS WITH THE VENDOR’S BID PROPOSAL AS DIRECTED IN CONTRACT SECTION-L. THE GOVERNMENT WILL REVIEW, COMMENT, APPROVE/DISAPPROVE THE RECOMMENDED SPARE PARTS LIST(S) AND PROVIDE THE VENDER WITH COMMENTS DURING THE POST AWARD

CONFERENCE.

Block 13 -THE CONTRACTOR MUST UPDATE AND RESUBMIT THE RECOMMENDED SPARE PARTS LISTS, 90 CALENDAR DAYS PRIOR TO WHEN NEW REVISIONS IN EQUIPMENT OCCUR, AND WHEN THE VENDOR INTRODUCES A

NEW PRODUCT LINE OF EQUIPMENT.

(1 DATA ITEM)

FORM APPROVED OMB

NO. 0704-0188

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY

X130, X132, X152 TDP TM INTEGRATED LOGISTICS SUPPORT

D. SYSTEM / ITEM E. CONTRACT / PR NO. F. CONTRACTOR

Engine Generator Systems

1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE OF DATA ITEM

L003 SITE SPARE PARTS LIST (SSPL)

4. AUTHORITY (DATA ACQUISITION DOCUMENT NO.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE

DI-FAA-L003 SOW C.3.4.2.1.2 NAS POWER SERVICES GROUP

POWER INTEGRATION TEAM

7. DD 250 REQUIRED 8. APP CODE 9. DIST STATEMENT REQUIRED 10. FREQUENCY

N/A N/A N/A As Equipment Changes

11. AS OF DATE 12. DATE OF FIRST SUBMISSION 13. DATE OF SUBSEQUENT SUBMISSION

SEE BLOCK 16 SEE BLOCK 16

14. D I S T R I B U T I O N

B. COPIES B. COPIES

A. ADDRESSEE FINAL A. ADDRESSEE FINAL

DRAFT REG ELECTRONIC DRAFT REG REPRO

CONTRACTING

OFFICER

0 0 1

POWER

SERVICES

GROUP

16. REMARKS: THE CONTRACTOR MUST PROVIDE A RECOMMENDED SPARE PARTS LIST FOR ALL EGS ORDERED UNDER THIS CONTACT.

BLOCK 10 – AS EQUIPMENT CHANGES

BLOCK 12 – THE FIRST RECOMMENDED SPARE PARTS LIST SUBMITTAL IS WITH THE VENDOR’S BID PROPOSAL AS DIRECTED IN CONTRACT SECTION-L. THE GOVERNMENT WILL REVIEW, COMMENT, APPROVE/DISAPPROVE THE RECOMMENDED SITE SPARE PARTS LIST(S) AND PROVIDE THE VENDER WITH COMMENTS DURING THE POST

AWARD CONFERENCE.

BLOCK 13 – THE CONTRACTOR MUST UPDATE AND RESUBMIT THE RECOMMENDED SITE SPARE PARTS LISTS, 90 CALENDAR DAYS PRIOR TO REVISIONS OR MODIFICATIONS IN EXISTING EQUIPMENT, AND WHEN THE VENDOR INTRODUCES A NEW PRODUCT LINE OF EQUIPMENT MODEL(s)

(1 DATA ITEM)

FORM APPROVED OMB

NO. 0704-0188

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY

X130, X132, X152 TDP TM INTEGRATED LOGISTICS SUPPORT

D. SYSTEM / ITEM E. CONTRACT / PR NO. F. CONTRACTOR

Engine Generator Systems

1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE OF DATA ITEM

L004 SUPPORT EQUIPMENT CANDIDATES LIST (SECL)

4. AUTHORITY (DATA ACQUISITION DOCUMENT NO.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE

DI-FAA-L004 SOW C.3.4.2.1.3 NAS POWER SERVICES GROUP POWER

INTEGRATION TEAM

7. DD 250 REQUIRED 8. APP CODE 9. DIST STATEMENT REQUIRED 10. FREQUENCY

N/A N/A N/A As Equipment Changes

11. AS OF DATE 12. DATE OF FIRST SUBMISSION 13. DATE OF SUBSEQUENT SUBMISSION

SEE BLOCK 16 SEE BLOCK 16

14. D I S T R I B U T I O N

B. COPIES B. COPIES

A. ADDRESSEE FINAL A. ADDRESSEE FINAL

DRAFT REG ELECTRONIC DRAFT REG REPRO

CONTRACTING

OFFICER

0 0 1

POWER

SERVICES

GROUP

16. REMARKS: THE CONTRACTOR MUST PROVIDE A SUPPORT EQUIPMENT CANDIDATES FOR ALL EGS ORDERED UNDER THIS CONTRACT.

BLOCK 10 – AS EQUIPMENT CHANGES

BLOCK 12 – THE SUPPORT EQUIPMENT CANDIDATES LIST SUBMITTAL IS WITH THE VENDORS BID PROPOSAL AS DIRECTED IN THE SIR/RFO LECTION L. THE SECL MUST INCLUDE TEST AND TOOLS FOR THE EGS AD ATS MODEL THAT IS LISTED IN THE SIR/RFO SECTION B. THE GOVERNMENT WILL REVIEW, COMMENT, APPROVE/DISAPPROVE THE SUPPORT EQUIPMENT CANDIDATE LIST(S) AND PROVIDE THE VENDOR WITH

COMMENTS DURING THE POST AWARD CONFERENCE.

BLOCK 13 – THE CONTRACTOR MUST UPDATE AND RE-SUBMIT THE SUPPORT EQUIPMENT CANDIDATES LIST(S) 90 CALENDAR DAYS PRIOR TO REVISIONS OR MODIFICATIONS TO EXISTING EGS AND ATS MODEL/UNIT(S). AND WHEN THE VENDOR INTRODUCES A NEW PRODUCT LINE OF EGS OR

ATS MODEL(S).

17. PRICE GROUP: 18. ESTIMATED TOTAL PRICE:

FORM APPROVED OMB

NO. 0704-0188

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY

X130, X132, X152 TDP TM INTEGRATED LOGISTICS SUPPORT

D. SYSTEM / ITEM E. CONTRACT / PR NO. F. CONTRACTOR

Engine Generator Systems

1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE OF DATA ITEM

L005 SPARE PARTS PECULIAR LIST (SPPL)

4. AUTHORITY (DATA ACQUISITION DOCUMENT

NO.)

5. CONTRACT REFERENCE 6. REQUIRING OFFICE

DI-FAA-L005 C.3.4.2.1.4 NAS POWER SERVICES GROUP

POWER INTEGRATION TEAM

7. DD 250 REQUIRED 8. APP CODE 9. DIST STATEMENT REQUIRED 10. FREQUENCY

N/A N/A SEE BLOCK 16

11. AS OF DATE 12. DATE OF FIRST SUBMISSION 13. DATE OF SUBSEQUENT SUBMISSION

SEE BLOCK 16 SEE BLOCK 16 AS REQUIRED

14. D I S T R I B U T I O N

B. COPIES B. COPIES

A. ADDRESSEE FINAL A. ADDRESSEE FINAL

DRAFT REG ELECTRONIC DRAFT REG REPRO

CONTRACTING

OFFICER

0 0 1

POWER

SERVICES

GROUP

(A) TOTAL 0 3 (B) TOTAL

16. REMARKS: THE CONTRACTOR MUST DELIVER A SPARE PARTS PECULIAR LIST DETAILING ALL ITEMS SPECIFIED AS PART-PECULIAR

IN A CONTRACTOR DETERMINED FORMAT.

BLOCK 10 – AS EQUIPMENT CHANGES

BLOCK 12 – THE SUPPORT EQUIPMENT CANDIDATES LIST SUBMITTAL IS WITH THE VENDORS BID PROPOSAL AS DIRECTED IN THE SIR/RFO SECTION L. THE SECL MUST INCLUDE TEST AND TOOLS FOR THE EGS AD ATS MODEL THAT IS LISTED IN THE SIR/RFO SECTION B. THE GOVERNMENT WILL REVIEW, COMMENT, APPROVE/DISAPPROVE THE SUPPORT EQUIPMENT CANDIDATE LIST(S)

AND PROVIDE THE VENDOR WITH COMMENTS DURING THE POST AWARD CONFERENCE.

BLOCK 13 – THE CONTRACTOR MUST UPDATE AND RE-SUBMIT THE SUPPORT EQUIPMENT CANDIDATES LIST(S) 90 CALENDAR DAYS PRIOR TO REVISIONS OR MODIFICATIONS TO EXISTING EGS AND ATS MODEL(S). AND WHEN THE VENDOR INTRODUCES A NEW

PRODUCT LINE OF EGS OR ATS MODEL(S).

(1 DATA ITEM)

FORM APPROVED OMB

NO. 0704-0188

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY

X130, X132, X152 TDP TM INTEGRATED LOGISTICS SUPPORT

D. SYSTEM / ITEM E. CONTRACT / PR NO. F. CONTRACTOR

Engine Generator Systems

1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE OF DATA ITEM

L006 LOGISTICS MANAGEMENT INFORMATION (LMI) DATA PRODUCTS WORKSHEET

4. AUTHORITY (DATA ACQUISITION DOCUMENT

NO.)

5. CONTRACT REFERENCE 6. REQUIRING OFFICE

DI-FAA-L006 C.3.4.4 NAS POWER SERVICES GROUP

POWER INTEGRATION TEAM

7. DD 250 REQUIRED 8. APP CODE 9. DIST STATEMENT REQUIRED 10. FREQUENCY

N/A N/A AS REQUIRED

11. AS OF DATE 12. DATE OF FIRST SUBMISSION 13. DATE OF SUBSEQUENT

SUBMISSION

SEE BLOCK 16 SEE BLOCK 16 AS REQUIRED

14. D I S T R I B U T I O N

B. COPIES B. COPIES

A. ADDRESSEE FINAL A. ADDRESSEE FINAL

DRAFT REG ELECTRONIC DRAFT REG REPRO

CONTRACTING

OFFICER

0 0 1

POWER

SERVICES

GROUP

16. REMARKS THE CONTRACTOR MUST DELIVER TO THE GOVERNMENT THE DATA PRODUCTS CONTAINED IN THE LMI DATA PRODUCTS WORKSHEET, LISTED IN DI-FAA-L006.

BLOCK 10 – AS REQUIRED

BLOCK 11 – WITHIN 90 CALENDAR DAYS AFTER CONTRACT AWARD

BLOCK 12 – WITHIN 90 CALENDAR DAYS AFTER CONTRACT AWARD

BLOCK 13 – AT THE TIME OF TECHNICAL INTERCHANGE MEETINGS, PROGRAM MANAGEMENT REVIEWS, AND INTEGRATED LOGISTICS MANAGEMENT

TEAM MEETINGS.

17. PRICE GROUP: 18. ESTIMATED TOTAL PRICE:

FORM APPROVED OMB

NO. 0704-0188

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY

X130, X132 TDP TM INTEGRATED LOGISTICS SUPPORT

D. SYSTEM / ITEM E. CONTRACT / PR NO. F. CONTRACTOR

Engine Generator Systems

1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE OF DATA ITEM

L007 COMMERCIAL SUPPORT DOCUMENTATION DATA PRODUCTS WORKSHEET

4. AUTHORITY (DATA ACQUISITION DOCUMENT

NO.)

5. CONTRACT REFERENCE 6. REQUIRING OFFICE

DI-FAA-L007 C.3.4.6.1 NAS POWER SERVICES GROUP

POWER INTEGRATION TEAM

7. DD 250 REQUIRED 8. APP CODE 9. DIST STATEMENT REQUIRED 10. FREQUENCY

N/A N/A SEE BLOCK 16

11. AS OF DATE 12. DATE OF FIRST SUBMISSION 13. DATE OF SUBSEQUENT SUBMISSION

SEE BLOCK 16 SEE BLOCK 16 AS REQUIRED

14. D I S T R I B U T I O N

B. COPIES B. COPIES

A. ADDRESSEE FINAL A. ADDRESSEE FINAL

DRAFT REG ELECTRONIC DRAFT REG REPRO

CONTRACTING

OFFICER

0 0 1

POWER

SERVICES

GROUP

16. REMARKS: THE CONTRACTOR MUST PROVIDE DOCUMENTATION AS SPECIFIED IN THE SOW AND DI-FAA-L007.

BLOCK 10 – WHEN DIRECTED BY THE DELIVERY ORDER, THE CONTRACTOR MUST DELIVER WITH EACH ENGINE GENERATOR SET AND ASSOCIATED EQUIPMENT ORDERED, ONE COMPLETE SET OF OPERATIONS AND INSTALLATIONS MANUALS. COST IS INCLUDED IN THE COST OF CLIN(S) X101-X123, X138, X142, X143, X148-X150 AND OPTION CONTRACT PERIODS.

BLOCK 12 - THE CONTRACTOR MUST SUBMIT THE COMMERCIAL SUPPORT DOCUMENTATION FOR ALL EQUIPMENT PURCHASED

UNDER THIS CONTRACT, IN ACCORDANCE WITH THE DELIVERY ORDER.

BLOCK 13 – THE CONTRACTOR MUST UPDATE AND RESUBMIT ALL DOCUMENTATION PREVIOUSLY SUBMITTED 90 CALENDARS DAYS

PRIOR TO THE DELIVERY OF NEW EQUIPMENT.

FORM APPROVED OMB

NO. 0704-0188

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY

X130 TDP TM PROGRAM MANAGEMENT

D. SYSTEM / ITEM E. CONTRACT / PR NO. F. CONTRACTOR

Engine Generator Systems

1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE OF DATA ITEM

M001 PROGRAM PLAN

4. AUTHORITY (DATA ACQUISITION DOCUMENT NO.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE

DI-FAA-M001 SOW C.3.1.2.1 NAS POWER SERVICES GROUP

POWER INTEGRATION TEAM

7. DD 250 REQUIRED 8. APP CODE 9. DIST STATEMENT REQUIRED 10. FREQUENCY

N/A N/A ONE TIME

11. AS OF DATE 12. DATE OF FIRST SUBMISSION 13. DATE OF SUBSEQUENT SUBMISSION

SEE BLOCK 16 AS REQUIRED

14. D I S T R I B U T I O N

B. COPIES B. COPIES

A. ADDRESSEE FINAL A. ADDRESSEE FINAL

DRAFT REG ELECTRONIC DRAFT REG REPRO

CONTRACTING

OFFICER

0 0 1

POWER

SERVICES

(A) TOTAL 0 2 (B) TOTAL

16. REMARKS:

THE CONTRACTOR MUST PROVIDE ITS EXISTING PROGRAM PLAN AS IDENTIFIED IN THE SOW AND DI-FAA-M001

BLOCK 10 – ONE TIME

BLOCK 12 - THE CONTRACTOR MUST SUBMIT THE PROGRAM PLAN 14 CALENDAR DAYS FOLLOWING RECEIPT OF THE DELIVERY

ORDER.

BLOCK 13 - THE CONTRACTOR MUST UPDATE AND RESUBMIT THE PROGRAM PLAN AS REVISIONS TO THE PROGRAM MANAGEMENT

STRUCTURE OCCUR.

FORM APPROVED OMB

NO. 0704-0188

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY

X130 TDP TM PROGRAM MANAGEMENT

D. SYSTEM / ITEM E. CONTRACT / PR NO. F. CONTRACTOR

Engine Generator Systems

1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE OF DATA ITEM

M002 PROGRAM MANAGEMENT REPORTS

4. AUTHORITY (DATA ACQUISITION DOCUMENT NO.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE

DI-FAA-M002 SOW C.3.1.2.2 NAS POWER SERVICES GROUP

POWER INTEGRATION TEAM

7. DD 250 REQUIRED 8. APP CODE 9. DIST STATEMENT REQUIRED 10. FREQUENCY

N/A NONE SEE BLOCK 16

11. AS OF DATE 12. DATE OF FIRST SUBMISSION 13. DATE OF SUBSEQUENT SUBMISSION

SEE BLOCK 16 SEE BLOCK 16 SEE BLOCK 16

14. D I S T R I B U T I O N

B. COPIES B. COPIES

A. ADDRESSEE FINAL A. ADDRESSEE FINAL

DRAFT REG ELECTRONIC DRAFT REG REPRO

CONTRACTING

OFFICER

0 0 1

POWER SERVICES

GROUP

16. REMARKS:

THE CONTRACTOR MUST REPORT AND MAINTAIN A SPREADSHEET OF EQUIPMENT, TRAINING, AND SERVICE TASK ORDERS INDICATING THE STATUS OF EACH AS DEFINED IN DI-FAA-M002. THIS REPORT WILL BE SUBMITTED IN AN EXCEL FORMAT.

BLOCK 10 – MONTHLY, AS DEFINED IN DI-FAA-M002

BLOCK 11 – AS REQUESTED OR DEFINED IN DI-FAA-M002

BLOCK 12 – DATE OF FIRST SUBMISSION MUST BE NLT 14 CALENDARS AFTER THE MONTH AFTER CONTRACT AWARD.

BLOCK 13 – AS REQUESTED OR DEFINED IN DI-FAA-M002.

FORM APPROVED OMB

NO. 0704-0188

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY

X132 TDP TM PROGRAM MANAGEMENT

D. SYSTEM / ITEM E. CONTRACT / PR NO. F. CONTRACTOR

Engine Generator Systems

1. DATA ITEM

NO.

2. TITLE OF DATA ITEM 3. SUBTITLE OF DATA ITEM

M003 CDLS REPORTS

4. AUTHORITY (DATA ACQUISITION DOCUMENT NO.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE

DI-FAA-M003 SOW C.3.5.2.1 NAS POWER SERVICES GROUP

POWER INTEGRATION TEAM

7. DD 250 REQUIRED 8. APP CODE 9. DIST STATEMENT REQUIRED 10. FREQUENCY

N/A NONE SEE BLOCK 16

11. AS OF DATE 12. DATE OF FIRST SUBMISSION 13. DATE OF SUBSEQUENT SUBMISSION

SEE BLOCK 16 SEE BLOCK 16 SEE BLOCK 16

14. D I S T R I B U T I O N

B. COPIES B. COPIES

A. ADDRESSEE FINAL A. ADDRESSEE FINAL

DRAFT REG ELECTRONIC DRAFT REG REPRO

CONTRACTING

OFFICER

0 0 1

POWER

SERVICES

GROUP

16. REMARKS:

THIS REPORT IS A MONTHLY AND CUMULATIVE REPORT OF ALL REPAIRS, REPLACEMENTS, AND THE COST ASSOCIATED WITH THE OPERATIONAL PARTS REQUIRED TO SUPPORT THE PROGRAM. THIS REPORT WILL BE SUBMITTED IN AN EXCEL FORMAT.

BLOCK 10 – THE 14TH DAY OF EACH MONTH.

BLOCK 11 – THE 14TH DAY OF THE MONTH AFTER THE FIRST 30 DAYS OF CONTRACT AWARD.

BLOCK 12 – THE 14TH DAY OF EACH MONTH.

(1 DATA ITEM)

FORM APPROVED OMB

NO. 0704-0188

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY

X131B TDP TM PROGRAM MANAGEMENT

D. SYSTEM / ITEM E. CONTRACT / PR NO. F. CONTRACTOR

Engine Generator Systems

1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE OF DATA ITEM

M004 CONFERENCE AGENDA

4. AUTHORITY (DATA ACQUISITION DOCUMENT NO.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE

DI-FAA-M004 SOW C.3.1.3 NAS POWER SERVICES GROUP POWER

INTEGRATION TEAM

7. DD 250 REQUIRED 8. APP CODE 9. DIST STATEMENT REQUIRED 10. FREQUENCY

N/A N/A N/A AS REQUESTED

11. AS OF DATE 12. DATE OF FIRST SUBMISSION 13. DATE OF SUBSEQUENT SUBMISSION

SEE BLOCK 16 SEE BLOCK 16 AS REQUIRED

14. D I S T R I B U T I O N

B. COPIES B. COPIES

A. ADDRESSEE FINAL A. ADDRESSEE FINAL

DRAFT REG ELECTRONIC DRAFT REG REPRO

CONTRACTING

OFFICER

0 0 1

POWER

SERVICES

GROUP

16. REMARKS:

THE CONTRACTOR MUST FORMULATE AND SUBMIT AN AGENDA FOR CONFERENCES/MEETINGS.

BLOCK 10 - AS REQUESTED.

BLOCK 11 – WITHIN 21 CALENDAR DAYS PRIOR TO EACH SCHEDULED CONFERENCE/MEETING FOR WHICH THE CONTRACTOR HAS

RESPONSIBILITY.

BLOCK 12 - WITHIN 21 CALENDAR DAYS PRIOR TO CONFERENCE/MEETING THE CONTRACTOR HAS RESPONSIBILITY FOR.

BLOCK 13 - AS IDENTIFIED OR REQUESTED BY THE GOVERNMENT.

(1 DATA ITEM)

FORM APPROVED OMB

NO. 0704-0188

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY

X131B TDP TM PROGRAM MANAGEMENT

D. SYSTEM / ITEM E. CONTRACT / PR NO. F. CONTRACTOR

Engine Generator Systems

1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE OF DATA ITEM

M005 CONFERENCE MINUTES

4. AUTHORITY (DATA ACQUISITION DOCUMENT NO.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE

DI-FAA-M005 SOW C.3.1.3 NAS POWER SERVICES GROUP

POWER INTEGRATION TEAM

7. DD 250 REQUIRED 8. APP CODE 9. DIST STATEMENT REQUIRED 10. FREQUENCY

N/A N/A N/A AS REQUESTED

11. AS OF DATE 12. DATE OF FIRST SUBMISSION 13. DATE OF SUBSEQUENT SUBMISSION

SEE BLOCK 16 SEE BLOCK 16 AS REQUIRED

14. D I S T R I B U T I O N

B. COPIES B. COPIES

A. ADDRESSEE FINAL A. ADDRESSEE FINAL

DRAFT REG ELECTRONIC DRAFT REG REPRO

CONTRACTING

OFFICER*

0 0 1

POWER

SERVICES

GROUP

16. REMARKS

THE CONTRACTOR MUST PROVIDE CLERICAL SUPPORT FOR THE RECORDING AND PREPARATION OF MEETING MINUTES. THE GOVERNMENT RESERVES THE RIGHT TO REDLINE, CLARIFY, OR ADD/DELETE ITEMS FROM THE MINUTES BEFORE GRANTING APPROVAL.

BLOCK 10 - AS REQUESTED.

BLOCK 11 – THE CONTRACTOR MUST SUBMIT CONFERENCE/MEETING MINUTES FOR WHICH THE CONTRACTOR HAS RESPONSIBILITY, TO THE GOVERNMENT FOR APPROVAL WITHIN 7 CALENDAR DAYS AFTER EACH CONFERENCE/MEETING.

BLOCK12 – WITHIN 7 CALENDAR DAYS AFTER EACH CONFERENCE/MEETING FOR WHICH THE CONTRACTOR HAS RESPONSIBILITY.

BLOCK 13 – THE CONTRACTOR MUST RESUBMIT MINUTES, IF REQUIRED, TO THE GOVERNMENT FOR APPROVAL WITHIN 7

CALENDAR DAYS AFTER RECEIPT OF REDLINES.

BLOCK 14 – ADDITIONAL COPIES OF THE MINUTES MUST BE DISTRIBUTED PER THE ATTENDANCE LIST.

17. PRICE GROUP: 18. ESTIMATED TOTAL PRICE:

FORM APPROVED OMB

NO. 0704-0188

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY

X130 TDP TM QUALITY

D. SYSTEM / ITEM E. CONTRACT / PR NO. F. CONTRACTOR

Engine Generator Systems

1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE OF DATA ITEM

Q001 QUALITY ASSURANCE PLAN

4. AUTHORITY (DATA ACQUISITION DOCUMENT NO.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE

DI-FAA-Q001 SOW C.3.1.6 NAS POWER SERVICES GROUP

POWER INTEGRATION TEAM

7. DD 250 REQUIRED 8. APP CODE 9. DIST STATEMENT REQUIRED 10. FREQUENCY

N/A N/A N/A AS CHANGES OCCUR

11. AS OF DATE 12. DATE OF FIRST SUBMISSION 13. DATE OF SUBSEQUENT SUBMISSION

N/A SEE BLOCK 16 AS REQUIRED

14. D I S T R I B U T I O N

B. COPIES B. COPIES

A. ADDRESSEE FINAL A. ADDRESSEE FINAL

DRAFT REG ELECTRONIC DRAFT REG REPRO

CONTRACTING

OFFICER

0 0 1

POWER

SERVICES

16. REMARKS:

THE CONTRACTOR MUST PROVIDE A QUALITY ASSURANCE PLAN.

BLOCK 10 - AS CHANGES OCCUR

BLOCK1 2 – THE CONTRACTOR MUST SUBMIT TO THE GOVERNMENT THE CONTRACTOR’S QUALITY ASSURANCE PLAN 30 CALENDAR DAYS AFTER CONTRACT AWARD. IF THE CONTRACTOR IS ISO 9000 CERTIFIED, THE CONTRACTOR WILL BE REQUIRED

TO SUBMIT THEIR CURRENT ISO CERTIFICATION TO THE GOVERNMENT.

BLOCK 13 – THE CONTRACTOR MUST UPDATE AND SUBMIT THE QA PLAN WITHIN 30 CALENDAR DAYS AS REVISIONS TO THE PLAN

OCCUR.

(1 DATA ITEM)

FORM APPROVED OMB

NO. 0704-0188

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY

X130 TDP TM QUALITY

D. SYSTEM / ITEM E. CONTRACT / PR NO. F. CONTRACTOR

Engine Generator Systems

1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE OF DATA ITEM

Q002 CONTRACTORS CONFIGURATION MANAGEMENT PLAN

4. AUTHORITY (DATA ACQUISITION DOCUMENT NO.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE

DI-FAA-Q001 SOW C.3.1.7 NAS POWER SERVICES GROUP

POWER INTEGRATION TEAM

7. DD 250 REQUIRED 8. APP CODE 9. DIST STATEMENT REQUIRED 10. FREQUENCY

N/A N/A N/A AS CHANGES OCCUR

11. AS OF DATE 12. DATE OF FIRST SUBMISSION 13. DATE OF SUBSEQUENT SUBMISSION

N/A SEE BLOCK 16 AS REQUIRED

14. D I S T R I B U T I O N

B. COPIES B. COPIES

A. ADDRESSEE FINAL A. ADDRESSEE FINAL

DRAFT REG ELECTRONIC DRAFT REG REPRO

CONTRACTING

OFFICER*

0 0 1

POWER

SERVICES

TOTAL OF A & B 2

16. REMARKS: THE CONTRACTOR MUST INCORPORATE THE FAA CONFIGURATION MANAGEMENT REQUIREMENTS INTO THEIR ESTABLISHED CONFIGURATION

MANAGEMENT PROGRAM AND REPORTING SYSTEM.

BLOCK 10 – AS CHANGES OCCUR

BLOCK1 2 – THE CONTRACTOR MUST DELIVER TO THE GOVERNMENT A CONFIGURATION MANAGEMENT PLAN 30 CALENDAR DAYS AFTER CONTRACT AWARD. IF THE CONTRACTOR IS ISO 9000 CERTIFIED, THE CONTRACTOR WILL BE REQUIRED TO SUBMIT THEIR CURRENT ISO CERTIFICATION TO THE

GOVERNMENT.

BLOCK 13 – THE CONTRACTOR MUST UPDATE AND SUBMIT THE CM PLAN WITHIN 30 CALENDAR DAYS AFTER REVISIONS TO THE PLAN OCCUR.

17. PRICE GROUP: 18. ESTIMATED TOTAL PRIC

FORM APPROVED OMB NO

0704-0188

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY

TDP TM TRAINING

D. SYSTEM / ITEM E. CONTRACT / PR NO. F. CONTRACTOR

ENGINE GENERATOR SYSTEMS

1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE OF DATA ITEM

T001 POST AWARD TRAINING CONFERENCE REPORT MEETING MINUTES

4. AUTHORITY (DATA ACQUISITION DOCUMENT NO.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE

DI-FAA-T001 SOW C.3.6.5.1 POWER SERVICES GROUP

POWER INTEGRATION TEAM

7. DD 250 REQUIRED 8. APP CODE 9. DIST STATEMENT REQUIRED 10. FREQUENCY

N/A N/A NONE ONE TIME

11. AS OF DATE 12. DATE OF FIRST SUBMISSION 13. DATE OF SUBSEQUENT SUBMISSION

N/A SEE BLOCK 16 AS REQUIRED

14. D I S T R I B U T I O N

B. COPIES B. COPIES

A. ADDRESSEE FINAL A. ADDRESSEE FINAL

DRAFT REG ELECTRONIC DRAFT REG REPRO

CONTRACTING

OFFICER

0 0 1

TRAINING TEAM 0 0 1

POWER

SERVICES

GROUP

COR 1

(A) TOTAL 0 4 (B) TOTAL

15. TOTAL OF A & B 4

16. REMARKS: THE PURPOSE OF THE CONFERENCE IS TO PROVIDE DETAILS AND CLARIFICATION TO THE TRAINING REQUIREMENTS SET FORTH IN THE SOW. GUIDANCE FOR THE

CONTENT CAN BE FOUND IN FAA-STD-028C, PARAGRAPH 2-7 AND 3-6.

NOTE: ONE SOFTWARE COPY OF THE FAA-STD-028C WILL BE PROVIDED BY THE GOVERNMENT.

BLOCK 10 - ONE TIME

BLOCK12 - MINUTES FROM THE POST-AWARD TRAINING CONFERENCE INCLUDING ACTION ITEMS MUST BE SUBMITTED NLT 14 CALENDAR DAYS AFTER THE CONFERENCE.

BLOCK 13 - MINUTES FROM THE TRAINING REVIEW (TR) MEETINGS ARE DUE 14 CALENDAR DAYS AFTER THE MEETING.

BLOCK 14 – EMAIL EACH ADDRESSEE A SOFTCOPY OF THE MINUTES FROM THE POST-AWARD TRAINING CONFERENCE OR TRAINING REVIEW MEETING WITHIN 14 CALENDAR DAYS

AFTER POST AWARD MEETING OR TRAINING MEETING.

17. PRICE GROUP: 18. ESTIMATED TOTAL PRICE

FORM APPROVED OMB NO.

0704-0188

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY

TDP TM TRAINING

D. SYSTEM / ITEM E. CONTRACT / PR NO. F. CONTRACTOR

ENGINE GENERATOR SYSTEMS

1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE OF DATA ITEM

T002 PERSONAL QUALIFICATIONS REPORT

4. AUTHORITY (DATA ACQUISITION DOCUMENT NO.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE

FAA-STD-028C (DID-1) SOW C.3.6.4.1 POWER SERVICES GROUP

POWER INTEGRATION TEAM

7. DD 250 REQUIRED 8. APP CODE 9. DIST STATEMENT REQUIRED 10. FREQUENCY

N/A N/A NONE SEE BLOCK 16

11. AS OF DATE 12. DATE OF FIRST SUBMISSION 13. DATE OF SUBSEQUENT SUBMISSION

N/A SEE BLOCK 16 SEE BLOCK 16

14. D I S T R I B U T I O N

B. COPIES B. COPIES

A. ADDRESSEE FINAL A. ADDRESSEE FINAL

DRAFT REG ELECTRONIC DRAFT REG REPRO

CONTRACTING

OFFICER

0 0 1

TRAINING TEAM 0 0 1

POWER

SERVICES

GROUP

COR 0 0 1

16. REMARKS

GUIDANCE FOR CONTENT CAN BE FOUND IN FAA-STD-028C, PERSONAL QUALIFICATIONS REPORT, CHAPTER 2, AND APPENDIX 1. DID-001

(PAGE 45).

NOTE: ONE SOFTWARE COPY OF THE FAA-STD-028C WILL BE PROVIDED BY THE GOVERNMENT.

BLOCK 10 - WHEN INSTRUCTORS LEAVE OR NEW INSTRUCTORS ARE HIRED.

BLOCK 12 - ORIGINAL SUBMITTAL 14 CALENDAR DAYS FROM RECEIPT OF DELIVERY ORDER.

BLOCK 13 - WITHIN 14 CALENDAR DAYS FOLLOWING RECEIPT OF GOVERNMENT REVIEW COMMENTS.

BLOCK 14 – EMAIL ANY SUBSEQUENT RE-SUBMISSION TO EACH ADDRESSEE.

17. PRICE GROUP: 18. ESTIMATED TOTAL PRICE:

FORM APPROVED OMB NO.

0704-0188

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY

TDP TM TRAINING

ENGINE GENERATOR SYSTEMS

1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE OF DATA ITEM

T003 TASK AND SKILLS ANALYSES (TASA) REPORT REPORT TASA FOR SECOND LEVEL

ENGINEERING TRAINING COURSE (SLETC)

4. AUTHORITY (DATA ACQUISITION DOCUMENT NO.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE

FAA-STD-028C (DID-2) SOW C.3.6.4.2 POWER SERVICES GROUP

POWER INTEGRATION TEAM

7. DD 250 REQUIRED 8. APP CODE 9. DIST STATEMENT REQUIRED 10. FREQUENCY

N/A N/A NONE SEE BLOCK 16

11. AS OF DATE 12. DATE OF FIRST SUBMISSION 13. DATE OF SUBSEQUENT SUBMISSION

N/A SEE BLOCK 16 SEE BLOCK 16

14. D I S T R I B U T I O N

B. COPIES B. COPIES

A. ADDRESSEE FINAL A. ADDRESSEE FINAL

DRAFT REG ELECTRONIC DRAFT REG REPRO

CONTRACTING

OFFICER

0 0 1

TRAINING TEAM 0 0 1

POWER

SERVICES

GROUP

16. REMARKS: GUIDANCE FOR CONTENT CAN BE FOUND IN FAA-STD-028C, CHAPTER 4 AND APPENDIX 1, DID-002 (PAGE 49).

NOTE: ONE SOFTWARE COPY OF FAA-STD-028C WILL BE PROVIDED BY THE GOVERNMENT.

BLOCK 10 – ORIGINAL AND TWO RE-SUBMITTALS.

BLOCK 12 - ORIGINAL SUBMITTAL 45 CALENDAR DAYS FROM RECEIPT OF DELIVERY ORDER.

BLOCK 13 - WITHIN 14 CALENDAR DAYS FOLLOWING RECEIPT OF FAA REVIEW COMMENTS.

FINAL VERSION SUBMITTED PRIOR TO CDRL T013 AND FAA-STD-028C, DID-016, FIRST COURSE CONDUCT.

BLOCK 14 – EMAIL EACH ADDRESSEE ONE SOFTCOPY OF THE ORIGINAL AND RE-SUBMITTAL OF THE TASK AND SKILLS ANALYSIS.

REPORT.

17. PRICE GROUP: 18. ESTIMATED TOTAL PRICE:

FORM APPROVED OMB NO.

0704-0188

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY

TDP TM TRAINING

T004 TRAINING DEVELOPMENT PLAN TRAINING DEVELOPMENT PLAN FOR SECOND LEVEL

ENGINEERING TRAINING COURSE (SLETC)

4. AUTHORITY (DATA ACQUISITION DOCUMENT NO.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE

FAA-STD-028C (DID-005) SOW C.3.6.4.6 POWER SERVICES GROUP

POWER INTEGRATION TEAM

7. DD 250 REQUIRED 8. APP CODE 9. DIST STATEMENT REQUIRED 10. FREQUENCY

N/A N/A NONE SEE BLOCK 16

11. AS OF DATE 12. DATE OF FIRST SUBMISSION 13. DATE OF SUBSEQUENT SUBMISSION

N/A SEE BLOCK 16 SEE BLOCK 16

14. D I S T R I B U T I O N

B. COPIES B. COPIES

A. ADDRESSEE FINAL A. ADDRESSEE FINAL

DRAFT REG ELECTRONIC DRAFT REG REPRO

CONTRACTING

OFFICER

0 0 1

TRAINING TEAM 0 0 1

POWER

SERVICES

GROUP

16. REMARKS

GUIDANCE FOR CONTENT CAN BE FOUND IN FAA-STD-028C, CHAPTER 7, APPENDIX 1, DID-005 (PAGE 69).

NOTE: ONE SOFTWARE COPY OF THE FAA-STD-028C WILL BE PROVIDED BY THE GOVERNMENT.

BLOCK 10 – ORIGINAL AND TWO-RE-SUBMITTALS.

BLOCK 12 - ORIGINAL SUBMITTAL 30 CALENDAR DAYS FROM RECEIPT OF DELIVERY ORDER.

BLOCK 13 – TWO RE-SUBMITTALS, 14 CALENDAR DAYS AFTER RECEIPT AND REVIEW COMMENTS FROM THE FAA.

17. PRICE GROUP: 18. ESTIMATED TOTAL PRICE:

(1 DATA ITEM)

FORM APPROVED OMB NO.

0704-0188

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY

TDP TM TRAINING

T005 COURSE DESIGN GUIDE COTS TRAINING MATERIALS REPORT FOR SECOND

LEVEL ENGINEERING TRAINING COURSE (SLETC)

4. AUTHORITY (DATA ACQUISITION DOCUMENT NO.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE

FAA-STD-028C (DID-006) SOW C.3.6.4.6 POWER SERVICES GROUP

POWER INTEGRATION TEAM

7. DD 250 REQUIRED 8. APP CODE 9. DIST STATEMENT REQUIRED 10. FREQUENCY

N/A N/A NONE SEE BLOCK 16

11. AS OF DATE 12. DATE OF FIRST SUBMISSION 13. DATE OF SUBSEQUENT SUBMISSION

N/A SEE BLOCK 16 SEE BLOCK 16

14. D I S T R I B U T I O N

B. COPIES B. COPIES

A. ADDRESSEE FINAL A. ADDRESSEE FINAL

DRAFT REG ELECTRONIC DRAFT REG REPRO

CONTRACTING

OFFICER

0 0 1

TRAINING TEAM 0 0 1

POWER

SERVICES

GROUP

16. REMARKS: GUIDANCE FOR CONTENT CAN BE FOUND IN FAA-STD-28C, CHAPTER 7 AND APPENDIX 1, DID-006 (PAGE 75).

NOTE: ONE SOFTWARE COPY OF THE FAA-STD-028C, CHAPTER 7 AND APPENDIX 1, DID-006 (PAGE 75).

BLOCK 10 – ORIGINAL AND TWO RE-SUBMITTALS.

BLOCK 12 - ORIGINAL SUBMITTAL 30 CALENDAR DAYS FROM RECEIPT OF DELIVERY ORDER.

BLOCK 13 – TWO RE-SUBMITTALS, 14 CALENDAR DAYS AFTER RECEIPT OF REVIEW COMMENTS FROM THE FAA.

FINAL VERSION MUST BE SUBMITTED PRIOR TO CDRL T013, DID-16 FIRST COURSE CONDUCT.

BLOCK 14 – DELIVER TO EACH ADDRESSEE ONE SOFTCOPY.

17. PRICE GROUP: 18. ESTIMATED TOTAL PRICE:

FORM APPROVED OMB NO.

0704-0188

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY

TDP TM TRAINING

T006 CLASSROOM TRAINING MATERIALS COTS TRAINING MATERIALS REPORT FOR SECOND

LEVEL ENGINEERING TRAINING COURSE (SLETC)

4. AUTHORITY (DATA ACQUISITION DOCUMENT NO.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE

FAA-STD-028C (DID-008) C.3.6.4.6 POWER SERVICES GROUP

POWER INTEGRATION TEAM

7. DD 250 REQUIRED 8. APP CODE 9. DIST STATEMENT REQUIRED 10. FREQUENCY

N/A N/A NONE SEE BLOCK 16

11. AS OF DATE 12. DATE OF FIRST SUBMISSION 13. DATE OF SUBSEQUENT SUBMISSION

N/A SEE BLOCK 16 SEE BLOCK 16

14. D I S T R I B U T I O N

B. COPIES B. COPIES

A. ADDRESSEE FINAL A. ADDRESSEE FINAL

DRAFT REG ELECTRONIC DRAFT REG REPRO

CONTRACTING

OFFICER

0 0 1

TRAINING TEAM 0 0 1

POWER

SERVICES

GROUP

16. REMARKS: GUIDANCE FOR CONTENT CAN BE FOUND IN FAA-STD-028C, CHAPTER 8 AND ATTACHMENT 1, DID-008 (PAGE 93).

NOTE: ONE SOFTWARE COPY OF THE FAA-STD-028C WILL BE PROVIDED BY THE GOVERNMENT.

BLOCK 10 – ORIGINAL AND TWO RE-SUBMITTALS.

BLOCK 12 - ORIGINAL SUBMITTAL 90 CALENDAR DAYS FROM RECEIPT OF DELIVERY ORDER.

BLOCK 13 – RE-SUBMITTALS, 14 CALENDAR DAYS AFTER RECEIPT OF REVIEW COMMENTS, FINAL VERSION SUBMITTED PRIOR TO CDRL T-013, DI-FAA-016, FIRST COURSE CONDUCT.

BLOCK 14 – DELIVER TO EACH ADDRESSEE ONE SOFTCOPY.

17. PRICE GROUP: 8. ESTIMATED TOTAL PRICE:

(1 DATA ITEM)

FORM APPROVED OMB NO.

0704-0188

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY

TDP TM TRAINING

T007 TEST WRITTEN AND PERFORMANCE Test FOR SECOND LEVEL ENGINEERING TRAINING

COURSE (SLETC)

4. AUTHORITY (DATA ACQUISITION DOCUMENT NO.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE

FAA-STD-028C (DID-007) SOW C.3.6.4.5 POWER SERVICES GROUP

POWER INTEGRATION TEAM

7. DD 250 REQUIRED 8. APP CODE 9. DIST STATEMENT REQUIRED 10. FREQUENCY

N/A N/A NONE SEE BLOCK 16

11. AS OF DATE 12. DATE OF FIRST SUBMISSION 13. DATE OF SUBSEQUENT SUBMISSION

N/A SEE BLOCK 16 SEE BLOCK 16

14. D I S T R I B U T I O N

B. COPIES B. COPIES

A. ADDRESSEE FINAL A. ADDRESSEE FINAL

DRAFT REG ELECTRONIC DRAFT REG REPRO

CONTRACTING

OFFICER

0 0 1

TRAINING TEAM 0 0 1

POWER

SERVICES

GROUP

16. REMARKS GUIDANCE FOR CONTENT CAN BE FOUND IN FAA-STD-028C, CHAPTER 7 AND APPENDIX 1, DI-FAA-007 (PAGE 85).

NOTE: ONE SOFTWARE COPY OF THE FAA-STD-028C WILL BE PROVIDED BY THE GOVERNMENT.

BLOCK 10 – ORIGINAL AND TWO RE-SUBMITTALS.

BLOCK 12 - ORIGINAL SUBMITTAL 30 CALENDAR DAYS FROM RECEIPT OF DELIVERY ORDER.

BLOCK 13 – RE-SUBMITTALS, 14 CALENDAR DAYS AFTER RECEIPT OF FAA REVIEW COMMENTS.

BLOCK 14 – DELIVER TO EACH ADDRESSEE ONE SOFTCOPY.

17. PRICE GROUP: 18. ESTIMATED TOTAL PRICE:

FORM APPROVED OMB NO.

0704-0188

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY

TDP TM TRAINING

T008 DELIVERY OF STUDENT WELCOME PACKAGES

4. AUTHORITY (DATA ACQUISITION DOCUMENT NO.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE

SOW SOW C.3.6.4.7 POWER SERVICES GROUP

POWER INTEGRATION TEAM

7. DD 250 REQUIRED 8. APP CODE 9. DIST STATEMENT REQUIRED 10. FREQUENCY

N/A N/A NONE SEE BLOCK 16

11. AS OF DATE 12. DATE OF FIRST SUBMISSION 13. DATE OF SUBSEQUENT SUBMISSION

N/A SEE BLOCK 16 SEE BLOCK 16

14. D I S T R I B U T I O N

B. COPIES B. COPIES

A. ADDRESSEE FINAL A. ADDRESSEE FINAL

DRAFT REG ELECTRONIC DRAFT REG REPRO

CONTRACTING

OFFICER*

0 0 1

TRAINING TEAM 0 0 1

POWER

SERVICES

GROUP

16. REMARKS: GUIDANCE FOR CONTENT CAN BE FOUND IN THE STATEMENT OF WORK, SECTION C.3.6.4.7.

BLOCK 10 – EMAILED 30 CALENDARS BEFORE STUDENT(S) ATTEND FACTORY TRAINING.

A FACTORY TRAINING DELIVERY (TASK) ORDER WILL INITIATE NEED FOR STUDENT WELCOME PACKAGES.

BLOCK 12 – SUBMIT DRAFT WELCOME PACKAGE AT THE POST AWARD TRAINING CONFERENCE.

BLOCK 13 – REVISE AND SUBMIT FOR FAA REVIEW AND COMMENT WHEN INFORMATION CONTAINED IN THE WELCOME PACKAGE IS

OBSOLETE.

BLOCK 14 – DELIVER TO EACH ADDRESSEE ONE SOFTCOPY.

(1 DATA ITEM)

FORM APPROVED OMB NO.

0704-0188

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY

TDP TM TRAINING

D. SYSTEM / ITEM E. CONTRACT / PR NO. F. CONTRACTOR

T

T009 CONTRACTOR’S PRESENTATION CP FOR SECOND LEVEL ENGINEERING TRAINING

COURSE (SLETC)

4. AUTHORITY (DATA ACQUISITION DOCUMENT NO.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE

FAA-STD-028C (DID-014) SOW C.3.6.4.8.1 POWER SERVICES GROUP

POWER INTEGRATION TEAM

7. DD 250 REQUIRED 8. APP CODE 9. DIST STATEMENT REQUIRED 10. FREQUENCY

N/A N/A NONE SEE BLOCK 16

11. AS OF DATE 12. DATE OF FIRST SUBMISSION 13. DATE OF SUBSEQUENT SUBMISSION

N/A SEE BLOCK 16 SEE BLOCK 16

14. D I S T R I B U T I O N

B. COPIES B. COPIES

A. ADDRESSEE FINAL A. ADDRESSEE FINAL

DRAFT REG ELECTRONIC DRAFT REG REPRO

CONTRACTING

OFFICER

0 0 1

TRAINING TEAM 0 0 1

POWER

SERVICES

GROUP

16. REMARKS GUIDANCE FOR CONTENT CAN BE FOUND IN FAA-STD-028C, CHAPTER 8 AND APPENDIX DID-014 (PAGE 133).

NOTE: THE CONTRACTORS PRESENTATION IS AN ABBREVIATED VERSION OF THE ACTUAL TRAINING COURSE. PRIOR TO PRESENTING THE COURSE TO FAA EVALUATIONS, THE CONTRACTOR WILL SUBMIT SUPPORTING DOCUMENTATION.

NOTE: ONE SOFTWARE COPY OF FAA-STD-028C WILL BE PROVIDED BY THE GOVERNMENT.

BLOCK 12 - THE CONTRACTOR MUST SUBMIT THE DELIVERABLE TO THE FAA FOR REVIEW, NO LATER THAN 30 CALENDARS DAYS PRIOR

TO THE SCHEDULED PRESENTATION.

BLOCK 13 – RE-SUBMIT DELIVERABLES DURING OPERATIONAL TRYOUT, INCORPORATING FAA COMMENTS INTO THE SUBMITTAL.

BLOCK 14 - DELIVER TO EACH ADDRESSEE ONE SOFTCOPY.

17. PRICE GROUP: 18. ESTIMATED TOTAL PRICE:

(1 DATA ITEM)

FORM APPROVED OMB NO.

0704-0188

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY

TDP TM TRAINING

T010 OPERATIONAL TRYOUT OT FOR SECOND LEVEL ENGINEERING TRAINING

COURSE (SLETC)

4. AUTHORITY (DATA ACQUISITION DOCUMENT NO.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE

FAA-STD-028C (DID-015) SOW C.3.6.4.8.2 POWER SERVICES GROUP

POWER INTEGRATION TEAM

7. DD 250 REQUIRED 8. APP CODE 9. DIST STATEMENT REQUIRED 10. FREQUENCY

N/A N/A NONE ONE TIME

11. AS OF DATE 12. DATE OF FIRST SUBMISSION 13. DATE OF SUBSEQUENT SUBMISSION

N/A SEE BLOCK 16 SEE BLOCK 16

14. D I S T R I B U T I O N

B. COPIES B. COPIES

A. ADDRESSEE FINAL A. ADDRESSEE FINAL

DRAFT REG ELECTRONIC DRAFT REG REPRO

CONTRACTING

OFFICER*

0 0 1

TRAINING TEAM 0 0 1

POWER

SERVICES

GROUP

0 0 1

COR 1

(A) TOTAL 0 4 (B) TOTAL

15. TOTAL OF A & B 2

16. REMARKS

GUIDANCE FOR CONTENT CAN BE FOUND IN FAA-STD-028C, CHAPTER 8 AND APPENDIX A, DID-015 (PAGE 135).

NOTE: THE CONTRACTOR’S OPERATIONAL TRYOUT IS APPROXIMATELY 1.5 TIMES THE PROPOSED COURSE LENGTH. PRIOR TO PREFORMING THE OPERATIONAL TRYOUT FOR THE FAA EVALUATORS, THE CONTRACTOR WILL SUBMIT SUPPORTING DOCUMENTATION, NOTE: ONE SOFTWARE COPY OF THE FAA-STD-028C WILL BE PROVIDED BY THE GOVERNMENT.

BLOCK 12 – SUBMIT PLAN AND ALL INSTRUCTIONAL MATERIAL TO THE FAA NLT 21 CALENDAR DAYS PRIOR TO SCHEDULED OPERATIONAL TRYOUT. THE INSTRUCTIONAL MATERIAL IS REVISED COURSE MATERIAL AFTER PRESENTING THE CONTRACTOR’S PRESENTATION AND

RECEIVING FAA REVIEW COMMENTS.

BLOCK 13 – RE-SUBMIT DELIVERABLES DURING OPERATIONAL TRYOUT THAT INCORPORATES FAA REVIEW COMMENTS.

BLOCK 14 - DELIVER TO EACH ADDRESSEE ONE SOFTCOPY OF COURSE MATERIALS WHEN REQUESTED BY THE GOVERNMENT.

* LTO - LETTER OF TRANSMITTAL ONLY

(1 DATA ITEM)

FORM APPROVED OMB NO.

0704-0188

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY

TDP TM TRAINING

T011 FIRST COURSE CONDUCT FCC FOR SECOND LEVEL ENGINEERING TRAINING

COURSE (SLETC)

4. AUTHORITY (DATA ACQUISITION DOCUMENT NO.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE

FAA-STD-028C (DID-016) SOW C.3.6.4.8.3 POWER SERVICES GROUP

POWER INTEGRATION TEAM

7. DD 250 REQUIRED 8. APP CODE 9. DIST STATEMENT REQUIRED 10. FREQUENCY

N/A N/A NONE ONE TIME

11. AS OF DATE 12. DATE OF FIRST SUBMISSION 13. DATE OF SUBSEQUENT SUBMISSION

N/A SEE BLOCK 16 SEE BLOCK 16

14. D I S T R I B U T I O N

B. COPIES B. COPIES

A. ADDRESSEE FINAL A. ADDRESSEE FINAL

DRAFT REG ELECTRONIC DRAFT REG REPRO

CONTRACTING

OFFICER*

0 0 1

TRAINING TEAM 0 0 1

POWER

SERVICES

GROUP

0 0 1

COR 1

(A) TOTAL 0 4 (B) TOTAL

15. TOTAL OF A & B 4

16. REMARKS:

GUIDANCE FOR CONTENT CAN BE FOUND IN FAA-STD-028C, CHAPTER 9 AND APPENDIX 1, DID-016.

NOTE: FIRST COURSE CONDUCT IS THE FIRST FULL LENGTH COURSE TAUGHT BY THE CONTRACTOR.

PRIOR TO PREFORMING THE FIRST COURSE CONDUCT THE CONTRACTOR MUST SUBMIT DELIVERABLES.

NOTE: ONE SOFTWARE COPY OF THE FAA-STD-028C WILL BE PROVIDED BY THE GOVERNMENT.

BLOCK 12 – SUBMIT PLAN FOR DELIVERABLE AS REQUIRED IN DI-FAA-D016, NLT 30 CALENDARS DAYS PRIOR TO THE SCHEDULED FIRST COURSE CONDUCT. BEFORE SUBMITTING DOCUMENTS, REVISE DOCUMENTS BY INCORPORATING FAA REVIEW COMMENTS GENERATED FORM THE OPERATIONAL TRYOUT. THESE DELIVERABLES MUST INCLUDE THE FINAL TASA AND COURSE DESIGN GUIDE.

BLOCK 13 – RE-SUBMIT REVISED DOCUMENTS THAT INCORPORATES FAA REVIEW COMMENTS TO THE FAA, 14 CALENDAR DAYS FOLLOWING

RECEIPT OF FIRST COURSE CONDUCT.

BLOCK 14 - DELIVER TO EACH ADDRESSEE ONE SOFTCOPY OF COURSE MATERIALS.

* LTO - LETTER OF TRANSMITTAL ONLY

17. PRICE GROUP: 18. ESTIMATED TOTAL PRICE:

FORM APPROVED OMB NO.

0704-0188

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY

TDP TM TRAINING

T012 END-OF-COURSE EVALUATIONS

4. AUTHORITY (DATA ACQUISITION DOCUMENT NO.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE

FAA-STD-028C Chap. 1 SOW C.3.6.4.9.1 POWER SERVICES GROUP

POWER INTEGRATION TEAM

7. DD 250 REQUIRED 8. APP CODE 9. DIST STATEMENT REQUIRED 10. FREQUENCY

N/A N/A NONE FOLLOWING EACH COURSE

COMPLETION

11. AS OF DATE 12. DATE OF FIRST SUBMISSION 13. DATE OF SUBSEQUENT SUBMISSION

N/A SEE BLOCK 16 SEE BLOCK 16

14. D I S T R I B U T I O N

B. COPIES B. COPIES

A. ADDRESSEE FINAL A. ADDRESSEE FINAL

DRAFT REG ELECTRONIC DRAFT REG REPRO

CONTRACTING

OFFICER

0 0 1

TRAINING TEAM 0 0 1

POWER

SERVICES

GROUP

0 0 1

COR 1

(A) TOTAL 0 4 (B) TOTAL

15. TOTAL OF A & B 4

16. REMARKS:

GUIDANCE FOR CONTENT CAN BE FOUND IN FAA-STD-028C, CHAPTER 1.

NOTE: ONE SOFTWARE COPY OF THE FAA-STD-028C WILL BE PROVIDED BY THE GOVERNMENT.

BLOCK 10 - FOLLOWING EACH COURSE COMPLETION.

BLOCK 12 - END OF COURSE EVALUATIONS MUST BE SUBMITTED NLT SEVEN (7) CALENDARS DAYS AFTER COMPLETION OF A CLASS.

BLOCK 13 - END OF COURSE EVALUATIONS MUST BE SUBMITTED NLT SEVEN (7) CALENDARS DAYS AFTER COMPLETION OF A CLASS.

BLOCK 14 - DELIVER TO EACH ADDRESSEE ONE HARD COPY OF THE FAA COURSE EVALUATION NLT SEVEN (7) CALENDAR DAYS AFTER

COURSE COMPLETION.

(1 DATA ITEM)

FORM APPROVED OMB NO.

0704-0188

A. CONTRACT LINE-ITEM NO. B. EXHIBIT C. CATEGORY

TDP TM TRAINING

T013 END OF COURSE EXAMINATIONS

4. AUTHORITY (DATA ACQUISITION DOCUMENT NO.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE

FAA-STD-028C (DID-019) SOW C.3.6.4.9.2 POWER SERVICES GROUP

POWER INTEGRATION TEAM

7. DD 250 REQUIRED 8. APP CODE 9. DIST STATEMENT REQUIRED 10. FREQUENCY

N/A N/A NONE FOLLOWING EACH COURSE

COMPLETION

11. AS OF DATE 12. DATE OF FIRST SUBMISSION 13. DATE OF SUBSEQUENT SUBMISSION

N/A SEE BLOCK 16 AS REQUIRED

14. D I S T R I B U T I O N

B. COPIES B. COPIES

A. ADDRESSEE FINAL A. ADDRESSEE FINAL

DRAFT REG ELECTRONIC DRAFT REG REPRO

CONTRACTING

OFFICER

0 0 1

TRAINING TEAM 0 0 1

POWER

SERVICES

GROUP

16. REMARKS: GUIDANCE FOR CONTENT CAN BE FOUND IN FAA-STD-028C, CHAPTER 11.

NOTE: ONE SOFTWARE COPY OF THE FAA-STD-028C WILL BE PROVIDED BY THE GOVERNMENT.

BLOCK 10 - FOLLOWING EACH COURSE COMPLETION.

BLOCK 12 - END OF COURSE EXAMINATIONS MUST BE SUBMITTED NLT SEVEN (7) CALENDARS DAYS AFTER COMPLETION OF A CLASS.

BLOCK 13 - END OF COURSE EXAMINATIONS MUST BE SUBMITTED NLT SEVEN (7) CALENDARS DAYS AFTER COMPLETION OF A CLASS.

BLOCK 14 - DELIVER TO EACH ADDRESSEE ONE HARD COPY OF THE FAA COURSE EXAMINATIONS AND A STUDENT SCORE SUMMARY

NLT SEVEN (7) CALENDAR DAYS AFTER COURSE COMPLETION.

File details come from the government source that posted it. Updated .